RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

Transcript of RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column...

Page 1: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

RAPIDAluminium column formwork

Edition 02/2008

Assembly instructions for standard application

Page 2: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

Dokument 1 28.04.2005 12:48 Uhr Seite 1

Page 3: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

Legend

Important safety Hints Visual Check Site Tipsinstructions

Page

Overview 1Introduction 2Product features 2Intended use 2Safety instructions 3

Standard application

A1 Basic assemblyCutting-to-size of the formlining 4Formlining assembly with chamfer strip 4-5Formlining projection 5Sharp-edged solution 5Assembling the formwork halves 6Crane lifting unit 6Push-pull props 7

A2 Safety systemConcreting platform 8Ladder access 9

A3 ShutteringPositioning the formwork 10Closing the formwork 11

A4 ApplicationStriking, moving 12Oversized cross-sections 13Height adjustment up to 8.10 m 14

A5 MiscellaneousMaintenance and Cleaning tips 15List of materials for the access ladder 16

Components 18-21

Contents

Page 4: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

1

4

3

21

5 22

23

2425

27

21

26

11 121314

A1 Overview

RAPID column

1 Column frame

2 Corner profile with column

tie bolt and locking pin

3 Formlining

4 Chamfer strip

5 Crane lifting unit

Access ladder

21 Ladder connector Rapid

22 Access ladder 180/2

23 Ladder 180/6

24 Ladder hook

25 Ladder base

26 Ladder safety cage 75

27 Ladder safety cage 150

Concreting platform (complete)

11 Concreting landing

12 Handrail 134 or 52

13 Crane hook

14 Cam nut DW 15

Page 5: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

2

These Assembly Instructions havebeen prepared in order to ensurecorrect assembly and safe use.They describe the standard applicationof the PERI column formwork, RAPID,based on H = 3.0 m.

Introduction

The cross-section for square orrectangular-shaped columns is createdcontinuously using the wind millprinciple. Column frames are availablein three heights. They can be combinedwith each other and height incrementsof 30 cm are possible.

The access ladder with ladder safetycage and concreting platform form thesafety system for the PERI RAPID.It can be used for closing the columnformwork. Connections for push-pullprops and kicker braces are likewiseavailable in the system.

Care of the formwork is made simplerthrough the attachment of the cranelifting unit or concreting platform. Largedeposits of concrete are preventedfrom forming and any residual concreteis easily removed due to the powdercoating.

These assembly instructions containdetails regarding the intended use ofthe RAPID column formwork fromPERI. Safety instructions and loadspecifications must be observed at alltimes.

Special permission must be givenby PERI if the formwork is to be usedfor applications other than thatwhich it has been designed for,together with supplementaryassembly instructions.

Product features

PERI RAPID is the column formworkfor joint-free architectural concrete

Basic assembly takes place with thecolumn frames in a horizontal positionand without the use of a crane. Theformlining sheets are cut to size andare clamped from above to the columnframework by means of clampingprofiles. With extended column frames,the formlining sheet can be fitted overthe element joint itself. Chamfer stripsare simply inserted between sheetingand clamping profile. Creation of sharp-edged column cross sections is alsopossible.

Two column frames with the integratededge connections are connected usingthe column tie yoke to form oneformwork half, fitted with appropriatesystem parts and then placed intoposition.

The intended use is presented in thebasic assembly instructions and theapplication of the safety equipment.

In addition, these assembly instructionsare supplemented by informationconcerning appropriate maintenancemeasures

Dimensions without any unit ofmeasurement are to be taken as cm.

The programme overview whichfollows at the end provides a detailedlook at all system componentscomplete with dimensions and itemnumbers. If you should have anyquestions, please contact your localPERI representative.

Technical data:Permissible fresh concrete pressure:120 kN/m2

Formlining:21 mm for chamfered columns30 mm for sharp edged columns

Column frame made of aluminium

Column cross-sections:square or rectangular-shapedup to 60 x 60 cmSharp-edged columns:up to 58 x 58 cmOver-sized cross-sections from85 x 85 to 130 x 130 cm

Powder-coated column frame:H = 3.0 m, 2.10 m, 0.60 m

Intended use

Basically, only materials in perfectcondition may be used. Damagedcomponents must be replaced.

All valid laws and safety regulationsmust be observed when using ourproducts.

This product is intended for commercialuse only.

These assembly instructions as wellas PERI offer and implementationplans do not replace specificconstruction site work and assemblyinstructions.

