Re: Design Submission for Strategic Housing Development at ......Re: Design Submission for Strategic...
Transcript of Re: Design Submission for Strategic Housing Development at ......Re: Design Submission for Strategic...
Nido Management UK Ltd C/O Kevin O’Mahony,
Cora Consulting Engineers,
Behan House,
10 Lower Mount Street,
Dublin 18
17 April 2019
Re: Design Submission for Strategic Housing Development at Brewery Block,
Newmarket, Dublin 8 (the “Development”) (the “Design Submission”) / 3999408649.
Dear Kevin,
Many thanks for your recent Design Submission.
We have reviewed your proposal for the connection(s) at the Development. Based on the
information provided, which included the documents outlined in Appendix A to this letter,
Irish Water has no objection to your proposals.
This letter does not constitute an offer, in whole or in part, to provide a connection to any
Irish Water infrastructure. Before you can connect to our network you must sign a
connection agreement with Irish Water. This can be applied for by completing the
connection application form at www.water.ie/connections. Irish Water’s current charges for
water and wastewater connections are set out in the Water Charges Plan as approved by
the Commission for Regulation of Utilities (CRU) (https://www.cru.ie/document_group/irish-
waters-water-charges-plan-2018/).
You the Customer (including any designers/contractors or other related parties appointed
by you) is entirely responsible for the design and construction of all water and/or
wastewater infrastructure within the Development which is necessary to facilitate
connection(s) from the boundary of the Development to Irish Water’s network(s) (the “Self-
Lay Works”), as reflected in your Design Submission. Acceptance of the Design
Submission by Irish Water does not, in any way, render Irish Water liable for any elements
of the design and/or construction of the Self-Lay Works.
If you have any further questions, please contact your Irish Water Representative
Name: Paul Lowry
Phone: 01 8230377
Email: [email protected]
Yours sincerely,
Maria O’Dwyer
Connections and Developer Services
Appendix A
Document Title & Revision
1896-Cora-00-ZZ-DR-C-001-PL2 Site Location Plan
1896-Cora-00-00-DR-C-002-PL3 Proposed Water Distribution & Sprinkler Main Plan
1896-Cora-00-00-DR-C-003-PL3 Proposed Foul Drainage Plan
1896-Cora-00-00-DR-C-005-PL1 Longitudinal Section Through Foul Sewer
1896-Cora-XX-ZZ-DR-C-010-PL1 Standard Water Services Details Sheet 1/4
1896-Cora-XX-ZZ-DR-C-012-PL1 Standard Water Services Details Sheet 3/4
Standard Details/Code of Practice Exemption:
For further information, visit www.water.ie/connections
Notwithstanding any matters listed above, the Customer (including any appointed
designers/contractors, etc.) is entirely responsible for the design and construction of the
Self-Lay Works. Acceptance of the Design Submission by Irish Water will not, in any way,
render Irish Water liable for any elements of the design and/or construction of the Self-Lay
Works.
SITE LOCATION PLAN
C001
-
SCALE 1:250
ROOF AREA
SURFACING LEGEND:
BUILDING OUTLINE
NEWMARKET
A
R
D
E
E
S
T
R
E
E
T
BR
AB
AZ
ON
S
TR
EE
T
ST. LU
KES AVE
DC
C L
AN
DS
SITE BOUNDARY
Checked by:Drawn by: Approved by:
Contractor:
Drawing Stage:
Project Name:
Drawing Title:
Revision:
Drawing No:
Scale: Project Number:
Notes
M&E Designer:
Architect:
Client:
Site Address:
Project Details:
Behan House,
10 Lower Mount Street,
Dublin 2. D02 HT71
Tel: +353 1 661 1100
e-mail: [email protected]
Web: www.cora.ie
Stage:
Type: Discipline:Level:Zone:Originator:Project:
Date:
PLANNING
TGB KO'M KO'M 08/04/2019
THE BREWERY BLOCK
1896
SITE LOCATION PLAN
1:250 @A1
TBB CORA 00 ZZ DR C 001 - PL2
NEWMARKET, DUBLIN 8
SUMMIX
HENRY J. LYONS ARCHITECTS
EDC ENGINEERS
REVISION SCHEDULE
REV. NO. REV. DESCRIPTION REV. DATE DRAWN CHECKED
PL1 ISSUED FOR PLANNING 14/03/2019 TGB KO'M
PL2 ISSUED FOR PLANNING 08/04/2019 TGB KO'M
N
PROPOSED WATER DISTRIBUTION & SPRINKLER MAIN PLAN
C002
-
SCALE 1:250
• ALL FOUL DRAINAGE PIPES @ 1:150 U.N.O.
• ALL SURFACE WATER PIPES ARE 150mmØ @ 1:100 U.N.O.
• PIPES TO BE LAID WITH LEVEL INVERTS.
• ALL PIPE & MANHOLE REFERENCES RELATE TO MICRODRAINAGE ANALYSIS.
• ALL FOUL AND SURFACE WATER SEWERS WITHIN DEVELOPMENT SITE TO BE UPVC
SW
FS
LEGEND:
RAIN WATER DOWN PIPE
SURFACE WATER SEWER (EXISTING)
SURFACE WATER SEWER (NEW)
ACO
FLOOR GULLY
FOUL SEWER (NEW)
FSMH (NEW FOUL)
FOUL SEWER (EXISTING)
POP UP
S.V.P.
FMH (FOUL - EXISTING)
P.U.
SOIL VENT PIPE
SWMH (NEW SURFACE)
SMH (SURFACE - EXISTING)
RWP
I.C. (SURFACE)
I.C. (FOUL)
I.C. (EXISTING)
F.G.
BACK INLET GULLY TRAPB.I.G.T.
DRAINAGE CHANNEL
FOUL SEWER (DIVERTED)
EXISTING SEWER TO BE DECOMISSIONED
WATER MAIN (EXISTING)
PROPOSED WATER SUPPLY CONNECTED TO PUBLIC
SYSTEM (UNO)
METER (EXISTING)
MH (DEMOLISHED - EXISTING)
PERFORATED PIPE IN LINEAR SOAKAWAY @ 1:200
WITH 20-40mm CRUSHED LIMESTONE SURROUND U.N.O.
SLUICE VALVE (NEW)
H NEW FIRE HYDRANT (NEW)
NEW AIR VALVE (NEW)
NEW WASHOUT HYDRANT (NEW)WO
SLUICE VALVE OPEN (EXISTING)
COMBINED SEWER (EXISTING)
CMH (COMBINED - EXISTING)
M
SLUICE VALVE CLOSED (EXISTING)
FIRE HYDRANT (EXISTING)
PROPOSED INTERNAL WATER DISTRIBUTION
S.V.
FS
SW
SPRINKLER MAIN (NEW)
RISING MAIN (NEW)
GL
+15.63
GL
+15.26
GL
+14.331
TOW
+14.931
GL
+13.66
GL
+13.92
GL
+13.87
GL
+14.09
GL
+14.17
GL
+14.04
GL
+14.02
DCC LANDS
ST LUKES AVENUE
NEWMARKET
BR
AB
AZ
ON
P
LA
CE
A
R
D
E
E
S
T
R
E
E
T
1
9
2
0
2
0
2
0
BUS STOP
1
:
2
1
1
:2
7
1:21
1:21
2
0
0
m
m
M
O
P
V
C
2
0
0
2
1
5
0
m
m
M
O
P
V
C
2
0
0
1
110m
m M
OP
VC
2000
4" CAST-IRON 1920
6" C
AS
T-IR
ON
1900
200mm MOPVC 2001
200mm MOPVC 2001
1
2
5
m
m
H
P
P
E
2
0
0
9
6
"
C
A
S
T
-
I
R
O
N
1
9
2
0
4
"
C
A
S
T
-
I
R
O
N
1
9
0
0
1
0
''
C
A
S
T
-
I
R
O
N
1
9
0
0
7
"
C
A
S
T
-
I
R
O
N
1
9
0
0
6
"
C
A
S
T
-
IR
O
N
1
9
0
0
6" C
AS
T-IR
ON
1900
M
M
6" CAST-IRON 1900
6" C
AS
T-IR
ON
1900
5
"
C
A
S
T
-
I
R
O
N
1
9
0
0
4
"
C
A
S
T
-
I
R
O
N
1
9
0
0
7
"
C
A
S
T
-
I
R
O
N
1
9
0
0
2
0
0
m
m
M
O
P
V
C
2
0
0
1
Me
A.V.
