Eaton Protection Station 650 800 Installation and User Manual AB Web
REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations...
Transcript of REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations...
![Page 1: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/1.jpg)
REA’S POND PUMP STATION REPLACEMENTOvercoming Obstacles to Remove Reservoir Contamination ThreatBruce Thibodeau, PE, Town of North Andover, MA; Tim Willett, Town of North Andover, MA; Ken Carlson, PE, Woodard & Curran; Jason Kreil, PE, Woodard & Curran
![Page 2: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/2.jpg)
2
Obstacles
§Land Ownership§Conservation Commission Approval of Land Swap§Town Meeting Eminent Domain Taking§Article 97 Legislative Action§Reduced Site Size§Stormwater Regulations§Local Watershed Protection District§Funding Limitations§The “Tree”
![Page 3: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/3.jpg)
3
Unique Features
§Segmental Pre-Cast Concrete Structures §Bypass Options§Surge and Transient Protection
![Page 4: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/4.jpg)
4
Town of North Andover
§30 miles Northwest of Boston§27,000 Residents§91 Miles of Sewers§22 Pump Stations§60% Sewered§Customer of GLSD
![Page 5: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/5.jpg)
5
Location Plan
![Page 6: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/6.jpg)
6
Rea’s Pond Pump Station Location
Culvert
French Farm Subdivision
Route 125
Great Pond RoadRoute 133
To Haverhill
![Page 7: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/7.jpg)
7
Rea’s Pond Pump Station Site
Source: Pictometry Bird’s Eye 2015 MDA Geospatial Services, Inc.; accessed from Bing® Images
Proposed Pump Station Location
Existing Pump Station
Rea’s Pond
Lake Cochichewick
§Located on Conservation Land and the Town’s Water Supply§Rea’s Pond and Lake
Cochichewick connected by Culvert
Culvert
![Page 8: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/8.jpg)
8
Tributary Sewered Area
Rea’s Pond
Culvert
![Page 9: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/9.jpg)
9
Existing Pump Station
§Constructed 1992 for French Farm Subdivision§Brooks School & Other Subdivisions Added Later§Pre-Cast Concrete Wet Pit/Dry Pit Type§500 gpm capacity§8” FM, Approx. 1 Mile in Length§No Record Plans
![Page 10: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/10.jpg)
10
Existing Pump Station Drawings
![Page 11: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/11.jpg)
11
Existing Pump Station
![Page 12: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/12.jpg)
12
A History of Overflows and Flooding
§Station Capacity Exceeded During Spring Storm Events within a Few Years§Overflow Wet Well Added pre-1999§Emergency Pump Connection Added §Portable Diesel Pumps and Vactors Needed for High Flows§10+ Years of Emergency Pumping§Several Overflow Close-Calls
![Page 13: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/13.jpg)
13
May 2006 Mother’s Day Storm
§17” of Rain in New England§Probable 100-Year Storm§Flood Waters Within 1 Foot of Structure Tops§Station Isolated from Access§Flood Waters at Elev. 118.0+/-§1999 Mitigation Raised Top of Structures to El. 119.0
![Page 14: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/14.jpg)
14
Congressional Earmark Funds – $100,000
§Initially to Address Shawsheen River Flooding Elevations§ACOE Completed Flood Elevation Survey Negating Funding Need§2010 Town Suggests Using Funding Towards Replacement of Rea’s Pond
Pump Station§Town receives OK to Use FEMA as Funding Agency with 25% Town Match§FEMA Approval of Hazard Mitigation Analysis Scope and Budget – 2011
![Page 15: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/15.jpg)
15
March 2012 Hazard Mitigation Analysis
§Established Design Flow §Condition Assessment§Evaluated Alternatives
ØGravity BypassØReplacement/Upgrade ØRelocate
§Recommendations:ØNew 950 gpm Station on Adjacent Conservation LandØHigher ElevationØReplace Sewers in Sutton Street
![Page 16: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/16.jpg)
16
Proposed Pump Station Site Plan and Sewer Plan
![Page 17: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/17.jpg)
17
New Pump Station Location
§ 13.5 Acre Mazurenko Farm Land Purchased by the Town in 1975 for Conservation Purposes
§ Land Placed under Article 97 Protection§ Land Swap with Conservation Commission Recommended
ØProposed Site for Existing SiteØExisting Site to be Restored after Station Demolition
§Required Legislative Approval
![Page 18: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/18.jpg)
18
EOEA Disposition Process - Article 97
§EOEA’s Disposition ProcessØConCom Vote that the Land is Surplus to its NeedsØTown Meeting Vote to Remove the Land from Protected StatusØFile an Environmental Notification Form with EOEA’s MEPA UnitØRequest Must Pass by a Two-Thirds Vote of the Massachusetts
Legislature and be Signed by the Governor
§“No Net Loss” – Land Swap Required to Offset Land Removed by Article 97 Action
![Page 19: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/19.jpg)
19
Existing and Proposed Easements
Existing Easement
New Pump Station Easement
Mazurenko Property / Conservation Land
French Farm Subdivision
![Page 20: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/20.jpg)
20
Easement Issues Uncovered Fall 2012
