Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020 · 909 12th Street, Suite 202,...
Transcript of Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020 · 909 12th Street, Suite 202,...
909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • www.sierraclubcalifornia.org
January 6, 2020
[email protected] via email
Erin Mellon, Assistant Director
Public Affairs Office, Department of Water Resources
[email protected] via email
Re: Written Comments on DWR’s Draft EIR for Long-Term Operation of the SWP
(State Clearinghouse No. 2019049121)
Dear Assistant Director Mellon and Department of Water Resources:
By this letter our public interest organizations comment, pursuant to the California
Environmental Quality Act (CEQA), on the Department of Water Resources (DWR)
Draft Environmental Impact Report (Draft EIR) for Long-Term Operation of the State
Water Project (SWP.)1 Our public interest organizations object to approval of the project
and object to certification of a Final EIR for the project.
Our Table of Contents is on the next page:
1 AquAlliance, California Water Impact Network, California Sportfishing Protection Alliance, Center for Biological
Diversity, Environmental Water Caucus, Planning and Conservation League, Restore the Delta, and Sierra Club
California join in this letter.
2
TABLE OF CONTENTS
Introduction 3
Alternatives Reducing Reliance on the Delta are Required by the Delta Reform Act 4
Public Trust Doctrine Analysis Will be of Critical Importance in Doing the
Quantification Work Required by the Delta Reform Act 5
DWR Must Prepare and Recirculate a new Draft EIR Including the Required Range
of Reasonable Alternatives in order to Proceed in the Manner Required by CEQA 6
A New Draft EIR Must be Prepared and Recirculated for Public Review and
Comment for DWR to perform CEQA-Required Full Environmental Disclosure 8
Absence of Quantification 8
Failure to Disclose and Analyze DWR’s Delta Water Tunnel Project 9
This Draft EIR Process Must be Integrated with DWR’s Other Related Processes 12
DWR Must Not Segment Environmental Analysis 13
DWR Must Analyze the Impacts of Providing Water to the Entire Project 13
DWR Must Accurately Evaluate Cumulative Environmental Impacts 14
DWR Must Disclose and Evaluate Project Growth-Inducing Impacts 17
DWR Must Disclose and Analyze the Significant Adverse Environmental
Impacts of the Project 17
DWR Must Evaluate the Reality that DWR’s Federal Partner is Committed to
Maximizing Exports Regardless of the Environmental Consequences 19
DWR Must Evaluate SWP Long-Term Operations in light of Climate Change 21
DWR Must Disclose and Assess the future Reduction in Claimed Needs for
SWP Exports as a result of New Technologies and Curtailed Exports 22
DWR Must Include an Accurate, Stable, and Finite Project Description 24
DWR’s Draft EIR Substitutes Argument, Speculation, and Unsubstantiated
Opinion for Substantial Evidence 25
Conclusion 25
3
Introduction
SWP operations have numerous and enormous environmental impacts on
California’s rivers and the San Francisco Bay-Delta estuary (Delta.) “The SWP includes
water, power, and conveyance systems, moving an annual average of 2.9 million acre-
feet of water.” (Draft EIR 2-1.)2
DWR released the Draft EIR for public review on November 21, 2019. The Draft
EIR “was so fundamentally and basically inadequate and conclusory in nature that
meaningful public review and comment were precluded.” (CEQA Guidelines, §
15088.5(a)(4.) 3 DWR must, therefore, prepare a new Draft EIR.
“A feasible project alternative” “considerably different from others previously
analyzed would clearly lessen the significant environmental impacts of the project, but
the project’s proponents decline to adopt it.” (CEQA Guidelines, § 15088.5(a)(3.)
Reducing exports has always been an obvious alternative that would increase needed
freshwater flows through the Delta. Moreover, reducing reliance on the Delta is required
by the Delta Reform Act. The project instead increases reliance on the Delta. Again, a
new Draft EIR is required.
“A new significant environmental impact would result from the project” and “A
substantial increase in the severity of an environmental impact would result” from the
project. (CEQA Guidelines, § 15088.5 (a) (1) and (2.) Though the project would have
many severe adverse environmental impacts, the Draft EIR claims it would have none. As
just one example, the danger posed to people by the worsening algal blooms in the Delta
is not even mentioned in the Draft EIR. Yet again, a new Draft EIR is required.
The astonishing number and seriousness of the omissions and deficiencies in the
Draft EIR were avoidable. Our organizations advised DWR what was necessary in order
to comply with CEQA in our May 28, 2019, comment letter on the Notice of Preparation
(NOP) and scoping.
Preparation and recirculation of a new, adequate Draft EIR for public review and
comment is required by CEQA, including CEQA Guidelines § 15088.5(a.) 4
2 In each citation to the Draft EIR, the first number refers to the section of the document and the second number
refers to the page number within the section.
33 The CEQA Guidelines are codified at 14 Code Cal. Regs, § 15000 et seq.
4 Cases involving water issues and requiring recirculation of environmental documents under CEQA include
Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 447-449 and
Gray v. County of Madera (2008) 167 Cal.App.4th 1099, 1120.
4
Alternatives Reducing Reliance on the Delta are Required by the Delta
Reform Act
The Sacramento-San Joaquin Delta Reform Act of 2009 (Delta Reform Act) is
codified at Water Code § 85000 et seq. Water Code section 85021 establishes the policy
of the State of California “to reduce reliance on the Delta in meeting California’s future
water supply needs through a statewide strategy of investing in improved regional
supplies, conservation, and water use efficiency.” The Delta Reform Act establishes co-
equal goals meaning, “the two goals of providing a more reliable water supply for
California and protecting, restoring, and enhancing the Delta ecosystem.” (Water Code §
85054.)
The Sacramento River and San Joaquin River watersheds remaining flows, flow
into the Delta prior to portions being diverted for export to regions south of the Delta by
SWP and federal Central Valley Project (CVP) operations. “The sustainability of
California’s water resources depends on the environmental health of the Sacramento-San
Joaquin Delta.” (Draft EIR 1-1.) “Reclamation and DWR propose to use the Sacramento
River, San Joaquin River, and Delta channels to transport water to export pumping plants
located in the South Delta.” (Draft EIR 3-30.)
“DWR, in coordination with Reclamation, proposes to operate the SWP in a
manner that maximizes exports while minimizing direct and indirect impacts on state and
federally listed fish species. ” (Draft EIR 3-18.) DWR admits “the Proposed Project has
the potential to increase average annual water supply yields, . . .” (Draft EIR 1-10.) Other
versions of the admission include “the Proposed Project would increase the potential
delivery of water from the Delta, . . . (Draft EIR 4-324, also 4-322, 323.) DWR admits,
“Increasing or decreasing SWP or CVP exports can achieve changes to Delta outflow
immediately.” (Draft EIR 3-12.)
“The Proposed Project would continue DWR’s ongoing, long-term SWP
operations consistent with applicable laws, contractual obligations, and agreements.
DWR proposes long-term operation of the SWP that will allow DWR to continue to
store, divert, and convey water, in accordance with its existing water rights, to deliver
water pursuant to water contracts and agreements up to full contract quantities. DWR is
seeking to optimize water supply and improve operational flexibility while protecting fish
and wildlife.” (Draft EIR 1-3; also 3-1.)
