Rajivnagar Bit I

download Rajivnagar Bit I

of 68

Transcript of Rajivnagar Bit I

  • 7/28/2019 Rajivnagar Bit I

    1/68

    23.50 Lakhs

    1. Improvement of Existing embankment.

    2. Providing Granular Base Gravel with 66% of Gravel and 34% of Local available sand.

    3. Construction of WBM Gr. II.

    4. CC Payment as per the guidelines of MG NREGS i.e., M-20 Nominal mix

    5. RCC slabs over side drains

    Asst. Engineer Dy. Executive Engineer

    T.W; Echoda T.W; S.D. Echoda

    The estimate cost comes to Rs. 23.50 Lakhs within the Administrative Sanctioned Amount.

    An early technical approval is soliciated.

    Work ID No. :

    SPECIFICATION REPORT

    Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST

    COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P

    Estd. Cost Rs.

    The work for Providing internal roads with CC pavement & CC Drains in SC ST Localities of

    Rajeevnagar Bit-I H/O Gudihathnur G.P. & M of Adilabad (D) has been sanctioned vide Proc. No.

    ___________________________ of the District Collector, Adilabad for an amount of Rs. 23.50 Lakhs

    under the Grant of M.G.N.R.E.G.S. for the year 2011-12.

    The estimate is prepared as per the Guidelines of M.G.N.R.E.G.S. Works on basis of CSSR - 2011-12

    with the following provisions are made in the estimate.

    68 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    2/68

    Sl,

    NoDescription of Item Quantity Rate Per Amount

    1Construction of WBM sigle layer road as

    per abstratct estimate1 2313122.73 Each 2313122.73

    3 Other Provisions 1 35219.42 Each 35219.42

    4 Add L.S For round off 1657.85

    2350000.00

    Asst. Engineer Dy. Executive EngineerT.W; Echoda T.W; S.D. Echoda

    GENERAL ABSTRACT

    Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN

    SC ST COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P

    GRAND TOTAL RUPEES

  • 7/28/2019 Rajivnagar Bit I

    3/68

    Note:

    1. The estimate should be prepared habitation wise.

    2. The entire length of road shall be covered in one estimate.

    4. The specification of MS name board has to be in detail in datasheet.

    A) General InformationUTNOOR

    GUDIHATHNUR

    GUDIHATNUR

    RAJEEVNAGAR

    1) Road connecting from To2) Total length ofthe proposed Road 1075.00 M

    3 )Total drain length proposed: 1105.00 M4) Population being served:

    D) Quarries and Leads

    S.N Name of Name of the uarr Lead inTharnam

    Peddawagu

    Name of Habitation :

    2 Sand for

    Mortor

    90

    1 Sand for

    filling

    33

    RAJEEVNAGAR

    4 19-22mm

    HBG

    Metal

    Boregaongutta 10

    3 Aggregat

    e 20mm

    to 10mm

    Boregaongutta 10

    6 60-63mm

    HBG

    Metal

    Boregaongutta 10

    5 40-45mm

    HBG

    Metal

    Boregaongutta 10

    7 225 mm

    Rough

    stone of

    OTG

    variety

    Boregaongutta 10

    Rural Development Department

    Input Data Sheet for the work

    MGNREGS-AP

    5. The detailed estimate, datasheet and lead statement prepared manually outside the computer should betied to the computer generated estimate.

    Comprehensive Development-Providing Internal Roads with CC Drains in SC ST Colonies

    DCC (Departmental Computer Center) Name :

    Name of Mandal :

    Name of Gram Panchayat ;

  • 7/28/2019 Rajivnagar Bit I

    4/68

    E) Abstract estimate

    Road Work (RW)

    Total tasks

    Sl.NoTask No Task Details Qty Rate Amount

    1 16134

    CCRW01.Engaging Unskilled Labour for earth workexcavation in ordinary soils at site with initial lead &

    initial lift and breaking clods and sectioning for

    formation of embankment (RSSR)

    Cum 403.13 253.75 51146.00

    2 16135

    CCRW02.Engaging unskilled labour for Filling

    foundation with sand but excluding conveyance of

    sand (RSSR)

    Cum 0.00 14.00 0.00

    3 16136

    CCRW03.Cost and conveyance of sand for fil ling

    including all charges but excluding labour charges for

    filling.(CSSR)

    Cum 0.00 469.23 0.00

    4 16137

    CCRW04.Providing plain cement concrete M15 using

    20mm to 12mm Graded HBG crushed Metal with 250

    Kgs of cement per 1cum of concrete, including C/c of

    all materials, curing ,labour charges etc., complete as

    per drawings & tech. specifications Clause 802, 803,

    1202 & 1203 as per clause 800 & 1200 (1) of MORD

    and guidelines For side drains

    Cum 0.00 6333.70 0.00

    5 16138

    CCRW05.RCC M- 20 Nominal mix using 20mm to

    12mm Graded size crushed hard granite metal

    including C/C of all mater ials, taxes ,operational,

    incidental and labour charges such as machine

    mixing, laying concrete, curing etc.,complete but

    excluding cost of steel and its fabrication charges for

    finished item of work for slab over drain

    Cum 0.00 5021.00 0.00

    6 16139

    CCRW06.Supplying, f it ting and placing HYSD bar

    reinforcement in slab over drain complete and

    technical specifications including fabrication charges

    Kgs 0.00 47300.40 0.00

    7 16140

    CCRW07.Supply and collection of well gradedgranular mater ial ( i.e. 66% of gravel having stone

    aggregate of 9.5 mm to 4.75 mm size, and 34% of

    sand of size less than 2.6mm) with CBR not

  • 7/28/2019 Rajivnagar Bit I

    5/68

    8 16141

    CCRW08.Engaging Unskilled Labour for spreading

    the collected well graded granular material and

    sectioning for Sub Base, blindage &

    Shoulders.(RSSR)

    Cum 725.63 12.15 8816.00

    9 16142

    CCRW09.Compaction of collected well graded

    granular soil to OMC using 8-10T Power Road Roller

    to achieve CBR value not

  • 7/28/2019 Rajivnagar Bit I

    6/68

    30 15671 Differential cost of Cement for June as per GO.94 Nos. --

    31 15668 Differential cost of Cement for March as per GO.94 Nos. --

    32 15670 Differential cost of Cement for May as per GO.94 Nos. --

    33 15676

    Differential cost of Cement for November as per

    GO.94Nos. --

    34 15675Differential cost of Cement for October as per GO.94 Nos. --

    35 15674

    Differential cost of Cement for September as per

    GO.94Nos. --

    36 15681 Differential cost of Steel for April as per GO.94 Kgs --

    37 15685 Differential cost of Steel for August as per GO.94 Kgs --

    38 15689Differential cost of Steel for December as per GO.94 Kgs --

    39 15684 Differential cost of Steel for July as per GO.94 Kgs --

    40 15683 Differential cost of Steel for June as per GO.94 Kgs --

    41 15680 Differential cost of Steel for March as per GO.94 Kgs --

    42 15682 Differential cost of Steel for May as per GO.94 Kgs --

    43 15688Differential cost of Steel for November as per GO.94 Kgs --

    44 15687 Differential cost of Steel for October as per GO.94 Kgs --

    45 15686Differential cost of Steel for September as per GO.94 Kgs --

    2348342.15

    Asst. Engineer Dy. Executive Engineer

    T.W; Echoda T.W; S.D. Echoda

    TOTAL

  • 7/28/2019 Rajivnagar Bit I

    7/68

    L B D

    1 2 4 5 6 7 8 9 10

    1

    CCRW01.Engaging Unskilled Labour for earth

    work excavation in ordinary soils at site withinitial lead & initial lift and breaking clods and

    sectioning for formation of embankment

    (RSSR) For Internal Road

    Sri Gangareddy (h) to Sana (h) 1 x 1 51.00

    Sri S.Keshav (h) to Rajanna (h) 1 x 1 50.00

    Sri Balaji (h) to Phoolsingh (h) 1 x 1 102.00

    Smt Urmila (h) to Babu (h) 1 x 1 117.00

    Sri Faizu (h) to Arju (h) 1 x 1 115.00

    Smt Drupathibai (h) to Muthnur road 1 x 1 35.00

    Sri Rajanna (h) to Mohd. Ali (h) 1 x 1 70.00

    Sri Vishwanath (h) to Jai indal (h) 1 x 1 80.00

    Sri Jadi prahlad (h) to Kashinath (h) 1 x 1 75.00

    Sri Babu (h) to Salim (h) 1 x 1 80.00

    Sri Pasha Driver (h) to Bikshapathi (h) 1 x 1 20.00

    Sri G.Srinivas(h) to Suresh (h) 1 x 1 180.00Sri Shivlal (h) to Narhari (h) 1 x 1 100.00

    1075.00 2.50 0.15 403.13 126.88 Cum 51,146

    2

    CCRW02.Engaging unskilled labour for Filling

    foundation with sand but excluding

    conveyance of sand (RSSR)

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    From A to B 1 x 1 0.00

    0.00 2.50 0.15 0.00 14.00 Cum

    CCRW03.Cost and conveyance of sand for

    filling including all charges but excluding labour

    charges for filling.(CSSR) For side Drain

    Rate as per RSSR ( NREGS ) 1 X 1 1105.00 0.90 0.10 0.00 469.23 Cum 0.00

    3

    CCRW07.Supply and collection of well graded

    granular material (i.e. 66% of gravel having

    stone aggregate of 9.5 mm to 4.75 mm size,

    and 34% of sand of size less than 2.6mm)

    with CBR not

  • 7/28/2019 Rajivnagar Bit I

    8/68

    L B D

    1 2 4 5 6 7 8 9 103

    Rate Per AmountNo QtyMeasurmetnsSl

    NoDescription of Item

    Smt Urmila (h) to Babu (h)1 x 1 117.00 2.50 0.15 43.88

    Sri Faizu (h) to Arju (h)1 x 1 115.00 2.50 0.15 43.13

    Smt Drupathibai (h) to Muthnur road1 x 1 35.00 2.50 0.15 13.13

    Sri Rajanna (h) to Mohd. Ali (h)1 x 1 70.00 2.50 0.15 26.25

    Sri Vishwanath (h) to Jai indal (h) 1 x 1 80.00 2.50 0.15 30.00

    Sri Jadi prahlad (h) to Kashinath (h)1 x 1 75.00 2.50 0.15 28.13

    Sri Babu (h) to Salim (h)1 x 1 80.00 2.50 0.15 30.00

    Sri Pasha Driver (h) to Bikshapathi (h)1 x 1 20.00 2.50 0.15 7.50

    Sri G.Srinivas(h) to Suresh (h)1 x 1 180.00 2.50 0.15 67.50

    Sri Shivlal (h) to Narhari (h)1 x 1 100.00 2.50 0.15 37.50

    For Side berms

    Sri Gangareddy (h) to Sana (h)1 x 2 51.00 1.00 0.15 15.30

    Sri S.Keshav (h) to Rajanna (h)

    1 x 2 50.00 1.00 0.15 15.00Sri Balaji (h) to Phoolsingh (h)

    1 x 2 102.00 1.00 0.15 30.60

    Smt Urmila (h) to Babu (h)1 x 2 117.00 1.00 0.15 35.10

    Sri Faizu (h) to Arju (h)1 x 2 115.00 1.00 0.15 34.50

    Smt Drupathibai (h) to Muthnur road1 x 2 35.00 1.00 0.15 10.50

    Sri Rajanna (h) to Mohd. Ali (h)1 x 2 70.00 1.00 0.15 21.00

    Sri Vishwanath (h) to Jai indal (h)1 x 2 80.00 1.00 0.15 24.00

    Sri Jadi prahlad (h) to Kashinath (h)1 x 2 75.00 1.00 0.15 22.50

    Sri Babu (h) to Salim (h)1 x 2 80.00 1.00 0.15 24.00

    Sri Pasha Driver (h) to Bikshapathi (h)1 x 2 20.00 1.00 0.15 6.00

    Sri G.Srinivas(h) to Suresh (h)1 x 2 180.00 1.00 0.15 54.00

    Sri Shivlal (h) to Narhari (h)1 x 2 100.00 1.00 0.15 30.00

    2150.00 725.63 443.01 Cum 321,45

    4

    CCRW08.Engaging Unskilled Labour for

    spreading the collected well graded granular

    material and sectioning for Sub Base, blindage

    & Shoulders.(RSSR)