S.V.
S.V.
S.V.
S.V.
Me
S.V.
S.V.
SITE BOUNDARY
Me
S.V.
A.V.
Me
S.V.
S.V.
Me
32mmØ PE SPRINKLER
MAIN TO 35mmØ
COPPER
SPRINKLER TANK TO
MEP ENGINEERS
DETAILS
INTERNAL WATER
DISTRIBUTION 100mmØ
PE FROM PLANT ROOM
DISTRIBUTION
WATER STORAGE TO
MEP ENGINEERS
DETAILS
67mm Ø PE
INTERNAL WATER
DISTRIBUTION
POTABLE +
NON-POTABLE
FORM NEW HYDRANT
IN PUBLIC REALM
GFL:
15.500
GFL:
17.200
GFL:
14.400
GFL:
15.000
GFL:
16.400
GFL:
14.400
GFL:
15.500
Me
Me
S.V.
S.V.
S.V.
S.V.
S.V.
H
H
Me
NOTE:
NON-RETURN VALVES
TO BE INSTALLED AT
WATER STORAGE TANKS
TO PREVENT CROSS
CONTAMINATION OF THE
NETWORKS
NOTE:
NOTE:
VALVES, METERS AND HYDRANTS IN
LANDSCAPED AREAS TO BE INSTALLED
ON CONCRETE PLINTHS WITH MARKER
POSTS IN ACCORDANCE WITH IRISH
WATER STANDARD DETAILS.
DETAILS SHOWN ARE IN ACCORDANCE WITH
IRISH WATER STANDARD DETAILS AND CODES
OF PRACTICE. REFERENCE SHOULD BE MADE
TO CURRENT IRISH WATER STANDARD
DETAILS IN ADVANCE OF CONSTRUCTION.
ROOF AREA
SURFACING LEGEND:
SOFT LANDSCAPING AREA (GROUND LEVEL)
PERMEABLE PAVED AREA (GROUND LEVEL)
BUILDING OUTLINE
IMPERMEABLE PAVED AREA (GROUND LEVEL)
S.V.
S.V.
S.V.
S.V.
S.V.
H
Me
Checked by:Drawn by: Approved by:
Contractor:
Drawing Stage:
Project Name:
Drawing Title:
Revision:
Drawing No:
Scale: Project Number:
Notes
M&E Designer:
Architect:
Client:
Site Address:
Project Details:
Behan House,
10 Lower Mount Street,
Dublin 2. D02 HT71
Tel: +353 1 661 1100
e-mail: [email protected]
Web: www.cora.ie
Stage:
Type: Discipline:Level:Zone:Originator:Project:
Date:
PLANNING
TGB KO'M KO'M 15/04/2019
THE BREWERY BLOCK
1896
PROPOSED WATER DISTRIBUTION
& SPRINKLER MAIN PLAN
1:250 @A1
TBB CORA 00 00 DR C 002 - PL3
NEWMARKET, DUBLIN 8
SUMMIX
HENRY J. LYONS ARCHITECTS
EDC ENGINEERS
REVISION SCHEDULE
REV. NO. REV. DESCRIPTION REV. DATE DRAWN CHECKED
PL1 ISSUED FOR PLANNING 14/03/2019 TGB KO'M
PL2 ISSUED FOR PLANNING 08/04/2019 TGB KO'M
PL3 ISSUED FOR PLANNING 15/04/2019 TGB KO'M
N
PROPOSED FOUL DRAINAGE PLAN
C003
-
SCALE 1:250
GL
+15.63
GL
+15.26
GL
+14.331
TOW
+14.931
GL
+13.66
GL
+13.92
GL
+13.87
GL
+14.09
GL
+14.17
GL
+14.04
GL
+14.02
DCC LANDS
ST LUKES AVENUE
NEWMARKET
BR
AB
AZ
ON
P
LA
CE
A
R
D
E
E
S
T
R
E
E
T
1
9
2
0
2
0
2
0
BUS STOP
1
:
2
1
1
:2
7
1:21
1:21
1
2
0
0
m
m
Ø
C
O
N
C
R
E
T
E
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
C
W
1
4
4
0
x
8
2
0
C
W
3
0
0
m
m
Ø
CW 790 x 490 BRICK
0 UN
KNO
WN
6
0
0
m
m
Ø
C
O
N
C
R
E
T
E
225m
m Ø
U
PV
C
FS
FS
FS
FS
FS
FS
EX CMH
CL = 14.798
IL = 11.858
EX CMH
CL = 15.442
IL = 12.352
EX CMH
CL = 15.390
IL = 11.820
EX CMH
CL = 15.483
IL = 12.583
EX CMH
CL = 15.409
IL = 13.429
EX CMH
CL = 15.361
IL = 13.111
EX CMH
CL = 14.989
IL = 14.139
EX CMH
CL = 14.687
IL = 13.187
SERVICE DUCT
EX CMH
CL = 14.731
IL = 12.821
EX CMH
CL = 14.717
IL = 12.747
EX CMH
CL = 14.601
IL = 12.171
EX CMH
CL = 14.419
IL = 12.169
2
0
0
m
m
M
O
P
V
C
2
0
0
2
1
5
0
m
m
M
O
P
V
C
2
0
0
1
110m
m M
OP
VC
2000
330m
m Ø
V
IT
RIF
IE
D C
LA
Y
4" CAST-IRON 1920
6" C
AS
T-IR
ON
1900
200mm MOPVC 2001
200mm MOPVC 2001
1
4
8
0
B
R
IC
K
1
2
5
m
m
H
P
P
E
2
0
0
9
6
"
C
A
S
T
-
I
R
O
N
1
9
2
0
4
"
C
A
S
T
-
I
R
O
N
1
9
0
0
1
0
''
C
A
S
T
-
I
R
O
N
1
9
0
0
7
"
C
A
S
T
-
I
R
O
N
1
9
0
0
6
"
C
A
S
T
-
IR
O
N
1
9
0
0
6" C
AS
T-IR
ON
1900
M
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
EX CMH
CL = 14.490
IL = 11.770
600mm Ø CONCRETE
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
FS
600m
m
Ø
CO
NC
RE
TE
EX FMH
CL = 13.850
IL = 10.910
6" CAST-IRON 1900
6" C
AS
T-IR
ON
1900
5
"
C
A
S
T
-
I
R
O
N
1
9
0
0
4
"
C
A
S
T
-
I
R
O
N
1
9
0
0
7
"
C
A
S
T
-
I
R
O
N
1
9
0
0
2
0
0
m
m
M
O
P
V
C
2
0
0
1
6
0
0
m
m
Ø
C
O
N
C
R
E
T
E
300m
m V
IT
RIF
IE
D C
LA
Y
330m
m Ø
V
IT
RIF
IE
D C
LA
Y
SITE BOUNDARY
FSMH 14
CL= 14.400
IL= 13.400
FSMH 09
CL= 14.400
IL= 13.150
FSMH 08
CL= 14.400
IL= 13.250
FSMH 19
CL= 14.400
IL= 13.320
FSMH 18
CL= 14.400
IL= 13.400
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
FS
FS
F
S
FS
F
S
FS
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
FS
FS
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
FS
FS
FS
FS
FS
FS
F
S
F
S
F
S
F
S
F
S
FS
FS
FS
FS
FS
FS
FS
FS
F
S
F
S
F
S
F
S
F
S
FS
EX CMH
CL = 14.850
IL = 12.320
P.U.