A central issue in a legally sufficient Draft EIR would be consideration of the
trade-offs between delivery of full contract quantities, and reduction of deliveries in order
to improve water quantities and quality in California’s rivers and the Delta.
DWR virtually ignores the Delta Reform Act, simply mentioning it in two
sentences. (Draft EIR 4-105.) Yet DWR admits under the heading “areas of controversy”
5
that “Issues raised by the public and other agencies [in comments on the Notice of
Preparation (NOP) and scoping] include: Alternatives that incorporate actions to reduce
demand for water from the Delta.” (Draft EIR 1-10.)
A new Draft EIR must be prepared and recirculated for public review and
comment because the document fails to comply with State policy established by the Delta
Reform Act by failing to include alternatives that would reduce reliance on the Delta.
Public Trust Doctrine Analysis Will be of Critical Importance in Doing the
Quantification Work Required by the Delta Reform Act
The Delta Reform Act (Water Code § 85023) mandates,
The longstanding constitutional principle of reasonable use and the public trust
doctrine shall be the foundation of state water management policy and are
particularly important and applicable to the Delta.
The California Natural Resources Agency, CalEPA, and the California
Department of Food & Agriculture released the Draft Water Resilience Portfolio (Draft
Portfolio) on Friday afternoon, January 3, 2020. The Draft Portfolio admits,
Improved understanding is needed about the amount of water that must stay in
rivers and streams to protect fish, wildlife, habitat, and water quality, and further
actions are needed to support the availability of water for these needs.
Drastic loss of fish and wildlife habitat makes it important to restore and connect
habitat where feasible. (Draft Portfolio 13.)5
Moreover,
The projected statewide water needs of California fish, wildlife, and natural
ecosystems have not been quantified, given the diversity of the state’s river
systems and evolving understanding of both the biological needs of species and
future climate-driven conditions. However, it is clear that each river system
requires adequate season-by-season water flow to protect the natural functions fish
and wildlife need. Such flows also support healthy water quality and temperatures
and should be complemented by adequate habitat and removal of invasive species
to enable fish and wildlife to thrive. (Draft Portfolio 15.)
Public Trust Doctrine analysis is of critical importance here. A real public trust
analysis of the 26 rivers of the Delta watershed needs to be done in performing the
5 The number in citations to the Draft Portfolio refers to the page number cited.
6
quantification work required to make informed, rational decisions about SWP Long-Term
operations. Having a real public trust analysis that includes all non-market public trust
resources, including clean water, healthy flowing rivers, healthy abundant fish, and
recreational opportunities, is also critical information for an alternatives analysis.
DWR Must Prepare and Recirculate a new Draft EIR Including the Required
Range of Reasonable Alternatives in order to Proceed in the Manner Required by
CEQA
“Evaluation of project alternatives and mitigation measures is ‘the core of an
EIR.’” (Banning Ranch Conservancy v. City of Newport Beach (2017) 2 Cal.5th 918,
937.) An EIR must “describe a range of reasonable alternatives to the project . . . which
would feasibly attain most of the basic objectives of the project but would avoid or
substantially lessen any of the significant effects of the project, and evaluate the
comparative merits of the alternatives.” CEQA Guidelines § 15126.6(a). “[T]he
discussion of alternatives shall focus on alternatives to the project or its location which
are capable of avoiding or substantially lessening any significant effects of the project,
even if these alternatives would impede to some degree the attainment of the project
objectives, or would be more costly.” § 15126.6(b).
Section 5 of the Draft EIR sets forth the discussion of alternatives including the
“no project alternative,” and four additional alternatives. No alternatives are included that
would reduce reliance on the Delta as required by the State policy established by the
Delta Reform Act. No alternatives are included that would increase freshwater flows
through the Delta and protect California’s rivers by reducing exports. The Draft EIR
instead simply starts and ends with a given being to maximize exports. No “hard look” is
taken at trade-offs between maintaining or increasing exports as opposed to reducing
exports to protect the Delta and California’s rivers.
The founders of our nation and our State created governments of laws not rulers.
Whether California Executive Branch officers wish to consider real alternatives to the
proposed SWP Long-Term operations project, is not the standard. The standard is set by
CEQA, the Delta Reform Act, and the public trust doctrine. Such alternatives, including
ones reducing exports, must be included and considered in a new Draft EIR to be
recirculated for public review and comment.
Real alternatives must be included in the new Draft EIR to be prepared and
recirculated, including alternatives that would increase freshwater flows through the
Delta and improve Delta water quality by reducing SWP exports. For example, the
Governor’s Executive Order N-10-19 (April 29, 2019) calls for a water resilience
portfolio that will do such things as “embrace innovation and new technologies” and
“incorporate successful approaches from other parts of the world.” Implementing such
7
modern water measures would reduce the claimed need for SWP exports and thus
improve water quality in California’s rivers and the Delta.
As an example of such alternatives, our organizations presented A Sustainable
Water Plan for California (Environmental Water Caucus, May 2015) attached to our
May 28, 2019 comment letter on the NOP and scoping that is part of DWR’s Record.
By way of brief summary, the Sustainable Water Plan alternative includes reducing
exports out of the Delta to 3,000,000 acre-feet, or other variants on that quantity. Also
included are: spending funds on such modern water measures as water conservation,
water recycling, groundwater treatment and desalination and agricultural water
conservation including conversion to drip irrigation in export areas, annual crops in
export areas that can be fallowed in drought years, and staged removal from production
of drainage-impaired lands in export areas that worsen water quality by such
consequences as selenium discharge.
The Ninth Circuit Court of Appeals reversed a district court decision denying
environmental plaintiffs’ summary judgment because the challenged environmental
document issued by the Bureau of Reclamation under NEPA (National Environmental
Policy Act), “did not give full and meaningful consideration to the alternative of a
reduction in maximum water quantities.” (Pacific Coast Federation of Fishermen’s
Assn’s v. U.S. Dept. of the Interior, 655 Fed.Appx. 595, 2016 WL 3974183*3 (9th. Cir.,
No. 14-15514, July 25, 2016) (Not selected for publication).) “Reclamation’s decision
not to give full and meaningful consideration to the alternative of a reduction in
maximum interim contract water quantities was an abuse of discretion and the agency did
not adequately explain why it eliminated this alternative from detailed study.” (Id. at *2.)
Reclamation’s “reasoning in large part reflects a policy decision to promote the economic
security of agricultural users, rather than an explanation of why reducing maximum
contract quantities was so infeasible as to preclude study of its environmental impacts.”
(Id. at *3.)
The requirement under NEPA, also true under CEQA, to consider the alternative
of reducing exports to increase flows through the Delta is so obvious that the Ninth
Circuit’s decision was not selected for publication because no new legal analysis was
required to reach the decision. The decision pertained to interim two-year contract
renewals. If the alternative of reducing exports must be considered during renewal of
two-year interim contracts, it most assuredly must be considered during the course of
DWR’s EIR on Long-Term operations of the SWP.