    725.63 12.15 Cum 8,81

    5

    CCRW09.Compaction of collected well graded

    granular soil to OMC using 8-10T Power Road

    Roller to achieve CBR value not

  • 7/28/2019 Rajivnagar Bit I

    9/68

    L B D

    1 2 4 5 6 7 8 9 103

    Rate Per AmountNo QtyMeasurmetnsSl

    NoDescription of Item

    Sri Jadi prahlad (h) to Kashinath (h) 1 x 1 75.00 2.50 0.15 28.13

    Sri Babu (h) to Salim (h) 1 x 1 80.00 2.50 0.15 30.00

    Sri Pasha Driver (h) to Bikshapathi (h) 1 x 1 20.00 2.50 0.15 7.50

    Sri G.Srinivas(h) to Suresh (h) 1 x 1 180.00 2.50 0.15 67.50

    Sri Shivlal (h) to Narhari (h) 1 x 1 100.00 2.50 0.15 37.50

    403.13 93.64 Cum 37,74

    6

    CCRW10.Supply and collection of mixer ofstone aggregates having 50% of 60-63mm

    HBG metal , 46% of 40-45mm HBG metal and

    4% of 19-22mm HBG metal including cost

    ,conveyance, loading, unloading and stacking

    to departmental gauge for pre measurements

    for WBM Grade-II surfaceas per MORD

    standards( 100mm Loose thick)(CSSR)

    Sri Gangareddy (h) to Sana (h) 1 x 1 51.00 2.50 0.075 9.56

    Sri S.Keshav (h) to Rajanna (h) 1 x 1 50.00 2.50 0.075 9.38

    Sri Balaji (h) to Phoolsingh (h) 1 x 1 102.00 2.50 0.075 19.13

    Smt Urmila (h) to Babu (h) 1 x 1 117.00 2.50 0.075 21.94

    Sri Faizu (h) to Arju (h) 1 x 1 115.00 2.50 0.075 21.56

    Smt Drupathibai (h) to Muthnur road 1 x 1 35.00 2.50 0.075 6.56

    Sri Rajanna (h) to Mohd. Ali (h) 1 x 1 70.00 2.50 0.075 13.13

    Sri Vishwanath (h) to Jai indal (h) 1 x 1 80.00 2.50 0.075 15.00

    Sri Jadi prahlad (h) to Kashinath (h) 1 x 1 75.00 2.50 0.075 14.06

    Sri Babu (h) to Salim (h) 1 x 1 80.00 2.50 0.075 15.00

    Sri Pasha Driver (h) to Bikshapathi (h) 1 x 1 20.00 2.50 0.075 3.75

    Sri G.Srinivas(h) to Suresh (h) 1 x 1 180.00 2.50 0.075 33.75

    Sri Shivlal (h) to Narhari (h) 1 x 1 100.00 2.50 0.075 18.75

    1075.00 201.56 959.17 Cum 193,33

    7

    CCRW11.Spreading the collected mixer of

    stone aggregates in uniform thicknesses and

    good gravel for blindage, hand packing and

    rolling with 8-10T Power Road Roller in stages

    to proper grade and camber with required

    waterings and keeping the rolled surface wet

    for a period of 15 days includingbrooming.(100mm loose to 75mm compacted)

    (CSSR)

    Sri Gangareddy (h) to Sana (h) 1 x 1 51.00 2.50 0.075 9.56

    Sri S.Keshav (h) to Rajanna (h) 1 x 1 50.00 2.50 0.075 9.38

    Sri Balaji (h) to Phoolsingh (h) 1 x 1 102.00 2.50 0.075 19.13

    Smt Urmila (h) to Babu (h) 1 x 1 117.00 2.50 0.075 21.94

    Sri Faizu (h) to Arju (h) 1 x 1 115.00 2.50 0.075 21.56

    Smt Drupathibai (h) to Muthnur road 1 x 1 35.00 2.50 0.075 6.56

    Sri Rajanna (h) to Mohd. Ali (h) 1 x 1 70.00 2.50 0.075 13.13

    Sri Vishwanath (h) to Jai indal (h) 1 x 1 80.00 2.50 0.075 15.00

    Sri Jadi prahlad (h) to Kashinath (h) 1 x 1 75.00 2.50 0.075 14.06

    Sri Babu (h) to Salim (h) 1 x 1 80.00 2.50 0.075 15.00

    Sri Pasha Driver (h) to Bikshapathi (h) 1 x 1 20.00 2.50 0.075 3.75

    Sri G.Srinivas(h) to Suresh (h) 1 x 1 180.00 2.50 0.075 33.75

    Sri Shivlal (h) to Narhari (h) 1 x 1 100.00 2.50 0.075 18.75

    1075.00 201.56 326.09 Cum 65,72

    8

    CCRW12.Construction of un-reinforced, dowel

    jointed at expansion and construction joint

    only, PCC pavement thickness as per design

    over a prepared sub base using M20 grade,

    coarse and fine aggregates confirming to IS

    383including all labour charges etc.

    complete(CSSR)

    Sri Gangareddy (h) to Sana (h) 1 x 1 51.00 2.50 0.125 15.94

    P 9 137665296 l ffi

  • 7/28/2019 Rajivnagar Bit I

    10/68

    L B D

    1 2 4 5 6 7 8 9 103

    Rate Per AmountNo QtyMeasurmetnsSl

    NoDescription of Item

    Sri S.Keshav (h) to Rajanna (h) 1 x 1 50.00 2.50 0.125 15.63

    Sri Balaji (h) to Phoolsingh (h) 1 x 1 102.00 2.50 0.125 31.88

    Smt Urmila (h) to Babu (h) 1 x 1 117.00 2.50 0.125 36.56

    Sri Faizu (h) to Arju (h) 1 x 1 115.00 2.50 0.125 35.94

    Smt Drupathibai (h) to Muthnur road 1 x 1 35.00 2.50 0.125 10.94

    Sri Rajanna (h) to Mohd. Ali (h) 1 x 1 70.00 2.50 0.125 21.88

    Sri Vishwanath (h) to Jai indal (h) 1 x 1 80.00 2.50 0.125 25.00

    Sri Jadi prahlad (h) to Kashinath (h) 1 x 1 75.00 2.50 0.125 23.44Sri Babu (h) to Salim (h) 1 x 1 80.00 2.50 0.125 25.00

    Sri Pasha Driver (h) to Bikshapathi (h) 1 x 1 20.00 2.50 0.125 6.25

    Sri G.Srinivas(h) to Suresh (h) 1 x 1 180.00 2.50 0.125 56.25

    Sri Shivlal (h) to Narhari (h) 1 x 1 100.00 2.50 0.125 31.25

    1075.00 335.94 4815.70 Cum 1,617,77

    9

    CCRW13.Providing Mastic Pads of size

    .6mX1.2 M of 12.7mm thick as per CSSR

    ( 2.50 X 0.125 = 0.3125 ) = 0.3125 X 1225/10

    From A to B 1 x 107.5 2.50 - 0.125 33.59 340.00 Each 11,42

    10CCRW14.Supply and fixing of KM stones

    including painting and required letteringFrom A to B 1 x 1 - - - 1.00 0.00 Each

    11CCRW15.Supply and fixing of HM stones

    including painting and required lettering

    From A to B 1 x 2 - - - 2.00 0.00 Each

    12

    CCRW16.Supply and fixing of MS name board

    of size 2feet.6inch x4feet including painting

    and required lettering

    From A to B 1 x 1 - - - 1.00 5700.00 Each 5,70

    2,313,12

    13

    CCRW01.Engaging Unskilled Labour for earth

    work excavation in ordinary soils at site with

    initial lead & initial lift and breaking clods and

    sectioning for formation of embankment

    (RSSR)

    Sri Gangareddy (h) to Sana (h) 1 X 2 51.00

    Sri S.Keshav (h) to Rajanna (h) 1 X 2 50.00

    Sri Balaji (h) to Phoolsingh (h) 1 X 2 0.00

    Sri J.Bheemrao (h) to Pawar Bheemsingh (h) 1 X 2 115.00

    Smt Urmila (h) to Babu (h) 1 X 2 117.00

    Sri Faizu (h) to Arju (h) 1 X 2 115.00

    Smt Drupathibai (h) to Muthnur road 1 X 2 90.00

    Sri Rajanna (h) to Mohd. Ali (h) 1 X 2 0.00

    Sri Vishwanath (h) to Jai indal (h) 1 X 2 30.00

    Sri Kantharao (h) to Niyaz (h) 1 X 2 52.00

    Sri Jadi prahlad (h) to Kashinath (h) 1 X 2 75.00

    Sri Babu (h) to Salim (h) 1 X 2 80.00

    Sri Pasha Driver (h) to Bikshapathi (h) 1 X 2 0.00

    Sri G.Srinivas(h) to Suresh (h) 1 X 2 180.00

    FOR CC SIDE DRAINS

    Sub Total

    P 10 137665296 l ffi

  • 7/28/2019 Rajivnagar Bit I

    11/68

    L B D

    1 2 4 5 6 7 8 9 103

    Rate Per AmouNo QtyMeasurmetnsSl

    NoDescription of Item

    Sri Shivlal (h) to Narhari (h) 1 X 2 0.00

    Sri Hanmanth (h) to Ankush (h) 1 X 2 100.00

    Sri MGM School to Paithanya Uttam (h) 1 X 2 50.00

    1105.00 0.90 0.60 0.00 126.88 Cum

    14

    CCRW02.Engaging unskilled labour for Filling

    foundation with sand but excluding

    conveyance of sand (RSSR)

    Rate as per RSSR ( NREGS ) 1 X 1 1105.00 0.90 0.10 0.00 14.00 Cum

    15

    CCRW04.Providing plain cement concrete

    M15 using 20mm to 12mm Graded HBG

    crushed Metal with 250 Kgs of cement per

    1cum of concrete, including C/c of all

    materials, curing ,labour charges etc.,

    complete as per drawings & tech.

    specifications Clause 802, 803, 1202 & 1203

    as per clause 800 & 1200 (1) of MORD and

    guidelines For side drains

    Bottom of Drain 1 X 2 1105.00 0.75 0.10 0.00

    Sides Walls of drain 1 X 2 1105.00 0.225 0.600 0.00

    1 X 2 1105.00 0.175 0.600 0.00

    0.00 6333.70 Cum

    16

    CCRW05.RCC M- 20 Nominal mix using 20mm to

    12mm Graded size crushed hard granite metal

    including C/C of all materials, taxes ,operational,

    incidental and labour charges such as machine

    mixing, laying concrete, curing etc.,complete but

    excluding cost of steel and its fabrication charges for

    finished item of work for slab over drain

    1 x 56 2.50 0.65 0.10 0.00 5021.00

    17

    CCRW06.Supplying, fitting and placing HYSD

    bar reinforcement in slab over drain complete

    and technical specifications including

    fabrication charges

    1 x 1.683 0.00 47300.40 MT

    18 CCRW17.OP04.Seigniorage charges of gravel 478.91 22.00 10,

    19CCRW18.OP02.Seignorage charges on

    quantity of metal296.30 50.00 14,

    20CCRW19.OP03.Seignorage charges on

    quantity of sand246.71 40.00 9,

    21CCRW20.OP05.Seignorage charges on

    quantity of stone0.00 50.00

    22 CCRW21.OP01.VAT @ 4% 1.00 0.00

    23 CCRW22.OP06.Q.C. charges @ 0.50% 1.00 0.00

    24CCRW23.Provision for price escalation

    cement and steel1.00 0.00

    35

    25Differential cost of Cement for April as per

    GO.94

    26Differential cost of Cement for August as per

    GO.94

    27Differential cost of Cement for December as

    per GO.94

    28Differential cost of Cement for February as per

    GO.94

    29Differential cost of Cement for January as per

    GO.94

    Sub-Total

    Sub-Total

  • 7/28/2019 Rajivnagar Bit I

    12/68

    L B D

    1 2 4 5 6 7 8 9 103

    Rate Per AmountNo QtyMeasurmetnsSl

    NoDescription of Item

    30Differential cost of Cement for July as per

    GO.94

    31Differential cost of Cement for June as per

    GO.94

    32Differential cost of Cement for March as per

    GO.94

    33Differential cost of Cement for May as per

    GO.9434

    Differential cost of Cement for November as

    per GO.94

    35Differential cost of Cement for October as per

    GO.94

    36Differential cost of Cement for September as

    per GO.94

    37 Differential cost of Steel for April as per GO.94

    38Differential cost of Steel for August as per

    GO.94

    39Differential cost of Steel for December as per

    GO.94

    40 Differential cost of Steel for July as per GO.94

    41 Differential cost of Steel for June as per GO.94

    42Differential cost of Steel for March as per

    GO.94

    43 Differential cost of Steel for May as per GO.94

    44Differential cost of Steel for November as per

    GO.94

    45Differential cost of Steel for October as per

    GO.94

    46Differential cost of Steel for September as per

    GO.94

    2,348,342

    23.50

    Asst. Engineer Dy. Executive Engineer

    T.W; ECHODA T.W; S.D. ECHODA

    GRAND TOTAL

    Say Rs. (in Lakhs )

    Page 12 137665296.xls.ms offic

  • 7/28/2019 Rajivnagar Bit I

    13/68

    GP GUDIHATNUR HB M

    1 2 3 4 5 6 7 8 9 10

    1 Coarse Sand for mortor Peddawagu 90 662.02 279.50 0 0 0 941.52

    2 Coarse Sand for filling Tharnam 33 264.73 204.50 0 0 0 469.23

    3 Fine sand Pendalwada 90 662.02 279.50 0 0 0 941.52

    4 Morrum / 9.5 - 4.75mm Kupti 24 193.66 52.50 0 0 0 246.16

    56mm M/c HBG MetalNominal size (Granite,

    Dolamite &Trap variety)

    Boregaongutta 10 77.63 419.30 70 104.83 -8.70 663.06

    610mm M/c HBG Metal

    Nominal size -do-Boregaongutta 10 77.63 551.30 70 137.83 -8.70 828.06

    712-14mm M/c HBG Metal

    Nominal size -do-Boregaongutta 10 77.63 681.30 70 170.33 -8.70 990.56

    820mm M/c HBG Metal

    Nominal size -do-Boregaongutta 10 77.63 835.30 70 208.83 -8.70 1183.06

    940mm M/c HBG Metal

    Nominal size -do-Boregaongutta 10 77.63 491.30 70 122.83 -8.70 753.06

    1060-63mm metal IRC and

    morth HBG metalBoregaongutta 10 77.63 351.30 70 0 0 498.93

    1140-45mm metal IRC and

    morth HBG metalBoregaongutta 10 77.63 491.30 70 122.83 0 761.76

    1225-27mm metal IRC and

    morth HBG metal Boregaongutta 10 77.63 821.30 70 205.33 -8.70 1165.56

    Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST COLONIES IN RAJEEVNAGAR BIT - I H/O G

    L E A D C H A R T

    Deductfrom

    Conveya

    nce

    USl.No.

