Rapid Transformation - Making Change Happen Fast

53
May 2010 Rapid Transformation Making Change Happen Fast Larry W Dyer Director, Process Improvement Master Black Belt Coventry Health Care

description

 

Transcript of Rapid Transformation - Making Change Happen Fast

  • 1. May 2010 Rapid Transformation Making Change Happen Fast Larry W Dyer Director, Process Improvement Master Black Belt Coventry Health Care

2. Agenda

  • Lean and Six Sigma Overview
  • What is Kaizen?
  • How to execute a Kaizen
  • Kaizen examples
  • Where to start with Kaizen
  • Top 10 reasons projects fail

Rapid Transformation WC Process & Strategy 3. Assumptions

  • You have some exposure to Six Sigma and Lean
  • You understand what the project charter is
  • You understand that projects with a high return on investment and moderate to low effort are executed first

Rapid Transformation WC Process & Strategy 4. Every Firm Is Driven to Improve Quality, and Reduce Cost and Lead Time

  • Customer loyalty and retention
  • Shorter customer lead time demands
  • Downward price pressure: lower costs
  • Lower invested capital
  • Capacity expansion

Rapid Transformation WC Process & Strategy 5. Why Do These Goals RequireBoth Lean and Six Sigma?

  • In a value stream, thework often spends up to 95% of its time waiting
  • Poor quality increases the lead time to customer
    • 10% defect rate can increase lead time by 40% and reduces available capacity
  • Capacity problems can be masked by slow cycle times
  • Lean tools accelerate lead time reduction
  • Six sigma brings a process under control

Rapid Transformation WC Process & Strategy 6. 95% of Time Waiting, For What? Customer Value Added Time Business Value Added Time Non-Value Added Time Wait Time

  • Findings indicate:
    • Long process time
    • Process Cycle Efficiency Poor - 0.069%(World Class Standard = 50%)
    • Wait times are extremely long

Rapid Transformation WC Process & Strategy 7. What is Lean Six Sigma?

  • Lean Six Sigmais a combination of two process improvement methodologies Lean and Six Sigma
  • Leanis all about speed.
    • Pioneered by Ford and perfected by Toyota
    • Focuses on eliminating waste and finding better ways to do things
    • Helps eliminate steps that add no value
  • Six Sigmais all about quality and repeatability.
    • Started by Motorola in the 80s; improved by GE
    • Focuses on reducing defects and variation and incorporates powerful statistical tools to control a process
    • Six Sigma Quality literally means 3.4 defects per 1 million parts
    • It is the origin of the DMAIC process

Rapid Transformation WC Process & Strategy 8. Greatest Challenges to Successful Deployment From ASQ, Quality Progress, August 2009 Why? Why? Rapid Transformation WC Process & Strategy 77 of 5,000 hospitals Confidence level 95% Confidence interval +-11% 9. Why Lean Six Sigma?

  • Why use them together?
    • Because Lean cannot bring a process under statistical control, and Six Sigma alone cannot dramatically improve process speed.
  • Six Sigma is the Unifying Framework
    • It provides the improvement infrastructure (role definitions, deployment model, etc.) and the overriding methodology (DMAIC).
  • Lean provides additional improvement tools to turbo charge improvement efforts.

Rapid Transformation WC Process & Strategy 10. When to Use LSS for Process Improvement

  • When to Use:
    • You have a challenging goal to reach or issue to solve
      • Driven by the business strategy
      • Issues that are valuable for the business to resolve
      • Problems that have stood the test of time
      • Solution is not known
    • You are willing to commit people to identify and resolve the issue
    • You want a more robust solution than traditional methods can provide
    • You want group ownership of a course of action
  • When NOT to Use:
    • You dont have a specific challenge or clear issue to solve
    • You already have a solution and course of action
    • You dont have a process to improve

Rapid Transformation WC Process & Strategy 11. Rapid Transformation

  • Relies heavily on:
    • Lean techniques
    • Statistical Process Control
  • Uses Kaizen Format
  • Focuses on a subset of Six Sigma Tools
    • Stakeholder Analysis
    • FMEA
    • Value Stream Mapping
    • Non-Value Added Analysis
    • Root Cause Analysis
    • Quick Improvement Techniques

Rapid Transformation WC Process & Strategy Lean Is Cool! 12. What is Kaizen?

