REKAPITULASI DAFTAR KUANTITAS DAN HARGAKode Rekening Kegiatan : 1.03.01.15.22
Kode Rekening Belanja Modal: 5.2.3.21.04 74 Kegiatan Nama Proyek Lokasi Volume Volume Pelaksanaan Propinsi / Kabupaten : Pembangunan / Peningkatan Jalan Kecamatan Sukamulya : Peningkatan JL. Jambu - Buni Ayu - Jengkol : KECAMATAN SUKAMULYA : PANJANG : PANJANG = = 13,248.00 9,683.00 LEBAR = LEBAR = 3,5 ; 4 ; 6 5;6 m' m'
: BANTEN / TANGERANG
NO I. III. PEKERJAAN PENDAHULUAN PEKERJAAN TANAH
URAIAN
JUMLAH HARGA Rp. 140,196,000.00 276,870,970.00 10,400,904,890.00 37,142,000.00 462,740,000.00 9,077,695,904.00 1,425,104,670.00 132,210,900.00 8,100,000.00 1,513,036,200.00 217,390,000.00 23,691,391,534.00 2,369,139,153.40 26,060,530,687.40 26,060,000,000.00
VII. PEKERJAAN PONDASI BATU KALI / BELAH X. PEKERJAAN PLESTERAN
XVII. PEKERJAAN SANITASI / DRAINASE XIX. PEKERJAAN BETON XX PEKERJAAN BESI / BAJA PENGELASAN & ERECTION XXI PEKERJAAN BEKISTING XXII. PEKERJAAN LAPISAN ATAS JALAN XXIII. PEKERJAAN LAPISAN BAWAH JALAN XXVIII.PEKERJAAN PENGAMAN JALAN A B C JUMLAH HARGA PEKERJAAN PPN ( 10 % X A )
TOTAL JUMLAH KESELURUHAN
DIBULATKAN TERBILANG :
DUA PULUH ENAM MILIAR LIMA PULUH LIMA JUTA RUPIAH Tangerang, 4 Mei' 2011 PT. CATUR BIJAKSANA
MUHAMMAD ARIFIN Direktur
DAFTAR KUANTITAS DAN HARGA Kode Rekening Kegiatan : 1.03.01.15.22 Kode Rekening Belanja Modal : 5.2.3.21.04 74 Kegiatan : Pembangunan / Peningkatan Jalan Kecamatan Sukamulya Nama Proyek : Peningkatan Jl. Jambu - Buni - Ayu - Jengkol Lokasi : KECAMATAN SUKAMULYA Volume Keseluruhan PANJANG =13248.0 m' : LEBAR = 3,5m' : 5 ; 6 ;4 Perkiraan volume Pelaksanaan = 9683.0 m' : PANJANG LEBAR = 5:6 m' Propinsi / Kabupaten BANTEN / TANGERANG : N0. I. 1 2 3 4 JENIS PEKERJAAN KODE ANALISA PERKIRAAN VOLUME 1.00 2.00 11,296.00 Terlampir HARGA PEKERJAAN TOTAL HARGA ( Rp ) ( Rp ) ls unit m2 10,000,000.00 500,000.00 1,000.00 10,000,000.00 1,000,000.00 11,296,000.00 117,900,000.00 140,196,000.00 III. 1 2 3 4 5 6 PEKERJAAN TANAH Galian Tanah Keras Badan Jalan ( Mekanik ) Analisa El-312 a Galian Biasa ( Mekanik ) PLB Bdn Jalan & Sal,Air + TPT Analisa El-311 Urug Pasir Bawah Pasangan SNI 2835 - 6.11 a Timbunan Tanah Merah u/Badan Jalan BOW B. 16 Urug Tanah Kembali Ex Galian SNI 2835 - 6.9 Pek. Kisdam / Dewatering BOW B. 24 1,242.25 6,461.28 168.56 1,778.00 3,248.00 435.00 m3 m3 m3 m3 m3 m' 33,000.00 40,994,250.00 11,000.00 71,074,080.00 144,000.00 24,272,640.00 64,000.00 113,792,000.00 1,000.00 3,248,000.00 54,000.00 23,490,000.00 276,870,970.00 VII. 1 2 3 4 5 6 7 PEKERJAAN PONDASI BATU BELAH / KALI Pas.Batu Kali Tembok Penahan dan Dinding Talud Pas.Batu Kali Saluran Air Pas.Batu Kali Lonengan Gorong-Gorong Timbunan Porous / Steel Slag Pas. Sulingan PVC 2" + INJUK Pek. Tembok Penahan Tanah Corougated Sheet Pile Pek. Dinding Talud pas. Batu Kali Analisa EL-222 Analisa EL-222 Analisa EL-222 BOW C.27 BOW C.32 Dihitung Dihitung ( Terlampir ) 1,621.73 228.00 67.52 226.81 2,207.00 Terlampir 2 426.00 m3 m3 m3 m3 ttk m' 420,000.00 681,126,600.00 420,000.00 95,760,000.00 420,000.00 28,358,400.00 169,000.00 38,330,890.00 7,000.00 15,449,000.00 ### 2,780,000.00 ### ### X PEKERJAAN PLESTERAN 1 Pek. Plesteran U/ Tenbok Pernahan Tanah dan Saluran Air NI 2837 - 6.14 S U/ Lonengan Gorong-Gorong 928.55 m2 40,000.00 37,142,000.00
PEKERJAAN PENDAHULUAN Pengukuran dan Pematokan Dng alat optik dan soft Drawing Ls Papan Nama Proyek Ls Pembersiahan Lokasi BOW A.7 Mobilisasi Dihitung
37,142,000.00 XVII.PEKERJAAN SANITASI / DRAINASE 1 Pas. Gorong-Gorong Beton Bertulang BC. 100 X 100 ( 8 ttk ) Analisa EL-233 k 2 Pek. Tembok Penahan Tanah Beton pada Gorong-Gorong Dihitung 3 Pek. Trotoar Dihitung 64.00 Terlampir 4 Terlampir 5 m' 3,510,000.00 224,640,000.00 81,910,000.00 156,190,000.00 462,740,000.00 XIX PEKERJAAN BETON 1 LC / B.0 Beton K-125 T = 5 cm 2 Beton K-350 T= 22 Cm + Circle 3 Joint Sealent Pada Rigid Pavement Analisa EL-718 e Analisa EL-713 h Analisa EL-7115 a 2,491.12 10,960.56 19.74 m3 m3 m' 520,000.00 710,000.00 16,000.00 ### ### 315,904.00 ### XX 1 2 3 PEKERJAAN BESI / BAJA / PENGELASAN DAN ERECTION Dowel Baja Tulangan ( Polos ) U24 Analisa EL-731 Tiebar Analisa EL-734 Besi Wiremest 10-15 mm Analisa EL-734 101,778.33 11,861.97 39,048.00 kg kg kg 9,000.00 916,004,970.00 10,000.00 118,619,700.00 10,000.00 390,480,000.00 ### XXI PEKERJAAN BEKISTING 1 Bekisting Multiplex 9 mm BOW.I.14 1,149.66 m2 115,000.00 132,210,900.00 132,210,900.00 XXII. PEKERJAAN LAPISAN ATAS JALAN 1 Lapis Resap Pengikat (0,8 ltr/m2-Medium/Slow etting-56% Aspal EL-611 Analisa Cemen Pen.80/100 / Liter 2 Laston Permukaan ( AC-WC) t=5cm padat rata-rata (Pabrikasi) EL-635 c Analisa 360.00 450.00 liter m2 5,000.00 14,000.00 1,800,000.00 6,300,000.00 8,100,000.00
XXIII. PEKERJAAN LAPISAN BAWAH JALAN 1 LPB untuk perbaikan Badan Jlan Dng Agregat Kelas B Analisa EL-512 2 LPB Baru T = 15, 20, 25 cm Dengan Agregat Kelas B Analisa EL-512 3 LPB T = 25 CM pada Pelebaran Dengan Agregat Kelas B Analisa EL-512 4 LPA Dnga Agregat Kelas A untuk oprit Analisa EL-512 5 Perkerasan Bahu Jalan dengan Steel Slag BOW C.27
a a a a
1,213.48 3,507.55 2,773.65 24.00 1,834.60
m3 m3 m3 m3 m3
160,000.00 160,000.00 160,000.00 160,000.00 169,000.00
194,156,800.00 561,208,000.00 443,784,000.00 3,840,000.00 310,047,400.00 ###
XXVIII. PEKERJAAN PENGAMAN JALAN 1 Pek. Guard Raill ( 5 m' unit) 2 Pek. Pengecatan Marka Jalan
Analisa EL-847 Analisa EL-842
80.00 210.00
unit m2
2,510,000.00 200,800,000.00 79,000.00 16,590,000.00 217,390,000.00
Tangerang, 4 Mei' 2011 PT. CATUR BIJAKSANA
MUHAMMAD ARIFIN Direktur
DAFTAR HARGA DASAR SATUAN BAHAN, UPAH DAN SEWA ALAT TAHUN ANGGARAN 2011MT ### ### HARGA SATUAN ( Rp. ) 4
KODE 1
JENIS BAHAN / MATERIAL / UPAH 2 MATERIAL/ BAHAN
unit 3
### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B BAHAN BAHAN ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45
### AHAN 46 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 47 48 49 50 51
### AHAN 52 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 53 54 55 56 57 58 59 60
### AHAN 61 B ### AHAN 62 B
Batu Palimanan Kuning 20x20 cm Rata Sebelah Besi Beton bulat U-24 Besi Beton Ulir U-32 Besi Kanal "U" (Channel) Besi Kanal "C" (Channel) Besi Beugel Kuda - Kuda Besi Siku/Profil Besi Profil H Beam Besi Pelat Bordes Besi Pelat Hitam (Segala uk.) Besi Pelat putih (Segala uk.) Besi Pelat Tipis 1 mm Besi Pelat Strip Casing Pipa Besi Hitam Untuk Tiang Bor Beton Pipa Baja Gelombang Pipa Besi Profil ex DN SII Abu Batu (Filler) Batu Pecah 0.5 - 1 cm (Screening) Batu Pecah 1 - 2 cm (Split/Chipping) Batu Pecah 2 - 3 cm (Split/Chipping) Batu Pecah 3 - 5 cm (Agregat Batu Pecah) Sirtu / Material Pilihan Batu Pecah Tersaring A (Agregat Kelas A) Batu Pecah Tersaring B (Agregat Kelas B) Batu Pecah Tersaring C (Agregat Kelas C) Agregat Kasar Agregat Halus/Filler Pasir Pasang Pasir Beton Koral Kali / Koral Beton Batu Koral Sikat Batu Telor Batu Siku Campur Batu Apung (Goko) Batu Apung (Goko) Tanah Urug / Tanah Merah (galian C / hanya tanah saja) Tanah Urug / Tanah Merah Super Tanah Urug / Tanah Liat Batu Belah Pondasi / Batu Kali Batu Belah 5 - 7 cm/ Macadam Batu Belah 10 - 15 cm (Onderlaagh) Batu Bata Merah uk. Besar Kelas I Batu Bata merah, uk. 20x10x5 cm uk. kecil proses tangan Batu bata merah uk. 22x11x5 cm uk. kecil proses tangan Batu Bata Merah, uk. 20x10x5 cm Press Mesin Bata Homogen Dekoratif, KARANG PILANG, type Adalpstone, Regular Pattern, berbagai uk., berbagai warna Rooster Bata Merah 12 x 24 x 11,5 cm Rooster / Bata Karawang Rooster Beton 20 x 20 x 7 cm Rooster Beton 30 x 30 x 7 cm Glass Block 20 x 20 (Kedawung) Hot Rolled Beam/H-Beam, GUNUNG GARUDA, HB 100x100x6x8 mm, berat 17,2 kg/m Paving Block K-250 Tebal 6 Abu-Abu Paving Block K-250 Tebal 8 Abu-Abu Paving Block K-350 Tebal 6 Abu-Abu Paving Block K-350 Tebal 8 Abu-Abu Topi Uskup K-250 Tebal 6 (isi 24 pcs/m) Topi Uskup K-250 Tebal 8 (isi 24 pcs/m) Topi Uskup K-350 Tebal 6 (isi 24 pcs/m) Topi Uskup K-350 Tebal 8 (isi 24 pcs/m) Kerb/Kansteen, Conbloc Internusa, type Kst 15.30.40 (Kst DKI), Berat 37 kg/buah, 2,5 buah/m' Kerb/Kansteen, Conbloc Internusa, type Mulut Air 15.30.40, Berat 26 kg/buah, 2,5 buah/m'