P.U.
P.U.
F.G.
F.G.
F.G.
F.G.
P.U.
P.U.
P.U.
P.U.
P.U.
P.U.
F.G.
F.G.
1
5
0
m
m
Ø
2
2
5
m
m
Ø
2
2
5
m
m
Ø
1
5
0
m
m
Ø
225m
m
Ø
2
2
5
m
m
Ø
150m
mØ
225m
m
Ø
1
0
0
m
m
Ø
100m
mØ
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
0
0
m
m
Ø
1
5
0
m
m
Ø
1
5
0
m
m
Ø
1
5
0
m
m
Ø
225m
m
Ø
225m
m
Ø
225m
m
Ø
2
2
5
m
m
Ø
225m
m
Ø
150m
m
Ø
100m
mØ
1
0
0
m
m
Ø
150m
m
Ø
1
5
0
m
m
Ø
I.C 01
CL= 15.500
IL= 14.400
FSMH 01
CL= 15.500
IL= 14.500
FSMH 02
CL= 15.500
IL= 14.450
FSMH 03
CL= 15.500
IL= 14.300
FSMH 04
CL= 15.500
IL= 14.200
FSMH 05
CL= 15.000
IL= 13.800
FSMH 17
CL= 14.400
IL= 13.600
FSMH 16
CL= 14.400
IL= 13.650
FSMH 13
CL= 14.700
IL= 14.100
FSMH 06
CL= 15.000
IL= 13.500
FSMH 12
CL= 15.500
IL= 14.150
FSMH 11
CL= 15.500
IL= 14.200
FSMH 10
CL= 15.500
IL= 14.300
FSMH 07
CL= 14.400
IL= 13.400
I.C 04
CL= 15.500
IL= 14.200
I.C 02
CL= 15.500
IL= 14.460
I.C 03
CL= 15.500
IL= 14.350
GFL:
15.500
GFL:
17.200
GFL:
14.400
GFL:
15.000
GFL:
16.400
GFL:
14.400
GFL:
15.500
NEW MANHOLE AT
CONNECTION POINT
TO PUBLIC SEWER
• ALL FOUL DRAINAGE PIPES @ 1:150 U.N.O.
• ALL SURFACE WATER PIPES ARE 150mmØ @ 1:100 U.N.O.
• PIPES TO BE LAID WITH LEVEL INVERTS.
• ALL PIPE & MANHOLE REFERENCES RELATE TO MICRODRAINAGE ANALYSIS.
• ALL FOUL AND SURFACE WATER SEWERS WITHIN DEVELOPMENT SITE TO BE UPVC
SW
FS
LEGEND:
RAIN WATER DOWN PIPE
SURFACE WATER SEWER (EXISTING)
SURFACE WATER SEWER (NEW)
ACO
FLOOR GULLY
FOUL SEWER (NEW)
FSMH (NEW FOUL)
FOUL SEWER (EXISTING)
POP UP
S.V.P.
FMH (FOUL - EXISTING)
P.U.
SOIL VENT PIPE
SWMH (NEW SURFACE)
SMH (SURFACE - EXISTING)
RWP
I.C. (SURFACE)
I.C. (FOUL)
I.C. (EXISTING)
F.G.
BACK INLET GULLY TRAPB.I.G.T.
DRAINAGE CHANNEL
FOUL SEWER (DIVERTED)
EXISTING SEWER TO BE DECOMISSIONED
WATER MAIN (EXISTING)
PROPOSED WATER SUPPLY CONNECTED TO PUBLIC
SYSTEM (UNO)
METER (EXISTING)
MH (DEMOLISHED - EXISTING)
PERFORATED PIPE IN LINEAR SOAKAWAY @ 1:200
WITH 20-40mm CRUSHED LIMESTONE SURROUND U.N.O.
SLUICE VALVE (NEW)
H NEW FIRE HYDRANT (NEW)
NEW AIR VALVE (NEW)
NEW WASHOUT HYDRANT (NEW)WO
SLUICE VALVE OPEN (EXISTING)
COMBINED SEWER (EXISTING)
CMH (COMBINED - EXISTING)
M
SLUICE VALVE CLOSED (EXISTING)
FIRE HYDRANT (EXISTING)
PROPOSED INTERNAL WATER DISTRIBUTION
S.V.
FS
SW
SPRINKLER MAIN (NEW)
RISING MAIN (NEW)
NOTE:
NOTE:
VALVES, METERS AND HYDRANTS IN
LANDSCAPED AREAS TO BE INSTALLED
ON CONCRETE PLINTHS WITH MARKER
POSTS IN ACCORDANCE WITH IRISH
WATER STANDARD DETAILS.
DETAILS SHOWN ARE IN ACCORDANCE WITH
IRISH WATER STANDARD DETAILS AND CODES
OF PRACTICE. REFERENCE SHOULD BE MADE
TO CURRENT IRISH WATER STANDARD
DETAILS IN ADVANCE OF CONSTRUCTION.
ROOF AREA
SURFACING LEGEND:
SOFT LANDSCAPING AREA (GROUND LEVEL)
PERMEABLE PAVED AREA (GROUND LEVEL)
BUILDING OUTLINE
IMPERMEABLE PAVED AREA (GROUND LEVEL)
Checked by:Drawn by: Approved by:
Contractor:
Drawing Stage:
Project Name:
Drawing Title:
Revision:
Drawing No:
Scale: Project Number:
Notes
M&E Designer:
Architect:
Client:
Site Address:
Project Details:
Behan House,
10 Lower Mount Street,
Dublin 2. D02 HT71
Tel: +353 1 661 1100
e-mail: [email protected]
Web: www.cora.ie
Stage:
Type: Discipline:Level:Zone:Originator:Project:
Date:
PLANNING
TGB KO'M KO'M 15/04/2019
THE BREWERY BLOCK
1896
PROPOSED FOUL DRAINAGE PLAN
1:250 @A1
TBB CORA 00 00 DR C 003 - PL3
NEWMARKET, DUBLIN 8
SUMMIX
HENRY J. LYONS ARCHITECTS
EDC ENGINEERS
REVISION SCHEDULE
REV. NO. REV. DESCRIPTION REV. DATE DRAWN CHECKED
PL1 ISSUED FOR PLANNING 14/03/2019 TGB KO'M
PL2 ISSUED FOR PLANNING 08/04/2019 TGB KO'M
PL3 ISSUED FOR PLANNING 15/04/2019 TGB KO'M
N
15
.50
014
.50
0
14
.47
2
FSMH 02
F1.001
150
150.0
15
.50
014
.45
0
14
.38
2
10.129
FSMH 03
F1.002
225
150.0
15
.50
014
.30
0
14
.23
9
9.206
FSMH 04
F1.003
225
150.0
15
.50
014
.20
0
14
.13
5
9.825
FSMH 05
F1.004
225
150.0
15
.00
013
.80
0
13
.72
9
10.669
FSMH 06
F1.005
225
150.0
15
.00
013
.50
0
13
.39
1
16.412
FSMH 07
F1.006
225
150.7
14
.40
013
.40
0
13
.34
5
8.289
FSMH 08
F1.007
225
150.0
14
.40
013
.25
0
13
.14
6
15.538
14
.40
013
.15
0
13
.11
7
FSMH
14
.40
0
MH Name
PN
Dia (mm)
Slope (1:150)
Cover Level (m)
Invert Level (m)
Length (m)
Datum (m)-12.000
Ver. Scale = 1:100
Hor. Scale = 1:500
15.500
P.S.L
15.000
P.S.L
14.400
F1.000
150
150.0
F3.003
CL= 14.400
IL= 13.320
F2.002
CL= 15.000
IL= 14.150
12.281
P.S.L
EXISTING 330mmØ
PUBLIC FOUL SEWER
BRABAZON
PLACE
Checked by:Drawn by: Approved by:
Contractor:
Drawing Stage:
Project Name:
Drawing Title:
Revision:
Drawing No:
Scale: Project Number:
Notes
M&E Designer:
Architect:
Client:
Site Address:
Project Details:
Behan House,
10 Lower Mount Street,
Dublin 2. D02 HT71
Tel: +353 1 661 1100
e-mail: [email protected]
Web: www.cora.ie
Stage:
Type: Discipline:Level:Zone:Originator:Project:
Date:
PLANNING
TGB KO'M KO'M 14/03/2019
THE BREWERY BLOCK
1896
LONGITUDINAL SECTION THROUGH FOUL SEWER
N.T.S @A1
TBB CORA 00 00 DR C 005 - PL1
NEWMARKET, DUBLIN 8
SUMMIX
HENRY J. LYONS ARCHITECTS
EDC ENGINEERS
REVISION SCHEDULE
REV. NO. REV. DESCRIPTION REV. DATE DRAWN CHECKED
PL1 ISSUED FOR PLANNING 14/03/2019 TGB KO'M
N
150mm THICK CONCRETE
SURROUND (GRADE
C16/20 Dmax 20 TO SHAFT)
150mm THICK CONCRETE SURROUND
(GRADE C15 N20 TO SHAFT)