Alternatives reducing exports must be considered pursuant to CEQA and under the
mandates of the Delta Reform Act. (Water Code § 85000 et seq). Again, the Delta
Reform Act establishes the policy of the State of California “to reduce reliance on the
Delta in meeting California’s future water supply needs through a statewide strategy of
8
investing in improved regional supplies, conservation, and water use efficiency.” (Water
Code § 85021.)
DWR must comply with CEQA, by developing and including real alternatives in a
new Draft EIR recirculated for public review and comment, which would improve Delta
and river water quantities and quality by reducing SWP exports. (CEQA Guidelines §
15088.5(a)(3.)
A New Draft EIR must be Prepared and Recirculated for Public Review and
Comment for DWR to perform CEQA-Required Full Environmental Disclosure
Absence of Quantification
“’While foreseeing the unforeseeable is not possible, an agency must use its best
efforts to find out and disclose all that it reasonably can.’ (Guidelines, § 15144.)”
(Banning Ranch Conservancy, 2 Cal.5th 918, 938). A primary goal of CEQA is
“transparency in environmental decision-making.” (Save Tara v. City of West Hollywood
(2008) 45 Cal.4th 116, 136.) “CEQA requires full environmental disclosure.”
(Communities for a Better Environment v. City of Richmond (2010) 184 Cal.App.4th 70,
88.)
As explained above, the Draft EIR simply takes maximizing exports and deliveries
up to full contract quantities as givens. There is no real quantification of real water
available for export and the adverse environmental impacts of maximizing exports.
The Water Resilience Portfolio referenced above, would require the subject
agencies to “first inventory and assess” eight subjects, including, “Existing demand for
water on a statewide and regional basis and available water supply to address this
demand.” (Executive Order N-10-19 ¶ 2a.) Other required subjects include “projected
water needs in coming decades for communities, economy and environment” (¶ 2c), and
“anticipated impacts of climate change to our water systems, . . . (¶ 2d.)
We understood the State plan had been to release the Draft Portfolio around the
end of 2019. Sierra Club California, requested extension of the public comment period on
the Draft EIR of at least one month, to afford the public the opportunity to comment on
the Draft EIR informed by the information expected in the Portfolio. (Letter request,
December 17, 2019.) That request was denied. DWR has failed to provide water
availability and demand information in the Draft EIR. DWR has refused to extend the
public comment period to allow the public to have the benefit of the information provided
in the Portfolio. Again, the State agencies released the Draft Portfolio on Friday
afternoon, January 3, 2020. That was 1/2 business day before comments were due on this
Draft EIR on Monday, January 6, 2020. The State agencies have denied the public
reasonable time to review the Draft Portfolio before closure of the public comment period
9
on this Draft EIR. DWR has violated its full environmental disclosure duties and has
failed to use its best efforts to find out and disclose all that it reasonably can.
Failure to Disclose and Analyze DWR’s Delta Water Tunnel Project
There is more. The Draft EIR in addition to its omissions also misleads and
amounts to environmental concealment. The Draft EIR does not even mention the
ongoing Delta Water Tunnel project. The Tunnel would worsen the existing crisis in the
Delta by diverting massive quantities of freshwater upstream from the Delta. The flows
diverted upstream would no longer provide any benefits by first flowing through the
already impaired Delta.
In fact, there is an ongoing Delta Conveyance Design and Construction Authority
(DCDCA) process (Delta Water Tunnel process) involving DWR, the Metropolitan
Water District of Southern California (MWD) and several other exporters. Pursuant to the
Delta Water Tunnel process, over $300 million is being spent between May 2019 and
June 2022 on engineering, fieldwork, property access, property acquisition, and power,
roads, and utilities for the previously selected Water Tunnel alignment.
Under the previous Administration, an amended and restated joint exercise of
powers Agreement was entered into between DWR and several SWP contractors
including MWD making up the DCDCA on October 26, 2018. The DCDCA had been
created by a Joint Powers Agreements including MWD and several other export
contractors on May 14, 2018.
The Amendment No. 1, amended and restated Joint Exercise of Powers
Agreement of June, 2019, defines in Section 2(a), “Conveyance Project,”
For the purposes of the Planning Phase, “Conveyance Project” shall mean the
planning, environmental documentation, permitting, and other preconstruction
activities associated with the evaluation and development of a proposal and, as
appropriate, alternatives for new Delta water conveyance facilities to be owned and
operated by DWR, that would convey water from the Sacramento River north of the
Delta directly to the existing SWP and, potentially, CVP pumping plants located in
the south Delta.
Amendment No. 1 included a revised exhibit B, the Planning Budget and Schedule.
That shows expenditures of $348,100,000 from May 2019 through June 2022. That
includes $173,200,000 for engineering, $56,000,000 for field work, $19,900,000 for
property access and acquisition services, and $30,600,000 for power, roads, and utilities.
10
We understand that geotechnical work began at 19 sites in San Joaquin, Sacramento,
and Contra Costa counties on June 10, 2019, including borehole drilling 150-200 feet
down, to the depths of the previously proposed Delta Tunnels.
There is still more. The SWP Contract Amendment negotiation process defines the
Delta Conveyance Facility (DCF) as,
Delta Conveyance Facility (DCF) shall mean those facilities of the State Water
Project consisting of a water diversion intake structure, or structures, located on the
Sacramento River in the northern Delta and connected by facilities to Banks Pumping
Plant in the southern Delta with a single tunnel that will, in whole or in part, serve the
purposes of this AIP.
DWR refers to this process as “the Contract Negotiations Concerning Water Supply
Contract Cost and Benefit Allocation of Delta Conveyance Facilities of the State Water
Project.” (DWR Preface to Sixth Offer, December 20, 2019.) (A copy of DWR’s Preface
and Sixth Offer is attached.)
The “First Offer” submitted by the State Water Contractors to DWR on July 24, 2019,
calls for the negotiation process to result in an Agreement-in-Principle (AIP.) The
Contractors proposed that the AIP include a definition of the proposed new conveyance
project, meaning Delta Water Tunnel, to include (First Offer, p. 5),
Project objectives
Capacity
General configuration (alignment, number of intakes, tunnels, pump stations,
etc.) (First Offer, p. 5.)
DWR’s Sixth Offer of December 20, 2019, says “It is the Department’s continued belief
that a Delta conveyance facility is in the best interests of the state, the PWAs [public
water agencies], and the Delta.” (DWR’s Preface, p.1 of 1, December 20, 2019.)
The Sixth Offer recites,
This Agreement in Principle is by and between the undersigned State Water
Project Public Water Agencies and the State of California by and through the
Department of Water Resources for the purpose of providing a mechanism for
amending the State Water Project Water Supply Contracts that will address cost
and benefit allocation of Delta Conveyance Facilities of the State Water Project
with an assumed State Water Project capacity of 6000 cubic feet per second.
(DWR’s Sixth Offer, p.2, December 20, 2019)(Emphasis added.)
DWR’s Sixth Offer includes the definition,
11
Delta Conveyance Facility (DCF) shall mean those facilities of the State Water
Project consisting of a water diversion intake structure, or structures, located on
the Sacramento River and connected by facilities to Banks Pumping Plant in the
southern Delta with a single tunnel that will serve the water supply purposes of the
State Water Project. (DWR’s Sixth Offer, p.3, December 20, 2019.)