  • Kai = to take apart
  • Zen = to make good
  • Kai + zen = taking something apart to make it better
  • Team activity
  • Rapid improvement within a short time
  • Well planned and highly structured
  • Essentially an accelerated DMAIC project

Rapid Transformation WC Process & Strategy 13. When to Kaizen

  • When obvious waste sources have been identified
  • When the scope and boundaries ofa problem are clearly defined and understood
  • When implementation risk is minimal
  • When results are needed immediately - i.e., capacity constraints, setup reduction, acute quality problems, safety/ergonomic issues
  • In the early stages of a project to gain momentum and build credibility

Rapid Transformation WC Process & Strategy 14. When to Use Kaizen Project Idea Incremental Improvement? Re-engineer Project Small Project? Large Project Process Speed? Process Quality Project Kaizen Perform Value Stream Mapping Break into Small Projects Yes No Yes Yes No No Use Inter-Ocular analysis Rapid Transformation WC Process & Strategy 15. Kaizen Goal

  • Focus on each step in the process
  • Reduce the Non-Value Added Steps
  • Minimize the Business Value Added Steps
  • Streamline the Customer Value Added Steps
  • Eliminate All Waste

Product Lead Time Customer Value Added Non-Value Added Start Finish Business Value Added Rapid Transformation WC Process & Strategy 16. Kaizen Benefits

  • Provides momentum for the project
  • Drives value ($) early, thus improving ROI
  • Helps the Company
    • Eliminate hidden costs of waste
    • Ensure work provides value
    • Allows major improvements quickly
  • Helps You
    • Eliminate waste and interruptions
    • Influence the work you do every day
    • Be part of the solution
  • Reduces stress on project team to Get Something Done!

Rapid Transformation WC Process & Strategy 17. Kaizen VS Traditional DMAIC Project

  • Team is 5 Days Full Time vs. 4 Mo Part Time
    • Actual team hours may be close
  • Resources Dedicated
    • 100% Dedicated for 5 days
  • Scope Completed/Problem Identified Going In
    • Team does not have time for scope assessment
  • Basic Data Gathered
  • May use Tribal Knowledge vs. Detail Analysis
    • Solution may be known but historically not listened to
  • 30-Day Follow Up Action Items
    • Items that cannot be finished that week

Rapid Transformation WC Process & Strategy 18. Kaizen Structure Team Training Rapid Transformation WC Process & Strategy Issue List Area Discovery Cause & Effect GoalBrainstormed Ideas Final Presentation Effort Benefit .5 1.5 1.0 2.0 2.5 .5 3.0 3.5 4.0 4.5 5.0 1.0 1.5 2.0 2.5 3.0 3.5 4.0 4.5 5.0 1 2 3 4 5 8 9 10 7 6 Action Items What Who When Status Implementation 19. Kaizen Preparation

  • Begin preparation 2 weeks before start of the Kaizen event
    • Collect necessary data
    • Notify participants of their involvement
    • Create introductory training for participants
    • Share the project charter
    • Collect preliminary process maps
    • Complete any meeting logistic issues
    • Hold Kaizen
      • Meet for one week
      • No interruptions
      • No cell phones

Kaizen! Timeline(Maximum of 45 Days from Start of Event Prep, Through Event, to Final Follow-up) Pre-Event Prep (3-10 days) Kaizen! Event (3-5 days) Event Follow-up (30-35 days) Rapid Transformation WC Process & Strategy Meeting Logistics Order lunch Soft drinks Ice Tea Coffee Etc. 20. Facilitation Keys

