RAF Brize Norton, Oxford - Tubosider · 2015. 10. 13. · RAF Brize Norton, Oxford Who: Royal Air...

1
Call us: 01744 452 900 Tubosider United Kingdom Ltd , 10 Sutton Fold Industrial Estate, Off Lancots Lane, Sutton. St Helens. WA9 3GL Supporting you from the ground up. Call us: 01744 452 900 Email us: [email protected] Visit us: www.tubosider.co.uk RAF Brize Norton, Oxford Who: Royal Air Force Where: RAF Brize Norton airbase, Oxfordshire What: Specifier: Stormwater attenuation system Main contractor: Drainage subcontractor: Project requirements: Doubling service area for six new aircraft service platforms System cost: £370,000 Key criteria: Cost effective impermeable system with load-bearing strength to support parking for a range of aircraft including new Future Strategic Tanker Aircraft, Tristars and C130Js from Lyneham. Solution achieved: 4500 cubic metre tank in 1800mm steel composed of 18 legs of 96 metre length with six access shafts, inlet and outlet. Other benefits: Quicker and simpler to install than polythene or conctrete, easy access for maintenance, and Tubosider installation engineer on site to help with the set up and establish good practice. Project details

Transcript of RAF Brize Norton, Oxford - Tubosider · 2015. 10. 13. · RAF Brize Norton, Oxford Who: Royal Air...

Page 1: RAF Brize Norton, Oxford - Tubosider · 2015. 10. 13. · RAF Brize Norton, Oxford Who: Royal Air Force Where: RAF Brize Norton airbase, Oxfordshire What: Specifier: Stormwater attenuation

Call us:01744 452 900

Tubosider United Kingdom Ltd,10 Sutton Fold Industrial Estate,Off Lancots Lane,Sutton.St Helens. WA9 3GL

Supporting you from the ground up.

Call us: 01744 452 900Email us: [email protected] us: www.tubosider.co.uk

RAF Brize Norton, Oxford

Who:Royal Air Force

Where:RAF Brize Norton airbase, Oxfordshire

What: Specifier:Stormwater attenuation system

Main contractor:

Drainage subcontractor:

Project requirements:Doubling service area for six new aircraft service platforms

System cost:£370,000

Key criteria:Cost effective impermeable system with load-bearing strength to support parking for a range of aircraft including new Future Strategic Tanker Aircraft, Tristars and C130Js from Lyneham.

Solution achieved:4500 cubic metre tank in 1800mm steel composed of 18 legs of 96 metre length with six access shafts, inlet and outlet.

Other benefits:Quicker and simpler to install than polythene or conctrete, easy access for maintenance, and Tubosider installation engineer on site to help with the set up and establish good practice.

Project details