The previous Bay-Delta Conservation Plan (BDCP)/Water Fix project does not
exist as the approval was rescinded by DWR on May 2, 2019. There is no EIR for the
previous project because certification of the previous EIR was set aside by DWR on May
2, 2019.
The claimed purpose for DWR’s single Tunnel project is to improve SWP water
export conveyance and deliveries. The Tunnel will be a SWP facility. Since SWP Long-
Term operations are the reason for DWR’s single Tunnel project, omitting the Delta
Tunnel process from the Draft EIR, renders it “so fundamentally and basically inadequate
and conclusory in nature that meaningful public review and comment were precluded.”
(CEQA Guidelines, § 15088.5(a)(4.)
The Draft EIR includes affirmative misrepresentations,
The Proposed Project would not include any of the following:
• New construction of water facilities, infrastructure, or other land
disturbance
• Construction of new facilities or modification to existing facilities that
could increase the capacity of the SWP (Draft EIR 4-321.)
The truth is that DWR is in the process right now of planning the Delta Water Tunnel
project for the very purpose of maximizing SWP water exports. The truth is that DWR is
continuing its ongoing negotiations with water exporters over the cost and benefit
allocation of Delta Conveyance Facilities of the SWP, meaning the Delta Water Tunnel.
The truth is that the Proposed Project does include construction of the Delta Water
Tunnel project.
The Draft EIR says, “Reclamation and DWR propose to use the Sacramento River,
San Joaquin River, and Delta channels to transport water to export pumping plants
located in the South Delta.” (Draft EIR 3-30.) That is false. The truth is that DWR
proposes to develop, construct, and use an enormous, more than 30 miles long,
underground Tunnel to transport water to export pumping plants located in the South
Delta.
DWR’s deception includes omitting the Delta Water Tunnel project from its list of
more than 40 cumulative water supply, management, and quality projects and actions in
the Draft EIR. (Draft EIR, Table 4. 6-1a, List, following page 4-294.)
12
There is still more. The just released Draft Portfolio admits,
The Administration is advancing a single-tunnel conveyance project under the
Delta, . . . The project is undergoing environmental review and includes significant
public engagement to design a project to limit Delta impacts and provide local
benefits. (Draft Portfolio 16, also 7, 22 proposal 19.1, 113, unnumbered online
page 143.)
The Draft EIR provides the opposite of CEQA-required full environmental
disclosure. The Draft EIR instead provides concealment, deception, and
misrepresentations.
This Draft EIR Process Must be Integrated with DWR’s Other Related Processes
CEQA Guidelines § 15124(d)(1)(C) requires that the EIR project description
include “A list of related environmental review and consultation requirements required
by federal, state, or local laws, regulations, or policies.” The second sentence in that
subsection goes on to require, “To the fullest extent possible, the lead agency should
integrate CEQA review with these related environmental review and consultation
requirements.” (Emphasis added.) CEQA’s policy is to conduct integrated review.
(Banning Ranch Conservancy v. City of Newport Beach (2017) 2 Cal.5th 918, 939, 942.)
Moreover, “Lead agencies in particular must take a comprehensive view in an EIR.”
(Banning Ranch Conservancy, 2 Cal.5th 918, 939, citing Public Resources Code §
21002.1(d).)
As shown above, instead of integrated CEQA review, key environmental review
processes are going ahead separately, each in its silo. With one hand, DWR is proceeding
to plan the design of the Delta Water Tunnel. With another hand, DWR is negotiating
cost allocations with the water exporters for the Delta Water Tunnel. With an extra hand,
DWR issued the subject Draft EIR that conceals instead of reveals the Delta Water
Tunnel project and its causal relationship with SWP Long-Term operations.
This “silo” approach is puzzling given that the just released Draft Portfolio
emphasizes that addressing new challenges such as climate change requires reflection,
innovation, communication, and coordination. “This cannot take place in silos but must
be integrated within and across regions.” (Draft Portfolio 25.)(Emphasis added.)
To proceed in the manner required by CEQA, DWR must prepare a new, honest Draft
EIR and recirculate it for public review and comment. An accurate water availability and
needs analysis, quantification, and disclosure and analysis of the Delta Water Tunnel
project and its causal relationship with SWP Long-Term operations must be central
focuses of the new Draft EIR.
13
DWR Must Not Segment Environmental Analysis
Guidelines § 15378(a) in pertinent part defines a “project” to be:
‘Project’ means the whole of an action, which has a potential for resulting in either a
direct physical change in the environment, or a reasonably foreseeable indirect
physical change in the environment, and that is any of the following . . . (Emphasis
added.)
Guidelines § 15378(c) adds that:
The term ‘project’ refers to the activity which is being approved and which may be
subject to several discretionary approvals by government agencies. The term ‘project’
does not mean each separate governmental approval. (Emphasis added.)
CEQA prohibits the piecemealing or segmentation of environmental analysis. A lead
agency must not piecemeal the analysis of several smaller projects that are part of a larger
project. Piecemealing is prohibited in order to ensure “that environmental considerations
not become submerged by chopping a large project into many little ones, each with a
potential impact on the environment, which cumulatively may have disastrous
consequences.” (Burbank-Glendale-Pasadena Airport Authority v. Hensler (1991) 233
Cal.App.3d 577, 592.)
DWR and the exporters are designing the construction and operations of a Tunnel
project in the absence of any CEQA compliance whatsoever. They are likewise
negotiating an agreement in principle for the specific project. The Draft EIR on Long-
Term SWP operations conceals rather than reveals and analyzes those ongoing DWR
activities. Instead of dealing with the whole of the action as required by CEQA, these
processes are all being done separately and segmented from each other. DWR is failing to
proceed in the manner required by CEQA. DWR must prepare a new Draft EIR and
recirculate it for public review and comment in order to correct these deficiencies.
DWR Must Analyze the Impacts of providing Water to the Entire Project
Pursuant to CEQA an EIR,
must assume that all phases of the project will eventually be built and will need
water, and must analyze, to the extent reasonably possible, the impacts of
providing water to the entire proposed project. (Vineyard Area Citizens for
Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 431.)
Moreover,
14
The future water supplies identified and analyzed must bear a likelihood of
actually proving available; speculative sources and unrealistic allocations (“paper
water”) are insufficient bases for decision-making under CEQA. (Vineyard Area
Citizens, 40 Cal.4th 412, 432.)
The inventory and assessment and water resilience portfolio required by the
Governor’s Executive Order are also the type of information required by CEQA to be in
an EIR. There is no such information in the Draft EIR and therefore no foundation for
determining SWP Long-Term operations. Consequently, a new Draft EIR and
recirculation are necessary.
DWR Must Accurately Evaluate Cumulative Environmental Impacts
The Draft EIR concludes “the Proposed Project would have no impacts on
aesthetics, agricultural resources, air quality, terrestrial biological resources, cultural
resources, energy, geology and soils, greenhouse gas emissions, hazards and hazardous
materials, land-use and planning, mineral resources, noise, population and housing,
public services, recreation, transportation, tribal cultural resources, utilities and service
systems, and wild fire; and therefore, it would not contribute to potential cumulative
impacts on these resource topics.” (Draft EIR 4-294.) This conclusory error will be
addressed later.
