HONEYWELL SITE#: R37793 DOCUMENT FILE LOC: 4.03 Race Street Quarterly Site Progress Report Fourth Quarter 2011 2000 Race Street Baltimore, MD Prepared for 101 Columbia Road Morristown, N.J. and The Mayor and City Council of Baltimore January 2012 Prepared by

Transcript of Race Street Quarterly Site Progress Report Fourth...

Page 1: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

HONEYWELL SITE#: R37793 DOCUMENT FILE LOC: 4.03

Race Street Quarterly Site Progress Report

Fourth Quarter 2011

2000 Race Street Baltimore, MD

Prepared for

101 Columbia Road

Morristown, N.J.

and

The Mayor and City Council of Baltimore

January 2012 Prepared by

Page 2: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

HONEYWELL SITE#: R37793 II DOCUMENT FILE LOC: 4.03

Contents

1 Introduction ........................................................................................................................... 1-1

2 Quarter in Review ................................................................................................................. 2-1

3 Upcoming Work and Submittals During First Quarter 2012......................................... 3-1

4 Schedule .................................................................................................................................. 4-1

Appendices

A Site Inspection Reports

Page 3: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

HONEYWELL SITE#: R37793 1-1 DOCUMENT FILE LOC: 4.03

SECTION 1

Introduction

Honeywell International Inc. (Honeywell) and the Mayor and City Council of Baltimore (City) are submitting this Quarterly Site Progress Report for the 2000 Race Street Site (Site) pursuant to the May 23, 2007, Administrative Consent Order (Consent Order) between the Maryland Department of the Environment (MDE), Honeywell, and the City. Quarterly Site Progress Reports will be submitted to MDE for the duration of the Consent Order. As specified within Section III.F of the Consent Order, the reports will identify the following information:

• Work completed and documents submitted to MDE in the preceding quarter; • A schedule and submittals for the upcoming quarter; and • Any delays, modifications, or changes anticipated in the upcoming quarter.

This report covers Race Street Site–related activities conducted under the Consent Order during the fourth quarter of 2011, from October 1 through December 31, 2011.

The Site is located at 2000 Race Street in Baltimore, Maryland (ZIP Code 21230). It occupies approximately 10.3 acres and is bounded on the north by the Baltimore Gas and Electric (BGE) Spring Gardens facility, on the south by Swann Park, on the east by Race Street, and on the west by the Middle Branch of the Patapsco River. In addition, two elevated spans of Interstate 95 (I-95) oriented from east to west overlie the Site on the northern half of the property. A chain-link security fence is present at the perimeter of the Site. The Site has no onsite building structures and is currently vacant.

Controlled hazardous substances (CHS) are contained on the Site and covered with an engineered cap consisting of the following materials from top to bottom: asphalt, gravel base, and compacted clay. Cap maintenance is ongoing. The Site has not received CHS since 1976. Additional information regarding the Site is provided in several documents, including the May 23, 2007, Consent Order; the “Site Characterization Work Plan,” dated September 2007; the “Site Characterization Report,” dated September 2009; and the “Near Shore Investigation Report,” dated December 2009.

Page 4: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

HONEYWELL SITE#: R37793 2-1 DOCUMENT FILE LOC: 4.03

SECTION 2

Quarter in Review

Activities performed at the Site during the fourth quarter of 2011 include the following:

• October 7: Bridge Monitoring Program Work Plan submitted to MDE;

• October 10–20: Test pit excavations for Bridge Monitoring Program;

• October 20: Monthly Site status inspection (Appendix A);

• October 24 through November 13: Drilling for Bridge Monitoring Program;

• October 30: Submission of the third quarter 2011 Site Status Report to MDE;

• November 2: Monthly Site status call with MDE;

• November 9: Sampled groundwater at TPZ-008 and TPZ-009 to support IRMA pilot test;

• November 16: Monthly Site status inspection (Appendix A);

• December 8: Monthly Site status call with MDE;

• December 14 and 15: Obtained inclinometer readings;

• December 16: City of Baltimore Site-wide cleanup;

• December 20: Obtain City of Baltimore right-of-way permit for asphalt paving;

• December 21: Performed asphalt paving and repairs;

• December 21: Monthly Site status inspection (Appendix A); and

• December 23: Vehicle gate to parking area for Swann Park repaired.

