Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202,...

27
909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • www.sierraclubcalifornia.org January 6, 2020 [email protected] via email Erin Mellon, Assistant Director Public Affairs Office, Department of Water Resources [email protected] via email Re: Written Comments on DWR’s Draft EIR for Long-Term Operation of the SWP (State Clearinghouse No. 2019049121) Dear Assistant Director Mellon and Department of Water Resources: By this letter our public interest organizations comment, pursuant to the California Environmental Quality Act (CEQA), on the Department of Water Resources (DWR) Draft Environmental Impact Report (Draft EIR) for Long-Term Operation of the State Water Project (SWP.) 1 Our public interest organizations object to approval of the project and object to certification of a Final EIR for the project. Our Table of Contents is on the next page: 1 AquAlliance, California Water Impact Network, California Sportfishing Protection Alliance, Center for Biological Diversity, Environmental Water Caucus, Planning and Conservation League, Restore the Delta, and Sierra Club California join in this letter.

Transcript of Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202,...

Page 1: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • www.sierraclubcalifornia.org

January 6, 2020

[email protected] via email

Erin Mellon, Assistant Director

Public Affairs Office, Department of Water Resources

[email protected] via email

Re: Written Comments on DWR’s Draft EIR for Long-Term Operation of the SWP

(State Clearinghouse No. 2019049121)

Dear Assistant Director Mellon and Department of Water Resources:

By this letter our public interest organizations comment, pursuant to the California

Environmental Quality Act (CEQA), on the Department of Water Resources (DWR)

Draft Environmental Impact Report (Draft EIR) for Long-Term Operation of the State

Water Project (SWP.)1 Our public interest organizations object to approval of the project

and object to certification of a Final EIR for the project.

Our Table of Contents is on the next page:

1 AquAlliance, California Water Impact Network, California Sportfishing Protection Alliance, Center for Biological

Diversity, Environmental Water Caucus, Planning and Conservation League, Restore the Delta, and Sierra Club

California join in this letter.

Page 2: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

2

TABLE OF CONTENTS

Introduction 3

Alternatives Reducing Reliance on the Delta are Required by the Delta Reform Act 4

Public Trust Doctrine Analysis Will be of Critical Importance in Doing the

Quantification Work Required by the Delta Reform Act 5

DWR Must Prepare and Recirculate a new Draft EIR Including the Required Range

of Reasonable Alternatives in order to Proceed in the Manner Required by CEQA 6

A New Draft EIR Must be Prepared and Recirculated for Public Review and

Comment for DWR to perform CEQA-Required Full Environmental Disclosure 8

Absence of Quantification 8

Failure to Disclose and Analyze DWR’s Delta Water Tunnel Project 9

This Draft EIR Process Must be Integrated with DWR’s Other Related Processes 12

DWR Must Not Segment Environmental Analysis 13

DWR Must Analyze the Impacts of Providing Water to the Entire Project 13

DWR Must Accurately Evaluate Cumulative Environmental Impacts 14

DWR Must Disclose and Evaluate Project Growth-Inducing Impacts 17

DWR Must Disclose and Analyze the Significant Adverse Environmental

Impacts of the Project 17

DWR Must Evaluate the Reality that DWR’s Federal Partner is Committed to

Maximizing Exports Regardless of the Environmental Consequences 19

DWR Must Evaluate SWP Long-Term Operations in light of Climate Change 21

DWR Must Disclose and Assess the future Reduction in Claimed Needs for

SWP Exports as a result of New Technologies and Curtailed Exports 22

DWR Must Include an Accurate, Stable, and Finite Project Description 24

DWR’s Draft EIR Substitutes Argument, Speculation, and Unsubstantiated

Opinion for Substantial Evidence 25

Conclusion 25

Page 3: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

3

Introduction

SWP operations have numerous and enormous environmental impacts on

California’s rivers and the San Francisco Bay-Delta estuary (Delta.) “The SWP includes

water, power, and conveyance systems, moving an annual average of 2.9 million acre-

feet of water.” (Draft EIR 2-1.)2

DWR released the Draft EIR for public review on November 21, 2019. The Draft

EIR “was so fundamentally and basically inadequate and conclusory in nature that

meaningful public review and comment were precluded.” (CEQA Guidelines, §

15088.5(a)(4.) 3 DWR must, therefore, prepare a new Draft EIR.

“A feasible project alternative” “considerably different from others previously

analyzed would clearly lessen the significant environmental impacts of the project, but

the project’s proponents decline to adopt it.” (CEQA Guidelines, § 15088.5(a)(3.)

Reducing exports has always been an obvious alternative that would increase needed

freshwater flows through the Delta. Moreover, reducing reliance on the Delta is required

by the Delta Reform Act. The project instead increases reliance on the Delta. Again, a

new Draft EIR is required.

“A new significant environmental impact would result from the project” and “A

substantial increase in the severity of an environmental impact would result” from the

project. (CEQA Guidelines, § 15088.5 (a) (1) and (2.) Though the project would have

many severe adverse environmental impacts, the Draft EIR claims it would have none. As

just one example, the danger posed to people by the worsening algal blooms in the Delta

is not even mentioned in the Draft EIR. Yet again, a new Draft EIR is required.

The astonishing number and seriousness of the omissions and deficiencies in the

Draft EIR were avoidable. Our organizations advised DWR what was necessary in order

to comply with CEQA in our May 28, 2019, comment letter on the Notice of Preparation

(NOP) and scoping.

Preparation and recirculation of a new, adequate Draft EIR for public review and

comment is required by CEQA, including CEQA Guidelines § 15088.5(a.) 4

2 In each citation to the Draft EIR, the first number refers to the section of the document and the second number

refers to the page number within the section.

33 The CEQA Guidelines are codified at 14 Code Cal. Regs, § 15000 et seq.

4 Cases involving water issues and requiring recirculation of environmental documents under CEQA include

Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 447-449 and

Gray v. County of Madera (2008) 167 Cal.App.4th 1099, 1120.

Page 4: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

4

Alternatives Reducing Reliance on the Delta are Required by the Delta

Reform Act

The Sacramento-San Joaquin Delta Reform Act of 2009 (Delta Reform Act) is

codified at Water Code § 85000 et seq. Water Code section 85021 establishes the policy

of the State of California “to reduce reliance on the Delta in meeting California’s future

water supply needs through a statewide strategy of investing in improved regional

supplies, conservation, and water use efficiency.” The Delta Reform Act establishes co-

equal goals meaning, “the two goals of providing a more reliable water supply for

California and protecting, restoring, and enhancing the Delta ecosystem.” (Water Code §

85054.)

The Sacramento River and San Joaquin River watersheds remaining flows, flow

into the Delta prior to portions being diverted for export to regions south of the Delta by

SWP and federal Central Valley Project (CVP) operations. “The sustainability of

California’s water resources depends on the environmental health of the Sacramento-San

Joaquin Delta.” (Draft EIR 1-1.) “Reclamation and DWR propose to use the Sacramento

River, San Joaquin River, and Delta channels to transport water to export pumping plants

located in the South Delta.” (Draft EIR 3-30.)

