Supporting Design Review Documents 4- 1 Chapter 4 Station Design Station Design 4.1 Design Standard 4.1.1 Station Design: Overview The design of stations shall be consistent with MRT train operation. Design considerations include the promptness to connect with both present and future mass transportation system, convenient and safe access to station for passengers, international standard safety system in case of emergency. In addition, opportunity and possibility for community development and reduction of negative impact to community are carefully considered in station design. Purposes 1) To design stations which are consistent to the surroundings, in accordance with other MRT systems which are connected to Khae Rai - Minburi route. Station design shall JMS/TLT/RE5501/P1988/RE093 The feasibility study review, preliminary design plan modification, and preparation of tender documents for Pink Line Project. Khae Rai - Min Buri. Chapt

description

Station Design

Transcript of Re093_Ch.4 Station Design (12!10!55) Noot

1-1

1-1

1

Supporting Design Review Documents

4-7Chapter 4 Station Design

Station Design

4.1 Design Standard4.1.1 Station Design: Overview

The design of stations shall be consistent with MRT train operation. Design considerations include the promptness to connect with both present and future mass transportation system, convenient and safe access to station for passengers, international standard safety system in case of emergency. In addition, opportunity and possibility for community development and reduction of negative impact to community are carefully considered in station design.

Purposes

1) To design stations which are consistent to the surroundings, in accordance with other MRT systems which are connected to Khae Rai - Minburi route. Station design shall also promote the maximum convenience of passengers.

2) To design stations which are in accordance with train operation system, low-cost maintenance and efficient.

3) To design stations which are enable to connect with other facilities and surrounded areas.

4) To fully facilitate and serve all type of passengers, including those who are disabled.4.1.2 Design Standard

The station design elements comply with Thai building code and selected international standard (NFPA 130, NFPA 101) appropriate to each element shall be selected.

Table 4.1-1 Code & Standard For Design Elements

DescriptionDimension (mm)Minimum Dim (mm)Remark

Concourse, Platform, Corridors, Entrance

Concourse

Height to underside of ceiling

Height to underside of obstruction3000

2800Minimum

Minimum

Corridors Width (leading to Plant rooms.)2000(Minimum width.)

Corridors Width (leading to Staff Rest Room)1500(minimum width.)

Entrance Height, (station)

: Floor to underside of ceiling

Floor to underside of any obstruction (signage etc.)2600

2500Minimum

Minimum

Entrance Width, (station)2000Minimum

Escalators, unobstructed distance at bottom landing from escalator working point7000Minimum

Escalators, unobstructed distance at top landing from escalator working point6000Minimum

Lift

Space in front for congregating2000Size required for wheel chair access Refer to specific section

Platform

Height to underside of ceiling3000Minimum

Platform

Height to underside of obstruction2500Minimum

Platform (centre), clear width, from nosing to any obstruction.3250Minimum

Platform (side), clear width, from nosing to any obstruction.

3250Fixed

Platform length (working train length)110 m

Platform nosing above rail line500Refer Rolling Stock

Passageway Dimensions

Vertical Clearance, minimum height above finished floor to :

Structural soffit

Underside of suspended ceiling (preferable)

Underside of any small local obstruction

Underside of signs (minimum)2900

2800

2500

2500

2500

Space around Gates

Clear distance on either side of gate to any

Obstruction :

Preferred

Absolute Minimum6000

4000

Clear side space to any wall or obstruction from the end gates :

2000

Emergency gate access width :1500

Balustrade Height

Adjacent to open well, (greater than 300 wide)

Stairs

Ramps

Landing1200

1200

1200

1200

HeadroomPublic stairs, (measured vertically from a line in the plane of the stair nosing)

Landings, (vertical clear headroom, same as area in which the landing is situated)Desirable 3000

Minimum

2500

Landings Intermediate length :

Lesser of width of stairs or :

Absolute minimum length :

Staff / emergency stairs :2000

1200

Width of stairs

Risers135

168

180Minimum

Preferred

Absolute maximum

Risers per flight (without intermediate landing)

No open risers shall be allowed

(see note)12

2

16

20DesirableMinimum

Maximum

(preferred)

Absolute maximum

Space (run off)

Top and bottom of stairs (minimum clear for maneuvering)

4500

Width of Stairs :

To be sized according to capacity requirements with a minimum of :

Unidirectional

Desirable

Absolute minimum

Bi-directional

Desirable

Absolute minimum

2000

1500

2400

2200

Lift for the Disabled

Internal car dimension :

Width (minimum)

Depth (minimum)

Height1 500 mm

1 500 mm

2 300 mm

Minimum car and landing opening :

Width

Height900 mm clear (2 panels side opening)

2100 mm clear

Lift well approx size :

Width

Depth2450 mm or 2 100 mm

2100 mm or 2 450 mm

Headroom in lift well from top landing4400 mm min Traction and Hydraulic

4.2Concept for Station Design and Functional Space Arrangement4.2.1Main ConceptsMain concepts in architectural design of stations are as followed:

1) Stations shall have a light and sparse-architectural look.

2) Columns to support platform roof shall not obstruct passengers circulation on platform. Platform, therefore, shall have a wider space. Roof of platform shall be designed as to protect passengers from rains. Rainwater shall be appropriately flow to designated points.

3) Station components shall be designed in accordance with their functions. Aesthetics and cost efficiency shall also be considered.

4) Materials used shall be durable, easy to maintain, aesthetical with reasonable cost.

5) Energy saving in both Passive and Active Cooling. Stations shall be well insulated and well ventilated. 6) Functional space arrangement and interior decoration concepts shall focus on the avoidance of passengers confusion. Elevated stations shall be natural ventilated and provide good visibility. Natural lights inside stations shall be suitable for passengers. Interior architecture shall be focused on simplicity. Safety, convenience and color of materials shall be carefully selected.

7) Environmental impact shall be considered.

8) Stations design shall be developed to achieve simplicity in style in order to consistent with function and budget. In addition, stations design shall reflect Thai architecture.

9) Stations design shall response to directions of passengers movement both inside and outside station. 4.2.2 Concept for Functional Areas Design 4.2.2.1 Functional Areas Design Concept

Main concepts in designing functional areas are:

1) Rooms and station components shall be carefully organized. Passengers area shall be separated from staff area and station equipment room. Zoning of station shall be clear according to function.

2) Stairs to connect concourse and platforms, which are a pair of stairs, escalator, stairs for disabled, shall be located to suitably response to the six-car train. Stairs and escalator shall conveniently serve passengers in both Normal Operation Movement and Emergency Evacuation Movement.

3) Functional areas arrangement shall be in accordance with train operating system and building equipment system.

4) In order to achieve cost efficiency, station shall be designed to suit the number of passengers in each station.

5) To renovate, expand footpaths which are close to stations in order to provide convenient entry and exit of stations, including walkway.Table 4.2-2 Functional Area

Elevated stations, which have 2-3 levels, consist of two main areas: Platform and Concourse. The layout of typical station shall be as followed. Chapter 4

JMS/TLT/RT5507/P1988/RT067

-JMS/TLT/RE5501/P1988/RE093The feasibility study review, preliminary design plan modification,

and preparation of tender documents for Pink Line Project. Khae Rai - Min Buri.