§Research Reveals Developer Owns Existing Easement§50-foot Right-of-Way was Retained by Property Owner in 1975§Town has No Rights to Existing Sewer and Pump Station Easement§Existing Pump Station Constructed Partially on Conservation Land
![Page 21: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/21.jpg)
21
Existing Pump Station Location
Existing Sewer Easement
Existing Pump Station
![Page 22: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/22.jpg)
22
Encroachment on Conservation Land
Existing Easement Line
Existing Pump Station Site
Conservation Land
Encroachment
![Page 23: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/23.jpg)
23
Site Issues Resolved
§Reduced New Pump Station Site per Conservation Commission Requirements and No Net Loss per Article 97§Conservation Commission Vote Approves Land Swap per Article 97§April 2013 – Town Meeting
ØTakes Sewer and Pump Station Easements and Facilities By Eminent DomainØApproves Filing Special Legislation for Article 97 Taking
§October 2014 – Article 97 Action Approved by Legislature
![Page 24: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/24.jpg)
24
Pump Station Design Changes
§Building Eliminated to Reduce Footprint to Fit Reduced Site§Segmental Pre-Cast Concrete Wet and Dry Well Proposed §Pump Station Changes Also Addressed Funding Limitations
![Page 25: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/25.jpg)
25
Project Timeline
2011 2012 2013 2014 2015 2016
Survey & Wetlands Delineation
Hazard Mitigation Analysis
ConCom Approves Easement
Town Meeting Approves Easement Takings
Sewer Replacement Design & Construction
Easements Granted by Legislature
Pump Station Design
Pump Station Construction
![Page 26: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/26.jpg)
26
Water Protection Considerations
§Station Designed Provide Additional Protection from Failure to Protect Water Quality of Adjacent Drinking Water SupplyØRaised Structures and Site Above the Estimated Flood PlainØIncreased Storage with Larger Wet WellØStandby Power for Complete Pump Station OperationØAdditional Alarms for High Water, Power Failure at Site and at Control PanelØAll Pumps on Timed Relays to Provide Backup in Event of CP FailureØBypass Piping for Various Bypass Pumping Configurations
![Page 27: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/27.jpg)
27
Water Quality Reminder
![Page 28: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/28.jpg)
28
Design
§Site LimitationsØSmall Site FootprintØWithin 100-foot Buffer of Pond and LakeØLocated in Zone A for Drinking Water Supply / Watershed Protection District
• Infiltration Prohibited• No Diesel Storage
§Utility LimitationsØUnreliable Grid Power at SiteØNatural Gas Not Available
![Page 29: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/29.jpg)
29
Design
§Pump Station to be Located West of Existing LocationØGround Surface 3 feet
above Existing LocationØPump Station Driveway
Accessible in 100-year Flood Condition
Resource Area: Inside 25-Foot Buffer:Inside 50-Foot Buffer:
![Page 30: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/30.jpg)
30
Design
§Stormwater ConsiderationØTown Wanted Paved Driveway for Convenience and MaintenanceØStormwater Runoff
• Insufficient Space for Treatment of Stormwater via Overland Flow• Insufficient Area for Retention/Detention• Zone A Infiltration Prohibition
ØProject Required to Meet Stormwater Standards by Conservation Commission
§Stormwater Infiltration within Zone A Approved by MADEP§Stormceptor and Subsurface Infiltration Most Effective Option
![Page 31: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/31.jpg)
31
Design
§Standby/Emergency PowerØPower
• No Natural Gas – Considered PropaneØPropane Required Significant Amount of Tank Storage Limited by
Overall Site FootprintØPropane Storage Triggered Additional Permitting
§Diesel Fuel Storage Prohibited in Watershed Protection DistrictØPlanning Board Issued Special Permit Allowing Diesel Generator with
Double Walled Tank and Active Leak SensorsØConservation Commission Agreed
![Page 32: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/32.jpg)
32
Design
§Package Precast Concrete §10’ x 20’ Rounded Corner Precast Structures § Approximately 23 Feet Below the Ground Surface§Geotechnical Report – Sand over Glacial Till§Shoring Specifications Required Sheet Pile Excavation§Dewatering Specifications Required a Well Point System
![Page 33: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/33.jpg)
33
Forcemain Design
§Connect to Existing Forcemain on Site§Performed Pump Tests to Determine Forcemain Characteristics
and System CurveØApproximate Hazen Williams C Value Range – 85 to 120ØDesign C Value – 95
![Page 34: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/34.jpg)
34
Pump Design
§Design FlowØExisting Flow/Normal Conditions – 450 gpm, 160 feet TDHØSeasonal High Flows/Buildout – 950 gpm, 257 feet TDH
§Concern about Water Hammer and Transients during High Flow OperationØSlow closing/Dampened Check ValvesØAir/Vacuum Release ValveØSurge Relief Valve
![Page 35: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/35.jpg)
35
Design
![Page 36: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/36.jpg)
36
Construction Timeline
FEB APR MAY JUL SEP OCT
Site Clearing / Erosion Control
Sheet Pile Installation by Vibratory Hammer / Waler
Dewatering System Installation
Excavation
Utility Connections
Pump Station Installation
Testing & Startup / AcceptancePower / Controls
Installation
JANNOV2015 2016