“DWR, in coordination with Reclamation, proposes to operate the SWP in a

manner that maximizes exports while minimizing direct and indirect impacts on state and

federally listed fish species. ” (Draft EIR 3-18.) DWR admits “the Proposed Project has

the potential to increase average annual water supply yields, . . .” (Draft EIR 1-10.) Other

versions of the admission include “the Proposed Project would increase the potential

delivery of water from the Delta, . . . (Draft EIR 4-324, also 4-322, 323.) DWR admits,

“Increasing or decreasing SWP or CVP exports can achieve changes to Delta outflow

immediately.” (Draft EIR 3-12.)

“The Proposed Project would continue DWR’s ongoing, long-term SWP

operations consistent with applicable laws, contractual obligations, and agreements.

DWR proposes long-term operation of the SWP that will allow DWR to continue to

store, divert, and convey water, in accordance with its existing water rights, to deliver

water pursuant to water contracts and agreements up to full contract quantities. DWR is

seeking to optimize water supply and improve operational flexibility while protecting fish

and wildlife.” (Draft EIR 1-3; also 3-1.)

A central issue in a legally sufficient Draft EIR would be consideration of the

trade-offs between delivery of full contract quantities, and reduction of deliveries in order

to improve water quantities and quality in California’s rivers and the Delta.

DWR virtually ignores the Delta Reform Act, simply mentioning it in two

sentences. (Draft EIR 4-105.) Yet DWR admits under the heading “areas of controversy”

Page 5: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

5

that “Issues raised by the public and other agencies [in comments on the Notice of

Preparation (NOP) and scoping] include: Alternatives that incorporate actions to reduce

demand for water from the Delta.” (Draft EIR 1-10.)

A new Draft EIR must be prepared and recirculated for public review and

comment because the document fails to comply with State policy established by the Delta

Reform Act by failing to include alternatives that would reduce reliance on the Delta.

Public Trust Doctrine Analysis Will be of Critical Importance in Doing the

Quantification Work Required by the Delta Reform Act

The Delta Reform Act (Water Code § 85023) mandates,

The longstanding constitutional principle of reasonable use and the public trust

doctrine shall be the foundation of state water management policy and are

particularly important and applicable to the Delta.

The California Natural Resources Agency, CalEPA, and the California

Department of Food & Agriculture released the Draft Water Resilience Portfolio (Draft

Portfolio) on Friday afternoon, January 3, 2020. The Draft Portfolio admits,

Improved understanding is needed about the amount of water that must stay in

rivers and streams to protect fish, wildlife, habitat, and water quality, and further

actions are needed to support the availability of water for these needs.

Drastic loss of fish and wildlife habitat makes it important to restore and connect

habitat where feasible. (Draft Portfolio 13.)5

Moreover,

The projected statewide water needs of California fish, wildlife, and natural

ecosystems have not been quantified, given the diversity of the state’s river

systems and evolving understanding of both the biological needs of species and

future climate-driven conditions. However, it is clear that each river system

requires adequate season-by-season water flow to protect the natural functions fish

and wildlife need. Such flows also support healthy water quality and temperatures

and should be complemented by adequate habitat and removal of invasive species

to enable fish and wildlife to thrive. (Draft Portfolio 15.)

Public Trust Doctrine analysis is of critical importance here. A real public trust

analysis of the 26 rivers of the Delta watershed needs to be done in performing the

5 The number in citations to the Draft Portfolio refers to the page number cited.

Page 6: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

6

quantification work required to make informed, rational decisions about SWP Long-Term

operations. Having a real public trust analysis that includes all non-market public trust

resources, including clean water, healthy flowing rivers, healthy abundant fish, and

recreational opportunities, is also critical information for an alternatives analysis.

DWR Must Prepare and Recirculate a new Draft EIR Including the Required

Range of Reasonable Alternatives in order to Proceed in the Manner Required by

CEQA

“Evaluation of project alternatives and mitigation measures is ‘the core of an

EIR.’” (Banning Ranch Conservancy v. City of Newport Beach (2017) 2 Cal.5th 918,

937.) An EIR must “describe a range of reasonable alternatives to the project . . . which

would feasibly attain most of the basic objectives of the project but would avoid or

substantially lessen any of the significant effects of the project, and evaluate the

comparative merits of the alternatives.” CEQA Guidelines § 15126.6(a). “[T]he

discussion of alternatives shall focus on alternatives to the project or its location which

are capable of avoiding or substantially lessening any significant effects of the project,

even if these alternatives would impede to some degree the attainment of the project

objectives, or would be more costly.” § 15126.6(b).

Section 5 of the Draft EIR sets forth the discussion of alternatives including the

“no project alternative,” and four additional alternatives. No alternatives are included that

would reduce reliance on the Delta as required by the State policy established by the

Delta Reform Act. No alternatives are included that would increase freshwater flows

through the Delta and protect California’s rivers by reducing exports. The Draft EIR

instead simply starts and ends with a given being to maximize exports. No “hard look” is

taken at trade-offs between maintaining or increasing exports as opposed to reducing

exports to protect the Delta and California’s rivers.

The founders of our nation and our State created governments of laws not rulers.

Whether California Executive Branch officers wish to consider real alternatives to the

proposed SWP Long-Term operations project, is not the standard. The standard is set by

CEQA, the Delta Reform Act, and the public trust doctrine. Such alternatives, including

ones reducing exports, must be included and considered in a new Draft EIR to be

recirculated for public review and comment.

Real alternatives must be included in the new Draft EIR to be prepared and

recirculated, including alternatives that would increase freshwater flows through the

Delta and improve Delta water quality by reducing SWP exports. For example, the

Governor’s Executive Order N-10-19 (April 29, 2019) calls for a water resilience

portfolio that will do such things as “embrace innovation and new technologies” and

“incorporate successful approaches from other parts of the world.” Implementing such

Page 7: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

7

modern water measures would reduce the claimed need for SWP exports and thus

improve water quality in California’s rivers and the Delta.

As an example of such alternatives, our organizations presented A Sustainable

Water Plan for California (Environmental Water Caucus, May 2015) attached to our

May 28, 2019 comment letter on the NOP and scoping that is part of DWR’s Record.

By way of brief summary, the Sustainable Water Plan alternative includes reducing

exports out of the Delta to 3,000,000 acre-feet, or other variants on that quantity. Also

included are: spending funds on such modern water measures as water conservation,

water recycling, groundwater treatment and desalination and agricultural water

conservation including conversion to drip irrigation in export areas, annual crops in

export areas that can be fallowed in drought years, and staged removal from production

of drainage-impaired lands in export areas that worsen water quality by such

consequences as selenium discharge.

The Ninth Circuit Court of Appeals reversed a district court decision denying

environmental plaintiffs’ summary judgment because the challenged environmental

document issued by the Bureau of Reclamation under NEPA (National Environmental

Policy Act), “did not give full and meaningful consideration to the alternative of a

reduction in maximum water quantities.” (Pacific Coast Federation of Fishermen’s

Assn’s v. U.S. Dept. of the Interior, 655 Fed.Appx. 595, 2016 WL 3974183*3 (9th. Cir.,

No. 14-15514, July 25, 2016) (Not selected for publication).) “Reclamation’s decision

not to give full and meaningful consideration to the alternative of a reduction in

maximum interim contract water quantities was an abuse of discretion and the agency did

not adequately explain why it eliminated this alternative from detailed study.” (Id. at *2.)

Reclamation’s “reasoning in large part reflects a policy decision to promote the economic

security of agricultural users, rather than an explanation of why reducing maximum

contract quantities was so infeasible as to preclude study of its environmental impacts.”