m kg kg Kg Kg Kg kg Kg Kg Kg Kg kg kg m kg kg m m m m m m m m m m m m m m karung m kg m kg m m m m m m buah buah buah buah m buah buah buah buah buah kg m2 m2 m2 m2 m2 m2 m2 m2 buah buah
55,000.00 7,000.00 7,500.00 8,200.00 8,200.00 8,200.00 8,200.00 8,200.00 8,200.00 8,000.00 8,200.00 8,000.00 8,000.00 192,000.00 8,200.00 8,200.00 115,000.00 125,000.00 125,000.00 125,000.00 125,000.00 90,000.00 125,000.00 125,000.00 107,500.00 110,000.00 120,000.00 100,000.00 115,000.00 135,000.00 91,300.00 9,680.00 132,500.00 9,900.00 30,000.00 30,000.00 15,000.00 120,000.00 120,000.00 120,000.00 577.50 300.00 300.00 300.00 180,000.00 2,750.00 10,120.00 3,740.00 4,950.00 13,700.00 12,500.00 47,000.00 56,600.00 52,400.00 63,300.00 72,800.00 91,000.00 81,900.00 107,000.00 34,000.00 38,000.00
### AHAN 63 B ### AHAN 64 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 65 66 67 68 69 70 71 72 73 74 75 76 77
Kerb/Kansteen, Conbloc Internusa, type Kst Tikung-30, 15.30.40, R. 1,5 m, Berat 32 kg/buah, 2,5 buah/m' Kerb/Kansteen, Conbloc Internusa, type Kst Tikung-30, 15.30.40, R. 3 m, Berat 34 kg/buah, 2,5 buah/m' Kanstin Jepit Lokal, 10.20.40., K-300 Kanstin type Zamrud, 10.20.40., K-300 Kansteen type Oval, 20.30.40, k-300 Kansteen type Mutiara, 20.30.60, K-300 Batako Alpen type L2.1/2.9 uk. 39x9x19 cm, berat 4.5 kg, Isi 12 bh/m Mur / Baut (untuk jembatan) Beton Readymix, Mutu Beton B0, Slump 12 2 cm Beton Readymix, Mutu Beton K-175, Slump 12 2 cm Beton Readymix, Mutu Beton K-225, Slump 12 2 cm Beton Readymix, Mutu Beton K-250, Slump 12 2 cm Beton Readymix, Mutu Beton K-300, Slump 12 2 cm Beton Readymix, Mutu Beton K-350, Slump 12 2 cm Gravel Beton uk. 1/2 20 cm tanpa tulangan panjang 1,00 m Lokal Pipa Beton Bertulang, ROCLA, type RJ kelas 2 AS, 225 mm, tebal 2,5 cm, Panjang 2440 mm Pipa Beton Bertulang, ROCLA, type RJ kelas 2 AS, 300 mm, tebal 2,9 cm, Panjang 2440 mm Cat Tembok (Exterior) Jotun - Jotashield Standard Color 2.5 L Cat Kayu/Besi ICI/Catylac Gloss - Warna Khusus Cat Kayu/Besi Nippon Paint - Pelatone 8000 Enamel & Silver (3.8 Ltr) Cat Kayu/Besi Nippon Paint - Bodelac 9000 Alumunium (1 Ltr) Cat Dasar Kayu/Besi Nippon Paint - Bodelac Metal Primer (1 kg) Cat Dasar Kayu/Besi Nippon Paint - Bodelac Metal Primer (1 kg) Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Lead/Red Oxide Primer (1 Ltr) Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Lead Red Primer (1 Ltr) Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Zinc Chromate Primer A (1 kg) Cat Dasar Kayu/Besi Nippon Paint - Bodelac 9000 Zinc Chromate Primer B (1 kg) Cat Marka Merk Delta (Produksi P.T. Catur Marga Delta Sarana) Glass Bit ALUS / Kalkarium Poliphospate Soda Api Ampelas Kayu/Besi Halus Minyak Cat Danapaint - Thinner Sintetis type 801-0011 Minyak Cat Danapaint - Thinner type 802-0021 Minyak Cat ICI/Dulux - Thinner A850-41 Minyak Bensin Minyak Solar Transportasi Minyak Tanah / Kerosene Minyak Spiritus Bunker Oil Pelumas Stempet / Gemuk Terpentin Residu Residu Bahan Bakar Residu Filter Plastik Geotextile 33 gr Ijuk Ijuk Sapu Lidi Sapu/Sikat Jerami Kuas No.3 Kuas No.4 Kwas 3" Roll Cat Tembok Lokal Roll Cat Tembok Kualitas Baik Plamur Tembok Danapaint - Danalac Plamur 515-0001 (5 Kg) Plamur Tembok Danapaint - Danplamur 555-0001 (7 Kg) Plamur Tembok Nippon Paint - Matex Putty (Water Type) (1 kg) Plamur Tembok Nippon Paint - Pelatone PVA Putty (5 kg) Plamur Tembok ICI/Catylac - 5kg Plamur Tembok, PRIME MORTAR, type PM-315 Wall Putty (2 - 2.5 m / kg tiap tebal 1.5 mm), uk. 5 kg/kaleng Dempul DUCO (SANPOLAC) Plamur Besi Nippon Paint - Nippe 2000-280 (Plamir Duco) (1 kg) Plamur Besi Nippon Paint - Nippe Autolux 66 PE Putty (3 kg) Plamur Kayu Pacific Paint - Glotek Plamur Kayu 4001 / 1 Kg
buah buah bh bh bh bh buah buah m m m m m m buah batang batang liter kg liter liter kg kg liter liter kg kg Kg kg kg kg kg Lembar liter liter liter liter liter liter liter liter liter kg liter liter kg liter m m kg ikat ikat buah buah buah buah buah buah kg kg kg kg kg kaleng kg kg kg kg
38,000.00 38,000.00 5,500.00 6,400.00 22,000.00 22,000.00 1,000.00 7,050.00 446,500.00 508,000.00 536,000.00 551,000.00 605,000.00 610,000.00 24,750.00 164,000.00 264,300.00 40,000.00 28,500.00 23,800.00 38,000.00 14,300.00 14,300.00 24,200.00 28,600.00 24,200.00 20,900.00 17,750.00 21,700.00 24,900.00 7,000.00 12,000.00 4,550.00 12,150.00 14,580.00 17,460.00 4,500.00 4,500.00 2,800.00 6,000.00 1,200.00 18,300.00 11,340.00 4,400.00 10,765.01 6,800.00 2,790.00 18,500.00 31,200.00 5,000.00 9,900.00 4,600.00 12,650.00 13,550.00 16,400.00 11,250.00 24,100.00 36,400.00 5,184.00 8,793.00 8,400.00 5,180.00 6,000.00 39,500.00 26,640.00 24,800.00 17,600.00 14,400.00
### AHAN 78 B ### AHAN 79 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 80 81 82 83 84 85
### AHAN 86 B ### AHAN 87 B ### AHAN 88 B ### AHAN 89 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125
### AHAN 126 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 127 128 129 130
### AHAN 131 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 132 133 134 135 136 137
### AHAN 138 B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206
Politur Kayu, MOWILEX, Acrylic Woodstain, Water Base, kemasan 1 liter/kaleng Engsel Pintu Kuningan uk. 3" (Aiwa) Engsel Pintu Kuningan uk. 4" Engsel Pintu Kuningan uk. 4"x3" Engsel Pintu Nillon uk. 3"x3" 1/2 Engsel Pintu Nillon uk. 3"x4" Fitting Plafon Besar, BROCO, Standard Line, Kode 1210, Isi 144 buah/dus Saklar Engkel, New Gee Urea, BROCO, Standard Line, Kode 6621U, Isi 240 buah/dus Saklar Engkel, BROCO, Lugano, Warna Putih (A161-55) Stop Kontak OB, BROCO, Lugano, Warna Cream (A151-SM11) Teak Wood uk. 3 x 7 ft (90 x 210 cm), 3 mm Teak Wood uk. 4 x 8 ft (120 x 240 cm), 3 mm Triplek uk. 3 x 7 ft (90 x 210 cm), 3 mm Triplek uk. 4 x 8 ft (120 x 240 cm), 3 mm Triplek uk. 4 x 8 ft (120 x 240 cm), 4 mm Multiplex uk. 4 x 8 ft (120 x 240 cm), 9 mm Multiplex uk. 4 x 8 ft (120 x 240 cm), 12 mm Plywood Sungkat uk. 4 x 8 ft (120 x 240 cm), 3 mm Plywood Sungkat uk. 4 x 8 ft (120 x 240 cm), 4 mm Kaca (Ex. Asahi Mas) bening 3 mm Kaca (Ex. Asahi Mas) bening 5 mm Kaca (Ex. Asahi Mas) Kaca Susu/Es 5 mm Kawat Beton Kawat Pengikat Kawat Duri 10 Kg ( P.60M) - 1 ROLL Kawat BC (Tembaga) Kawat las Listrik Kawat las harmonika Kawat Harmonika 2 cm Kawat Harmonika 4 cm Grendel uk. 8" Grendel Kecil 5 cm Lokal Kait angin uk. 10-20 cm (Lokal) Kuningan Kait angin uk. 21-31 cm (Lokal) Kuningan Hak Angin Sendok Stainless/ Kuningan Kait Angin Alumunium Hak Angin Jendela Antik Hak Angin Jendela Biasa Kunci Gembok Kecil Gembok Sedang Kunci Gembok Lengkap uk. 60 mm Kunci Gembok Besar Kunci 2 Slaag, ROYAL Lem Paralon Lem PVC Seal Tape Solatip Ledeng Sealent Joint Sealent Paku Kayu Segala uk. Paku Beton 2 cm s/d 5 cm Paku Asbes / buah Paku asbes / kg Paku Cacing Paku seng Paku Gypsum Paku gypsum kualitas baik Perangkat Paku Sekrup Sekrup Kait Lengkap Fisher 12 s/d 20 cm Fisher Paku Triplek Balok Kamper Samarinda Basah uk. 8 x 15 x 400 cm Balok Kamper Samarinda Basah uk. 8 x 12 x 400 cm Balok Kamper Samarinda Basah uk. 6 x 15 x 400 cm Balok Kamper Samarinda Basah uk. 6 x 12 x 400 cm Balok Kamper Samarinda Basah uk. 5 x 10 x 400 cm Kaso Kamper Samarinda Basah uk. 5 x 7 x 400 cm Kaso Kamper Samarinda Basah uk. 4 x 6 x 400 cm Reng Kamper Samarinda Basah uk. 3 x 4 x 400 cm Reng Kamper Samarinda Basah uk. 2 x 3 x 400 cm Papan Kamper Samarinda Basah uk. 3 x 30 x 400 cm Papan Kamper Samarinda Basah uk. 3 x 20 x 400 cm Papan Kamper Samarinda Basah uk. 2 x 30 x 400 cm Balok Meranti Palembang Basah uk. 8 x 15 x 400 cm