Page 5: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

HONEYWELL SITE#: R37793 3-1 DOCUMENT FILE LOC: 4.03

SECTION 3

Upcoming Work and Submittals During First Quarter 2012

The following activities and submittals are anticipated to occur in the upcoming quarter:

• January, February, March: Conduct monthly Site status inspections and participate in monthly Site status calls with MDE;

• Submit Bridge Monitoring Baseline report;

• Submit Interim Remedial Measures Assessment (IRMA) Investigation and Pilot Test Data Report presenting results from the pilot testing and the geotechnical and hydrogeologic characterization of the area inland of the seep; and

• Continue preparation of IRMA report.

The First Quarter 2012 Site Status Report will be submitted to the MDE by April 30, 2012.

Page 6: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

HONEYWELL SITE#: R37793 4-1 DOCUMENT FILE LOC: 4.03

SECTION 4

Schedule

A schedule of Consent Order activities anticipated during the first quarter of 2012 is provided below.

Milestone Anticipated

Date

January 2012

Perform monthly Site inspection 1-26-2012

Submit fourth quarter 2011 Site Status Report 1-30-2012

February 2012

Perform monthly Site inspection 2-23-2012

March 2012

Perform monthly Site inspection Submit Bridge Monitoring report Submit IRMA Investigation and Pilot Test Data Report

TBD TBD TBD

Second Quarter 2012

Submit First Quarter 2012 Site Status Report 4-30-2012

Complete monthly Site inspections TBD

Page 7: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

Appendix A Site Inspection Reports

Page 8: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

2000 Race StreetMonthly Site Inspection Checklist

Inspector: Kenneth Biles Date of Inspection:

Title: Assistant Project Manager Date of Last Inspection:

Organization: CH2M HILL Weather:

Task Observations Actions Taken Date Completed Comments/Additional Observations

Inspect site for presence of surface debris. Identify type, approximate volume of debris, and location via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect site for presence of vegetation. Identify estimated amount and location of vegetation via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect around pier footings for settlement. Identify settlement off-set from grade and location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect around pier footings for joint failure. Identify location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect cap for alligator cracking. Identify estimated area of cracking and location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect cap for holes. Identify number of holes, width and depth, and location via description of on Site Plan (attach to Monthly Site Inspection Checklist)

2) Hole on edge of cap City notified TBD Localized erosion to be repaired as part of ongoing O&M activities.

Inspect cap for cracks less than 0.5 inches wide. Note number of cracks. Identify location of cracks via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect cap for cracks greater than 0.5 inches wide. Note number of cracks. Identify location of cracks via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect cap for any signs of ponding of water None None NA NA

Inspect shorefront embankment for evidence of erosion or releases

None None NA NA

Identify any other observations related to the condition of the cap and potential for cap damage

None None NA NA

10/20/2011

9/22/2011

Warm & clear

3. Engineered Cap

Site Inspection Results

4. Fence

1. General

2. Interstate 95 Footings and Joints

Page 1 of 2

Page 9: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

2000 Race StreetMonthly Site Inspection Checklist

Task Observations Actions Taken Date Completed Comments/Additional ObservationsSite Inspection Results

Inspect fence for holes. Note number of holes. Identify location of holes via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect fence to determine if there is any erosion compromising the integrity of the fence

None None NA NA

Inspect fence to determine if barbed wire is in good condition

None None NA NA

Inspect gates, chains, and locks for damage 5) Swann Park Gate not repaired6) Gates to SP not closed or locked

BGE notified TBD Gate damaged by BGE vehicle; BGE to pay for gate repair.