(Id. at *3.)

The requirement under NEPA, also true under CEQA, to consider the alternative

of reducing exports to increase flows through the Delta is so obvious that the Ninth

Circuit’s decision was not selected for publication because no new legal analysis was

required to reach the decision. The decision pertained to interim two-year contract

renewals. If the alternative of reducing exports must be considered during renewal of

two-year interim contracts, it most assuredly must be considered during the course of

DWR’s EIR on Long-Term operations of the SWP.

Alternatives reducing exports must be considered pursuant to CEQA and under the

mandates of the Delta Reform Act. (Water Code § 85000 et seq). Again, the Delta

Reform Act establishes the policy of the State of California “to reduce reliance on the

Delta in meeting California’s future water supply needs through a statewide strategy of

Page 8: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

8

investing in improved regional supplies, conservation, and water use efficiency.” (Water

Code § 85021.)

DWR must comply with CEQA, by developing and including real alternatives in a

new Draft EIR recirculated for public review and comment, which would improve Delta

and river water quantities and quality by reducing SWP exports. (CEQA Guidelines §

15088.5(a)(3.)

A New Draft EIR must be Prepared and Recirculated for Public Review and

Comment for DWR to perform CEQA-Required Full Environmental Disclosure

Absence of Quantification

“’While foreseeing the unforeseeable is not possible, an agency must use its best

efforts to find out and disclose all that it reasonably can.’ (Guidelines, § 15144.)”

(Banning Ranch Conservancy, 2 Cal.5th 918, 938). A primary goal of CEQA is

“transparency in environmental decision-making.” (Save Tara v. City of West Hollywood

(2008) 45 Cal.4th 116, 136.) “CEQA requires full environmental disclosure.”

(Communities for a Better Environment v. City of Richmond (2010) 184 Cal.App.4th 70,

88.)

As explained above, the Draft EIR simply takes maximizing exports and deliveries

up to full contract quantities as givens. There is no real quantification of real water

available for export and the adverse environmental impacts of maximizing exports.

The Water Resilience Portfolio referenced above, would require the subject

agencies to “first inventory and assess” eight subjects, including, “Existing demand for

water on a statewide and regional basis and available water supply to address this

demand.” (Executive Order N-10-19 ¶ 2a.) Other required subjects include “projected

water needs in coming decades for communities, economy and environment” (¶ 2c), and

“anticipated impacts of climate change to our water systems, . . . (¶ 2d.)

We understood the State plan had been to release the Draft Portfolio around the

end of 2019. Sierra Club California, requested extension of the public comment period on

the Draft EIR of at least one month, to afford the public the opportunity to comment on

the Draft EIR informed by the information expected in the Portfolio. (Letter request,

December 17, 2019.) That request was denied. DWR has failed to provide water

availability and demand information in the Draft EIR. DWR has refused to extend the

public comment period to allow the public to have the benefit of the information provided

in the Portfolio. Again, the State agencies released the Draft Portfolio on Friday

afternoon, January 3, 2020. That was 1/2 business day before comments were due on this

Draft EIR on Monday, January 6, 2020. The State agencies have denied the public

reasonable time to review the Draft Portfolio before closure of the public comment period

Page 9: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

9

on this Draft EIR. DWR has violated its full environmental disclosure duties and has

failed to use its best efforts to find out and disclose all that it reasonably can.

Failure to Disclose and Analyze DWR’s Delta Water Tunnel Project

There is more. The Draft EIR in addition to its omissions also misleads and

amounts to environmental concealment. The Draft EIR does not even mention the

ongoing Delta Water Tunnel project. The Tunnel would worsen the existing crisis in the

Delta by diverting massive quantities of freshwater upstream from the Delta. The flows

diverted upstream would no longer provide any benefits by first flowing through the

already impaired Delta.

In fact, there is an ongoing Delta Conveyance Design and Construction Authority

(DCDCA) process (Delta Water Tunnel process) involving DWR, the Metropolitan

Water District of Southern California (MWD) and several other exporters. Pursuant to the

Delta Water Tunnel process, over $300 million is being spent between May 2019 and

June 2022 on engineering, fieldwork, property access, property acquisition, and power,

roads, and utilities for the previously selected Water Tunnel alignment.

Under the previous Administration, an amended and restated joint exercise of

powers Agreement was entered into between DWR and several SWP contractors

including MWD making up the DCDCA on October 26, 2018. The DCDCA had been

created by a Joint Powers Agreements including MWD and several other export

contractors on May 14, 2018.

The Amendment No. 1, amended and restated Joint Exercise of Powers

Agreement of June, 2019, defines in Section 2(a), “Conveyance Project,”

For the purposes of the Planning Phase, “Conveyance Project” shall mean the

planning, environmental documentation, permitting, and other preconstruction

activities associated with the evaluation and development of a proposal and, as

appropriate, alternatives for new Delta water conveyance facilities to be owned and

operated by DWR, that would convey water from the Sacramento River north of the

Delta directly to the existing SWP and, potentially, CVP pumping plants located in

the south Delta.

Amendment No. 1 included a revised exhibit B, the Planning Budget and Schedule.

That shows expenditures of $348,100,000 from May 2019 through June 2022. That

includes $173,200,000 for engineering, $56,000,000 for field work, $19,900,000 for

property access and acquisition services, and $30,600,000 for power, roads, and utilities.

Page 10: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

10

We understand that geotechnical work began at 19 sites in San Joaquin, Sacramento,

and Contra Costa counties on June 10, 2019, including borehole drilling 150-200 feet

down, to the depths of the previously proposed Delta Tunnels.

There is still more. The SWP Contract Amendment negotiation process defines the

Delta Conveyance Facility (DCF) as,

Delta Conveyance Facility (DCF) shall mean those facilities of the State Water

Project consisting of a water diversion intake structure, or structures, located on the

Sacramento River in the northern Delta and connected by facilities to Banks Pumping

Plant in the southern Delta with a single tunnel that will, in whole or in part, serve the

purposes of this AIP.

DWR refers to this process as “the Contract Negotiations Concerning Water Supply

Contract Cost and Benefit Allocation of Delta Conveyance Facilities of the State Water

Project.” (DWR Preface to Sixth Offer, December 20, 2019.) (A copy of DWR’s Preface

and Sixth Offer is attached.)

The “First Offer” submitted by the State Water Contractors to DWR on July 24, 2019,

calls for the negotiation process to result in an Agreement-in-Principle (AIP.) The

Contractors proposed that the AIP include a definition of the proposed new conveyance

project, meaning Delta Water Tunnel, to include (First Offer, p. 5),

Project objectives

Capacity

General configuration (alignment, number of intakes, tunnels, pump stations,

etc.) (First Offer, p. 5.)

DWR’s Sixth Offer of December 20, 2019, says “It is the Department’s continued belief

that a Delta conveyance facility is in the best interests of the state, the PWAs [public

water agencies], and the Delta.” (DWR’s Preface, p.1 of 1, December 20, 2019.)

The Sixth Offer recites,

This Agreement in Principle is by and between the undersigned State Water

Project Public Water Agencies and the State of California by and through the

Department of Water Resources for the purpose of providing a mechanism for

amending the State Water Project Water Supply Contracts that will address cost

and benefit allocation of Delta Conveyance Facilities of the State Water Project

with an assumed State Water Project capacity of 6000 cubic feet per second.