kaleng buah buah buah buah buah buah buah buah buah Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar Lembar m m m Kg kg kg kg kg kg m m buah buah buah buah buah Pasang Pasang Pasang buah buah buah buah buah buah buah buah buah m m kg buah buah kg kg kg kg Kg kg buah buah buah dus kg m m m m m m m m m m m m m
48,000.00 15,600.00 5,600.00 18,220.00 14,700.00 20,300.00 9,675.00 11,555.00 17,730.00 24,945.00 66,800.00 75,000.00 25,000.00 35,000.00 45,000.00 120,000.00 135,000.00 98,600.00 99,000.00 71,400.00 92,600.00 100,200.00 8,500.00 10,750.00 13,200.00 52,800.00 13,100.00 12,700.00 18,200.00 13,000.00 13,300.00 2,700.00 7,000.00 13,500.00 23,130.00 99,540.00 13,230.00 4,590.00 10,000.00 23,750.00 36,000.00 72,250.00 58,500.00 4,500.00 4,500.00 1,500.00 1,500.00 9,600.00 168,000.00 8,500.00 1,200.00 900.00 11,000.00 950.00 11,500.00 13,800.00 19,650.00 51,800.00 950.00 950.00 1,900.00 9,270.00 12,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00 1,650,000.00
### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B ### AHAN B BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN BAHAN ### ### ### ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH
207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 833 834 835 836 837 838 839 840 841 842 843 844 845 846 847 848 849 850 851
Balok Meranti Palembang Basah uk. 8 x 12 x 400 cm Balok Meranti Palembang Basah uk. 6 x 15 x 400 cm Dolken 5-7 x 350-400 cm Dolken 8-10 x 350-400 cm Bambu 8-10 x 400-550 cm Bambu penunjang (Steger bambu bulat), 15-20 cm Steger bambu bulat 2-4 m (untuk pertamanan) Bilik Bambu (Kulit Dalam) uk. 2 x 2.5 cm / 9 m Bilik Bambu (Kulit Luar) uk. 2 x 2.5 cm / 9 m Kayu Bekisting/Perancah Meranti Palembang Kayu Bekisting/Perancah Meranti Jambi Kayu Bekisting/Perancah Kruing/Medan List Profil Kamper 1 cm List Profil Kamper 2 cm List Profil Kamper 5 cm Karung Goni Karung plastik 50 Kg Roll Meter 30 Meter (Bahan Plastik) Roll Meter 5 Meter (Bahan Plastik) Selang Plastik untuk Water Pass 0,5 cm Water Pas Alumunium 60 cm Counter Alat Bantu (1 Set = 3 Alat) Kape Kayu Kape Tembok Gergaji Besi Linggis Palu 1 kg Palu 0,5 Kg Air PDAM Gol Niaga Besar ( B2 ) Kaso Meranti Jambi Bash uk 5 x 7 x 400 cm Papan Meranti Jambi Basah uk 2 x 3 x 400 cm Hotmix WC Aspal Emulsi Prime Coat Sheet pile PC Corrugated w 600 k 1000 Semen Tiga Roda @ 50 kg @pasir beton @agregat kasar @semen tiga roda Beton Pracetak ROCLA box culvert 1000 x 1000 panjang 1200, tebal 12.5 cm Pipa PVC Wavin 2" Pipa PVC Wavin 4" Guard Rail Beam, panjang 4,3 m Guard Rail Post ( tiang ) tinggi 1,8 m Blocking Terminal End Perlengkapan Baut Minyak Cat / Thinner UPAH TENAGA BURUH DENGAN KEAHLIAN BIASA Pekerja / knek @Pekerja / knek Tukang @Tukang Tukang gali @Tukang gali Kepala Tukang Batu @Kepala Tukang Batu Tukang Batu @Tukang Batu Kepala Tukang Kayu @Kepala Tukang Kayu Tukang Kayu @Tukang Kayu Kepala Tukang Besi @Kepala Tukang Besi Tukang Besi @Tukang Besi Tukang Cat / Pelitur @Tukang Cat / Pelitur Tukang Aspal @Tukang Aspal Mandor / pengawas @Mandor / pengawas
m m batang batang batang batang btg Lembar Lembar m m m m m m buah buah buah buah buah buah buah set buah buah buah buah buah buah m m m kg kg m' zak kg kg kg unit batang batang batang buah batang buah l/s liter
1,650,000.00 1,650,000.00 8,500.00 10,000.00 11,500.00 23,000.00 5,000.00 12,000.00 35,000.00 1,650,000.00 1,102,833.33 556,166.67 1,500.00 2,000.00 3,000.00 2,800.00 5,200.00 58,500.00 13,000.00 1,300.00 63,180.00 46,800.00 68,000.00 6,500.00 5,200.00 11,700.00 25,450.00 11,700.00 25,450.00 4,000.00 2,033,000.00 2,033,000.00 99,589.00 4,800.00 1,200,000.00 53,000.00 63.89 73.33 1,060.00 3,570,000.00 48,000.00 165,000.00 410,000.00 200,000.00 150,000.00 100,000.00 200,000.00 18,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam
35,000.00 4,375.00 40,000.00 5,000.00 40,000.00 5,000.00 50,000.00 6,250.00 40,000.00 5,000.00 50,000.00 6,250.00 40,000.00 5,000.00 50,000.00 6,250.00 40,000.00 5,000.00 40,000.00 5,000.00 40,000.00 5,000.00 55,000.00 6,875.00
###UPAH ###UPAH ### ### ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH ###UPAH
25 26
Kepala Tukang Cat / Pelitur @Kepala Tukang Cat / Pelitur TENAGA BURUH DENGAN KEAHLIAN KHUSUS Instalator @Instalator Pembantu Instalator Tukang Pasang Pipa @Tukang Pasang Pipa Operator Alat Besar @Operator Alat Pembantu Operator Alat Besar @Pembantu Operator Alat Besar Mekanik @Mekanik Juru ukur @Tukang Stresser Tukang Grouting @Tukang Grouting Tukang Bor @Tukang Bor Kepala Tukang Bor @Kepala Tukang Bor @Buruh Lokal Setempat @Pekerja Mekanik Baja Ringan @Tukang Mekanik Baja Ringan @Kepala Tukang Mekanik Baja Ringan @Mandor Mekanik Baja Ringan @Tenaga Ahli Kepala S1 @Tenaga Ahli Utama S1 @Tenaga Ahli Utama S1 @Tenaga Ahli S1 @Tenaga Ahli Muda S1
org/hr org/jam
50,000.00 6,250.00
27 28 29 35 36 37 38 39 47 48 49 52 57 58 59 60 61 62 63 67 71 73 75 77 81 84 85 87 90
org/hr org/jam org/hr org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/hr org/jam org/jam org/jam org/jam org/hari org/hari org/jam org/hari org/hari
50,000.00 6,250.00 45,000.00 48,000.00 6,000.00 65,000.00 8,125.00 55,000.00 859.40 65,000.00 8,125.00 75,000.00 11,300.00 40,000.00 5,000.00 40,000.00 5,000.00 65,000.00 15,336.00 6,250.00 7,500.00 10,000.00 13,750.00 20,000.00 269,840.00 231,750.00 28,970.00 193,650.00 149,210.00
### ### ### ###ALAT ###ALAT ###ALAT ###ALAT ###ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ALAT ### ###ALAT ###ALAT ###ALAT ###ALAT ###ALAT ### *)
SEWA ALAT SEWA PERALATAN Excavator 80-140 HP, 80 HP, Kap. 0.5 m Swakelola Generator Set, 175 HP, Kap. 125 KVA Swakelola Pedestrian Roller, 11 HP, Kap. 0.98 ton Swakelola Fulvi Mixer, 75 HP, Kap. - Swakleola Grass Cutter Swakelola Asphalt Mixing Plant Asphalt Finisher Asphalt Sprayer Dump Truck 3 - 4 m3 Dump Truck Generator Set Wheel Loader 1.0 - 1.6 m3 Three Wheel Roller 6 - 8 T Tandem Roller 6 - 8 T Tire Roller 8 - 10 T Concrete Vibrator Water Pump 70 - 100 mm Water Tanker 3000 - 4500 L Jack Hammer Tamper, 5 HP, Kap. 0.17 ton Asphalt Liquid Mixer Concrete Mixer 0.3 - 0.6 m3 Crane 10 - 15 ton Compressor 4000 - 6500 L\M Concrete Cutter Machine Baby Walles
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
/ jam / jam / jam / jam /Jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam / jam
120,000.00 130,000.00 23,600.00 72,000.00 62,500.00 50,000.00 12,183.46 29,323.54 41,690.10 47,593.77 52,295.26 24,138.62 29,411.05 39,026.99 6,779.22 6,186.64 26,327.95 6,342.56 6,392.73 8,528.70 11,627.51 49,349.30 24,308.83 42,857.14 42,000.00