Inspect fence to determine if any vegetation is damaging or otherwise compromising fence

None None NA NA

Inspect fence to determine if there is any burrowing beneath fence

1) Burrow under fence4) Burrow at edge of asphalt

City notified TBD Localized erosion to be repaired as part of ongoing O&M activities.

Identify any other observations related to the condition of the fence and potential for fence damage (e.g., points of weakness, corrosion)

None None NA NA

Inspect aboveground stormwater conveyance system including piping, downspouts, and drain in southwest corner of site for proper operation

3) Storm drain lead off. MDTA notified NA MDTA to perform repairs as part of ongoing O&M activities.

Inspect site for any vandalism including any dumped material on-site and damage to monitoring wells

None None NA NA

Identify any other observations related to vandalism on the site

None None NA NA

Inspect warning signs on exterior perimeter of fence to determine condition and readability. Identify number of signs removed/damaged/unreadable and locations via description or Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Any interaction with people on or adjacent to the site? If yes, identify who, title, organization, contact information, and content of interaction

Other Comments/Observations?

Josh Floyd (ERM) and Jim Leizear (MDE) onsite during site walk. Lisa Carter (Ch2M Hill) onsite is overseeing bridge monitoring activities.

5. Aboveground Stormwater Conveyance System

6. Vandalism

8. Miscellaneous Items

7. Signage

Page 2 of 2

Page 10: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

78?78?

78?

78?

78?

78?

78?

78?78?

BG&E SpringGardens Facility

Swann Park

Race Street Site

11

<

<

I-95 Northbound

I-95 Southbound

Race

Stre

et

8 14121015

23

111613

2010

10

18

13

20 22

25

24

9

13

1615

19

25

5

7

2418

21

12

27

19

22

25

26

26

28

6

15

17

21

12

17

16

12

8

6

4

20

2

0

22

18

14

16

12

10

24

6

14

420

18

16

10

22

12

24

/Legend

Existing ShorelineApproximate Limits of I-95Edge of PavementStorm ManholeAbove Ground Stormwater Conveyance SystemBelow Ground Stormwater Conveyance System

78? Warning SignFence/Approximate Property BoundaryElevation Contours (feet-MSL)Buildings

q Down SpoutsBaltimore Stormwater Pipe

Land UseCommercialExempt CommercialIndustrialResidential

Concrete ColumnConcrete Footer

Monthly Inspection MapRace Street Site

Baltimore, MD50 0 50 100 150

Feet1 inch equals 100 feet­ General Stormwater Flow Direction

Notes:1) Source of Race Street Site elevation contours and other site-specificinformation is the Final Corrective Action Plan for Interim Repairs (CAPIR)Completion Report, January 2005. O'brien & Gere Engineers, Inc.2) Off-site elevation contours were generated from USGS 30-meter DEMfor the Baltimore East Quad; Source Date 1953, with a revision date of 1994.3) Source of off-site spatial information is from the City of Baltimore.

kbiles
Typewritten Text
October 20, 2011
kbiles
Typewritten Text
kbiles
Typewritten Text
1
kbiles
Typewritten Text
2
kbiles
Typewritten Text
6
kbiles
Typewritten Text
5
kbiles
Typewritten Text
4
kbiles
Typewritten Text
3
kbiles
Text Box
Numbers correspond to descriptions in the Inspection report
Page 11: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

2000 Race StreetMonthly Site Inspection Checklist

Inspector: Kenneth Biles Date of Inspection:

Title: Assistant Project Manager Date of Last Inspection:

Organization: CH2M HILL Weather:

Task Observations Actions Taken Date Completed Comments/Additional Observations

Inspect site for presence of surface debris. Identify type, approximate volume of debris, and location via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect site for presence of vegetation. Identify estimated amount and location of vegetation via description or on Site Plan (attach to Monthly Site Inspection Checklist)

8) Vegetation in crack around piling City to perform site-wide cleanup and vegetation control in December 2011.

TBD City performs vegetation control as part of ongoing O&M activities.

Inspect around pier footings for settlement. Identify settlement off-set from grade and location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect around pier footings for joint failure. Identify location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect cap for alligator cracking. Identify estimated area of cracking and location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

1) ~ 20' of crack w/vegetation11) localized crack in asphalt

O&M activities scheduled to be performed in December 2011.