FOUL SEWER MANHOLES TO BE
RENDERED INTERNALLY RENDER
IN 2 COATS, INCORPORATING AN
APPROVED WATERPROOFING
AGENT
75 MIN.
50
225
MIN
500
MIN
2400 MIN.
500
MIN
`ID'
900
`ID'
300
STAGGERED
(1m TO 3m DEEP, COVER LEVEL TO PIPE SOFFIT) (FOR
INTERNAL DIAMETER OF MANHOLE (I.D.) REFER TO
SCHEDULE.)
300
STAGGERED
1:1
2
1:1
2
1
:1
2
1:1
2
700 MIN.
900 MIN.
300
STAGGERED
150
150
(3 TO 5m DEEP, COVER LEVEL TO PIPE SOFFIT) (FOR
INTERNAL DIAMETER OF MANHOLE (I.D.) REFER TO
SCHEDULE)
500 MAX
500 MAX
225
MIN
225mm TO INVERT OF PIPE
225mm TO INVERT OF PIPE
75 MIN.
50
50
TOE HOLES TO BE PROVIDED IN
BENCHING OF SEWER GREATER THAN
450mm Ø (150Wd x 100High x 150 Dp. @
300 crs.)
TOE HOLES TO BE PROVIDED IN
BENCHING OF SEWER GREATER
THAN 450mm Ø (150Wd x 100High
x 150 Dp. @ 300 crs.)
CHAMBERS WITH OUTGOING PIPES
GREATER THAN 600mm DIA. SHALL BE
FITTED WITH GUARD BARS, SAFETY
CHAINS OR OTHER SAFETY DEVICES
CHAMBERS WITH OUTGOING PIPES
GREATER THAN 600mm DIA. SHALL BE
FITTED WITH GUARD BARS, SAFETY
CHAINS OR OTHER SAFETY DEVICES
GALVANISED MILD STEEL
STEPS AT 300mm crs.
STAGGERED
600mm LONG MAX.
ROCKER PIPE
600mm LONG MAX.
ROCKER PIPE
HEAVY DUTY (LOADING CLASS D400) DUCTILE
IRON NON VENTILATING AND REMOVABLE
COVER & FRAME TO I.S. EN 124
FRAME TO BE BEDDED & HAUNCHED
WITH DESIGNATION (i) MORTAR
BRICKWORK-CLASS A ENGINEERING
BRICKS TO I.S. 91 WITH DESIGINATION
(i) MORTAR (MINIMUM 2 COURSES,
MAXIMUM 5)
HEAVY DUTY REINFORCED COVER
AND
REDUCING SLABS BEDDED WITH
MORTAR, PROPRIETARY BITUMEN OR
RESIN MASTIC SEALANT
FOUL SEWER MANHOLES TO
BE RENDERED INTERNALLY
20mm (TYP.)
CONSTRUCTION
JOINT
INVERTS FORMED
GENERALLY
USING CHANNEL PIPES
PRECAST CONCRETE SHAFT AND
CHAMBER SECTIONS TO BE BEDDED WITH
MORTAR PROPRIETARY BITUMEN RESIN
MASTIC SEALANT OR ELASTOMETRIC
RINGS
INTEGRAL CONCRETE BENCHING &
BASE SLAB SHALL BE FORMED IN
C30/N20 CONCRETE. BENCHING SHALL
BE STEEL FLOATED TO A HARD SMOOTH
SURFACE WITH A 20mm CEMENT SAND
MORTAR LAID MONOLITHICALLY
600mm LONG MAX.
ROCKER PIPE
600mm LONG MAX.
ROCKER PIPE
CONCRETE
BASE
OUTLINE OF COVER OPENING ABOVE
(SQUARE OR CIRCULAR)
HEAVY DUTY (LOADING CLASS D400)
DUCTILE
IRON NON VENTILATING AND
REMOVABLE
COVER & FRAME TO I.S. EN 124
CONSTRUCTION JOINT
INVERTS FORMED GENERALLY
USING CHANNEL PIPES
BRICKWORK-CLASS A ENGINEERING
BRICKS TO I.S. 91 WITH DESIGINATION
(i) MORTAR (MINIMUM 2 COURSES,
MAXIMUM 5)
PRECAST CONCRETE SHAFT AND CHAMBER
SECTIONS TO BE BEDDED WITH MORTAR,
TOGETHER WITH PROPRIETARY BITUMEN
RESIN MASTIC SEALANT OR ELASTOMETRIC
RINGS
FOUL SEWER MANHOLES TO BE
RENDERED INTERNALLY RENDER
IN 2 COATS, INCORPORATING AN
APPROVED WATERPROOFING
AGENT
INTEGRAL CONCRETE BENCHING & BASE
SLAB SHALL BE FORMED IN C30/N20
CONCRETE. BENCHING SHALL BE STEEL
FLOATED TO A HARD SMOOTH SURFACE
WITH A 20mm THICK COAT OF 1:3 CEMENT
SAND MORTAR LAID MONOLITHICALLY
GALVANISED MILD STEEL
STEPS
@ 300mm crs. STAGGERED
HEAVY DUTY REINFORCED COVER AND
REDUCING SLABS BEDDED WITH
MORTAR, PROPRIETARY BITUMEN OR
RESIN MASTIC SEALANT
FRAME TO BE BEDDED & HAUNCHED
WITH DESIGNATION (i) MORTAR
150mm THICK CONCRETE SURROUND
(GRADE
C16/20 Dmax 20 TO SHAFT)
150mm THICK CONCRETE SURROUND (GRADE
C16/20 Dmax 20 TO SHAFT)
600mm LONG MAX.
ROCKER PIPE
CONCRETE BASE
OUTLINE OF COVER OPENING ABOVE
(SQUARE OR CIRCULAR)
600mm LONG MAX.