SEWA ALAT PENYELIDIKAN TEKNIS Alat Survey Geolistrik (komplit kabel & Battery) Alat Ukur Hidrogeologi Termasuk Laboratorium & Studio Logger (Alat Penyelidikan Penampang geofisika) Alat Uji Pemompaan (Submersible pump, Debit meter, Level Water, DHL meter, PH Meter, Termometer) Alat Laboratorium Analisa Contoh Air
/hari /hari /hari set set
1,312,400.00 1,312,400.00 3,281,000.00 333,300.00 328,100.00
LAMPIRAN 1 Kode Rekening Kegiatan Kode Rekening Belanja Kegiatan Nama Proyek Lokasi Propinsi / Kabupaten : : : : : : 1.03.01.15.22 5.2.3.21.04 74 Pembangunan / Peningkatan Jalan Kecamatan Sukamulya Peningkatan Jl. Jambu - Buni Ayu - Jengkol KECAMATAN SUKAMULYA BANTEN / TANGERANG
ITEM PEMBAYARAN JENIS PEKERJAAN
: 1.2 : MOBILISASI / DEMOBILISASI SATUA PERKIRAA N N VOLUME M2 HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
URAIAN
A. Sewa Tanah
B. PERALATAN Pek. Hotmix ASPHAL FINISHER ASPHAL SPRAYER TANDEM ROLLER PNEUMATIC TIRE ROLLER AIR COMPRESSOR GENERATOR SET Pek. Beton VIBRATOR ROLLER CONCRETE VIBRATOR WATER TANK 3000 - 5000 L CONCRETE CUTTER CONCRETE MIXER EXCAVATOR PILE HAMMER DRIVER CRANE ON TRACK
1 2 3 4 5 6
E02 E03 E17 E18 E05 E12
unit unit unit unit unit unit
1.00 1.00 1.00 1.00 1.00 2.00
2,000,000.00 500,000.00 2,000,000.00 2,000,000.00 500,000.00 500,000.00
2,000,000.00 500,000.00 2,000,000.00 2,000,000.00 500,000.00 1,000,000.00
1 2 3 4 5 6 7 8
E19 E20 E23 -
unit unit unit unit unit unit unit unit
3.00 4.00 2.00 4.00 6.00 3.00 1.00 1.00
2,000,000.00 200,000.00 700,000.00 200,000.00 500,000.00 1,500,000.00 3,000,000.00 3,000,000.00
6,000,000.00 800,000.00 1,400,000.00 800,000.00 3,000,000.00 4,500,000.00 3,000,000.00 3,000,000.00
D. FASILITAS LABORATORIUM
3,000,000.00
E E.I. 1 E.II. 1 2
3 4 5 6 7 8 9 10 11
MOBILISASI LAINNYA PEKERJAAN DARURAT Pengecatan Reling Jembatan LS LAIN LAIN Penebangan Pohon Produksi Btg Penebangan Pohon Non Produksi Batang 5 s/d 10 cm Btg Batang 11 s/d 20 cm Btg Pembongkaran Pagar Bambu M' Pembongkaran dan Pemasangan kembali Pagar Permanen ' M Pembebasan Tanah M2 Pemindahan Tiang Listrik Rendah Bh Pemindahan Tiang Listrik Menengah Bh Pemindahan Tiang Listrik Tegangan Tinggi Bh Pemindahan Tiang Telepon Bh Lapis Plastik M2 Bongkar & Pasang Kembali Selasar M2 Total Biaya Mobilisasi
1.00 25.00 200.00 200.00 20.00 25.00 30.00 15.00
500,000.00 65,000.00 10,000.00 20,000.00 400,000.00
500,000.00 1,625,000.00 2,000,000.00 4,000,000.00 8,000,000.00 37,500,000.00 24,000,000.00 6,750,000.00 117,900,000.00
1,500,000.00 800,000.00 450,000.00
Catatan :
Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over head dan laba serta seluruh pajak dan bea ( kecuali PPn ), dan pengeluaran lainnya.
LAMPIRAN 2Nama Pekerjaan Volume Pelaksanaan : TPT CORRUGATED SHEET PILE : PANJANG = 183 m'
H=
6 m'
No.
JENIS PEKERJAAN
HARGA PEKERJAAN KODE ANALISA PERKIRAAN VOLUME ( Rp. ) 1,000.00 ### ### 30,000.00 9,000.00 115,000.00 250,000.00 7,000.00 710,000.00 169,000.00
TOTAL HARGA ( Rp. ) 183,000.00 4,114,400,000.00 4,114,400,000.00 5,550,000.00 55,110,690.00 11,088,300.00 13,750,000.00 6,405,000.00 27,285,300.00 9,464,000.00 8,357,600,000.00
1 2 3 4 5 6 7 8 9 10
Pengukuran dan Pematokan 183.00 m' BOW.A.07 Pengadaan Corrugated Sheet Pile Type W = 600 L = 16 Analisa El-7616.bma 2,960.00 m' Pek. Pemancangan 2,960.00 m' Analisa El-7616 Pek. Pemotongan 185.00 Titik LS Pembesian Sloof 6,123.41 Kg Analisa El.731 Pekerjaan Bekisting Triplek 12 mm 96.42 m2 BOW I.15 Perancah / Stoot Work 55.00 m2 BOW I.16 Pas. Sulingan PVC 2" + Injuk 915.00 Titik BOW C.32 Cor Beton K 350 38.43 m3 Analisa El.713 h Timbunan Porous Steel Slag 56.00 m3 BOW C.27
LAMPIRAN 3Nama Pekerjaan Volume Pelaksanaan : Dinding Talud Pas. Batu Kali : PANJANG = 1 m'
H=
3 m'
No.
JENIS PEKERJAAN
HARGA KODE ANALISA PERKIRAAN VOLUME PEKERJAAN ( Rp. ) BOW.A.07 SNI 2835 - 6.1 BOW C.15 SNI 2835 - 6.11.a Analisa El-222 SNI 2835 - 6.9 BOW B.16 SNI 2837 - 6.14 BOW I.14 Analisa El-731 Analisa El-713 h BOW C.32 BOW C.27 3.00 0.96 1.50 0.25 2.115 0.48 1.060 0.85 0.79 68.87 1.10 2.00 0.12 m' m3 m3 m3 m3 m3 m3 m2 m2 Kg m3 Titik m3 1,000.00 30,000.00 136,000.00 144,000.00 420,000.00 1,000.00 64,000.00 40,000.00 115,000.00 9,000.00 710,000.00 7,000.00 169,000.00
TOTAL HARGA ( Rp. ) 3,000.00 28,800.00 204,000.00 36,000.00 888,300.00 480.00 67,840.00 34,000.00 90,850.00 619,830.00 781,000.00 14,000.00 20,280.00 2,780,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13
Pengukuran dan Pematokan Galian Tanah Cerukcuk Dolken Urug Pasir Bawah Pasangan Pas Batu Kali ad 1PC : 4PS Urugan Kembali tanah ex Galian Urugan Tanah Merah Pek. Plesteran Pekerjaan Bekisting Triplek 12 mm Pembesian Sloof / Kolom Cor Beton K - 350 Pasangan Sulingan PVC 2" + Injuk Timbunan Pourous / Steel Slag
LAMPIRAN 4Nama Pekerjaan Volume Pelaksanaan : TPT Beton Pada Gorong - Gorong : PANJANG = 7 m'
H=
6 m'
No.
JENIS PEKERJAAN
HARGA KODE ANALISA PERKIRAAN VOLUME PEKERJAAN ( Rp. ) BOW A.3 SNI A.13 SNI 2835 - 6.1 BOW C.27 Analisa El-734 BOW I.14 BOW I.16 BOW C.32 Analisa El-713 h SNI 2835 - 6.9 20.00 6.21 3.40 1.55 4,351.400 63.00 13.500 25.00 8.00 35.18 12.00 m' m3 m3 m3 Kg m2 m2 Titik Bh m3 m3 26,000.00 270,000.00 30,000.00 169,000.00 10,000.00 115,000.00 250,000.00 7,000.00 7,050.00 710,000.00 1,000.00
TOTAL HARGA ( Rp. ) 520,000.00 1,676,700.00 102,000.00 261,950.00 43,514,000.00 7,245,000.00 3,375,000.00 175,000.00 56,400.00 24,977,800.00 12,000.00 81,910,000.00
1 2 3 4 5 6 7 8 9 10 11
Pengukuran Pas. Bowplank Pek Bongkaran Beton Galian Tanah Timbunan Pourous / Steel Slag Pembesian Pekerjaan Bekisting Triplek 12 mm Perancah / Stoot Work Pasangan Sulingan PVC 2" + Injuk Pasangan Baut Bekisting 16 mm Cor Beton K 350 Urugan Kembali Tanah ex Galian
LAMPIRAN 5Nama Pekerjaan Volume Pelaksanaan : TPT Beton Pada Gorong : Type 1 PANJANG = Type 2 PANJANG = Type 3 PANJANG = - Gorong 610 m' 133 m' 130 m'
H= H= H=
1 m' 1.4 m' 1.4 m'
No.
JENIS PEKERJAAN
HARGA TOTAL HARGA PEKERJAAN KODE ANALISAPERKIRAAN VOLUME ( Rp. ) ( Rp. ) Analisa El-222 SNI 2837 - 6.14 BOW O.07 e BOW C.27 BOW O.01 h SNI J.32 SNI N.14b 157.68 472.40 1,012.00 120.97 604.850 112.00 353.000 m' m2 m' m3 m' m' m2 420,000.00 40,000.00 5,000.00 169,000.00 9,000.00 270,000.00 28,000.00 66,225,600.00 18,896,000.00 5,060,000.00 20,443,930.00 5,443,650.00 30,240,000.00 9,884,000.00 156,190,000.00
1 2 3 4 5 6 7
Pas. Batu Kali Plesteran Pas. Cansteen DKI 15.30.40 Agregat Kelas C / Steel Slag Paving Block T = 6 cm, K 350 Pas. Pipa Pembuang Air PVC 4" Pengecatan Cansteen
INFORMASI UMUMNo.1. 2. 3. 4. 5. 4. 5. 6. 7. 8. 9. 10. Nama Kegiatan Nomor Rekening Pagu Anggaran Kabupaten / Kota Propinsi Lokasi pekerjaan Kondisi jalan lama Panjang efektif Lebar jalan lama Lebar Rencana ( lihat sketsa di bawah ) ( bahu + perkerasan + bahu ) ( bahu + perkerasan + bahu )
URAIAN
INFORMASI KABUPATEN TANGERANG BANTEN Periksa lampiran RUSAK 57.0 Kilometer ( Leff = a + b ) ( 2.00 ( 1.50 + + 7.00 8.00 + + 2.00 1.50 ) meter ) meter
Penampang jalan, jenis dan volume pekerjaan pokok Jangka waktu pelaksanaan pekerjaan Atau :
Lihat lampiran. 360 hari kalender 12.00 bulan (Periode Pelaksanaan)
11.
Jarak rata-rata Base Camp ke lokasi pekerjaan ---> Perhitungan didasarkan pada sketsa di bawah ini : 35.00 A Base Camp --> Km = a C
L=
20.00 Kilometer
L = { (c+a/2)*a + (c+b/2)*b } / (a+b) 22.00 Km = b 5.00 D Km = c B
12. 13. 14. 15. 16. 17. a. b.
Jam kerja efektif dalam 1 hari Asuransi, Pajak, dsb. untuk Peralatan Tingkat Suku Bunga Investasi Alat Biaya Umum dan Keuntungan Kurs US $ yang berlaku RINGKASAN METHODE PELAKSANAAN Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.
