BREAKDOWN VOLUME NO ITEM DESCRIPTION QTY UNIT U.W WEIGHT INCH-D REMARK I FABRICATION WORKS CARBON STEEL 1 CS PIPE / FIT-UP DN 80 181 JOINT 543 DWG/ IDBC-RH-LDISO-NR7001 2 CS PIPE / TAPPING POINT DN 80 12 JOINT 36 DWG/ IDBC-RH-LDISO-NR7001 579.0 II ERECTION WORKS CARBON STEEL 1 CS PIPE DN 80 x 424,39 M 1273.15 INCH-M DWG/ IDBC-RH-LDISO-NR7001 1273.15 INCH-M III FABRICATION SUPPORT PIPE 1 H-BEAM N/A 2 WIDE FLANGE N/A 3 INP N/A 4 UNP N/A 5 ANGLE BARS N/A 6 PLAT BARRS N/A SUPPORT SHOES N/A 7 PLATE FOR BASE PLATE N/A 8 PLATE FOR BASE PLATE N/A 9 PLATE FOR BASE PLATE N/A 10 PLATE FOR BASE PLATE 0 IV INSTALL BOLT & NUT ` 1 BOLT & NUT 5/8 x 100mm 36 EA N/A 36 EA V INSTALL G.VALVE 1 GATE VALVE N/A 2 GLOBE VALVE N/A 3 CONTROL VALVE N/A 4 BALL VALVE N/A 5 STEAM TRAP N/A 0.0 VI INSTALL BLIND FLANGE 1 BLIND FLANGE DN 80 8 EA 24 DWG/ IDBC-RH-LDISO-NR7001 24.0 0 KG SPESIFIKASI DAN KETENTUAN Material (Standard Owner) Prepared by Owner Tools and Consumable Prepared by Contractor/Pelaksana Manpower and Supervisor Prepared by Contractor/Pelaksana Radiography / X-Ray Prepared by Contractor/Pelaksana RAB TIDAK TERMASUK Pengadaan tenaga listrik untuk mesin, penerangan (Tools). Pekerjaan sipil Bobokan perapian kembali, acian dan pengecatan Pekerjaan Fabrikasi Support Pipe (Tidak terlampir dalam detail drawing) Blowing, Purging, Pemasangan Valve maupun pembongkaran Sarana seccafolding, steger (Tidak termasuk dalam RAB ) Engineering, Supply / Procurement, Construction, Maintenance (Bayu Kristianto) Eng/Est SUB TOTAL I SUB TOTAL II SUB TOTAL III SUB TOTAL V SUB TOTAL VI SUB TOTAL IV SUB TOTAL (KG) Prepared, by

description

RAB PLUMBING

Transcript of RAB EPC CEPU 3

Page 1: RAB EPC CEPU 3

BREAKDOWN VOLUME

NO ITEM DESCRIPTION QTY UNIT U.W WEIGHT INCH-D REMARK

I FABRICATION WORKS

CARBON STEEL

1 CS PIPE / FIT-UP DN 80 181 JOINT 543 DWG/ IDBC-RH-LDISO-NR7001

2 CS PIPE / TAPPING POINT DN 80 12 JOINT 36 DWG/ IDBC-RH-LDISO-NR7001

579.0

II ERECTION WORKS

CARBON STEEL

1 CS PIPE DN 80 x 424,39 M 1273.15 INCH-M DWG/ IDBC-RH-LDISO-NR7001

1273.15 INCH-M

III FABRICATION SUPPORT PIPE

1 H-BEAM N/A

2 WIDE FLANGE N/A

3 INP N/A

4 UNP N/A

5 ANGLE BARS N/A

6 PLAT BARRS N/A

SUPPORT SHOES N/A

7 PLATE FOR BASE PLATE N/A

8 PLATE FOR BASE PLATE N/A

9 PLATE FOR BASE PLATE N/A

10 PLATE FOR BASE PLATE

0

IV INSTALL BOLT & NUT `

1 BOLT & NUT 5/8 x 100mm 36 EA N/A

36 EA

V INSTALL G.VALVE

1 GATE VALVE N/A

2 GLOBE VALVE N/A

3 CONTROL VALVE N/A

4 BALL VALVE N/A

5 STEAM TRAP N/A

0.0

VI INSTALL BLIND FLANGE

1 BLIND FLANGE DN 80 8 EA 24 DWG/ IDBC-RH-LDISO-NR7001

24.0

0 KG

SPESIFIKASI DAN KETENTUAN

Material (Standard Owner) Prepared by Owner

Tools and Consumable Prepared by Contractor/Pelaksana

Manpower and Supervisor Prepared by Contractor/Pelaksana

Radiography / X-Ray Prepared by Contractor/Pelaksana

RAB TIDAK TERMASUK

Pengadaan tenaga listrik untuk mesin, penerangan (Tools).

Pekerjaan sipil Bobokan perapian kembali, acian dan pengecatan

Pekerjaan Fabrikasi Support Pipe (Tidak terlampir dalam detail drawing)

Blowing, Purging, Pemasangan Valve maupun pembongkaran

Sarana seccafolding, steger (Tidak termasuk dalam RAB )

Engineering, Supply / Procurement, Construction, Maintenance

(Bayu Kristianto)

Eng/Est

SUB TOTAL I

SUB TOTAL II

SUB TOTAL III

SUB TOTAL V

SUB TOTAL VI

SUB TOTAL IV

SUB TOTAL (KG)

Prepared, by