  • Keep Team On Track!
    • No emails or blackberrys
  • Event will be stressful
  • Drive them to success
  • Be a part of scope and team selection if possible
  • Plant seeds but dont overpower the team with your ideas

Rapid Transformation WC Process & Strategy 21. Kaizen Team Rules

  • Throw out all of your fixed ideas about how to do things.
    • That is the way it has always worked!
    • It has to be that way!It wont work any other way!
  • Maintain a positive attitude (how will it work, not how it wont).
  • Practice mutual respect.Treat others as you want to be treated. Never leave disagreements unspoken.
  • The only stupid questions are the ones not asked.
  • Ask Why? at least five times until you find the ultimate cause.
  • Were not interested in assigning blame - only in creating solutions!
  • One person, one vote position doesnt matter.
  • Have fun!
  • Understand the process, and JUST DO IT!

Rapid Transformation WC Process & Strategy 22. Toolset Used During Kaizen

  • Any tool may be used to aid the team during a Kaizen event from a Process Map to a Designed Experiment.
  • Bottom line is you use any tool that is needed!
    • Pareto
    • Fishbone
    • Process map
    • Spaghetti Diagram
    • Cycle Time/Takt Time
    • NVA Analysis
    • Time Studies

Rapid Transformation WC Process & Strategy 23. Kaizen Toolset: Resource Flow Layout

  • The Spaghetti Chart

Indicates an in-box or outbox where work (forms/information) waits to be worked on or transferred Lines indicate paper/information travel: - No set path - Lots of rework 230 yards Rapid Transformation WC Process & Strategy 24. Kaizen Schedule Rapid Transformation WC Process & Strategy 25. Weeks Activities

  • Monday
  • Team Training
    • What is a Kaizen?
    • Project and Goal Background
    • Present Data/Burning Platform
    • Specialized Training Geared Toward Project Goal
  • Discovery
    • Team Spends Afternoon in Project Area
    • Map the Existing Process
    • Gather Insights from Personnel
    • Observe Issues/Conduct Studies
    • Evaluate Risk
    • Keep Detailed Notes

Rapid Transformation WC Process & Strategy 26. Failure Mode Effects Analysis

  • Document
    • What will happen if our project fails?
    • What will happen if the implementation fails?

Rapid Transformation WC Process & Strategy 27. Weeks Activities (Cont.)

  • Tuesday
  • Area Discovery (Cont.)
    • Review Monday Activities
    • Process Map
    • Gather Insights from Personnel
    • Document Problems Found
    • Analyze Problems to Determine Root Causes
    • Begin to Define Future Metrics

Our ability to assess the performance of a process we wish to improve is only as good as our ability to measure it. Rapid Transformation WC Process & Strategy 28. There are usually three views of a process: Process Mapping Rapid Transformation WC Process & Strategy What youTHINKit is.. 1 What itACTUALLYis.. 2 3 What itSHOULDbe.. 29. The Hidden Operation Rapid Transformation WC Process & Strategy Work Arounds Op i Op i + 1 Analysis Scrap Off-Line Correction Correctable ? Verified ? No Yes Quick Fixes Inspections Scrap Rework Extra Equipment Increased Inventory Increased Cycle Time Frustration Defects Customer Dissatisfaction Cost 30. Example: High-level Swim Lane Process Map Rapid Transformation WC Process & Strategy 31. Example: High-level Swim Lane Process Map Rapid Transformation WC Process & Strategy 32. Identify Waste

    • Each process activity can be tested for its value-add contribution
    • Ask the following two questions to identify non-value added activity:
      • Is the form, fit or function of the work item changed as a result of this activity?
      • Is the customer willing to pay for this activity?