    Machinecrushing

    charges@

    25%

    Total CostConvenceCharges

    Lead inKm

    GUD

    InitialCostincluding

    Seigionarage

    Charges

    Description Source of Material

    BlasteringC

    harges

    RAJEEVNAGAR

    13

  • 7/28/2019 Rajivnagar Bit I

    14/68

    Deductfrom

    Conveyance

    Sl.

    No.

    Machinecrushing

    charges@2

    5%

    Total CostConvence

    Charges

    Lead in

    Km

    InitialCostincluding

    SeigionarageCharges

    Description Source of Material

    BlasteringCharges

    1319-22mm metal IRC and

    morth HBG metalBoregaongutta 10 77.63 941.30 70 235.33 -8.70 1315.56

    1412.-14mm metal IRC and

    morth HBG metalBoregaongutta 10 77.63 681.30 70 170.33 -8.70 990.56

    159.50-11.20mm metal IRC

    and morth HBG metalBoregaongutta 10 77.63 551.30 70 137.83 -8.70 828.06

    165-7mm metal IRC and

    morth HBG metalBoregaongutta 10 77.63 421.30 70 105.33 -8.70 665.56

    172.36-5mm metal IRC and

    morth HBG metalBoregaongutta 10 77.63 251.30 70 62.83 -8.70 453.06

    18

    2.36mm & below size (HBG

    stone chips ) metal IRC and

    morth HBG metal

    Kupti 24 194.67 227.30 70 56.83 -8.70 540.10

    19 65mm IRC and morth OTG Boregaongutta 10 77.63 113.30 70 0 0 260.93

    20 40mm IRC and morth OTG Boregaongutta 10 77.63 137.30 70 34.33 -8.70 310.56

    21Field picked metal

    unbrocken of 25mm sizeBoregaongutta 10 77.63 37.60 70 0 0 185.23

    22 HYSD Steel (FE415) Adilabad 1 0 41000.00 0 0 0 41000.00

    23 Cement Adilabad 1 0 5500.00 0 0 0 5500.00

    24RCC Hume Pipes 900mm

    diaNirmal 60 284.08 5250.60 0 0 0 5534.68

    14

  • 7/28/2019 Rajivnagar Bit I

    15/68

    Deductfrom

    Conveyance

    Sl.

    No.

    Machinecrushing

    charges@2

    5%

    Total CostConvence

    Charges

    Lead in

    Km

    InitialCostincluding

    SeigionarageCharges

    Description Source of Material

    BlasteringCharges

    CERTIFICATES:-

    1

    2

    3

    Asst. Engineer Dy .Executive Engineer Executive Engineer

    TW Echoda TW SD Echoda TW Division Utno

    Certified that the quarry requries blasting for RR, CRS, 6mm, 10mm, 12mm, 20mm & 40mm Metal

    Certified that the 40mm, 20mm, 12mm, 10mm, 6mm Metal requires Machine Crushing

    Certified that the above leads are true and correct to the best of my knowledge

    15

  • 7/28/2019 Rajivnagar Bit I

    16/68

    16

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    1 2 3 4 5 6 7

    1

    CCRW01.Engaging Unskilled Labour for earthwork excavation in ordinary soils at site with

    initial lead & initial lift and breaking clods and

    sectioning for formation of embankment

    (RSSR)

    Rate as per RSSR ( NREGS ) Cum 1.00 72.50 72.50

    Add 75% for narrow excavation 54.38

    126.88

    2

    CCRW02.Engaging unskilled labour for Filling

    foundation with sand but excluding

    conveyance of sand (RSSR)

    Material

    Add For Re Filling Charges Cum 1.00 14.00 14.00

    Rate per Cum 14.00

    3

    CCRW03.Cost and conveyance of sand for

    filling including all charges but excluding

    labour charges for filling.(CSSR)

    As per lead chart Cum 1.00 469.23 469.23

    Rate per Cum 469.23

    4

    CCRW04.Providing plain cement concreteM15 using 20mm to 12mm Graded HBG

    crushed Metal with 250 Kgs of cement per

    1cum of concrete, including C/c of all

    materials, curing ,labour charges etc.,

    complete as per drawings & tech.

    specifications Clause 802, 803, 1202 & 1203

    as per clause 800 & 1200 (1) of MORD and

    guidelines For side drains

    Unit = cum

    P.C.C grade M 15

    Nominal mix (1:2.5:5) using CC Mixer(MORD)

    Unit = cum

    (a) Material

    Cement 0.275 5500.00 1512.50

    Coarse sand cum 0.480 941.52 451.93

    20 mm aggregate cum 0.607 1183.06 718.11

    DATA SHEET C.D Work

    Name of work :- PROVIDING INTERNAL ROADS WITH CC PAVEMENT & CC DRAINS IN SC ST

    COLONIES IN RAJEEVNAGAR BIT - I H/O GUDIHATHNUR G.P

    Page 16 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    17/68

    17

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    12 mm aggregate cum 0.313 990.56 310.04

    (b) Labour

    Mate day 0.00 0.00 0.00

    Mason (1st Class) day 0.100 445.31 44.53

    Mazdoor (Unskilled) day 1.390 335.94 466.95(c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.400 5500.00 2200.00

    5704.07

    (d) Formwork @ 10% on cost of material,

    labour and machinery (a+b+c)10% 5704.07 570.41

    6274.48

    e) Overheads & Contractors Profit on

    (a+b+c+d)0 6274.48 0.00

    Sub-Total : 6274.48f) Seigniorage charges (i) Sand cum 0.48 40.00 19.20

    (ii) Aggregate cum 0.8 50.00 40.00

    6333.68

    g) Rate per cum 6333.70

    5

    CCRW05.RCC M- 20 Nominal mix using 20mm to

    12mm Graded size crushed hard granite metal

    including C/C of all materials, taxes ,operational,

    incidental and labour charges such as machine

    mixing, laying concrete, curing etc.,complete but

    excluding cost of steel and its fabrication charges

    for finished item of work for slab over drain

    R.C.C grade M 20 Nominal mix (MORD)

    (Nominal mix) using 20mm graded metal

    (MORD)

    Unit = cum

    (a) Material

    Cement t 0.330 5500.00 1815.00

    Coarse sand cum 0.45 941.52 423.68

    20 mm aggregate cum 0.54 1183.06 638.85

    12 mm aggregate cum 0.36 990.56 356.60

    (b) Labour

    Mate day 0.00 0.00 0.00

    Mason (1st Class) day 0.10 445.31 44.53

    Mazdoor (Unskilled) day 1.39 335.94 466.95

    Page 17 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    18/68

    18

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    (c) Machinery

    Concrete mixer 0.4/0.28 cum capacity hour 0.40 345.00 138.00

    Generator 33 KVA hour 0.40 620.00 248.00

    4131.62

    d) Formwork @ 20% on cost of material,

    labour and machinery (a+b+c) 20% 4131.62 826.32

    4957.94

    e) Overheads & Contractors Profit on

    (a+b+c+d)0 4957.94 0.00

    Sub-Total : 4957.94

    f) Seigniorage charges (i) Sand cum 0.45 40.00 18.00

    (ii) Aggregate cum 0.9 50.00 45.00

    5020.94

    g) Rate per cum 5021.00

    6

    CCRW06.Supplying, fitting and placing HYSD

    bar reinforcement in slab over drain complete

    and technical specifications including

    fabrication charges

    Unit = t

    (a) Material

    HYSD bars including 5 per cent overlaps

    and wastaget 1.050 41000.00 43050.00

    Binding wire kg 8.000 55.00 440.00

    (b) Labour for cutting, bending,shifting to site, tying, and placing in

    position

    Mate day 0.000 0.00 0.00

    Blacksmith / Rod binder day 3.000 325.00 975.00

    Mazdoor (Unskilled) day 8.440 335.94 2835.31

    Sub-Total : 47300.31

    c) Overheads & Contractors Profit 0.00% 47300.31 0.00

    Rate per tonn = a+b+c 47300.31

    Rate per tonne 47300.40

    Page 18 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    19/68

    19

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    7

    CCRW07.Supply and collection of well graded

    granular material (i.e. 66% of gravel having

    stone aggregate of 9.5 mm to 4.75 mm size,

    and 34% of sand of size less than 2.6mm)

    with CBR not

  • 7/28/2019 Rajivnagar Bit I

    20/68

    20

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    By manual Means

    Taking out put =360 Cum

    Material

    Cost of material

    Cost of 60 - 63 mm HBG metal ( 50% 435.60

    )Cum 264.60 498.93 132016.88

    Cost of 40 - 45 mm HBG metal (46%435.60)Cum 243.43 761.76 185434.02

    Cost of 19 - 22 mm HBG metal ( 4% 435.60 )Cum 21.17 1315.56 27850.30

    Rate Per 360 Cum 345301.20

    Rate Per 1 Cum 959.17

    11

    CCRW11.Spreading the collected mixer of

    stone aggregates in uniform thicknesses and

    good gravel for blindage, hand packing and

    rolling with 8-10T Power Road Roller in stages

    to proper grade and camber with required

    waterings and keeping the rolled surface wet

    for a period of 15 days including

    brooming.(100mm loose to 75mm compacted)

    (CSSR)

    By Manual Means

    Taking out put =360 Cum

    Labour

    Mate day 10.08 325.00 3276.00

    Mazdoor ( Skilled ) day 2.00 325.00 650.00

    Mazdoor ( Un Skilled ) day 250.00 268.75 67187.50

    Machinery

    Three Wheel 80 -100 KN static roller at

    10cum per hourhour 45.00 844.40 37998.00

    Water tanker 6KL capacity hour 24.00 345.00 8280.00Rate Per 360 Cum 117391.50

    Rate Per 1 Cum 326.09

    12

    CCRW12.Construction of un-reinforced,

    dowel jointed at expansion and construction

    joint only, PCC pavement thickness as per

    design over a prepared sub base using M20

    grade, coarse and fine aggregates confirming

    to IS 383including all labour charges etc.

    complete(CSSR)

    Unit = cumTaking output = 75 cum (172.50 t)

    (100 x 3.75 x 0.200)

    a)Labour

    Mate day -

    Mason (1st class) day 5.00 445.31 2226.56

    Mason (2nd class) day 5.00 406.25 2031.25

    Mazdoor (Unskilled) day 150.00 268.75 40312.50

    Mazdoor (Skilled) day 6.00 325.00 1950.00

    Cement Concrete Pavement

    Construction of un-reinforced, dowel jointed at expansion

    Page 20 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    21/68

    21

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    Surveyor day 2.00 500.00 1000.00

    Mazdoor (Semi-Skilled) day 6.00 268.75 1612.50

    Blacksmith for cutting of dowel bars including

    removal of burrs, fabrications & fixing of dowel

    bars.

    day 1.00 406.25 406.25

    b) Machinery

    Concrete mixer 0.28 / 0.4 cum capacity (6

    mixers) with weigh batcher and suitable

    capacity calibrated water tank

    hour 36.00 248.40 8942.40

    Needle vibrator 40mm (petrol) hour 9.00 120.40 1083.60

    Screed vibrator hour 9.00 40.00 360.00

    Plate vibrator hour 9.00 40.00 360.00

    Concrete joint cutting machine for initial & final

    cutshour 4.00

    Water tanker 6 kl capacity hour 5.00 345.00 1725.00

    Air Compressor (1 hour initial + 1 hour final) hour 2.00 370.00 740.00

    c) Material

    Crushed stone coarse aggregates, grading

    will be as per Clause 1501.2.4.1 (Table

    1500.1) of specifications @ 0.90 cum/cum of

    concrete (25 mm & 12.5 mm blending)

    cum 67.50 1241.75 83818.13

    Sand as per IS:383 and conforming to Clause

    1500.2.4.2 @ 0.45 cum/cum of concretecum 33.75 941.52 31776.30

    Cement @ 310 kg/cum of concrete t 26.25 5500.00 144375.00

    Polythene sheet 125 micron sqm 412.50 25.00 10312.50

    Mild steel dowel bar 25 mm dia of grade S

    240. 500 mm long 20 Nos. at culvert/bridge

    slab and at construction joint including 5 per

    cent wastage.