ROCKER PIPE
PIPE JOINT WITH CHANNEL TO
BE LOCATED MIN. 100mm
INSIDE FACE OF CHAMBER
SHORT LENGTH PIPE TO BE SIMILAR LENGTH
TO ROCKER PIPE. JOINT TO BE AS CLOSE AS
PRACTICABLE TO FACE OF MH TO PERMIT
SATISFACTORY JOINT AND SUBSEQUENT
MOVEMENT
GALVANISED MILD STEEL STEPS
@ 300mm crs. THROUGHOUT
PIPE JOINT WITH CHANNEL TO BE
LOCATED MIN. 100mm INSIDE
FACE OF CHAMBER
SHORT LENGTH PIPE TO BE SIMILAR LENGTH
TO ROCKER PIPE. JOINT TO BE AS CLOSE AS
PRACTICABLE TO FACE OF MH TO PERMIT
SATISFACTORY JOINT AND SUBSEQUENT
MOVEMENT
PIPE JOINT WITH CHANNEL TO BE
LOCATED MIN. 100mm INSIDE
FACE OF CHAMBER
GALVANISED MILD STEEL STEPS
@ 300mm crs. THROUGHOUT
SECTION THRU' MANHOLE
-
-
SCALE 1:20
PLAN ON MANHOLE (TYPE A)
-
-
SCALE 1:20
PLAN ON MANHOLE (TYPE C)
-
-
SCALE 1:20
PLAN ON MANHOLE (TYPE D)
-
-
SCALE 1:20
SECTION THRU' MANHOLE
-
-
SCALE 1:20
(1m DEEP, COVER LEVEL TO PIPE SOFFIT)
1:1
21:1
2
150
MIN.
600
FRAME TO BE BEDDED &
HAUNCHED WITH DESIGNATION
(i) MORTAR
BRICKWORK-CLASS A
ENGINEERING BRICKS TO I.S.
91 WITH DESIGINATION (i)
MORTAR (MINIMUM 2
COURSES, MAXIMUM 5)
BENCHING SHALL BE FORMED IN C30 N20
CONCRETE. FLOATED TO A HARD SMOOTH
SURFACE WITH A 20mm THICK COAT OF 1:3
CEMENT SAND MORTAR LAID
MONOLITHICALLY
INVERTS FORMED GENERALLY USING
CHANNEL PIPES
150mm THICK CONCRETE BASE (GRADE C30
N20) REINFORCED WITH A393 MESH
REINFORCEMENT TOP & BOTTOM
HEAVY DUTY (LOADING CLASS D400) DUCTILE
IRON NON VENTILATING AND REMOVABLE
COVER & FRAME TO I.S. EN 124
225mm THK. GRADE C30 N20 COVER SLAB
REINFORCEMENT WITH H12's @ 100 crs.
EW BOTTOM (BEDDED ON MORTAR OR
MASTIC SELANT IF PRECAST)
215mm WIDE 21N CONCRETE
BLOCKS TO I.S. 20 WITH
DESIGNATION (i) MORTAR
GALVANISED MILD STEEL
STEPS AT 300mm crs.
STAGGERED
2no. COATS OF 1:3 CEMENT SAND RENDER
INCORPORATING AN APPROVED
WATERPROOFING AGENT, 20mm Thk.
OVERALL INTERNALLY AND EXTERNALLY
SECTION THRU' MANHOLE
-
-
SCALE 1:20
GALVANISED MILD STEEL
LADDER
150mm THICK CONCRETE SURROUND (GRADE
C16/20 Dmax 20 TO SHAFT)
INTEGRAL CONCRETE BENCHING & BASE
SLAB SHALL BE FORMED IN C30/N20
CONCRETE. BENCHING SHALL BE STEEL
FLOATED TO A HARD SMOOTH SURFACE
WITH A 20mm THICK COAT OF 1:3 CEMENT
SAND MORTAR LAID MONOLITHICALLY
500
MIN
900
2400 MIN.
`ID'
1:1
21:1
2
225mm TO INVERT OF PIPE
500 MAX
75 MIN.
50
225
MIN
(5 TO 6m DEEP, COVER LEVEL TO PIPE SOFFIT) (FOR
INTERNAL DIAMETER OF MANHOLE (I.D.) REFER TO
SCHEDULE.)
50
CHAMBERS WITH OUTGOING PIPES
GREATER THAN 600mm DIA. SHALL BE
FITTED WITH GUARD BARS, SAFETY
CHAINS OR OTHER SAFETY DEVICES
TOE HOLES TO BE PROVIDED IN
BENCHING OF SEWER GREATER THAN
450mm Ø (150Wd x 100High x 150 Dp.
@ 300 crs.)
FOUL SEWER MANHOLES TO BE
RENDERED INTERNALLY RENDER
IN 2 COATS, INCORPORATING AN
APPROVED WATERPROOFING
AGENT
FRAME TO BE BEDDED & HAUNCHED
WITH DESIGNATION (i) MORTAR
BRICKWORK-CLASS A ENGINEERING
BRICKS TO I.S. 91 WITH DESIGINATION
(i) MORTAR (MINIMUM 2 COURSES,
MAXIMUM 5)
150mm THICK CONCRETE SURROUND
(GRADE C15 N20 TO SHAFT)
PRECAST CONCRETE SHAFT AND CHAMBER
SECTIONS TO BE BEDDED WITH MORTAR,
TOGETHER WITH PROPRIETARY BITUMEN
RESIN MASTIC SEALANT OR ELASTOMETRIC
RINGS
150mm THICK CONCRETE SURROUND
(GRADE C16/20 Dmax 20 TO SHAFT)
HEAVY DUTY REINFORCED COVER AND
REDUCING SLABS BEDDED WITH
MORTAR, PROPRIETARY BITUMEN OR
RESIN MASTIC SEALANT
HEAVY DUTY (LOADING CLASS D400) DUCTILE
IRON NON VENTILATING AND REMOVABLE
COVER & FRAME TO I.S. EN 124
GALVANISED MILD STEEL LADDER FIXED
TO MANHOLE WITH STAINLESS BOLTS
WITH NEOPRENE BUSHES THROUGH
MILD STEEL HOLES
CONSTRUCTION JOINT
INVERTS FORMED GENERALLY
USING CHANNEL PIPES
600mm LONG MAX.
ROCKER PIPE
CONCRETE BASE
OUTLINE OF COVER OPENING ABOVE
(SQUARE OR CIRCULAR)
600mm LONG MAX.
ROCKER PIPE
SHORT LENGTH PIPE TO BE SIMILAR LENGTH
TO ROCKER PIPE. JOINT TO BE AS CLOSE AS
PRACTICABLE TO FACE OF MH TO PERMIT
SATISFACTORY JOINT AND SUBSEQUENT
MOVEMENT
PIPE JOINT WITH CHANNEL TO BE
LOCATED MIN. 100mm INSIDE
FACE OF CHAMBER
SECTION THRU' MANHOLE
-
-
SCALE 1:20
PLAN ON MANHOLE (TYPE E)
-
-
SCALE 1:20
50
MANHOLE - INTERNAL DIMENSIONS
PIPE Ø
(mm)
MANHOLE TYPE
A C D E
UP TO 225 700 x 900 900Ø
300 700 x 900 1050Ø 1050Ø 1050Ø
375 700 x 900 1050Ø 1050Ø 1050Ø
450 700 x 900 1050Ø 1050Ø 1050Ø
525 700 x 900 1200Ø 1200Ø 1200Ø
600 1200Ø 1200Ø 1200Ø
675 1350Ø 1350Ø 1350Ø
750 1350Ø 1500Ø 1500Ø
900 1500Ø 1500Ø 1500Ø
STOPPER
CHAIN
225mm GRADE C25/20
CONCRETE SURROUND
225mm GRADE C25/20
CONCRETE SURROUND
90° BEND
45° BEND
Y - JUNCTION
150mm CONCRETE
SURROUND
150mm DIA PVC PIPE
COVER TO BE SET AS
PER MANUFACTURER'S
SPECIFICATION
HEAVY DUTY COVER AND
FRAME D400 (TO SUIT
150mm OPE)
(150mm-450mm DIA (INCL.) DROP GREATER THAN 1700mm)
BACKDROP MANHOLE (TYPE 1)
-
-
N.T.S.
