Raleigh Waste Management Centre Landfill Environmental Management Plan

Transcript of Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill...

Page 1: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Raleigh Waste Management Centre

Landfill Environmental Management Plan

Page 2: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 2

Page 3: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 3

Document Check Off and Disclaimer

DATE DRAFT AUTHOR CHECKED

20/12/2013 1 Thomas Freeman Greg Freeman

07/03/2014 2 Thomas Freeman Jeff Green

12/05/2014 FINAL Thomas Freeman Greg Freeman

The collection of information presented in this report was undertaken to the best level possible

within the agreed timeframe and should not be solely relied upon for commercial purposes. The

opinions, representations, statements or advice, expressed or implied in this report was done so in

good faith. While every effort has been made to ensure that the information contained within is

accurate, Impact Environmental Consulting makes no representation as to the suitability of this

information for any particular purpose. Impact Environmental Consulting disclaims all warranties

with regard to this information. No part of this report is to be reproduced without the written

consent of Impact Environmental Consulting Pty Limited.

Page 4: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 4

Table of Contents

PART 1 INTRODUCTION ............................................................................................................. 10

1.1 BACKGROUND ....................................................................................................................... 10

1.2 WHAT IS A LEMP? .................................................................................................................. 11

1.3 PURPOSE OF THE LEMP ...................................................................................................... 11

1.4 DOCUMENT CONTROL .......................................................................................................... 12

1.5 REVIEWS AND UPDATES ...................................................................................................... 12

PART 2 KEY DRIVERS OF THE LEMP ....................................................................................... 13

2.1 COMPLIANCE WITH EPA LICENSE ...................................................................................... 13

2.2 COMPLIANCE WITH LANDFILL GUIDELINES ...................................................................... 16

2.3 EPA LICENCE AND GUIDELINES IN THIS LEMP ................................................................. 17

PART 3 RELEVANT LEGISLATION, POLICIES AND GUIDELINES ......................................... 18

PART 4 SITE OVERVIEW ............................................................................................................ 19

4.1 LOCATION ............................................................................................................................... 19

4.2 LAND USE AND ZONING ....................................................................................................... 20

4.3 NEIGHBOURING LAND USES ............................................................................................... 22

4.4 OWNERSHIP ........................................................................................................................... 22

4.5 SITE HISTORY ........................................................................................................................ 22

PLANNING CONSENT ............................................................................................................ 22

4.6 LICENCING ............................................................................................................................. 22

PART 5 PHYSICAL ENVIRONMENT ........................................................................................... 23

5.1 CLIMATE AND METEROLOGICAL CHARACTERISTICS ..................................................... 23

5.2 FLORA AND FAUNA ............................................................................................................... 24

5.3 TOPOGRPAHY ........................................................................................................................ 24

5.4 GEOLOGY AND SITE SOILS .................................................................................................. 25

ACID SULPHATE SOILS ......................................................................................................... 25

5.5 SURFACE WATER HYDROLOGY .......................................................................................... 25

5.6 GROUNDWATER HYDROLOGY ............................................................................................ 26

GROUNDWATER USE ............................................................................................................ 27

5.7 FORESTRY ............................................................................................................................. 27

5.8 ACCOUSTIC ENVIRONMENT ................................................................................................ 28

5.9 VISUAL AMENITY ................................................................................................................... 28

5.10 CULTURAL AND HERITAGE VALUES ................................................................................... 28

PART 6 WASTE TYPES AND QUANTITIES ............................................................................... 29

6.1 GENERAL ................................................................................................................................ 29

6.2 WASTE TYPES AND QUANTITIES ........................................................................................ 29

6.3 WASTE GROWTH ................................................................................................................... 31

PART 7 FACILITY DESIGN .......................................................................................................... 32

Page 5: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 5

7.1 ACCESS AND LAYOUT .......................................................................................................... 32

7.2 FACILITIES .............................................................................................................................. 32

SMALL VEHICLE TRANSFER STATION ................................................................................ 32

REUSE CENTRE ..................................................................................................................... 32

BULKY GARDEN WASTE PROCESSING AREA ................................................................... 32

SCRAP METAL STORAGE AREA .......................................................................................... 33

TYRES STOKCPILE AREA ..................................................................................................... 33

MATTRESS STORAGE SHED ................................................................................................ 33

WASTE OIL SHED .................................................................................................................. 33

E-WASTE CAGE ..................................................................................................................... 33

HAZARDOUS MATERIALS STORAGE SHED ....................................................................... 33

7.3 FINAL LANDFORM AND LIFE OF SITE ................................................................................. 33

7.4 STAGING OF LANDFILLING .................................................................................................. 34

STAGE 1 .................................................................................................................................. 34

STAGE 2 .................................................................................................................................. 34

7.5 FUTURE USE .......................................................................................................................... 34

7.6 STORMWATER DRAINAGE ................................................................................................... 35

7.7 LEACHATE MANAGEMENT SYSTEM ................................................................................... 35

PART 8 FACILITY OPERATION .................................................................................................. 37

8.1 OPENING HOURS .................................................................................................................. 37

8.2 MANAGEMENT, SUPERVISION AND STAFFING ................................................................. 38

8.3 TRAFFIC MANAGEMENT ....................................................................................................... 39

8.4 PUBLIC AND STAFF SAFETY ................................................................................................ 39

8.5 SITE SECURITY ...................................................................................................................... 40

8.6 WASTE ACCEPTANCE AND SCREENING ........................................................................... 40

ACCEPTED WASTES ............................................................................................................. 41

WASTE TYRES ....................................................................................................................... 42

WASTE SCREENING AND HANDLING ................................................................................. 42

UNACCEPTABLE WASTE PROCEDURE .............................................................................. 43

8.7 RECORDING OF WASTES RECIEVED ................................................................................. 43

8.8 WASTE COMPACTION ........................................................................................................... 44

8.9 FILLING PLAN ......................................................................................................................... 44

8.10 COVER MATERIAL ................................................................................................................. 45

DAILY COVER ......................................................................................................................... 45

ALTERNATE DAILY COVER................................................................................................... 46

INTERMEDIATE COVER ........................................................................................................ 46

8.11 FINAL CAPPING LAYER ......................................................................................................... 47

8.12 WET WEATHER OPERATIONS ............................................................................................. 47

Page 6: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 6

8.13 FIRE PREVENTION AND CONTROL MEASURES ................................................................ 48

CONTROLLED BURNING ....................................................................................................... 49

8.14 EQUIPMENT ............................................................................................................................ 49

8.15 ASBESTOS HANDLING .......................................................................................................... 49

8.16 QUALITY ASSURANCE .......................................................................................................... 51

PART 9 RECYCLING AND RESOURCE RECOVERY ................................................................ 52

9.1 GENERAL ................................................................................................................................ 52

9.2 COMINGLED RECYCLABLES ................................................................................................ 52

9.3 GREENWASTE ....................................................................................................................... 52

9.4 SCRAP METAL & CAR BATTERIES ...................................................................................... 52

9.5 TYRES ..................................................................................................................................... 53

9.6 WASTE OIL ............................................................................................................................. 53

9.7 CONCRETE BRICKS AND TILES ........................................................................................... 53

9.8 CLEAN FILL ............................................................................................................................. 53

9.9 REUSE CENTRE ..................................................................................................................... 53

PART 10 ENVIRONMENTAL MANAGEMENT ISSUES ................................................................ 54

10.1 WATER .................................................................................................................................... 54

10.1.1 LEACHATE MANAGEMENT ........................................................................................ 54

i. LEACHATE BARRIER ................................................................................................. 54

ii. LEACHATE COLLECTION SYSTEM .......................................................................... 54

iii. LEACHATE DISPOSAL ............................................................................................... 55

iv. UPGRADES ................................................................................................................. 56

10.1.2 STORMWATER ............................................................................................................ 57

i. UPGRADES ................................................................................................................. 58

GROUNDWATER .................................................................................................................... 60

10.2 NOISE MANAGEMENT ........................................................................................................... 60

10.3 ODOUR CONTROL ................................................................................................................. 61

10.4 LITTER CONTROL .................................................................................................................. 62

10.5 DUST CONTROL ..................................................................................................................... 63

10.6 LANDFILL GAS MANAGEMENT ............................................................................................. 64

10.7 FERAL PESTS AND VERMIN CONTROL .............................................................................. 66

10.8 WEED MANAGMENT .............................................................................................................. 67

10.9 FINANCIAL ASSURANCE ....................................................................................................... 68

PART 11 ENVIRONMENTAL MONITORING ................................................................................. 70

11.1 RECORDS ............................................................................................................................... 70

11.2 GROUNDWATER .................................................................................................................... 70

LOCATION POINTS AND MONITORING ............................................................................... 70

GROUNDWATER POLLUTION DETECTION......................................................................... 71

Page 7: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 7

11.3 LEACHATE .............................................................................................................................. 72

LOCATION POINTS AND MONITORING ............................................................................... 72

DISCHARGE OF LEACHATE TO SURFACE WATER ........................................................... 73

11.4 SURFACE WATER .................................................................................................................. 74

LOCATION POINTS AND MONITORING ............................................................................... 74

SURFACE WATER POLLUTION DETECTION ...................................................................... 75

11.5 RAINFALL MONITORING ....................................................................................................... 76

11.6 LANDFILL GAS ........................................................................................................................ 76

REMEDIATING LANDFILL GAS EMISIONS ........................................................................... 77

11.7 LANDFILL VOLUME ................................................................................................................ 77

11.8 COMPLAINTS HANDLING ...................................................................................................... 77

PART 12 SITE CLOSURE AND REHABILITATION ...................................................................... 78

12.1 CLOSURE PLAN ..................................................................................................................... 78

12.2 POST CLOSURE MANAGEMENT .......................................................................................... 79

ENVIRONMENTAL MANAGEMENT ....................................................................................... 79

ENVIRONMENTAL MONITORING ......................................................................................... 79

MAINTENANCE ....................................................................................................................... 79

PART 13 REPORTING ................................................................................................................... 80

13.1 MONTHLY SECTION 88 LEVY REPORTING ......................................................................... 80

13.2 ANNUAL REPORTING ............................................................................................................ 80

13.3 INCIDENT REPORTING .......................................................................................................... 81

EMERGENCY CONTACTS ..................................................................................................... 82

APENDICIES ................................................................................................................................... 85

APPENDIX 1: ENVIRONMENTAL PROTECTION LICENSE .......................................................... 86

APPENDIX 2: DRAWINGS .............................................................................................................. 87

APPENDIX 3: PLANS ...................................................................................................................... 88

APPENDIX 4: NON-COMPLIANCE RECORD ................................................................................ 92

APPENDIX 5: ANNUAL RETURN ................................................................................................... 96

Page 8: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 8

Table of Figures

Figure 1 – ENLARGED BELLINGEN SHIRE LOCALITY BOUNDARIES, 2006 ............................. 10

Figure 2 –LOT86 D.P. 630914, BELLINGEN SHIRE COUNCIL RECORDS 2014 ......................... 19

Figure 3 – BELLINGEN LEP 2010: LAND ZONING MAP 6C &6E COMBINED ............................. 21

Figure 4 – GROUNDWATER BORE MAP ....................................................................................... 27

Table of Tables

Table 1 – ENVIRONMENTAL PROTECTION LICENSE ................................................................. 13

Table 2 - SOLID WASTE LANDFILL GUIDELINES ........................................................................ 16

Table 3 – CLIMATE DATA ............................................................................................................... 23

Table 4 – WASTE TYPES AND QUANTITIES ................................................................................ 30

Table 5 – KERBSIDE COLLECTION ............................................................................................... 30

Table 6 – BELLINGEN SHIRE POPULATION GROWTH ............................................................... 31

Table 7 – ACCEPTABLE WASTES ................................................................................................. 41

Table 8 – COVER MATERIAL REQUIRED ..................................................................................... 45

Table 9 – GROUNDWATER MONITORING POINTS ..................................................................... 70

Table 10 – GROUNDWATER MONITORING POLLUTANTS AND FREQUENCY ........................ 71

Table 11 – MONITORING POINT 18 TRIGGER VALUES .............................................................. 72

Table 12 – LEACHATE MONITORING POINTS ............................................................................. 72

Table 13 – LEACHATE POLLUTANTS AND FREQUENCY ........................................................... 73

Table 14 – SURFACE WATER MONITORING POINTS ................................................................. 74

Table 15 – SURFACE WATER POLLUTANTS AND FREQUENCY ............................................... 75

Table 16 – SURFACE WATER PERMITTED EXCEEDANCES ...................................................... 76

Table 17 – LANDFILL GAS MONITOING POINTS AND FREQUENCY ......................................... 76

Table 18 – BELLINGEN SHIRE COUNCIL CONTACTS ................................................................. 82

Table 19 – EMERGENCY ORGANISATION CONTACTS .............................................................. 83

Page 9: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 9

Definitions

AHD Australian Height Datum

BSC Bellingen Shire Council

Council Bellingen Shire Council

DA Development Application

EIS Environmental Impact Statement

EPL 5896 Raleigh Waste Management Centre Environmental Protection Licence

EPA New South Wales Environmental Protection Authority

LCP Landfill Closure Plan

LEMP Landfill Environmental Management Plan

LEP Bellingen Local Environment Plan

Licence Environmental Protection Licence

OEH Office of Environment and Heritage

POEO Protection of the Environment Operations Act 1997

RWMC Raleigh Waste Management Centre

SEPP State Environmental Planning Policy

Page 10: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 10

PART 1 INTRODUCTION

1.1 BACKGROUND

Impact Environmental Consulting have been contracted by Bellingen Shire Council (“Council”) to

review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste

Management Centre (“the RWMC”) which was produced in 1999 by Jelliffe Environmental.

Changes in landfill management have brought about the need to review the LEMP. Council is

committed to improving management operations generally at the Landfill through the adoption and

implementation of sound environmental management practices and required infrastructure.

Figure 1 below displays the locality of the Raleigh Waste Management Centre as shown by the red

circle.

Source: Bellingen Shire Council, 2014

Figure 1 – ENLARGED BELLINGEN SHIRE LOCALITY BOUNDARIES, 2006

Page 11: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 11

This LEMP provides a general framework for Council to:

i. Undertake remediation of staged landfill areas;

ii. Make efficient use of available airspace

iii. Ascertain and continually improve existing environmental management practices at

the landfill in accordance with industry guidelines1;

iv. Assess the current impact by the landfill on the surrounding environment; and

v. To minimise any future impact on the natural environment caused by the landfill.

This LEMP is integral to the planning phase at the landfill ensuring that existing and future

activities at the landfill are sustainable, performed in an environmentally sound and appropriate

manner and in accordance with the conditions prescribed under Council’s Environmental

Protection Licence (EPL).

1.2 WHAT IS A LEMP?

A LEMP contains site specific strategic approaches that an organisation can implement to ensure

a facility is managed and operated in an environmentally responsible manner.

These approaches are based on industry best practice and on guidelines such as:

For landfills; the Environmental Guidelines - Solid Waste Landfills (Guidelines), NSW

Environmental Protection Authority 1996.

For resource recovery and transfer stations; the Handbook for the Design and Operation

of Rural and Regional Transfer Stations produced by the OEH, 2006.

The guidelines provide environmental goals and management benchmark techniques that provide

an illustration of the level of environmental protection that is recommended for each aspect of a

facility’s operation.

These guidelines adopt a performance based rather than prescriptive approach that are designed

to encourage operators to use their initiative to develop integrated, appropriate and relevant

solutions for their landfill and/or transfer station (using either benchmark techniques or

alternatives) to achieve environmentally beneficial outcomes in a cost effective manner.

1.3 PURPOSE OF THE LEMP

The LEMP has been prepared as a tool to assist Council in the management of the RWMC in an

environmentally responsible manner and in accordance with best practice and industry guidelines.

Council will ensure that operations undertaken at the Landfill are in accordance with regulatory

requirements including any conditions of consent for further expansion and development of the

landfill cell and associated infrastructure, and the conditions imposed under its EPL.

The objectives of the LEMP are to ensure that the existing site, environmental practices and

operations at the RWMC are improved, to minimise any off-site effects caused to the surrounding

environment and neighbouring communities. The LEMP also provides a guide to staff employed at

the landfill site regarding general operational procedures.

1 NSW EPA, Environmental Guidelines: Solid Waste Landfills, January 1996

Page 12: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 12

The LEMP aims to address the following areas:

Legislative and Other Requirements;

Site overview including the physical environment;

Approvals and Licensing;

Landfill design and operations;

Waste management practices;

Environmental management issues and monitoring requirements;

Post closure and remediation of the landfill; and

Reporting requirements.

1.4 DOCUMENT CONTROL

A copy of BSC’s EPL for the site and this LEMP shall be kept on site at all times and shall be

made available for inspection to the EPA upon request.

BSC shall ensure that all staff and sub-contractors at the site are familiar with the relevant

requirements described in this LEMP.

1.5 REVIEWS AND UPDATES

Council will review and update the LEMP (as necessary) after every review of the site EPL or at

least every 3 years to ensure that it reflects the facilities and operations at the Raleigh Waste

Management Centre and any changes in regulatory requirements. This shall include undertaking

revisions and updates due to changes in the site’s EPL or due to changes in operations or

directives from BSC or the EPA.

Page 13: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 13

PART 2 KEY DRIVERS OF THE LEMP

2.1 COMPLIANCE WITH EPA LICENSE

This LEMP has been structured to address each and every EPL condition as shown below in

Table 1.

Table 1 – ENVIRONMENTAL PROTECTION LICENSE

Administrative Conditions Addressed in Section

of LEMP

A1 What the licence authorises and regulates 4.6

A2 Premises to which this licence applies 4.4

A3 Other activities N/A

A4 Information supplied to the EPA

Refer to License

Application

Discharges to Air and Water and Applications to

Land

Addressed in Section

of LEMP

P1

Location of monitoring/discharge points and

areas

11.2, 11.3, 11.4, 11.5,

1.6

Limit Conditions Addressed in Section

of LEMP

L1 Pollution of waters 11.2, 11.4

L2 Load limits N/A

L3 Concentration limits 11.4

L4 Volume and mass limits N/A

L5 Waste Table 6

L6 Noise Limits 10.1

L7 Hours of operation 8.1

L8 Odours 10.3

Operating Conditions Addressed in Section

of LEMP

O1

Activities must be carried out in a competent

manner 8.2

Page 14: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 14

O2 Maintenance of plant and equipment 8.14

O3 Dust Control 10.5

O4 Closure plan 12.1

O5 Tyre Storage 9.5

O6 Leachate management 10.1.1

O7 Management of surface waters 10.1.2

O8 Fire risk reduction works 10.9

O9 Fire extinguishment 10.9

O10 Fire fighting capability 10.9

O11 Burning of green waste 10.9

O12 Quality assurance 8.18

O13 Screening of waste 8.6

O14 Filling plan 8.9

O15 Completion of landfill cells 8.11

O16 Unauthorised entry 8.5

O17 Degradation of local amenity 10.4

O18 Covering of waste 8.10

Monitoring and Recording Conditions Addressed in Section

of LEMP

M1 Monitoring records 11.1

M2

Requirement to monitor concentration of

pollutants discharged 11

M3 Testing methods - concentration limits 11

M4 Recording of pollution complaints 11.8

M5 Telephone complaints line 11.8

M6 Requirement to monitor volume or mass 11.3

Page 15: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 15

M7 Monitoring remaining landfill capacity 11.7

M8 Rainfall Monitoring 11.5

M9 Laboratory accreditation 11.1

Reporting Conditions Addressed in Section

of LEMP

R1 Annual return documents 13.2

R2 Notification of environmental harm 13.3

R3 Written report 13.3

R4 Recording of fires 13.3

R5 Leachate discharges to surface waters 13.3

R6 Landfill Gas Hazard Reporting 11.6

R7 Groundwater contamination reporting 13.3

R8 Surface water contamination reporting 13.3

General Conditions Addressed in Section

of LEMP

G1 Copy of licence kept at the premises 1.4

Source: Environment Protection Licence Number 5896

Page 16: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 16

2.2 COMPLIANCE WITH LANDFILL GUIDELINES

This LEMP has been structured to address the relevant environmental goals stated in the

Environmental Guidelines: Solid Waste Landfills as shown below in Table 2.

Table 2 - SOLID WASTE LANDFILL GUIDELINES

Environmental Goals Addressed in Section of LEMP

Water Pollution

Preventing pollution of water by leachate 10.1.1

Detecting water pollution 11.2,11.3,11.4

Remediating water pollution 11.2,11.4

Air Pollution

Preventing landfill gas emissions 10.6

Detecting landfill gas emissions 11.6

Remediating landfill gas emissions 11.6

Land Management and Conservation

Assuring quality of design, construction and

operation 8.18

Assuring quality of incoming waste 8.6

Recording of wastes received 8.7

Minimising landfill space used 8.8

Maximisation of recycling 9

Remediating landfill after closure 12

Hazards and Loss of Amenity

Preventing unauthorised entry 8.5

Preventing degradation of local amenity 10.4

Preventing noise pollution 10.2

Adequate fire fighting capacity 8.13

Adequate staffing and training 8.2

Source: Environmental Guidelines: Solid Waste Landfills, 1996

Page 17: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 17

2.3 EPA LICENCE AND GUIDELINES IN THIS LEMP

In addition to the tables above, the relevant licence conditions and benchmark techniques are

featured in the left column. An example is shown below:

O13.1 - The licensee must have in place and implement procedures to identify and prevent the

disposal of any waste not permitted by this licence to be disposed of at the premises in

accordance with the procedures in section 4.5.10 and 4.5.11 of the LEMP.

BM 21 - Screening of Waste Received: The landfill occupier should have in place waste

acceptance and screening procedures to ensure that the site does not accept wastes that are

prohibited from entry.

O13.1

BM 21

Page 18: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 18

PART 3 RELEVANT LEGISLATION, POLICIES AND GUIDELINES

Activities carried out at the Bellingen Waste Management Centre must comply with the relevant

provisions of all legislation relating to the operation of the Facility. This includes but is not limited

to the following:

Protection of the Environment Operations Act 1997

Protection of the Environment Operations (Waste) Regulation 2005

Clean Energy Act 2011

Protection of the Environment Operations (General) Regulation 2009

Soil Conservation Act 1938

Dangerous Goods Act 1975

Environmental Restoration and Rehabilitation Act 1990

Environmentally Hazardous Chemicals Act 1985

Waste Minimisation and Management Act 1995

Ozone Protection Act 1989

Rivers and Foreshores Improvement Act 1948

Heritage Act 1977

Water Act 1912

Bushfire Act 1949

Native Vegetation Act 2003

Threatened Species Conservation Act 1995

Environmental Planning and Assessment Act 1979

Fisheries Management Act 1998

Waste Management Act 2000

Waste Avoidance and Resource Recovery Act 2001

The Environment Protection Authority’s “Environmental Guidelines; Solid Waste Landfills, 1996”

has significant importance and forms part of the regulatory framework for the operation and

management of the RWMC.