TBD Localized areas to be repaired as part of ongoing O&M activities.

Inspect cap for holes. Identify number of holes, width and depth, and location via description of on Site Plan (attach to Monthly Site Inspection Checklist)

4) ~1"X3" hole in asphalt O&M activities scheduled to be performed in December 2011.

TBD Localized areas to be repaired as part of ongoing O&M activities.

Inspect cap for cracks less than 0.5 inches wide. Note number of cracks. Identify location of cracks via description or on Site Plan (attach to Monthly Site Inspection Checklist).

14) Settlement cracking near pile cap. O&M activities scheduled to be performed in December 2011.

TBD Localized areas to be repaired as part of ongoing O&M activities.

Inspect cap for cracks greater than 0.5 inches wide. Note number of cracks. Identify location of cracks via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect cap for any signs of ponding of water 2) Standing water in low lying area O&M activities scheduled to be performed in December 2011.

TBD Localized areas to be repaired as part of ongoing O&M activities.

Inspect shorefront embankment for evidence of erosion or releases

12) Localized erosion O&M activities scheduled to be performed in December 2011.

TBD Localized areas to be repaired as part of ongoing O&M activities.

Identify any other observations related to the condition of the cap and potential for cap damage

3) ~1" offset in asphalt ~ 20' long6) Saw cut in asphalt from bridge monitoring system installation13) Low area in asphalt cap

O&M activities scheduled to be performed in December 2011.

TBD Localized areas to be filled/repaired as part of ongoing O&M activities.

16-Nov-11

20-Oct-11

Cloudy, Raining

3. Engineered Cap

Site Inspection Results

4. Fence

1. General

2. Interstate 95 Footings and Joints

Page 1 of 2

Page 12: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

2000 Race StreetMonthly Site Inspection Checklist

Task Observations Actions Taken Date Completed Comments/Additional ObservationsSite Inspection Results

Inspect fence for holes. Note number of holes. Identify location of holes via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect fence to determine if there is any erosion compromising the integrity of the fence

None None NA NA

Inspect fence to determine if barbed wire is in good condition

None None NA NA

Inspect gates, chains, and locks for damage 10) Gate not repaired BGE notified TBD BGE to perform repairs

Inspect fence to determine if any vegetation is damaging or otherwise compromising fence

9) Vines on fencing and barbed wire City to perform site-wide cleanup during December 2011.

TBD City performs vegetation control as part of ongoing O&M activities.

Inspect fence to determine if there is any burrowing beneath fence

7) Animal burrow under asphalt City notified. TBD City to perform repairs as part of ongoing O&M activities.

Identify any other observations related to the condition of the fence and potential for fence damage (e.g., points of weakness, corrosion)

None None NA NA

Inspect aboveground stormwater conveyance system including piping, downspouts, and drain in southwest corner of site for proper operation

None None NA NA

Inspect site for any vandalism including any dumped material on-site and damage to monitoring wells

None None NA NA

Identify any other observations related to vandalism on the site

None None NA NA

Inspect warning signs on exterior perimeter of fence to determine condition and readability. Identify number of signs removed/damaged/unreadable and locations via description or Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Any interaction with people on or adjacent to the site? If yes, identify who, title, organization, contact information, and content of interaction

Other Comments/Observations?

Josh Floyd (ERM) and Jim Leizear (MDE) onsite during site walk and four EQ representative onsite for cleaning and removal of frac tank.

5) Gate open to Swann Park, Baltimore City service personnel onsite.

5. Aboveground Stormwater Conveyance System

6. Vandalism

8. Miscellaneous Items

7. Signage

Page 2 of 2

Page 13: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

78?78?

78?

78?

78?

78?

78?

78?78?

