RDS Migracion Hana

18
Rapid Database Migration SAP NW BW to SAP HANA Your Partner for SAP HANA Carmen Santisi Consulting Director www.realtech.com

Transcript of RDS Migracion Hana

Page 2: RDS Migracion Hana

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 2

REALTECH Italia is recognized as leader in the design, implementation and

governance of SAP Solutions and of the underlying technology platforms;

PIONEER in all innovative SAP Solutions!

For further information: www.realtech.it

REALTECH Italia

Page 3: RDS Migracion Hana

SAP HANA

www.realtech.de - 7/5/2012, © 2012 REALTECH, Page 3

What is SAP HANA?

It is an appliance that combines SAP

software components optimized on

hardware provided and delivered by SAP

hardware partners

It enables business operations real real-

time analysis based on large volumes data.

By combining data compression, columnar

data store and in-memory computing

technologies, it is designed to be the next

generation high speed platform for all SAP

Solutions.

SAP HANA

SAP

Business

Suite

SAP BW

3rd Party

replicate

ETL

SAP HANA

modeling

BI Clients

SQ

L

MD

X

BIC

S

3rd Party

Page 4: RDS Migracion Hana

SAP HANA for SAP BW

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 4

After one of the shortest and most successful Ramp Up periods in SAP’s history, BW Powered by

SAP HANA is now available for General Availability (GA). This means that every BW customer

can take advantage of running SAP HANA as the powerful in-memory database underneath their

BW system to dramatically improve performance, speed up data loads, shorten the decision

support window and streamline their IT landscape

Yesterday

Today

Page 5: RDS Migracion Hana

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 5

Realtech Italia is a Strategic Partner of SAP Italia for SAP HANA, thanks to its longtime knowledge and

experience in SAP Technology and Application Solutions implementation and governance

Realtech Italia has its own SAP HANA Competence Center with more than 15 experts, certified among

the first in Italy as “Application Associate-SAP HANA 1.0”

Realtech has its own SAP HANA Demo Center in collaboration with HP for customers PoC and internal

training

Realtech experts are able to provide a reliable and valuable support for SAP HANA introduction into the

existing SAP technogical framework and solutions without disruption

Realtech experts are able to guide the migration of SAP BW 7.3 SP07 on relational database to SAP

BW powered by HANA with the intervention of SAP HANA specialists, “OS/DB Migration Certified”

REALTECH Italia @ SAP HANA

Page 6: RDS Migracion Hana

SAP RDS

Preconfigured Software

Implementation Services

Best Practices

Defined Scope

Predictable Times

Fixed Costs

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 6

Package Guarantee

SAP Rapid Deployment Solutions

Page 7: RDS Migracion Hana

Rapid Database Migration

SAP NetWeaver BW to SAP HANA

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 7

SAP RDS

Page 8: RDS Migracion Hana

SAP BW on relational DB - Business Challange

Slow Query Performance - i.e very detailed level

Long Runtimes for Upload - Cubes and DSO

Low Flexibility - i.e. Data model changes are not easy

Data Volume - Storage of redundant data

Complex Data Modeling

Slow Planning Functions

No Real Time

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 8

Page 9: RDS Migracion Hana

SAP BW powered by SAP HANA - Business Benefits

Faster reporting and to the most detailed level

Real Time Operational data access

Reduce Latency

Plan Faster and Plan More Frequently

Preserve Your BW Investment without Disruption

Reduced Load Windows

Simplified Administration and Streamlined Landscape

Greater Flexibility

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 9

Page 10: RDS Migracion Hana

The Project

Objective

Scope

Prerequisites

Macro Plan

Macro Activities

Team

Pricing

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 10

Rapid Database Migration

SAP NetWeaver BW to SAP HANA

Page 11: RDS Migracion Hana

Objective

Rapid Migration of SAP NetWeaver BW to SAP HANA In-Memory

database without disruption of the existing SAP BW content,

drammatically improving performance, simplifying the

existing IT landscape and overall cost of ownership

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 11

Page 12: RDS Migracion Hana

Scope

OS/DB Migration of SAP NetWeaver BW 7.30 SP07 (unicode) to

SAP NetWeaver BW Powered by SAP HANA

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 12

SAP BW 7.30 DEV TEST PROD

Source Landscape SAP BW 7.30 SP07

(unicode)

SAP BW 7.30 SP07

(unicode)

SAP BW 7.30 SP07

(unicode)

Target Landscape SAP BW powered by

HANA 1.0 SP03

SAP BW powered by

HANA 1.0 SP03

SAP BW powered by

HANA 1.0 SP03

Page 13: RDS Migracion Hana

Prerequisites

The source database is smaller or equal 5 TB

The source system SAP NetWeaver BW must be:

● 7.3 SP07 (minimum)

● ABAP

● Unicode

SAP HANA must be 1.0 SP03 minimum

The SAP Solution Manager will be running the

latest version with the latest service pack and be

connected to the other SAP applications within

the SAP landscape

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 13

Page 14: RDS Migracion Hana

Macro Plan/Activities

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 14

Phase I

Build

• Prerequites Check

• HANA Workshop

• Project Plan

• Arch. Design & Sizing

• HANA Installation Check

• Kick-Off

Phase II

Deploy

• I TEST Migr. RUN (sandbox)

• Customer Tests

• II DEV Migr. RUN (develop.)

• III TEST Migr. RUN (test)

• IV PROD Migr RUN (produ.)

• Migr RUN

• Preparation

• Export Database

• Import Database

• Post Steps

Phase III

Run

• Customer Acceptance

Tests

• GoLive

• Post GoLive Support

• Sign-Off

Page 15: RDS Migracion Hana

Macro Activities

Included

● Homogeneous System Copy of

SAP BW production system to SAP

BW sandbox system (*)

● Homogeneous System Copy of

SAP BW production system to SAP

BW test system (*)

● HANA High Availability scenario

● Accelerators like questionnaires,

checklists and best practices

● Activities will be delivered OnLine

except for the production system

(*) Excluding backup & restore tasks in charge of customer

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 15

Excluded

● Release upgrade to SAP BW 7.3

SP07

● SAP Unicode conversion

● Other prerequisites implementation

as per SAP standard checklists

● SAP Solution Manager installation

and base configuration

● SAP HANA server installation and

customer network cabling

● Backup/recovery/administration

procedures

Page 16: RDS Migracion Hana

Team

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 16

Customer

Project Manager

HANA

Technology & security

Specialist

Steering Committee

REALTECH

HANA/BI-BO

Specialist

SAP

Quality Auditor Project Manager

OS/DB Migration

Specialist IT Staff & K-Users

Business Owners

Page 17: RDS Migracion Hana

Pricing

www.realtech.de - 7/5/2012, © 2009 REALTECH, Page 17

Project Activities Project

Elapsed Time

Project

Pricing (all inclusive)

Migration Preparation

8 weeks € 32.000,00 (*)

I TEST Migration Run (sandbox)

II DEV Migration Run (develop.)

III TEST Migration Run (test)

IV PRD Migration Run (produc.)

Post GoLive Support (5 days)

(*) The Project Pricing does not include SAP HANA hardware and license costs