The RWMC is also licensed and regulated under an Environmental Protection Licence pursuant to

the Protection of the Environment Operation Act 1997 (POEO Act).

Page 19: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 19

PART 4 SITE OVERVIEW

4.1 LOCATION

The Raleigh Waste Management Centre is located on Lot 86 D.P. 630914 which is approximately

9km east of the township of Bellingen. The entrance is off Short Cut Road as shown below in

Figure 2 which connects to Waterfall Way and the Pacific Highway. The total area of the landfill

site is 6.3 hectares.

Source: Bellingen Shire Council, 2014

Figure 2 –LOT86 D.P. 630914, BELLINGEN SHIRE COUNCIL RECORDS 2014

The landfill is located within a small valley bounded to the north by a ridge of appoximatly 23 m

Australian Heigh Datum (AHD) elevation. The ridge forms the northern boundary of the landfill site

catchment. The existing surface of the landfill has been raised to an elevation of around 15m AHD.

N

Page 20: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 20

The services provided by the Centre include:

Raleigh Reuse Shop which is a waste collection and sorting building

Small Vehicle Transfer Station:

34m3 domestic putrescible waste skip

34m3 comingled recyclables skip

34m3 greenwaste skip

Hazardous chemical storage shed

Mattress storage shed

Waste oil storage shed

Temporary battery storage shed

Collapsable E-waste skip bin

Bulky greenwaste stockpile

4.2 LAND USE AND ZONING

Land surrounding the landfill site is zoned General Industrial (IN 1). This zone extends at least

500m beyond the existing landfill area which can be seen below in Figure 3.

Zone IN1 General Industrial: Objectives of zone

To provide a wide range of industrial and warehouse land uses.

To encourage employment opportunities.

To minimise any adverse effect of industry on other land uses.

To support and protect industrial land for industrial uses.

To minimise any adverse effect of industry on the surrounding environment, with

particular regard to the on site disposal of effluent and the generation of stormwater.

To ensure that industrial development is adequately screened from the view of

classified roads

Page 21: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 21

Source: Bellingen Shire Council, 2014

Figure 3 – BELLINGEN LEP 2010: LAND ZONING MAP 6C &6E COMBINED

Part of the industrial zone near the landfill site has been classified Zone E3 Environmental

Management which provides a ‘buffer zone.’ This encircles the northern, eastern, western and

south eastern boundaries of the industrial zone. Only land to the south west does not fall under

this zoning. There is no land use conflict for this area and the landfill.

N

Page 22: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 22

4.3 NEIGHBOURING LAND USES

Generally land to the west of the site is predominantly rural. Land to the north is forested and an

industrial area bounds the site to the south. The closest residence is located approximately 250m

from the Raleigh Reuse Shop.

Land use zones adjacent to the General Industrial (IN 1) Zone include:

E3 Environmental Management: north, east, west and south east

R5 Large Lot Residential: west and north.

Land use zones in the broarder viscinity of the General Industrial (IN 1) Zone include:

RU4 Primary Production Small Lots: south west

SP2 Special Infrastructure (Classified Road): east

4.4 OWNERSHIP

Bellingen Shire Council owns the land on Lot 86 D.P. 630914 where the landfill site is situated.

4.5 SITE HISTORY

It is understood that the site has been used for solid waste disposal since 1978.2

PLANNING CONSENT

There is no evidence of the original Development Application on Councils Property Planning

Consent System. The earliest documented application on Lot 86 D.P. 630914 is regarding the

construction of a caretaker residence in 1985.

Approval for DA-00376 was granted in 1999 regarding the landfill extension.

4.6 LICENCING

The Raleigh Waste Management Centre is currently licensed under the Protection of the

Environment Operations Act 1997 (POEO Act) (Licence No, 5896)

Scheduled Activity: Waste disposal (application to land)

Fee Based Activity Scale; Waste disposal (application to land) Scale 0 – All.

A copy of the current licence is annexed in Appendix 1.

2 Jelliffe Environmental - Raleigh Waste Management Facility EIS 2/9/97

Page 23: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 23

PART 5 PHYSICAL ENVIRONMENT

5.1 CLIMATE AND METEROLOGICAL CHARACTERISTICS

The site is located in a humid sub-tropical climate with warm to hot, humid summers and mild, dry

winters with the occurrence of high intensity rainstorms. Rainfall predominantly occurs in the

summer months. The average annual rainfall is 1701.5mm3 as measured at the Coffs Harbour

Meteorological Observation (MO) station.

The mean daily pan evaporation rate for Coffs Harbour MO is 4.4mm/day. Wind conditions are

variable throughout the year. As a general pattern winds are predominantly from the south west in

the morning and from the north east in the afternoon.

Table 3 below displays detailed climate data obtained from the Bureau of Meteorology.

Table 3 – CLIMATE DATA

Ja

nua

ry

Fe

bru

ary

Ma

rch

Ap

ril

Ma

y

Ju

ne

Ju

ly

Au

gu

st

Se

pte

mb

er

Octo

be

r

Nove

mb

er

Dece

mb

er

An

nu

al

Temperature

Mean maximum

temperature (°C) 26.9 26.8 26 24 21 19 19 20 22 24 25 26 23.3

Mean minimum

temperature (°C) 19.4 19.5 18 15 12 9 7.6 8 11 14 16 18 14

Rainfall

Mean rainfall

(mm) 189 222 234 179 160 123 74 77 60 98 143 145

1701.

5

Decile 5 (median)

rainfall (mm) 151 179 201 135 117 90 58 41 36 75 125 114

1623.

5

Mean number of

days of rain >= 1

mm 9.4 9.5 11 8.5 7.6 6.2 4.5 5 4.5 6.8 8.1 8.4 88.8

Mean number of

days of rain >= 10

mm 3.8 3.9 4.7 3.6 3 2.6 1.6 1 1.2 2.2 3.3 3.3 34.6

Mean number of

days of rain >= 25

mm 1.7 1.8 2.2 1.7 1.3 1.3 0.7 1 0.3 0.8 1.3 1.2 14.9

Other Daily

Elements

Mean number of

clear days 7 5.9 8.3 9.8 10 11 14 15 14 10 8.1 7.9 122.1

3 Mean average rainfall as measured at Bellingen Post Office is 1520.4mm. Measurements ceased in 2002.

Page 24: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 24

Mean number of

cloudy days 12.8 12.8 12 11 11 9.7 8 7 6.5 9.8 11 12 123.2

Evaporation

Mean daily

evaporation (mm) 6.2 5.6 4.8 3.9 2.8 2.3 2.5 3 4.5 5.2 5.7 6.2 4.4

9am

Conditions

Mean 9am

temperature (°C) 23.9 23.4 23 21 17 15 14 15 19 21 22 23 19.7

Mean 9am

relative humidity

(%) 72 75 74 71 71 71 67 60 56 61 65 68 68

Mean 9am wind

speed (km/h) 14.5 13.4 13 12 11 11 10 12 14 16 16 15 13.1

3pm

Conditions

Mean 3pm

temperature (°C) 25.3 25.3 25 23 20 18 18 19 20 22 23 24 21.8

Mean 3pm

relative humidity

(%) 69 71 69 65 62 59 54 53 57 63 65 68 63

Mean 3pm wind

speed (km/h) 22.4 20.9 19 17 15 15 16 18 22 23 24 23 19.5

Source: Bureau of Meteorology Coffs Harbour MO Station, 2013

5.2 FLORA AND FAUNA

Much of the site has been disturbed as a result of more than 25 years of landfill operations. During

the Environmental Impact Statement (EIS) process a flora and fauna survey was undertaken in

1996. It found that there were:

“No endangered or vulnerable species listed in Schedules 1 and 2 of the Threatened Species

Conservation Act 1995 or ROTAP plants were identified on the site. It is concluded that the

proposed extension will no effect any areas of significant, endangered or vulnerable flora.”

“No reptile, bird or mammal species listed in Schedules 1 and 2 of the Threatened Species

Conservation Act 1995 or ROTAP plants were identified on the site.”

5.3 TOPOGRPAHY

The site is located on the southern side of a small ridge with the landfill area situated in the valley.

A detailed survey of the site was undertaken in 2013 by Hopkins Consultants on behalf of Impact

Environmental. Drawing 6835-0002-01 in Appendix 2 displays the existing topography.

Page 25: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 25

Site topography is characterised by a small ridge running steeply down to the south. The elevation

of the site varies from maximum heights of approximately 23m AHD along the ridge line to a low

point of approximately 4m AHD at the toe of the landfill. The existing landfill surface is generally

flat with gradients less than 2%. Batters around the edge of the landfill are constructed to a

gradient of 33%.

5.4 GEOLOGY AND SITE SOILS

Boreholes drilled at the site as part of the EIS for the expansion of the facility in 1997 indicated that

the sub-surface strata on the ridge is of weathered phyllite origin, being multicoloured, silty clay

with residual rock structure. Soil at the toe of the landfill area comprises a grey to black, silty

topsoil over silt, clayey silt and silty clay. The silty clays are grey or yellow brown with some red-

brown mottling. The site is underlain by highly weathered grey-yellow-brown phyllite clay to a

depth of 4 meters4.

The underlying geology is part of the Nambucca Beds consisting of slate, phyllite, schistose

sandstone and schistose conglomerate. Quaternary sediments are located in the drainage line

along the southern boundary and in the low lying eastern section of the site.

ACID SULPHATE SOILS

During the EIS process CaLM ASS Risk Maps (Bellingen/Raleigh) identified potential acid

sulphate soils on the eastern edge of the landfill. Testing of this area in November 1997 during the

construction of sediment control ponds found Acid Sulphate Potential to be below the level of

concern established by the EPA.

5.5 SURFACE WATER HYDROLOGY

The Raleigh landfill site is located within the Boggy Creek and Yellow Rock Creek catchments.

Runoff from the Raleigh landfill flows into Boggy Creek which flows east into Yellow Rock Creek.

This then joins the Kalang and Bellinger Rivers. The total drainage path is approximately 3km from

the landfill to the Kalang River5.

Waters of the Kalang and Bellinger River are traditionally used for cultivating oysters and for

recreational uses. Currently all oyster farming in the Kalang River is on hold due to issues

involving septic tanks and farm runoff in the area. The creek immediately below the Melaleuca

forest is used by cattle. It is therefore necessary to ensure that the landfill does not cause levels of

pollution which may adversely affect those beneficial uses.

The surface water catchment of the Raleigh landfill area is 6.3 ha. This is formed by the ridge on

the northern and western boundaries. A channel running along the southern boundary of the

landfill area to the Melaleuca forest diverts runoff from the upper catchment west of the landfill site

(20.6ha) and part of the industrial estate (5.3ha) but does not collect water from the landfill site.

4 Jelliffe Environmental - Raleigh Waste Management Facility EIS 2/9/97 5 Jelliffe Environmental - Raleigh Waste Management Facility EIS 2/9/97

Page 26: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 26

5.6 GROUNDWATER HYDROLOGY

Low lying areas below the site are characterised by silty clays overlaying phyllite bedrock. The

water table in this area fluctuates at times becoming saturated near the surface6. Groundwater

depth monitoring has been undertaken in a series of seven bore holes (BH) around the perimeter

of the facility. Their location is annexed in Appendix 3: Plan E.

Subsurface investigations during the original EIS stated:

Occasional bands of quartz gravel were located at 5.0 to 5.2 m below ground level7 within the

Melaleuca forest which are a potential source of water inflow. On the eastern edge of the

Melaleuca forest a water inflow zone is located 1.5 m below ground level, with another level

located at a depth of 5.4 m below ground level.

The original EIS in 1997 stated:

Nearby water bores were over 3 km from the landfill site to the NNE. It is considered extremely

unlikely that water originating in the landfill would flow in the direction of these bores or be

affected by the landfill.

Since 1997 there have been a number of new groundwater bores drilled in the vicinity of the

landfill as shown below in Figure 4. Some of these the bores are located in the direction of the

north east groundwater flow as annexed in Appendix 3: Ground Water Flow diagram.

6 Jelliffe Environmental - Raleigh Waste Management Facility EIS 2/9/97 7 Jelliffe Environmental - Raleigh Waste Management Facility EIS 2/9/97

Page 27: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 27

Source: NSW Office of Water, 2013

Figure 4 – GROUNDWATER BORE MAP

Recent rounds of groundwater monitoring on 05/12/12 and 04/06/13 at Bore Hole 7 (Monitoring

Point 18 in EPA Licence) indicate that the downstream water is well within the licence conditions.

GROUNDWATER USE

Groundwater is extracted for various purposes from sites down gradient from the landfill such as

agricultural purposes.

5.7 FORESTRY

The NSW Resource Atlas indicates that Newry and Tarkeeth State Forests are the closest forests

to the RWMC. Newry State Forest is located approximately 2km SW of the Raleigh Resource Hub.

Tarkeeth is situated 6 to 8 km further west of the facility.

N

Raleigh Waste Management

Centre

Locality

Page 28: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 28

5.8 ACCOUSTIC ENVIRONMENT

The existing acoustic environment is characterised by:

rural activities

industrial activities in the neighbouring industrial area

traffic generated by the landfill

plant operations within the landfill

the re-use centre

traffic along Short Cut Road

Noise measurements were recorded during the EIS process for the landfill expansion.

Background noise measurements were taken at the closest residence which was approximately

200m west of the site. The daytime lowest repeatable LA90-15min background noise level was

found to be 40 dB.

5.9 VISUAL AMENITY

The RWMC is located within a well wooded valley and is largely hidden from view from Short Cut

Road or Waterfall Way. The landfill only becomes visible upon turning off Shortcut Road and

approaching the gate. The recycling area is visible to the closest residence to the West. The visual

character of the landfill itself is dominated by exposed earth, plant, waste piles and dust

surrounded by open eucalypt forest and scarred hill slopes. As expected the landfill has a low

visual aesthetic value and hence low visual amenity.

The area of the landfill has a moderately low aesthetic value due mainly to inaccessibility and the

fact that it does not from part of any wider view. As the landfill approaches 22 m AHD it has the

potential to become more visually accessible from the Short Cut Road and the industrial park the

south. The visual impact will be minimised through revegetation.

5.10 CULTURAL AND HERITAGE VALUES

During the EIS a cultural and heritage survey was undertaken in 1996 finding that the area held no

special significance to the local Aboriginal people. This is possibly as a result of extensive clearing

and landfill operations.

Page 29: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 29

PART 6 WASTE TYPES AND QUANTITIES

6.1 GENERAL

Bellingen Shire has a population of approximately 12,819. The waste catchment for the landfill

comprises the following areas:

Township of Bellingen

Mylestom/Repton

Township of Urunga

Rural Valley and seaboard

6.2 WASTE TYPES AND QUANTITIES

The RWMC accepts a range of wastes from the Bellingen local government area and from the

region. The predominant source of waste in the catchment is municipal solid waste to a lack of

heavy industries. There is some commercial and light industry waste.

The range of materials accepted at the RWMC includes:

Municipal solid waste (putrascible and non-putresciable)

Commingled recylables

Construction and demolition material

Greenwaste

Metals for recycling

Tyres

Waste Oil

E-waste

The amount of waste deposited to landfill is calculated using NSW EPA’s weight conversion

factors. Table 4 below contains the waste tonnage data for the RWMC.

Page 30: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 30

Table 4 – WASTE TYPES AND QUANTITIES

Units

Jun 2012 - May

2013

Jun 2013 -

Dec 2013

Accepted Waste - RWMC

Municipal Solid Waste tonnes 569.6 257.23

Commercial and Industrial Waste tonnes 0 0

Construction and Demolition Waste tonnes 733.52 402.76

Transferred Waste tonnes 1065.96 609.58

Asbestos Waste tonnes 49 30

Contaminated Soil tonnes 0 0

VENM tonnes 78.67 0

Total tonnes 2,496.75 1,299.57

Resource Recovery - RWMC

Garden Waste tonnes 463.36 281.22

Scrap Metal (ferrous) tonnes 161.4 100

Scrap metal (non-ferrous) tonnes 11.35 12.28

Bricks and Concrete tonnes 0 0

Waste Oil litres 4950 1600

Mattresses (number) number 58 74

Co-mingled recycling tonnes 242.16 137.16

E-waste tonnes 13.96 15.27

Total Resource Recovery tonnes

Source: Bellingen Shire Council, 2013

Waste collected by the kerbside collection is taken to Coffs Harbour for processing; as such it

does not enter the RWMC. Before 2007 this waste was disposed at the RWMC. Table 5 below

provides an indication of the kerbside collection tonnages.

Table 5 – KERBSIDE COLLECTION

MATERIAL 2012 2011 2010 2009 2008 2007 2006

Recycling 1,101.68 1,224.80 1,180.68 1,209.74 1,239.84 1,228.21 1,345.89

Organic 1,513.08 1,597.20 1,433.62 1,351.28 1,398.82 938.88 -

MSW 1,325.20 1,150.68 1,193.96 1,433.48 1,243.14 1,153.53 1,766.91

Source: Bellingen Shire Council, 2013

Page 31: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 31

6.3 WASTE GROWTH

With no heavy industry and limited light industry in Bellingen Shire waste growth is dependent on

domestic waste. The historic growth in population is shown below in Table 6.

Table 6 – BELLINGEN SHIRE POPULATION GROWTH

YEAR ENDING JUNE 30 NUMBER % CHANGE

2001 12,634 --

2002 12,673 +0.31

2003 12,705 +0.25

2004 12,672 -0.26

2005 12,682 +0.08

2006 12,716 +0.27

2007 12,773 +0.45

2008 12,787 +0.11

2009 12,837 +0.39

2010 12,891 +0.42

2011 12,923 +0.25

2012 12,819 -0.80

Source: Australian Bureau of Statistics, Regional Population Growth, Australia 2012

The population of Bellingen Shire has remained relatively steady in the years 2001-2012; the

amount of waste disposed at the RWMC however has dropped significantly during this period. In

1998 there were 8,166 tonnes per year of waste landfilled at the RWMC; by 2013 this has dropped

to 1,389 tonnes per year. The large decrease can be attributed to the introduction of a three bin

collection system as part of the Coffs Coast Waste Services (CCWS) partnership between

Handybin Waste Services, Coffs Harbour City Council, Bellingen and Nambucca Shire Council.

Page 32: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 32

PART 7 FACILITY DESIGN

7.1 ACCESS AND LAYOUT

The Raleigh Waste Management Centre is located approximately 9km east of Bellingen off

Shortcut Road. Drawing 6835-0002-01 in Appendix 2 displays the general layout.

The main features of the RWMC include the following:

Small vehicle transfer station;

Reuse centre;

Hazardous chemical shed;

Mens club shed;

Stockpile areas for garden waste, scrap metal, tyres, mattresses;

Animal carcass trench;

Landfilling area for general solid waste;

Stormwater ponds;

Leachate storage tanks; and

Leachate interception trench

7.2 FACILITIES

SMALL VEHICLE TRANSFER STATION

The small vehicle transfer station is located a short distance from the entrance of the facility. It

comprises a covered rectangular pad including two large 34m3 hook lift bins. One bin is provided

for domestic putrescible municipal solid waste, the other is for commingled recyclables.

Greenwaste is deposited in a 34m3 skip that is adjacent to this shed.

All material collected is transported by Handybin Waste Services to the Coffs Coast Resource

Recovery Facility on Englands Road, Coffs Harbour under the Coffs Coast Waste Services

(CCWS) regional contract.

REUSE CENTRE

The reuse centre is located adjacent to the load inspection point. BSC staff collect and sort

incoming waste, diverting reusable items such as furniture into the reuse centre.

BULKY GARDEN WASTE PROCESSING AREA

Bulky greenwaste such as tree stumps and trunks is not accepted under the Coffs Coast Waste

Services (CCWS) regional contract. At present it is temporarily stockpiled an old quarry towards

the east of the site where it is shredded and used on site.

Page 33: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 33

SCRAP METAL STORAGE AREA

Scrap metal is stockpiled along the ridge to the north of the existing landfill area. It is separated

into ferrous and non-ferrous materials. Once the stockpile reaches sufficient size it is collected by

Matthews Metal Management.

TYRES STOKCPILE AREA

Tyres are stockpiled adjacent to the scrap metal pile on the northern ridge of the landfill. Once the

stockpile reaches sufficient size it is collected by Tyre Cycle.

MATTRESS STORAGE SHED

Mattresses are stored in an old shed located on the northern ridge of the landfill. RWMC staff strip

the mattresses, recovering the ferrous metal which is stockpiled in the scrap metal storage area.

WASTE OIL SHED

The waste oil is stored in a lockable shed adjacent to the small vehicle transfer station. It is

collected by Australian Waste Oil.

E-WASTE CAGE

E-waste items are stored in collapsible cages next to the waste oil. They are collected by

Matthews Metal Management.

HAZARDOUS MATERIALS STORAGE SHED

Hazardous materials such as chemicals, chemical containers and used gas cylinders are stored in

a purpose built lockable shed on a bunded base located near to the entry to the centre. They are

collected by Transpacific Industries.

7.3 FINAL LANDFORM AND LIFE OF SITE

The final landform will consist of a domed landform with a minimum 5% (1V:20H) grade to shed

water. It is proposed to rehabilitate the landfill batters as they are completed by shaping to a

maximum grade of 33% (1V:3H) and covering with suitable clay material and topsoil. According to

Council this has been completed through stages 1 to 4 which has raised the landfill to its present

surface of around 15m AHD.

Page 34: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 34

Stages 1 to 4 as stated in the 1996 LEMP are as follows:

Stage 1: 10m AHD

Stage 2: 12m AHD

Stage 3: 13.5m AHD

Stage 4: 15m AHD

The proposed final landform is annexed in Appendix 2: Drawing 6835-0002-02. The estimated

landfilling capacity from the existing landform to the proposed final landform is approximately

87,572 m3. This will result in approximately 52,224 m3 of airspace available for waste fill.

At the current filling rate and assuming the targeted waste compaction rate is achieved the landfill

has a predicted life of up to 20 years8.

7.4 STAGING OF LANDFILLING

Currently, landfilling operations are occurring towards the north east of the landfill area. A staging

and filling plan is annexed in Appendix 2: Drawing 6835-0002-04 with cross sections detailed in

Drawing 6835-0002-05. Filling of the landfill, detailed in 8.9, will be in successive lifts of no greater

than 1.5 metres deep. In general it is proposed to fill towards a central ridge which will run east

west. To minimise infiltration, the landfill surface at each stage will have a minimum gradient of 1%

towards the batters of the landfill.