Page 6: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

Dokument 1 28.04.2005 12:48 Uhr Seite 1

Page 7: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

3

Care instructions for the formlinig

Concrete immersion vibrator withrubber cap minimizes possible damageto the formlining.

Spacers for the reinforcement withlarge support area minimizesindentations and markings.

Other regulationsIn particular, this currently includes:– Operational Safety Regulations

(BetrSichV)– Technical Regulations for Operational

Safety (TRBS)

AdditionalPERI product information– PERI formwork technology design

tables– PERI RAPID brochure

Safety instructions

These assembly instructions areintended for those persons who workwith PERI RAPID column formwork.Non-observance of assemblyguidelines and safety instructions canlead to accidents and damage tomaterials.

Responsibilities of the user:

1. The user must ensure that allrequired instructions are at theoperator’s disposal (including theofficial assembly instructions).

2. All persons working with theproduct must be familiar with thecontent of these instructions andsafety information.

3. The user must ensure that alloperators have a full and completeunderstanding of these instructionsand safety information.

4. The user must ensure thatassembly, adjusting anddismantling work carried out, aswell as correct use of the product,is supervised by trained andauthorised personnel.

5. The user is obliged to provide allrequirements to ensurecompliance with all applicablesafety regulations.

Safety information

1. All RAPID components are to bechecked before every use to makesure they are in perfect workingcondition!Damaged parts are to bereplaced by PERI originalcomponents!

2. All loads arising during the intendeduse must not be exceeded!

3. All load effects on the RAPIDformwork must be safelytransferred!

4. Stability must be guaranteedthroughout all building phases!

5. Never remove any safetyequipment!

6. Safe access ways must beprovided for site personnel to reachall working areas!

7. Working areas must have suitablesafety barriers to prevent sitepersonnel falling to the ground!

8. All openings must be fitted withsafety barriers!

9. Avoid using in areas of risk duringunfavourable weather conditions!

10. Striking is only to take place whenthe concrete is hard enough andsite management has given thego-ahead!

11. Striking or moving are to be carriedout using suitable tools andequipment! Do not tear awayformwork elements from theconcrete with the crane!

12. Remove all non-captivecomponents!

13. Equipment should not be usedin strong winds!

14. Remove lifting accessories from alowered formwork component orunit only when it is in a stablecondition!

Page 8: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

4

A1 Basic assembly

Formlining assembly with chamferstrip

Cutting-to-size of the formlining

Plywood sheet: 21 mm

Horizontal formwork joints must bearranged on the lateral struts of theframes.

Width of plywoodExample:

Column width 55 cm 550 mm- reduction in size 8 mmCutting width of formlining 542 mm

Fig.1

Fig. 1

Fig. 2b

1. Place column frames on assemblytrestles. Fig.2a

Column width - 8 mm

SW 30

Fig. 2a

Fig. 2c

3. Mount plywood sheet and insert in theguide. Fig.2c

2. Bolt column frames together accordingto the required length (SW 30). Fig.2b

Page 9: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

5

Sharp-edged solutionMax. cross-section dimensions580 x 580 mm.For forming without chamfer strips,a 30 mm thick plywood sheet isrequired which has been milledaccordingly. Fig.6

Width of plywood sheetExample:

Column width 550 mm+ increase in size 12 mmCutting width of formlining 562 mm

It is held in position with the clampingprofile and guide. Fig.6aSecure plywood sheet against slipping.

A1 Basic assembly

Formlining assembly with chamferstrip

4. Position chamfer strip next to theplywood sheet. Fig.3

5. Push clamping profile over chamferstrip. Fig.3a

6. Tighten by means of G-clamps. Fig.4

7. Clamp in position the plywood sheetand chamfer strip with clamping profile.(SW 17 socket wrench)

8. Remove G-clamps.

9. Nail plywood sheet to prevent slipping.Use drilled holes in the guide. Fig.3a

Install plywood sheets in additionalcolumn frames in the same way.

Fig. 3a

Formlining projection

– below approx. 40 mm– above max. 200 mm with crane lifting

unit Fig.5

Fig. 3

Fig. 4

max. 40

max. 200

Fig. 5

30

8 8

8

65

Fig. 6a

Fig. 6Dimensions in mm

Column width + 12 mm

Page 10: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

6

A1 Basic assembly

Assembling the formwork halves

1. Place second pre-assembled columnframe on first column frame. Fig.7

2. Insert column tie yokes through thecorner connection.

3. Peg out using the locking pin in theperforated profile.

4. Tighten with nut. Fig.7a

5. Assemble second formwork half in thesame way.

Fig. 7

Fig. 7a

Crane lifting unit

One crane lifting unit per column frame,however not with the concretingplatform.(The crane lifting unit is already attachedhere to the concreting platform).