    (4 x 20 x 0.500) + 5 per cent wastage = 42 m

    @ 2.80 kg per m = 117.6 kg.t 0.118 941.52 110.72

    Bitumen primer @ 200 ml per joint for 23joints t 0.005 37205.74 186.03

    Bituminous sealant 800 ml per joint for 23

    jointslitre 19.00 55.00 1045.00

    Jute rope 12 mm dia including 5 per cent

    wastagem 90.00 10.00 900.00

    Debonding strips 3.75 m (length) x 10 mm

    (width) x 5 mm (thick) cut-out of rubber filler

    board or similar material including 5 per cent

    wastage

    m 90.00 10.00 900.00

    Polythene sheathing, covering 2/3rd dowel

    bars (20x23) and tight fit including 5 per cent

    wastage

    No. 483.00 1.00 483.00

    Plasticizer 0.5 per cent by weight of cement(M.180, P.336)

    litre 122.00 54.00 6588.00

    Curing compound (if used) @ 0.33 litre per

    sqmlitre 131.25 0.00 0.00

    Water for curing kl 18.00 70.00 1260.00

    Joint filler board 20 mm thick as per IS:1838

    (4 x 3.75 x 0.200 = 3 sqm)sqm 3.00 520.00 1560.00

    (a+b+c) 346064.74

    d) Formwork @ 3% of (a+b+c) 3% 346064.74 10381.94

    Page 21 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    22/68

    22

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    356446.68

    e) Overheads & Contractors Profit of

    (a+b+c+d)0.00 356446.68 0.00

    Sub-Total :: 356446.68

    f)Seigniorage charges (i) Sand cum 33.75 40.00 1350.00

    (ii) Metal cum 67.50 50.00 3375.00

    361171.68

    g) Rate per cum = (a+b+c+d+e+f)/75 4815.62

    4815.70

    13CCRW13.Providing Mastic Pads of size

    .6mX1.2 M of 12.7mm thick as per CSSRSq.m 1.00 340.00 340.00

    14CCRW14.Supply and fixing of KM stones

    including painting and required letteringeach

    15CCRW15.Supply and fixing of HM stones

    including painting and required letteringeach

    16

    CCRW16.Supply and fixing of MS name

    board of size 2feet.6inch x4feet including

    painting and required lettering

    each 1.00 5700.00 5700.00

    17 CCRW17.OP04.Seigniorage charges ofgravel Cum

    18CCRW18.OP02.Seignorage charges on

    quantity of metalCum

    19CCRW19.OP03.Seignorage charges on

    quantity of sandCum

    20CCRW20.OP05.Seignorage charges on

    quantity of stoneCum

    21 CCRW21.OP01.VAT @ 4% Rs.

    22 CCRW22.OP06.Q.C. charges @ 0.50% Rs.

    23CCRW23.Provision for price escalation

    cement and steelRs.

    24Differential cost of Cement for April as per

    GO.94Nos.

    25Differential cost of Cement for August as per

    GO.94Nos.

    26Differential cost of Cement for December as

    per GO.94Nos.

    27Differential cost of Cement for February as

    per GO.94Nos.

    28

    Differential cost of Cement for January as per

    GO.94 Nos.

    29Differential cost of Cement for July as per

    GO.94Nos.

    30Differential cost of Cement for June as per

    GO.94Nos.

    31Differential cost of Cement for March as per

    GO.94Nos.

    Page 22 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    23/68

    23

    Sl NoRef to MORD

    specificationsDescription of Item Unit Qty Rate Amount

    32Differential cost of Cement for May as per

    GO.94Nos.

    33Differential cost of Cement for November as

    per GO.94Nos.

    34Differential cost of Cement for October as per

    GO.94Nos.

    35Differential cost of Cement for September as

    per GO.94Nos.

    36Differential cost of Steel for April as per

    GO.94Kgs

    37Differential cost of Steel for August as per

    GO.94Kgs

    38Differential cost of Steel for December as per

    GO.94Kgs

    39 Differential cost of Steel for July as per GO.94 Kgs

    40Differential cost of Steel for June as per

    GO.94Kgs

    41Differential cost of Steel for March as per

    GO.94Kgs

    42 Differential cost of Steel for May as per GO.94 Kgs

    43Differential cost of Steel for November as per

    GO.94Kgs

    44Differential cost of Steel for October as per

    GO.94Kgs

    45Differential cost of Steel for September as per

    GO.94Kgs

    Asst. Engineer Dy. Executive Engineer

    T.W; ECHODA T.W; S.D. ECHODA

    Page 23 137665296.xls.ms_office

  • 7/28/2019 Rajivnagar Bit I

    24/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    1 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00 1 0.00

    2 2 8.36 2 7.95 2 12.52 2 11.04 2 4.69 2 4.69

    3 3 18.11 3 19.12 3 27.12 3 29.73 3 12.63 3 10.17

    4 4 26.47 4 27.48 4 39.65 4 42.02 4 17.86 4 14.87

    5 5 34.82 5 35.83 5 52.17 5 54.31 5 23.08 5 19.56

    6 6 43.18 6 44.19 6 64.69 6 66.60 6 28.30 6 24.26

    7 7 51.54 7 52.55 7 77.21 7 78.89 7 33.52 7 28.96

    8 8 59.90 8 60.91 8 89.73 8 91.18 8 38.74 8 33.66

    9 9 68.26 9 69.27 9 102.25 9 103.47 9 43.96 9 38.36

    1010

    76.6210

    77.6310

    114.7710

    115.7610

    49.1810

    43.06

    11 11 84.98 11 85.99 11 127.29 11 128.05 11 54.40 11 47.76

    12 12 93.34 12 94.35 12 139.81 12 140.34 12 59.62 12 52.46

    13 13 101.70 13 102.71 13 152.33 13 152.63 13 64.84 13 57.16

    14 14 110.06 14 111.07 14 164.85 14 164.92 14 70.06 14 61.86

    15 15 118.42 15 119.43 15 177.37 15 177.21 15 75.28 15 66.56

    16 16 126.78 16 127.79 16 189.89 16 189.50 16 80.50 16 71.26

    17 17 135.14 17 136.15 17 202.41 17 201.79 17 85.72 17 75.96

    18 18 143.50 18 144.51 18 214.93 18 214.08 18 90.94 18 80.66

    19 19 151.86 19 152.87 19 227.45 19 226.37 19 96.16 19 85.36

    20 20 160.22 20 161.23 20 239.97 20 238.66 20 101.38 20 90.06

    21 21 168.58 21 169.59 21 252.49 21 250.95 21 106.60 21 94.76

    22 22 176.94 22 177.95 22 265.01 22 263.24 22 111.82 22 99.4623 23 185.30 23 186.31 23 277.53 23 275.53 23 117.04 23 104.16

    24 24 193.66 24 194.67 24 290.05 24 287.82 24 122.26 24 108.86

    25 25 202.02 25 203.03 25 302.57 25 300.11 25 127.48 25 113.56

    26 26 210.38 26 211.39 26 315.09 26 312.40 26 132.70 26 118.26

    27 27 218.74 27 219.75 27 327.61 27 324.69 27 137.92 27 122.96

    28 28 227.10 28 228.11 28 340.13 28 336.98 28 143.14 28 127.66

    29 29 235.46 29 236.47 29 352.65 29 349.27 29 148.36 29 132.36

    30 30 243.82 30 244.83 30 365.17 30 361.56 30 153.58 30 137.06

    31 31 250.79 31 251.80 31 375.61 31 371.80 31 157.93 31 140.97

    32 32 257.76 32 258.77 32 386.05 32 382.04 32 162.28 32 144.88

    33 33 264.73 33 265.74 33 396.49 33 392.28 33 166.63 33 148.7934 34 271.70 34 272.71 34 406.93 34 402.52 34 170.98 34 152.70

    35 35 278.67 35 279.68 35 417.37 35 412.76 35 175.33 35 156.61

    36 36 285.64 36 286.65 36 427.81 36 423.00 36 179.68 36 160.52

    37 37 292.61 37 293.62 37 438.25 37 433.24 37 184.03 37 164.43

    38 38 299.58 38 300.59 38 448.69 38 443.48 38 188.38 38 168.34

    39 39 306.55 39 307.56 39 459.13 39 453.72 39 192.73 39 172.25

    40 40 313.52 40 314.53 40 469.57 40 463.96 40 197.08 40 176.16

    41 41 320.49 41 321.50 41 480.01 41 474.20 41 201.43 41 180.07

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    CONVEYANCE CHARGES PAGE NO : 24 of 68

  • 7/28/2019 Rajivnagar Bit I

    25/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    42 42 327.46 42 328.47 42 490.45 42 484.44 42 205.78 42 183.98

    43 43 334.43 43 335.44 43 500.89 43 494.68 43 210.13 43 187.89

    44 44 341.40 44 342.41 44 511.33 44 504.92 44 214.48 44 191.80

    45 45 348.37 45 349.38 45 521.77 45 515.16 45 218.83 45 195.71

    46 46 355.34 46 356.35 46 532.21 46 525.40 46 223.18 46 199.62

    47 47 362.31 47 363.32 47 542.65 47 535.64 47 227.53 47 203.53

    48 48 369.28 48 370.29 48 553.09 48 545.88 48 231.88 48 207.44

    49 49 376.25 49 377.26 49 563.53 49 556.12 49 236.23 49 211.35

    50 50 383.22 50 384.23 50 573.97 50 566.36 50 240.58 50 215.26

    5151

    390.1951

    391.2051

    584.4151

    576.6051

    244.9351

    219.17

    52 52 397.16 52 398.17 52 594.85 52 586.84 52 249.28 52 223.08

    53 53 404.13 53 405.14 53 605.29 53 597.08 53 253.63 53 226.99

    54 54 411.10 54 412.11 54 615.73 54 607.32 54 257.98 54 230.90

    55 55 418.07 55 419.08 55 626.17 55 617.56 55 262.33 55 234.81

    56 56 425.04 56 426.05 56 636.61 56 627.80 56 266.68 56 238.72

    57 57 432.01 57 433.02 57 647.05 57 638.04 57 271.03 57 242.63

    58 58 438.98 58 439.99 58 657.49 58 648.28 58 275.38 58 246.54

    59 59 445.95 59 446.96 59 667.93 59 658.52 59 279.73 59 250.45

    60 60 452.92 60 453.93 60 678.37 60 668.76 60 284.08 60 254.36

    61 61 459.89 61 460.90 61 688.81 61 679.00 61 288.43 61 258.27

    62 62 466.86 62 467.87 62 699.25 62 689.24 62 292.78 62 262.18

    63 63 473.83 63 474.84 63 709.69 63 699.48 63 297.13 63 266.0964 64 480.80 64 481.81 64 720.13 64 709.72 64 301.48 64 270.00

    65 65 487.77 65 488.78 65 730.57 65 719.96 65 305.83 65 273.91

    66 66 494.74 66 495.75 66 741.01 66 730.20 66 310.18 66 277.82

    67 67 501.71 67 502.72 67 751.45 67 740.44 67 314.53 67 281.73

    68 68 508.68 68 509.69 68 761.89 68 750.68 68 318.88 68 285.64

    69 69 515.65 69 516.66 69 772.33 69 760.92 69 323.23 69 289.55

    70 70 522.62 70 523.63 70 782.77 70 771.16 70 327.58 70 293.46

    71 71 529.59 71 530.60 71 793.21 71 781.40 71 331.93 71 297.37

    72 72 536.56 72 537.57 72 803.65 72 791.64 72 336.28 72 301.28

    73 73 543.53 73 544.54 73 814.09 73 801.88 73 340.63 73 305.19

    74 74 550.50 74 551.51 74 824.53 74 812.12 74 344.98 74 309.1075 75 557.47 75 558.48 75 834.97 75 822.36 75 349.33 75 313.01

    76 76 564.44 76 565.45 76 845.41 76 832.60 76 353.68 76 316.92

    77 77 571.41 77 572.42 77 855.85 77 842.84 77 358.03 77 320.83

    78 78 578.38 78 579.39 78 866.29 78 853.08 78 362.38 78 324.74

    79 79 585.35 79 586.36 79 876.73 79 863.32 79 366.73 79 328.65

    80 80 592.32 80 593.33 80 887.17 80 873.56 80 371.08 80 332.56

    81 81 599.29 81 600.30 81 897.61 81 883.80 81 375.43 81 336.47

    82 82 606.26 82 607.27 82 908.05 82 894.04 82 379.78 82 340.38

    CONVEYANCE CHARGES PAGE NO : 25 of 68

  • 7/28/2019 Rajivnagar Bit I

    26/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    83 83 613.23 83 614.24 83 918.49 83 904.28 83 384.13 83 344.29