8.0 0.002 20.00 10.00 9,200
jam x Harga Pokok Alat % % x Biaya Langsung per US $
Pekerjaan Tanah dilaksanakan untuk mengupas lapisan tanah / jalan yang rusak untuk kemudian di ganti dengan lapisan / konstruksi baru. Dalam hal ini termasuk juga pekerjaan galian untuk konstruksi saluran maupun pekerjaan pengurugan kembali. Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk pengganti lapisan tanah pada konstruksi, sehingga tercapai daya dukung tekanan yang memadai, dimana berfungsi sebagai lapisan awal pondasi dari konstruksi. Pekerjaan Campuran Aspal Panas dilaksanakan untuk lapisan baru konstruksi jalan, di padatkan sesuai ketebalan pada spesifikasi umum Pekerjaan Pasangan Batu dilaksanakan untuk pondasi penahan tanah dan saluran pembuangan air / irigasi Pekerjaan Pengembalian Kondisi dilaksanakan untuk menjadikan kondisi utilitas / sarana pendukung infrastruktur lain yang ada semasa pekerjaan proyek, yaitu yang di pindahkan / relokasi untuk di kembalikan ke posisi semula.
c. d. e. f.
g.
18. 19. 20. 21. 22. 23.
Lokasi Quarry .................................... .................................... .................................... .................................... ....................................
Periksa lampiran.
HOME
ANALISA BIAYA SEWA PERALATAN PER JAM KERJAKAPASITAS ALAT HARGA ALAT ALAT YANG DIPAKAIJAM UMUR ALAT (HP) (Tahun) (Tahun) KERJA 1 TAHUN (Jam) HARGA ALAT (Rp.) (Rp.)
TENAGA ALAT
NILAI SISA ALAT
FAKTOR PENGEMBALIAN MODALi(1+i)^A
BIAYA PASTI PER JAMBIAYA PENGEMBALIAN MODAL (Rp.) (B - C) x D ----------W e1 11 (Rp.) 0.002 x B ----------W e2 12 E 13 (e1 + e2) (Rp.) Lt/HP/Jam 0.125 s/d 0.175 f1 14 Ltr/HP/Jam 0.01 s/d 0.02 f2 15 (Rp.) f1 x HP x ASURANSI DAN LAIN-LAIN TOTAL BIAYA PASTI / JAM BAHAN BAKAR & PELUMAS BAHAN BAKAR MINYAK PELUMAS BIAYA
BIAYA OPERASI PER JAM KERJAPERBAIKAN & PERAWATAN KOEF. 0.125 s/d 0.175 g1 17 BIAYA (Rp.) (g1 x B') ----------W G 18 / SOPIR (Rp.) 1 Orang Per Jam Kerja = Rp2,250.0 H 19 UPAH OPERATOR PEMBANTU OPERATOR / SOPIR (Rp.) 1 Orang Per Jam Kerja = Rp2,000.0 I 20 J 21 F+G+H+I TOTAL BIAYA OPERASI / JAM (Rp.)
TOTAL BIAYA SEWA ALAT PER JAM KERJA (Rp.)
KET.
No.
JENIS PERALATAN
KODE ALAT(10% X B)
Harga BBM + f2 x HP x Harga Olie F 16
----------(1+i)^A-1
E+J
HP 1 2 2a 3
Cp 4
B 5
A 6
W 7
B 8
C 9
D 10
K 22
L 23
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30 31. 32. 33. 34.
ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3-4 M3 DUMP TRUCK EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER KETERANGAN :
E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34
150.0 47.0 15.0 140.0 80.0 15.0 150.0 100.0 125.0 80.0 100.0 175.0 125.0 90.0 105.0 55.0 50.0 60.0 75.0 10.0 220.0 6.0 100.0 11.0 5.0 3.0 75.0 100.0 175.0 25.0 125.0 40.0 150.0 5.0
30.0 6.0 800.0 500.0 15.0 6.0 8.0 0.5 4.0 125.0 1.6 1.5 8.0 8.0 10.0 7.0 30.0 4,000.0 1.0 0.2 8.00 10.00 2.50 35.00 250.00 2,000.0 1,000.0
T/Jam Ton Liter
Liter Ton Ton Ton M3 M3 KVA M3 M3 Ton Ton Ton Ton T/Jam Liter Ton Ton
M3 Ton Ton Ton Amp Meter Liter
639,000,000 195,000,000 27,000,000 242,000,000 40,000,000 22,000,000 110,000,000 50,000,000 91,000,000 120,000,000 133,000,000 85,000,000 183,000,000 189,000,000 154,000,000 56,000,000 84,000,000 110,000,000 118,000,000 2,300,000 491,500,000 3,000,000 36,000,000 18,500,000 3,000,000 3,500,000 46,000,000 112,500,000 166,250,000 70,000,000 350,000,000 17,500,000 2,250,000,000 15,000,000
10.0 6.0 5.0 5.0 5.0 4.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 4.0 4.0 5.0 2.0 5.0 4.0 4.0 4.0 5.0 6.0 6.0 5.0 6.0 5.0 6.0 4.0
1,500.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 1,800.0 2,000.0 1,000.0 2,000.0 2,000.0 2,000.0 2,000.0 1,000.0 1,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0 2,000.0
639,000,000 195,000,000 27,000,000 242,000,000 40,000,000 22,000,000 110,000,000 50,000,000 91,000,000 120,000,000 133,000,000 85,000,000 183,000,000 189,000,000 154,000,000 56,000,000 84,000,000 110,000,000 118,000,000 2,300,000 491,500,000 3,000,000 36,000,000 18,500,000 3,000,000 3,500,000 46,000,000 112,500,000 166,250,000 70,000,000 350,000,000 17,500,000 2,250,000,000 15,000,000
63,900,000 19,500,000 2,700,000 24,200,000 4,000,000 2,200,000 11,000,000 5,000,000 9,100,000 12,000,000 13,300,000 8,500,000 18,300,000 18,900,000 15,400,000 5,600,000 8,400,000 11,000,000 11,800,000 230,000 49,150,000 300,000 3,600,000 1,850,000 300,000 350,000 4,600,000 11,250,000 16,625,000 7,000,000 35,000,000 1,750,000 225,000,000 1,500,000
0.23852 0.30071 0.33438 0.33438 0.33438 0.38629 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.33438 0.38629 0.38629 0.33438 0.65455 0.33438 0.38629 0.38629 0.38629 0.33438 0.30071 0.30071 0.33438 0.30071 0.33438 0.30071 0.38629
91,449.62 26,386.93 4,062.71 36,413.95 6,018.83 3,824.26 16,551.80 7,523.54 13,692.85 18,056.50 20,012.63 12,790.02 27,536.17 28,438.99 23,172.51 8,426.37 12,639.55 18,390.88 20,511.95 799.62 73,956.43 883.64 5,416.95 3,215.86 1,042.98 1,216.81 6,921.66 15,223.23 22,496.55 10,532.96 47,361.15 2,633.24 304,464.57 2,607.45
852.00 195.00 27.00 242.00 40.00 22.00 110.00 50.00 91.00 120.00 133.00 85.00 183.00 189.00 154.00 56.00 84.00 122.22 118.00 4.60 491.50 3.00 36.00 18.50 6.00 7.00 46.00 112.50 166.25 70.00 350.00 17.50 2,250.00 15.00
92,301.62 26,581.93 4,089.71 36,655.95 6,058.83 3,846.26 16,661.80 7,573.54 13,783.85 18,176.50 20,145.63 12,875.02 27,719.17 28,627.99 23,326.51 8,482.37 12,723.55 18,513.11 20,629.95 804.22 74,447.93 886.64 5,452.95 3,234.36 1,048.98 1,223.81 6,967.66 15,335.73 22,662.80 10,602.96 47,711.15 2,650.74 306,714.57 2,622.45
0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250
0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100 0.0100
160,162.50 6,756.25 2,156.25 20,125.00 11,500.00 2,156.25 21,562.50 14,375.00 17,968.75 11,500.00 14,375.00 25,156.25 17,968.75 12,937.50 15,093.75 7,906.25 7,187.50 8,625.00 10,781.25 1,437.50 31,625.00 862.50 14,375.00 1,581.25 718.75 431.25 10,781.25 14,375.00 25,156.25 3,593.75 17,968.75 5,750.00 21,562.50 718.75
0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250 0.1250
53,250.00 12,187.50 1,687.50 15,125.00 2,500.00 1,375.00 6,875.00 3,125.00 5,687.50 7,500.00 8,312.50 5,312.50 11,437.50 11,812.50 9,625.00 3,500.00 5,250.00 7,638.89 7,375.00 287.50 30,718.75 187.50 2,250.00 1,156.25 375.00 437.50 2,875.00 7,031.25 10,390.63 4,375.00 21,875.00 1,093.75 140,625.00 937.50
2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00 2,250.00
6,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 4,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00 2,000.00
221,662.50 23,193.75 8,093.75 39,500.00 18,250.00 7,781.25 32,687.50 21,750.00 27,906.25 23,250.00 26,937.50 34,718.75 33,656.25 29,000.00 28,968.75 15,656.25 16,687.50 20,513.89 22,406.25 5,975.00 68,593.75 5,300.00 20,875.00 6,987.50 5,343.75 5,118.75 17,906.25 25,656.25 39,796.88 12,218.75 44,093.75 11,093.75 166,437.50 5,906.25
313,964.12 49,775.68 12,183.46 76,155.95 24,308.83 11,627.51 49,349.30 29,323.54 41,690.10 41,426.50 47,083.13 47,593.77 61,375.42 57,627.99 52,295.26 24,138.62 29,411.05 39,026.99 43,036.20 6,779.22 143,041.68 6,186.64 26,327.95 10,221.86 6,392.73 6,342.56 24,873.91 40,991.98 62,459.67 22,821.71 91,804.90 13,744.49 473,152.07 8,528.70
Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru Alat Baru
1. 2. 3. 4. 5. 6. 7. 8.