1. Loosen bolt, SW 30, in the columnframe.

2. Position crane lifting unit on the frameand secure with the bolt, SW 30.Fig.8 + 8a

Fig. 8

Fig. 8a

SW 30

Page 11: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

7

A1 Basic assembly

Push-pull props

Mount 3 push-pull props to ensurestability!

Mount three brace connectors on oneformwork half. Fig.9

1. Pull out locking pins.

2. Fasten brace connector to perforatedprofile.

3. Insert brace connector in the perforatedprofile and peg out with locking pins.Fig.9a

4. Fix push-pull prop and kicker bracewith bolts and cotter pins. Fig.10

Fig. 9

Fig. 9a

Fig. 10

Page 12: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

8

a

b

c

SW 30

A2 Safety system

Concreting platform

The concreting platform is assembledon horizontally-positioned columnhalves lying on the ground

1. Remove cam nut of the crane eye.

2. Remove bolt (SW 30) in the columnelement.

3. Position platform by hand on its edgedirectly against the formwork half.

4. Insert locking pin of the crane eyethrough the hole a of the columnelement and screw on cam nut.

5. Same procedure using hole b.

6. Align telescopic beam with hole c andmount third crane eye. Fig.11

7. Install guardrails. Fig.12

Fig. 11

Fig. 12

Page 13: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

9

SW 19

SW 19

Ladder access

The access ladder is assembled onhorizontally-positioned column halveslying on the ground.

1. Place ladder connection on frame andpeg out in the perforated profile withbolts. Fig.13

2. Pre-assemble ladder:– connect access ladder 180/2 with

ladder 180/6, SW 19. Depending onthe height required, attach additionalladders 180/6.

– mount ladder base and ladder hook onbottom ladder, SW 19. Fig.14

3. Attach the pre-assembled ladder withthe clamping plates to the ladderconnections, SW 19.

4. Mount ladder safety cage 150 or 75with clamping plates according to plan.Clear spacing between the laddersafety cage elements 30 cm.

Visual check of the clamping plates.The contact surface must lie againstthe ladder profile.

5. For high columns:Likewise install an access ladder forclosing the formwork in the oppositeformwork half.

A2 Safety system

Fig. 13

Fig. 14

Fig. 15

Page 14: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

10

A3 Shuttering

Positioning the formwork

– Always erect the formwork half withthe concreting platform first.

– Locating boards make it easier to alignthe formwork.

Formwork halves with concretingplatform (placing formwork)

1. Attach 3-sling lifting gear to crane eyes,lift formwork to a vertical position andtransport to place of use.Fig.16

2. Position formwork halves againstlocating boards. Fig.17

3. Fix base plates of push-pull props andkicker braces to load-bearingfoundations/slab, e.g. with PERI MultiMonti. Fig.18

4. Check stability and make anynecessary adjustments.

5. Remove crane lifting gear.

The first formwork half is now inposition.

Fig. 16

Fig. 17

Fig. 18

Page 15: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

11

A3 Shuttering

Positioning the formwork

6. Attach lifting unit to crane eyes, lift2nd formwork halve to a verticalposition and transport to place of use.

7. Position this formwork half againstlocating boards. Fig.19

Closing the formwork

– Use a second access ladder for highercolumns.

– When closing the formwork, start atthe bottom and work upwards.

1. Insert column tie yoke through thecorner connection.

2. Peg out in the perforated profile withlocking pins.

3. Tighten with nut. Fig.20

4. Remove crane lifting gear.

The formwork is now in position.

Fig. 19

Fig. 20

Page 16: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

12

A4 Application

Striking, moving

– Push-pull props, concreting platformand access ladder remain attached.

– Formwork is opened from top tobottom.

– The corner connections remainattached to the column frames (noindividual components).

Formwork halves without push-pullprops

1. Attach crane lifting gear to the non-supported formwork half and tension.

2. Separate corner connections betweenthe formwork halves: pull locking pinsand pull back column tie yokes.Fig.21

Use second access ladder.