BG&E SpringGardens Facility

Swann Park

Race Street Site

11

<

<

I-95 Northbound

I-95 Southbound

Race

Stre

et

8 14121015

23

111613

2010

10

18

13

20 22

25

24

9

13

1615

19

25

5

7

2418

21

12

27

19

22

25

26

26

28

6

15

17

21

12

17

16

12

8

6

4

20

2

0

22

18

14

16

12

10

24

6

14

420

18

16

10

22

12

24

/Legend

Existing ShorelineApproximate Limits of I-95Edge of PavementStorm ManholeAbove Ground Stormwater Conveyance SystemBelow Ground Stormwater Conveyance System

78? Warning SignFence/Approximate Property BoundaryElevation Contours (feet-MSL)Buildings

q Down SpoutsBaltimore Stormwater Pipe

Land UseCommercialExempt CommercialIndustrialResidential

Concrete ColumnConcrete Footer

Monthly Inspection MapRace Street Site

Baltimore, MD50 0 50 100 150

Feet1 inch equals 100 feet­ General Stormwater Flow Direction

Notes:1) Source of Race Street Site elevation contours and other site-specificinformation is the Final Corrective Action Plan for Interim Repairs (CAPIR)Completion Report, January 2005. O'brien & Gere Engineers, Inc.2) Off-site elevation contours were generated from USGS 30-meter DEMfor the Baltimore East Quad; Source Date 1953, with a revision date of 1994.3) Source of off-site spatial information is from the City of Baltimore.

kbiles
Typewritten Text
November 16. 2011
kbiles
Typewritten Text
kbiles
Line
kbiles
Line
kbiles
Line
kbiles
Typewritten Text
1
kbiles
Typewritten Text
2
kbiles
Typewritten Text
3
kbiles
Typewritten Text
4
kbiles
Typewritten Text
5
kbiles
Typewritten Text
6
kbiles
Typewritten Text
6
kbiles
Typewritten Text
9
kbiles
Typewritten Text
10
kbiles
Typewritten Text
9
kbiles
Typewritten Text
8
kbiles
Typewritten Text
8
kbiles
Typewritten Text
7
kbiles
Typewritten Text
11
kbiles
Typewritten Text
14
kbiles
Typewritten Text
13
kbiles
Typewritten Text
12
kbiles
Text Box
Numbers correspond to descriptions in the Inspection report
Page 14: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

2000 Race StreetMonthly Site Inspection Checklist

Inspector: Kenneth Biles Date of Inspection:

Title: Assistant Project Manager Date of Last Inspection:

Organization: CH2M HILL Weather:

Task Observations Actions Taken Date Completed Comments/Additional Observations

Inspect site for presence of surface debris. Identify type, approximate volume of debris, and location via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect site for presence of vegetation. Identify estimated amount and location of vegetation via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect around pier footings for settlement. Identify settlement off-set from grade and location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect around pier footings for joint failure. Identify location via description or on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect cap for alligator cracking. Identify estimated area of cracking and location via description or on

None None NA NA

1. General

2. Interstate 95 Footings and Joints

12/20/2011

11/16/2011

Cool, Cloudy, Rainy

3. Engineered Cap

Site Inspection Results

g pSite Plan (attach to Monthly Site Inspection Checklist)Inspect cap for holes. Identify number of holes, width and depth, and location via description of on Site Plan (attach to Monthly Site Inspection Checklist)

None None NA NA

Inspect cap for cracks less than 0.5 inches wide. Note number of cracks. Identify location of cracks via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect cap for cracks greater than 0.5 inches wide. Note number of cracks. Identify location of cracks via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect cap for any signs of ponding of water None None NA NA

Inspect shorefront embankment for evidence of erosion or releases

3) Discolored seep None NA Seep is being evaluated as part of the Interim Remedial Measures Assessment.

Identify any other observations related to the condition of the cap and potential for cap damage

1) Asphalt repaired in this area4) location of 2 asphalt patches over conduit

Asphalt repairs performed at part of O&M activities

Dec-12 NA

4. Fence

Page 1 of 2

Page 15: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

2000 Race StreetMonthly Site Inspection Checklist

Task Observations Actions Taken Date Completed Comments/Additional ObservationsSite Inspection Results

Inspect fence for holes. Note number of holes. Identify location of holes via description or on Site Plan (attach to Monthly Site Inspection Checklist).