A general overview of the works required to support ongoing landfilling activities is as follows:

Regrading of the landfill surface during future lifts to promote water sheding;

Upgrade of the perimter drainage system;

Installation of additional spurs in the leachate interceptor trench;

Upgrade of the leachate irrigation system.

STAGE 1

Stage 1 will involve raising the surface of the landfill from 15m AHD to around 17m.

STAGE 2

Stage 2 will involve raising the surface of the landfill to a maximum of 19.795m along the east west ridge. This will be the final level of the waste before the capping layer is applied.

7.5 FUTURE USE

The final land use options for the completed landfill are considered limited due to:

The crossfall on the finished surface and the steep batters

The potential for ongoing surface settlement and displacement due to the nature of the

waste being landfilled

The limited width of the finished surface.

8 Assuming a minimum compaction of 650 kg per cubic metre is achieved

Page 35: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 35

The concepts for the future use of the landfill site have therefore been identified as:

Passive recreation including walking tracks and viewing platforms

Informal active recreation areas.

7.6 STORMWATER DRAINAGE

Stormwater drainage comprises a concrete lined drain running around the perimeter of the landfill,

temporary bunded stormwater channels and culverts on the surface of the landfill and a sediment

pond at the south east of the site as detailed in Appendix 2: Drawing 6835-0002-01.

Recent works include:

Sealing a 450mm stormwater drainage pipe that was found to be carrying leachate

Increasing bund heights across the active cell

Realigining and stabilising onsite drains

Bunding leachate irrigation areas to prevent runoff

Placing topsoil scross poorley grassed areas of the site to improve vegetation

In addition to the recent works the site stormwater management system will be upgraded,

encompassing the following:

Construction of temporary bunds and drainage on each landfill lift as required to divert

stormwater from active waste disposal areas

Excavating strips from the existing sediment pont for the purpose of sedimant retention

7.7 LEACHATE MANAGEMENT SYSTEM

A leachate model was developed for the site during the 1997 Environmental Impact Statement

process. It predicted a maximum daily production of 29,000L of leachate. The model

recommended 40,000L of storage to handle the maximum daily generation with 33% reserve

capacity remaining.

The leachate management system is divided into three components: capture, storage and

treatment:

1. Capture:

A 370m leachate interceptor trench (LIT) is excavated into the underlying phyllite around the lower

perimeter of the landfill. Refer to annexed Plan 2 and 3 in Appendix 3. It is lined with a 2mm

HD.P.E liner on the outer edge with a continuous membrane. A 150mm perforated agricultural

pipe drains the leachate to a low point. Here a 1,500L leachate sump is located with dual

submersible pumps (3 l/s) which are activated by the depth of leachate in the sump. The sump is

covered and locked to prevent unauthorised access.

A high level alarm will be activated if the leachate sump storage level exceeds 75%.

Page 36: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 36

2. Storage:

Leachate is pumped into two 25,000L concrete tanks located south of the landfill area as annexed

Plan 2 in Appendix 3.

A high level alarm will be activated if the tank storage level exceeds 75% and the leachate sump

pumps shall be set to cut out when the level reaches 95%. The tanks are accessible by a pump

truck to allow for periodic silting and emergency emptying.

3. Treatment:

Dual submersible pumps (3 L/s) pump leachate from the tanks into a recirculation network. This

irrigates the leachate across bunded areas of the landfill which have been intermediately capped,

relying on evaporation and evapotranspiration to reduce the volume before infiltration back into the

landfill. Time switches connected to the pump determine the application of the leachate to the

irrigation area. Irrigation is not practiced on high wind days or during times of significant rainfall.

The original design in the 1999 LEMP relied upon recirculation of leachate through trenches

excavated in the landfill (185 m x 1 m wide x 0.5 m deep) that allowed leachate to be pumped into

re-injection wells located within the landfill mass. The leachate would be absorbed into the waste

material or percolate through to the leachate interceptor trench. This practice will be reserved for

periods of heightened leachate generation.

Page 37: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 37

PART 8 FACILITY OPERATION

The Raleigh Waste Management Centre shall be operated by BSC in accordance with the site’s

EPL, this LEMP, and other relevant regulatory requirements.

The primary activities carried out in the Facility shall include:

Receival of waste other than hazardous waste;

Retrieval of recyclable resources and their redistribution;

The separation, storage and transfer of received waste;

Monitoring of waste movement and maintenance of records of that movement;

The control of the aspects of the Facility and its operations that may affect the

environment;

Management of the Facility to ensure the safety of the public, the operators and the

environment.

8.1 OPENING HOURS

The RWMC shall be open to the public as advertised by Council. It will be closed on nominated

public holidays and as advertised by Council.

The current summer operating hours are Sunday to Saturday 08:00 am till 5:00pm. The winter

operating hours are between 08.00 am to 4:00 pm. The waste disposal facility is closed:

New Years Day

Australia Day

Good Friday

Easter Sunday

Easter Monday

Anzac Day

Queen's Birthday

Labour Day

Christmas Day

Boxing Day

The site will remain in operation until no later than 6:00 pm so that staff may undertake required

earthmoving activities such as compaction of deposited waste, separation of waste materials and

application of daily cover material. This ensures that landfill activity disturbance impacts such as

noise, dust and odour will be minimised during times where the majority of staff and residents are

onsite.

L7.1

L7.2

Page 38: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 38

8.2 MANAGEMENT, SUPERVISION AND STAFFING

The RWMC is to be supervised by suitably trained staff at all times during operating hours. Council

will provide as a minimum two (2) staff members on site any given time to ensure that the overall

management, supervision, operation and maintenance of the site and operations at the landfill are

achieved such as:

Directing the public to designated stockpile areas and tip face and ensuring public safety

and access;

Supervision of any active disposal of waste to designated waste disposal and stockpile

areas;

Design, maintenance and construction of roads, firebreaks, leachate and stormwater

ponds and associated drainage works as required;

Leachate pump and irrigation system monitoring and maintenance;

Waste screening and recording;

Ensuring that incoming collected waste is appropriately spread, separated, compacted

and covered using earthmoving equipment as required;

Recording of waste data such as tonnages, waste types including hazardous materials

and asbestos;

Ensuring that monitoring bores are maintained and accessible;

Weed, vermin, fire and litter management practices are undertaken by staff appropriately

and in accordance with this LEMP; and

Security of the site preventing unauthorised entry and illegal dumping.

The RWMC management structure is as follows:

Manager Environment and Sustainability

Waste Management Coordinator

Waste Site Supervisor

RWMC Plant Operator and Field Staff

All RWMC staff will be appropriately qualified and trained to conduct tasks allocated by the

Manager Environment and Sustainability and the Waste Management Coordinator in a safe and

proper manner.

O1.1

BM 39

Page 39: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 39

At a minimum, staff training is to ensure that:

1. All operators of compaction or earthworks plant are skilled at undertaking al tasks

required of them

2. All those who operate gas testing, water sampling or testing apparatus are familiar with

required testing and sample preservation procedures, to a standard approved by the

EPA

3. Al those who inspect or direct the placement of incoming wastes are capable or accurate

data recording and skilled at identifying wastes that are unacceptable.

Staff training procedures will be documented and recorded in Councils corporate records keeping

system.

8.3 TRAFFIC MANAGEMENT

The Waste Site Supervisor and Field Staff are empowered to direct the movement of vehicular and

pedestrian traffic to ensure a safe work environment is maintained. This shall be noted as a

condition of entry on the gate signage. Traffic control signage shall be erected as directed by the

Manager Environment and Sustainability or the Waste Management Coordinator. The signage

shall include:

Conditions of entry

Hours of operation

Acceptable and prohibited wastes signage

Speed restriction signage (10 km/h max)

Directional signage

Material drop off points signage

Notification that it is the vehicle operator’s responsibility to ensure that the remnants of

their load or the material stuck to the underside of the vehicle or the wheels does not litter

public roads

There is no vehicle wash bay in operation at the RWMC.

8.4 PUBLIC AND STAFF SAFETY

Council will ensure that all staff and contractors are provided with training in workplace, health and

safety issues as it relates to the duties performed at the RWMC. Council will ensure that all staffs

are made aware of the potential hazards and risks present at the landfill and the provisions of the

Work Health and Safety Act 2011 (WHS Act) and regulations.

Council will also ensure that staffs working at the RWMC are provided with personal protective

equipment as required to perform their duties in a safe and responsible manner, in particular when

handling hazardous waste materials such as asbestos or operating machinery.

BM 32

Page 40: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 40

Signage relating to safety on site will be clearly displayed for the public, staff and contractors

visiting the site ensuring that safety precautions are adhered to. The types of signage include but

not limited to:

The types of wastes not accepted on site, e.g combustible materials, unauthorised

chemical drums;

Location of first aid and fire extinguishers; and

Excluded or barricaded areas e.g. around active tipping areas and ponds.

Operational plant and equipment will be operated in such a way as to minimise risk to persons

delivering waste for disposal or transfer.

8.5 SITE SECURITY

Council will maintain adequate security on the RWMC during its life. This will include:

Access gates being locked at all times outside opening hours

Maintenance of boundary fences

Maintenance of lockable gates

The site is currently gated with a 1.5m man-proof chain link fence extending to either side. A five

strand wire cattle fence runs along the western and northern boundary of the site. The creek to the

south and Melaleuca wetland to the south east form a natural boundary. No fencing has been

installed along this boundary.

Council is aware that the fence has not been maintained to an adequate standard in certain areas

and as a result requires work to secure the facility.

Staff and contractors are provided with keys to the main gate and site buildings as deemed

necessary for after hour access.

8.6 WASTE ACCEPTANCE AND SCREENING

All wastes entering the RWMC are inspected before disposal to ensure they are not hazardous,

and their entry is to be recorded. If the load is suitable for the disposal, the drivers are

subsequently advised as to which section of the Waste Management Centre each component of

their load should be taken.

O16.1

O16.2

O16.3

BM 30

Page 41: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 41

ACCEPTED WASTES

The total quantity of waste disposed of at the premises in accordance with Council’s EPL must not

exceed 8000 tonnes per year. The Raleigh Waste Management Centre is licensed to accept the

following wastes as detailed in Table 7 below.

Table 7 – ACCEPTABLE WASTES

CODE WASTE DESCRIPTION ACTIVITY OTHER

LIMITS

NA General Solid Waste

(Putrescible)

Waste

disposal

(application

to land)

Total tonnage

of waste

disposed of at

the premises

must not

exceed 8,000

tonnes per

year

NA General Solid Waste

(Non-putrescible)

As describes in Schedule 1 of the

POEO Act, in force from time to

time

Asbestos

Waste Tyres

NA General Solid Waste

Wastes assessed as General Solid

Waste which are also subject to

general or specific immobilisation

approvals which have a restriction

that they may only be disposed of

at waste disposal facilities which

have currently operating leachate

collection systems.

NA

Any waste received on site that is

below licensing thresholds in

Schedule 1 of the POEO Act, as in

force from time to time

NA

Source: NSW EPA EPL 5896, 2013

Bellingen Shire Council will not permit or allow any waste to be received at the premises except for

those expressly referred to in the EPL.

The material listed below will not be accepted for burial at the RWMC. Council staff will be

responsible for preventing their acceptance.

1. Liquid wastes

2. Radioactive wastes

3. Medical Waste

4. Any explosive, flammable material including material derived from grease, oil, tar,

petroleum or oil

5. Any sludge or refuse material (unless it can be shown to be harmless) from any:

i. Tanning or leather processing plant

ii. Petroleum or petrochemical plant

iii. Chemical plant

iv. Paint manufacturing plant

v. Metal treatment plant

vi. Vegetable oil or mineral oil plant

vii. Pharmaceutical or drug manufacturing plant

L5.1

Page 42: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 42

6. Any material containing:

i. Arsenic

ii. Cadmium

iii. Cyanide

iv. Lead (including batteries)

v. Mercury

vi. Selenium

vii. Sulphide

7. Any toxic inorganic material, including any soluble salt or the following:

i. Barium

ii. Boron

iii. Chromium

iv. Copper

v. Manganese

vi. Silver

vii. Zinc

8. Fertilisers in quantities greater than 1 kg

9. Any toxic organic material, including any pesticide or weedicide, in particular containing:

i. Chlorinated hydrocarbons

ii. Fluorinated hydrocarbons

iii. Organophosphates

iv. Carbamates or thiocarbamates

v. Phenols

10. Any soluble acid or alkali or acidic or basic compound, unless it can be shown that it may

be beneficial to the operation of the depot.

WASTE TYRES

Tyres from the Sydney Metropolitan Area must not be received at the premises unless:

a) they have been shredded into pieces measuring no more than 250mm in any direction; or

b) they have had their walls removed; or

c) the facility has the capacity, at the time of receiving the tyres, to recycle or reprocess the

d) tyres into a saleable product (including retreading the tyres); or

e) the facility has the capacity, at the time of receiving the tyres, to shred the tyres or remove

the walls from the tyres; or

f) the tyres are from a domestic load containing no more than 5 tyres having a diameter of

less than 1.2 metres.

WASTE SCREENING AND HANDLING

Residents are encouraged by staff at the RWMC entrance to sort waste materials into designated

stockpiles or transfer bins at the point of access. Material suitable for sale in the Raleigh Ruse

Centre is to be identified and placed aside for processing.

All staff members that monitor the site entrance shall be trained in the identification and

classification of waste. New staff will undergo at least one week of supervised training in the

identification of materials not accepted at the RWMC. Vehicles with unacceptable loads of waste

will be refused entry to the site. Waste handling will be undertaken in accordance with relevant

L5.2

O13.1

BM 21

Page 43: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 43

industry guidelines and standards.

The following activities are carried out for waste screening purposes:

1. The RWMC staff will inspect all waste loads for materials not accepted at the landfill.

2. Supervision of waste deposited at the tip face should be conducted to screen for

unacceptable waste material.

3. Signs should clearly be in place showing types of waste accepted and those not

accepted at the landfill.

4. The regional EPA office must be notified if any unauthorised hazardous wastes have

been discovered on-site. The identity of the person/s found dumping the waste must be

reported to the EPA if known.

5. Where there is any uncertainty regarding whether soil is contaminated the Waste

Management Coordinator can require NATA accredited lab testing before accepting the

material on site. This process will enable Council to screen out any single amount of

hazardous waste greater than 200 mL/tonne or 200 g/tonne. Soil which has acid

sulphate potential must be pH stabilised before it is accepted.

6. Records of all inspections are to be maintained for at least 4 years.

7. Hazardous waste should be handled by appropriately trained staff. It is the Waste

Management Coordinators responsibility to ensure that staff is appropriately trained and

that a record of the training is maintained.

UNACCEPTABLE WASTE PROCEDURE

Vehicles that are deemed by BSC staff to be carrying unacceptable waste will be refused entry, re-

directed, and details of the incident recorded. Details to be recorded include:

Date and time

Waste type

Source of waste

Approporite waste management facility and results of contact

EPA cpntact if required

RWMC personnel will advise the driver of the vehicle of appropriate waste management facilities,

or contact the EPA for advice on appropriate management of the unacceptable waste.

8.7 RECORDING OF WASTES RECIEVED

All waste loads that come into the RWMC will be inspected by Council staff at the gate. As there is

no weighbridge Council will use the EPA approved standard weights to calculate waste tonnages.

The following information will be recorded directly into Councils computer database by Council

field staff:

Vehicle type (classified using the NSW EPA Weigh Conversion Factors)

Registration number

Type of waste

Volume of waste

Source of waste (MSW, C&I or C&D)

BM 21

BM 22

Page 44: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 44

All RWMC staff responsible for monitoring the site entrance shall be trained in vehicle identification

and classification of waste. New staff will undergo at least one week of supervised training in the

classification of waste accepted at the RWMC. At the end of each month the Waste Management

Coordinator will apply the EPA standard weights to each vehicle that deposited waste at the facility

in order to calculate tonnages for the monthly EPA reporting. If data if found to be missing then the

Waste Management Coordinator will be responsible for informing the EPA and estimating vehicle

movements using past months as reference.

Council will undertake a yearly volumetric survey performed by a registered surveyor as required

for the annual EPA report.

All vehicles entering the RWMC will have a receipt completed and issued by the field staff. The

receipt shall include the vehicle registration and waste classification, and amount of money paid, if

applicable.

8.8 WASTE COMPACTION

Waste deposited will be spread evenly in layers within the lift and compacted by the landfill plant

which is currently owned and operated by Council and contractors. Compaction will ideally occur

before the application of daily cover. Generally, the plant will make 3 to 5 passes over the waste

and will not operate on slopes exceeding 1:3 (vertical to horizontal) due to reduced compaction

and operational safety considerations. Heavy vehicles may also be directed over appropriately

capped areas to aid in compaction of the waste.

Council will seek to achieve the desired waste density (>650 kg/m3) required for landfills receiving

less than 50,000 tonnes per year. Council is seeking to improve its compaction capabilities

through additional plant such as a tracked loader.

8.9 FILLING PLAN

Conceptual filling plans have been developed for the site by Impact Environmental and are

annexed in Appendix 2: Drawing 6835-0002-04 and 6835-0002-05.

A staged lift approach will be used to raise the landfill profile to a maximum height of 22m AHD.

This is slightly higher than the original 20m AHD height stated in the 1999 LEMP due to the need

to achieve minimum 5% water shedding grades. Settlement of up to 20% can be expected over a

period of 20-30 years after closure which will further reduce the final profile.

Progression towards the final landform will be assessed by the Manager of Environment and

Sustainability and the Waste Management Coordinator during the annual volumetric survey with

the location of any special burials such as asbestos or decontaminated soil being updated.

BM 24

O14.1

BM 27

Page 45: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 45

8.10 COVER MATERIAL

The RWMC EPA EPL 5896 states the following with regard to covering of waste:

O18.1 Cover material must be virgin excavated natural material (VENM) or an alternative

cover material approved in writing by the EPA.

(a) Daily cover: Cover material must be applied to a minimum depth of 15

centimetres over all exposed landfilled waste prior to ceasing operations at the

end of each day.

(b) Intermediate cover: Cover material must be applied to a depth of 30

centimetres over surfaces of the landfilled waste at the premises which are to

be exposed for more than 90 days.

(c) Cover material stockpile At least two weeks cover material must be available

at the premises under all weather conditions. This material may be won on site,

or alternatively a cover stockpile must be maintained adjacent to the tip face.

DAILY COVER

At the end of each day a layer of compacted soil or other EPA approved material wll be aplied to

active surfaces to a minimum depth of 150 mm.

The principle source of daily cover is an old quarry on site. However, clean fill delivered to site by

residents and small commerical operators is the prefered source of cover material. Soil excaveted

from the old quarry is of weathered phyllie orign, making it difficult to processs when wet. Council

will ensure that a stockpile of clean fill is to be kept in sufficient quantities and stockpiled in a

readily accessible location for the daily application cover to the active landfill cell. Shredded

woodwaste will be mixed with soil and used as cover for the internal batters of each lift i.e. not the

exterior batters of the landfill which will be clay capped.

The filling plans annexed in Appendix 2 indicate that there is potentially 52,224 m3 of airspace

remaining at the RWMC landfill. Putrescible landfills tend to require 20 to 25 precent of the

available airspace as daily cover. This percentage can increase substantially at smaller landfills

where there are low tonnages and an absence of specialised landfill plant. Table 8 below provides

estimates of the daily cover required at the RWMC.

Table 8 – COVER MATERIAL REQUIRED

COVER MATERIAL DAILY COVER

REQUIRED (M3)

20 % 10,444

30 % 15,667

40 % 20,889

O18.1

BM 33

Page 46: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 46

These estimates will require continued revision to reflect the landfill volume consumption rates

experienced and the amount of cover used. In order to reduce the need for cover material Council

will examine the following measures where practicable:

Alternative daily cover to be used on non-traficable areas

Areas of the landfil that will be accessed by vehicles such as the tip face will be covered to

a maximum thickness of 150mm; to be thickened to 300mm if it will not be landfilled for 90

days

Weathered phyllite soil excavated from the quary is to be used for batters while clean fill

delivered to site is to be conserved for traficable areas and intermediate cover.

ALTERNATE DAILY COVER

Variability in the amount of clean fill delivered to site requires the use of the phyllite soil for daily

cover. This is not ideal due to its high water retention in wet weather, making vehicular access

difficult. The use of alternate daily cover (ADC) would enable BSC to minimise cover material

requirements and conserve clean fill.

Landfill occupiers are free to specify any alternative cover material (foams, mulch, etc.) provided

they can demonstrate compliance with the performance goals specified in benchmark Technique

33 of the Environmental Guidelines: Solid Waste Landfills 1996:

limiting run-on and infiltration of water

controlling and minimising risk of fire

minimising emission of landfill gas

suppressing site odour

reducing fly propagation and rodent attraction

decreasing litter generation

A number of ADC options exist, and one or more of the following could be used at the Raleigh

Landfill subject to EPA approval:

Tarpaulin style covers and lid style covers for non trafficable areas;

Fibre mulch applied by spray (potentially including a seed mix) for non trafficable areas;

Other spray on cover products for non trafficable areas;

Composts & mulches blended with 10% VENM for non trafficable areas; and

Crushed brick /concrete/ asphalt for trafficable and non trafficable areas.

INTERMEDIATE COVER

Intermediate cover is used to close off a cell that will not receive additional lifts of refuse or final

cover for some time. Areas of the landfill that remain inactive for a period of greater than 90 days

will be covered by 300 mm of compacted soil or other suitable material approved by the EPA.

Upon resuming waste deposition the cover material will be stripped back to a thickness of 100-

150mm and stockpiled for reuse as daily cover in subsequent lifts.

Page 47: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 47

8.11 FINAL CAPPING LAYER

Council will ensure that completed landfill cells are capped progressively at times when the level of

waste reaches final heights. Council will supply, construct and install a landfill capping system at

the premises in accordance with Australian Standard HB90.3 (2000) as detailed in 8.16.

At the conclusion of landfilling the landfilled areas will be levelled, graded and capped. The final

capping layer proposed draws from Benchmark 28 in the Solid Waste Landfills guidelines. A

typical capping cross section is annexed in Appendix 2: Drawing 6835-0002-05. It will comprise:

A seal bearing layer;

A 500mm clay sealing layer with permeability less than K=10-8ms-1;

A 300mm drainage layer with permeability not less than K=10-4ms-1;

A revegetation layer of depth of not less than 1000mm sown with a mixture of native and

introduced shallow rooted grasses. Fertiliser and mulch will be applied to assist

establishment.