The Draft EIR then states, “Thus, the cumulative impacts analysis in this DEIR is
limited to the potential of the project to contribute to potentially significant cumulative
impacts related to the topics of hydrology, surface water quality, aquatic resources and
tribal cultural resources.” (Draft EIR 4-294.)
The Draft EIR concludes, “the contribution of the Proposed Project to Delta water
quality would not be cumulatively considerable” because “DWR operates the SWP in
accordance with obligations under D-1641.” (Draft EIR 4-308.) (Emphasis added.)The
Draft EIR reaches the same conclusion, that the cumulative impact of the Proposed
Project is less than significant as to aquatic biological resources, again, because of the
existing regulatory framework. (Draft EIR 4-316, 317.) The plan for the Project is to
“Comply with D- 1641 and USACE Permit 2100” “Existing Regulatory Requirements.”
(Draft EIR 1-5, Table 1-1 a; also, 3-15, Table 3-3a .) The “Action Goal or Objective” is
“Continue to comply with existing limits and permit requirements to protect water quality
for the beneficial uses of fish and wildlife, agriculture and urban uses.” (Draft EIR 1-5,
Table 1-1 a; also, 3-15, Table 3-3a.)
The Water Quality Control Plan for the San Francisco Bay-San Joaquin -
Sacramento Delta Estuary (WQCP) (Water Rights Decision 1641, D-1641) was adopted
in 1995, and amended without substantive changes in 2006. The Water Board is in the
15
process of a periodic update of the WQCP, which is occurring in phases. The statement in
the Water Board February 11, 2016 Ruling (on DWR’s Petition for a point of diversion
change, p.4) reflecting reality is that: “The appropriate Delta flow criteria will be more
stringent than petitioners’ current obligations and may well be more stringent than
petitioners’ preferred project.”
D-1641 is now a quarter century out of date. In September 2016, the Water Board
determined that under its new flow proposal for the San Joaquin River and its tributaries
it would be necessary to “decrease the quantity of surface water available for diversion
for other uses compared to the current condition (water supply effect).” (Evaluation of
San Joaquin River Flow and Southern Delta Water Quality Objectives and
implementation, Executive Summary at (ES) -21). As the Board pointed out: “The Bay-
Delta is in ecological crisis. Fish species have not shown signs of recovery since adoption
of the 1995 Bay-Delta Plan objectives intended to protect fish and wildlife.” (Id. at ES -
1).6
In October 2017, the Water Board found that: “it is widely recognized that the
Bay-Delta ecosystem is in a state of crisis.” (Final Scientific Basis Report in Support of
New and Modified Requirements for Inflows from the Sacramento River and its
Tributaries and Eastside Tributaries to the Delta, Delta Outflows, Cold Water Habitat,
and Interior Delta Flows, at 1-4). The water management infrastructure including the
Central Valley Project (CVP) and State Water Project (SWP) “have been accompanied by
significant declines in nearly all species of native fish, as well as other native and non-
native species dependent on the aquatic ecosystem. Fish species have continued to
experience precipitous declines since last major update and implementation of the Bay-
Delta Plan in 1995 that was intended to halt and reverse the aquatic species declines
occurring at that time. In the early 2000s, scientists noted a steep and lasting decline in
population abundance of several native estuarine fish species that has continued and
worsened during the recent drought. Simultaneously, natural production of all runs of
Central Valley salmon and steelhead remains near all-time low levels.” (Id.). According
to the Water Board, the best available science indicates that existing “requirements are
insufficient to protect fish and wildlife.” (Id. at 1 – 5).
The Draft EIR admits,
on December 12, 2018, through State Water Board Resolution No. 2018-0059, the
State Water Board adopted the Bay-Delta Plan amendments establishing the lower
San Joaquin River flow objectives and revised Southern Delta salinity objectives.
However, the SWRCB did not assign responsibility to any water right holders to
meet these new and revised objectives. In addition, the amendments are being
6 Also in September 2016, The Bay Institute published its report, San Francisco Bay: The Freshwater-Starved
Estuary. Basically, water taken from the rivers is reducing water flowing from the rivers feeding the estuary so that
the estuary--the Sacramento-San Joaquin River Delta, Susuin Marsh, and the bay-- ecosystem is collapsing.
16
legally challenged and have not yet been implemented through a water rights
decision. The SWRCB continues to work on proposed amendments for the
Sacramento River, its tributaries and the Delta. (Draft EIR 4-108, 109.)
The just released Draft Portfolio admits,
State and federal laws enacted to protect against reduced river flows and loss of
habitat have been unevenly applied and only partially successful. . . . As
ecological stressors mount, existing approaches to protecting fish and wildlife
must be modernized to protect and restore natural systems that support our state’s
celebrated bio diversity. (Draft Portfolio 12.)
The Draft Portfolio also admits, of course water diversions have significant
adverse environmental impacts,
Over the last 200 years, human engineering to capture and divert flows has altered
the natural functions of most major rivers in the state. . . . These changes have
impaired our overall resilience as a state and impacted fish and wildlife,
threatening the existence of several native fish species including distinct runs of
salmon and steelhead.
Reduced stream flows, increased temperatures, lack of habitat, and proliferation of
invasive species have impacted many fish species across the state. Native fish and
wildlife evolved to cope with drought, and dry periods are increasingly stressful
given reduced habitat and river flow in recent decades. . . . Pollution compounds
the stress. Many species are declining, and the number of fish species considered
highly vulnerable to extinction rose from nine in 1975 to 31 species today. (Draft
Portfolio 12.)
It is unreasonable to conclude that SWP Long-Term operations complying with
the outdated and insufficient standards in D-1641 will not result in cumulatively
considerable adverse impacts on Delta water quality and aquatic biological resources.
Again, also, the Draft EIR fails to reveal and evaluate the impacts of the
cumulative Delta Water Tunnel project which is a result of SWP Long-Term operations.
An EIR must discuss a related project when “it [is] reasonable and practical to include the
project and…without [its] inclusion, the severity and significance of the cumulative
impacts” could not be adequately stated. Gray v. County of Madera (2008) 167 Cal. App.
4th 1099, 1127. An “EIR must contain facts and analysis, not just the bare conclusions of
the agency.” Gray, 167 Cal. App. 4th at 1109. EIRs require detail for a very
commonsense reason. Without a complete understanding of a project, decision-makers
cannot determine whether it would make sense.
17
The omission of the Delta Water Tunnel project renders the Draft EIR so
fundamentally and basically inadequate and conclusory in nature that meaningful public
review and comment on direct, indirect, and cumulative environmental impacts of the
project are precluded.
DWR Must Disclose and Evaluate Project Growth-Inducing Impacts
The Draft EIR concludes “the Proposed Project is not growth-inducing and would
not induce secondary impacts of growth.” (Draft EIR 4-326.) Nothing could be further
from the truth. It is the Long-Term operation of the SWP that is the reason for DWR’s
ongoing processes to develop and approve the Delta Water Tunnel project. A new Draft
EIR and recirculation are required in order to fully and accurately disclose and evaluate
the growth inducing impacts of SWP Long-Term operation and the Delta Water Tunnel
project.