Site Piping / Connection to Existing Sewer Demolition
DEC
Final Site Work
![Page 37: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/37.jpg)
37
Construction
§Initial Site Work Began November 2015ØProject Used Force Labor from Town of North Andover to Reduce Cost
§Full Time RPR Began Mid-January 2016ØLayout and Excavation
![Page 38: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/38.jpg)
38
Construction
§Sand over Glacial Till§Sheet Pile and Dewatering Installation §Contractor Provided Internal Sump in Lieu of Wellpoints
ØAided by Drought and Low Pond and Lake Levels
![Page 39: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/39.jpg)
39
Construction
§Precast Structure InstallationØLimited Space – No StagingØNarrow, Busy Roadway with Traffic ControlØSchool Vacation Week Allowed for Staging
of Delivery Trucks in Nearby School Parking Lot
![Page 40: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/40.jpg)
40
Construction
![Page 41: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/41.jpg)
41
Construction
![Page 42: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/42.jpg)
42
Construction
![Page 43: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/43.jpg)
43
Construction
![Page 44: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/44.jpg)
44
Construction
![Page 45: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/45.jpg)
45
Construction
![Page 46: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/46.jpg)
46
Construction
![Page 47: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/47.jpg)
47
Construction
![Page 48: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/48.jpg)
48
Construction
![Page 49: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/49.jpg)
49
Construction
![Page 50: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/50.jpg)
50
Construction
![Page 51: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/51.jpg)
51
Construction
![Page 52: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/52.jpg)
52
Construction
![Page 53: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/53.jpg)
53
Construction
![Page 54: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/54.jpg)
54
Construction
![Page 55: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/55.jpg)
55
Construction
![Page 56: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/56.jpg)
56
Pump Station
§Stainless Clips/Brackets§Doweled Anti-Floatation
Slab Installation§New FM Connection
to ExistingØAllow Quick Transition
Between Stations for Testing
ØBypass Risers
![Page 57: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/57.jpg)
57
Site Work
![Page 58: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/58.jpg)
58
Construction
![Page 59: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/59.jpg)
59
Electric Utility Connection
§Multiple Delays on Site Power§Two Easements Required for
New Poles for PS Serviceand New Support Pole§10-week Delay, June –
August 2016§Transformer Installation and
Connection to Primary§At Last, Removal of “Tree”
![Page 60: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/60.jpg)
60
Construction
§Demolition – About 3 WeeksØRemoved All EquipmentØWet Well, Auxiliary Storage Wet Well
and Dry Pit Cut off 4 Feet Below Ground Surface, and Backfilled
ØGravity Sewer and Forcemain to Existing Station Removed, Capped and Secured
ØManhole Connections Plugged
![Page 61: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/61.jpg)
61
Stormwater Management System Installation
§Stormceptor§Stormwater Infiltration Basins
![Page 62: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/62.jpg)
62
Pump Testing / Acceptance
§Pumps Performed Above Design Criteria§Design C-Value = Conservative§Station Entered Operation October 2016
ØSmall Pump Operation, Large Pumps Exercised.ØPanel Heater
![Page 63: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/63.jpg)
63
Completed Station
![Page 64: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/64.jpg)
64
Completed Station
![Page 65: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/65.jpg)
65
Completed Station
Final Completion – Spring 2017§Outstanding Items
ØWarranty InspectionØSeeding and Final Cleanup of Parking Area
![Page 66: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/66.jpg)
66
Acknowledgements
§ Town of North AndoverØGlen Alt, Water Treatment Plant Superintendent, Pump Station O&MØDan Concessi, Assistant Operations Manager, Resident InspectorØJennifer Hughes, Conservation AdministratorØHeidi Gaffney, Conservation Field Inspector
§ Jack Troidl, Woodard & Curran, Project Manager§Kate Roosa, Woodard & Curran, Engineer§Maureen Herald/Steve Eriksen, Norse Environmental Services, Environmental Monitors§Dan Maurano, Bryant Associates, Resident Inspector§Mike Girard, Waterline Industries, Project Manager§ Jan Vastl, Waterline Industries, Superintendent
![Page 67: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/67.jpg)
67
Acknowledgements
A Special Acknowledgement to Bruce Thibodeau, Town of North Andover Director of Public Works, for Participation in this Presentation.
Bruce Retired on January 20, 2017.Best Wishes Bruce!
![Page 68: REA’S POND PUMP STATION REPLACEMENT · 2017-10-17 · 26 Water Protection Considerations §Station Designed Provide Additional Protection from Failure to Protect Water Quality of](https://reader031.fdocuments.net/reader031/viewer/2022013022/5f82cea8fef6633fe20552e7/html5/thumbnails/68.jpg)
Questions?