3. Place formwork half on ground forcleaning.

Formwork halves with push-pullprops

1. Connect lifting gear to crane eyes ofthe concreting platform.

2. Remove base plates of push-pull propsand kicker braces from ground.

3. Place formwork half on ground forcleaning and secure.Fig.21

Fig. 21

Page 17: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

13

A4 Application

Oversized cross-sections

Cross-sections from 85 x 85 cm to130 x 130 cm

For oversized cross-sections, amaximum of two column frames(length and width) are connected witheach other. Connections are carriedout using the TRIO BFD alignmentcoupler.

1. For bracing, mount walers to everyperforated profile with column tie yokesand locking pins.

2. Insert anchor ties in the centre at thesame height as the walers.

Example Fig.22

Fig. 22

No. of pieces for each height

SRZ 120 U100Height BFD alignment coupler steel walerColumn Frame 300 5 4Column Frame 210 4 3Column Frame 60 1 1

Page 18: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

14

A4 Application

Height adjustment up to 8.10 m

With three frame heights, heightadjustments are possible in 30 cmincrements.

Combination examples: Fig.21

The column frames are connectedusing M20 x 50 bolts (SW 30).Each RAPID frame is equipped withthese bolts Fig. 2b.

Larger heights are possible.

Height Column Frame

[m] 300 210 60

2.10 - 1 -2.70 1 13.00 1 - -3.30 - 1 23.60 1 - 13.90 - 1 34.20 - 2 -4.50 - 1 44.80 - 2 15.10 1 1 -5.40 - 2 25.70 1 1 16.00 2 - -6.30 1 1 26.60 2 - 16.90 1 1 37.20 2 - 27.50 1 1 47.80 2 - 38.10 2 1 -

Page 19: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

15

A5 Miscellaneous

Maintenance tips

What needs to be done?

1. Spray formwork on all sides before first use witha release agent e.g. PERI BIO Clean.

2. Spray formlining every time after striking with PERIBio Clean, then clean.

3. For longer storage periods, e.g. bad weather, storeformwork materials in clean condition and sprayed.

4. Spray (grease if necessary) all moving partsregularly with a release agent.

5. Transport elements with suitable as well as safetransportation and lifting gear.

6. Ensure elements and accessories are properlystored.

7. Do not throw or drop accessories.

8. Never use unnecessary force during assemblyand dismantling.

Cleaning tips

Ensure elements are in a secure position duringcleaning!Cleaning of elements still attached to the craneis not allowed!Remove concrete surplus!

1. Immediately after concreting, spray the rear sideof the formwork with water.

2. After striking has taken place, spray formwork allover with PERI Bio Clean.

3. Remove nails, battens etc. from the plywoodbefore any mechanical cleaning.

4. Mechanically clean the elements using suitableequipment e.g. scraper.

5. Brush clean the elements after mechanicalcleaning. Remove dust and loosened concretesurplus.

6. After shuttering, element may require sprayingagain.

Why?

Provides good protection against sticking andcorrosion before first dirt accumulation.

Helps to remove concrete surplus and makes cleaningeasier. Removing by force or scraping off is notnecessary. Formlining and coating remain intact.

The frame is protected against corrosion andweathering.

Removes rust, prevents corrosion and keeps partsin good working order.

Avoids damage through improper transportation.

Prevents damage to the element frame andaccessories. Damage to the formlining throughindentations is avoided.

Maintains the functionality of the parts.

Maintains the functionality of the parts.

Concrete has not yet hardened and can easily beremoved. This reduces the amount of cleaningrequired.

Penetrates the concrete surplus, breaks it up andmakes subsequent mechanical cleaning much easier.

Unnecessary enlargement of nail holes and damageto the formlining is avoided. No damage to cleaningequipment.

Formlining surface is clean for the next use.

Page 20: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

16

A5 Miscellaneous

List of materials for the accessladder

For higher columns, mount twoaccess ladders!

Ladder access A:with access to the concreting platform

Ladder access B:without access to the concretingplatform, only for connecting the twoformwork halves

For heights of 7.80 m and more, werecommend the use of two concretingplatforms

Ladder access B Ladder access A

Item no. Description A* B* A* B* A* B* A* B* A* B* A* B*

037400 Concreting Platform, complete 1 0 1 0 1 0 1 0 1 0 1 0

051410 Ladder 180/6 2 2 2 2 3 3 4 4 5 5 6 6

103724 Access Ladder 180/2 1 0 1 0 1 0 1 0 1 0 1 0

051450 Ladder Safety Cage 150 0 0 1 1 2 2 3 3 4 4 5 5

104132 Ladder Safety Cage 75 1 1 1 0 2 1 2 1 2 1 2 1

051460 Ladder Base 1 1 1 1 1 1 1 1 1 1 1 1

103718 Ladder Hook 2 2 2 2 2 2 2 2 2 2 2 2

103369 Ladder Connector RAPID 2 2 2 2 3 3 4 4 5 5 6 6

2.70 – 3.90 – 4.50 – 6.00 – 7.80 – 9.60 –3.60 m 4.20 m 5.70 m 7.50 m 9.30 m 10.80 m

