CLARIFICATION - CONSIDERATION CHARACTERIZATION CLARIFICATION - CONSIDERATION CHARACTERIZATION.
RE-CONSIDERATION PRESENTATIONenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0_16_Feb... ·...
-
Upload
nguyenphuc -
Category
Documents
-
view
214 -
download
1
Transcript of RE-CONSIDERATION PRESENTATIONenvironmentclearance.nic.in/writereaddata/Online/EDS/0_0_16_Feb... ·...
RE-CONSIDERATION PRESENTATION
FOR
CRZ CLEARANCE
FOR
ECO FRIENDLY RESORT
AT
Village Manjeri (Badabalu), Andaman & Nicobar Island
Being Developed by:
M/s Smartspace Infrastructure Pvt. Ltd
67 Friends Colony West, New Delhi 110065, India.
M/s Surya Chidiya Tapu Resorts Pvt. Ltd.
SCO 30, First Floor Sector-41-D, Chandigarh, India
Environmental Consultant:
M/S PERFACT ENVIRO SOLUTIONS PVT. LTD.
(NABET Registered vide list of accredited consultants
organizations/ Rev 36/ 5th Nov. 2015 at S.No-116)
(An ISO 9001:2008 & ISO 14001:2004 Certified Company)
5th Floor, NN Mall, Mangalam Place, Sector-3, Rohini, New
Delhi-110085
ABOUT THE PROJECT• The project is a construction of an eco-friendly resort having villas, restaurants, spa, gym,
fitness centre, scuba diving, retail etc. As per IPZ Notification, 2011 the beach resort falls
under the ICRZ - III zone.
• The project will be located in village Manjeri (Bada Balu), Tehsil Ferrarganj, Andaman and
Nicobar Islands. The land is jointly and equally owned by M/s Surya Chidiya Tapu Resorts
Private Ltd. And M/s Smart space Infrastructure Private Ltd.
• Resort development with cottages and rooms does not exceed the stipulated G+1
construction. FSI utilized will be 5.8% (11,264 sq m) out of a total plot area of 1,92,185 sqm
(approx) against the permissible FSI of 33%. The resort development is to be beyond 50m
as per the provisions of the amendment Notification of IPZ-2011 dated 22.08.2013.
• Case was appraised in Andaman & Nicobar Coastal Zone Management Authority
(A&NCZMA) on 02.11.2015 and recommended to MoEF for approval.
• Case was appraised in 154th EAC (Infra-I) on 22nd-23rd December 2015. A single query was
raised.
2
Query: Project Proponent shall prepare a layout plan indicating contours based on the ITS maps
(it is IRS) prepared during the present financial year. This map will indicate the highest Tsunami
levels attained as well as the proposed ground level of the building/structures to be located at the
sites. The object of this exercise is to ensure that no portion of the public facility is disaster
prone.
Reply: The Tsunami inundation at 1.8m level contour was superimposed by IRS (Indian Institute
of Remote Sensing, Anna University, Chennai) on the 1:4000 CRZ map of the site. The Ground
survey was done based on the Port Blair Municipal Council Benchmark. Stilts shall be provided
provided on cottages/structures which are located on that portion of site having a height below
1.8m from MSL. No portion of this public facility shall be disaster prone.
3
QUERY & REPLY
SUPERIMPOSITION OF TSUNAMI INUNDATION LINE (1.8M CONTOUR) ON THE 1:4000 CRZ MAP SURVEY BASED ON RL VALUE FOR BENCHMARK OF PORT BLAIR MUNICIPAL AUTHORITY
4
MASTER PLAN SUPERIMPOSED ON GOOGLE EARTH WITH 7 REFERENCE POINTS MEASURED BY IRS, ANNA UNIVERSITY3 ADDITIONAL POINTS TAKEN FROM CONTOUR PLAN OF PROJECT PROPONENT
5
SECTIONAL ELEVATION – 2COTTAGE ON STILTS LOCATED ON PORTION OF SITE HAVING HEIGHT BELOW 1.8M FROM MSL
7
SECTIONAL ELEVATION – 3COTTAGE ON STILTS LOCATED ON PORTION OF SITE HAVING HEIGHT BELOW 1.8M FROM MSL
8