Transcript of RAB EPC CEPU 3
BREAKDOWN VOLUME
NO ITEM DESCRIPTION QTY UNIT U.W WEIGHT INCH-D REMARK
I FABRICATION WORKS
CARBON STEEL
1 CS PIPE / FIT-UP DN 80 181 JOINT 543 DWG/ IDBC-RH-LDISO-NR7001
2 CS PIPE / TAPPING POINT DN 80 12 JOINT 36 DWG/ IDBC-RH-LDISO-NR7001
579.0
II ERECTION WORKS
CARBON STEEL
1 CS PIPE DN 80 x 424,39 M 1273.15 INCH-M DWG/ IDBC-RH-LDISO-NR7001
1273.15 INCH-M
III FABRICATION SUPPORT PIPE
1 H-BEAM N/A
2 WIDE FLANGE N/A
3 INP N/A
4 UNP N/A
5 ANGLE BARS N/A
6 PLAT BARRS N/A
SUPPORT SHOES N/A
7 PLATE FOR BASE PLATE N/A
8 PLATE FOR BASE PLATE N/A
9 PLATE FOR BASE PLATE N/A
10 PLATE FOR BASE PLATE
0
IV INSTALL BOLT & NUT `
1 BOLT & NUT 5/8 x 100mm 36 EA N/A
36 EA
V INSTALL G.VALVE
1 GATE VALVE N/A
2 GLOBE VALVE N/A
3 CONTROL VALVE N/A
4 BALL VALVE N/A
5 STEAM TRAP N/A
0.0
VI INSTALL BLIND FLANGE
1 BLIND FLANGE DN 80 8 EA 24 DWG/ IDBC-RH-LDISO-NR7001
24.0
0 KG
SPESIFIKASI DAN KETENTUAN
Material (Standard Owner) Prepared by Owner
Tools and Consumable Prepared by Contractor/Pelaksana
Manpower and Supervisor Prepared by Contractor/Pelaksana
Radiography / X-Ray Prepared by Contractor/Pelaksana
RAB TIDAK TERMASUK
Pengadaan tenaga listrik untuk mesin, penerangan (Tools).
Pekerjaan sipil Bobokan perapian kembali, acian dan pengecatan
Pekerjaan Fabrikasi Support Pipe (Tidak terlampir dalam detail drawing)
Blowing, Purging, Pemasangan Valve maupun pembongkaran
Sarana seccafolding, steger (Tidak termasuk dalam RAB )
Engineering, Supply / Procurement, Construction, Maintenance
(Bayu Kristianto)
Eng/Est
SUB TOTAL I
SUB TOTAL II
SUB TOTAL III
SUB TOTAL V
SUB TOTAL VI
SUB TOTAL IV
SUB TOTAL (KG)
Prepared, by