A*= ladder access AB* = ladder access B

Page 21: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

Dokument 1 23.11.2006 14:06 Uhr Seite 2

Page 22: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

290

205

165

20

ø 16

20

20

35

15

15

5

4

794

600

300

65412

0

19x30=57025

60 80

23

ø 21

800

243

500 64

794

2100

250

800

800

250

250

1000

794

3000

1000

500

250

18

Column Frames RAPID, AluFor column cross section up to 600x600mm.Complete with:Clamping Profile, Column Tie Yoke DW15,Spherical Nut DW15, galv., Locking Pinø 20x205, galv., and Hex. Bolt ISO 4017M20x50-8.8, galv. with Hex. NutISO 7042 M20-8, galv. (2x).

Column Frame 300 59,90 037250Column Frame 210 42,70 037260Column Frame 60 14,30 037270

Chamfer Strip RAPID L = 3,00m 0,32 037210For clamping plywood to the ColumnFrames RAPID.

Brace Connector-3 RAPID, galv. 3,05 037190For fixing Push-Pull Props andKicker Braces to the Column Frames RAPID.Complete with:Locking Pin ø 20x205, galv. (1x)Pin ø 16x42, (1x), and Cotter Pin 4/1 (2x).

Weight kg Item no.

ø 20x205FS 4/1

ø 16x42FS 4/1

DW15

M20x50

Page 23: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

106

68

125

120

205

20

ø 20

ø 34

290

28

ø 21

42

250

100

119

400 118

400118

500

798

ø 18

ø 22

178

230195

50

260

661

469SW 19

19

Crane Lifting Unit-2 RAPID 14,00 0373204 for a fully assembled column form.Only 2 needed when a concreting platformis used.

Load-bearing pointPermissible load: 500kg

Column Tie Yoke DW15 0,60 037150For tying RAPID Column Frames.Comes with the RAPID Column Frames.For Column Frame 300 (4x), 210 (3x), 60 (1x)

Permissible Load to DIN 18216: 90kN

Locking Pin ø 20x205, galv. 0,74 037160For tying RAPID Column Frames.Comes with the RAPID Column Frames.For Column Frame 300 (4x), 210 (3x), 60 (1x)Complete with:Cotter Pin 4/1 (1x)

Spherical Nut DW 15, galv. 0,49 030440For tying RAPID Column Frames.Comes with the RAPID Column Frames.For Column Frame 300 (4x), 210 (3x), 60 (1x)

Permissible Load to DIN 18216: 90kN

Ladder connector RAPID, galv. 6,58 103369For connecting ladders to RAPIDcolumn frames.Complete with:Hex. Bolt ISO 4017 M12x25-8.8, galv. (2x) andClamping plate (2x)

Weight kg Item no.

SW 27

DW15

FS 4/1

DW

15

Page 24: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

20 405 40

2013

0

50

130

20

ø 13

1810

25

220

155

1960

5 x

298

= 1

490

95

40025

405

2510

0

210

50

53

130

40

13

80

80

50

400

534

1885

1200

220

168

298

405

12032

0

355

50

50

325

294

710

450

750

(150

0)

79

25

20

20

Weight kg Item no.

Ladder 180/6, galv. 13,10 051410Access Ladder 180/2, galv. 11,10 103724Complete with:Hex. Bolts ISO 4017 M12x40-8.8, galv. andHex. Nut ISO 7042 M12-8, galv. (4x)

Accessories:Formwork chain 3kN, 2,5m 1,37 065073

Ladder Hook, galv. 0,68 103718Only for the lower ladder (2x)Complete with:Hex. Bolt ISO 4017 M12x25-8.8, galv. andHex. Nut ISO 7042 M12-8, galv. (2x)

Ladder Base 2,36 051460For preventing the ladders sliding.