Tingkat Suku Bunga = 20.00 % per-tahun Upah Operator / Sopir / Mekanik = 2,250 Rupiah per-orang/jam Upah Pembantu Operator/Sopir/Mekanik = 2,000 Rupiah per-orang/jam Harga Bahan Bakar Bensin = 1,000 Rupiah per-liter Harga Bahan Bakar Solar = 550 Rupiah per-liter Minyak Pelumas = 7,500 Rupiah per-liter Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16)
Mata Pembayaran : VI.007
Analisa EI-241
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN VI.007 Timbunan Porous / Bhn.Penyaring, dipadatkan tiap 15 cm dengan Tamper m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja / Kenek @Mandor / Pengawas
Upah Upah
2 org / jam 24 org / jam
2.8000 0.7000
4,375.00 6,875.00
12,250.00 4,812.50
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Agregat Kasar Pasir urug darat
17,062.50
Bahan 26 Bahan 22
m m
0.5500 0.5500
110,000.00 90,000.00
60,500.00 49,500.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Tamper, 5 HP, Kap. 0.17 ton Pemborong
110,000.00
Alat
20
Jam
1.2851
6,392.73
8,215.30
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
8,215.30
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D VI.007
135,277.80 13,527.78 148,805.58 140,000.00
Mata Pembayaran : III.001
Analisa EI-311
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.001 Galian Biasa Dengan Excavator (Mekanik), Dibuang Dengan Dump Truck Sejauh 2 km m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja / Kenek @Mandor / Pengawas
Upah 2 org / jam Upah 24 org / jam
0.1071 0.0535
4,375.00 6,875.00
468.56 367.81
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN
836.38
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Excavator 80-140 HP, 80 HP Kap. 0.5 m Pemborong Dump Truck 3-4 m, 100 HP,Kap. 6 ton Pemborong
-
Alat Alat
1 9
Jam Jam
0.0535 0.1116
120,000.00 29,323.54
6,420.00 3,272.51
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
9,692.51
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D III.001
10,528.88 1,052.89 11,581.77 11,000.00
Mata Pembayaran : VII.001
Analisa EI-222
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN VII.001 Pasangan Batu Kali / Belah Dengan Mortar (mekanik), Ad. 1 : 4, 60% Batu Kali m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @ Pekerja / Kenek @ Tukang @ Mandor / Pengawas
Upah Upah Upah
2 4 24
org / jam org / jam org / jam
4.0161 1.2048 0.4016
4,375.00 5,000.00 6,875.00
17,570.44 6,024.00 2,761.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Batu Belah Pondasi / Batu Kali @ Semen Tiga Roda 50 kg Pasir Pasang
26,355.44
Bahan 39 Bahan 842 Bahan 28
m kg m
1.1000 161.0000 0.4829
120,000.00 1,060.00 100,000.00
132,000.00 170,660.00 48,290.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Concrete Mixer 0.3-0.6 m,15 HP,Kap 500 Liter Pemborong
350,950.00
Alat
22
jam
0.4016
11,627.51
4,669.61
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
200.00
200.00 4,869.61
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D VII.001
382,175.05 38,217.50 420,392.55 420,000.00
Mata Pembayaran : XIX.220.a
Analisa El - 7616. bma
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.220.a Penyediaan dan Pemancangan Sheet Pile PC Corrugated Type w.600 K.1000 m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor / Pengawas
Upah Upah Upah
2 4 24
org / hr org / hr org / hr
0.3347 0.0669 0.0335
4,375.00 5,000.00 6,875.00
1,464.31 334.50 230.31
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Sheet Pile PC Corrugated Type W.600 K.1000
2,029.13
Bahan 838
m'
1.0500
1,200,000.00
1,260,000.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong Crane 10 - 15 Ton, 150 HP, Kap. 15 Ton Pemborong
1,260,000.00
Alat Alat
12 23
Jam Jam
0.0502 0.0335
29,323.54 49,349.30
1,472.04 1,653.20
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
200.00
200.00 3,325.24
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XIX.220.a 10 % x D
1,265,354.37 126,535.44 1,391,889.81 1,390,000.00
Mata Pembayaran : XIX.220.a
Analisa El - 7616. bma
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.220.a Penyediaan dan Pemancangan Sheet Pile PC Corrugated Type w.600 K.1000 m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor / Pengawas
Upah Upah Upah
2 4 24
org / hr org / hr org / hr
0.3347 0.0669 0.0335
4,375.00 5,000.00 6,875.00
1,464.31 334.50 230.31
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Sheet Pile PC Corrugated Type W.600 K.1000
2,029.13
Bahan 838
m'
1.0500
1,200,000.00
1,260,000.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong Crane 10 - 15 Ton, 150 HP, Kap. 15 Ton Pemborong
1,260,000.00
Alat Alat
12 23
Jam Jam
0.0502 0.0335
29,323.54 49,349.30
1,472.04 1,653.20
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
200.00
200.00 3,325.24
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XIX.220.a 10 % x D
1,265,354.37 126,535.44 1,391,889.81 1,390,000.00
Mata Pembayaran : XVII.079
Analisan El-233 k
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XVII.079 Gorong-gorong Kotak Beton Bertulang setara ROCLA,uk. 1000 x 1000 mm tebal 12,5 cm,Panjang 1200 mm m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @ Pekerja / Kenek @Tukang @ Mandor / Pengawas
Upah Upah Upah
2 4 24
org / jam org / jam org / jam
14.0000 1.7500 1.7500
4,375.00 5,000.00 6,875.00
61,250.00 8,750.00 12,031.25
JUMLAH HARGA TENAGA B. 1 2 3 4 JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Tamper,5 HP,Kap.0.17 ton Pemborong Dump Truck 3-4 m,100 HP,Kap.6 ton Pemborong BAHAN Beton Pracetak Saluran Box Culvert, ROCLA, uk. 1000 x 1000 mm, tebal 12,5 cm, Panjang 1200 mm Sirtu / Material Pilihan Timbunan Porous / Bhn.Penyaring, dipadatkan tiap 15 cm dengan Tamper
82,031.25
Bahan
843
batang m m
0.8333 0.4430 0.2914
3,574,000.00 90,000.00 140,000.00
Bahan 22 Analisa El-241
2,978,214.20 79,489.15 40,796.00 3,098,499.35
Alat Alat
20 12
Jam Jam
0.1334 0.5221
6,392.73 29,323.54
852.79 15,309.82 16,162.61
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XVII.022
3,196,693.21 319,669.32 3,516,362.53 3,510,000.00
Mata Pembayaran : XIX.071
Analisa El-718 e
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.071 Beton Kelas K-125 (Bo) Readymix, Tanpa Bekisting, Tanpa Vibrator m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @ Pekerja / Kenek @Tukang Batu @ Mandor / Pengawas
Upah Upah Upah
2 org / jam 4 org / jam 24 org / jam
1.3253 0.4418 0.4418
4,375.00 5,000.00 6,875.00
5,798.19 2,209.00 3,037.38
JUMLAH HARGA TENAGA B. 1 2 3 BAHAN Beton Readymix, Mutu Beton B0, Slump 12 2 cm
11,044.56
Bahan 76
m
1.0500
446,500.00
468,825.00 -
4 JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
468,825.00
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XIX.071
479,869.56 47,986.96 527,856.52 520,000.00
Mata Pembayaran : XXVIII.003
Analisa El-847
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXVIII.003 Rel Pengaman Steel Guard Rail Beam Uk 3999 x 350 x 2.7 mm unit HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor
Upah Upah Upah
2 4 24
org / jam org / jam org / jam
5.0133 1.2533 0.6267
4,375.00 5,000.00 6,875.00
21,933.19 6,266.50 4,308.56
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Guard Rail Beam, panjang 4,3 m Beton K-225 Site mix, Tanpa bekisting, tanpa pompa, tanpa vibrator Besi beton bulat U 24 Guard Rail Post ( tiang ) tinggi 1,8 m Blocking Terminal End Baut dan Kelengkapannya
32,508.25
Bahan Bahan Bahan Bahan Bahan
846 2 847 848 849
SNI7394-6.7 a
buah m kg buah batang buah LS
1.0500 0.3716 18.5806 3.0000 3.0000 2.0000 1.0000 JUMLAH HARGA BAHAN
410,000.00 649,000.00 7,000.00 200,000.00 150,000.00 100,000.00 200,000.00
430,500.00 241,168.40 130,064.20 600,000.00 450,000.00 200,000.00 200,000.00 2,251,732.60
C. 1 2 3 4 5 6 7 8
PERALATAN Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong
Alat
9
jam
0.1567
29,323.54
4,595.00
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
300.00
300.00 4,895.00
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXVIII.003 10 % x D
2,289,135.85 228,913.58 2,518,049.43 2,510,000.00
Mata Pembayaran : XXVIII.002
Analisa El-842
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXVIII.002 Marka Jalan ( Thermoplastic ) m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor
Upah Upah Upah
2 4 24
org / jam org / jam org / jam
0.6000 0.2250 0.0750
4,375.00 5,000.00 6,875.00
2,625.00 1,125.00 515.63
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Cat Marka Thermoplastic Minyak Cat Nippon Paint - Thinner Melamic ( 1 ltr ) Glass Bit
4,265.63
Bahan Bahan Bahan
90 851 91
kg liter kg
1.9500 1.0500 0.4500
17,750.00 18,000.00 21,700.00
34,612.50 18,900.00 9,765.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Compressor 4000-6500 L\M, 80 HP, Kap. Pemborong Dump Truck 3-4 m, 100 HP, Kap. 6 ton Pemborong
63,277.50
Alat Alat
24 12
jam jam
0.0750 0.0750
24,308.83 29,323.54
1,823.16 2,199.27
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
400.00
400.00 4,422.43
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXVIII.002 10 % x D
71,965.55 7,196.56 79,162.11 79,000.00
Mata Pembayaran : XX.001
Analisa El - 731
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XX.001 Baja Tulangan Besi Beton Bulat U-24 kg HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor / Pengawas
Upah Upah Upah
2 4 24
org / hr org / hr org / hr
0.1050 0.0350 0.0350
4,375.00 5,000.00 6,875.00
459.38 175.00 240.63
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Besi Beton Bulat U-24 Kawat Beton
875.00
Bahan 2 Bahan 153
kg kg
1.1000 0.0200
7,000.00 8,500.00
7,700.00 170.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
7,870.00
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
25.00
25.00 25.00
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XX.001 10 % x D
8,770.00 877.00 9,647.00 9,000.00
Mata Pembayaran : XX.002
Analisa El - 734
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XX.002 Baja Tulangan Ulir U-24 kg HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor / Pengawas
Upah Upah Upah
2 4 24
org / hr org / hr org / hr
0.1050 0.0350 0.0350
4,375.00 5,000.00 6,875.00
459.38 175.00 240.63
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Besi Beton Ulir U-32 Kawat Beton
875.00
Bahan 3 Bahan 153
kg kg
1.1000 0.0200
7,500.00 8,500.00
8,250.00 170.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
8,420.00
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
50.00
50.00 50.00
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XX.002 10 % x D
9,345.00 934.50 10,279.50 10,000.00
Mata Pembayaran : XXII.042
Analisa El-635 c
