Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations...
-
Upload
melvyn-holland -
Category
Documents
-
view
220 -
download
3
Transcript of Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations...
![Page 1: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/1.jpg)
Real-Time Transmission Congestion Management & Market Effects
Chad Thompson, Manager, Operations Support, ERCOTJeff Gilbertson, Sr Market Operations Analyst, ERCOT
![Page 2: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/2.jpg)
2
Objectives
• Identify what defines a constraint in the ERCOT system.
• Identify which ERCOT application dispatches generation to resolve constraint overloads.
• Identify the types of Constraint Management Plans as detailed in the ERCOT Nodal Protocols.
![Page 3: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/3.jpg)
3
Objectives
• Identify the time-frame in which all Congestion Management Plans are intended to resolve loading below Emergency Ratings.
• Identify where Congestion Management Plans are posted to the Market
• Identify the ERCOT application whose goal is to minimize generation costs while also respecting transmission constraints.
![Page 4: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/4.jpg)
4
Objectives
• Identify when the transmission network is “invisible” to Security Constrained Economic Dispatch (SCED).
• Identify the condition when a constraint Shadow Price is zero dollars ($0)
![Page 5: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/5.jpg)
5
Congestion Management:Real-Time
Chad Thompson
![Page 6: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/6.jpg)
6
Congestion Basics
• Equipment Ratings– Normal/Continuous– Emergency/2-Hour– Loadshed/15-Minute
• Dynamic Line Ratings– Temperature-adjusted based on ambient temperature– TSPs submit a static ratings table that is tied to the
ERCOT weather forecast– TSPs also have the option to submit a rating via ICCP
telemetry – MVA, Amps, Temperature
• All Autotransformers and Transmission lines have 3 ratings in the model; some may be the same
![Page 7: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/7.jpg)
7
Congestion Basics
![Page 8: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/8.jpg)
8
Congestion Basics
• ERCOT Operates to “N-1” Contingency Criteria• Contingencies include the loss of
Autotransformers, Transmission Lines and Generation Units
• N-1 congestion *generally* based on the Emergency Rating– Base Case congestion based on the Normal Rating
• What is a constraint?– An N-1 contingency and overloaded transmission
element pair– A base case, or real-time transmission element
overload
![Page 9: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/9.jpg)
9
Constraint Management
• How are constraints identified?– ERCOT executes its State Estimator and performs a
Real-Time Contingency Analysis (RTCA) every 5 minutes– RTCA produces a list of constraints which is updated
every time it executes
• How are constraints used?– ERCOT executes a Security Constrained Economic
Dispatch (SCED) market every 5 minutes– SCED dispatches generation to resolve constraint
overloads– Only those constraints passed from RTCA into SCED are
considered in congestion management
![Page 10: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/10.jpg)
10
• Does this mean that not all constraints are activated?
• What are the criteria for activating constraints?– Correct modeling, telemetry, & solution– Not redundant– Not Private Use Network Equipment– 2 % or greater Generator Shift Factor*– Constraint Management Plans (CMP)
Constraint Management
“Only those constraints passed from RTCA into SCED are considered in congestion management”
![Page 11: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/11.jpg)
11
Constraint Management
• How can I find out why a constraint was not activated?– MIS Secure Area under Grid Transmission
Real-Time Operations
![Page 12: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/12.jpg)
12
Constraint Management
• What’s a Constraint Management Plan?– A transmission switching action that is
developed to ensure overall grid reliability in the event a given contingency occurs
– CMPs are intended to supplement SCED, while maximizing transmission capacity when possible
![Page 13: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/13.jpg)
13
Constraint Management
• What’s a Constraint Management Plan?– Currently 4 types of CMPs as detailed in
Section 2.1 Definitions of the ERCOT Nodal Protocols
• Mitigation Plan• Pre-Contingency Action Plan (PCAP)• Remedial Action Plan (RAP)• Temporary Outage Action Plan (TOAP)
– All CMPs are intended to resolve loading to below Emergency Ratings, with restoration of normal operating conditions within two hours
![Page 14: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/14.jpg)
14
Constraint Management
• Mitigation Plan– Post-contingency actions– May include load shed– Constraints managed to their Emergency Ratings– Not Modeled in ERCOT Systems
• Pre-Contingency Action Plan (PCAP)– Pre-contingency actions– Do not include load shed– Constraints managed to their Emergency Ratings– Not Modeled in ERCOT Systems
![Page 15: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/15.jpg)
15
Constraint Management
• Remedial Action Plan (RAP)– Post-contingency actions– Do not include load shed– Constraints managed to their 15-Minute Ratings– Modeled in ERCOT Systems
• Temporary Outage Action Plan (TOAP)– Post-contingency actions– May include load shed– Constraints managed to their Emergency Ratings– Not Modeled in ERCOT Systems– “Mitigation Plan for the duration of an outage”
![Page 16: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/16.jpg)
16
Constraint Management
Contingency Details