The gas drainage layer has been omitted due to the following assumptions:

i. Waste tonnages delivered to the RWMC will remain low (less than 2,000 tonnes per

year), prolonging the remaining life.

ii. Bellingen Shire Council will continue to divert all putrescible waste and organics from

landfill;

iii. With 20 years of life remaining the vast majority methane will have been emitted from

putrescible material landfilled prior to 2007.

The site contours and drainage pattern shall be in accordance with Drawing 6835-0002-02

annexed in Appendix 2. Runoff from the top of the landfill will be collected by the perimeter drain

which will continue into the sedimentation pond.

At the current filling rate the landfill has a predicted life of up to 20 years9. During this time new

capping techniques such as Phytocapping may become preferable or Government Policy may

change. Designs for the final proposed capping system will be submitted to the EPA three months

prior to the last load of waste being landfilled.

8.12 WET WEATHER OPERATIONS

The stormwater management and collection systems on site will be maintained in such a way that

minimises the risk of flood events and spills. Access into the landfill will be maintained during all

weather conditions without compromising the environmental management of the site. The access

roads will be levelled, graded and where practicable sealed to ensure traffic is maintained in a safe

manner and damage to the environment and property are minimised.

9 Assuming a minimum compaction of 650 kg per cubic metre is achieved

O15.1

O15.2

O18.1

BM 28

Page 48: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 48

8.13 FIRE PREVENTION AND CONTROL MEASURES

Council personnel at the landfill will be trained in fire safety practices and are made aware of the

location of fire safety equipment on site such as fire extinguishers. Council will work in

collaboration with NSW Rural Fire Service who are to be contacted immediately in the event of a

fire outbreak. Any fire incidents are to be recorded in detail and reported immediately to the EPA.

The incidence of accidental fires occurring at the site will be minimised by the implementation of

the following measures:

1. Signage on display advertising to the public that flammable liquids are not permitted on

site;

2. Regular fire break maintenance around the perimeter of the site;

3. Internal fire breaks around combustible stockpiles;

4. Combustible materials such as fuels and other flammables are separated into small

secure storage areas away from the active tipping areas;

5. Greenwaste materials are stored separately in small windrows to minimise combustion;

6. Council staff to man the site during operating hours preventing residents from deliberately

lighting fires;

7. The regular compaction and covering of the landfill cell to prevent the escape of methane

gas;

8. All staff insitu are trained in fire management procedures;

9. A fire log book to record any fire incidents and relevant contact numbers for fire fighting

authorities and the EPA will be in a central location readily accessible for staff;

10. All machinery will contain fire extinguishers and staff will be appropriately trained in the

use of fire fighting equipment.

In the event of a fire Council will notify the EPA as soon as practical by telephoning the

Environment Line service on 131 555 and providing written details of the notification to the EPA

within 7 days of the date on which the fire occurred. Under the site’s EPL, Council as licensee will

record the following data in relation to fires occurring at the premises:

Time and date when the fire started;

Whether the fire was authorised by the licensee, and, if not, the circumstances which

ignited the fire.

The time and date that the fire burnt out or was extinguished;

The location of fire (e.g clean timber stockpile, putrescibles garbage cell, etc..);

Prevailing weather conditions at the time of the fire;

Observations made in regard to smoke direction and dispersion;

The amount of waste that was combusted by the fire;

Action taken to extinguish the fire;

Action taken to prevent a reoccurrence.

O5.4

O8.1

O9.1

O10.1

O11.1

R4.1

R4.2

BM12

BM13

BM 38

Page 49: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 49

CONTROLLED BURNING

After flood events the RWMC can receive heightened amounts of oversized greenwaste. This

material is often mulched and offered to residents or used as daily cover. Oversized greenwaste

unsuitable for mulching or composting will be stockpiled and burnt in a controlled environment.

Material suited for controlled burning includes vegetation, timber, paper and cardboard.

The following conditions shall be met before the commencement of controlled burning:

RWMC field staff have inspected the stockpile, removing any material other than

greenwaste;

An authorised person from the RFS must be present at all times during the controlled

burning and is solely responsible for lighting and controlling the fires;

Waste for burning must be placed in windrows, trenches or pits. The controlled fire must

be at lest 50 metres from any site perimeter or working face of the landfill;

The fire shall not be located over any areas previously used for landfill unless it is proven

to the EPA that landfill gas is not present in the area;

The fire shall not be located so that it is offensive or potentially harmful to any person at or

beyond the landfill boundary.

8.14 EQUIPMENT

Council will maintain, hire or purchase required machinery, plant and equipment sufficient to

undertake the following:

Separating and maintaining stockpiles of metals, tyres, timber, concrete and demolition

wastes;

Compaction of landfill lifts;

Application of daily cover material to exposed waste;

Landforming and shaping of existing landfill area;

Spreading of waste;

Levelling, grading, tidying of landfill areas;

Closure of landfill cell including capping and revegetation.

All plant and equipment will be maintained in a proper and efficient manner and in accordance with

relevant Australian Standards. Maintenance and monitoring of equipment will be undertaken by

on-site staff daily. Servicing of equipment and machinery will be undertaken regularly by a suitably

qualified third party mechanic as required.

8.15 ASBESTOS HANDLING

All asbestos material accepted at the RWMC will be handled in accordance with Clause 42 of the

Protection of the Environment Operations (Waste) Regulation 2005 shown below.

O2.1

Page 50: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 50

Protection of the Environment Operations (Waste) Regulation 2005

(1) This clause applies to any activity that involves the transportation, disposal, re-use or

recycling of any type of asbestos waste, regardless of whether the activity is required to be

licensed.

(2) A person who carries on an activity to which this clause applies must comply with the

requirements specified in this clause in relation to the activity concerned.

Maximum penalty: 400 penalty units in the case of a corporation, 200 penalty units in the case

of an individual.

(3) The requirements relating to the transportation of asbestos waste are as follows:

(a) bonded asbestos material must be securely packaged at all times,

(b) friable asbestos material must be kept in a sealed container,

(c) asbestos-contaminated soils must be wetted down,

(d) all asbestos waste must be transported in a covered, leak-proof vehicle.

(4) The requirements relating to the offsite disposal of asbestos waste are as follows:

(a) asbestos waste in any form must be disposed of only at a landfill site that

may lawfully receive the waste,

(b) when asbestos waste is delivered to a landfill site, the occupier of the landfill

site must be informed by the person delivering the waste that

the waste contains asbestos,

(c) when unloading and disposing of asbestos waste at a landfill site,

the waste must be unloaded and disposed of in such a manner as to prevent

the generation of dust or the stirring up of dust,

(d) asbestos waste disposed of at a landfill site must be covered with virgin

excavated natural material or other material as approved in the facility’s

environment protection licence:

(i) initially (at the time of disposal), to a depth of at least 0.15 metre, and

(ii) at the end of each day’s operation, to a depth of at least 0.5 metre, and

(iii) finally, to a depth of at least 1 metre (in the case of bonded

asbestos waste or asbestos-contaminated soils) or 3 metres (in the case

of friable asbestos material) beneath the final land surface of the landfill site.

(5) A person must not cause or permit asbestos waste in any form to be re-used or recycled.

(6) In this clause:

"bonded asbestos material" means any material (other than friable asbestos material) that

contains asbestos.

"friable asbestos material" means any material that contains asbestos and is in the form of a

powder or can be crumbled, pulverised or reduced to powder by hand pressure when dry.

Asbestos will only be accepted at the RWMC after Council staff has received at least 24 hours

prior notice, with Council scheduling a time for disposal. The burial of asbestos waste will be

carried out immediately with the pit already having been excavated and the cover material nearby.

Page 51: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 51

Council staff will record the amount and the GPS coordinates of the burial pit.

The asbestos waste will not be compacted before it is covered and will not come into direct contact

with earthmoving equipment tracks at any time. Resident access to the tip face will be restricted

until the pit has been covered in 0.5m of soil.

8.16 QUALITY ASSURANCE

Key construction work at the site includes the landfill capping layer which will meet Australian

Standard HB90.3(2000) HB90.3 provides guidance in the application of the ISO 9001:2000

standards for the construction industry. Quality assurance of the construction of these key works

and other significant works shall be conducted during their construction. Alternative construction

quality assurance programs will be approved in writing by the EPA.

O12.1

BM 20

Page 52: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 52

PART 9 RECYCLING AND RESOURCE RECOVERY

9.1 GENERAL

Bellingen Shire Council will continue to assess methods to maximise materials recovery and

minimise the amount of waste going to landfill. Council will continue its involvement in community

campaigns to educate the public about separation of waste at the kerb and on site.

9.2 COMINGLED RECYCLABLES

After inspecting the load, RWMC Field Staff will direct customers to deposit any commingled

recyclables into a 34m3 skip bin near the entrance to the facility. The skip bin is serviced by

Handybin with the materials processed at the Coffs Coast Waste Services Materials Recovery

Facility.

9.3 GREENWASTE

After inspecting the load, RWMC Field Staff will direct customers to deposit any small to medium

size greenwaste (mainly bushes, branches and tree waste) into a 34m3 skip bin near the entrance

to the facility. The skip bin is serviced by Handybin with the materials processed at the Coffs Coast

Waste Services Biomass Facility.

Customers with bulky green waste such as large tree stumps will be directed to the bulky

greenwaste stockpile which is currently located in the old quarry. The bulky greenwaste stockpiles

shall not exceed a height of two metres. All works required to keep the stockpiles within these size

constraints shall be conducted by BSC.

When the bulky greenwaste stockpile reaches a sufficient size, a waste shredding contractor will

be engaged to shred the stockpile. The shredded material will be primarily used on site for

landscaping and cover purposes. Its use as cover will be limited to the internal batters of each lift

i.e. not the exterior batters of the landfill which will be clay capped. Any material that is taken

offsite will comply with the relevant 51/51A exemption clause of the POEO.

9.4 SCRAP METAL & CAR BATTERIES

Customers will be directed to separate their scrap metal into ferrous metal, non-ferrous metals and

batteries upon entering the RWMC.

Ferrous metals are stockpiled on the northern ridge of the site. Non-ferrous metals (mainly

aluminium and copper) are stored in lockable cages adjacent to the Reuse Centre. Batteries are

stored in a bunded lockable cage near the landfill entrance.

Scrap metal stockpiles will be kept tidy and located in an accessible location for recyclers. All

works required to keep the stockpile within these size constraints shall be conducted by RWMC

Field Staff. RWMC Field Staff will be responsible for preventing the public from scavenging directly

from the scrap metal stockpile.

All arrangements for the removal of scrap metal and batteries, including all income, reside with

BSC.

BM 25

Page 53: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 53

9.5 TYRES

Customers will be directed to place their waste tyres in the waste tyre stockpile area opposite the

ferrous scrap metal stockpile. The total quantity of used, rejected or unwanted tyres (including

shredded tyres and tyre pieces) stockpiled at the premises will not exceed 50 tonnes.

9.6 WASTE OIL

Customers will be directed to place their waste oil containers adjacent to the bunded waste oil

shed which is located opposite the Reuse Centre. RWMC Field Staff will be responsible for

decanting containers into the waste oil collection tank provided. Customers are not permitted to

have access to the oil collection tank for any reason.

9.7 CONCRETE BRICKS AND TILES

Concrete, bricks and tiles are not specifically separated for recovery due to low volumes and high

crushing costs. They are used for engineered fill on site or mixed in with soil for daily cover.

9.8 CLEAN FILL

Residents or contractors delivering clean fill will be directed to the daily cover stockpile area.

9.9 REUSE CENTRE

Items of value that may be sold back to the public and avoid going to landfill include:

Bulky items such as couches and furniture of a reasonable condition;

Childrens toys;

Bikes;

Electrical and white goods (as determined by staff);

Drainage pipes of a reasonable condition;

Carpet of a reasonable condition (as determined by staff);

Kitchen crockery; and

Star pickets and tomato stakes.

O5.1

O5.2

Page 54: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 54

PART 10 ENVIRONMENTAL MANAGEMENT ISSUES

10.1 WATER

10.1.1 LEACHATE MANAGEMENT

The basic requirement of the leachate collection and storage system is to ensure that the leachate

cannot leak out into the surrounding soil. Leachate on site consists of stormwater run-off from the

active landfill area/greenwaste stockpiles and water that has percolated though the landfill surface

into the LIT. Leachate generated on site shall be minimised, collected and disposed. The strategy

for managing leachate at the RWMC is to minimise leachate generation by undertaking the

following:

Directing stormwater run-on away from the active landfill area;

Regular compaction and covering of the landfilled waste;

Keeping any leachate generated within the active tipping area separate from stormwater

run-off;

Grading the active landfill and directing clean stormwater runoff to a collection point;

Only operating one active landfill face;

Intermediate covering of landfilled areas that will be inactive for a period of 90 days or

more;

Progressively constructing the final capping across the site as the final landform is

reached;

Collection and irigation of leachate from the leachate interceptor trench

Continuing to operate and maintain the leachate management system as required post-

restoration.

Minimising the amount of water used to clean the transfer station and storage areas

generally

If required, excess leachate could also be tankered off site for disposal at the nearest

sewage treatment plant.

i. LEACHATE BARRIER

Permeability testing during the EIS indicated that the phyllite bedrock underlying the landfill site

met the benchmark conductivity of 10-9 ms-1. Therefore, no leachate barrier was deemed

necessary between the landfill and the underlying substrata. A leachate interceptor trench was

constructed down gradient of the landfill in September 2000.

ii. LEACHATE COLLECTION SYSTEM

The leachate collection system consists of a 370m leachate interceptor trench (LIT) excavated into

the underlying phyllite around the lower perimeter of the landfill as annexed in Plans 2 and 3 in

Appendix 3. It is lined with a 2mm HD.P.E liner on the outer edge with a continuous membrane. A

150mm perforated agricultural pipe drains the leachate to a low point. Here a 1500L leachate

sump is located with dual submersible pumps (3 L/s) which are activated by the depth of leachate

in the sump. The sump is covered and locked to prevent unauthorised access. All leachate

collected is pumped to the leachate storage tanks.

L1.2

L1.3

O6.1

O6.2

O6.3

O6.4

O6.5

O6.6

O6.7

O6.8

U2.1

U2.2

U2.3

U2.4

U2.5

U2.6

U2.7

U2.8

U2.9

BM 1

BM 2

BM 3

Page 55: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 55

Leachate is only permitted to overflow from either the leachate sump or the active cell as a direct

result of a rainfall event of equal to or greater than 300mm in total falling over any consecutive five

day period. In the event of an overflow the leachate will enter into the surface water collection

system where it will be diluted upon entering the sedimanetation pond and Melaleuca wetland.

RWMC field staff will be responsible for monitoring the level of leachate within the leachate sump

and the leachate storage tanks on the days the facility is open to the public. If the leachate level

approaches the invert of the leachate pipes where they enter the leachate sump the Waste Site

Supervisor will inform the Waste Management Coordinator who will:

i. Review the rainfall records to see whether 300mm or greater has fallen over the

previous five day period;

ii. Commence leachate recirculation as detailed in 7.7;

iii. If recirculation is infeasable arrange for disposal at sewerage treatment plant.

In the event of an unexpected drop in the leachate level in the sump the Waste Management

Coordinator will arrange to have a pipe camera inserted into the drainage line to determine the

issue. Similarly, should there be an unforseen drop in the leachate level in the storage tanks the

Waste Management Coordinator will arrange to have the tanks drained, cleaned and inspected for

leaks.

iii. LEACHATE DISPOSAL

Council will take all practical measures to minimise the amount of leachate in the leachate

collection and storage system and maximise the disposal of leachate. Leachate disposal on site

comprises irrigation and when necessary reinjection.

IRRIGATION

Irrigation on site consists of static and mobile irrigation. A 32mm Trolley with Sime K1 sprinkler will

be used to irrigate an area of approximately 1134m2. This will be moved around the site in order to

irrigate areas that are not currently covered by the static irrigation system. A valve manifold at the

top of the will enable Council staff to switch between the static sprinklers and a 2” rural poly line to

the mobile unit.

Mobile irrigation will only take place within areas of the landfill that have been bunded to prevent

contact with storm water runoff. Council staff will be responsible for moving the irrigator regularly to

maximise evaporation and prevent circulation of leachate due to saturation. Irrigation rates shall be

limited to 50% of evaporation rates. This is approximately 3 mm during the hotter months, 2 mm

during autumn and spring and 1.5 mm during winter (Jelliffe, 1999).

Before commencing irrigation the Waste Site Supervisor will access the Bureau of Meteorology

database and check the wind forecasts. Irrigation will not occur if the winds exceed 10 knots

(around 19 km/hour) in any direction. Irrigation of leachate will not occur within 50m of areas with

public access. Sprays will be larger droplets to prevent drift across the bunds that surround the

leachate irrigation area.

Page 56: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 56

RECIRCULAION

The recirculation scheme involves infiltrating leachate back into the landfill. Leachate will be

pumped from the leachate tank to trenches constructed on the surface of the landfill. Jellifee

(1999) predicted the average daily flow to be 4,100 L/d with a peak flow of 29,100 L/d and a 90

percentie flow of 16,200 L/d in a leachate model developed for the 1997 landfill expansion.

If the trench is designed to dispose of the 90 pecentile flow (16,200L) a trench of approximatly 185

m long x 1 m wide x 0.5 m deep is required assuming 0.25 m leachate depth, effective porosity of

0.35 and a width of 1.0 m (Jelliffe, 1997).

The trenches will be gravel filled with a 150 mm slotted pipe laid along the base. In addition to the

trench 50 mm bore hole should be bored into the landfill, piercing the intermediate cover to a depth

of 2 m where possible.A bore hole seperation of 25 m will be adequate (Jelliffe 1997).

iv. UPGRADES

The leachate management system will be upgraded, encompassing the following:

Regrading the landfill surface during future lifts to promote water shedding and reduce

ponding and percolation;

Bunding of the greenwaste stockpile area in the old quarry to divert run-on of stormwater

and limit leachate generation;

Upgrade of leachate irrigation system to allow for mobile irrigation (currently underway);

Installation of two new dual submersible leachate pumps in the leachate sump

(completed);

Mounting the leachate pumps on rails in the leachate collection sump to facilitate faster

maintenance (completed);

Installtation of new sumbersible pump in lechate storage tanks (currently underway);

Excavation and inspection of leachate seepage points and if necessary, installation of

additional spur lines which is detailed below.

A visual inspection of the batters revealed that leachate is currently seeping from two areas

Western batter: Council staff belive that the seepage of leachate is due to a perched water

table which is preventing leachate from entering the leachate interception trench, instead

forcing it to migrate laterally. Council staff will excavate into the batter and attempt to

penetrate the impermeable barrier, lining the hole with gravel to minimise future lateral

migration. The disturbed area of the batter will be recapped and revegetated. Works will

only be undertaken during dry periods to prevent leachate mixing with stormwater.

Southern toe: If the works undertaken on the western batter prove sucessful then a similar

method will be followed at the seepage point on the southern batter.

If neither of these options are successful at preventing leachate seepage Council will consider

constructing additional spur lines to conduct leachate from the landfill into the interceptor trench as

detailed in Plan 3 annexed in Appendix 3. Additional spur lines will follow the same design as

those which were installed during the installation of the LIT. It will comprise a 150-160mm

perforated pipe with a minimum gradient of 1% installed at least 2m into the landfill.

Page 57: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 57

LEACHATE RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Applying daily cover to the active landfill face

Daily monitoring of the level of leachate within the leachate control structures on the

days the RWMC is open to the public

Advising the Waste Management Coordinator of the need to reduce the leachate level

in the containment structures when it reaches the agreed level

Waste Management Coordinator is responsible for:

Informing earthmoving contractors of the location of the leachate structures

Regular monitoring of the leachate structures and the level of leachate within the

containment structures

Arranging for the removal of leachate from the leachate containment structures and its

disposal at an approved facility when required

Regular monitoring of the leachate management structures to ensure the agreed

capacity is maintained

Arranging for the cleaning/desilting of leachate management structures to ensure the

agreed capacity is maintained

Coordinating the repair of leachate management structures, plant and equipment

Regular monitoring of day to day operations to ensure compliance with the EMP

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the LEMP

Overall management of the site and the activities carried out in the RWMC

10.1.2 STORMWATER

Stormwater gathered on the site is managed to ensure it is not contaminated with leachate and is

free of sediment prior to discharge. The stormwater on site consists of:

Clean stormwater from roofs, undisturbed and revegetated areas:

Leachate contaminated stormwater run-off from the active landfill area and greenwaste

stockpiles;

Sediment laden stormwater from disturbed areas; and

Stormwater runoff from the transfer station.

Contamination of surface water is generally managed by Council by:

Constructing and maintaining a series of temporary stormwater drains during landfilling

operations to prevent stormwater run-off from entering the active waste disposal area or

recycling area.

Constructing and maintaining a series of temporary stormwater bunds to keep

L1.4

O7.1

O7.2

O7.3

O7.4

BM 3

Page 58: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 58

contaminated stormwater run-off inside the active landfill area

Revegetating disturbed areas as soon as practicable;

Minimising disturbance of areas on site;

Ensuring stormwater channels, ponds are cleaned/desilted and functional; and

Ensuring leachate management system is functional to prevent leachate contaminated

surface water runoff.

Controling vehicle movements

All surface water that comes into contact with waste will be treated as leachate. Leachate will be

kept separate from stormwater via the measures described in 10.1.1. Surface water will be

directed from the landfill surface by maintaining a minimum 1% grade towards all drainage

structures. A system of temporary bunds and drains will direct the runoff into a permanent

perimeter drainage system which will drain into a sediment control pond. The catchment of the

sediment pond is approximately 3.8 ha. All temporary drains will be earthen drains constructed at

grades no steeper than 3% to minimise scouring. Where drain slopes exceed 3% the drains shall

be suitably lined with crushed rock, grassed or otherwise stabilised to prevent erosion.

The sedimentation pond was designed during the 1997 EIS for the landfill extension using the EPA

Managing Urban Stormwater: Soils and Construction (1998). It is capable of settling particles of

0.05mm diameter (fine sand) for a 1 in 10 year average recurrence interval, 1 hour storm event

and 0.02 mm diameter (fine silt) 0.25 x 0.25 x QTc 1 year ARI. Overflow is spread out across the

Melaeuca forest through a grassed spillway where the remaining sediments settle out. The

sediment pond is designed to drain dry during no-flow periods to minimise the retention of poor

quality water which then overflows during rainfall events.