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXII.042 Laston Permukaan ( AC-WC ), t = 5 cm padat rata-rata ( Pabrikasi ) m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja / Knek @Mandor / Pengawas
Upah Upah
2 24
org / hr org / hr
0.0271 0.0027
4,375.00 6,875.00
118.56 18.56
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN HOTMIX, WC
137.13
Bahan
836
kg
0.1238
99,589.00
12,329.12
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Wheel Loader 1.0-1.6 m, 105 HP, Kap 1.5 m Pemborong Asphalt Mixing Plant, 150 HP, Kap 50 T/Jam Pemborong Generator Set,175 HP, Kap.125 kVA Pemborong Dump Truck, 125 HP, Kap. 18-21 m Pemborong Asphalt Finisher, 47 HP, Kap 6 ton Pemborong Tandem Roller 6-8 T, 50 HP, Kap 8 ton Pemborong Tire Roller 8-10 T, 60 HP, Kap.10 ton Pemborong Alat Bantu
12,329.12
Alat Alat Alat Alat Alat Alat Alat
15 9 5 12 10 17 18
Jam Jam Jam Jam Jam Jam Jam Ls
0.0034 0.0032 0.0023 1.0000 JUMLAH HARGA UPAH
52,295.26 62,500.00 130,000.00 41,690.10 50,000.00 29,411.05 39,026.99 20.00
170.00 94.12 89.76 20.00 373.88
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXII.042 10 % x D
12,840.12 1,284.01 14,124.13 14,000.00
Mata Pembayaran : XIX.123
Analisa El 7115 a
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.123 Joint Sealent Pada Rigid Pavement m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang @Mandor / Pengawas
Upah Upah Upah
2 4 24
org / jam org / jam org / jam
0.9762 0.5267 0.3472
4,375.00 5,000.00 6,875.00
4,270.88 2,633.50 2,387.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Joint Sealant
9,291.38
Bahan
17
m
0.0004
168,000.00
67.20
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Concrete Cutter Machine Pemborong
67.20
Alat
25
Jam
0.1389
42,857.14
5,952.86
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH 5,952.86
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XIX.123 10 % x D
15,311.43 1,531.14 16,842.58 16,000.00
Mata Pembayaran : III.010
Analisa El 312 a
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.010 Galian Berbatu Pakai alat berat, di buang setempat m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Mandor / Pengawas
Upah Upah
2 24
org / jam org / jam
1.0000 0.1250
4,375.00 6,875.00
4,375.00 859.38
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN
5,234.38
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Compressor 4000-6500 L\M, 80 HP, Kap. - Pemborong Jack Hammer, 3 HP, Kap. - Pemborong Wheel Loader 1.0-1.6 m, 105 HP, Kap. 1.5 m Pemborong Excavator 80-140 HP, 80 HP, Kap. 0.5 m Pemborong
-
Alat Alat Alat Alat
24 22 15 4
Jam Jam Jam Jam
0.1250 0.1250 0.1250 0.1250
24,308.83 6,342.56 52,295.26 120,000.00
3,038.60 792.82 6,536.91 15,000.00
Ls
1.0000 JUMLAH HARGA UPAH 25,368.33
D. E. F. G. III.010 10 % x D
30,602.71 3,060.27 33,662.98 33,000.00
Mata Pembayaran : XIX.100
Analisa El-713 h
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.100 Beton K-350 Ready Mix, Tanpa Bekisting, Tanpa Pompa, Pakai Vibrator m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @ Pekerja / Kenek @Tukang Batu @ Mandor / Pengawas
Upah Upah Upah
2 org / jam 10 org / jam 24 org / jam
1.3253 0.4418 0.4418
4,375.00 5,000.00 6,875.00
5,798.19 2,209.00 3,037.38
JUMLAH HARGA TENAGA B. 1 2 3 BAHAN Beton Readymix, Mutu Beton K-350, Slump 12 2 cm
11,044.56
Bahan 76
m
1.0500
610,000.00
640,500.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Concrete Vibrator, 10 HP, Kap.- Pemborong
640,500.00
Alat
19
jam
0.4418
6,779.22
2,995.06
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
2,995.06
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XIX.100
654,539.62 65,453.96 719,993.58 710,000.00
Mata Pembayaran : XXII.001
Analisa El-611
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXII.001 Lapis Resap Pengikat (0,8 ltr/m2 - Medium/Slow setting - 56% Aspal Cemen Pen. 80/100 / liter) m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja / Knek @Mandor / Pengawas
Upah Upah
2 24
org / hr org / hr
0.0301 0.0060
4,375.00 6,875.00
131.69 41.25
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Aspal Emulsi, LAE - Prime Coat, curah ( Prime Coat ) Minyak Tanah / Kerosene
172.94
Bahan Bahan
837 101
kg liter
0.6294 0.4889
4,800.00 2,800.00
3,021.12 1,368.92
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Asphalt Sprayer, 15 HP, Kap. 800 liter Pemborong Compressor 4000-6500 L\M, 80 HP, Kap - Pemborong Dump Truck 3 - 4 m, 100 HP, Kap. 6 ton Pemborong
4,390.04
Alat Alat Alat
11 24 9
Jam Jam Jam
0.0030 0.0031 0.0030
12,183.46 24,308.83 29,323.54
36.55 75.36 87.97
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
199.88
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXII.001 10 % x D
4,762.86 476.29 5,239.14 5,000.00
Mata Pembayaran : XXIII.004
Analisa El-512 a
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXIII.004 Lps. Pond. Ag. Kls. B, CBR Min 35 % padat rata-rata ( Material Ditempat ) m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja / Knek @Mandor / Pengawas
Upah Upah
2 24
org / hr org / hr
0.6250 0.8930
4,375.00 6,875.00
2,734.38 6,139.38
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Batu Pecah Tersaring B ( Agregat Kelas B )
8,873.75
Bahan
24
m
1.1000
125,000.00
137,500.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Tandem Roller 6-8 T, 50 HP, Kap 8 ton Pemborong Water Tanker 5000-8500 L, 100 HP, Kap 4000 Liter Pemborong
137,500.00
Alat Alat
14 18
Jam Jam
0.0178 0.0141
29,411.05 26,327.95
523.52 371.22
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
75.00
75.00 969.74
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXIII.004 10 % x D
147,343.49 14,734.35 162,077.84 160,000.00
Mata Pembayaran : III.040
BOW B.24
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.040 Pasang/Bongkar Kisdam tinggi 2 s.d 3 m Dolken 8 - 10 cm 350 - 400 cm Tanah Setempat m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Mandor / Pengawas
Upah Upah Upah
1 3 23
org / hr org / hr org / hr
0.7500 0.2625 0.0505
35,000.00 40,000.00 55,000.00
26,250.00 10,500.00 2,777.50
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Dolken 8-10 x 350-400
39,527.50
Bahan 210
batang
1.0000
10,000.00
10,000.00 10,000.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D III.040
49,527.50 4,952.75 54,480.25 54,000.00
Mata Pembayaran : VII.018
BOW C.32
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN VII.018 Pasang Suling-Suling Pada Pasangan Batu Kali, PVC 2", KLlas AW,Filter Ijuk, Untuk Turap s/d 2m titik HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek
Upah
1
org / hr
0.0060
35,000.00 -
210.00 -
JUMLAH HARGA TENAGA B. 1 2 3 4 5 JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN BAHAN Ijuk Pipa PVC, WAVIN, Standard, 2" ( 60 mm), tebal 2.3 mm, kelas AW (10 kg/cm), Panjang 4 m, SC Jointing System
210.00
Bahan Bahan
113 844
ikat batang
0.0625 0.1000
9,900.00 56,850.00
618.75 5,685.00 6,303.75
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D VII.018
6,513.75 651.38 7,165.13 7,000.00
Mata Pembayaran : XIX.003
BOW C.14
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.003 Membuat Lantai Kerja 1 pc : 2 ps : 4 Krl m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Mandor / Pengawas
Upah Upah Upah
1 9 23
org / hr org / hr org / hr
6.0000 1.0500 0.3500
-
-
JUMLAH HARGA TENAGA B. 1 2 3 BAHAN Pasir Beton /Kasar/Hitam Semen Tiga Roda 50 kg Koral Kali / Koral Beton
-
Bahan 29 Bahan 839 Bahan 30
m Zak m
0.4800 7.4630 0.9600
-
4 JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
-
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XIX.003
-
Mata Pembayaran : XIX.003
BOW C.15
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.023 Pek. Pondasi Cerucuk Dolken, Jarak 50 cm, dalam 3 m m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Kayu Mandor / Pengawas
Upah Upah Upah
1 13 23
org / hr org / hr org / hr
0.7500 0.2625 0.5050
35,000.00 40,000.00 55,000.00
26,250.00 10,500.00 27,775.00
JUMLAH HARGA TENAGA B. 1 2 3 BAHAN Dolken 8-10 x 350-400 cm
64,525.00
Bahan 211
batang
6.0000
10,000.00
60,000.00 -
4 JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
60,000.00
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XIX.003
124,525.00 12,452.50 136,977.50 136,000.00
Mata Pembayaran : XXV.031
BOW O.07 e
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXV.031 Kanstin Jepit Lokal 10.20.40, K-300 warna abu-abu m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang Batu @Kepala Tukang Batu @Mandor
Upah Upah Upah
2 10 8 24
org / jam org / jam org / jam org / jam
0.2857 0.0571 0.0571 0.0286
4,375.00 5,000.00 6,250.00 6,875.00
1,249.94 285.50 356.88 196.63
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Kanstin Jepit Lokal 10.20.40, k-300 @semen tiga roda Pasir pasang
2,088.94
Bahan 64 Bahan 839 Bahan 28
buah kg m
2.6250 1.5843 0.0044
5,500.00 1,060.00 100,000.00
14,437.50 1,679.36 440.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
2,119.36
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
400.00
400.00 400.00
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXV.031 10 % x D
4,608.30 460.83 5,069.13 5,000.00
Mata Pembayaran : XXV.031
BOW O.01 h
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXV.031 Paving Block Lokal Tinggi 6 cmK 350 Warna abu-abu + Abu Batu t = 5 cm m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA @Pekerja @Tukang Batu @Kepala Tukang Batu @Mandor
Upah Upah Upah Upah
2 10 8 24
org / jam org / jam org / jam org / jam
0.3500 0.0700 0.0700 0.0350
4,375.00 5,000.00 6,250.00 6,875.00
1,531.25 350.00 437.50 240.63
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Paving block lokal tinggi 8 cm K-250 Warna Abu-abu Batu t = 5 cm Abu Batu ( filler )
2,559.38
Bahan 54 Bahan 17
buah kg
1.0500 0.0525
56,600.00 115,000.00
59,430.00 6,037.50
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
6,037.50
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
400.00
400.00 400.00
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXV.031 10 % x D
8,996.88 899.69 9,896.56 9,000.00
Mata Pembayaran : XXI.009
BOW I.14
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXI.009 Bekisting Multiplex 9 mm m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Knek Tukang Kayu Kepala Tukang Kayu Mandor / Pengawas
Upah Upah Upah Upah
1 13 11 23
org / hr org / hr org / hr org / hr
0.2500 0.5000 0.0500 0.0250
35,000.00 40,000.00 50,000.00 55,000.00
8,750.00 20,000.00 2,500.00 1,375.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Balok Meranti Palembang Basah uk.8 x 15 x 400 cm Multiplex Uk. 4 x 8 ft ( 120 x 240 cm ), 9 mm Paku Kayu Segala Uk.