Ladder Safety Cage 75, galv. 15,50 104132Ladder Safety Cage 150, galv. 25,20 051450Complete with:Hex. Bolt ISO 4017 M12x25-8.8, galv. (4x),Clamping plate (4x)

SW 19

Eyes for security chain

SW 19

Page 25: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

840

520

1340

1005

100

525

74

137 60

225

150ø 19

70

1524

1420

1340

52540

1524

500

525

710

40

ø 20

ø 14

1305

ø 38

50

110

130

21

Concreting Platform, complete 126,00 037400Used for TRIO, RAPID and QUATTRO columns.Consisting of:Concreting Landing (1x)Handrail 52 galv. (2x)Handrail 134 galv. (2x)Crane Hook Concreting Platform (3x)

Concreting Landing, Alu 51,50 037410Powder-coatedSuitable for any cross section up to amaximum of 600x600mm. It is mountedwith the Crane Hook Concreting Platform.

Permissible Load: 150kg/m2

Handrail 52, galv. 10,50 037420Handrail 134, galv. 18,10 0374302 of each per concreting platform.Locks in place automatically.

Crane Hook Concreting Platform 5,70 0374403 per concreting platform.Complete with: Captive Fixing Pinand Cam Nut DW15, galv.

Load-bearing pointPermissible load: 1000kg

Weight kg Item no.

adjustable620

DW15

Eyes for security chain

Page 26: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

22

02 PERI S.A.S.

Zone Industrielle Nord

34-36 rue des Frères Lumière

77109 Meaux Cedex [email protected]

www.peri.fr

03 PERI AG

Aspstraße 17

8472 Ohringen [email protected]

www.peri.ch

04 PERI S.A. Sociedad

Unipersonal

Ctra. Paracuellos -

Fuente el Saz km. 18,9

Camino de Malatones, km. 0,5

28110 Algete/Madrid [email protected]

www.peri.es

05 N.V. PERI S.A.

Industriepark

Nijverheidsstraat 6 PB 54

1840 Londerzeel [email protected]

www.peri.be

06 PERI B.V.

v. Leeuwenhoekweg 23

Postbus 304

5480 AH-Schijndel [email protected]

www.peri.nl

07 PERI Formwork Systems, Inc.

7135 Dorsey Run Road

Elkridge, MD 21075 [email protected]

www.peri-usa.com

08 PT Beton Perkasa Wijaksana

P.O. Box 3737

Jakarta 10210 [email protected]

www.peri.de

09 PERI S.p.A.

Via G. Pascoli, 4

20060 Basiano (MI) [email protected]

www.peri.it

10 PERI Japan K.K.

7F Hakozaki 314 Building,

31-4 Hakozaki-cho,

Nihonbashi Chuo-ku

Tokyo 103-0015 [email protected]

www.perijapan.jp

11 PERI Ltd.

Market Harborough Road

Clifton upon Dunsmore

Rugby, CV23 0AN [email protected]

www.peri.ltd.uk

12 PERI Kalıp ve İskeleleri

San. ve Tic. Ltd. Sti.

Çakmaklı Mahallesi

Akçaburgaz Cad.

72. Sokak No: 23

Kıraç - Büyükçekmece/ Istanbul 34500 [email protected]

www.peri.com.tr

13 PERI Kft.

Zádor u. 4.

1181 Budapest [email protected]

www.peri.hu

14 PERI Formwork Malaysia

Sdn. Bhd.

Unit 19-07-4, Level 7

PNB Damansara

19 Lorong Dungun

Damansara Heights

50490 Kuala Lumpur [email protected]

www.perimalaysia.com

15 PERI ASIA Pte. Ltd

Formwork Pte. Ltd.

No. 1 Sims Lane # 06-10

Singapore 387355 [email protected]

www.periasia.com

16 PERI Ges.mbH

Traisenstraße 3

3134 Nußdorf ob der Traisen offi [email protected]

www.peri.at

17 PERI spol. s r.o.

Průmyslová 392

252 42 Jesenice [email protected]

www.peri.cz

18 PERI Danmark A/S

forskalling og stillads

Greve Main 26

2670 Greve [email protected]

www.peri.dk

19 PERI Suomi Ltd. Oy

Hakakalliontie 5

05460 Hyvinkää [email protected]

www.perisuomi.fi

20 PERI NORGE AS

Kobbervikdalen 156

3036 Drammen [email protected]

www.peri.no

21 PERI Polska Sp. z o.o.

ul. Stołeczna 62

05-860 Płochocin [email protected]

www.peri.pl.pl

22 PERIform SVERIGE AB

Montörgatan 4-6

Box 9073

30013 Halmstad [email protected]

www.periform.se

23 PERI (Korea) Ltd.

8-9th Fl., Yuseong Bldg.