DWR Must Disclose and Analyze the Significant Adverse Environmental
Impacts of the Project
The SWP moves “an annual average of 2.9 million acre-feet of water.” (Draft EIR
2-1.) DWR is pursuing the Delta Water Tunnel project to facilitate SWP Long-Term
operations. Yet the Draft EIR concludes “the proposed project does not result in
significant effects, . . .” (Draft EIR 5-1; also, 4-294, 308, 316, 317) (Emphasis added.)
The conclusions in the Draft EIR are not supported by substantial evidence. They
are simply based on speculation and argument. Just as compliance with the quarter
century old D-1641 does not mean the project will not have significant adverse
cumulative environmental impacts; the same is true with respect to direct and indirect
impacts of the project. In addition, as shown above, DWR’s Delta Water Tunnel project
is underway and is intended to facilitate SWP Long-Term operations. The Tunnel would
cause numerous adverse environmental impacts including reducing freshwater flows
through the already impaired Delta as a result of a new, large upstream diversion for the
Tunnel. The Draft EIR admits “estimated changes to Delta outflow could affect the
surface water quality or aquatic resources, . . .” (Draft EIR 4-14.) The Draft EIR
obscures, in the process of admitting, the Delta is already impaired, not meeting water
quality standards, including the pollutants chlorpyrifos and diazinon, DO, mercury and
methylmercury, pathogens, pesticides, organochlorine pesticides, salt and boron, and
selenium. (Draft EIR 4-104.)
Again, the just-released Draft Portfolio admits the obvious; reducing river flows
by diversions adversely impacts fish species. (Draft Portfolio 12, 13.)
As an example of an adverse impact, the Draft EIR contains a brief two paragraph
discussion of environmental toxins, confined to exposure of Delta Smelt to toxins
18
including toxic blue-green cyanobacteria (Microcystis.) (Draft EIR 5-101, 102.) The
Draft EIR ignores the danger to people. On September 1, 2019, Bay City News Service
reported,
A buildup of blue-green algae (cyanobacteria), commonly called an algae bloom,
along the Sacramento-San Joaquin River Delta has prompted a safety warning
from Contra Costa Environmental Health Services.
The department is advising people out for holiday weekend recreation on the Delta
that contact with blooms can make people and pets very sick. Cyanobacteria create
a green, blue-green, white or brown coloring on the surface of slow-moving
waterways.
Advisory notices have been posted at the kayak launch and around the fishing
dock at Big Break Regional Shoreline in Oakley after cyanobacteria was detected
in the water.
It warns users to stay out of the water, and do not touch algae scum in the water or
on the shore, do not use the water for drinking, cleaning or cooking; do not let pets
or livestock enter or drink the water; and do not eat fish or shellfish from the
water.
A caution advisory has also been posted near the boat ramp around the mouth of
Mormon Slough by the California State Water Resources Control Board.
Stockton urban waterways are stagnant and thick with algal scum and toxins. Algae
blooms are regularly found from Stockton to Discovery Bay with smaller ones becoming
visible in sloughs between the cities. Increasing or even maintaining exports combined
with climate change will reduce freshwater flows and increase the buildup of these
dangerous algal blooms.
According to the EPA (
https://www.epa.gov › nutrientpollution › harmful-algal-blooms),
Harmful algal blooms can:
● Produce extremely dangerous toxins that can sicken or kill people and animals
● Create dead zones in the water
● Raise treatment costs for drinking water
● Hurt industries that depend on clean water
19
According to the Draft Portfolio, “A warmer climate provides optimal conditions for
worsening harmful algal blooms, which can force the closure of beaches, rivers, and lakes
due to health risks for people and pets.” (Draft Portfolio 13.) Moreover, “Waterways are
becoming increasingly prone to harmful algal blooms and low dissolved oxygen levels.
(Draft Portfolio 13.)
We incorporate by reference the written comments submitted by Restore the Delta
(submitted January 6, 2020.) Those comments go into much greater detail on several
important subjects including water quality, harmful algal blooms, and climate change.
DWR must prepare and recirculate a new Draft EIR to accurately and honestly
disclose and evaluate the numerous, serious adverse environmental impacts caused by
increasing or even maintaining current SWP export levels. Producing or increasing
dangerous toxins that can kill or sicken people, create dead zones in the water, and raise
treatment costs for drinking water are examples of the serious adverse environmental
impacts caused or worsened by SWP Long-Term operations. These serious impacts are
ignored in the Draft EIR.
DWR Must Evaluate the Reality that DWR’s Federal Partner is Committed to
Maximizing Exports Regardless of the Environmental Consequences
In the real world, the governing political landscape has changed. As has been said
as to other issues, “hope is not a plan.” Until recently, the hope was that federal and state
agencies would act in good faith to work together to protect water quality while operating
the SWP in the case of the State, and the Central Valley Project (CVP) in the case of the
U.S. Bureau of Reclamation. “DWR operates the SWP in coordination with the CVP,
under the Coordinated Operation Agreement (COA) between the federal government and
the State of California (authorized by Public Law 99-546).” (Draft EIR 1-3.) There is no
longer any basis for such hope with respect to the federal government. It is a critically
important issue when two partners in an operation, in this case the State, and the federal
executive branch, are in foundational and fundamental disagreement.
Former Secretary of the Interior Ryan Zinke issued his August 17, 2018,
memorandum to his staff on the subject “California Water Infrastructure.” The
Memorandum stated, within 15 days, the Assistant Secretaries “shall jointly develop and
provide to the Office of the Deputy Secretary an initial plan of action that must contain
options for: maximizing water supply deliveries; . .” That same memorandum included a
directive to develop a plan of action for “preparing legislative and litigation measures that
may be taken to maximize water supply deliveries to people; . .”
On October 19, 2018, the president issued the Presidential Memorandum on
Promoting the Reliable Supply and Delivery of Water in the West. (83 Fed.Reg. 53961,
October 25, 2018.) The Presidential Memorandum in Section 2(a)(ii) ordered the
20
Secretary of the Interior and the Secretary of Commerce to within 30 days designate one
official to,
identify regulations and procedures that potentially burden the [California water
infrastructure] project and develop a proposed plan, for consideration by the
Secretaries, to appropriately suspend, revise, or rescind any regulations or
procedures that unduly burden the project beyond the degree necessary to protect
the public interest or otherwise comply with the law. For purposes of this
memorandum, ‘burden’ means to unnecessarily obstruct, delay, curtail, impede, or
otherwise impose significant costs on the permitting, utilization, transmission,
delivery, or supply of water resources and infrastructure.
On March 28, 2019, the federal government brought two lawsuits against the
Water Board seeking to divert more water for the CVP, challenging the Water Board’s
new flow requirements set forth in the Water Quality Control Plan for the San Francisco
Bay/Sacramento-San Joaquin Delta estuary.7 The Draft EIR mentions that the Water
Board’s “amendments are being legally challenged” but fails to disclose that one of the
challengers is the federal government. (Draft EIR 4-107, 108.)