The pond will be maintained at an average depth of 1.5m which is 250% of the required settling

depth of 0.6m. At present there is no sedimentation depth marker installed. Once Council has

installed a depth marker the upper level of the storage zone will be monitored by the RWMC field

staff. Once the pond has reached capacity the Waste Management Coordinator will be responsible

for organising de-silting.

i. UPGRADES

The stormwater management infrastructure will be upgraded, encompassing the following:

Installation of a sedimentation basin marker that identifies the upper level of the sediment

storage zone;

Excavation of macrophyte area of sediment pond to remove captured sediments and

increse the storgare volume of the pond;

Ensuring a minimum 1% slope is maintanined towards drainage structures during each

sucessive landfill lift;

Staged upgrade of perimteter drainage system to the design specified in Drawing 6835-

0002-02 annexed in Appendix 2.

Page 59: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 59

STORMWATER RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Regular monitoring for damage to the surface water management structures on the

days the RWMC is open to the public

Removal of litter from the surface water drainage structures on a weekly basis

Reporting damage to surface water management structures to the Waste Coordinator.

Advising the Waste Coordinator of the need to reduce the water level in the containment

structures when it reaches the agreed level

On receipt of a complaint documenting and advising the Waste Management

Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Advising the Waste Environment & Operations Manager of any surface water

management complaint received

Complying with the procedures and practices outlined in the LEMP

The Waste Management Coordinator is responsible for:

Co-ordinating the repair of surface water management structures

Arranging for the cleaning/desilting of surface water management structures to ensure

the agreed capacity is maintained

Investigating any surface water management complaints

Documenting the results of the investigation and the actions taken

Maintaining the records of the surface water management complaints on Councils

corporate records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the LEMP

Overall management of the site and the activities carried out in the RWMC

Page 60: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 60

GROUNDWATER

Council will take all reasonable measures to prevent the migration of leachate into the

groundwater table. The existing landfill will be closed capped and revegetated as soon as

practicable to prevent further generation of leachate. Other measures to be adopted by Council

include:

Minimising exposed areas of the active landfill areas by ensuring that material is

compacted and covered daily. Council will ensure that cover material is available on site

for this purpose.

Grading areas to divert surface water run-off away from active landfill areas into

stormwater channels and holding ponds;

Ensuring leachate pump is operational and pumping is carried out regularly; and

Complying with this LEMP and EPL 5896 in terms of leachate collection, monitoring and

storage

10.2 NOISE MANAGEMENT

Council will seek to ensure that the noise generated from the site is minimised by implementing

the following measures:

Plant and equipment is to be used within specified working hours that will have the least

impact on surrounding residents, i.e sometime between the standard working hours of

9.00am – 5.00pm;

All landfill machinery, plant and equipment is to be maintained regularly in a proper and

workmanlike manner;

Traffic to be controlled by Council officers ensuring that residents accessing the site use

designated roads away from the active tipping face and work areas which are susceptible

to higher than background levels of noise;

Buffer zones around the landfill are to be maintained and not cleared.

The landfill site is not in close proximity to neighbouring residents and there have been no

recorded complaints received by Council regarding noise pollution. Generally there are small

movements of vehicles at any one given time and the traffic into and out of the site is relatively

minor. Plant and equipment on site is generally run infrequently.

Noise measurements will only be taken should valid complaints be received. Should Council need

to undertake noise monitoring it will comply with Licence Condition L6.1 and L6.2 which can be

found in Appendix 1.

L 6.1

L6.2

BM 37

Page 61: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 61

NOISE MANAGEMENT RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Regular monitoring of the noise levels on the days the RWMC is open to the public and

informing the Waste Management Coordinator if it is believed that the license conditions

are being exceeded

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Monitoring of noise levels on the days the RWMC is open to the public

Taking steps to limit noise levles if it is believed that the license conditions are being

exceeded

Investigating any noise complaints

Documenting the results of the investigation and the actions taken

Maintaining the records of the noise complaints on Councils corporate records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.3 ODOUR CONTROL

The landfill is not in close proximity to neighbouring residents and there have been no recorded

complaints regarding odour arising from the landfill that can be found on Councils records.

Operations at the landfill are undertaken in such a manner so as to minimise the generation of

odour and impacts on surrounding landholders.

All practicable measures will be implemented to minimise future offensive odours escaping the

site. These include:

Covering all animal carcasses and putrescibles deposited in the animal burial pit with daily

cover material;

Maintenance of surface water control structures to ensure that stormwater does not enter

the active landfill face;

Investigating and implement either the use of alternate dialy cover such as landfill lids to

cover all exposed waste in the existing active landfill face to contain odours;

L8.1

BM 36

Page 62: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 62

If any odorous sources are identified, these are to be covered immediately with cover

material.

ODOUR CONTROL RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Regular monitoring of odours levels on the days the RWMC is open to the public

Cleaning of the waste receival bin bays and the transfer station generally

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Monitoring of odour levels on the days the RWMC is open to the public

If necessary, taking steps to limit odour levles

Investigating any noise complaints

Documenting the results of the investigation and the actions taken

Maintaining the records of the noise complaints on Councils corporate records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.4 LITTER CONTROL

Council will take all practical measures to prevent the incidence of wind-blown litter at the RWMC.

Litter will be minimised by:

Maintenance of perimeter litter fences;

Conducting litter patrols on a daily basis;

Requiring vehicles entering the RWMC to be covered to prevent escaped litter;

Application of daily cover to exposed waste of each day and as often as required as

detailed in 8.10.

O17.1

BM 31

Page 63: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 63

LITTER CONTROL RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Applying daily cover to the active landfill face

Conducting litter patrols on the days the RWMC is open to the public

Notifying residents of the requirement to cover loads when entering the RWMC

Inspecting perimeter fencing for areas where litter has migrated offsite

Cleaning of the waste receival bin bays and the transfer station generally

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Taking steps to limit litter generation if it is believed that the license conditions are being

exceeded

Investigating any litter complaints

Documenting the results of the investigation and the actions taken

Maintaining records of that dust complaints on Councils corporate records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.5 DUST CONTROL

The primary access road to the RWMC is bitumen sealed which reduces potential dust generation.

The waste transfer station reduces the total number of vehicle movements on the internal

unsealed roads.

Council will ensure that dust generation at the site is minimised where practicable by adhering to

the following practices:

Use of water cart as required on dusty roads, and loads as required;

Maintenance and enforcement of careful speed limits within the site to avoid disturbance

of roads and dust generation;

Landfill machinery and equipment to be washed frequently;

To delay or suspend earthmoving activities when excessive dust is being generated that

O3.1

BM 34

Page 64: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 64

may affect neighbouring residents; and

To rehabilitate and revegetate landfill areas as soon as practicable after works have been

completed.

DUST CONTROL RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Regular monitoring of dust generation on the days the RWMC is open to the public

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Monitoring of dust generation on the days the RWMC is open to the public

Taking steps to limit dust generation if it is believed that the license conditions are being

exceeded

Investigating any dust complaints

Documenting the results of the investigation and the actions taken

Maintaining records of that dust complaints on Councils corporate records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.6 LANDFILL GAS MANAGEMENT

At present there is no landfill gas infrastructure in place at the RWMC as the low waste tonnages

do not warrant dedicated landfill gas infrastructure. Council has been proactive in removing

organics from the municipal waste stream. This has resulted in a significant drop in the amount of

organic material being landfilled. The landfill is a fairly permeable structure with ample opportunity

for methane to escape to the atmosphere along the lower edges. Any methane that is emitted can

be expected to move east through the Melaleuca forest. No hazards are identified along this path.

R6.1

BM 19

Page 65: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 65

The landfill will be operated to minimise the generation and effect of gaseous odours arising from

the waste management operations. Council will ensure that landfill gas generation at the site is

minimised by adhering to the following practices:

Regular compaction of exposed waste at the active landfill as discussed in section 8.8;

Application of daily cover to exposed waste of each day and as often as required as

detailed in 8.10; and

Animal waste (offal) will to be deposited into the designated animal pit and covered

immediately with soil.

There has been a rapid decline in the amount of putrescible material landfilled since the beginning

of the Coffs Coast Waste Services collection contract in 2007. The contract saw the addition of a

third bin allowing for the source separation of household organics which are sent to the Biomass

facility in Coffs Harbour for composting. Kerbside putrescible MSW is also directed to the same

facility where the organic fraction is recovered. This lack of putrescible material limits the

availability of nutrients for methane-generating bacteria.

Landfill gas monitoring is required at the RWMC as required in EPL 5896 and discussed in 11.6. In

the event of a gas monitoring triggering the EPA threshold of 1.25% (v/v) the Waste Management

Coordinator will be responsible for installing a passive venting system. This would involve sinking

of perforated shafts or the layering of perforated collection pipes under the final cover soil within

the refuse layer.

Page 66: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 66

LANDFILL GAS MANAGEMENT RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Ensuring daily cover is applied to waste

Maintnenance of stormwater diversion structures as detailed in 10.1.1 Stormwater.

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Monitoring of landfill gas as detailed in 10.6 Landfill Gas Management

Arranging for the design and installation of landfill gas management systems

Investigating any landfill gas complaints

Documenting the results of the investigation and the actions taken

Maintaining the records of the feral pests or vermin complaints on Councils corporate

records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.7 FERAL PESTS AND VERMIN CONTROL

The compaction and covering of waste will minimise the incidence of feral pests such as cats, rats

and foxes. Council will manage pest and vermin numbers through the use of baits, traps and bird

scares where required. Should the use of chemicals be deemed necessary, care will be exercised

to ensure that chemicals are not subject to stormwater or leachate runoff or not susceptible to

becoming air borne and posing an environmental pollution hazard.

Areas of the RWMC that will require particular attention will be the:

tippng face;

scrap metal, tyre and greenwaste stockpiles

O5.3

BM 35

Page 67: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 67

FERAL PESTS AND VERMIN CONTROL RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Ensuring daily cover is applied to waste

Regular monitoring of feral pests and vermin on the days the RWMC is open to the

public

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Monitoring of feral pests and vermin on the days the RWMC is open to the public

Ensuring RWMC staff are trained in the identification of relevant pests and vermin of

concern in order to effectively manage landfill site

Arranging for baiting and trapping and bird scares when required

Investigating any feral pests or vermin complaints

Documenting the results of the investigation and the actions taken

Maintaining the records of the feral pests or vermin complaints on Councils corporate

records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.8 WEED MANAGMENT

Weed management is required to be undertaken as frequently as deemed necessary to sufficiently

control numbers. Council will undertake regular patrols and spray weeds as deemed necessary.

To minimise the incidence of weed growth, disturbed landfill areas will be revegetated as soon as

practicable. Green waste material will be stockpiled appropriately in windrows to ensure organic

matter and seed banks are kept at optimum temperatures for organic breakdown. Residents will

be directed to cover all incoming and outgoing loads containing waste material, including green

waste, to prevent dispersal of seed.

Particular attention will be given to locations where weeds are most prevalent such as sumps,

leachate drains and pillar box drains as well as around the green waste deposit areas.

BM 35

Page 68: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 68

WEED MANAGEMENT RESPONSIBILITIES

Waste Site Supervisor/Field Staff are responsible for:

Ensuring daily cover is applied to waste

Regular monitoring of weeds on the days the RWMC is open to the public

On receipt of a complaint documenting and advising the Waste Coordinator of:

i. The nature of the complaint

ii. The date and time of the complaint

iii. The name and address of the complainant

Complying with the procedures and practices outlined in the EMP

The Waste Management Coordinator is responsible for:

Monitoring of weeds on the days the RWMC is open to the public

Ensuring RWMC staff are trained in the identification of weeds of concern in order to

effectively manage landfill site.

Arranging for sprays of pesticides to target weeds

Investigating any weed complaints

Documenting the results of the investigation and the actions taken

Maintaining the records of the feral pests or vermin complaints on Councils corporate

records system

Implementing this procedure

Manager Environment and Sustainability is responsible for:

Auditing the RWMC on a regular basis to ensure compliance with the EMP

Overall management of the site and the activities carried out in the Facility

10.9 FINANCIAL ASSURANCE

Council must ensure that it has the financial assurance to appropriately manage and undertake

required developments at the RWMC. It is a means of ensuring that landfill operators adequately

plan for emergency closure, site remediation and post closure care, by providing a specific

mechanism to accumulate requisite funding during the life of the landfill. The estimated costs of

closing the landfill are set out below.

The proposed cap will have a volume of around 35,348 m3. The Victorian EPA’s Determination of

Financial Assurance for Landfills (2001) was used to provide an estimate of the cost of closure and

remediation costs. Prices for raw materials and construction were increased from 2001 prices to

bring them in line with inflation.

The capital cost of closure and final rehabilitation is estimated to be around $1,000,000. This figure

does not take into ongoing post maintenance and monitoring costs. This amount is a preliminary

calculation that will require refinement in line with future regulatory changes. Council will ensure

that the funds in the landfill reserve are capable of covering closure, site remediation and post

BM 26

Page 69: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 69

closure care of the RWMC.

FINANCIAL ASSURANCE RESPONSIBILITIES

RWMC Waste Attendant/Field Staff are responsible for:

Collecting waste disposal fees from residents accessing the facility

Balancing the cash register after the RWMC has closed each day

Depositing collected cash in the bank account specified by the Waste Management

Coordinator

The Waste Management Coordinator is responsible for:

Auditing the RWMC cash flow on a regular basis

Manager Environment and Sustainability is responsible for:

Ensuring that revenue is collected from the Domestic Waste Management Charge and

waste disposal fees

Ensuring funds in the landfill reserve are capable of covering closure, site remediation

and post closure care of the RWMC

Page 70: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 70

PART 11 ENVIRONMENTAL MONITORING

11.1 RECORDS

Bellingen Shire Council shall ensure that environmental monitoring of groundwater, surface water

and landfill gas are carried out in accordance with EPA Environmental Guidelines: Solid Waste

Landfills and the EPA publication Methods for Sampling and Analysis of Water Pollutants in NSW.

Monitoring will be undertaken as required under the EPL 5896 and this LEMP to ensure legislative

and regulatory requirements are met. The sampling will be undertaken by suitably qualified

environmental scientists as nominated by Council. All samples collected will be sent to a NATA

registered laboratory for final analysis and reporting.

For each of the required monitoring points records will be kept of any samples collected for the

purposes of this licence:

the date(s) on which the sample was taken;

the time(s) at which the sample was collected;

the point at which the sample was taken; and

the name of the person who collected the sample.

All records required to be kept by BSC will be:

in a legible form, or in a form that can readily be reduced to a legible form;

kept for at least 4 years after the monitoring or event to which they relate took place; and

produced in a legible form to any authorised officer of the EPA who asks to see them.

11.2 GROUNDWATER

LOCATION POINTS AND MONITORING

The monitoring locations specified in the EPL 5896 are identified below in Table 9 and are

annexed in Appendix 3: Plan E.

Table 9 – GROUNDWATER MONITORING POINTS

EPA IDENTIFICATION

NUMBER

TYPE OF MONITORING

POINT

DESCRIPTION OF

LOCATION

3 Groundwater quality

monitoring.

BH1, as marked on works-as-

executed Plan E forwarded to

the EPA with the licensee's

correspondence dated 22

November 2004.

18 Groundwater quality

monitoring.

BH7, as marked on Plan E of

LEMP.

Source: NSW EPA EPL 5896, 2013

M2.1

R7.1

BM 4

BM 5

BM 6

M1.2

M1.3

Page 71: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 71

There are 7 groundwater monitoring bores named BH1 to BH7 as shown Plan E annexed in

Appendix 3: Plan E. The bores have been installed downstream of the leachate interception trench

in order to detect any potential leaks. In accordance with the site’s EPL 5896 BH1 and BH7 (EPA

Identification Number 3 and 13 respectively) are sampled for groundwater quality.

Collection of samples is the responsibility of the Waste Management Coordinator. The pollutants,

units of measure, frequency and sampling methods are indicated under EPL 5896 and shown

below in Table 10.

Table 10 – GROUNDWATER MONITORING POLLUTANTS AND FREQUENCY

POLLUTANT UNITS OF

MEASURE FREQUENCY

SAMPLING

METHOD

Alkalinity (as calcium

carbonate) milligrams per litre Every 6 months Grab sample

Ammonia milligrams per litre Every 6 months Grab sample

BOD milligrams per litre Every 6 months Grab sample

Calcium milligrams per litre Every 6 months Grab sample

Nitrate milligrams per litre Every 6 months Grab sample

Potassium milligrams per litre Every 6 months Grab sample

pH pH Every 6 months Probe

Source: NSW EPA EPL 5896, 2013

If a borehole is not sampled because it is dry or damaged, or for any other reason, then the person

responsible for sampling shall record the reasons for not sampling and report the reason in writing

to BSC. BSC will then include this information in the annual monitoring report.

GROUNDWATER POLLUTION DETECTION

The results of groundwater testing will be reported annually to the EPA. Should monitoring at point

18 (BH7 as shown Plan E annexed in Appendix 3) exceed the trigger values shown below in Table

11 for any two or more parameters; the affected monitoring boreholes will be re-sampled as soon

as possible.

Page 72: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 72

Table 11 – MONITORING POINT 18 TRIGGER VALUES

UNITS OF MEASURE TRIGGER VALUE

Potassium mg/l 16.5

Ammonia mg/l 3.1

Calcium mg/l 49.5

Alkalinity mg/l 63.9

Source: NSW EPA EPL 5896, 2013

If the results for any two consecutive monitoring rounds exceed the rigger values Council will

prepare a report to the EPA within 14 days proposing a Groundwater Assessment Program

identifying a strategy for assessing the nature and extent of groundwater contamination at the

premises. In addition to the EPL 5896 trigger values groundwater data will be compared to

background conditions, leachate water quality and previously recorded trends.

11.3 LEACHATE

LOCATION POINTS AND MONITORING

The monitoring locations specified in the EPL 5896 are identified below in Table 12 and are

annexed in Appendix 3: Plan E.

Table 12 – LEACHATE MONITORING POINTS

EPA IDENTIFICATION

NUMBER

TYPE OF

MONITORING POINT

TYPE OF

DISCHARGE

POINT

DESCRIPTION OF

LOCATION

1 Leachate quality and

leachate level.

Leachate quality

and leachate

level.

Leachate sump,

marked MH on Plan E

of LEMP

13 Leachate volume

monitoring

Leachate tank as

marked on Plan E of

LEMP

Source: NSW EPA EPL 5896, 2013

Collection of samples is the responsibility of the Waste Management Coordinator. The pollutants,

units of measure, frequency and sampling methods are indicated under EPL 5896 and shown

below in Table 13.

M2.1

R5.1

R5.2

R5.3

Page 73: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 73

Table 13 – LEACHATE POLLUTANTS AND FREQUENCY

POLLUTANT UNITS OF

MEASURE FREQUENCY

SAMPLING

METHOD

Alkalinity (as calcium

carbonate) milligrams per litre Every 6 months Grab sample

Ammonia milligrams per litre Every 6 months Grab sample

Arsenic milligrams per litre Yearly Grab sample

BOD milligrams per litre Every 6 months Grab sample

Calcium milligrams per litre Every 6 months Grab sample

Nitrate milligrams per litre Every 6 months Grab sample

Organochlorine

pesticides milligrams per litre Yearly Grab sample

Organophosphate

pesticides milligrams per litre Yearly Grab sample

Phenols milligrams per litre Yearly

Potassium milligrams per litre Every 6 months Grab sample

pH pH Every 6 months Probe

Source: NSW EPA EPL 5896, 2013

DISCHARGE OF LEACHATE TO SURFACE WATER

Council will inform the EPA in the event of leachate discharging from the premises and/or when

the level of leachate in the leachate sump (Point 1) exceeds the invert of the leachate pipes in the

leachate interception trench where they enter the leachate sump.

In the event of a leachate discharge Council will prepare a report for the EPA detailing the

following:

1. the volume of the leachate discharged and over what time period the discharge

occurred;

2. the date and time of the commencement of the overflow;

3. the weather conditions at the time of the discharge, specifying the amount of rainfall on a

daily basis that had fallen:

on the day(s) of the discharge; and

for the one week period prior to the discharge.

4. the most recent monitoring results of the chemical composition of the leachate;

5. an explanation as to why the discharge occurred;

6. the location(s) of the discharge;

7. a plan of action to prevent a similar discharge in the future; and

8. was the discharge permitted by this licence.

Page 74: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 74

11.4 SURFACE WATER

LOCATION POINTS AND MONITORING

The monitoring locations specified in the EPL 5896 are identified below in Table 14 and are

annexed in Appendix 3: Drawings – Plan C and Plan E.

Table 14 – SURFACE WATER MONITORING POINTS

EPA IDENTIFICATION

NUMBER

TYPE OF

MONITORING POINT

TYPE OF

DISCHARGE

POINT

DESCRIPTION OF

LOCATION

2 Surface water quality

monitoring.

Surface water

quality

monitoring.

Outlet pipe of surface

water treatment

wetland, marked SWB

on Plan E of LEMP (as

modified by

correspondence from

the licensee dated 8

November 2004).

8 Surface water quality

monitoring.

In creek immediately

upstream of landfill,

marked as SWA on

Plan C of LEMP.

9 Surface water quality

monitoring.

Outlet of pipe located in

bund of eastern edge of

wetland, marked as

SWC on Plan C of

LEMP.

Source: NSW EPA EPL 5896, 2013

Collection of samples is the responsibility of the Waste Management Coordinator. Samples will be

taken from a point 100mm below the surface. The pollutants, units of measure, frequency and

sampling methods are indicated under EPL 5896 and shown below in Table 15.

M2.1

R8.1

BM 7

Page 75: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 75

Table 15 – SURFACE WATER POLLUTANTS AND FREQUENCY

POLLUTANT UNITS OF

MEASURE FREQUENCY

SAMPLING

METHOD

Alkalinity (as calcium

carbonate) milligrams per litre Special Frequency 2 Grab sample

Ammonia milligrams per litre Special Frequency 2 Grab sample

BOD milligrams per litre Special Frequency 2 Grab sample

Calcium milligrams per litre Special Frequency 2 Grab sample

Nitrate milligrams per litre Special Frequency 2 Grab sample

Potassium milligrams per litre Special Frequency 2 Grab sample

TKN-N milligrams per litre Special Frequency 2 Grab sample

TN milligrams per litre Special Frequency 2 Grab sample

TSS milligrams per litre

Special Frequency 1

(MP2)

Special Frequency 2

(MP8,MP9)

Grab sample

pH pH

Special Frequency 1

(MP2)

Special Frequency 2

(MP8,MP9)

Probe

Source: NSW EPA EPL 5896, 2013

For the purposes of the above table(s) Special Frequency 1 means the collection of one sample as

soon as practicable after each of five rainfall events each year exceeding 40mm in any 48 hour

period, including three samples from the outlet of the discharge pipe of Point 2.

