► Technology Readiness Level

► Horizon 2020 Tipsserkanbolat.com

[email protected]

February 9, 2016 - Istanbul

Source: EC Horizon 2020 Calls Overview presentation http://goo.gl/IDZylz

Source: HSSMI http://goo.gl/cSC7M9

1974 1986 1989 1995 2000 2013

Source: CPI http://goo.gl/8qsdDp

Measurement Maturation

- Project objectives- TRL definitions(CTEs & exit criteria)

- Evaluation team- Measurement- Report

SystemTRL

SubsystemTRL

SubsystemTRL

SubsystemTRL

SubsystemTRL

AssemblyTRL

ComponentTRL

There is no authoritative body approving or certifying TRLs.

Each TRL should be verified even if it seems obvious.

TRL progress is not a linear or time-boxed process.

TRLs are achieved when their exit criteria are met.

System TRL is the lowest of all sub-system TRLs.

Alteration of CTEs or the system makes a TRL invalid.

TRL 6 requires a prototype whereas TRL 9 requires a product.

Source: .xls developed by William Nolte for the Air Force Research Lab