The Draft EIR fails to include significant new information. It states “When the
new USFWS [United States Fish and Wildlife Service] and NMFS [National Marine
Fisheries Service] Biological Opinions are issued, they will include incidental take
statements (ITS) for Delta Smelt, Winter-run Chinook Salmon, Spring-run Chinook
Salmon, Green Sturgeon, and steelhead. DWR will comply with the ITS in accordance
with federal law in addition to state requirements.” (Draft EIR 3-14.)
In fact, the new federal biological opinions have already been issued. They were
issued back on October 21, 2019. On July 1, 2019, NMFS biologists had concluded in a
1123-page biological opinion that Reclamation’s plan would likely jeopardize listed
salmon and steelhead, along with Southern Resident killer whales, and would be likely to
destroy or adversely modify critical habitat, all in violation of the federal Endangered
Species Act.8 The federal government subsequently replaced the biologists with political
appointees, and the October 21, 2019 NMFS biological opinion concluded Reclamation’s
plan was not likely to jeopardize the continued existence of the subject species or destroy
or adversely modify their critical habitats. Also on October 21, 2019, the USFWS issued
a biological opinion concluding Reclamation’s plan was not likely to jeopardize the
continued existence of Delta Smelt or destroy or modify its critical habitat.
Several public interest organizations filed a complaint on December 2, 2019, in the
United States District Court for the Northern District of California seeking to set aside the
7 One federal lawsuit seeks a writ of mandate in state court, the Superior Court, County of Sacramento, while the
other federal lawsuit seeks declaratory and injunctive relief in federal court, in the Eastern District of California. 8 The July 2019 biological opinion is available at: https://www.documentcloud.org/documents/6311822-NMFS-
Jeopardy-Biop-2019-OCR.html.
21
October 2019 biological opinions as being unlawful under the Administrative Procedure
Act and the Endangered Species Act. The suit is entitled Pacific Coast Federation of
Fishermen’s Associations et al. v. Wilbur Ross et al., Case No. 19-cv-07897.9
According to the Sacramento Bee, “Gov. Gavin Newsom’s administration said
Thursday [November 21, 2019] it will sue the Trump Administration over its efforts to
push more water through the Sacramento-San Joaquin Delta, saying the federal plan
would harm the sprawling estuary and the fragile fish populations that live there.” (Ryan
Sabalow, Newsom says California will sue Trump over Delta water, endangered fish,
Sacramento Bee, November 21, 2019.)
The federal government now claims it can override California environmental
protection laws and Water Board water allocations and protections. The new federal
policy is to maximize water exports regardless of the environmental damage and
California’s water policies. The Draft EIR gives no hint of the new federal policies
contrary to California’s laws and policies.
DWR must, pursuant to CEQA, disclose and analyze the fight that the federal
government is now waging against the efforts of California state government to protect
water quality. Long-Term SWP operations cannot be evaluated or determined in a
vacuum from the federal efforts to maximize project exports.
The Court noted in Banning Ranch Conservancy v. City of Newport Beach (2017)
2 Cal.5th 918, 941 that the governmental actions not only conflicted with CEQA
obligations, “but also ignored the practical reality. . . .” The integrity of the process of
decision under CEQA is to be ensured “by precluding stubborn problems or serious
criticism from being swept under the rug . . . (Banning Ranch Conservancy, 2 Cal.5th 918,
940-41.) Again, CEQA is a full environmental disclosure statute. DWR must disclose and
analyze the likely impacts of the new federal policies and how Long-Term SWP
operations can be modified to prevent or mitigate the adverse impacts of the new federal
policies to maximize exports. For example, increasing or maintaining instead of reducing
SWP exports will further worsen water quality and watershed degradation given the new
federal policies to maximize exports as well as reduced runoff and increasing salinity
intrusion due to climate change. The new federal policies to maximize exports are a
practical reality that cannot be covered up by the State in making decisions regarding
Long-Term SWP operations and whether to develop a Water Tunnel project.
DWR Must Evaluate SWP Long-Term Operations in light of Climate Change
The Draft EIR evades the impacts of climate change in one page plus part of one
sentence. (Draft EIR 4-3, 4.) The discussion includes misleading statements, saying that
9 The facts in this and the preceding paragraph are taken from the filed complaint.
22
“The Proposed Project is not expected to exacerbate any hazards, such as flood potential,
because River flows and SWP pumping would remain within historical operating range.
Thus, no further climate change analysis is required for this EIR.” (Draft EIR 4-3.) “No
additional analysis or discussion of impacts of climate change on the environmental
resources addressed in the DEIR is warranted.” (Draft EIR 4-4.)
In fact, the already impaired Delta is facing a quadruple whammy. There will be
decreasing watershed runoff as a result of decreased snowfall due to climate change. That
will reduce freshwater flows through the Delta. “Rising winter temperatures will reduce
mountain snowpack in the Sierra Nevada and Cascade ranges by 65% on average by the
end of the century, increasing flashy winter run off and flood risks while reducing spring
and summer stream flow.” (Draft Portfolio 14.) Rising sea levels caused by climate
change will result in greater salinity intrusion further into the Delta. “San Francisco Bay
and the Sacramento-San Joaquin Delta will face salinity intrusion as sea level rises.
(Draft Portfolio 14.) “Although the Delta is not one of the state’s ten major hydrologic
regions, it plays a complex role in the water resilience of California and faces particularly
acute climate risks.” (Draft Portfolio 110.) The new federal policy to maximize exports
will further decrease freshwater flows. DWR’s Delta Water Tunnel will further reduce
freshwater flows through the Delta. That means that maintaining or increasing SWP
exports will further exacerbate the Delta’s poor freshwater flows and water quality.
These issues need to be dealt with in a, new, recirculated Draft EIR to allow
informed development and consideration of alternatives responsive to the problems. That
will include reducing exports to by that way increase freshwater flows through the Delta
to compensate for declining watershed runoff and worsening salinity intrusion.
DWR Must Disclose and Assess the future Reduction in Claimed Needs for SWP
Exports as a result of New Technologies and Curtailed Exports
The refusal of DWR to extend the public comment period so the public would be
informed by the Draft Portfolio appears deliberate. Paragraph 3 of Executive Order N-
10-19 requires that the portfolio established by the State agencies embody seven
principles including, “Utilize natural infrastructure such as forests and floodplains” (¶
3(b); “Embrace innovation and new technologies” (¶ 3(c); and “Incorporate successful
approaches from other parts of the world.” (¶ 3) (e.)” That type of information would be
invaluable in lessening the future claimed need for water exports from the Delta. We
understand, for example, the City of Los Angeles has a plan to reduce its imported water
supply by 50% by the year 2025. According to Water Replenishment District President
John Allen, “Water recycling is the wave of the future.” (Release, August 22, 2019.) “SB
606 and AB 1660 [signed into law May 31, 2018] emphasize efficiency and stretching
existing water supplies in our cities and on farms.” (State Water Resources Control Board
fact sheet.)
23
The Draft Portfolio informs,
More efficient use of water by communities and agriculture has stretched water
supplies to meet demands, especially on urban landscapes.
Diverse water supply sources and reuse of water have helped many communities
effectively weather drought. (Draft Portfolio 12.)