(DWR’s Sixth Offer, p.2, December 20, 2019)(Emphasis added.)

DWR’s Sixth Offer includes the definition,

Page 11: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

11

Delta Conveyance Facility (DCF) shall mean those facilities of the State Water

Project consisting of a water diversion intake structure, or structures, located on

the Sacramento River and connected by facilities to Banks Pumping Plant in the

southern Delta with a single tunnel that will serve the water supply purposes of the

State Water Project. (DWR’s Sixth Offer, p.3, December 20, 2019.)

The previous Bay-Delta Conservation Plan (BDCP)/Water Fix project does not

exist as the approval was rescinded by DWR on May 2, 2019. There is no EIR for the

previous project because certification of the previous EIR was set aside by DWR on May

2, 2019.

The claimed purpose for DWR’s single Tunnel project is to improve SWP water

export conveyance and deliveries. The Tunnel will be a SWP facility. Since SWP Long-

Term operations are the reason for DWR’s single Tunnel project, omitting the Delta

Tunnel process from the Draft EIR, renders it “so fundamentally and basically inadequate

and conclusory in nature that meaningful public review and comment were precluded.”

(CEQA Guidelines, § 15088.5(a)(4.)

The Draft EIR includes affirmative misrepresentations,

The Proposed Project would not include any of the following:

• New construction of water facilities, infrastructure, or other land

disturbance

• Construction of new facilities or modification to existing facilities that

could increase the capacity of the SWP (Draft EIR 4-321.)

The truth is that DWR is in the process right now of planning the Delta Water Tunnel

project for the very purpose of maximizing SWP water exports. The truth is that DWR is

continuing its ongoing negotiations with water exporters over the cost and benefit

allocation of Delta Conveyance Facilities of the SWP, meaning the Delta Water Tunnel.

The truth is that the Proposed Project does include construction of the Delta Water

Tunnel project.

The Draft EIR says, “Reclamation and DWR propose to use the Sacramento River,

San Joaquin River, and Delta channels to transport water to export pumping plants

located in the South Delta.” (Draft EIR 3-30.) That is false. The truth is that DWR

proposes to develop, construct, and use an enormous, more than 30 miles long,

underground Tunnel to transport water to export pumping plants located in the South

Delta.

DWR’s deception includes omitting the Delta Water Tunnel project from its list of

more than 40 cumulative water supply, management, and quality projects and actions in

the Draft EIR. (Draft EIR, Table 4. 6-1a, List, following page 4-294.)

Page 12: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

12

There is still more. The just released Draft Portfolio admits,

The Administration is advancing a single-tunnel conveyance project under the

Delta, . . . The project is undergoing environmental review and includes significant

public engagement to design a project to limit Delta impacts and provide local

benefits. (Draft Portfolio 16, also 7, 22 proposal 19.1, 113, unnumbered online

page 143.)

The Draft EIR provides the opposite of CEQA-required full environmental

disclosure. The Draft EIR instead provides concealment, deception, and

misrepresentations.

This Draft EIR Process Must be Integrated with DWR’s Other Related Processes

CEQA Guidelines § 15124(d)(1)(C) requires that the EIR project description

include “A list of related environmental review and consultation requirements required

by federal, state, or local laws, regulations, or policies.” The second sentence in that

subsection goes on to require, “To the fullest extent possible, the lead agency should

integrate CEQA review with these related environmental review and consultation

requirements.” (Emphasis added.) CEQA’s policy is to conduct integrated review.

(Banning Ranch Conservancy v. City of Newport Beach (2017) 2 Cal.5th 918, 939, 942.)

Moreover, “Lead agencies in particular must take a comprehensive view in an EIR.”

(Banning Ranch Conservancy, 2 Cal.5th 918, 939, citing Public Resources Code §

21002.1(d).)

As shown above, instead of integrated CEQA review, key environmental review

processes are going ahead separately, each in its silo. With one hand, DWR is proceeding

to plan the design of the Delta Water Tunnel. With another hand, DWR is negotiating

cost allocations with the water exporters for the Delta Water Tunnel. With an extra hand,

DWR issued the subject Draft EIR that conceals instead of reveals the Delta Water

Tunnel project and its causal relationship with SWP Long-Term operations.

This “silo” approach is puzzling given that the just released Draft Portfolio

emphasizes that addressing new challenges such as climate change requires reflection,

innovation, communication, and coordination. “This cannot take place in silos but must

be integrated within and across regions.” (Draft Portfolio 25.)(Emphasis added.)

To proceed in the manner required by CEQA, DWR must prepare a new, honest Draft

EIR and recirculate it for public review and comment. An accurate water availability and

needs analysis, quantification, and disclosure and analysis of the Delta Water Tunnel

project and its causal relationship with SWP Long-Term operations must be central

focuses of the new Draft EIR.

Page 13: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

13

DWR Must Not Segment Environmental Analysis

Guidelines § 15378(a) in pertinent part defines a “project” to be:

‘Project’ means the whole of an action, which has a potential for resulting in either a

direct physical change in the environment, or a reasonably foreseeable indirect

physical change in the environment, and that is any of the following . . . (Emphasis

added.)

Guidelines § 15378(c) adds that:

The term ‘project’ refers to the activity which is being approved and which may be

subject to several discretionary approvals by government agencies. The term ‘project’

does not mean each separate governmental approval. (Emphasis added.)

CEQA prohibits the piecemealing or segmentation of environmental analysis. A lead

agency must not piecemeal the analysis of several smaller projects that are part of a larger

project. Piecemealing is prohibited in order to ensure “that environmental considerations

not become submerged by chopping a large project into many little ones, each with a

potential impact on the environment, which cumulatively may have disastrous

consequences.” (Burbank-Glendale-Pasadena Airport Authority v. Hensler (1991) 233

Cal.App.3d 577, 592.)

DWR and the exporters are designing the construction and operations of a Tunnel

project in the absence of any CEQA compliance whatsoever. They are likewise

negotiating an agreement in principle for the specific project. The Draft EIR on Long-

Term SWP operations conceals rather than reveals and analyzes those ongoing DWR

activities. Instead of dealing with the whole of the action as required by CEQA, these

processes are all being done separately and segmented from each other. DWR is failing to

proceed in the manner required by CEQA. DWR must prepare a new Draft EIR and

recirculate it for public review and comment in order to correct these deficiencies.

DWR Must Analyze the Impacts of providing Water to the Entire Project

Pursuant to CEQA an EIR,

must assume that all phases of the project will eventually be built and will need

water, and must analyze, to the extent reasonably possible, the impacts of

providing water to the entire proposed project. (Vineyard Area Citizens for

Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 431.)

Moreover,

Page 14: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

14

The future water supplies identified and analyzed must bear a likelihood of

actually proving available; speculative sources and unrealistic allocations (“paper

water”) are insufficient bases for decision-making under CEQA. (Vineyard Area

Citizens, 40 Cal.4th 412, 432.)

The inventory and assessment and water resilience portfolio required by the

Governor’s Executive Order are also the type of information required by CEQA to be in

an EIR. There is no such information in the Draft EIR and therefore no foundation for

determining SWP Long-Term operations. Consequently, a new Draft EIR and

recirculation are necessary.