None None NA NA

Inspect fence to determine if there is any erosion compromising the integrity of the fence

None None NA NA

Inspect fence to determine if barbed wire is in good condition

None None NA NA

Inspect gates, chains, and locks for damage 5) New fence posts installed. Gate repair scheduled 12/23/2011 No gates installed

Inspect fence to determine if any vegetation is damaging or otherwise compromising fence

None None NA NA

Inspect fence to determine if there is any burrowing beneath fence

None None NA NA

Identify any other observations related to the condition of the fence and potential for fence damage (e.g., points of weakness, corrosion)

None None NA NA

Inspect aboveground stormwater conveyance system including piping, downspouts, and drain in southwest corner of site for proper operation

None None NA NA

Inspect site for any vandalism including any dumped material on-site and damage to monitoring wells

None None NA NA6. Vandalism

5. Aboveground Stormwater Conveyance System

Identify any other observations related to vandalism on the site

None None NA NA

Inspect warning signs on exterior perimeter of fence to determine condition and readability. Identify number of signs removed/damaged/unreadable and locations via description or Site Plan (attach to Monthly Site Inspection Checklist)

2) Bent bollard protecting well None NA Bollard to be repaired as part of future site O&M activities.

Any interaction with people on or adjacent to the site? If yes, identify who, title, organization, contact information, and content of interaction

Other Comments/Observations?

7. Signage

8. Miscellaneous ItemsJim Leizear (MDE) and Josh Floyd (ERM) onsite during site visit. Flannigan was onsite completing milling and paving repairs to asphalt cover.

Page 2 of 2

Page 16: Race Street Quarterly Site Progress Report Fourth …baltimorechromiumresiduecleanup.com/_resources/... · Progress Report Fourth Quarter 2011 . 2000 Race Street ... Progress Reports

78?78?

78?

78?

78?

78?

78?

78?78?

BG&E SpringGardens Facility

Swann Park

Race Street Site

11

<

<

I-95 Northbound

I-95 Southbound

Race

Stre

et

8 14121015

23

111613

2010

10

18

13

20 22

25

24

9

13

1615

19

25

5

7

2418

21

12

27

19

22

25

26

26

28

6

15

17

21

12

17

16

12

8

6

4

20

2

0

22

18

14

16

12

10

24

6

14

420

18

16

10

22

12

24

/Legend

Existing ShorelineApproximate Limits of I-95Edge of PavementStorm ManholeAbove Ground Stormwater Conveyance SystemBelow Ground Stormwater Conveyance System

78? Warning SignFence/Approximate Property BoundaryElevation Contours (feet-MSL)Buildings

q Down SpoutsBaltimore Stormwater Pipe

Land UseCommercialExempt CommercialIndustrialResidential

Concrete ColumnConcrete Footer

Monthly Inspection MapRace Street Site

Baltimore, MD50 0 50 100 150

Feet1 inch equals 100 feet­ General Stormwater Flow Direction

Notes:1) Source of Race Street Site elevation contours and other site-specificinformation is the Final Corrective Action Plan for Interim Repairs (CAPIR)Completion Report, January 2005. O'brien & Gere Engineers, Inc.2) Off-site elevation contours were generated from USGS 30-meter DEMfor the Baltimore East Quad; Source Date 1953, with a revision date of 1994.3) Source of off-site spatial information is from the City of Baltimore.

kbiles
Typewritten Text
December 20, 2011
kbiles
Typewritten Text
kbiles
Typewritten Text
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
5
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
4
kbiles
Typewritten Text
4
kbiles
Typewritten Text
3
kbiles
Typewritten Text
2
kbiles
Typewritten Text
2
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
4
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Typewritten Text
2
kbiles
Typewritten Text
1
kbiles
Typewritten Text
1
kbiles
Text Box
Numbers correspond to descriptions in the Inspection report