For the purposes of the above table(s) ‘Special Frequency 2’ means the collection of one sample

as soon as practicable after each of two rainfall events each year exceeding 40mm in any 48 hour

period.

SURFACE WATER POLLUTION DETECTION

Surface water data will be compared to background conditions, leachate water quality and

previously recorded trends and ANZECC (2000) water quality trigger levels for freshwater

ecosystems (95% protection). It is likely that the existing water quality will not meet the ANZECC

(2000) criteria in full. Analysis of the results should therefore seek to identify parameters which

significantly exceed the parameters or show a significant trend upwards.

Exceedances of the concentration limits shown below in Table 16 are permitted at Point 2 (SWB

as shown Plan E annexed in Appendix 3), whenever a wet weather overflow is occurring due to a

stormwater event greater than or equal to 74mm of rain in total falling over any consecutive five

day period.

Page 76: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 76

Table 16 – SURFACE WATER PERMITTED EXCEEDANCES

POLLUTANT UNITS OF

MEASURE

100 PERCENTILE

CONCENTRATION LIMIT

pH pH 6.5 -8.5

Total Suspended

Solids milligrams per litre 50

Source: NSW EPA EPL 5896, 2013

If the parameters measured during testing exceed the established limits than the affected

monitoring point will be re-sampled as soon as possible. If the contamination is confirmed by the

re-sampling, the EPA will be notified by Council, in writing, within 14 days. Within 28 days of

notifying the EPA Council will prepare a detailed surface water assessment plan which will

determine the extent of remediation required. Upon completion of the surface water assessment

program a remediation plan will be prepared, if required by the EPA, detailing the corrective

actions proposed.

11.5 RAINFALL MONITORING

Council field staff will undertake daily rainfall monitoring. The Waste Management Coordinator will

be responsible for ensuring that the data is entered into Councils corporate records system.

11.6 LANDFILL GAS

The monitoring locations and frequency specified in the EPL 5896 are identified below in Table 17.

Table 17 – LANDFILL GAS MONITOING POINTS AND FREQUENCY

EPA

IDENTIFIACTION

NUMBER

TYPE OF

MONITORING

POINT

TYPE OF

DISCHARGE

POINT

DESCRIPTION OF

LOCATION FREQUENCY

14 Air quality

monitoring. -

All enclosed buildings

at the premises Monthly

15 Air quality

monitoring. -

All enclosed buildings

within 250 metres of

waste filled areas of

the premises.

Quarterly

16

Landfill gas

generation

monitoring

-

The surface of waste

filled surfaces which

have been subject to

final capping.

Yearly

Source: NSW EPA EPL 5896, 2013

M8.1

R6.1

BM 17

BM 18

Page 77: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 77

Gas monitoring will be the responsibility of the Waste Management Coordinator who will hire

appropriately qualified consultants. Monitoring will be conducted on calm days with wind speeds

less than 10 km/hour and will include. The handheld equipment will sample (50) millimetres above

the ground surface. The Waste Management Coordinator will start at a point five (5) metres away

from the waste perimeter and walk across the landfill surface parallel to the boundary until

reaching the opposite site. This procedure will be repeated every 25 metres from the perimeter

across the site to the opposite of the capped area.

REMEDIATING LANDFILL GAS EMISIONS

If the gas surface emissions and accumulation monitoring program detects methane levels

exceeding 1.25% methane (v/v) then sub surface gas monitoring and possibly surface remediation

will be required. The preparation of an assessment program and if required, a plan for sub surface

gas monitoring and site remediation will be triggered if methane gas levels at any part of the site or

in buildings exceed the EPA threshold of 1.25% (v/v). The assessment program shall be the

responsibility of the Waste Management Coordinator and shall be prepared and initiated within

one week of the elevated gas measurement. A remediation plan, if necessary, shall be prepared

on completion of the assessment program and in consultation with the EPA.

11.7 LANDFILL VOLUME

Council will engage a registered surveyor to produce plans detailing the remaining disposal

capacity of the RWMC landfill. Copies of the plans will be provided to the EPA as part of the

annual reporting.

11.8 COMPLAINTS HANDLING

Complaints received from an outside party will be reported, investigated and appropriate action

taken/implemented as required. Complaints are received through the Council office or through the

Waste Management Coordinator after hours as listed in 13.3 Incident Reporting.

Any complaint received will be investigated including:

The cause of the complaint

The climatic conditions at the time of the incident which is the cause of the complaint

If known, the date and time the incident took place

The occurrence of similar complaints in the past

Actions taken in the past to overcome similar complaints

Details of the complaint received, investigations and actions taken are to be recorded on Councils

corporate records system and kept for at least four years. The records will be available in either

electronic or physical form to any authorised officer of the EPA who asks to see them.

M4.1

M4.2

M4.3

M4.4

M5.1

M5.2

M7.1

Page 78: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 78

PART 12 SITE CLOSURE AND REHABILITATION

The landfill has predicted life of up to 20 years by which time it is likely this LEMP will have been

reviewed in line with changes in Government policy and technology.

Upon completion, the maximum slope angles on the landfill batters shall not exceed 1 (vertical) to

3 (horizontal) (33%) and level parts of the landfill will be domed or graded to a minimum 5% to

minimise infiltration and consequent leachate generation. Rehabilitation of the batter slopes shall

be undertaken at the end of each lift with the final rehabilitation of the landfill surface occurring at

the end of the final sage.

A water irrigation system shall be located on the top of the rehabilitated landfill. The irrigation

scheme shall irrigate water from the sediment pond or use town water. Water from the leachate

system will not be irrigated. Water from the sediment pond will not be irrigated within 20m of areas

accessed by the public. Wind conditions will be monitored by Council staff to ensure that spray

drift of sediment pond water does not cross into area used by the public.

12.1 CLOSURE PLAN

BSC will prepare and submit a written closure plan to the NSW EPA within 3 months prior to the

last load of waste being landfilled a closure plan in accordance with section 76 of the Protection of

the Environment Operations Act 1997. The plan will detail as a minimum:

The schedule and means proposed for closure and rehabilitation and for any remediation

required;

Maintenance, monitoring and reporting required until such time as the landfill does not

pose a threat to the environment;

Complaint recording and corrective action procedures;

Measures proposed to safeguard against waste materials being deposited following

closure of the landfill. Waste materials that are intended for use in site remediation will be

reported and documented.

BSC may apply to complete all obligations with the landfill site and retrieve any financial assurance

lodged with the NSW EPA by submitting a Certified Statement of Completion. The statement of

completion specifies that the landfill site had been remediated and further environmental

management of the premises is not required. The certified statement of completion must provide

evidence of the following:

Gas concentrations measure on the surface of the landfill are below the lower explosive

limit (LEL) of 5% for methane.

Waste stabilisation is complete. This would be shown by the leachate containing a low

level of contamination and posing no environmental threat;

Groundwater monitoring indicates that the interceptor trench is operating correctly;

Over several years of assessment, the landfill capping is found to be stable with

acceptable water drainage;

Written documentation and confirmation that the closure plan submitted has been

completed;

Notify the NSW EPA that the site is now classed as contaminated land under the

Contaminated Land Management Act 1997.

O4.1

Page 79: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 79

12.2 POST CLOSURE MANAGEMENT

Post closure management of the RWMC will encompass ongoing environmental management,

environmental monitoring, and maintenance of the landfill.

ENVIRONMENTAL MANAGEMENT

Environmental management will consist of:

Maintenance of stromwater structures;

Maintenance of leachate interceptor trench, leachate storage tanks and pumps;

Management of surface water runoff from the the waste transfer station, reuse shop and

remaining scrap metal stockpiles.

ENVIRONMENTAL MONITORING

BSC will maintain the same monitoring program and reporting practices for leachate, groundwater,

stormwater and landfill gas as used throughout the operation of the site.

MAINTENANCE

Post-closure landfill maintenance will consist of:

Identifying any cracks that may occur in the final cover layer;

Inspecting the landfill surface for depressions that will hinder surface water runoff and

promote infiltration;

Repairing erosion damage to the capping layer;

Maintenance of vegetation to limit erosion;

Ensuring monitoring borehole and surface water points are maintained and accessible.

Page 80: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 80

PART 13 REPORTING

13.1 MONTHLY SECTION 88 LEVY REPORTING

Monthly reports will to be provided to the EPA within 56 days of the end of each month, and will

include information for that month on:

1. the quantity, source (MSW, C&I, C&D) and type of waste received at the facility

2. the quantity and type of waste transported from the facility

3. any other information specified by DECCW

The quantity of waste will be determined using the EPA’s weight conversion factors.

BSC will keep records for at least 3 years of:

the movement of waste into the RWMC

the movement of waste within the RMWC

the movement of waste material or recycled, recovered or processed material out of the

RWMC

exempted waste that is received at the RWMC

At all times BSC will comply with the Waste and Environment Levy: Operational Guidance Notes

(2009) published by the EPA.

13.2 ANNUAL REPORTING

An Annual Return is prepared by Bellingen Council and submitted to the EPA for the required

reporting period i.e. twelve (12) months ending 29 June. Under the terms of the EPL 5896 , the

Annual Return must be submitted by Council to the EPA no later than sixty (60) days after the

expiry of the reporting period in the approved form comprising a signed Statement of Compliance

and Monitoring and Complaints Summary.

The Monitoring and Complaints Summary will generally include information such as:

a summary report on total wastes received;

a qualified surveyors report of volume of landfill space and estimate of compaction

density;

detected changes in groundwater;

surface water results;

summary report of fires that occurred on site;

a copy of odour litter and other complaints received by the landfill in the past twelve

months and

a summary of any incident reports during the 12 month reporting period

A copy of the Annual Return for the period 30 June 2012 to 29 June 2013 is annexed in Appendix

5.

R1.1

R1.2

R1.3

R1.4

R1.5

R1.7

R.18

Page 81: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 81

13.3 INCIDENT REPORTING

The Protection of the Environment Operations Act (POEO) 1997 requires that if a licensee

becomes aware of a pollution incident, they are required to report pollution incidents immediately.

Section 147 of the Protection of the Environment Operations Act:

Harm to the environment is material if:

it involves actual or potential harm to the health or safety of human beings or to

ecosystems that is not trivial, or

it results in actual or potential loss or property damage of an amount, or amounts in

aggregate, exceeding $10,000 (or such other amount as is prescribed by the

regulations), and

loss includes the reasonable costs and expenses that would be incurred in taking all

reasonable and practicable measures to prevent, mitigate or make good harm to the

environment’.

Bellingen Council has implemented a Pollution Incident Response Management Plan (PIRMP) for

the RWMC to report pollution incidents as they happen. Should a pollution incident occur Councils

primary duty will be to enact the relevant procedure in the PIRMP. A copy will be kept on site and

referred to in the case of an incident. After the PIRMP has been enacted notifications will be made

by telephoning the EPA’s Pollution Line service on 131555. Under the terms of the EPL, a written

report must be submitted within seven (7) days of the date on which the incident occurred.

Examples of incidents under the EPL that require reporting include but are not limited to:

Leachate level in sump exceedes invert level of the leachate pipes

Leachate storage tanks overflow

Discharge of untreated leachate into the environment from landfill operations

Leachate pump line rupture or failure

Leachate sump overflow

Surface water contamination from leachate irrigation activities

Ground water contamination

Leachate spring eruption

Fire at tip face

Fire in transfer bin

Fire in incoming load

Fire in tyre stockpile

Fire in green waste stockpile

Chemical spill

Oil/fuel spills

Failure of hazardous material containment tanks/bund

Windblown litter

R2.1

R2.2

R3.1

R3.2

R3.3

R3.4

R5.1

R5.2

R5.3

Page 82: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 82

Odour

Dust

Explosion (gas cylinders, methane)

Escape of refrigerant gases

The occurrence of any incident will be recorded in the site’s daily logbook and Councils corporate

records system as appropriate. The EPA shall be notified of any incident that represents a material

threat to the environment and which may lead to a breach of the license conditions immediately.

A written incident report will be provided to the EPA if requested by the authorised officer of the

EPA. The report will include, but not be limited to, the following details.

i. The cause, time and duration of the event;

ii. The type, volume and concentration of every pollutant discharged as a result of the

event;

iii. The name, address and business hours telephone number of employees of CMSC or

other witnesses;

iv. Actions taken by the BSC in relation to the event; and

v. Details of any measure taken to proposed to be taken to prevent or mitigate against a

recurrence of such an event;

vi. Any other relevant matters

EMERGENCY CONTACTS

Below is a list of incident response individuals and organizations that may be needed during a

pollution incident. Table 18 contains Council staff contact details and Table 19 contains

emergency organisations.

Table 18 – BELLINGEN SHIRE COUNCIL CONTACTS

NAME POSITION CONACT

Council Office - (02) 6655 7300

Glen Rumble Waste Site Supervisor 0417 239 447

Sam Tate Waste Management

Coordinator 0427 715 343

Daan Schiebaan Manager Sustainability and

Natural Resources 0407 662 963

Page 83: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 83

Table 19 – EMERGENCY ORGANISATION CONTACTS

ORGANISATION CONTACT NAME CONTACT DETAILS

Fire and Rescue NSW

Duty Officer

1300729579

Police Force NSW

Duty Officer

66551444 (Bellingen)

000

Ambulance Service of NSW

Duty Officer

1312 333

000

Bellingen River District

Hospital

Reception

6659 5800

000

Department of Environment

and Conservation (EPA)

EPA Environment Line

131 555

Coffs Harbour Regional Office

6651 5946

Department of Environment

and Conservation (NP&WS)

NSW Parks and Wildlife

Service

6657 2309

Workcover Authority

Duty Officer

131 050

Department of Primary

Industries (NSW Fisheries)

Reception

1300 550 474

Forests NSW

Coffs Harbour Regional Office

6652 0111

Poisons Information Duty Officer

131 126

000

NSW Ministry of Health Reception 9391 9000

Page 84: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 84

Department of Families and

Community Services

Reception 9248 0900

State Emergency Service

Duty Officer

132 500

000

Roads and Traffic Authority

Reception

132 213

Bureau of Meteorology

Land weather and flood

warnings

1300 659 218

Rural Fire Service Reception 000

Page 85: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 85

APENDICIES

Page 86: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 86

APPENDIX 1: ENVIRONMENTAL PROTECTION LICENSE

Page 87: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 1 of 29 Archive date: 01-Apr-2011

Licence Details Number: 5896 Anniversary Date: 01-July Licensee BELLINGEN SHIRE COUNCIL PO BOX 117 BELLINGEN NSW 2454 Licence Type Premises Premises RALEIGH WASTE MANAGEMENT CENTRE LOT 86, DP 630914, SHORTCUT ROAD URUNGA NSW 2455 Scheduled Activity Waste disposal (application to land)

Fee Based Activity Scale Waste disposal (application to land) 0 - All Region Waste Operations (Coffs Harbour) 59-61 Goulburn Street SYDNEY NSW 2000 Phone: 02 9995 5000 Fax: 02 9995 5999 PO BOX A290 SYDNEY SOUTH NSW 1232

Page 88: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 2 of 29 Archive date: 01-Apr-2011

INFORMATION ABOUT THIS LICENCE................................................................................................................... 4

Dictionary..................................................................................................................................................... 4

Responsibilities of licensee.......................................................................................................................... 4

Variation of licence conditions ..................................................................................................................... 4

Duration of licence ....................................................................................................................................... 4

Licence review ............................................................................................................................................. 4

Fees and annual return to be sent to the EPA............................................................................................. 4

Transfer of licence ....................................................................................................................................... 5

Public register and access to monitoring data ............................................................................................. 5

1 ADMINISTRATIVE CONDITIONS ................................................................................................................. 5 A1 What the licence authorises and regulates ......................................................................................... 5

A2 Premises to which this licence applies................................................................................................ 7

A3 Other activities .................................................................................................................................... 7

A4 Information supplied to the EPA.......................................................................................................... 7

2 DISCHARGES TO AIR AND WATER AND APPLICATIONS TO LAND................................................................. 8

P1 Location of monitoring/discharge points and areas............................................................................. 8

3 LIMIT CONDITIONS................................................................................................................................... 9

L1 Pollution of waters............................................................................................................................... 9

L2 Load limits ......................................................................................................................................... 10

L3 Concentration limits........................................................................................................................... 10

L4 Volume and mass limits .................................................................................................................... 10

L5 Waste ................................................................................................................................................ 11

L6 Noise Limits....................................................................................................................................... 11

L7 Hours of operation............................................................................................................................. 12

L8 Odours .............................................................................................................................................. 12

4 OPERATING CONDITIONS....................................................................................................................... 12 O1 Activities must be carried out in a competent manner................................................................... 12

O2 Maintenance of plant and equipment ............................................................................................ 12

O3 Dust Control .................................................................................................................................. 13

O4 Closure plan .................................................................................................................................. 13

O5 Tyre Storage.................................................................................................................................. 13

O6 Leachate management.................................................................................................................. 13

O7 Management of surface waters ..................................................................................................... 14

O8 Fire risk reduction works ............................................................................................................... 14

O9 Fire extinguishment ....................................................................................................................... 14

O10 Fire fighting capability.................................................................................................................... 14

O11 Burning of green waste ................................................................................................................. 14

O12 Quality assurance.......................................................................................................................... 15

O13 Screening of waste........................................................................................................................ 15

Page 89: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 3 of 29 Archive date: 01-Apr-2011

O14 Filling plan ..................................................................................................................................... 15

O15 Completion of landfill cells............................................................................................................. 15

O16 Unauthorised entry ........................................................................................................................ 15

O17 Degradation of local amenity......................................................................................................... 15

O18 Covering of waste.......................................................................................................................... 15

5 MONITORING AND RECORDING CONDITIONS ........................................................................................... 16 M1 Monitoring records......................................................................................................................... 16

M2 Requirement to monitor concentration of pollutants discharged ................................................... 16

M3 Testing methods - concentration limits.......................................................................................... 18

M4 Recording of pollution complaints ................................................................................................. 18

M5 Telephone complaints line............................................................................................................. 19

M6 Requirement to monitor volume or mass ...................................................................................... 19

M7 Monitoring remaining landfill capacity ........................................................................................... 20

M8 Rainfall Monitoring......................................................................................................................... 20

M9 Laboratory accreditation................................................................................................................ 20

6 REPORTING CONDITIONS....................................................................................................................... 20 R1 Annual return documents .................................................................................................................. 20

R2 Notification of environmental harm.................................................................................................... 21

R3 Written report .................................................................................................................................... 22

R4 Recording of fires .............................................................................................................................. 22

R5 Leachate discharges to surface waters............................................................................................ 23

R6 Landfill Gas Hazard Reporting .......................................................................................................... 23

R7 Groundwater contamination reporting............................................................................................... 23

R8 Surface water contamination reporting ............................................................................................. 24

GENERAL CONDITIONS.................................................................................................................................... 24 G1 Copy of licence kept at the premises ............................................................................................ 24

POLLUTION STUDIES AND REDUCTION PROGRAMS ........................................................................................... 24 U1 The licensee must complete by 30 June 2005 the upgrading of its existing sediment basin to a ..... 24

U2 Leachate Management ..................................................................................................................... 24

SPECIAL CONDITIONS...................................................................................................................................... 25

Not applicable ............................................................................................................................................ 25

DICTIONARY ................................................................................................................................................... 25

General Dictionary ..................................................................................................................................... 25

Special Dictionary.................................................................................................................................... 27

Page 90: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 4 of 29 Archive date: 01-Apr-2011

Information about this licence

Dictionary

A definition of terms used in the licence can be found in the dictionary at the end of this licence.

Responsibilities of licensee

Separate to the requirements of this licence, general obligations of licensees are set out in the Protection of the Environment Operations Act 1997 ("the Act") and the Regulations made under the Act. These include obligations to: ensure persons associated with you comply with this licence, as set out in section 64 of the Act; control the pollution of waters and the pollution of air (see for example sections 120 - 132 of the Act);

and report incidents causing or threatening material environmental harm to the environment, as set out in

Part 5.7 of the Act.

Variation of licence conditions

The licence holder can apply to vary the conditions of this licence. An application form for this purpose is available from the EPA. The EPA may also vary the conditions of the licence at any time by written notice without an application being made. Where a licence has been granted in relation to development which was assessed under the Environmental Planning and Assessment Act 1979 in accordance with the procedures applying to integrated development, the EPA may not impose conditions which are inconsistent with the development consent conditions until the licence is first reviewed under Part 3.6 of the Act.

Duration of licence

This licence will remain in force until the licence is surrendered by the licence holder or until it is suspended or revoked by the EPA or the Minister. A licence may only be surrendered with the written approval of the EPA.

Licence review

The Act requires that the EPA review your licence at least every 5 years after the issue of the licence, as set out in Part 3.6 and Schedule 5 of the Act. You will receive advance notice of the licence review.

Fees and annual return to be sent to the EPA

For each licence fee period you must pay: an administrative fee; and a load-based fee (if applicable). The EPA publication "A Guide to Licensing" contains information about how to calculate your licence fees.

Page 91: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 5 of 29 Archive date: 01-Apr-2011

The licence requires that an Annual Return, comprising a Statement of Compliance and a summary of any monitoring required by the licence (including the recording of complaints), be submitted to the EPA. The Annual Return must be submitted within 60 days after the end of each reporting period. See condition R1 regarding the Annual Return reporting requirements. Usually the licence fee period is the same as the reporting period.

Transfer of licence

The licence holder can apply to transfer the licence to another person. An application form for this purpose is available from the EPA.

Public register and access to monitoring data

Part 9.5 of the Act requires the EPA to keep a public register of details and decisions of the EPA in relation to, for example: licence applications; licence conditions and variations; statements of compliance; load based licensing information; and load reduction agreements. Under s320 of the Act application can be made to the EPA for access to monitoring data which has been submitted to the EPA by licensees.

This licence is issued to:

BELLINGEN SHIRE COUNCIL PO BOX 117 BELLINGEN NSW 2454

subject to the conditions which follow.

1 Administrative conditions

A1 What the licence authorises and regulates

A1.1 Not applicable.

A1.2 This licence authorises the carrying out of the scheduled activities listed below at the premises specified in A2. The activities are listed according to their scheduled activity classification, fee-based activity classification and the scale of the operation.

Page 92: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 6 of 29 Archive date: 01-Apr-2011

Unless otherwise further restricted by a condition of this licence, the scale at which the activity is carried out must not exceed the maximum scale specified in this condition.

Scheduled Activity

Waste disposal (application to land)

Fee Based Activity Scale

Waste disposal (application to land) 0 - All

A1.3 Not applicable.