DWR Must Accurately Evaluate Cumulative Environmental Impacts

The Draft EIR concludes “the Proposed Project would have no impacts on

aesthetics, agricultural resources, air quality, terrestrial biological resources, cultural

resources, energy, geology and soils, greenhouse gas emissions, hazards and hazardous

materials, land-use and planning, mineral resources, noise, population and housing,

public services, recreation, transportation, tribal cultural resources, utilities and service

systems, and wild fire; and therefore, it would not contribute to potential cumulative

impacts on these resource topics.” (Draft EIR 4-294.) This conclusory error will be

addressed later.

The Draft EIR then states, “Thus, the cumulative impacts analysis in this DEIR is

limited to the potential of the project to contribute to potentially significant cumulative

impacts related to the topics of hydrology, surface water quality, aquatic resources and

tribal cultural resources.” (Draft EIR 4-294.)

The Draft EIR concludes, “the contribution of the Proposed Project to Delta water

quality would not be cumulatively considerable” because “DWR operates the SWP in

accordance with obligations under D-1641.” (Draft EIR 4-308.) (Emphasis added.)The

Draft EIR reaches the same conclusion, that the cumulative impact of the Proposed

Project is less than significant as to aquatic biological resources, again, because of the

existing regulatory framework. (Draft EIR 4-316, 317.) The plan for the Project is to

“Comply with D- 1641 and USACE Permit 2100” “Existing Regulatory Requirements.”

(Draft EIR 1-5, Table 1-1 a; also, 3-15, Table 3-3a .) The “Action Goal or Objective” is

“Continue to comply with existing limits and permit requirements to protect water quality

for the beneficial uses of fish and wildlife, agriculture and urban uses.” (Draft EIR 1-5,

Table 1-1 a; also, 3-15, Table 3-3a.)

The Water Quality Control Plan for the San Francisco Bay-San Joaquin -

Sacramento Delta Estuary (WQCP) (Water Rights Decision 1641, D-1641) was adopted

in 1995, and amended without substantive changes in 2006. The Water Board is in the

Page 15: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

15

process of a periodic update of the WQCP, which is occurring in phases. The statement in

the Water Board February 11, 2016 Ruling (on DWR’s Petition for a point of diversion

change, p.4) reflecting reality is that: “The appropriate Delta flow criteria will be more

stringent than petitioners’ current obligations and may well be more stringent than

petitioners’ preferred project.”

D-1641 is now a quarter century out of date. In September 2016, the Water Board

determined that under its new flow proposal for the San Joaquin River and its tributaries

it would be necessary to “decrease the quantity of surface water available for diversion

for other uses compared to the current condition (water supply effect).” (Evaluation of

San Joaquin River Flow and Southern Delta Water Quality Objectives and

implementation, Executive Summary at (ES) -21). As the Board pointed out: “The Bay-

Delta is in ecological crisis. Fish species have not shown signs of recovery since adoption

of the 1995 Bay-Delta Plan objectives intended to protect fish and wildlife.” (Id. at ES -

1).6

In October 2017, the Water Board found that: “it is widely recognized that the

Bay-Delta ecosystem is in a state of crisis.” (Final Scientific Basis Report in Support of

New and Modified Requirements for Inflows from the Sacramento River and its

Tributaries and Eastside Tributaries to the Delta, Delta Outflows, Cold Water Habitat,

and Interior Delta Flows, at 1-4). The water management infrastructure including the

Central Valley Project (CVP) and State Water Project (SWP) “have been accompanied by

significant declines in nearly all species of native fish, as well as other native and non-

native species dependent on the aquatic ecosystem. Fish species have continued to

experience precipitous declines since last major update and implementation of the Bay-

Delta Plan in 1995 that was intended to halt and reverse the aquatic species declines

occurring at that time. In the early 2000s, scientists noted a steep and lasting decline in

population abundance of several native estuarine fish species that has continued and

worsened during the recent drought. Simultaneously, natural production of all runs of

Central Valley salmon and steelhead remains near all-time low levels.” (Id.). According

to the Water Board, the best available science indicates that existing “requirements are

insufficient to protect fish and wildlife.” (Id. at 1 – 5).

The Draft EIR admits,

on December 12, 2018, through State Water Board Resolution No. 2018-0059, the

State Water Board adopted the Bay-Delta Plan amendments establishing the lower

San Joaquin River flow objectives and revised Southern Delta salinity objectives.

However, the SWRCB did not assign responsibility to any water right holders to

meet these new and revised objectives. In addition, the amendments are being

6 Also in September 2016, The Bay Institute published its report, San Francisco Bay: The Freshwater-Starved

Estuary. Basically, water taken from the rivers is reducing water flowing from the rivers feeding the estuary so that

the estuary--the Sacramento-San Joaquin River Delta, Susuin Marsh, and the bay-- ecosystem is collapsing.

Page 16: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

16

legally challenged and have not yet been implemented through a water rights

decision. The SWRCB continues to work on proposed amendments for the

Sacramento River, its tributaries and the Delta. (Draft EIR 4-108, 109.)

The just released Draft Portfolio admits,

State and federal laws enacted to protect against reduced river flows and loss of

habitat have been unevenly applied and only partially successful. . . . As

ecological stressors mount, existing approaches to protecting fish and wildlife

must be modernized to protect and restore natural systems that support our state’s

celebrated bio diversity. (Draft Portfolio 12.)

The Draft Portfolio also admits, of course water diversions have significant

adverse environmental impacts,

Over the last 200 years, human engineering to capture and divert flows has altered

the natural functions of most major rivers in the state. . . . These changes have

impaired our overall resilience as a state and impacted fish and wildlife,

threatening the existence of several native fish species including distinct runs of

salmon and steelhead.

Reduced stream flows, increased temperatures, lack of habitat, and proliferation of

invasive species have impacted many fish species across the state. Native fish and

wildlife evolved to cope with drought, and dry periods are increasingly stressful

given reduced habitat and river flow in recent decades. . . . Pollution compounds

the stress. Many species are declining, and the number of fish species considered

highly vulnerable to extinction rose from nine in 1975 to 31 species today. (Draft

Portfolio 12.)

It is unreasonable to conclude that SWP Long-Term operations complying with

the outdated and insufficient standards in D-1641 will not result in cumulatively

considerable adverse impacts on Delta water quality and aquatic biological resources.

Again, also, the Draft EIR fails to reveal and evaluate the impacts of the

cumulative Delta Water Tunnel project which is a result of SWP Long-Term operations.

An EIR must discuss a related project when “it [is] reasonable and practical to include the

project and…without [its] inclusion, the severity and significance of the cumulative

impacts” could not be adequately stated. Gray v. County of Madera (2008) 167 Cal. App.

4th 1099, 1127. An “EIR must contain facts and analysis, not just the bare conclusions of

the agency.” Gray, 167 Cal. App. 4th at 1109. EIRs require detail for a very

commonsense reason. Without a complete understanding of a project, decision-makers

cannot determine whether it would make sense.

Page 17: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

17

The omission of the Delta Water Tunnel project renders the Draft EIR so

fundamentally and basically inadequate and conclusory in nature that meaningful public

review and comment on direct, indirect, and cumulative environmental impacts of the

project are precluded.