    84 84 620.20 84 621.21 84 928.93 84 914.52 84 388.48 84 348.20

    85 85 627.17 85 628.18 85 939.37 85 924.76 85 392.83 85 352.11

    86 86 634.14 86 635.15 86 949.81 86 935.00 86 397.18 86 356.02

    87 87 641.11 87 642.12 87 960.25 87 945.24 87 401.53 87 359.93

    88 88 648.08 88 649.09 88 970.69 88 955.48 88 405.88 88 363.84

    89 89 655.05 89 656.06 89 981.13 89 965.72 89 410.23 89 367.75

    90 90 662.02 90 663.03 90 991.57 90 975.96 90 414.58 90 371.66

    91 91 668.99 91 670.00 91 1002.01 91 986.20 91 418.93 91 375.57

    9292

    675.9692

    676.9792

    1012.4592

    996.4492

    423.2892

    379.48

    93 93 682.93 93 683.94 93 1022.89 93 1006.68 93 427.63 93 383.39

    94 94 689.90 94 690.91 94 1033.33 94 1016.92 94 431.98 94 387.30

    95 95 696.87 95 697.88 95 1043.77 95 1027.16 95 436.33 95 391.21

    96 96 703.84 96 704.85 96 1054.21 96 1037.40 96 440.68 96 395.12

    97 97 710.81 97 711.82 97 1064.65 97 1047.64 97 445.03 97 399.03

    98 98 717.78 98 718.79 98 1075.09 98 1057.88 98 449.38 98 402.94

    99 99 724.75 99 725.76 99 1085.53 99 1068.12 99 453.73 99 406.85

    100 100 731.72 100 732.73 100 1095.97 100 1078.36 100 458.08 100 410.76

    101 101 738.69 101 739.70 101 1106.41 101 1088.60 101 462.43 101 414.67

    102 102 745.66 102 746.67 102 1116.85 102 1098.84 102 466.78 102 418.58

    103 103 752.63 103 753.64 103 1127.29 103 1109.08 103 471.13 103 422.49

    104 104 759.60 104 760.61 104 1137.73 104 1119.32 104 475.48 104 426.40105 105 766.57 105 767.58 105 1148.17 105 1129.56 105 479.83 105 430.31

    106 106 773.54 106 774.55 106 1158.61 106 1139.80 106 484.18 106 434.22

    107 107 780.51 107 781.52 107 1169.05 107 1150.04 107 488.53 107 438.13

    108 108 787.48 108 788.49 108 1179.49 108 1160.28 108 492.88 108 442.04

    109 109 794.45 109 795.46 109 1189.93 109 1170.52 109 497.23 109 445.95

    110 110 801.42 110 802.43 110 1200.37 110 1180.76 110 501.58 110 449.86

    111 111 808.39 111 809.40 111 1210.81 111 1191.00 111 505.93 111 453.77

    112 112 815.36 112 816.37 112 1221.25 112 1201.24 112 510.28 112 457.68

    113 113 822.33 113 823.34 113 1231.69 113 1211.48 113 514.63 113 461.59

    114 114 829.30 114 830.31 114 1242.13 114 1221.72 114 518.98 114 465.50

    115 115 836.27 115 837.28 115 1252.57 115 1231.96 115 523.33 115 469.41116 116 843.24 116 844.25 116 1263.01 116 1242.20 116 527.68 116 473.32

    117 117 850.21 117 851.22 117 1273.45 117 1252.44 117 532.03 117 477.23

    118 118 857.18 118 858.19 118 1283.89 118 1262.68 118 536.38 118 481.14

    119 119 864.15 119 865.16 119 1294.33 119 1272.92 119 540.73 119 485.05

    120 120 871.12 120 872.13 120 1304.77 120 1283.16 120 545.08 120 488.96

    121 121 878.09 121 879.10 121 1315.21 121 1293.40 121 549.43 121 492.87

    122 122 885.06 122 886.07 122 1325.65 122 1303.64 122 553.78 122 496.78

    123 123 892.03 123 893.04 123 1336.09 123 1313.88 123 558.13 123 500.69

    CONVEYANCE CHARGES PAGE NO : 26 of 68

  • 7/28/2019 Rajivnagar Bit I

    27/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    124 124 899.00 124 900.01 124 1346.53 124 1324.12 124 562.48 124 504.60

    125 125 905.97 125 906.98 125 1356.97 125 1334.36 125 566.83 125 508.51

    126 126 912.94 126 913.95 126 1367.41 126 1344.60 126 571.18 126 512.42

    127 127 919.91 127 920.92 127 1377.85 127 1354.84 127 575.53 127 516.33

    128 128 926.88 128 927.89 128 1388.29 128 1365.08 128 579.88 128 520.24

    129 129 933.85 129 934.86 129 1398.73 129 1375.32 129 584.23 129 524.15

    130 130 940.82 130 941.83 130 1409.17 130 1385.56 130 588.58 130 528.06

    131 131 947.79 131 948.80 131 1419.61 131 1395.80 131 592.93 131 531.97

    132 132 954.76 132 955.77 132 1430.05 132 1406.04 132 597.28 132 535.88

    133133

    961.73133

    962.74133

    1440.49133

    1416.28133

    601.63133

    539.79

    134 134 968.70 134 969.71 134 1450.93 134 1426.52 134 605.98 134 543.70

    135 135 975.67 135 976.68 135 1461.37 135 1436.76 135 610.33 135 547.61

    136 136 982.64 136 983.65 136 1471.81 136 1447.00 136 614.68 136 551.52

    137 137 989.61 137 990.62 137 1482.25 137 1457.24 137 619.03 137 555.43

    138 138 996.58 138 997.59 138 1492.69 138 1467.48 138 623.38 138 559.34

    139 139 1003.55 139 1004.56 139 1503.13 139 1477.72 139 627.73 139 563.25

    140 140 1010.52 140 1011.53 140 1513.57 140 1487.96 140 632.08 140 567.16

    141 141 1017.49 141 1018.50 141 1524.01 141 1498.20 141 636.43 141 571.07

    142 142 1024.46 142 1025.47 142 1534.45 142 1508.44 142 640.78 142 574.98

    143 143 1031.43 143 1032.44 143 1544.89 143 1518.68 143 645.13 143 578.89

    144 144 1038.40 144 1039.41 144 1555.33 144 1528.92 144 649.48 144 582.80

    145 145 1045.37 145 1046.38 145 1565.77 145 1539.16 145 653.83 145 586.71146 146 1052.34 146 1053.35 146 1576.21 146 1549.40 146 658.18 146 590.62

    147 147 1059.31 147 1060.32 147 1586.65 147 1559.64 147 662.53 147 594.53

    148 148 1066.28 148 1067.29 148 1597.09 148 1569.88 148 666.88 148 598.44

    149 149 1073.25 149 1074.26 149 1607.53 149 1580.12 149 671.23 149 602.35

    150 150 1080.22 150 1081.23 150 1617.97 150 1590.36 150 675.58 150 606.26

    151 151 1087.19 151 1088.20 151 1628.41 151 1600.60 151 679.93 151 610.17

    152 152 1094.16 152 1095.17 152 1638.85 152 1610.84 152 684.28 152 614.08

    153 153 1101.13 153 1102.14 153 1649.29 153 1621.08 153 688.63 153 617.99

    154 154 1108.10 154 1109.11 154 1659.73 154 1631.32 154 692.98 154 621.90

    155 155 1115.07 155 1116.08 155 1670.17 155 1641.56 155 697.33 155 625.81

    156 156 1122.04 156 1123.05 156 1680.61 156 1651.80 156 701.68 156 629.72157 157 1129.01 157 1130.02 157 1691.05 157 1662.04 157 706.03 157 633.63

    158 158 1135.98 158 1136.99 158 1701.49 158 1672.28 158 710.38 158 637.54

    159 159 1142.95 159 1143.96 159 1711.93 159 1682.52 159 714.73 159 641.45

    160 160 1149.92 160 1150.93 160 1722.37 160 1692.76 160 719.08 160 645.36

    161 161 1156.89 161 1157.90 161 1732.81 161 1703.00 161 723.43 161 649.27

    162 162 1163.86 162 1164.87 162 1743.25 162 1713.24 162 727.78 162 653.18

    163 163 1170.83 163 1171.84 163 1753.69 163 1723.48 163 732.13 163 657.09

    164 164 1177.80 164 1178.81 164 1764.13 164 1733.72 164 736.48 164 661.00

    CONVEYANCE CHARGES PAGE NO : 27 of 68

  • 7/28/2019 Rajivnagar Bit I

    28/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    165 165 1184.77 165 1185.78 165 1774.57 165 1743.96 165 740.83 165 664.91

    166 166 1191.74 166 1192.75 166 1785.01 166 1754.20 166 745.18 166 668.82

    167 167 1198.71 167 1199.72 167 1795.45 167 1764.44 167 749.53 167 672.73

    168 168 1205.68 168 1206.69 168 1805.89 168 1774.68 168 753.88 168 676.64

    169 169 1212.65 169 1213.66 169 1816.33 169 1784.92 169 758.23 169 680.55

    170 170 1219.62 170 1220.63 170 1826.77 170 1795.16 170 762.58 170 684.46

    171 171 1226.59 171 1227.60 171 1837.21 171 1805.40 171 766.93 171 688.37

    172 172 1233.56 172 1234.57 172 1847.65 172 1815.64 172 771.28 172 692.28

    173 173 1240.53 173 1241.54 173 1858.09 173 1825.88 173 775.63 173 696.19

    174174

    1247.50174

    1248.51174

    1868.53174

    1836.12174

    779.98174

    700.10

    175 175 1254.47 175 1255.48 175 1878.97 175 1846.36 175 784.33 175 704.01

    176 176 1261.44 176 1262.45 176 1889.41 176 1856.60 176 788.68 176 707.92

    177 177 1268.41 177 1269.42 177 1899.85 177 1866.84 177 793.03 177 711.83

    178 178 1275.38 178 1276.39 178 1910.29 178 1877.08 178 797.38 178 715.74

    179 179 1282.35 179 1283.36 179 1920.73 179 1887.32 179 801.73 179 719.65

    180 180 1289.32 180 1290.33 180 1931.17 180 1897.56 180 806.08 180 723.56

    181 181 1296.29 181 1297.30 181 1941.61 181 1907.80 181 810.43 181 727.47

    182 182 1303.26 182 1304.27 182 1952.05 182 1918.04 182 814.78 182 731.38

    183 183 1310.23 183 1311.24 183 1962.49 183 1928.28 183 819.13 183 735.29

    184 184 1317.20 184 1318.21 184 1972.93 184 1938.52 184 823.48 184 739.20

    185 185 1324.17 185 1325.18 185 1983.37 185 1948.76 185 827.83 185 743.11

    186 186 1331.14 186 1332.15 186 1993.81 186 1959.00 186 832.18 186 747.02187 187 1338.11 187 1339.12 187 2004.25 187 1969.24 187 836.53 187 750.93

    188 188 1345.08 188 1346.09 188 2014.69 188 1979.48 188 840.88 188 754.84

    189 189 1352.05 189 1353.06 189 2025.13 189 1989.72 189 845.23 189 758.75

    190 190 1359.02 190 1360.03 190 2035.57 190 1999.96 190 849.58 190 762.66

    191 191 1365.99 191 1367.00 191 2046.01 191 2010.20 191 853.93 191 766.57

    192 192 1372.96 192 1373.97 192 2056.45 192 2020.44 192 858.28 192 770.48

    193 193 1379.93 193 1380.94 193 2066.89 193 2030.68 193 862.63 193 774.39

    194 194 1386.90 194 1387.91 194 2077.33 194 2040.92 194 866.98 194 778.30

    195 195 1393.87 195 1394.88 195 2087.77 195 2051.16 195 871.33 195 782.21

    196 196 1400.84 196 1401.85 196 2098.21 196 2061.40 196 875.68 196 786.12

    197 197 1407.81 197 1408.82 197 2108.65 197 2071.64 197 880.03 197 790.03198 198 1414.78 198 1415.79 198 2119.09 198 2081.88 198 884.38 198 793.94

    199 199 1421.75 199 1422.76 199 2129.53 199 2092.12 199 888.73 199 797.85

    200 200 1428.72 200 1429.73 200 2139.97 200 2102.36 200 893.08 200 801.76

    201 201 1435.69 201 1436.70 201 2150.41 201 2112.60 201 897.43 201 805.67

    202 202 1442.66 202 1443.67 202 2160.85 202 2122.84 202 901.78 202 809.58

    203 203 1449.63 203 1450.64 203 2171.29 203 2133.08 203 906.13 203 813.49

    204 204 1456.60 204 1457.61 204 2181.73 204 2143.32 204 910.48 204 817.40

    205 205 1463.57 205 1464.58 205 2192.17 205 2153.56 205 914.83 205 821.31

    CONVEYANCE CHARGES PAGE NO : 28 of 68

  • 7/28/2019 Rajivnagar Bit I

    29/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    206 206 1470.54 206 1471.55 206 2202.61 206 2163.80 206 919.18 206 825.22