Page 93: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 7 of 29 Archive date: 01-Apr-2011

A2 Premises to which this licence applies

A2.1 The licence applies to the following premises:

Premises Details

RALEIGH WASTE MANAGEMENT CENTRE

LOT 86, DP 630914, SHORTCUT ROAD

URUNGA

NSW

2455

86/630914

86/630914

A3 Other activities A3.1 Not applicable.

A4 Information supplied to the EPA A4.1 Works and activities must be carried out in accordance with the proposal contained in the licence

application, except as expressly provided by a condition of this licence. In this condition the reference to "the licence application" includes a reference to:

(a) the applications for any licences (including former pollution control approvals) which this licence replaces under the Protection of the Environment Operations (Savings and Transitional) Regulation 1998; and

(b) the licence information form provided by the licensee to the EPA to assist the EPA in connection with the issuing of this licence.

A4.2 The following report submitted to the EPA:

Environmental Management Plan for the Raleigh Waste Management Facility Short Cut Road, Raleigh, Jellife Environmental Pty Ltd, 10 June 1999 amended 14 September 1999. as amended subsequently by;

(a) replacement pages 40, 41, 49 and Plan B faxed by Jelliffe Environmental Pty Ltd dated 14

September 1999; and (b) the letter and attachments from Bellingen Shire Council dated 18 February 2000; and (c) revised LEMP dated 20 April 2001.

Page 94: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 8 of 29 Archive date: 01-Apr-2011

is not to be taken as part of the documentation in A4.1, other than those parts specifically referenced in this licence.

Note: For the purposes of this licence the abbreviation ‘LEMP’ is defined as the report described in

this condition.

2 Discharges to air and water and applications to land

P1 Location of monitoring/discharge points and areas

P1.1 The following points referred to in the table below are identified in this licence for the purposes of monitoring and/or the setting of limits for the emission of pollutants to the air from the point.

Air

EPA Identi-

fication no.

Type of Monitoring Point Type of Discharge Point Description of Location

14 Air quality monitoring. All enclosed buildings at the premises.

15 Air quality monitoring. All enclosed buildings within 250 metres of

waste filled areas of the premises.

16 Landfill gas generation

monitoring

The surface of waste filled surfaces which

have been subject to final capping.

P1.2 The following points referred to in the table are identified in this licence for the purposes of the

monitoring and/or the setting of limits for discharges of pollutants to water from the point. P1.3 The following utilisation areas referred to in the table below are identified in this licence for the

purposes of the monitoring and/or the setting of limits for any application of solids or liquids to the utilisation area.

Page 95: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 9 of 29 Archive date: 01-Apr-2011

Water and land

EPA identi-

fication no.

Type of monitoring point Type of discharge point Description of location

1 Leachate quality and

leachate level.

Leachate quality and

leachate level.

Leachate sump, marked MH on Plan E of

LEMP

2 Surface water quality

monitoring.

Surface water quality

monitoring.

Outlet pipe of surface water treatment

wetland, marked SWB on Plan E of LEMP (as

modified by correspondence from the licensee

dated 8 November 2004).

3 Groundwater quality

monitoring.

BH1, as marked on works-as-executed Plan

E forwarded to the EPA with the licensee's

correspondence dated 22 November 2004.

8 Surface water quality

monitoring.

In creek immediately upstream of landfill,

marked as SWA on Plan C of LEMP.

9 Surface water quality

monitoring.

Outlet of pipe located in bund of eastern edge

of wetland, marked as SWC on Plan C of

LEMP.

13 Leachate volume

monitoring

Leachate tank as marked on Plan E of LEMP.

18 Groundwater quality

monitoring.

BH7, as marked on Plan E of LEMP.

3 Limit conditions

L1 Pollution of waters L1.1 Except as may be expressly provided in any other condition of this licence, the licensee must

comply with section 120 of the Protection of the Environment Operations Act 1997. L1.2 The level of leachate in the leachate sump (Point 1) must not exceed the level of the invert of the

leachate pipes where they enter the leachate sump, except as direct result of a rainfall event of greater than or equal to 300mm in total falling over any consecutive five day period.

L1.3 Leachate is permitted to overflow from the leachate management system only as a direct result of

a rainfall event of equal to or greater than 300mm in total falling over any consecutive five day period and only from the following points: Point 1 and the active cell.

Page 96: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 10 of 29 Archive date: 01-Apr-2011

L1.4 The level of liquid and other material in each sedimentation basin must not exceed the level indicated by the sedimentation basin marker, except:

(a) when the basin is receiving stormwater caused by rainfall on the premises; or (b) within five days of the cessation of any rain.

L2 Load limits L2.1 Not applicable. L2.2 Not applicable.

L3 Concentration limits

L3.1 For each monitoring/discharge point or utilisation area specified in the table\s below (by a point number), the concentration of a pollutant discharged at that point, or applied to that area, must not exceed the concentration limits specified for that pollutant in the table.

L3.2 Where a pH quality limit is specified in the table, the specified percentage of samples must be

within the specified ranges.

L3.3 To avoid any doubt, this condition does not authorise the pollution of waters by any pollutant other than those specified in the table\s.

Water and Land POINT 2

Pollutant Units of Measure 50 percentile concentration limit

90 percentile concentration limit

3DGM concentration limit

100 percentile Concentration Limit

pH pH 6.5 - 8.5 Total suspended solids

milligrams per litre 50

L3.4 Exceedances of the concentration limits for total suspended solids in condition L3.3 are permitted

at the following points for the duration of the overflow: Point 2, whenever a wet weather overflow is occurring due to a stormwater event greater than or

equal to 74mm of rain in total falling over any consecutive five day period.

L4 Volume and mass limits

L4.1 Not applicable.

Page 97: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 11 of 29 Archive date: 01-Apr-2011

L5 Waste L5.1 The licensee must not cause, permit or allow any waste to be received at the premises, except the

wastes expressly referred to in the column titled “Waste” and meeting the definition, if any, in the column titled “Description” in the table below. Any waste received at the premises must only be used for the activities referred to in relation to that waste in the column titled “Activity” in the table below. Any waste received at the premises is subject to those limits or conditions, if any, referred to in relation to that waste contained in the column titled “Other Limits” in the table below. Condition L5.1 does not limit any other conditions in this licence.

Code Waste Description Activity Other Limits

NA General Solid Waste (putrescible)

NA General Solid Waste (non-putrescible)

Asbestos Waste

Waste Tyres

As defined in Schedule 1 of the POEO Act, in force from time to time

NA General Solid Waste Wastes assessed as General Solid Waste which are also subject to general or specific immobilisation approvals which have a restriction that they may only be disposed of at waste disposal facilities which have currently operating leachate collection systems.

Waste disposal (application to land)

Total tonnage of waste disposed of at the premises must not exceed 8000 tonnes per year.

NA Any waste received on site that is below licensing thresholds in Schedule 1 of the POEO Act, as in force from time to time

NA

L5.2 Tyres from the Sydney Metropolitan Area must not be received at the premises unless:

(a) they have been shredded into pieces measuring no more than 250mm in any direction; or (b) they have had their walls removed; or (c) the facility has the capacity, at the time of receiving the tyres, to recycle or reprocess the

tyres into a saleable product (including retreading the tyres); or (d) the facility has the capacity, at the time of receiving the tyres, to shred the tyres or remove

the walls from the tyres; or (e) the tyres are from a domestic load containing no more than 5 tyres having a diameter of less

than 1.2 metres.

L6 Noise Limits L6.1 Noise from the premises must not exceed:

(a) an LAeq (15 minute) noise emission criterion of 45 dB(A) (7am to 6pm ) Monday to Friday and 8am to 5pm Saturday ; and

(b) an LAeq (15 minute) noise emission criterion of 40 dB(A) during the evening (6pm to 10pm) Monday to Friday; and

(c) at all other times, an LAeq (15 minutes) noise emission criterion of 35 dB(A), except as expressly provided by this licence.

Page 98: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 12 of 29 Archive date: 01-Apr-2011

L6.2 Noise from the premises is to be measured at the most affected point on or within the affected property boundary or, if this is more than 30 metres from a residence located within the boundaries of the affected property, at the most affected point within 30 metres of the residence.

L7 Hours of operation L7.1 All work at the premises must be conducted between the following hours: 7am to 6pm Mondays to Fridays, 8am to 5pm Saturdays, Sundays and Public Holidays. L7.2 The hours of operation permitted by this licence may be varied where there is no significant impact

on the ambient levels outside the premises or at any noise sensitive location. The licensee must provide evidence that no significant impact occurs prior to a variation being granted for the hours of operation.

L8 Odours L8.1 No condition of this licence identifies a potentially offensive odour for the purposes of section 129

of the Protection of the Environment Operations Act 1997. Note: Section 129 of the Protection of the Environment Operations Act 1997, provides that the licensee

must not cause or permit the emission of any offensive odour from the premises but provides a defence if the emission is identified in the relevant environment protection licence as a potentially offensive odour and the odour was emitted in accordance with the conditions of a licence directed at minimising odour.

4 Operating conditions

O1 Activities must be carried out in a competent manner

O1.1 Licensed activities must be carried out in a competent manner.

This includes: (a) the processing, handling, movement and storage of materials and substances used to carry

out the activity; and (b) the treatment, storage, processing, reprocessing, transport and disposal of waste generated

by the activity.

O2 Maintenance of plant and equipment O2.1 All plant and equipment installed at the premises or used in connection with the licensed activity:

(a) must be maintained in a proper and efficient condition; and (b) must be operated in a proper and efficient manner.

Page 99: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 13 of 29 Archive date: 01-Apr-2011

O3 Dust Control O3.1 All operations and activities occurring at the premises must be carried out in a manner that will

minimise the emission of dust from the premises.

O4 Closure plan O4.1 The last licensee must prepare and submit to the EPA within three months prior to the last load of

waste being landfilled a closure plan in accordance with section 76 of the Protection of the Environment Operations Act 1997.

O5 Tyre Storage O5.1 The total quantity of used, rejected or unwanted tyres (including shredded tyres and tyre pieces)

stockpiled at the premises must not exceed 50 tonnes. O5.2 The licensee must ensure that stockpiles of used, rejected or unwanted tyres (including shredded

tyres and tyre pieces) are located in a clearly defined area. O5.3 The licensee must ensure that stockpiles of used, rejected or unwanted tyres (including shredded

tyres and tyre pieces) are managed so as not to cause or to be likely to cause the spread of disease by vermin.

O5.4 The licensee must ensure that measures are taken to prevent stockpiles of used, rejected or

unwanted tyres (including shredded tyres and tyre pieces) from catching on fire.

O6 Leachate management O6.1 The leachate management system must be operated and maintained to ensure that the level of

leachate in the leachate interception trench will not exceed the level of the upper surface of the bedrock, except as a direct result of rainfall events greater than or equal to 300mm in total falling over any consecutive five day period.

O6.2 The leachate interception trench and drainage pipes must be maintained to ensure that their

capacity to capture and drain leachate to the leachate sump is not reduced. O6.3 The licensee must take all practical measures to minimise the amount of leachate in the leachate

collection and storage system and maximise the disposal of leachate to enable compliance with conditions L1.1 to L1.3 of this licence.

O6.4 Leachate collected at the premises may be irrigated onto waste filled areas of the premises,

reinjected into waste filled areas of the premises or transported off the premises to a facility lawfully able to receive and treat or process the leachate.

O6.5 Irrigation of leachate at the premises must not occur in a manner which causes surface runoff. O6.6 The volume of leachate directed to the reinjection trenches must not exceed the capacity of the

trenches to assimilate the leachate.

Page 100: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 14 of 29 Archive date: 01-Apr-2011

O6.7 Spray from leachate irrigation must not drift beyond the boundary of the premises. O6.8 The active cell must be bunded to prevent surface water flowing onto the active cell and to prevent

leachate overflowing from the active cell except as permitted by condition L1.3 of this licence. O6.9 The surface area of the active cell must be minimised at all times.

O7 Management of surface waters O7.1 The perimeter of the areas where waste has been landfilled must be contoured to prevent

stormwater running onto these surfaces from all storm events less than or equal to a 1 in 10 year 24 hour duration storm event .

O7.2 Each sedimentation basin must have a marker (the “sedimentation basin marker”) that identifies

the upper level of the sediment storage zone. O7.3 Whenever the level of liquid and other material in any sedimentation basin exceeds the level

indicated by the sedimentation basin marker, the licensee must take all practical measures as soon as possible to reduce the level of liquid and other material in the sedimentation basin.

O7.4 Surface water must not pond on the landfill surface, excepting ponding within the active cell which

arises from rain water falling directly onto the active cell.

O8 Fire risk reduction works O8.1 The licensee must have in place and implement section 4.4.2.3 of LEMP to minimise the risk of fire

at the premises.

O9 Fire extinguishment O9.1 The licensee must extinguish fires at the premises as soon as possible.

O10 Fire fighting capability O10.1 The licensee must have adequate fire prevention measures in place, and ensure that facility

personnel are able to access fire-fighting equipment and manage fire outbreaks at any part of the premises in accordance with section 4.6.6 in the LEMP.

O11 Burning of green waste O11.1 There must be no incineration or burning of any waste at the premises, except in accordance with

section 4.6.6.1 of the LEMP.

Page 101: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 15 of 29 Archive date: 01-Apr-2011

O12 Quality assurance O12.1 The licensee must supply, construct and install landfill capping system at the premises in

accordance with Australian Standard HB90.3(2000) or an alternative construction quality assurance program approved in writing by the EPA in advance.

O13 Screening of waste O13.1 The licensee must have in place and implement procedures to identify and prevent the disposal of

any waste not permitted by this licence to be disposed of at the premises in accordance with the procedures in section 4.5.10 and 4.5.11 of the LEMP.

O14 Filling plan O14.1 The licensee must manage the disposal of waste at the premises in accordance with the

progressive filling plan in section 4.5.2 of the LEMP.

O15 Completion of landfill cells O15.1 The licensee must ensure that the completed landfill cells are capped progressively at times when

the level of waste reaches final heights as detailed in section 4.5.2 of the LEMP. O15.2 Final capping of completed cells must comprise four layers in the order of installation: a seal

bearing surface, a sealing layer, an infiltration layer and a revegetation layer, which must be installed in accordance with section 4.5.20.1 of the LEMP.

O16 Unauthorised entry O16.1 The licensee must take all practicable steps to control entry to the premises. O16.2 The licensee must install and maintain lockable security gates at all access and departure

locations. O16.3 The licensee must ensure that all gates are locked whenever the landfill is unattended.

O17 Degradation of local amenity O17.1 The licensee must implement the litter management program specified in section 4.6.4.4 of the

LEMP.

O18 Covering of waste O18.1 Cover material must be virgin excavated natural material (VENM) or an alternative cover material

approved in writing by the EPA.

Page 102: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 16 of 29 Archive date: 01-Apr-2011

(a) Daily cover Cover material must be applied to a minimum depth of 15 centimetres over all exposed

landfilled waste prior to ceasing operations at the end of each day. (b) Intermediate cover Cover material must be applied to a depth of 30 centimetres over surfaces of the landfilled

waste at the premises which are to be exposed for more than 90 days. (c) Cover material stockpile At least two weeks cover material must be available at the premises under all weather

conditions. This material may be won on site, or alternatively a cover stockpile must be maintained adjacent to the tip face.

5 Monitoring and recording conditions

M1 Monitoring records

M1.1 The results of any monitoring required to be conducted by this licence or a load calculation protocol must be recorded and retained as set out in this condition.

M1.2 All records required to be kept by this licence must be:

(a) in a legible form, or in a form that can readily be reduced to a legible form; (b) kept for at least 4 years after the monitoring or event to which they relate took place; and (c) produced in a legible form to any authorised officer of the EPA who asks to see them.

M1.3 The following records must be kept in respect of any samples required to be collected for the purposes of this licence: (a) the date(s) on which the sample was taken; (b) the time(s) at which the sample was collected; (c) the point at which the sample was taken; and (d) the name of the person who collected the sample.

M2 Requirement to monitor concentration of pollutants discharged M2.1 For each monitoring/discharge point or utilisation area specified below (by a point number), the

licensee must monitor (by sampling and obtaining results by analysis) the concentration of each pollutant specified in Column 1. The licensee must use the sampling method, units of measure, and sample at the frequency, specified opposite in the other columns:

Page 103: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 17 of 29 Archive date: 01-Apr-2011

POINT 1 Pollutant Units of measure Frequency Sampling Method Alkalinity (as calcium carbonate)

milligrams per litre Every 6 months Grab sample

Ammonia milligrams per litre Every 6 months Grab sample Arsenic milligrams per litre Yearly Grab sample BOD milligrams per litre Every 6 months Grab sample Calcium milligrams per litre Every 6 months Grab sample Nitrate milligrams per litre Every 6 months Grab sample Organochlorine pesticides milligrams per litre Yearly Grab sample Organophosphate pesticides milligrams per litre Yearly Grab sample Phenols milligrams per litre Yearly Grab sample Potassium milligrams per litre Every 6 months Grab sample pH pH Every 6 months Probe

POINT 2 Pollutant Units of measure Frequency Sampling Method Alkalinity (as calcium carbonate)

milligrams per litre Special Frequency 2 Grab sample

Ammonia milligrams per litre Special Frequency 2 Grab sample BOD milligrams per litre Special Frequency 2 Grab sample Calcium milligrams per litre Special Frequency 2 Grab sample Nitrate milligrams per litre Special Frequency 2 Grab sample Potassium milligrams per litre Special Frequency 2 Grab sample TKN-N milligrams per litre Special Frequency 2 Grab sample TN milligrams per litre Special Frequency 2 Grab sample TSS milligrams per litre Special Frequency 1 Grab sample pH pH Special Frequency 1 Probe

POINTS 3,18 Pollutant Units of measure Frequency Sampling Method Alkalinity (as calcium carbonate)

milligrams per litre Every 6 months Grab sample

Ammonia milligrams per litre Every 6 months Grab sample BOD milligrams per litre Every 6 months Grab sample Calcium milligrams per litre Every 6 months Grab sample Nitrate milligrams per litre Every 6 months Grab sample Potassium milligrams per litre Every 6 months Grab sample pH pH Every 6 months Probe

POINTS 8,9 Pollutant Units of measure Frequency Sampling Method Alkalinity (as calcium carbonate)

milligrams per litre Special Frequency 2 Grab sample

Ammonia milligrams per litre Special Frequency 2 Grab sample BOD milligrams per litre Special Frequency 2 Grab sample Calcium milligrams per litre Special Frequency 2 Grab sample Nitrate milligrams per litre Special Frequency 2 Grab sample Potassium milligrams per litre Special Frequency 2 Grab sample TKN-N milligrams per litre Special Frequency 2 Grab sample TN milligrams per litre Special Frequency 2 Grab sample TSS milligrams per litre Special Frequency 2 Grab sample pH pH Special Frequency 2 Probe

POINT 14 Pollutant Units of measure Frequency Sampling Method Methane percent by volume Quarterly Probe

Page 104: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 18 of 29 Archive date: 01-Apr-2011

POINT 15 Pollutant Units of measure Frequency Sampling Method Methane percent by volume Quarterly Probe

POINT 16 Pollutant Units of measure Frequency Sampling Method Methane percent by volume Quarterly Probe

For the purposes of the above table(s) Special Frequency 1 means the collection of one sample as

soon as practicable after each of five rainfall events each year exceeding 40mm in any 48 hour period, including three samples from the outlet of the discharge pipe of Point 2.

For the purposes of the above table(s) ‘Special Frequency 2’ means the collection of one sample as soon as practicable after each of two rainfall events each year exceeding 40mm in any 48 hour period.

M3 Testing methods - concentration limits

M3.1 Monitoring for the concentration of a pollutant emitted to the air required to be conducted by this licence must be done in accordance with:

(a) any methodology which is required by or under the Act to be used for the testing of the concentration of the pollutant; or

(b) if no such requirement is imposed by or under the Act, any methodology which a condition of this licence requires to be used for that testing; or

(c) if no such requirement is imposed by or under the Act or by a condition of this licence, any methodology approved in writing by the EPA for the purposes of that testing prior to the testing taking place.

Note: The Protection of the Environment Operations (Clean Air) Regulation 2002 requires testing for certain purposes to be conducted in accordance with test methods contained in the publication "Approved Methods for the Sampling and Analysis of Air Pollutants in NSW".

M3.2 Subject to any express provision to the contrary in this licence, monitoring for the concentration of a pollutant discharged to waters or applied to a utilisation area must be done in accordance with the Approved Methods Publication unless another method has been approved by the EPA in writing before any tests are conducted.

M4 Recording of pollution complaints

M4.1 The licensee must keep a legible record of all complaints made to the licensee or any employee or agent of the licensee in relation to pollution arising from any activity to which this licence applies.

M4.2 The record must include details of the following:

(a) the date and time of the complaint;

Page 105: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 19 of 29 Archive date: 01-Apr-2011

(b) the method by which the complaint was made; (c) any personal details of the complainant which were provided by the complainant or, if no

such details were provided, a note to that effect; (d) the nature of the complaint; (e) the action taken by the licensee in relation to the complaint, including any follow-up contact

with the complainant; and (f) if no action was taken by the licensee, the reasons why no action was taken.

M4.3 The record of a complaint must be kept for at least 4 years after the complaint was made.

M4.4 The record must be produced to any authorised officer of the EPA who asks to see them.

M5 Telephone complaints line

M5.1 The licensee must operate during its operating hours a telephone complaints line for the purpose of receiving any complaints from members of the public in relation to activities conducted at the premises or by the vehicle or mobile plant, unless otherwise specified in the licence.

M5.2 The licensee must notify the public of the complaints line telephone number and the fact that it is a

complaints line so that the impacted community knows how to make a complaint.

M5.3 Conditions M5.1 and M5.2 do not apply until 3 months after:

(a) the date of the issue of this licence or (b) if this licence is a replacement licence within the meaning of the Protection of the Environment

Operations (Savings and Transitional) Regulation 1998, the date on which a copy of the licence was served on the licensee under clause 10 of that regulation.

M6 Requirement to monitor volume or mass

M6.1 Not applicable.

M6.2 For each Point specified below the licensee must monitor:

(a) the volume of leachate discharged from the Point for reinjection into waste filled areas; (b) the volume of leachate discharged from the Point for irrigation onto waste filled areas; and (c) the volume of leachate discharged from the Point for transport off-site, at the frequency and using the method and units of measure specified below.

POINT 13 Frequency Unit of Measure Sampling Method Weekly

kL

No method specified

Page 106: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 20 of 29 Archive date: 01-Apr-2011

M7 Monitoring remaining landfill capacity M7.1 The licensee must monitor the remaining disposal capacity (in cubic metres) of the landfill.