DWR Must Disclose and Evaluate Project Growth-Inducing Impacts

The Draft EIR concludes “the Proposed Project is not growth-inducing and would

not induce secondary impacts of growth.” (Draft EIR 4-326.) Nothing could be further

from the truth. It is the Long-Term operation of the SWP that is the reason for DWR’s

ongoing processes to develop and approve the Delta Water Tunnel project. A new Draft

EIR and recirculation are required in order to fully and accurately disclose and evaluate

the growth inducing impacts of SWP Long-Term operation and the Delta Water Tunnel

project.

DWR Must Disclose and Analyze the Significant Adverse Environmental

Impacts of the Project

The SWP moves “an annual average of 2.9 million acre-feet of water.” (Draft EIR

2-1.) DWR is pursuing the Delta Water Tunnel project to facilitate SWP Long-Term

operations. Yet the Draft EIR concludes “the proposed project does not result in

significant effects, . . .” (Draft EIR 5-1; also, 4-294, 308, 316, 317) (Emphasis added.)

The conclusions in the Draft EIR are not supported by substantial evidence. They

are simply based on speculation and argument. Just as compliance with the quarter

century old D-1641 does not mean the project will not have significant adverse

cumulative environmental impacts; the same is true with respect to direct and indirect

impacts of the project. In addition, as shown above, DWR’s Delta Water Tunnel project

is underway and is intended to facilitate SWP Long-Term operations. The Tunnel would

cause numerous adverse environmental impacts including reducing freshwater flows

through the already impaired Delta as a result of a new, large upstream diversion for the

Tunnel. The Draft EIR admits “estimated changes to Delta outflow could affect the

surface water quality or aquatic resources, . . .” (Draft EIR 4-14.) The Draft EIR

obscures, in the process of admitting, the Delta is already impaired, not meeting water

quality standards, including the pollutants chlorpyrifos and diazinon, DO, mercury and

methylmercury, pathogens, pesticides, organochlorine pesticides, salt and boron, and

selenium. (Draft EIR 4-104.)

Again, the just-released Draft Portfolio admits the obvious; reducing river flows

by diversions adversely impacts fish species. (Draft Portfolio 12, 13.)

As an example of an adverse impact, the Draft EIR contains a brief two paragraph

discussion of environmental toxins, confined to exposure of Delta Smelt to toxins

Page 18: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

18

including toxic blue-green cyanobacteria (Microcystis.) (Draft EIR 5-101, 102.) The

Draft EIR ignores the danger to people. On September 1, 2019, Bay City News Service

reported,

A buildup of blue-green algae (cyanobacteria), commonly called an algae bloom,

along the Sacramento-San Joaquin River Delta has prompted a safety warning

from Contra Costa Environmental Health Services.

The department is advising people out for holiday weekend recreation on the Delta

that contact with blooms can make people and pets very sick. Cyanobacteria create

a green, blue-green, white or brown coloring on the surface of slow-moving

waterways.

Advisory notices have been posted at the kayak launch and around the fishing

dock at Big Break Regional Shoreline in Oakley after cyanobacteria was detected

in the water.

It warns users to stay out of the water, and do not touch algae scum in the water or

on the shore, do not use the water for drinking, cleaning or cooking; do not let pets

or livestock enter or drink the water; and do not eat fish or shellfish from the

water.

A caution advisory has also been posted near the boat ramp around the mouth of

Mormon Slough by the California State Water Resources Control Board.

Stockton urban waterways are stagnant and thick with algal scum and toxins. Algae

blooms are regularly found from Stockton to Discovery Bay with smaller ones becoming

visible in sloughs between the cities. Increasing or even maintaining exports combined

with climate change will reduce freshwater flows and increase the buildup of these

dangerous algal blooms.

According to the EPA (

https://www.epa.gov › nutrientpollution › harmful-algal-blooms),

Harmful algal blooms can:

● Produce extremely dangerous toxins that can sicken or kill people and animals

● Create dead zones in the water

● Raise treatment costs for drinking water

● Hurt industries that depend on clean water

Page 19: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

19

According to the Draft Portfolio, “A warmer climate provides optimal conditions for

worsening harmful algal blooms, which can force the closure of beaches, rivers, and lakes

due to health risks for people and pets.” (Draft Portfolio 13.) Moreover, “Waterways are

becoming increasingly prone to harmful algal blooms and low dissolved oxygen levels.

(Draft Portfolio 13.)

We incorporate by reference the written comments submitted by Restore the Delta

(submitted January 6, 2020.) Those comments go into much greater detail on several

important subjects including water quality, harmful algal blooms, and climate change.

DWR must prepare and recirculate a new Draft EIR to accurately and honestly

disclose and evaluate the numerous, serious adverse environmental impacts caused by

increasing or even maintaining current SWP export levels. Producing or increasing

dangerous toxins that can kill or sicken people, create dead zones in the water, and raise

treatment costs for drinking water are examples of the serious adverse environmental

impacts caused or worsened by SWP Long-Term operations. These serious impacts are

ignored in the Draft EIR.

DWR Must Evaluate the Reality that DWR’s Federal Partner is Committed to

Maximizing Exports Regardless of the Environmental Consequences

In the real world, the governing political landscape has changed. As has been said

as to other issues, “hope is not a plan.” Until recently, the hope was that federal and state

agencies would act in good faith to work together to protect water quality while operating

the SWP in the case of the State, and the Central Valley Project (CVP) in the case of the

U.S. Bureau of Reclamation. “DWR operates the SWP in coordination with the CVP,

under the Coordinated Operation Agreement (COA) between the federal government and

the State of California (authorized by Public Law 99-546).” (Draft EIR 1-3.) There is no

longer any basis for such hope with respect to the federal government. It is a critically

important issue when two partners in an operation, in this case the State, and the federal

executive branch, are in foundational and fundamental disagreement.

Former Secretary of the Interior Ryan Zinke issued his August 17, 2018,

memorandum to his staff on the subject “California Water Infrastructure.” The

Memorandum stated, within 15 days, the Assistant Secretaries “shall jointly develop and

provide to the Office of the Deputy Secretary an initial plan of action that must contain

options for: maximizing water supply deliveries; . .” That same memorandum included a

directive to develop a plan of action for “preparing legislative and litigation measures that

may be taken to maximize water supply deliveries to people; . .”

On October 19, 2018, the president issued the Presidential Memorandum on

Promoting the Reliable Supply and Delivery of Water in the West. (83 Fed.Reg. 53961,

October 25, 2018.) The Presidential Memorandum in Section 2(a)(ii) ordered the

Page 20: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

20

Secretary of the Interior and the Secretary of Commerce to within 30 days designate one

official to,

identify regulations and procedures that potentially burden the [California water

infrastructure] project and develop a proposed plan, for consideration by the

Secretaries, to appropriately suspend, revise, or rescind any regulations or

procedures that unduly burden the project beyond the degree necessary to protect

the public interest or otherwise comply with the law. For purposes of this

memorandum, ‘burden’ means to unnecessarily obstruct, delay, curtail, impede, or

otherwise impose significant costs on the permitting, utilization, transmission,

delivery, or supply of water resources and infrastructure.

On March 28, 2019, the federal government brought two lawsuits against the

Water Board seeking to divert more water for the CVP, challenging the Water Board’s

new flow requirements set forth in the Water Quality Control Plan for the San Francisco

Bay/Sacramento-San Joaquin Delta estuary.7 The Draft EIR mentions that the Water

Board’s “amendments are being legally challenged” but fails to disclose that one of the

challengers is the federal government. (Draft EIR 4-107, 108.)