NVA NVA NVA NVA NVA NVA NVA Rapid Transformation WC Process & Strategy Call for an Order Answer phone Asks for more? Greetings and mention specials Calculate price Rewrite Order Order still OK? Gets address & phone # Add to Order Give order to Cook Rewrite order Yes Yes No No Request order from customer Writes on scratch pad Asks cook for time estimate Inform customer of price/time No Thanks customer & hangs up Completes order from from note pad Another call waiting Writes time on scratch pad Writes time on scratch pad Confirm order Yes 1 1 New order? No No Verify with notes Yes 2 2 OK Not OK 3 3 33. Get to the Root Cause

  • Ask Why 5 times
    • The follow-up time with clients is inconsistent.Why?
    • Client follow-up expectations vary.Why?
    • The Account Managers set unrealistic expectations with the clients.Why?
    • Account Managers are not trained on what expectations to set. Why?
    • No training has been developed about setting expectations.Why?
    • Each client has a unique service level agreement and that information has never been published.

34. Weeks Activities (Cont.)

  • Wednesday
  • Brainstorm Issues
    • Capture Ideas/Solutions
    • Evaluate Studies
  • Reduce and Prioritize Ideas
    • Affinitize Ideas/Solutions
    • Multivoting
    • Rank using Benefit/Effort Matrix
  • Midweek Status Meeting
  • Brainstorm Improvements

2. Multivoting 3.Rank by Benefit/ Effort/Cost 135 93 33 Rapid Transformation WC Process & Strategy 35. Mid-Kaizen Review

  • Mid-Week Status Meeting:
  • Purpose:
    • Review team successes with management team
    • Review proposed Kaizen activities for implementation
    • Address any obstacles impacting implementation
    • Gain agreement from Management to proceed
  • Responsibility for Conducting the Meeting:Kaizen Team and Project Sponsor
  • Frequency:End of third day
  • Duration:30-45 Minutes
  • Attendees:Kaizen Team, Project Sponsor ,Management

Rapid Transformation WC Process & Strategy 36. Weeks Activities (Cont.)

  • Thursday-Friday
  • Improve
    • Build the new process
    • DocumentAction Items
    • Develop plan to pilot the new process
  • Control
    • Train in the new process
    • Pilot the process
    • Create/Update Company Procedures to document and sustain improvements
    • Finalize metrics to measure new process
    • Present results to Management Team, complete follow-up, monitor results over time

Rapid Transformation WC Process & Strategy 37. More on Process Mapping 38. Process Mapping Hints

  • If your process handles or creates a work product or thing, then use this as part of your map indicating the information that is added, used, or changed.
    • Header sheets are a good example
  • Include samples of all information referenced as a part of the process .
    • If you use a chart, graph, report, or other information as part of your task, include a physical copy on the map.
  • This can not be done as separate parts pasted together.
    • It is a group activity where each person teaches the others what their role is and what work they perform.
  • It ALWAYS takes longer than you think

Rapid Transformation WC Process & Strategy 39. Example: Simple Process Map Rapid Transformation WC Process & Strategy 40. Example: Moderately Complex Process Map Rapid Transformation WC Process & Strategy 41. Example: Complex Process Map Rapid Transformation WC Process & Strategy 42. Example: Value Stream Map Rapid Transformation WC Process & Strategy 43. Why is it Important to Complete Projects Fast?

  • Minimize the number of active projects
  • Maximize the allocation of resources (intellectual capital) to the projects with the greatest return on investment

Black Belt with 8 Simultaneous Projects AndNo Prioritization :Black Belt focused on 2 Projects at a time ofHighest Priority :WC Process & Strategy 44. October 13, 2009 Three Project Examples 45.

  • Problem
  • It takes too long to load software on new servers for customers
  • Services and licenses are not billed to the customer until the customer takes the server live (60-120 days)

Hardware Conversion Cycle Time Reduction

  • Background
  • Healthcare company upgrades/optimizes servers for customers to enable their products to run efficiently and effectively
  • Results
  • HW revenue billed in 15 days
  • 80% of services revenue billed in 30 days
  • A $125,000 one time revenue increase was achieved by accelerating the billing of inventoried hardware
  • A $137,000 cost avoidance was achieved by reducing project hours and interest on inventory.
  • 1 staff member was redeployed to fix a bottleneck in the Systems Integration Group
  • Approach
  • The DMAIC methodology was used in this Lean project to reduce cycle time and hours
  • Process mapping identified non-value added work in the existing processes
    • SMEs accelerated parallel tasks to the front of the process
    • Finance compressed the revenue recognition to the front of the life cycle