(500mm-900mm DIA (INCL.) DROP GREATER THAN 2300mm)
STOPPER
CHAIN
150
225mm GRADE C25/20
CONCRETE SURROUND
225mm GRADE C25/20
CONCRETE SURROUND
45° BEND
TEE JUNCTION
150mm CONCRETE
SURROUND
150mm DIA PVC PIPE
COVER TO BE SET AS
PER MANUFACTURER'S
SPECIFICATION
HEAVY DUTY COVER AND
FRAME D400 (TO SUIT
150mm OPE)
(150mm-450mm DIA (INCL.) DROP GREATER THAN 900mm AND LESS THAN 1700mm)
BACKDROP MANHOLE (TYPE 2)
-
-
N.T.S.
(500mm-900mm DIA (INCL.) DROP GREATER THAN 1300mm AND LESS THAN 2300mm)
(150mm-450mm DIA (INCL.) DROP GREATER THAN 600mm AND LESS THAN 900mm)
BACKDROP MANHOLE (TYPE 3)
-
-
N.T.S.
(500mm-900mm DIA (INCL.) DROP GREATER THAN 600mm AND LESS THAN 1300mm)
STOPPER
CHAIN
225mm GRADE C25/20
CONCRETE SURROUND
225mm GRADE C25/20
CONCRETE SURROUND
45° BEND
Y-JUNCTION
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm)
UNLESS NOTED OTHERWISE.
2. RODDING EYE CHAMBER SHALL BE
COVERED WITH APPROVED HEAVY DUTY
METAL COVERS TO IS 261 AND BS 5834.
COVER AND FRAME SHALL BE SUITABLE
FOR ROAD AND TRAFFIC CONDITIONS AND
IS SUBJECT TO THE APPROVAL OF IRISH
WATER.
3. ALL CHAMBERS TO BE CHECKED FOR
UPLIFT BY THE DEVELOPER BASED ON
GROUND CONDITIONS WITHIN THE SITE.
SHOULD ANTI FLOATATION MEASURES BE
REQUIRED THEY SHALL BE SUBJECT TO
APPROVAL FROM IRISH WATER.
4. ALL CONCRETE TO BE IN ACCORDANCE
WITH IS EN 206.
5. MANHOLE DETAILS TO BE IN ACCORDANCE
WITH IRISH WATER STANDARDS.
1. ALL ENGINEERS DRAWINGS TO BE READ IN CONJUNCTION
WITH RELEVANT DRAWINGS AND SPECIFICATIONS.
2. ALL SETTING OUT TO ARCHITECTS DRAWINGS.
3. DO NOT SCALE FROM ENGINEERS DRAWINGS.
4. ANY DISCREPANCIES BETWEEN DRAWINGS, SKETCHES,
VERBAL INSTRUCTIONS AND SITE CONDITIONS TO BE
REFERRED TO THE DESIGN TEAM BEFORE WORK
COMMENCES.
5. ALL LEVELS ARE STRUCTURAL UNLESS NOTED OTHERWISE.
6. DETAILS SHOWN ARE IN ACCORDANCE WITH IRISH WATER
STANDARD DETAILS AND CODES OF PRACTICE.
REFERENCE SHOULD BE MADE TO CURRENT IRISH WATER
STANDARD DETAILS IN ADVANCE OF CONSTRUCTION.
7. VALVES, METERS AND HYDRANTS IN LANDSCAPED AREAS TO
BE INSTALLED ON CONCRETE PLINTHS WITH MARKER POSTS
IN ACCORDANCE WITH IRISH WATER STANDARD DETAILS.
Checked by:Drawn by: Approved by:
Contractor:
Drawing Stage:
Project Name:
Drawing Title:
Revision:
Drawing No:
Scale: Project Number:
Notes
M&E Designer:
Architect:
Client:
Site Address:
Project Details:
Behan House,
10 Lower Mount Street,
Dublin 2. D02 HT71
Tel: +353 1 661 1100
e-mail: [email protected]
Web: www.cora.ie
Stage:
Type: Discipline:Level:Zone:Originator:Project:
Date:
PLANNING
TGB KO'M KO'M 14/03/2019
THE BREWERY BLOCK
1896
STANDARD WATER SERVICES DETAILS
SHEET 1/4
A.S @A1
TBB CORA XX ZZ DR C 010 - PL1
NEWMARKET, DUBLIN 8
SUMMIX
HENRY J. LYONS ARCHITECTS
EDC ENGINEERS
REVISION SCHEDULE
REV. NO. REV. DESCRIPTION REV. DATE DRAWN CHECKED
PL1 ISSUED FOR PLANNING 14/03/2019 TGB KO'M
TYPE 'A'
-
-
N.T.S.
150
1 2
X
E
XT
ER
NA
L
Ø P
IP
E
TYPE 'C'
-
-
N.T.S.
TYPE 'D'
-
-
N.T.S.
TYPE 'B'
-
-
N.T.S.
15
01
50
150150
EXTERNALØ
OF PIPE
EX
TE
RN
AL
Ø
PIP
E
15
01
50
EX
TE
RN
AL
Ø
PIP
E
150150
EXTERNALØ
OF PIPE
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm)
UNLESS NOTED OTHERWISE.
2. CONCRETE PIPE BEDS AND HAUNCHES MAY
BE REQUIRED TO ADDRESS MINIMUM
COVER SITUATIOS, AND SHALL BE SUBJECT
TO SUBMISSION AND ASSESMENT BY IRISH
WATER BEFORE ADVANCING WITH THE
WORKS.
3. CONCRETE PIPE BEDS AND HAUNCHES
SHALL HAVE A MINIMUM THICKNESS OF
150mm WITH AN ABSOLUTE MINIMUM DEPTH
OF COVER ABOVE THE EXTERNAL CROWN
OF THE PIPE OF 750mm.
4. CONCRETE TO BE IN ACCORDANCE WITH IS
EN 206 AND TO BE CLASS C16/20.
5. THE HAUNCHES AND SURROUNDS TO BE
FORMED USING FORM WORK TO PROVIDE A
ROUGH CAST FINISH.
6. EXPANSION JOINTS IN THE CONCRETE
SHALL BE PROVIDED AT ALL PIPE JOINTS TO
ALLOW FOR PIPE FLEXIBILITY,
COMPRESSIBLE FILLER BOARD TO BE IN
ACCORDANCE WITH BS EN 622-1 AND BS EN
622-4, AN TO BE 18mm THICK.
7. POLYETHYLENE PIPES SHALL BE WRAPPED
IN PLASTIC SHEETING HAVING A
COMPOSITION IN ACCORDANCE WITH BS
6076 BEFORE BEING CAST INTO CONCRETE.
8. BITUMINOUS MATERIAL SHALL NOT BE PUT
IN CONTACT WITH PE OR PVC PIPES.
FLOWFLOW
150
EX
TE
RN
AL Ø
OF
P
IP
E
150
COMPRESSIBLE FILLER
EXPANSION JOINT WITH
COMPRESSIBLE FILLER BOARD
CONCRETE PIPE SURROUND
SPIGOT AND SOCKET JOINT
-
-
N.T.S.
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm)
UNLESS NOTED OTHERWISE.
2. THE MINIMUM DEPTH OF COVER FROM THE
FINISHED SURFACE TO THE CROWN OF
GRAVITY PIPES WITHOUT PROTECTION
SHOULD BE AS FOLLOWS:
A) GARDENS AND PATHWAYS WITHOUT ANY
POSSIBILITY OF VEHICULAR ACCESS
-DEPTH NOT LESS THAN 0.5m (THIS
WOULD NORMALLY RELATE TO DRAINS IN
PRIVATE PROPERTY, SHALLOW PIPES OF
THIS NATURE ARE UNDESIRABLE AND
SHOULD BE INSTALLED IN ACCORDANCE
WITH THE CURRENT BUILDING
REGULATIONS)
B) DRIVEWAYS, PARKING AREAS AND YARDS
WITH HEIGHT RESTRICTIONS TO PREVENT
ENTRY BY VEHICLES WITH A GROSS
VEHICLE WEIGHT IN EXCESS OF 7.5
TONNES - DEPTH NOT LESS THAN 0.75m.