830-67, Yeoksam-dong,

Kangnam-ku,

Seoul 135-080 [email protected]

www.perikorea.com

24 PERIcofragens Lda.

Cofragens e Andaimes

Rua Cesário Verde,

nº 5 - 3º Esq.

Linda-a-Pastora 2790-326 Queijas [email protected]

www.peri.pt

25 PERI S.A.

Ruta Nacional N°. 9, km 47,5

(Panamericana Ramal Escobar)

(1625) Escobar/Prov. Bs. As. [email protected]

www.peri.com.ar

26 PERI Formas e

Escoramentos Ltda.

Rodovia Raposo Tavares,

km 41

Colinas Bandeirante

CEP 06730-000 Vargem Grande Paulista São Paulo [email protected]

www.peribrasil.com.br

27 PERI Chile Ltda.

C/José de San Martin N° 104

Parque Industrial Los

Libertadores

Colina, Santiago de Chile [email protected]

www.peri.cl

28 PERI România SRL

Calea Bucureşti nr. 2B

077015 Baloteşti - ILFOV [email protected]

www.peri.ro

29 PERI SLOWENIEN

Goran Opalic

Obrežna 137

2000 Maribor [email protected]

www.peri.de

30 PERI spol. s r.o.

Šamorínska 18

903 01 Senec [email protected]

www.peri.sk

31 PERI Australia Pty. Ltd.

116 Glendenning Road

Glendenning NSW 2761 [email protected]

www.periaus.com.au

32 PERI AS

Valdmäe 8

Tänassilma Tehnopark

76401 Saku vald Harjumaa

[email protected]

www.peri.ee

2

1

3

4

5

6

9

11

12

1316

17

18

19

20

22

21

24

2829

30

32

33

34

38

41

42

46

48

52

53

01 PERI GmbH Rudolf-Diesel-Strasse

89264 Weissenhorn

[email protected]

www.peri.de

France

Switzerland

Spain

Belgium/Luxembourg

Netherlands

USA

Indonesia

Italy

Japan

United Kingdom/Ireland

Turkey

Hungary

Malaysia

Singapore

Austria

Czech Republic

Denmark

Finland

Norway

Poland

Sweden

Korea

Portugal

Argentina

Brazil

Chile

Romania

Slovania

Slovakia

Australia

Estonia

PERI International

Page 27: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

23

33 PERI Hellas Ltd.

Sokratous Str.

5th kil. Koropi-Varis Ave.

P. O. Box 407

194 00 Koropi [email protected]

www.perihellas.gr

34 PERI SIA

Granita 26

1057 Riga [email protected]

www.peri-latvija.lv

35 PERI (L.L.C.)

Brashy Building,

Offi ce No. 212

Shk. Zayed Road

P.O. Box 27933

Dubai [email protected]

www.perime.com

36 PERI Formwork Systems, Inc.

45 Nixon Road

Bolton, Ontario L7E 1K1 [email protected]

www.peri.ca

37 PERI GmbH

Lebanon Representative

Offi ce

AYA Commercial Center,

7th fl oor,

Dora Highway,

Beirut P.O. Box 90 416 Jdeidet

[email protected]

www.peri.de

38 PERI UAB

Titnago st. 19

02300 Vilnius [email protected]

www.peri.lt

39 PERI S.A.

Route de Rabat, km. 5

Piste de Beni Touzine

Tanger [email protected]

www.peri.de

40 PERI Formwork

Engineering Ltd

16 Moshe Dayan st.,

P.O. Box 10202

Petach Tikva,

49002 Israel [email protected]

www.peri.co.il

41 PERI BULGARIA EOOD

Kv. Vragdebna

m. Nova Machala Nr. 46

1839 – Sofi a [email protected]

www.peri.bg

42 MEST ltd.,

Fornubudum 5

220 Hafnarfjordur [email protected]

www.mest.is

43 TOO PERI Kazakhstan

Rubenstein Street 10

(Corner Dostyk Str. 7)

050010 Almaty [email protected]

www.peri.kz

44 OOO PERI

8 Etage, OOO PERI Buro

Krasnaya Presnya Str. 24

123022 Moskau [email protected]

www.peri.ru

45 PERI Wiehahn (Pty.) Ltd.

P.O. Box 2668

Bellville 7535 [email protected]

www.periwiehahn.co.za

46 TOW PERI Ukraina

23, M. Raskowa Str., B. 822

02002 Kiew [email protected]

www.peri.ua

47 PERI GmbH

Egypt Branch Offi ce

24 A, Obour Gardens,

4th Floor, apt. # 1

Salah Salem Street

11361 Heliopolis Cairo [email protected]

www.peri.com.eg

48 PERI Oplate d.o.o.

Jurija Gagarina 81

11070 Novi Beograd offi [email protected]

www.peri.co.yu

49 PERI Cimbras y Andamios,

S.A. de C.V.