46. University Hiring Process

  • Background
  • There is a mix of centralized and decentralized (automated and manual) hiring processes with no clear process ownership, resulting in different hiring processes for different types of employees
  • Problem
    • 4 manual hiring processes
    • No clear process ownership
    • 30% of the hiring forms have multiple defects
    • Many workarounds and shadow systems
  • Approach
    • Process mapped all four systems
    • Identified the sources of defects
    • Removed reliance on Cat Card
    • Accelerated other activities
    • Automated new process in PeopleSoft
  • Results
    • Centralized HR process
    • Virtual and in-person services
    • Removed Cat Card as a requirement
    • Accelerated hiring dramatically
    • Reduced department workload
  • Root Causes
    • No forms tracking
    • Lost/incomplete forms
    • Process redundancies
    • No hiring process training
    • Needed services require Cat Card

Rapid Transformation WC Process & Strategy 47. Sales to Project Scheduling Process

  • Problem
  • Interfaces were not scheduled
  • Staff had inconsistent workload
  • Forecasting revenue was impossible
  • Background
  • The time required to schedule interfaceswas highly variable with a mean of 30 days from the receipt of the Purchase Order.This variability made it difficult to predict revenue on a monthly basis.
  • Results
  • A new scheduling process was developed, trained and validated.
  • The sample mean of the time to schedule was reduced by 90% from 30 days to 3 days.
  • Statistical control achieved, weekly monitoring confirms compliance to process SOPs.
  • Approach
  • A Kaizen was used to quickly understand the problem and the data.
  • The DMAIC methodology was used to redesign the scheduling process.
  • Process mapping identified non-value added work in the existing processes and highlighted areas for improvement.
  • New tools were developed to accurately track call events
  • New procedures were written and employees were trained in the new process.

Sample Mean reduced by 82% from 37 to 7. Rapid Transformation WC Process & Strategy 48. Where to Deploy Kaizen in the Hospital 49. Lean Deployment Locations and Success From ASQ, Quality Progress, August 2009 Rapid Transformation WC Process & Strategy 50. Six Sigma Deployment Locations and Success From ASQ, Quality Progress, August 2009 Rapid Transformation WC Process & Strategy 51. Greatest Challenges to Successful Deployment From ASQ, Quality Progress, August 2009 Why? Why? Rapid Transformation WC Process & Strategy 77 of 5,000 hospitals Confidence level 95% Confidence interval +-11% 52. To 10 Reasons for Less Than Successful Projects

  • Project Sponsor not active
  • Project not linked to corporate strategy
  • Poorly defined Charter Team has to spend time to get the charter right
  • Scope too large or scope creep
  • Poor understanding of requirements
    • Process
    • Customer
    • Business
    • No organizational buy-in stakeholders not involved
  • This is not a lean or six sigma project to begin with
  • Team focus
    • Not honoring time commitment
    • Trying to do too much (boil the ocean)
  • Jumping from Define to Improve

Rapid Transformation WC Process & Strategy 53. References

  • Six Sigma
    • Thomas Pyzdek (2004).TheSix Sigma Handbook.New York: McGraw-Hill
  • Lean (Kaizen)
    • Jeffrey K. Liker(2004).The Toyota Way , New York: McGraw-Hill
    • James P. Womack and Daniel T. Jones,Lean Thinking , New York: McGraw-Hill
  • Lean/Six Sigma
    • George, M. L. (2002).Lean six sigma: Combining six sigma quality with lean speed . New York: McGraw-Hill
    • George, M. Rowlands, D. & Kastle, B.(2003).What is lean six sigma? New York: McGraw-Hill.

Rapid Transformation WC Process & Strategy