C) DRIVEWAYS, PARKING AREAS AND
NARROW STREETS WITHOUT FOOTWAYS
(E.G. MEWS DEVELOPMENTS) WITH
LIMITED ACCESS FOR VEHICLES WITH A
GROSS VEHICLE WEIGHT IN EXCESS OF
7.5 TONNES - DEPTH NOT LESS THAN 0.9m
D) DEPTHS OF SEWERS IN GATED ESTATES
SHALL BE SIMILAR TO THAT OUTLINED
ABOVE
E) AGRICULTURAL LAND AND PUBLIC OPEN
SPACE - DEPTH NOT LESS THAN 0.9m
F) OTHER HIGHWAYS AND PARKING AREAS
WITH UNRESTRICTED ACCESS TO
VEHICLES WITH A GROSS VEHICLE
WEIGHT IN EXCESS OF 7.5 TONNES -
DEPTH NOT LESS THAN 1.2m
3. CLAUSE 808 MATERIAL IN ACCORDANCE
WITH THE NATIONAL ROADS AUTHORITY
SPECIFICATION FOR ROAD WORKS IS TO BE
USED AS BACKFILL MATERIAL WHERE THE
SEWER MAIN IS LOCATED IN ROADS,
FOOTPATHS OR WHEN THE NEAREST PART
OF THE TRENCH IS WITHIN 1m OF THE
PAVED EDGE OF THE ROADWAY. CLAUSE
808 IS TO BE COMPACTED AS PER CLAUSE
802 OF THE NATIONAL ROADS AUTHORITY
SPECIFICATION FOR ROAD WORKS.
4. SELECTED EXCAVATED MATERIAL MAY BE
USED IN GREEN-FIELD AREAS ABOVE
GRANULAR PIPE SURROUND MATERIAL
SUBJECT TO THE APPROVAL OF IRISH
WATER.
5. PIPE BEDDING SHALL COMPLY WITH
WIS-08-02 AND IGN 4-08-01 GRANULAR
MATERIAL SHALL BE 14mm TO 5mm GRADED
AGGREGATE OR 10mm SINGLE SIZED
AGGREGATE IS EN 13242. CONCRETE BED,
HAUNCH & SURROUND, WHERE REQUIRED
SHALL BE TO IRISH WATER STANDARDS.
6. IN SOFT GROUND CONDITIONS (CBR <5)
THE MATERIAL SHOULD BE EXCAVATED
AND DISPOSED OF IN ACCORDANCE WITH
THE WASTE MANAGEMENT ACT AND
CLAUSE 808 MATERIAL IN ACCORDANCE
WITH THE NATIONAL ROADS AUTHORITY
SPECIFICATION FOR ROAD WORKS SHALL
REPLACE THE EXCAVATED MATERIAL,
WRAPPED IN GEO-TEXTILE WRAPPING,
ALTERNATIVELY, SPECIAL PIPE SUPPORT
ARRANGEMENTS, INCLUDING PILING ETC.
MAY BE REQUIRED WHERE THE DEPTH OF
SOFT MATERIAL IS EXCESSIVE. SUCH
ARRANGEMENTS SHALL BE SUBJECT TO
ASSESSMENT BY IRISH WATER BEFORE
ADVANCING WITH THE WORK.
7. IN GREEN FIELD AREAS, TYPE B BACKFILL
(SELECTED EXCAVATED MATERIAL) WILL BE
ALLOWED ABOVE THE SIDE HAUNCH
GRANULAR MATERIAL IN THE CASE OF
RIGID PIPES. A GRANULAR SURROUND OF A
MINIMUM DEPTH OF 150mm ABOVE THE
CROWN OF THE PIPE IS REQUIRED FOR
FLEXIBLE PIPES, AND TYPE B MATERIAL
MAY BE USED AS BACKFILL ABOVE THIS.
ALL RISING MAINS IN GREENFIELD AREAS
SHALL HAVE A MINIMUM COVER OF
300mmOF GRANULAR MATERIAL ABOVE THE
EXTERNAL CROWN OF THE PIPE.
8. PIPES SHALL NOT BE SUPPORTED ON
STONES, ROCKS OR ANY HARD OBJECTS AT
ANY POINT ALONG THE TRENCH, ROCK
SHALL BE EXCAVATED TO A DEPTH OF
150mm BELOW THE ACTUAL DEPTH OF THE
TRENCH WITH THE VOID FILLED WITH
CLAUSE 808 MATERIAL IN ACCORDANCE
WITH THE NATIONAL ROADS AUTHORITY
SPECIFICATION FOR ROAD WORKS. THE
GRANULAR MATERIAL SHALL BE LAID
ABOVE THIS VOID BACKFILL MATERIAL.
9. NON DEGRADABLE MARKER TAPE SHOULD
BE INSTALLED AT TOP OF PIPE BEDDING
LAYER. IN THE CASE OF NON METAL PIPE
MATERIAL, THE TAPE SHOULD
INCORPORATE A TRACE WIRE WHICH IS
LINKED TO FITTINGS AND TERMINATED AT
THE WASTE WATER PUMPING STATION AND
DISCHARGE MANHOLE.
10. TRENCH WIDTHS FOR PIPE SIZES ≤80mm
MAY BE <500mm, SUBJECT TO
CONSIDERATION BEING GIVEN TO THE
TRENCH DEPTH, HEALTH & SAFETY &
CONSTRUCTION ACCESS TO
REQUIREMENTS.
MARKER TAPE REFER TO NOTE 9
FOR DETAILS
MIN. TRENCH
WIDTH "B"
BACKFILL REFER TO
NOTE 3 FOR DETAILS
PIPE BEDDING REFER TO
NOTE 5 FOR DETAILS
CROSS SECTION IN ROADS
-
-
N.T.S
PIPE Ø "A"
C'
300
ROAD / FOOTPATH SURFACE
SE
E N
OT
E 2
MARKER TAPE REFER TO NOTE 9
FOR DETAILS
MIN. TRENCH
WIDTH "B"
BACKFILL REFER TO
NOTE 4 FOR DETAILS
PIPE BEDDING REFER TO
NOTE 5 FOR DETAILS
CROSS SECTION IN ROADS
-
-
N.T.S
PIPE Ø "A"
C'
VA
RIE
S S
EE
NO
TE
7
GRASSED AREAS
SE
E N
OT
E 2
DRAINAGE PIPEWORK WITHIN BUILDINGS
-
-
N.T.S
100
VARIES
BEDROCK
TRENCH EXCAVATED
IN BEDROCK
SECTION A-A CROSS SECTION OF
LEAN MIX BED AND
SURROUND TO PIPEWORK
1. THE SEPARATION DISTANCES OUTLINED ARE MINIMUM REQUIREMENTS.
2. SPECIFIC SEPARATION CLEARANCE DISTANCES IN EXCESS OF THESE MINIMA SHALL BE PROVIDED FOR
SERVICES SUCH AS GAS, ELECTRICITY, FIBRE-OPTIC OR OIL FILLED CABLES AS THE CASE MAY BE.
THE PARTICULAR UTILITY PROVIDERS SHALL BE CONSULTED TO DETERMINE THESE MINIMUM SEPARATION
DISTANCES AND EVIDENCE OF THIS CONSULTATION, WITH THE SPECIFIED SEPARATION DISTANCES,
SHALL BE PROVIDED TO IRISH WATER AT DESIGN STAGE.
3. WATERMAIN (PROPOSED) SEPARATION DISTANCES
HORIZONTAL
300mm TO DISTRIBUTION MAINS OF LESS THAN 300mm DIAMETER.
500mm TO TRUNK MAINS BETWEEN 300mm AND 450mm DIAMETER.
3m TO ARTERIAL WATER MAINS OF GREATER THAN 450mm DIAMETER.