The Draft EIR fails to include significant new information. It states “When the

new USFWS [United States Fish and Wildlife Service] and NMFS [National Marine

Fisheries Service] Biological Opinions are issued, they will include incidental take

statements (ITS) for Delta Smelt, Winter-run Chinook Salmon, Spring-run Chinook

Salmon, Green Sturgeon, and steelhead. DWR will comply with the ITS in accordance

with federal law in addition to state requirements.” (Draft EIR 3-14.)

In fact, the new federal biological opinions have already been issued. They were

issued back on October 21, 2019. On July 1, 2019, NMFS biologists had concluded in a

1123-page biological opinion that Reclamation’s plan would likely jeopardize listed

salmon and steelhead, along with Southern Resident killer whales, and would be likely to

destroy or adversely modify critical habitat, all in violation of the federal Endangered

Species Act.8 The federal government subsequently replaced the biologists with political

appointees, and the October 21, 2019 NMFS biological opinion concluded Reclamation’s

plan was not likely to jeopardize the continued existence of the subject species or destroy

or adversely modify their critical habitats. Also on October 21, 2019, the USFWS issued

a biological opinion concluding Reclamation’s plan was not likely to jeopardize the

continued existence of Delta Smelt or destroy or modify its critical habitat.

Several public interest organizations filed a complaint on December 2, 2019, in the

United States District Court for the Northern District of California seeking to set aside the

7 One federal lawsuit seeks a writ of mandate in state court, the Superior Court, County of Sacramento, while the

other federal lawsuit seeks declaratory and injunctive relief in federal court, in the Eastern District of California. 8 The July 2019 biological opinion is available at: https://www.documentcloud.org/documents/6311822-NMFS-

Jeopardy-Biop-2019-OCR.html.

Page 21: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

21

October 2019 biological opinions as being unlawful under the Administrative Procedure

Act and the Endangered Species Act. The suit is entitled Pacific Coast Federation of

Fishermen’s Associations et al. v. Wilbur Ross et al., Case No. 19-cv-07897.9

According to the Sacramento Bee, “Gov. Gavin Newsom’s administration said

Thursday [November 21, 2019] it will sue the Trump Administration over its efforts to

push more water through the Sacramento-San Joaquin Delta, saying the federal plan

would harm the sprawling estuary and the fragile fish populations that live there.” (Ryan

Sabalow, Newsom says California will sue Trump over Delta water, endangered fish,

Sacramento Bee, November 21, 2019.)

The federal government now claims it can override California environmental

protection laws and Water Board water allocations and protections. The new federal

policy is to maximize water exports regardless of the environmental damage and

California’s water policies. The Draft EIR gives no hint of the new federal policies

contrary to California’s laws and policies.

DWR must, pursuant to CEQA, disclose and analyze the fight that the federal

government is now waging against the efforts of California state government to protect

water quality. Long-Term SWP operations cannot be evaluated or determined in a

vacuum from the federal efforts to maximize project exports.

The Court noted in Banning Ranch Conservancy v. City of Newport Beach (2017)

2 Cal.5th 918, 941 that the governmental actions not only conflicted with CEQA

obligations, “but also ignored the practical reality. . . .” The integrity of the process of

decision under CEQA is to be ensured “by precluding stubborn problems or serious

criticism from being swept under the rug . . . (Banning Ranch Conservancy, 2 Cal.5th 918,

940-41.) Again, CEQA is a full environmental disclosure statute. DWR must disclose and

analyze the likely impacts of the new federal policies and how Long-Term SWP

operations can be modified to prevent or mitigate the adverse impacts of the new federal

policies to maximize exports. For example, increasing or maintaining instead of reducing

SWP exports will further worsen water quality and watershed degradation given the new

federal policies to maximize exports as well as reduced runoff and increasing salinity

intrusion due to climate change. The new federal policies to maximize exports are a

practical reality that cannot be covered up by the State in making decisions regarding

Long-Term SWP operations and whether to develop a Water Tunnel project.

DWR Must Evaluate SWP Long-Term Operations in light of Climate Change

The Draft EIR evades the impacts of climate change in one page plus part of one

sentence. (Draft EIR 4-3, 4.) The discussion includes misleading statements, saying that

9 The facts in this and the preceding paragraph are taken from the filed complaint.

Page 22: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

22

“The Proposed Project is not expected to exacerbate any hazards, such as flood potential,

because River flows and SWP pumping would remain within historical operating range.

Thus, no further climate change analysis is required for this EIR.” (Draft EIR 4-3.) “No

additional analysis or discussion of impacts of climate change on the environmental

resources addressed in the DEIR is warranted.” (Draft EIR 4-4.)

In fact, the already impaired Delta is facing a quadruple whammy. There will be

decreasing watershed runoff as a result of decreased snowfall due to climate change. That

will reduce freshwater flows through the Delta. “Rising winter temperatures will reduce

mountain snowpack in the Sierra Nevada and Cascade ranges by 65% on average by the

end of the century, increasing flashy winter run off and flood risks while reducing spring

and summer stream flow.” (Draft Portfolio 14.) Rising sea levels caused by climate

change will result in greater salinity intrusion further into the Delta. “San Francisco Bay

and the Sacramento-San Joaquin Delta will face salinity intrusion as sea level rises.

(Draft Portfolio 14.) “Although the Delta is not one of the state’s ten major hydrologic

regions, it plays a complex role in the water resilience of California and faces particularly

acute climate risks.” (Draft Portfolio 110.) The new federal policy to maximize exports

will further decrease freshwater flows. DWR’s Delta Water Tunnel will further reduce

freshwater flows through the Delta. That means that maintaining or increasing SWP

exports will further exacerbate the Delta’s poor freshwater flows and water quality.

These issues need to be dealt with in a, new, recirculated Draft EIR to allow

informed development and consideration of alternatives responsive to the problems. That

will include reducing exports to by that way increase freshwater flows through the Delta

to compensate for declining watershed runoff and worsening salinity intrusion.

DWR Must Disclose and Assess the future Reduction in Claimed Needs for SWP

Exports as a result of New Technologies and Curtailed Exports

The refusal of DWR to extend the public comment period so the public would be

informed by the Draft Portfolio appears deliberate. Paragraph 3 of Executive Order N-

10-19 requires that the portfolio established by the State agencies embody seven

principles including, “Utilize natural infrastructure such as forests and floodplains” (¶

3(b); “Embrace innovation and new technologies” (¶ 3(c); and “Incorporate successful

approaches from other parts of the world.” (¶ 3) (e.)” That type of information would be

invaluable in lessening the future claimed need for water exports from the Delta. We

understand, for example, the City of Los Angeles has a plan to reduce its imported water

supply by 50% by the year 2025. According to Water Replenishment District President

John Allen, “Water recycling is the wave of the future.” (Release, August 22, 2019.) “SB

606 and AB 1660 [signed into law May 31, 2018] emphasize efficiency and stretching

existing water supplies in our cities and on farms.” (State Water Resources Control Board

fact sheet.)

Page 23: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

23

The Draft Portfolio informs,

More efficient use of water by communities and agriculture has stretched water

supplies to meet demands, especially on urban landscapes.

Diverse water supply sources and reuse of water have helped many communities

effectively weather drought. (Draft Portfolio 12.)

Many Southern California water districts are building regional self-sufficiency but

do not expect to be able to feasibly replace all water supply diverted from the

Delta over the next couple of decades. (Draft Portfolio 113.)(Emphasis added.)