Overloaded Elements
Corrective Actions
Additional Details
Administrative Details
![Page 17: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/17.jpg)
17
Constraint Management
• Where are CMPs Posted?– MIS Secure Area under Grid Long-Term
Planning Special Protection Systems and Remedial Action Plans
![Page 18: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/18.jpg)
18
Congestion Management:Market Effects
Jeff Gilbertson
![Page 19: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/19.jpg)
19
Topics Covered
• Security Constrained Economic Dispatch (SCED) inputs and outputs
• Constraint Scenarios
• Data relationships
![Page 20: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/20.jpg)
20
SCED Inputs and Outputs
• Security Constrained Economic Dispatch (SCED)– Goal: Minimize generation cost while also
respecting transmission constraints (“security constrained”)
• Inputs– Generation to be Dispatched (GTBD)– Generator offer curves– Generator limits (Low/High Dispatch Limits)– Generator current power output– Active transmission constraints (cont’d)
![Page 21: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/21.jpg)
21
SCED Inputs and Outputs
• Active transmission constraints– Contingency and monitored element pair
names– Monitored element (“constraint”)
post-contingency flow– Constraint limit– Maximum shadow price– Resource shift factors
• This is all SCED knows about the ERCOT transmission network!
![Page 22: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/22.jpg)
22
SCED Inputs and Outputs
• Transmission Constraint Shadow Price (SCED output)– Change in cost of system dispatch for a 1 MW
change in monitored element limit
• Maximum Shadow Price (SCED input)– Prevents wide price spread when constraint is
not resolvable or very difficult to resolve
BASE CASE $5,000 138 kV $3,500
345 kV $4,500 69 kV $2,800
![Page 23: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/23.jpg)
23
SCED Inputs and Outputs
• Resource Shift Factor– Change of flow on monitored element due to
1MW change of output of Resource• Value range: -1 to 1• Positive shift factor : flow on monitored element
increases as generation increases• Negative shift factor: flow on monitored element
decreases as generation increases
![Page 24: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/24.jpg)
24
SCED Inputs and Outputs
• Resource Shift Factor– Magnitude of shift factor indicative of number
of paths Resource output has to flow– Greater magnitude shift factors:
• Resource located on a radial path from monitored element; and/or
• Resource located close to monitored element
![Page 25: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/25.jpg)
25
SCED Inputs and Outputs
• Outputs– Resource Base points (sent only to Resource)– Locational Marginal Prices (LMPs) – cost to
serve additional 1MW of load at a location• Consistent with base points
– LMP higher than offer curve price, base point instructs resource to increase output
– LMP lower than offer curve price, base point instructs resource to decrease output
– Constraint solution flow
![Page 26: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/26.jpg)
26
SCED Inputs and Outputs
• Where is SCED constraint data posted?– MIS Secure Area under Markets Real-Time
Market
![Page 27: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/27.jpg)
27
Constraint Scenarios
• No active constraints– Transmission network “invisible” to SCED– Dispatch is like using an “offer stack”
• Resources dispatched to meet GTBD• Less expensive resources fully dispatched to
High Dispatch Limit (HDL)• More expensive resources dispatched to
Low Dispatch Limit (LDL)• Resources in between LDL and HDL are “marginal” and
set one system-wide Locational Marginal Price (LMP)
– No congestion costs
![Page 28: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/28.jpg)
28
Constraint Scenarios
• Active constraint(s) that are not binding in SCED– By dispatching inexpensive resources first,
the resulting post-contingency flow on constraints is less than limit
– No congestion costs; one system-wide LMP– Again, dispatch is like using an “offer stack”
![Page 29: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/29.jpg)
29
Constraint Scenarios
• Active constraint(s) that are binding in SCED– Dispatch based on economics alone would result in
post-contingency flow above transmission limit– More expensive resources must be dispatched
higher and less expensive resources dispatched lower in order to respect the limit
– Flow change on constraint is (solution resource output – initial resource output) * shift factor for each resource
– Power balance must be maintained, so resource level adjustments must balance each other out
![Page 30: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/30.jpg)
30
Constraint Scenarios
• Active constraint(s) that are binding in SCED– Binding constraints have a non-zero “shadow price”– The shadow price is the price sensitivity of the
transmission constraint– If transmission limit was 1MW lower, what would that
mean in terms of cost?• Since we are already starting at the most economic solution
at the limit, the less expensive resources would need to produce less and more expensive resources would need to produce more
– Results in different LMPs throughout the system
![Page 31: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/31.jpg)
31
Constraint Scenarios
• Active constraint(s) that are violated in SCED– Transmission limit is NOT respected– Occurs because:
• there are no resources that can be dispatched to resolve the constraint
• the cost to resolve the constraint is very high
– Remember, flow is post-contingency flow. Actual monitored element flow is not allowed to go above limit.