    207 207 1477.51 207 1478.52 207 2213.05 207 2174.04 207 923.53 207 829.13

    208 208 1484.48 208 1485.49 208 2223.49 208 2184.28 208 927.88 208 833.04

    209 209 1491.45 209 1492.46 209 2233.93 209 2194.52 209 932.23 209 836.95

    210 210 1498.42 210 1499.43 210 2244.37 210 2204.76 210 936.58 210 840.86

    211 211 1505.39 211 1506.40 211 2254.81 211 2215.00 211 940.93 211 844.77

    212 212 1512.36 212 1513.37 212 2265.25 212 2225.24 212 945.28 212 848.68

    213 213 1519.33 213 1520.34 213 2275.69 213 2235.48 213 949.63 213 852.59

    214 214 1526.30 214 1527.31 214 2286.13 214 2245.72 214 953.98 214 856.50

    215215

    1533.27215

    1534.28215

    2296.57215

    2255.96215

    958.33215

    860.41

    216 216 1540.24 216 1541.25 216 2307.01 216 2266.20 216 962.68 216 864.32

    217 217 1547.21 217 1548.22 217 2317.45 217 2276.44 217 967.03 217 868.23

    218 218 1554.18 218 1555.19 218 2327.89 218 2286.68 218 971.38 218 872.14

    219 219 1561.15 219 1562.16 219 2338.33 219 2296.92 219 975.73 219 876.05

    220 220 1568.12 220 1569.13 220 2348.77 220 2307.16 220 980.08 220 879.96

    221 221 1575.09 221 1576.10 221 2359.21 221 2317.40 221 984.43 221 883.87

    222 222 1582.06 222 1583.07 222 2369.65 222 2327.64 222 988.78 222 887.78

    223 223 1589.03 223 1590.04 223 2380.09 223 2337.88 223 993.13 223 891.69

    224 224 1596.00 224 1597.01 224 2390.53 224 2348.12 224 997.48 224 895.60

    225 225 1602.97 225 1603.98 225 2400.97 225 2358.36 225 1001.83 225 899.51

    226 226 1609.94 226 1610.95 226 2411.41 226 2368.60 226 1006.18 226 903.42

    227 227 1616.91 227 1617.92 227 2421.85 227 2378.84 227 1010.53 227 907.33228 228 1623.88 228 1624.89 228 2432.29 228 2389.08 228 1014.88 228 911.24

    229 229 1630.85 229 1631.86 229 2442.73 229 2399.32 229 1019.23 229 915.15

    230 230 1637.82 230 1638.83 230 2453.17 230 2409.56 230 1023.58 230 919.06

    231 231 1644.79 231 1645.80 231 2463.61 231 2419.80 231 1027.93 231 922.97

    232 232 1651.76 232 1652.77 232 2474.05 232 2430.04 232 1032.28 232 926.88

    233 233 1658.73 233 1659.74 233 2484.49 233 2440.28 233 1036.63 233 930.79

    234 234 1665.70 234 1666.71 234 2494.93 234 2450.52 234 1040.98 234 934.70

    235 235 1672.67 235 1673.68 235 2505.37 235 2460.76 235 1045.33 235 938.61

    236 236 1679.64 236 1680.65 236 2515.81 236 2471.00 236 1049.68 236 942.52

    237 237 1686.61 237 1687.62 237 2526.25 237 2481.24 237 1054.03 237 946.43

    238 238 1693.58 238 1694.59 238 2536.69 238 2491.48 238 1058.38 238 950.34239 239 1700.55 239 1701.56 239 2547.13 239 2501.72 239 1062.73 239 954.25

    240 240 1707.52 240 1708.53 240 2557.57 240 2511.96 240 1067.08 240 958.16

    241 241 1714.49 241 1715.50 241 2568.01 241 2522.20 241 1071.43 241 962.07

    242 242 1721.46 242 1722.47 242 2578.45 242 2532.44 242 1075.78 242 965.98

    243 243 1728.43 243 1729.44 243 2588.89 243 2542.68 243 1080.13 243 969.89

    244 244 1735.40 244 1736.41 244 2599.33 244 2552.92 244 1084.48 244 973.80

    245 245 1742.37 245 1743.38 245 2609.77 245 2563.16 245 1088.83 245 977.71

    246 246 1749.34 246 1750.35 246 2620.21 246 2573.40 246 1093.18 246 981.62

    CONVEYANCE CHARGES PAGE NO : 29 of 68

  • 7/28/2019 Rajivnagar Bit I

    30/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    247 247 1756.31 247 1757.32 247 2630.65 247 2583.64 247 1097.53 247 985.53

    248 248 1763.28 248 1764.29 248 2641.09 248 2593.88 248 1101.88 248 989.44

    249 249 1770.25 249 1771.26 249 2651.53 249 2604.12 249 1106.23 249 993.35

    250 250 1777.22 250 1778.23 250 2661.97 250 2614.36 250 1110.58 250 997.26

    251 251 1784.19 251 1785.20 251 2672.41 251 2624.60 251 1114.93 251 1001.17

    252 252 1791.16 252 1792.17 252 2682.85 252 2634.84 252 1119.28 252 1005.08

    253 253 1798.13 253 1799.14 253 2693.29 253 2645.08 253 1123.63 253 1008.99

    254 254 1805.10 254 1806.11 254 2703.73 254 2655.32 254 1127.98 254 1012.90

    255 255 1812.07 255 1813.08 255 2714.17 255 2665.56 255 1132.33 255 1016.81

    256256

    1819.04256

    1820.05256

    2724.61256

    2675.80256

    1136.68256

    1020.72

    257 257 1826.01 257 1827.02 257 2735.05 257 2686.04 257 1141.03 257 1024.63

    258 258 1832.98 258 1833.99 258 2745.49 258 2696.28 258 1145.38 258 1028.54

    259 259 1839.95 259 1840.96 259 2755.93 259 2706.52 259 1149.73 259 1032.45

    260 260 1846.92 260 1847.93 260 2766.37 260 2716.76 260 1154.08 260 1036.36

    261 261 1853.89 261 1854.90 261 2776.81 261 2727.00 261 1158.43 261 1040.27

    262 262 1860.86 262 1861.87 262 2787.25 262 2737.24 262 1162.78 262 1044.18

    263 263 1867.83 263 1868.84 263 2797.69 263 2747.48 263 1167.13 263 1048.09

    264 264 1874.80 264 1875.81 264 2808.13 264 2757.72 264 1171.48 264 1052.00

    265 265 1881.77 265 1882.78 265 2818.57 265 2767.96 265 1175.83 265 1055.91

    266 266 1888.74 266 1889.75 266 2829.01 266 2778.20 266 1180.18 266 1059.82

    267 267 1895.71 267 1896.72 267 2839.45 267 2788.44 267 1184.53 267 1063.73

    268 268 1902.68 268 1903.69 268 2849.89 268 2798.68 268 1188.88 268 1067.64269 269 1909.65 269 1910.66 269 2860.33 269 2808.92 269 1193.23 269 1071.55

    270 270 1916.62 270 1917.63 270 2870.77 270 2819.16 270 1197.58 270 1075.46

    271 271 1923.59 271 1924.60 271 2881.21 271 2829.40 271 1201.93 271 1079.37

    272 272 1930.56 272 1931.57 272 2891.65 272 2839.64 272 1206.28 272 1083.28

    273 273 1937.53 273 1938.54 273 2902.09 273 2849.88 273 1210.63 273 1087.19

    274 274 1944.50 274 1945.51 274 2912.53 274 2860.12 274 1214.98 274 1091.10

    275 275 1951.47 275 1952.48 275 2922.97 275 2870.36 275 1219.33 275 1095.01

    276 276 1958.44 276 1959.45 276 2933.41 276 2880.60 276 1223.68 276 1098.92

    277 277 1965.41 277 1966.42 277 2943.85 277 2890.84 277 1228.03 277 1102.83

    278 278 1972.38 278 1973.39 278 2954.29 278 2901.08 278 1232.38 278 1106.74

    279 279 1979.35 279 1980.36 279 2964.73 279 2911.32 279 1236.73 279 1110.65280 280 1986.32 280 1987.33 280 2975.17 280 2921.56 280 1241.08 280 1114.56

    281 281 1993.29 281 1994.30 281 2985.61 281 2931.80 281 1245.43 281 1118.47

    282 282 2000.26 282 2001.27 282 2996.05 282 2942.04 282 1249.78 282 1122.38

    283 283 2007.23 283 2008.24 283 3006.49 283 2952.28 283 1254.13 283 1126.29

    284 284 2014.20 284 2015.21 284 3016.93 284 2962.52 284 1258.48 284 1130.20

    285 285 2021.17 285 2022.18 285 3027.37 285 2972.76 285 1262.83 285 1134.11

    286 286 2028.14 286 2029.15 286 3037.81 286 2983.00 286 1267.18 286 1138.02

    287 287 2035.11 287 2036.12 287 3048.25 287 2993.24 287 1271.53 287 1141.93

    CONVEYANCE CHARGES PAGE NO : 30 of 68

  • 7/28/2019 Rajivnagar Bit I

    31/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    288 288 2042.08 288 2043.09 288 3058.69 288 3003.48 288 1275.88 288 1145.84

    289 289 2049.05 289 2050.06 289 3069.13 289 3013.72 289 1280.23 289 1149.75

    290 290 2056.02 290 2057.03 290 3079.57 290 3023.96 290 1284.58 290 1153.66

    291 291 2062.99 291 2064.00 291 3090.01 291 3034.20 291 1288.93 291 1157.57

    292 292 2069.96 292 2070.97 292 3100.45 292 3044.44 292 1293.28 292 1161.48

    293 293 2076.93 293 2077.94 293 3110.89 293 3054.68 293 1297.63 293 1165.39

    294 294 2083.90 294 2084.91 294 3121.33 294 3064.92 294 1301.98 294 1169.30

    295 295 2090.87 295 2091.88 295 3131.77 295 3075.16 295 1306.33 295 1173.21

    296 296 2097.84 296 2098.85 296 3142.21 296 3085.40 296 1310.68 296 1177.12

    297297

    2104.81297

    2105.82297

    3152.65297

    3095.64297

    1315.03297

    1181.03

    298 298 2111.78 298 2112.79 298 3163.09 298 3105.88 298 1319.38 298 1184.94

    299 299 2118.75 299 2119.76 299 3173.53 299 3116.12 299 1323.73 299 1188.85

    300 300 2125.72 300 2126.73 300 3183.97 300 3126.36 300 1328.08 300 1192.76

    301 301 2132.69 301 2133.70 301 3194.41 301 3136.60 301 1332.43 301 1196.67

    302 302 2139.66 302 2140.67 302 3204.85 302 3146.84 302 1336.78 302 1200.58

    303 303 2146.63 303 2147.64 303 3215.29 303 3157.08 303 1341.13 303 1204.49

    304 304 2153.60 304 2154.61 304 3225.73 304 3167.32 304 1345.48 304 1208.40

    305 305 2160.57 305 2161.58 305 3236.17 305 3177.56 305 1349.83 305 1212.31

    306 306 2167.54 306 2168.55 306 3246.61 306 3187.80 306 1354.18 306 1216.22

    307 307 2174.51 307 2175.52 307 3257.05 307 3198.04 307 1358.53 307 1220.13

    308 308 2181.48 308 2182.49 308 3267.49 308 3208.28 308 1362.88 308 1224.04

    309 309 2188.45 309 2189.46 309 3277.93 309 3218.52 309 1367.23 309 1227.95310 310 2195.42 310 2196.43 310 3288.37 310 3228.76 310 1371.58 310 1231.86

    311 311 2202.39 311 2203.40 311 3298.81 311 3239.00 311 1375.93 311 1235.77

    312 312 2209.36 312 2210.37 312 3309.25 312 3249.24 312 1380.28 312 1239.68

    313 313 2216.33 313 2217.34 313 3319.69 313 3259.48 313 1384.63 313 1243.59

    314 314 2223.30 314 2224.31 314 3330.13 314 3269.72 314 1388.98 314 1247.50

    315 315 2230.27 315 2231.28 315 3340.57 315 3279.96 315 1393.33 315 1251.41

    316 316 2237.24 316 2238.25 316 3351.01 316 3290.20 316 1397.68 316 1255.32

    317 317 2244.21 317 2245.22 317 3361.45 317 3300.44 317 1402.03 317 1259.23

    318 318 2251.18 318 2252.19 318 3371.89 318 3310.68 318 1406.38 318 1263.14

    319 319 2258.15 319 2259.16 319 3382.33 319 3320.92 319 1410.73 319 1267.05

    320 320 2265.12 320 2266.13 320 3392.77 320 3331.16 320 1415.08 320 1270.96321 321 2272.09 321 2273.10 321 3403.21 321 3341.40 321 1419.43 321 1274.87

