4
100% P.C 60:40:00 cement 7.85 5.23 Slag 0 3.489 water 3.38 3.23 m-sand 15.42 15.07 20mm 20 7.5 12.5m 7.74 7.56 Slump(mm) 10-30mm Bleeding+seggergation(over dosage of SP) S.P consumed(Kg) 0.0605 0.08719(1% by weight of powder)

description

mix design

Transcript of Rahul Jsw Mix Design

Page 1: Rahul Jsw Mix Design

100% P.C 60:40:00 50:50:00

cement 7.85 5.23 4.34Slag 0 3.489 4.34water 3.38 3.23 3.03m-sand 15.42 15.07 15.1820mm 20 7.5 7.5712.5m 7.74 7.56 7.62

Slump(mm) 10-30mm Bleeding+seggergation(over dosage of SP) 160mm

S.P consumed(Kg) 0.0605 0.08719(1% by weight of powder) 0.061

Page 2: Rahul Jsw Mix Design

fly-ash40:60 30:70 75:25:00

3.45 2.61 6.55.18 6.08 2.172.85 2.69 3.2215.3 15.35 15.087.62 7.65 7.517.68 7.7 7.57

80mm 20mm 145mm

0.0751 0.087(1% by weight of powder) 0.0217

Page 3: Rahul Jsw Mix Design

TOTAL VOLUME 20 cm3

100 PC 60:40:00 50:50:00 40:60 30:70 75:25:00 S.G

OPC 62.8 3.14SLAG 2.75FLY ASH 2.8