![Page 32: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/32.jpg)
32
Constraint Scenarios
• Conditions for transmission congestion– At least one transmission constraint is active– SCED dispatch results in post-contingency
flow on the monitored element at or above the constraint limit
![Page 33: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/33.jpg)
33
Data Relationships
• Relationship between constraint flow and constraint shadow price
Scenario Flow Shadow Price
Not binding < limit $0
Binding = limit > $0 and < Max SP
Irresolvable/violated
> limit Max Shadow Price
![Page 34: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/34.jpg)
34
Data Relationships
• Relationship between shadow price, shift factors, and LMP
• LMP = System Lambda- (shift factor * shadow price)- (shift factor * shadow price)
…
• (shift factor * shadow price) subtracted for each constraint
![Page 35: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/35.jpg)
35
Data Relationships
• Example:• System Lambda is $50• Resource A has a shift factor of 0.2 to
constraint A• Constraint A shadow price is $100• LMP = System Lambda –
(shift factor * shadow price)
• LMP = $50 – (0.2 * $100) = $50-$20 = $30
![Page 36: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/36.jpg)
36
Questions?
![Page 37: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/37.jpg)
37
Questions
1. A constraint in the ERCOT system is defined as
a) An N-1 contingency and overloaded transmission element pair
b) A base case, or real-time transmission element overload
c) All of the above
![Page 38: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/38.jpg)
38
Questions
2. Which ERCOT application dispatches generation to resolve constraint overloads?
a) SCED
b) RTCA
c) VSAT
d) VSS
![Page 39: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/39.jpg)
39
Questions
3. Which of the following Constraint Management Plans are detailed in the ERCOT Nodal Protocols:
a) Mitigation Plan (MP)
b) Pre-Contingency Action Plan (PCAP)
c) Remedial Action Plan (RAP)
d) All of the above
![Page 40: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/40.jpg)
40
Questions
4. Within what time-frame which all Congestion Management Plans are intended to resolve loading below Emergency Ratings?
a) 2-hours
b) 4-hours
c) 24-hours
d) Doesn’t matter as long as resolved
![Page 41: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/41.jpg)
41
Questions
5. Where are Congestion Management Plans posted to the Market?
a) MIS Restricted
b) MIS Public
c) MIS General
d) MIS Secure
![Page 42: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/42.jpg)
42
Questions
6. Which ERCOT application’s goal is to minimize generation costs while also respecting transmission constraints?
a) GTBD
b) RTCA
c) SCED
d) SASM
![Page 43: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/43.jpg)
43
Questions
7. Under what condition is the transmission network “invisible” to Security Constrained Economic Dispatch (SCED)?
a) No Active Constraints
b) Active Constraints
c) Binding Constraints
d) Non-Binding Constraints
![Page 44: Real-Time Transmission Congestion Management & Market Effects Chad Thompson, Manager, Operations Support, ERCOT Jeff Gilbertson, Sr Market Operations Analyst,](https://reader036.fdocuments.net/reader036/viewer/2022062407/56649d345503460f94a0ba2f/html5/thumbnails/44.jpg)
44
Questions
8. Under what condition would a Shadow Price of zero dollars ($0) be calculated?
a) Constraint flow is < limit
b) Constraint flow is = limit
c) Constraint flow is > limit
d) None of the above