Many Southern California water districts are building regional self-sufficiency but
do not expect to be able to feasibly replace all water supply diverted from the
Delta over the next couple of decades. (Draft Portfolio 113.)(Emphasis added.)
Moreover,
The most cost-effective, environmentally beneficial way to stretch water supplies
is through better water use efficiency and eliminating water waste. . . . Recycled
water is a sustainable, nearly drought-proof supply when used efficiently, and the
total volume of water California recycles today could triple in the next decade.
(Draft Portfolio 17.)
Water exports will be reduced. “The trade-off to manage salinity could reduce the
amount of water available to support an ecosystem already under stress and for export
from the Delta. Exports could be naturally curtailed by about 10% under mid-century
climate projections, and by about 25% by 2100.” (Draft Portfolio 111.) By 2050 the
amount of water used by agriculture is expected to decline, and decline the most in the
San Joaquin and Tulare Lake regions. (Draft Portfolio unnumbered page, page 58 online.)
Utilizing natural infrastructure would mean continuing to use the Sacramento
River and Delta channels for conveying water as opposed to diverting large river flows
into an expensive underground Tunnel.
In the absence of any meaningful discussion of utilization of natural infrastructure,
embracing innovation, and incorporating successful approaches from other parts of the
world, the Draft EIR appears deliberately calculated to simply justify increasing or
maintaining the existing levels of exports. The Draft EIR appears deliberately calculated
to omit information and analysis that would be essential to an informed evaluation of the
trade-offs between increasing or maintaining exports or instead finally beginning to reduce
exports. As is true on every critical issue, the November 21, 2019 Draft EIR is so
fundamentally and basically inadequate and conclusory in nature that meaningful public
review and comment were precluded.
24
DWR Must Include an Accurate, Stable, and Finite Project Description
Pursuant to CEQA,
[a]n accurate, stable and finite project description is the sine qua non
[indispensable requirement] of an informative and legally sufficient EIR.
However, a curtailed, and enigmatic or unstable project description draws a red
herring across the path of public input. Only through an accurate view of the
project, may the public and interested parties and public agencies balance the
proposed project’s benefits against its environmental cost, consider appropriate
mitigation measures, assess the advantages of terminating the proposal and
properly weigh other alternatives. (San Joaquin Raptor Rescue Center v. County
of Merced (2007) 149 Cal.App.4th 645, 654 (Internal citations omitted.)
The Draft EIR, instead of providing the required accurate project description, uses
such vague phrases as “operational flexibility” and “adaptive management” as a
substitute for the legally required detail and quantification of the actual impacts of SWP
Long-Term operations on the environment. (Draft EIR 1-2.)
The State and the federal government are in essence partners in operating the SWP
and CVP and in creating new project facilities. The federal government has recently
changed policies to maximize exports regardless of the consequences. The Governor
recently threatened a lawsuit against the federal government as a result. The
“Conveyance Project” is defined to include conveying water in addition to SWP pumping
plants, to “potentially, CVP pumping plants located in the south Delta.” The existing
Draft EIR failed to disclose and evaluate the new federal policies to maximize exports. It
also failed to disclose and evaluate DWR’s Delta Water Tunnel project. These types of
omissions look deliberate. The law, here CEQA, requires sounding the environmental
alarm bell in Draft EIRs over serious issues. The Draft EIR project description is
inaccurate, unstable, and not finite.
There are adverse environmental impacts from SWP exports, which would
increase with a Water Tunnel, on other resources as well as endangered fish species,
including Delta agriculture, freshwater flows, water supply, water quality, fisheries,
growth-inducement, and cumulative impacts. The State’s EIR must also assess the
impacts of Long-Term SWP operations under the public trust doctrine. Moreover, it is
time also to evaluate SWP exports “through the Human Right to Water and
environmental justice lenses to ensure that environmental justice communities are being
included and treated as partners in water decision-making.” (The Fate of the Delta:
Impacts of Proposed Water Projects and Plans on Delta Environmental Justice
Communities) (at p. 94) (Restore the Delta, September 17, 2018.) For example, the Delta
includes large environmental justice communities adversely impacted by SWP exports.
25
The Fate of the Delta document is a comprehensive and current explanation of Delta
water issues. You can click on the report title, above, and get to this resource document.
A new, recirculated Draft EIR must present the case for stricter standards
including reduction in SWP exports to increase freshwater flows, not just compliance
with outdated D-1641.
DWR’s Draft EIR Substitutes Argument, Speculation, and Unsubstantiated
Opinion for Substantial Evidence
CEQA Guidelines § 15384(b) defines “substantial evidence” as including “facts,
reasonable assumptions predicated upon facts, and expert opinion supported by facts.”
“Argument, speculation, unsubstantiated opinion or narrative, evidence which is clearly
erroneous or inaccurate, . . . does not constitute substantial evidence.” (§ 15384(a.)
The word uncertain or one of its derivatives is used almost 200 times throughout
the Draft EIR. The Draft EIR recites, “Project environmental commitments include
facility operations, facility and habitat improvement actions, funding for studies that
reduce uncertainty about SWP effects on Delta fishes, and an adaptive management
framework that, individually and collectively are intended to minimize the effects of the
Proposed Project and improve conditions for Delta fishes.” (Draft EIR 5-3.) Over and
over again, impacts are uncertain or highly uncertain with respect to fish species.10 The
repeated reference to uncertainties is a deliberate device to avoid admitting the truth; the
project will have numerous, significant, adverse environmental impacts. DWR has failed
to use its best efforts to find out and disclose all that it reasonably can.
The Draft EIR throughout substitutes speculation for substantial evidence, in
reaching the clearly erroneous conclusion that SWP Long-Term operations have no
significant adverse environmental impacts, and no significant cumulative impacts.
Conclusion
The Draft EIR issued November 21, 2019, is so fundamentally and basically
inadequate and conclusory in nature that meaningful public review and comment have
been precluded. Consequently, DWR must prepare and recirculate a new Draft EIR in
order to proceed in the manner required by CEQA. (CEQA Guidelines, § 15088.5(a.)
Contacts for this comment letter are Conner Everts, Facilitator, Environmental
Water Caucus (310) 804-6615 or [email protected] , or Robert Wright, Counsel,
Sierra Club California (916) 557-1104 or [email protected] . We would do our
best to answer any questions you may have.
10
A few examples include Draft EIR 3-50, 4-6, 4-116, 117, 120, 121, 132, 134, 145, 215, 5-38, 100.
26
Sincerely,
E. Robert Wright, Counsel
Sierra Club California
Kathryn Phillips, Director
Sierra Club California
Barbara Barrigan-Parrilla, Executive
Director, Restore the Delta
Conner Everts, Facilitator
Environmental Water Caucus
Jeff Miller, Senior Conservation
Advocate
Center for Biological Diversity
Carolee Krieger, Executive Director
California Water Impact Network
Barbara Vlamis, Executive Director
AquAlliance
Bill Jennings, Executive Director
California Sportfishing Protection
Alliance
Jonas Minton, Senior Water Policy
Advisor
Planning and Conservation League
27
Attachment:
DWR Preface and Sixth Offer