    322 322 2279.06 322 2280.07 322 3413.65 322 3351.64 322 1423.78 322 1278.78

    323 323 2286.03 323 2287.04 323 3424.09 323 3361.88 323 1428.13 323 1282.69

    324 324 2293.00 324 2294.01 324 3434.53 324 3372.12 324 1432.48 324 1286.60

    325 325 2299.97 325 2300.98 325 3444.97 325 3382.36 325 1436.83 325 1290.51

    326 326 2306.94 326 2307.95 326 3455.41 326 3392.60 326 1441.18 326 1294.42

    327 327 2313.91 327 2314.92 327 3465.85 327 3402.84 327 1445.53 327 1298.33

    328 328 2320.88 328 2321.89 328 3476.29 328 3413.08 328 1449.88 328 1302.24

    CONVEYANCE CHARGES PAGE NO : 31 of 68

  • 7/28/2019 Rajivnagar Bit I

    32/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    329 329 2327.85 329 2328.86 329 3486.73 329 3423.32 329 1454.23 329 1306.15

    330 330 2334.82 330 2335.83 330 3497.17 330 3433.56 330 1458.58 330 1310.06

    331 331 2341.79 331 2342.80 331 3507.61 331 3443.80 331 1462.93 331 1313.97

    332 332 2348.76 332 2349.77 332 3518.05 332 3454.04 332 1467.28 332 1317.88

    333 333 2355.73 333 2356.74 333 3528.49 333 3464.28 333 1471.63 333 1321.79

    334 334 2362.70 334 2363.71 334 3538.93 334 3474.52 334 1475.98 334 1325.70

    335 335 2369.67 335 2370.68 335 3549.37 335 3484.76 335 1480.33 335 1329.61

    336 336 2376.64 336 2377.65 336 3559.81 336 3495.00 336 1484.68 336 1333.52

    337 337 2383.61 337 2384.62 337 3570.25 337 3505.24 337 1489.03 337 1337.43

    338338

    2390.58338

    2391.59338

    3580.69338

    3515.48338

    1493.38338

    1341.34

    339 339 2397.55 339 2398.56 339 3591.13 339 3525.72 339 1497.73 339 1345.25

    340 340 2404.52 340 2405.53 340 3601.57 340 3535.96 340 1502.08 340 1349.16

    341 341 2411.49 341 2412.50 341 3612.01 341 3546.20 341 1506.43 341 1353.07

    342 342 2418.46 342 2419.47 342 3622.45 342 3556.44 342 1510.78 342 1356.98

    343 343 2425.43 343 2426.44 343 3632.89 343 3566.68 343 1515.13 343 1360.89

    344 344 2432.40 344 2433.41 344 3643.33 344 3576.92 344 1519.48 344 1364.80

    345 345 2439.37 345 2440.38 345 3653.77 345 3587.16 345 1523.83 345 1368.71

    346 346 2446.34 346 2447.35 346 3664.21 346 3597.40 346 1528.18 346 1372.62

    347 347 2453.31 347 2454.32 347 3674.65 347 3607.64 347 1532.53 347 1376.53

    348 348 2460.28 348 2461.29 348 3685.09 348 3617.88 348 1536.88 348 1380.44

    349 349 2467.25 349 2468.26 349 3695.53 349 3628.12 349 1541.23 349 1384.35

    350 350 2474.22 350 2475.23 350 3705.97 350 3638.36 350 1545.58 350 1388.26351 351 2481.19 351 2482.20 351 3716.41 351 3648.60 351 1549.93 351 1392.17

    352 352 2488.16 352 2489.17 352 3726.85 352 3658.84 352 1554.28 352 1396.08

    353 353 2495.13 353 2496.14 353 3737.29 353 3669.08 353 1558.63 353 1399.99

    354 354 2502.10 354 2503.11 354 3747.73 354 3679.32 354 1562.98 354 1403.90

    355 355 2509.07 355 2510.08 355 3758.17 355 3689.56 355 1567.33 355 1407.81

    356 356 2516.04 356 2517.05 356 3768.61 356 3699.80 356 1571.68 356 1411.72

    357 357 2523.01 357 2524.02 357 3779.05 357 3710.04 357 1576.03 357 1415.63

    358 358 2529.98 358 2530.99 358 3789.49 358 3720.28 358 1580.38 358 1419.54

    359 359 2536.95 359 2537.96 359 3799.93 359 3730.52 359 1584.73 359 1423.45

    360 360 2543.92 360 2544.93 360 3810.37 360 3740.76 360 1589.08 360 1427.36

    361 361 2550.89 361 2551.90 361 3820.81 361 3751.00 361 1593.43 361 1431.27362 362 2557.86 362 2558.87 362 3831.25 362 3761.24 362 1597.78 362 1435.18

    363 363 2564.83 363 2565.84 363 3841.69 363 3771.48 363 1602.13 363 1439.09

    364 364 2571.80 364 2572.81 364 3852.13 364 3781.72 364 1606.48 364 1443.00

    365 365 2578.77 365 2579.78 365 3862.57 365 3791.96 365 1610.83 365 1446.91

    366 366 2585.74 366 2586.75 366 3873.01 366 3802.20 366 1615.18 366 1450.82

    367 367 2592.71 367 2593.72 367 3883.45 367 3812.44 367 1619.53 367 1454.73

    368 368 2599.68 368 2600.69 368 3893.89 368 3822.68 368 1623.88 368 1458.64

    369 369 2606.65 369 2607.66 369 3904.33 369 3832.92 369 1628.23 369 1462.55

    CONVEYANCE CHARGES PAGE NO : 32 of 68

  • 7/28/2019 Rajivnagar Bit I

    33/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    370 370 2613.62 370 2614.63 370 3914.77 370 3843.16 370 1632.58 370 1466.46

    371 371 2620.59 371 2621.60 371 3925.21 371 3853.40 371 1636.93 371 1470.37

    372 372 2627.56 372 2628.57 372 3935.65 372 3863.64 372 1641.28 372 1474.28

    373 373 2634.53 373 2635.54 373 3946.09 373 3873.88 373 1645.63 373 1478.19

    374 374 2641.50 374 2642.51 374 3956.53 374 3884.12 374 1649.98 374 1482.10

    375 375 2648.47 375 2649.48 375 3966.97 375 3894.36 375 1654.33 375 1486.01

    376 376 2655.44 376 2656.45 376 3977.41 376 3904.60 376 1658.68 376 1489.92

    377 377 2662.41 377 2663.42 377 3987.85 377 3914.84 377 1663.03 377 1493.83

    378 378 2669.38 378 2670.39 378 3998.29 378 3925.08 378 1667.38 378 1497.74

    379379

    2676.35379

    2677.36379

    4008.73379

    3935.32379

    1671.73379

    1501.65

    380 380 2683.32 380 2684.33 380 4019.17 380 3945.56 380 1676.08 380 1505.56

    381 381 2690.29 381 2691.30 381 4029.61 381 3955.80 381 1680.43 381 1509.47

    382 382 2697.26 382 2698.27 382 4040.05 382 3966.04 382 1684.78 382 1513.38

    383 383 2704.23 383 2705.24 383 4050.49 383 3976.28 383 1689.13 383 1517.29

    384 384 2711.20 384 2712.21 384 4060.93 384 3986.52 384 1693.48 384 1521.20

    385 385 2718.17 385 2719.18 385 4071.37 385 3996.76 385 1697.83 385 1525.11

    386 386 2725.14 386 2726.15 386 4081.81 386 4007.00 386 1702.18 386 1529.02

    387 387 2732.11 387 2733.12 387 4092.25 387 4017.24 387 1706.53 387 1532.93

    388 388 2739.08 388 2740.09 388 4102.69 388 4027.48 388 1710.88 388 1536.84

    389 389 2746.05 389 2747.06 389 4113.13 389 4037.72 389 1715.23 389 1540.75

    390 390 2753.02 390 2754.03 390 4123.57 390 4047.96 390 1719.58 390 1544.66

    391 391 2759.99 391 2761.00 391 4134.01 391 4058.20 391 1723.93 391 1548.57392 392 2766.96 392 2767.97 392 4144.45 392 4068.44 392 1728.28 392 1552.48

    393 393 2773.93 393 2774.94 393 4154.89 393 4078.68 393 1732.63 393 1556.39

    394 394 2780.90 394 2781.91 394 4165.33 394 4088.92 394 1736.98 394 1560.30

    395 395 2787.87 395 2788.88 395 4175.77 395 4099.16 395 1741.33 395 1564.21

    396 396 2794.84 396 2795.85 396 4186.21 396 4109.40 396 1745.68 396 1568.12

    397 397 2801.81 397 2802.82 397 4196.65 397 4119.64 397 1750.03 397 1572.03

    398 398 2808.78 398 2809.79 398 4207.09 398 4129.88 398 1754.38 398 1575.94

    399 399 2815.75 399 2816.76 399 4217.53 399 4140.12 399 1758.73 399 1579.85

    400 400 2822.72 400 2823.73 400 4227.97 400 4150.36 400 1763.08 400 1583.76

    401 401 2829.69 401 2830.70 401 4238.41 401 4160.60 401 1767.43 401 1587.67

    402 402 2836.66 402 2837.67 402 4248.85 402 4170.84 402 1771.78 402 1591.58403 403 2843.63 403 2844.64 403 4259.29 403 4181.08 403 1776.13 403 1595.49

    404 404 2850.60 404 2851.61 404 4269.73 404 4191.32 404 1780.48 404 1599.40

    405 405 2857.57 405 2858.58 405 4280.17 405 4201.56 405 1784.83 405 1603.31

    406 406 2864.54 406 2865.55 406 4290.61 406 4211.80 406 1789.18 406 1607.22

    407 407 2871.51 407 2872.52 407 4301.05 407 4222.04 407 1793.53 407 1611.13

    408 408 2878.48 408 2879.49 408 4311.49 408 4232.28 408 1797.88 408 1615.04

    409 409 2885.45 409 2886.46 409 4321.93 409 4242.52 409 1802.23 409 1618.95

    410 410 2892.42 410 2893.43 410 4332.37 410 4252.76 410 1806.58 410 1622.86

    CONVEYANCE CHARGES PAGE NO : 33 of 68

  • 7/28/2019 Rajivnagar Bit I

    34/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    411 411 2899.39 411 2900.40 411 4342.81 411 4263.00 411 1810.93 411 1626.77

    412 412 2906.36 412 2907.37 412 4353.25 412 4273.24 412 1815.28 412 1630.68

    413 413 2913.33 413 2914.34 413 4363.69 413 4283.48 413 1819.63 413 1634.59

    414 414 2920.30 414 2921.31 414 4374.13 414 4293.72 414 1823.98 414 1638.50

    415 415 2927.27 415 2928.28 415 4384.57 415 4303.96 415 1828.33 415 1642.41

    416 416 2934.24 416 2935.25 416 4395.01 416 4314.20 416 1832.68 416 1646.32

    417 417 2941.21 417 2942.22 417 4405.45 417 4324.44 417 1837.03 417 1650.23

    418 418 2948.18 418 2949.19 418 4415.89 418 4334.68 418 1841.38 418 1654.14

    419 419 2955.15 419 2956.16 419 4426.33 419 4344.92 419 1845.73 419 1658.05

    420420

    2962.12420

    2963.13420

    4436.77420

    4355.16420

    1850.08420

    1661.96

    421 421 2969.09 421 2970.10 421 4447.21 421 4365.40 421 1854.43 421 1665.87

    422 422 2976.06 422 2977.07 422 4457.65 422 4375.64 422 1858.78 422 1669.78

    423 423 2983.03 423 2984.04 423 4468.09 423 4385.88 423 1863.13 423 1673.69

    424 424 2990.00 424 2991.01 424 4478.53 424 4396.12 424 1867.48 424 1677.60

    425 425 2996.97 425 2997.98 425 4488.97 425 4406.36 425 1871.83 425 1681.51

    426 426 3003.94 426 3004.95 426 4499.41 426 4416.60 426 1876.18 426 1685.42

    427 427 3010.91 427 3011.92 427 4509.85 427 4426.84 427 1880.53 427 1689.33

    428 428 3017.88 428 3018.89 428 4520.29 428 4437.08 428 1884.88 428 1693.24

    429 429 3024.85 429 3025.86 429 4530.73 429 4447.32 429 1889.23 429 1697.15

    430 430 3031.82 430 3032.83 430 4541.17 430 4457.56 430 1893.58 430 1701.06

    431 431 3038.79 431 3039.80 431 4551.61 431 4467.80 431 1897.93 431 1704.97

    432 432 3045.76 432 3046.77 432 4562.05 432 4478.04 432 1902.28 432 1708.88433 433 3052.73 433 3053.74 433 4572.49 433 4488.28 433 1906.63 433 1712.79