Moreover,

The most cost-effective, environmentally beneficial way to stretch water supplies

is through better water use efficiency and eliminating water waste. . . . Recycled

water is a sustainable, nearly drought-proof supply when used efficiently, and the

total volume of water California recycles today could triple in the next decade.

(Draft Portfolio 17.)

Water exports will be reduced. “The trade-off to manage salinity could reduce the

amount of water available to support an ecosystem already under stress and for export

from the Delta. Exports could be naturally curtailed by about 10% under mid-century

climate projections, and by about 25% by 2100.” (Draft Portfolio 111.) By 2050 the

amount of water used by agriculture is expected to decline, and decline the most in the

San Joaquin and Tulare Lake regions. (Draft Portfolio unnumbered page, page 58 online.)

Utilizing natural infrastructure would mean continuing to use the Sacramento

River and Delta channels for conveying water as opposed to diverting large river flows

into an expensive underground Tunnel.

In the absence of any meaningful discussion of utilization of natural infrastructure,

embracing innovation, and incorporating successful approaches from other parts of the

world, the Draft EIR appears deliberately calculated to simply justify increasing or

maintaining the existing levels of exports. The Draft EIR appears deliberately calculated

to omit information and analysis that would be essential to an informed evaluation of the

trade-offs between increasing or maintaining exports or instead finally beginning to reduce

exports. As is true on every critical issue, the November 21, 2019 Draft EIR is so

fundamentally and basically inadequate and conclusory in nature that meaningful public

review and comment were precluded.

Page 24: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

24

DWR Must Include an Accurate, Stable, and Finite Project Description

Pursuant to CEQA,

[a]n accurate, stable and finite project description is the sine qua non

[indispensable requirement] of an informative and legally sufficient EIR.

However, a curtailed, and enigmatic or unstable project description draws a red

herring across the path of public input. Only through an accurate view of the

project, may the public and interested parties and public agencies balance the

proposed project’s benefits against its environmental cost, consider appropriate

mitigation measures, assess the advantages of terminating the proposal and

properly weigh other alternatives. (San Joaquin Raptor Rescue Center v. County

of Merced (2007) 149 Cal.App.4th 645, 654 (Internal citations omitted.)

The Draft EIR, instead of providing the required accurate project description, uses

such vague phrases as “operational flexibility” and “adaptive management” as a

substitute for the legally required detail and quantification of the actual impacts of SWP

Long-Term operations on the environment. (Draft EIR 1-2.)

The State and the federal government are in essence partners in operating the SWP

and CVP and in creating new project facilities. The federal government has recently

changed policies to maximize exports regardless of the consequences. The Governor

recently threatened a lawsuit against the federal government as a result. The

“Conveyance Project” is defined to include conveying water in addition to SWP pumping

plants, to “potentially, CVP pumping plants located in the south Delta.” The existing

Draft EIR failed to disclose and evaluate the new federal policies to maximize exports. It

also failed to disclose and evaluate DWR’s Delta Water Tunnel project. These types of

omissions look deliberate. The law, here CEQA, requires sounding the environmental

alarm bell in Draft EIRs over serious issues. The Draft EIR project description is

inaccurate, unstable, and not finite.

There are adverse environmental impacts from SWP exports, which would

increase with a Water Tunnel, on other resources as well as endangered fish species,

including Delta agriculture, freshwater flows, water supply, water quality, fisheries,

growth-inducement, and cumulative impacts. The State’s EIR must also assess the

impacts of Long-Term SWP operations under the public trust doctrine. Moreover, it is

time also to evaluate SWP exports “through the Human Right to Water and

environmental justice lenses to ensure that environmental justice communities are being

included and treated as partners in water decision-making.” (The Fate of the Delta:

Impacts of Proposed Water Projects and Plans on Delta Environmental Justice

Communities) (at p. 94) (Restore the Delta, September 17, 2018.) For example, the Delta

includes large environmental justice communities adversely impacted by SWP exports.

Page 25: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

25

The Fate of the Delta document is a comprehensive and current explanation of Delta

water issues. You can click on the report title, above, and get to this resource document.

A new, recirculated Draft EIR must present the case for stricter standards

including reduction in SWP exports to increase freshwater flows, not just compliance

with outdated D-1641.

DWR’s Draft EIR Substitutes Argument, Speculation, and Unsubstantiated

Opinion for Substantial Evidence

CEQA Guidelines § 15384(b) defines “substantial evidence” as including “facts,

reasonable assumptions predicated upon facts, and expert opinion supported by facts.”

“Argument, speculation, unsubstantiated opinion or narrative, evidence which is clearly

erroneous or inaccurate, . . . does not constitute substantial evidence.” (§ 15384(a.)

The word uncertain or one of its derivatives is used almost 200 times throughout

the Draft EIR. The Draft EIR recites, “Project environmental commitments include

facility operations, facility and habitat improvement actions, funding for studies that

reduce uncertainty about SWP effects on Delta fishes, and an adaptive management

framework that, individually and collectively are intended to minimize the effects of the

Proposed Project and improve conditions for Delta fishes.” (Draft EIR 5-3.) Over and

over again, impacts are uncertain or highly uncertain with respect to fish species.10 The

repeated reference to uncertainties is a deliberate device to avoid admitting the truth; the

project will have numerous, significant, adverse environmental impacts. DWR has failed

to use its best efforts to find out and disclose all that it reasonably can.

The Draft EIR throughout substitutes speculation for substantial evidence, in

reaching the clearly erroneous conclusion that SWP Long-Term operations have no

significant adverse environmental impacts, and no significant cumulative impacts.

Conclusion

The Draft EIR issued November 21, 2019, is so fundamentally and basically

inadequate and conclusory in nature that meaningful public review and comment have

been precluded. Consequently, DWR must prepare and recirculate a new Draft EIR in

order to proceed in the manner required by CEQA. (CEQA Guidelines, § 15088.5(a.)

Contacts for this comment letter are Conner Everts, Facilitator, Environmental

Water Caucus (310) 804-6615 or [email protected] , or Robert Wright, Counsel,

Sierra Club California (916) 557-1104 or [email protected] . We would do our

best to answer any questions you may have.

10

A few examples include Draft EIR 3-50, 4-6, 4-116, 117, 120, 121, 132, 134, 145, 215, 5-38, 100.

Page 26: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

26

Sincerely,

E. Robert Wright, Counsel

Sierra Club California

Kathryn Phillips, Director

Sierra Club California

Barbara Barrigan-Parrilla, Executive

Director, Restore the Delta

Conner Everts, Facilitator

Environmental Water Caucus

Jeff Miller, Senior Conservation

Advocate

Center for Biological Diversity

Carolee Krieger, Executive Director

California Water Impact Network

Barbara Vlamis, Executive Director

AquAlliance

Bill Jennings, Executive Director

California Sportfishing Protection

Alliance

Jonas Minton, Senior Water Policy

Advisor

Planning and Conservation League

Page 27: Re: Written Comments on DWR’s Draft EIR for Long · 6.01.2020  · 909 12th Street, Suite 202, Sacramento, CA 95814 (916) 557-1100 • Fax (916) 557-9669 • January 6, 2020 Erin.mellon@water.ca.gov

27

Attachment:

DWR Preface and Sixth Offer