32,625.00
Bahan 206 Bahan 146 Bahan 180
m Lembar kg
0.0170 0.3500 0.2500
1,650,000.00 120,000.00 8,500.00
28,050.00 42,000.00 2,125.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
72,175.00
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXI.009 10 % x D
104,800.00 10,480.00 115,280.00 115,000.00
Mata Pembayaran : XXI.010
BOW I.15
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXI.010 Bekisting Multiplex 12 mm m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Knek Tukang Kayu Kepala Tukang Kayu Mandor / Pengawas
Upah Upah Upah Upah
1 13 11 23
org / hr org / hr org / hr org / hr
0.2500 0.5000 0.0500 0.0250
35,000.00 40,000.00 50,000.00 55,000.00
8,750.00 20,000.00 2,500.00 1,375.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Balok Meranti Palembang Basah uk.8 x 15 x 400 cm Multiplex Uk. 4 x 8 ft ( 120 x 240 cm ), 12 mm Paku Kayu Segala Uk.
32,625.00
Bahan Bahan Bahan
206 147 180
m Lembar kg
0.0170 0.3500 0.2500
1,650,000.00 120,000.00 8,500.00
28,050.00 42,000.00 2,125.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
72,175.00
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXI.010 10 % x D
104,800.00 10,480.00 115,280.00 115,000.00
Mata Pembayaran : XXI.011
BOW I.16
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXI.011 Stoot Work / Sokongan Bekisting Kayu Meranti Palembang m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Knek Tukang Kayu Kepala Tukang Kayu Mandor / Pengawas
Upah Upah Upah Upah
1 13 11 23
org / hr org / hr org / hr org / hr
0.1500 0.2000 0.2000 0.0150
35,000.00 40,000.00 50,000.00 55,000.00
5,250.00 8,000.00 10,000.00 825.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Kaso Meranti Palembang Basah uk.5 x 7 x 400 cm Paku Kayu Segala Uk.
24,075.00
Bahan Bahan
208 180
m kg
0.1260 0.0500
1,650,000.00 8,500.00
207,900.00 425.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
208,325.00
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXI.011 10 % x D
232,400.00 23,240.00 255,640.00 250,000.00
Mata Pembayaran : XXIII.007
BOW C.27
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XXIII.007 Lapis Pondasi Macadam / Stell Slag ( Jalan Lingkungan ) m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Knek Mandor / Pengawas
Upah Upah
1 23
org / hr org / hr
0.0625 0.0089
35,000.00 55,000.00
2,187.50 491.15
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Batu Pecah Tersaring B ( Agregat Kelas B )
2,678.65
Bahan
24
m
1.2000
125,000.00
150,000.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Baby Walles, 2-4 T, Pemborong
150,000.00
Alat
26
Jam
0.0312
42,000.00
1,310.40
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
1,310.40
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN XXIII.007 10 % x D
153,989.05 15,398.91 169,387.96 169,000.00
Mata Pembayaran : III.013
BOW B.16
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.013 Urugan Kembali Tanah Bekas Galian m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja Mandor / Pengawas
Upah Upah
1 23
org / hari org / hari
0.3000 0.0050
4,375.00 6,875.00
1,312.50 34.38
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Tanah Urug / Tanah Merah (galian C / hanya tanah saja
1,346.88
Bahan
36
m
1.2000
42,656.00
51,187.20
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Tamper, 5 HP, Kap. 0.17 ton Pemborong
51,187.20
Alat
20
jam
0.9000
6,392.73
5,753.46
Ls
1.0000 JUMLAH HARGA UPAH 5,753.46
D. E. F. G. III.013 10 % x D
58,287.53 5,828.75 64,116.29 64,000.00
Mata Pembayaran : I.010
BOW A.07
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN I.010 Pekerjaan Pengukuran dan Pematokan ( Jalan dan Saluran ) m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Kayu Mandor / Pengawas Juru Ukur
Upah Upah Upah Upah
1 13 23 51
org / hr org / hr org / hr org / hr
0.0030
0.0001
35,000.00 40,000.00 55,000.00 75,000.00
105.00 7.50
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Kaso Meranti Jambi Basah uk. 5x7x400 cm
112.50
Bahan 834
m
0.0002
2,033,000.00
406.60
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
406.60
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D I.010
519.10 51.91 571.01 1,000.00
Mata Pembayaran : I.011
BOW A.3
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN I.011 Pek.Pasangan Bowplank Kayu Meranti Jambi (75%) m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Kayu Mandor / Pengawas Kepala Tukang Kayu
Upah Upah Upah Upah
1 13 23 11
org / hr org / hr org / hr org / hr
0.1000 0.1000 0.0050 0.0100
35,000.00 40,000.00 55,000.00 50,000.00
3,500.00 4,000.00 275.00 500.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Kaso Meranti Jambi Basah uk. 5 x 7 x 400 cm Papan Meranti Jambi Basah uk.2 x 30 x 400 cm Paku Kayu Segala uk.
8,275.00
Bahan 834 Bahan 835 Bahan 180
m m kg
0.0030 0.0045 0.0200
2,033,000.00 2,033,000.00 8,500.00
6,099.00 9,148.50 170.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
15,417.50
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D I.011
23,692.50 2,369.25 26,061.75 26,000.00
Mata Pembayaran : II.008
SNI A.13
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN II.008 Bongkaran Beton Bertulang m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Mandor / Pengawas
Upah 1 Upah 23
org / hr org / hr
6.6670 0.3330
35,000.00 55,000.00
233,345.00 18,315.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN
251,660.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
-
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D II.008
251,660.00 25,166.00 276,826.00 270,000.00
Mata Pembayaran : III.003
SNI 2835 - 6.1
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.003 Galian Tanah Biasa Sedalam 1 m ( manual ) m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Mandor / Pengawas
Upah 1 Upah 23
org / hr org / hr
0.7500 0.0250
35,000.00 55,000.00
26,250.00 1,375.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN
27,625.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
-
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
-
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D III.003
27,625.00 2,762.50 30,387.50 30,000.00
Mata Pembayaran : VI.002
SNI 2835 - 6.11 a
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN VI.002 Urugan Pasir Pasang m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Mandor / Pengawas
Upah Upah
1 23
org / hr org / hr
0.3000 0.0100
35,000.00 55,000.00
10,500.00 550.00 -
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN Pasir Pasang
11,050.00
Bahan 28
m
1.2000
100,000.00
120,000.00 120,000.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D VI.002
131,050.00 13,105.00 144,155.00 144,000.00
Mata Pembayaran : X.010
SNI 2837 - 6.14
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN X.010 Plesteran 1Pc : 3Ps, tebal 20 mm + Acian m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Batu Kepala Tukang Batu Mandor / Pengawas
Upah Upah Upah Upah
1 9 7 23
org / hr org / hr org / hr org / hr
0.4000 0.2000 0.0200 0.0220
35,000.00 40,000.00 50,000.00 55,000.00
14,000.00 8,000.00 1,000.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 BAHAN @Semen Tiga Roda 50 kg Pasir Pasang
23,000.00
Bahan 839 Bahan 28
kg m
10.3680 0.0310
1,060.00 100,000.00
10,990.08 3,100.00 14,090.08
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D X.010
37,090.08 3,709.01 40,799.09 40,000.00
Mata Pembayaran : X.019
SNI 2837 - 6.14 b
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN X.019 Plesteran 1Pc : 3Ps, tebal 30 mm + Acian m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Batu Kepala Tukang Batu Mandor / Pengawas
Upah Upah Upah Upah
1 9 7 23
org / hr org / hr org / hr org / hr
0.5450 0.2500 0.0250 0.0285
35,000.00 40,000.00 50,000.00 55,000.00
19,075.00 10,000.00 1,250.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 BAHAN @Seman Tiga Roda 50 kg Pasir Pasang
30,325.00
Bahan 839 Bahan 28
kg m
13.5020 0.0465
1,060.00 100,000.00
14,312.12 4,650.00 4,650.00
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D X.019
34,975.00 3,497.50 38,472.50 38,000.00
Mata Pembayaran : XVII.022
SNI J.32
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XVII.022 Memasang pipa PVC AW 4" m' HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Pasang Pipa Kepala Tukang Batu Mandor / Pengawas
Upah Upah Upah Upah
1 35 7 23
org / hr org / hr org / hr org / hr
0.0810 0.1350 0.0135 0.0041
-
-
JUMLAH HARGA TENAGA B. 1 2 3 4 5 Perlengkapan ls 0.3500 JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN 64,590.00 BAHAN pipa PVC WAVIN standard 4" ( 114 mm), tebal 41 mm,kelas AW Bahan 845 (10kg/cm),panjang 4 m,90 jointing System
-
batang
1.2000
185,840.00
223,008.00 22,606.50 245,614.50
Alat Bantu Ls 1.0000 JUMLAH HARGA UPAH -
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XVII.022
245,614.50 24,561.45 270,175.95 270,000.00
Mata Pembayaran : XIX.029
SNI 7394-6.7 a
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN XIX.029 Beton K-225 Site Mix, Tanpa Bekisting, Tanpa Pompa, Tanpa Vibrator m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja / Kenek Tukang Batu Kepala Tukang Batu Mandor / pengawas
Upah Upah Upah Upah
1 9 7 23
org / hr org / hr org / hr org / hr
1.6500 0.2750 0.0280 0.0830
35,000.00 40,000.00 50,000.00 55,000.00
57,750.00 11,000.00 1,400.00
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN @Semen Tiga Roda 50 kg Pasir Beton/Kasar/Hitam Agregat Kasar Air PDAM Golongan Niaga Besar (B2), Pemakaian 0 - 10 m
70,150.00
Bahan 839 Bahan 29 Bahan 26 Bahan 833
kg kg kg liter
371.0000 698.0000 1,047.0000 215.0000
1,060.00 63.89 73.33 4.00
393,260.00 44,594.44 76,780.00 860.00 515,494.44
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN Concrete Mixer 0.3-0.6 m, 15 HP, Kap. 500 Liter Pemborong
Alat
22
jam
0.4418
11,627.51
5,137.03 5,137.03
Alat Bantu
Ls
1.0000 JUMLAH HARGA UPAH
D. E. F. G.
JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) OVERHEAD HARGA SATUAN PEKERJAAN ( D + E ) DIBULATKAN 10 % x D XIX.029
590,781.48 59,078.15 649,859.63 649,000.00
Mata Pembayaran : III.013
SNI 2835 - 6.9
KAB / KOTA PROP ITEM PEMBAYARAN NO. JENIS PEKERJAAN SATUAN PEMBAYARAN
: : : : :
KABUPATEN TANGERANG BANTEN III.013 Urugan Kembali Tanah Bekas Galian m HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )
No.
KOMPONEN
SATUAN
PERKIRAAN KUANTITAS
A. 1 2 3 4 5 6
TENAGA Pekerja Mandor / Pengawas
Upah Upah
1 23
org / hari org / hari
0.2500 0.0083
4,375.00 6,875.00
1,093.75 57.06
JUMLAH HARGA TENAGA B. 1 2 3 4 5 6 7 BAHAN
1,150.81
JUMLAH HARGA BAHAN C. 1 2 3 4 5 6 7 8 PERALATAN
-
Ls
1.0000 JUMLAH HARGA UPAH -
D. E. F. G. III.013 10 % x D