    434 434 3059.70 434 3060.71 434 4582.93 434 4498.52 434 1910.98 434 1716.70

    435 435 3066.67 435 3067.68 435 4593.37 435 4508.76 435 1915.33 435 1720.61

    436 436 3073.64 436 3074.65 436 4603.81 436 4519.00 436 1919.68 436 1724.52

    437 437 3080.61 437 3081.62 437 4614.25 437 4529.24 437 1924.03 437 1728.43

    438 438 3087.58 438 3088.59 438 4624.69 438 4539.48 438 1928.38 438 1732.34

    439 439 3094.55 439 3095.56 439 4635.13 439 4549.72 439 1932.73 439 1736.25

    440 440 3101.52 440 3102.53 440 4645.57 440 4559.96 440 1937.08 440 1740.16

    441 441 3108.49 441 3109.50 441 4656.01 441 4570.20 441 1941.43 441 1744.07

    442 442 3115.46 442 3116.47 442 4666.45 442 4580.44 442 1945.78 442 1747.98

    443 443 3122.43 443 3123.44 443 4676.89 443 4590.68 443 1950.13 443 1751.89444 444 3129.40 444 3130.41 444 4687.33 444 4600.92 444 1954.48 444 1755.80

    445 445 3136.37 445 3137.38 445 4697.77 445 4611.16 445 1958.83 445 1759.71

    446 446 3143.34 446 3144.35 446 4708.21 446 4621.40 446 1963.18 446 1763.62

    447 447 3150.31 447 3151.32 447 4718.65 447 4631.64 447 1967.53 447 1767.53

    448 448 3157.28 448 3158.29 448 4729.09 448 4641.88 448 1971.88 448 1771.44

    449 449 3164.25 449 3165.26 449 4739.53 449 4652.12 449 1976.23 449 1775.35

    450 450 3171.22 450 3172.23 450 4749.97 450 4662.36 450 1980.58 450 1779.26

    451 451 3178.19 451 3179.20 451 4760.41 451 4672.60 451 1984.93 451 1783.17

    CONVEYANCE CHARGES PAGE NO : 34 of 68

  • 7/28/2019 Rajivnagar Bit I

    35/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    452 452 3185.16 452 3186.17 452 4770.85 452 4682.84 452 1989.28 452 1787.08

    453 453 3192.13 453 3193.14 453 4781.29 453 4693.08 453 1993.63 453 1790.99

    454 454 3199.10 454 3200.11 454 4791.73 454 4703.32 454 1997.98 454 1794.90

    455 455 3206.07 455 3207.08 455 4802.17 455 4713.56 455 2002.33 455 1798.81

    456 456 3213.04 456 3214.05 456 4812.61 456 4723.80 456 2006.68 456 1802.72

    457 457 3220.01 457 3221.02 457 4823.05 457 4734.04 457 2011.03 457 1806.63

    458 458 3226.98 458 3227.99 458 4833.49 458 4744.28 458 2015.38 458 1810.54

    459 459 3233.95 459 3234.96 459 4843.93 459 4754.52 459 2019.73 459 1814.45

    460 460 3240.92 460 3241.93 460 4854.37 460 4764.76 460 2024.08 460 1818.36

    461461

    3247.89461

    3248.90461

    4864.81461

    4775.00461

    2028.43461

    1822.27

    462 462 3254.86 462 3255.87 462 4875.25 462 4785.24 462 2032.78 462 1826.18

    463 463 3261.83 463 3262.84 463 4885.69 463 4795.48 463 2037.13 463 1830.09

    464 464 3268.80 464 3269.81 464 4896.13 464 4805.72 464 2041.48 464 1834.00

    465 465 3275.77 465 3276.78 465 4906.57 465 4815.96 465 2045.83 465 1837.91

    466 466 3282.74 466 3283.75 466 4917.01 466 4826.20 466 2050.18 466 1841.82

    467 467 3289.71 467 3290.72 467 4927.45 467 4836.44 467 2054.53 467 1845.73

    468 468 3296.68 468 3297.69 468 4937.89 468 4846.68 468 2058.88 468 1849.64

    469 469 3303.65 469 3304.66 469 4948.33 469 4856.92 469 2063.23 469 1853.55

    470 470 3310.62 470 3311.63 470 4958.77 470 4867.16 470 2067.58 470 1857.46

    471 471 3317.59 471 3318.60 471 4969.21 471 4877.40 471 2071.93 471 1861.37

    472 472 3324.56 472 3325.57 472 4979.65 472 4887.64 472 2076.28 472 1865.28

    473 473 3331.53 473 3332.54 473 4990.09 473 4897.88 473 2080.63 473 1869.19474 474 3338.50 474 3339.51 474 5000.53 474 4908.12 474 2084.98 474 1873.10

    475 475 3345.47 475 3346.48 475 5010.97 475 4918.36 475 2089.33 475 1877.01

    476 476 3352.44 476 3353.45 476 5021.41 476 4928.60 476 2093.68 476 1880.92

    477 477 3359.41 477 3360.42 477 5031.85 477 4938.84 477 2098.03 477 1884.83

    478 478 3366.38 478 3367.39 478 5042.29 478 4949.08 478 2102.38 478 1888.74

    479 479 3373.35 479 3374.36 479 5052.73 479 4959.32 479 2106.73 479 1892.65

    480 480 3380.32 480 3381.33 480 5063.17 480 4969.56 480 2111.08 480 1896.56

    481 481 3387.29 481 3388.30 481 5073.61 481 4979.80 481 2115.43 481 1900.47

    482 482 3394.26 482 3395.27 482 5084.05 482 4990.04 482 2119.78 482 1904.38

    483 483 3401.23 483 3402.24 483 5094.49 483 5000.28 483 2124.13 483 1908.29

    484 484 3408.20 484 3409.21 484 5104.93 484 5010.52 484 2128.48 484 1912.20485 485 3415.17 485 3416.18 485 5115.37 485 5020.76 485 2132.83 485 1916.11

    486 486 3422.14 486 3423.15 486 5125.81 486 5031.00 486 2137.18 486 1920.02

    487 487 3429.11 487 3430.12 487 5136.25 487 5041.24 487 2141.53 487 1923.93

    488 488 3436.08 488 3437.09 488 5146.69 488 5051.48 488 2145.88 488 1927.84

    489 489 3443.05 489 3444.06 489 5157.13 489 5061.72 489 2150.23 489 1931.75

    490 490 3450.02 490 3451.03 490 5167.57 490 5071.96 490 2154.58 490 1935.66

    491 491 3456.99 491 3458.00 491 5178.01 491 5082.20 491 2158.93 491 1939.57

    492 492 3463.96 492 3464.97 492 5188.45 492 5092.44 492 2163.28 492 1943.48

    CONVEYANCE CHARGES PAGE NO : 35 of 68

  • 7/28/2019 Rajivnagar Bit I

    36/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    493 493 3470.93 493 3471.94 493 5198.89 493 5102.68 493 2167.63 493 1947.39

    494 494 3477.90 494 3478.91 494 5209.33 494 5112.92 494 2171.98 494 1951.30

    495 495 3484.87 495 3485.88 495 5219.77 495 5123.16 495 2176.33 495 1955.21

    496 496 3491.84 496 3492.85 496 5230.21 496 5133.40 496 2180.68 496 1959.12

    497 497 3498.81 497 3499.82 497 5240.65 497 5143.64 497 2185.03 497 1963.03

    498 498 3505.78 498 3506.79 498 5251.09 498 5153.88 498 2189.38 498 1966.94

    499 499 3512.75 499 3513.76 499 5261.53 499 5164.12 499 2193.73 499 1970.85

    500 500 3519.72 500 3520.73 500 5271.97 500 5174.36 500 2198.08 500 1974.76

    501 501 3526.69 501 3527.70 501 5282.41 501 5184.60 501 2202.43 501 1978.67

    502502

    3533.66502

    3534.67502

    5292.85502

    5194.84502

    2206.78502

    1982.58

    503 503 3540.63 503 3541.64 503 5303.29 503 5205.08 503 2211.13 503 1986.49

    504 504 3547.60 504 3548.61 504 5313.73 504 5215.32 504 2215.48 504 1990.40

    505 505 3554.57 505 3555.58 505 5324.17 505 5225.56 505 2219.83 505 1994.31

    506 506 3561.54 506 3562.55 506 5334.61 506 5235.80 506 2224.18 506 1998.22

    507 507 3568.51 507 3569.52 507 5345.05 507 5246.04 507 2228.53 507 2002.13

    508 508 3575.48 508 3576.49 508 5355.49 508 5256.28 508 2232.88 508 2006.04

    509 509 3582.45 509 3583.46 509 5365.93 509 5266.52 509 2237.23 509 2009.95

    510 510 3589.42 510 3590.43 510 5376.37 510 5276.76 510 2241.58 510 2013.86

    511 511 3596.39 511 3597.40 511 5386.81 511 5287.00 511 2245.93 511 2017.77

    512 512 3603.36 512 3604.37 512 5397.25 512 5297.24 512 2250.28 512 2021.68

    513 513 3610.33 513 3611.34 513 5407.69 513 5307.48 513 2254.63 513 2025.59

    514 514 3617.30 514 3618.31 514 5418.13 514 5317.72 514 2258.98 514 2029.50515 515 3624.27 515 3625.28 515 5428.57 515 5327.96 515 2263.33 515 2033.41

    516 516 3631.24 516 3632.25 516 5439.01 516 5338.20 516 2267.68 516 2037.32

    517 517 3638.21 517 3639.22 517 5449.45 517 5348.44 517 2272.03 517 2041.23

    518 518 3645.18 518 3646.19 518 5459.89 518 5358.68 518 2276.38 518 2045.14

    519 519 3652.15 519 3653.16 519 5470.33 519 5368.92 519 2280.73 519 2049.05

    520 520 3659.12 520 3660.13 520 5480.77 520 5379.16 520 2285.08 520 2052.96

    521 521 3666.09 521 3667.10 521 5491.21 521 5389.40 521 2289.43 521 2056.87

    522 522 3673.06 522 3674.07 522 5501.65 522 5399.64 522 2293.78 522 2060.78

    523 523 3680.03 523 3681.04 523 5512.09 523 5409.88 523 2298.13 523 2064.69

    524 524 3687.00 524 3688.01 524 5522.53 524 5420.12 524 2302.48 524 2068.60

    525 525 3693.97 525 3694.98 525 5532.97 525 5430.36 525 2306.83 525 2072.51526 526 3700.94 526 3701.95 526 5543.41 526 5440.60 526 2311.18 526 2076.42

    527 527 3707.91 527 3708.92 527 5553.85 527 5450.84 527 2315.53 527 2080.33

    528 528 3714.88 528 3715.89 528 5564.29 528 5461.08 528 2319.88 528 2084.24

    529 529 3721.85 529 3722.86 529 5574.73 529 5471.32 529 2324.23 529 2088.15

    530 530 3728.82 530 3729.83 530 5585.17 530 5481.56 530 2328.58 530 2092.06

    531 531 3735.79 531 3736.80 531 5595.61 531 5491.80 531 2332.93 531 2095.97

    532 532 3742.76 532 3743.77 532 5606.05 532 5502.04 532 2337.28 532 2099.88

    533 533 3749.73 533 3750.74 533 5616.49 533 5512.28 533 2341.63 533 2103.79

    CONVEYANCE CHARGES PAGE NO : 36 of 68

  • 7/28/2019 Rajivnagar Bit I

    37/68

    Km Charges Km Charges Km Charges Km Charges Km Charges Km Charges

    Water

    CONVEYANCE CHARGES AS PER COMMON SSR 2011 - 2012

    Sl.N

    o

    Earth/Sand/Gr

    avel/ Murrum

    /Lime/Surki

    Rubble/Size

    Stone/ Cut

    Stone/ Coarse

    aggregates

    Bricks

    PCC

    Slabs/Shabad

    Slabs/CC &

    Laterite

    Blocks/Wood

    Cement/Steel/

    RCC poles/A.C

    & G.I Sheets

    /Packed

    materials

    534 534 3756.70 534 3757.71 534 5626.93 534 5522.52 534 2345.98 534 2107.70

    535 535 3763.67 535 3764.68 535 5637.37 535 5532.76 535 2350.33 535 2111.61

    536 536 3770.64 536 3771.65 536 5647.81 536 5543.00 536 2354.68 536 2115.52

    537 537 3777.61 537 3778.62 537 5658.25 537 5553.24 537 2359.03 537 2119.43

    538 538 3784.58 538 3785.59 538 5668.69 538 5563.48 538 2363.38 538 2123.34

    539 539 3791.55 539 3792.56 539 5679.13 539 5573.72 539 2367.73 539 2127.25

    540 540 3798.52 540 3799.53 540 5689.57 540 5583.96 540 2372.08 540 2131.16

    541 541 3805.49 541 3806.50 541 5700.01 541 5594.20 541 2376.43 541 2135.07

    542 542 3812.46 542 3813.47