VERTICAL
300mm TO DISTRIBUTION MAINS OF LESS THAN 300mm DIAMETER.
500mm TO TRUNK/ARTERIAL MAINS OF DIAMETER GREATER THAN 300mm.
ANY PROPOSED PIPE CROSSING SHOULD BE LOCATED MID-WAY BETWEEN THE WATER JOINTS WITH MINIMUM
CLEAR DISTANCE OF 300mm AND UP TO 500mm. ALL CROSSINGS SHOULD BE AT LEAST 500mm AWAY FROM FITTINGS OR JOINTS.
4. WATERMAIN (EXISTING) SEPARATION DISTANCES
HORIZONTAL
500mm AT EITHER SIDE OF MAINS UP TO AND INCLUDING 200mm IN DIAMETER.
1m AT EITHER SIDE OF MAINS OF 225mm TO 250mm DIAMETER.
2m AT EITHER SIDE OF MAINS OF 300mm TO 375mm IN DIAMETER.
5m AT EITHER SIDE OF MAINS OF 400mm AND 450mm IN DIAMETER.
SPECIFIC IRISH WATER ADVISED DISTANCES FOR MAINS IN EXCESS OF 475mm DIAMETER.
5. NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN THE FOLLOWING DISTANCES FROM AN EXISTING WATER MAIN OR WASTEWATER RISING MAIN:-
HORIZONTAL
1000mm AT EITHER SIDE OF EXISTING MAINS LESS THAN OR EQUAL TO 200mm DIAMETER
2000mm AT EITHER SIDE OF EXISTING MAINS OF 250mm TO 350mm DIAMETER
5000mm AT EITHER SIDE OF EXISTING MAINS OF DIAMETER GREATER THAN 350mm DIAMETER
WHERE DUCTS OR PIPES ARE TO BE LAID CLOSE TO AN EXISTING WATERMAIN OR SEWER IN THE OWNERSHIP OF IRISH WATER,
NOTIFICATION IN WRITING SHALL BE PROVIDED A MINIMUM OF 10 DAYS AHEAD OF ADVANCEMENT OF THE WORK
NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN 1.5m DISTANCE OF A WASTEWATER SEWER.
REQUIREMENTS SHALL ALSO APPLY TO TRIAL HOLES OR SLIT TRENCHES TO LOCATE THE MAIN OR GAIN GROUND INFO DATA.
LARGER DIAMETERS >300mm DISTRIBUTION AND TRUNK MAINS, IRISH WATER MUST BE NOTIFIED AT LEAST 1 MONTH IN ADVANCE.
DEVELOPERS SHALL ALSO COMPLY WITH ANY NOTIFICATION REQUIREMENTS OF OTHER UTILITY PROVIDERS (ESB, GAS MAIN, TELECOMMUNICATION ETC).
6. DETAILED PROPOSALS, INCLUDING WORK METHOD STATEMENTS, INSURANCE CONFIRMATION AND DETAILS OF WORK COMPLETED OF A SIMILAR NATURE MUST
BE SUBMITTED TO IRISH WATER FOR ITS CONSIDERATION BEFORE APPROVAL WILL ISSUE. ALL SUCH WORKS IN THE VICINITY OF ARTERIAL WATER MAINS AND SEWER
(MAINS GREATER THAN 400mm) SHALL BE SUBJECT TO WRITTEN AGREEMENT WITH IRISH WATER BEFORE CONSTRUCTION COMMENCES ON SITE. THIS AGREEMENT
SHALL ALSO INCLUDE ANY NECESSARY PROTECTION FOR WATER MAINS.
7. ANY DAMAGE SHALL BE NOTIFIED IMMEDIATELY TO IRISH WATER. THE PERSON WHO CAUSES THE DAMAGE TO A WATER MAIN OR FITTING WILL BE DEEMED TO HAVE
COMMITTED AN OFFENCE UNDER SECTION 45 OF THE WATER SERVICES ACT 2007.
8. WATERMAINS OF ANY SIZE SHALL NOT BE WITHIN 1m OF THE BOUNDARY TO A PREMISES.
9. UNDER NO CIRCUMSTANCES WILL IRISH WATER ACCEPT WATER MAIN INSTALLATIONS UNDER STRUCTURES, EXISTING OR PROPOSED, OR IN CLOSE PROXIMITY TO
ANY EXISTING STRUCTURES OR FEATURES THAT WILL INHIBIT ACCESS FOR POST INSTALLATION MAINTENANCE AND ACCESS.
10.WHERE THE DESIGN DEVIATES FROM THIS STANDARD DETAIL, THE DESIGN SHALL BE SUBJECT TO THE
APPROVAL OF IRISH WATER.
DIAMETER
(mm)
'C'
150
200 - 600
>600
BUILDING
3000
5000
8000
'C'
(mm)
1000mm MINIMUM 750mm
BOUNDARY WALL FOOTPATH GRASS VERGE KERB
CABLE TV
TELECOMMUNICATIONS
'A' 'A'
WATER MAIN
FOUNDATION
ELECTRICAL CORRIDOR (DEPTH AND LAYOUT
REQUIREMENTS TO BE CONFIRMED WITH
SERVICE PROVIDER)
GAS MAIN
FOUL SEWER
DIAMETER
(mm)
<300
300 - 450
>450
'A'
(mm)
300
500
3000
'B'
(mm)
300
500
500
NOTE;
NO OTHER SERVICES
TO BE CONSTRUCTED
WITHIN THIS ZONE
STORM WATER
'B
'
MIN
. 900m
m
NOTE:
1. ALL ENGINEERS DRAWINGS TO BE READ IN CONJUNCTION
WITH RELEVANT DRAWINGS AND SPECIFICATIONS.
2. ALL SETTING OUT TO ARCHITECTS DRAWINGS.
3. DO NOT SCALE FROM ENGINEERS DRAWINGS.
4. ANY DISCREPANCIES BETWEEN DRAWINGS, SKETCHES,
VERBAL INSTRUCTIONS AND SITE CONDITIONS TO BE
REFERRED TO THE DESIGN TEAM BEFORE WORK
COMMENCES.
5. ALL LEVELS ARE STRUCTURAL UNLESS NOTED OTHERWISE.
6. DETAILS SHOWN ARE IN ACCORDANCE WITH IRISH WATER
STANDARD DETAILS AND CODES OF PRACTICE.
REFERENCE SHOULD BE MADE TO CURRENT IRISH WATER
STANDARD DETAILS IN ADVANCE OF CONSTRUCTION.
7. VALVES, METERS AND HYDRANTS IN LANDSCAPED AREAS TO
BE INSTALLED ON CONCRETE PLINTHS WITH MARKER POSTS
IN ACCORDANCE WITH IRISH WATER STANDARD DETAILS.
Checked by:Drawn by: Approved by:
Contractor:
Drawing Stage:
Project Name:
Drawing Title:
Revision:
Drawing No:
Scale: Project Number:
Notes
M&E Designer:
Architect:
Client:
Site Address:
Project Details:
Behan House,
10 Lower Mount Street,
Dublin 2. D02 HT71
Tel: +353 1 661 1100
e-mail: [email protected]
Web: www.cora.ie
Stage:
Type: Discipline:Level:Zone:Originator:Project:
Date:
PLANNING
TGB KO'M KO'M 14/03/2019
THE BREWERY BLOCK
1896
STANDARD WATER SERVICES DETAILS
SHEET 3/4
A.S @A1
TBB CORA XX ZZ DR C 012 - PL1
NEWMARKET, DUBLIN 8
SUMMIX
HENRY J. LYONS ARCHITECTS
EDC ENGINEERS
REVISION SCHEDULE
REV. NO. REV. DESCRIPTION REV. DATE DRAWN CHECKED
PL1 ISSUED FOR PLANNING 14/03/2019 TGB KO'M