Raising People Trust to Public Transport - TransJogja Priority Lines
Transcript of Raising People Trust to Public Transport - TransJogja Priority Lines
-
7/30/2019 Raising People Trust to Public Transport - TransJogja Priority Lines
1/2
RaisingPeopleTrusttoPublicTransportbyProvide
1st
ProposedPriorityLineofTransJogja
Ghulamin Rizqiawan - 12/338919/PMU/7416 (Author)
Jan Prabowo Harmanto (Partner)
Introduction
Jogjakarta is one of main tourism destination city in
Indonesia. Jogjakarta also became cultural city as well
as education city. So many nice places and best
school/university locate around the city make
Jogjakarta more attractive rather than other city.Hence, Jogjakarta city grow rapidly from years to
come. One of the development challenges is to
counter the increasing of motor vehicle caused
congestion. Data show there is overloaded of road
sections because of vehicle growth (4%/year) going
faster than road provision growth (2,31%/year). Public
transport system believed has important role to
counter private motor vehicle use and make
Jogjakarta more convenient.
The existing system of Jogjakarta Public transportsystem consist regular old buses, TransJogja Busline,
Taxi, and other Paratransit such as Becak (Pedicab),
Ojek (Motorcycle Taxi) and Andong (Horse-drawn
Carriage). As a main Public Transport, regular old bus
and TransJogja still need a lot of improvement. The
main problem is still congestion, so there is an idea to
giving priority line to TransJogja to increase its speed
and integrating other mode as a feeder to widen
service area. The 1st
proposed priority line is to
connect main arterial road (jl. Solo) - main boulevard
(jl. Malioboro) North Square Palace (alun-alun utara Ngabean Parking Area. The line seem very good
because it`s going through the center of the city but
its deal with mix dense traffic, narrow road, public
space conquest, on-street parking and traditional
event held at Kraton which will closing the road.
The purpose of this small research is to examine what
will happen if the proposed line has been
implemented especially related to community
development theories. In this paper, I would like to
give emphasize on symbolic interactionism theory.
Symbolic interactionism is essential for community
development because it provides insight into the ways
people develop a sense of shared meaning, an
essential ingredient for solidarity (Hustedde, 2009).
Develop a sense of shared meaning and construct
solidarity is one of the key factors to make 1st
proposed new line successful. Joko Widodo, Major of
Solo City has implemented many successful
development of Street Vendor Relocation. He Said,
the first one is always difficult but if it`s successful,
the rest will be much more easier. After the first pilot
project completed and people got its benefit, the trust
to relocation program raised, people got the meaning
of the program, so they more open if there is any such
program in the future. In case of proposed 1st
TransJogja Fixed line, we can assume it will become
pilot project. The hypothesis is if the 1st priority line
successful, it can raise people trust to public transport
and share meaning that can change people travel
behavior from private to public transport.
Methods
To examine how the 1st
priority line will make a shared
meaning. We conduct some interview to different
peoples that will be affected by provision of this line.
The interviewed people consist Local User, Domestic
Tourist User, Foreign Tourist User, Private Car Driver,Taxi Driver, Old Bus Driver, Becak Driver, Andong
Driver, Parking Attendance, Street Vendor, and Street
Shop owner. The interview conduct to identify the
perception of TransJogja meaning to them and toward
TransJogja Reform by Provide 1st
Priority line. The
perception toward 1st
priority line will divide into three
category : positive, neutral, and negative. Identified
perception will make some portrait to us that show
how the pilot project will bring trust and potential to
change people travel behavior.
-
7/30/2019 Raising People Trust to Public Transport - TransJogja Priority Lines
2/2