M8 Rainfall Monitoring M8.1 The licensee must monitor and record rainfall occurring at the premises on a daily basis.

M9 Laboratory accreditation M9.1 Samples taken pursuant to a requirement in this licence to monitor the volume, mass or

concentration of pollutants, must be analysed and reported in accordance with the laboratory accreditation requirements set out in section 2.1.3 of the Load Calculation Protocol.

The Load Calculation Protocol is the Protocol referred to in clause 18 of the Protection of the

Environment Operations (General) Regulation 1998. A copy of the Protocol was published in the Government Gazette on 25 June 1999 and can be purchased from the EPA or viewed at http://www.epa.nsw.gov.au.

6 Reporting conditions

R1 Annual return documents What documents must an Annual Return contain? R1.1 The licensee must complete and supply to the EPA an Annual Return in the approved form

comprising: (a) a Statement of Compliance; and (b) a Monitoring and Complaints Summary. A copy of the form in which the Annual Return must be supplied to the EPA accompanies this licence. Before the end of each reporting period, the EPA will provide to the licensee a copy of the form that must be completed and returned to the EPA.

Period covered by Annual Return

R1.2 An Annual Return must be prepared in respect of each reporting period, except as provided below.

Note: The term "reporting period" is defined in the dictionary at the end of this licence. Do not complete the Annual Return until after the end of the reporting period.

R1.3 Where this licence is transferred from the licensee to a new licensee:

(a) the transferring licensee must prepare an Annual Return for the period commencing on the first day of the reporting period and ending on the date the application for the transfer of the licence to the new licensee is granted; and

Page 107: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 21 of 29 Archive date: 01-Apr-2011

(b) the new licensee must prepare an Annual Return for the period commencing on the date the application for the transfer of the licence is granted and ending on the last day of the reporting period.

Note: An application to transfer a licence must be made in the approved form for this purpose. R1.4 Where this licence is surrendered by the licensee or revoked by the EPA or Minister, the licensee

must prepare an Annual Return in respect of the period commencing on the first day of the reporting period and ending on: (a) in relation to the surrender of a licence - the date when notice in writing of approval of the

surrender is given; or (b) in relation to the revocation of the licence - the date from which notice revoking the licence

operates.

Deadline for Annual Return

R1.5 The Annual Return for the reporting period must be supplied to the EPA by registered post not later than 60 days after the end of each reporting period or in the case of a transferring licence not later than 60 days after the date the transfer was granted (the 'due date').

Notification where actual load can not be calculated R1.6 Not applicable.

Licensee must retain copy of Annual Return

R1.7 The licensee must retain a copy of the Annual Return supplied to the EPA for a period of at least 4 years after the Annual Return was due to be supplied to the EPA.

Certifying of Statement of Compliance and signing of Monitoring and Complaints Summary R1.8 Within the Annual Return, the Statement of Compliance must be certified and the Monitoring and

Complaints Summary must be signed by: (a) the licence holder; or (b) by a person approved in writing by the EPA to sign on behalf of the licence holder.

R1.9 A person who has been given written approval to certify a certificate of compliance under a licence issued under the Pollution Control Act 1970 is taken to be approved for the purpose of this condition until the date of first review of this licence.

R2 Notification of environmental harm

Note: The licensee or its employees must notify the EPA of incidents causing or threatening material harm to the environment as soon as practicable after the person becomes aware of the incident in accordance with the requirements of Part 5.7 of the Act.

R2.1 Notifications must be made by telephoning the Environment Line service on 131 555.

Page 108: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 22 of 29 Archive date: 01-Apr-2011

R2.2 The licensee must provide written details of the notification to the EPA within 7 days of the date on which the incident occurred.

R3 Written report R3.1 Where an authorised officer of the EPA suspects on reasonable grounds that:

(a) where this licence applies to premises, an event has occurred at the premises; or (b) where this licence applies to vehicles or mobile plant, an event has occurred in connection

with the carrying out of the activities authorised by this licence, and the event has caused, is causing or is likely to cause material harm to the environment (whether the harm occurs on or off premises to which the licence applies), the authorised officer may request a written report of the event.

R3.2 The licensee must make all reasonable inquiries in relation to the event and supply the report to the EPA within such time as may be specified in the request.

R3.3 The request may require a report which includes any or all of the following information:

(a) the cause, time and duration of the event; (b) the type, volume and concentration of every pollutant discharged as a result of the event; (c) the name, address and business hours telephone number of employees or agents of the

licensee, or a specified class of them, who witnessed the event; (d) the name, address and business hours telephone number of every other person (of whom

the licensee is aware) who witnessed the event, unless the licensee has been unable to obtain that information after making reasonable effort;

(e) action taken by the licensee in relation to the event, including any follow-up contact with any complainants;

(f) details of any measure taken or proposed to be taken to prevent or mitigate against a recurrence of such an event; and

(g) any other relevant matters.

R3.4 The EPA may make a written request for further details in relation to any of the above matters if it is not satisfied with the report provided by the licensee. The licensee must provide such further details to the EPA within the time specified in the request.

R4 Recording of fires R4.1 The licensee must maintain a daily log and record the following data of fires at the site: (a) Time and date when the fire was deliberately started or reported.

(b) Whether the fire was authorised by the licensee, and, if not, the circumstances which ignited the fire.

(c) The time and date that the fire ceased and whether it burnt out or was extinguished. (d) The location of fire (eg. clean timber stockpile, putrescible garbage cell, etc).

(e) Prevailing weather conditions. (f) Observations made in regard to smoke direction and dispersion. (g) The amount of waste that was combusted by the fire. (h) Action taken to extinguish the fire.

Page 109: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 23 of 29 Archive date: 01-Apr-2011

R4.2 The licensee or its employees or agents must notify the EPA in accordance with conditions R2.1 and R2.2 of all fires at the premises as soon as practical after becoming aware of the incident.

R5 Leachate discharges to surface waters R5.1 The licensee must notify the EPA in accordance with condition R5.2.when leachate discharges

from the premises and/or when the level of leachate in the leachate sump (Point 1) exceeds the invert of the leachate pipes in the leachate interception trench where they enter the leachate sump.

R5.2 The licensee must provide written details of any leachate discharge(s) to the EPA within 7 days of

the date on which the incident occurred in accordance with condition R5.3. R5.3 The written details referred to in the above condition must be provided as a report. The report

must include the following information: (a) the volume of the leachate discharged and over what time period the discharge occurred; (b) the date and time of the commencement of the overflow; (c) the weather conditions at the time of the discharge, specifying the amount of rainfall on a

daily basis that had fallen: - on the day(s) of the discharge; and - for the one week period prior to the discharge.

(d) the most recent monitoring results of the chemical composition of the leachate; (e) an explanation as to why the discharge occurred; (f) the location(s) of the discharge; (g) a plan of action to prevent a similar discharge in the future; and (h) was the discharge permitted by this licence.

R6 Landfill Gas Hazard Reporting R6.1 The licensee must notify the EPA within 24 hours in accordance with condition R2.1 if landfill gas

monitoring detects methane at Point 14 and/or 15 above 1.25% (v/v), and increase the frequency of monitoring to daily, until the EPA determines otherwise.

R7 Groundwater contamination reporting R7.1 Whenever the results for any two consecutive monitoring rounds required by condition M2 of this

licence for the following Point exceeds the following trigger values for any two or more parameters the licensee must submit a report to the EPA within 14 days proposing a Groundwater Assessment Program identifying a strategy for assessing the nature and extent of groundwater contamination at the premises:

Point 18

Parameter Units of Measure Trigger Value Potassium mg/l 16.5 Ammonia mg/l 3.1 Calcium mg/l 49.5 Alkalinity mg/l 63.9

Page 110: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 24 of 29 Archive date: 01-Apr-2011

R8 Surface water contamination reporting R8.1 Within three months after the completion of each 24 months of sampling in accordance with

condition M2 of this licence for the following Points the licensee must submit a report to the EPA incorporating all monitoring results in graphical and tabular form together with an assessment of the nature and extent of any impacts of the landfill activity on water quality: Points 2, 8, 9

General conditions

G1 Copy of licence kept at the premises

G1.1 A copy of this licence must be kept at the premises to which the licence applies.

G1.2 The licence must be produced to any authorised officer of the EPA who asks to see it.

G1.3 The licence must be available for inspection by any employee or agent of the licensee working at the premises.

Pollution studies and reduction programs U1 The licensee must complete by 30 June 2005 the upgrading of its existing sediment basin to a

surface water treatment wetland in accordance with the plan provided to the EPA dated 8 November 2004.

U2 Leachate Management U2.1 By 9 July 2010 the licensee must have in place a system to contain any leachate seeping from the batters of

the landfill. U2.2 By 9 July 2010 the licensee must have in place a system to contain any leachate from the greenwaste

storage area at the north of the current cell. U2.3 The licensee must prevent any collected leachate from entering the stormwater drainage system. U2.4 The licensee must direct all collected leachate to the leachate storage tanks.

Page 111: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 25 of 29 Archive date: 01-Apr-2011

U2.5 By 9 July 2010 the licensee must remove at least 15,000 litres of leachate out of the leachate collection and storage system and dispose of that leachate at a facility that is lawfully able to accept that waste.

U2.6 By 23 July 2010 the licensee must provide documentation that at least 15,000 litres of leachate has been

removed and disposed of at a facility that is lawfully able to accept that waste. U2.7 By 6 August 2010 the licensee must remove at least a further 15,000 litres of leachate out of the leachate

collection and storage system and dispose of that leachate at a facility that is lawfully able to accept that waste.

U2.8 By 20 August 2010 the licensee must provide documentation that at least a further 15,000 litres of leachate

has been removed and disposed of at a facility that is lawfully able to accept that waste. U2.9 No leachate shall be injected back into the landfill until at least 30 October 2010.

Special conditions Not applicable

Dictionary

General Dictionary

In this licence, unless the contrary is indicated, the terms below have the following meanings:

3DGM [in relation to a concentration limit]

Means the three day geometric mean, which is calculated by multiplying the results of the analysis of three samples collected on consecutive days and then taking the cubed root of that amount. Where one or more of the samples is zero or below the detection limit for the analysis, then 1 or the detection limit respectively should be used in place of those samples

Act Means the Protection of the Environment Operations Act 1997

activity Means a scheduled or non-scheduled activity within the meaning of the Protection of the Environment Operations Act 1997

actual load Has the same meaning as in the Protection of the Environment Operations (General) Regulation 1998

AM Together with a number, means an ambient air monitoring method of that number prescribed by the Approved Methods for the Sampling and Analysis of Air Pollutants in New South Wales.

AMG Australian Map Grid

anniversary date The anniversary date is the anniversary each year of the date of issue of the licence. In the case of a licence continued in force by the Protection of the Environment Operations Act 1997, the date of issue of the licence is the first anniversary of the date of issue or last renewal of the licence following the commencement of the Act.

annual return Is defined in R1.1

Page 112: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 26 of 29 Archive date: 01-Apr-2011

Approved Methods Publication

Has the same meaning as in the Protection of the Environment Operations (General) Regulation 1998

assessable pollutants

Has the same meaning as in the Protection of the Environment Operations (General) Regulation 1998

BOD Means biochemical oxygen demand

CEM Together with a number, means a continuous emission monitoring method of that number prescribed by the Approved Methods for the Sampling and Analysis of Air Pollutants in New South Wales.

COD Means chemical oxygen demand

composite sample Unless otherwise specifically approved in writing by the EPA, a sample consisting of 24 individual samples collected at hourly intervals and each having an equivalent volume.

cond. Means conductivity

environment Has the same meaning as in the Protection of the Environment Operations Act 1997

environment protection legislation

Has the same meaning as in the Protection of the Environment Administration Act 1991

EPA Means Environment Protection Authority of New South Wales.

fee-based activity classification

Means the numbered short descriptions in Schedule 1 of the Protection of the Environment Operations (General) Regulation 1998.

flow weighted composite sample

Means a sample whose composites are sized in proportion to the flow at each composites time of collection.

general solid waste (non-putrescible)

Has the same meaning as in Part 3 of Schedule 1 of the Protection of the Environment Operations Act 1997

general solid waste (putrescible)

Has the same meaning as in Part 3 of Schedule 1 of the Protection of the Environment Operations Act 1997

grab sample Means a single sample taken at a point at a single time

hazardous waste Has the same meaning as in Part 3 of Schedule 1 of the Protection of the Environment Operations Act 1997

licensee Means the licence holder described at the front of this licence

load calculation protocol

Has the same meaning as in the Protection of the Environment Operations (General) Regulation 1998

local authority Has the same meaning as in the Protection of the Environment Operations Act 1997

material harm Has the same meaning as in section 147 Protection of the Environment Operations Act 1997

MBAS Means methylene blue active substances

Minister Means the Minister administering the Protection of the Environment Operations Act 1997

mobile plant Has the same meaning as in Part 3 of Schedule 1 of the Protection of the Environment Operations Act 1997

motor vehicle Has the same meaning as in the Protection of the Environment Operations Act 1997

O&G Means oil and grease

percentile [in Means that percentage [eg.50%] of the number of samples taken that must meet the concentration limit

Page 113: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 27 of 29 Archive date: 01-Apr-2011

relation to a concentration limit of a sample]

specified in the licence for that pollutant over a specified period of time. In this licence, the specified period of time is the Reporting Period unless otherwise stated in this licence.

plant Includes all plant within the meaning of the Protection of the Environment Operations Act 1997 as well as motor vehicles.

pollution of waters [or water pollution]

Has the same meaning as in the Protection of the Environment Operations Act 1997

premises Means the premises described in condition A2.1

public authority Has the same meaning as in the Protection of the Environment Operations Act 1997

regional office Means the relevant EPA office referred to in the Contacting the EPA document accompanying this licence

reporting period For the purposes of this licence, the reporting period means the period of 12 months after the issue of the licence, and each subsequent period of 12 months. In the case of a licence continued in force by the Protection of the Environment Operations Act 1997, the date of issue of the licence is the first anniversary of the date of issue or last renewal of the licence following the commencement of the Act.

restricted solid waste

Has the same meaning as in Part 3 of Schedule 1 of the Protection of the Environment Operations Act 1997

scheduled activity Means an activity listed in Schedule 1 of the Protection of the Environment Operations Act 1997

special waste Has the same meaning as in Part 3 of Schedule 1 of the Protection of the Environment Operations Act 1997

TM Together with a number, means a test method of that number prescribed by the Approved Methods for the Sampling and Analysis of Air Pollutants in New South Wales.

TSP Means total suspended particles

TSS Means total suspended solids

Type 1 substance Means the elements antimony, arsenic, cadmium, lead or mercury or any compound containing one or more of those elements

Type 2 substance Means the elements beryllium, chromium, cobalt, manganese, nickel, selenium, tin or vanadium or any compound containing one or more of those elements

utilisation area Means any area shown as a utilisation area on a map submitted with the application for this licence

waste Has the same meaning as in the Protection of the Environment Operations Act 1997

waste type Means liquid, restricted solid waste, general solid waste (putrescible), general solid waste (non-putrescible), special waste or hazardous waste

Special Dictionary

Bedrock Means naturally occurring sub-surface strata of consistent particle size, texture and density which exhibits a permeability of less than or equal to 10 –9 metes per second.

dry weather Means any day at the premises which receives less than 10mm of rain and which is preceded by a 10 day period during which rainfall of not more than 10mm of rain is received at the premises on any one of those 10 days.

Page 114: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 28 of 29 Archive date: 01-Apr-2011

Leachate means liquid released by, or water that has percolated through, waste and which contains

dissolved and/or suspended liquids and/or solids and/or gases. Active cell means that part of the landfill where waste is being disposed of at the time.

Mr Graeme Budd Environment Protection Authority (By Delegation) Date of this edition - 17-Aug-2010

End Notes

1 Licence varied by notice 1005932, issued on 11-Apr-2001, which came into effect on 06-May-2001.

2 Licence varied by notice 1008507, issued on 17-Jul-2001, which came into effect on 11-Aug-2001.

3 Licence varied by notice 1012661, issued on 06-Nov-2001, which came into effect on 01-Dec-2001.

4 Licence varied by notice 1016356, issued on 10-Apr-2002, which came into effect on 05-May-2002.

5 Licence varied by notice 1022323, issued on 30-Apr-2003, which came into effect on 25-May-2003.

6 Licence varied by notice 1039983, issued on 24-Sep-2004, which came into effect on 19-Oct-2004.

7 Licence varied by notice 1044776, issued on 22-Feb-2005, which came into effect on 19-Mar-2005.

8 Licence varied by notice 1056840, issued on 02-Mar-2006, which came into effect on 27-Mar-2006.

9 Condition A1.3 Not applicable varied by notice issued on <issue date> which came into effect on <effective date>

10 Licence varied by notice 1097463, issued on 20-Mar-2009, which came into effect on 20-Mar-2009.

11 Licence varied by notice 1114446, issued on 18-Jun-2010, which came into effect on 18-Jun-2010.

12 Licence varied by change to DECCW region, issued on 17-Aug-2010, which came into effect on 17-Aug-2010.

Page 115: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Section 55 Protection of the Environment Operations Act 1997

Environment Protection Licence

Licence - 5896

Environment Protection Authority - NSW Page 29 of 29 Archive date: 01-Apr-2011

Page 116: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 87

APPENDIX 2: DRAWINGS

Page 117: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 118: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 119: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 120: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 121: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 122: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 88

APPENDIX 3: PLANS

Plan C

Page 123: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 89

Plan E

Page 124: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 90

Page 125: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 91

GROUNDWATER FLOW

Page 126: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 92

APPENDIX 4: NON-COMPLIANCE RECORD C

ON

DIT

ION

TYPE OF NON-COMPLIANCE

CO

ND

ITIO

N

TYPE OF NON-COMPLIANCE

CO

ND

ITIO

N

TYPE OF NON-

COMPLIANCE

CO

ND

ITIO

N

TYPE OF NON-COMPLIANCE

2012 2011 2008 2007

L 3.3

Limits exceeded for alkalinity and

pH at the downstream

groundwater borehole BH7, EPA

point 18.

L 3.3

Exceedance of alkalinity at downstream

groundwater borehole BH7 most likely

due to natural variations; three

exceedances of TSS and one

exceedance of ammonia at surface water

treatment wetland associated with

significant rainfall.

M 2.1

Only one sample

at the BH 1 was

taken

M2

Some parameters not tested

during a number of monitoring rounds

[alkalinity, BOD, TKN, ammonia, nitrate,

total nitrogen, calcium and potassium] at

the surface water treatment wetland (i.e.

EPA Sampling Point 2).

L 3.3

Concentration limits for Ammonia

exeeded in surface waters at the

outlet of wetland / EPA Point 2

O

11.1

Council carried out burning of a

greenwaste stockpile at RWMC during

January 2011. Fire not supervised and no

action taken to extinguish fire. Fire

brigade called. DECCW issued Council

with a penalty notice for breach of licence

conditions for site.

M 2.1

Nil samples for

arsenic in the

leachate -

sampling point 1

were taken

Two (2) exceedances of TSS at the

surface water treatment wetland (i.e. EPA

Sampling Point 2)

Page 127: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 93

2012 2011 2008 2007

L 3.3

ANZECC concentration limits for

total nitrogen, nitrate and

potassium were exceeded in

surface waters at outlet of wetland

/ EPA Point 2

M 2.1

Only 3 of the

4required

monitoring rounds

for methane were

taken - due to wet

weather

One (1) exceedance of pH at the

surface water treatment wetland (i.e.

EPA Sampling Point 2)

L 3.3

ANZECC concentration limits for

total nitrogen and potassium were

exceeded in downstream surface

waters at EPA point 9.

L 3.3

There were 4

exceedances of

TSS - see return

for further detail

One (1) exceedance of potassium at

BH 7 (i.e. EPA Sampling Point 18)

L 3.3

Sampling and monitoring of

groundwater was not conducted

on a six monthly basis

M2

1

exceedance of pH

at the surface

water treatment

wetland

M 2.1 Concentration limit for total

suspended solids M 2.1

Two exceedances

for ammonia at

the surface water

treatment wetland

- see return for

further detail

M 2.1 (TSS) was exceeded in surface

waters at EPA Point 2

Page 128: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 94

2006 2003 2002 2001 2000

M 2.1

EPA Sampling

Point 3 - No

samples were

taken from BH

1(old) instead of

the required 2

monitoring

samples.

M2

Failed to monitor

one water quality

parameter (DO)

and failed to

monitor some

ground and

surface water

locations.

M2

Not all sampling

or records

provided due to

death of

consultant.

M2

Not all

parameters

monitored and

number of

monitoring events

not complied with.

M2

No pollutant

concentration

monitoring re

leachate or

stormwater or

gas

undertaken.

M 2.1

Only 1 sample

was taken for

calcium in the

leachate (EPA

Sampling Point

1), instead of the

required 2

monitoring

samples.

L3

Sediment basin

discharge quality

limit (suspended

solids) not

achieved.

M6

No monitoring

of discharge

volumes from

leachate

storage tank

were provided.

M 2.1

No samples were

taken for the

upstream and

downstream

monitoring

locations (EPA

Sampling Points 8

and 9), instead of

the required 2

samples.

L1

Discharge of

leachate over 4

week period.

Page 129: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 95

M 2.1

Only 1 sample

was taken at the

surface water

treatment wetland

(EPA Sampling

Point 2) instead of

the required 5

monitoring

samples.

Page 130: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 96

APPENDIX 5: ANNUAL RETURN

Page 131: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 132: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 133: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 134: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 135: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 136: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 137: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 138: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 139: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 140: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 141: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 142: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 143: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 144: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 145: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 146: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 147: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 148: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 149: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 150: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 151: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 152: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 153: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the
Page 154: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council - Raleigh Landfill Environmental Management Plan 97

References

Australian Bureau of Statistics, 2011 Census

NSW EPA, Environmental Guidelines: Solid Waste Landfills

Environmental Management Plan for the Raleigh Waste Management Facility, Jelliffe

Environmental Pty Ltd, 2000

Raleigh Waste Management Centre Polution Incident Response Management Plan,

Robert Bailery Consulting, 2013

Environmental Impact Statement for the Proposed Expansion of the Bellingen Sire

Landfill, Jelliffe Environmental Pty Ltd, 1997

Page 155: Raleigh Waste Management Centre Landfill Environmental ... · review and update the Landfill Environmental Management Plan (“LEMP”) for its Raleigh Waste Management Centre (“the

Bellingen Shire Council

Raleigh Landfill Environmental Management Plan

12 May 2014