Parque de las Américas

KM 3.5 de la Carretera

Jorobas - Tula

Huehuetoca

Estado de México, C.P. 54680 [email protected]

www.peri.com.mx

50 PERI Kalıp ve İskeleleri

Baku Branch Offi ce

28 May Küç. Ev 72 Menzil 27

Baku [email protected]

www.peri.com.tr

51 PERI Kalıp ve İskeleleri

Aşgabat Branch Offi ce

Göroglu Sokak No. 130, Kat 2

744035 Aşgabat [email protected]

www.peri.com.tr

52 PERI Belarus

Pr. Nesawisimosti 11

Kopus-2 Zimmer: 526,528

220030 Minsk [email protected]

www.peri.com.tr

53 PERI oplate i skele d.o.o.

Dolenica 20

10 250 Donji Stupnik/ Zagreb [email protected]

www.peri.com.hr

54 PERI GmbH

Iran Branch Offi ce

Flat 27, Blvd. KAVE,

Building No. 246

P.O. Box 9 3979 3669

Tehran [email protected]

www.peri.ir

55 PERI (India) Pvt Ltd

717 Palm Springs

Palm Court

Malad Link Road

Malad (West)

Mumbai – 400064 [email protected]

www.peri.in

56 PERI Jordan

Saad 5 Center, 4th Floor

Offi ce No. 404

Al Madineh

Al Munawara Street

P.O. Box 367

11947 Amman [email protected]

www.peri.de

57 PERI Kuwait

Arraya Center, 29th Floor

Al-Shuhada Street, Sharq

P.O. Box 1060 Safat

13011 Kuwait [email protected]

www.peri.de

58 PERI Saudi Arabia

33 AL-Batraa Street

AL -Shurbatiy Building

AL - Bughdadiah AL -

Gharbiah Distrect

6th Floor, Flat # 61

P.O. Box 11641

Jeddah [email protected]

www.peri.de

59 PERI Qatar LLC

P.O. Box 24133

Doha [email protected]

www.peri.de

60 Société PERI S.A.S.

Bureau de liaison d‘Alger

50 bis, Route de Gué

de Constantine

Hai El Badr (ex Apreval)

Immeuble FADLI

Kouba - Alger [email protected]

www.peri.fr

7

8

10

1415

23

25

26

27 31

35

36

3739 40

43

44

45

4749

50 51

54

595558

5760 56

Greece

Latvia

United Arab Emirates

Canada

Libanon

Lithuania

Marocco

Israel

Bulgaria

Iceland

Kazakhstan

Russian Federation

South Africa

Ukraine

Egypt

Serbia

Mexico

Azerbaijan

Turkmenistan

Belorussia

Croatia

Iran

India

Jordan

Kuwait

Saudi Arabia

Qatar

Algeria

Page 28: RAPID Aluminium column formwork - PERI4d9cf9ff-599b-4ecb-b3af-86926845a73f/...RAPID Aluminium column formwork Edition 02/2008 Assembly instructions for standard application

D e

02

/20

08

3

ma

Art

. N

r.:

79

22

16

©

Co

pyri

gh

t by P

ER

I G

mb

H

Wall FormworkPanel Formwork

Girder Formwork

Circular Formwork

Facade Formwork

Brace Frame

Column FormworkSquare

Rectangular

Circular

Slab FormworkPanel Formwork

Beam Grid Formwork

Girder Formwork

Slab Table

Beam Formwork

Shoring SystemsSteel Slab Props

Aluminium Slab Props

Tower Systems

Heavy-Duty Props

Climbing SystemsClimbing Scaffold

Self-Climbing System

Climbing Protection Panel

Platform Systems

Scaffold, Stairways, Working PlatformsFacade Scaffold

Working Platform

Weather Protection Roof

Stairway Access

Bridge and Tunnel FormworkCantilevered Parapet Carriage

Cantilevered Parapet Platform

Engineer´s Construction Kit

ServicesFormwork Assembly

Cleaning / Repairs

Formwork Planning

Software

Statics

Special Constructions

Additional Systems

Plywood

Formwork Girders

Stopend Systems

Pallets

Transportation Containers