RAB EP CEPU 1

1
REVISI-0 Jakarta April 24, 2015 Ref. No : 0001/MJB-Q/IV/2015 To : PT. HUTAMA KARYA Jl. Letjen MT. Haryono Kav. 8 Cawang Jakarta Timur-13340 Attention : Mr. Fajar Agung Rahmadi Cc Subject : RAB/Commercial Proposal Area Dear Sir, Based on project drawings email you send, so I intend to give the plan calculation fee for such work, this below : PIPING LINE OF BUILDING TO BASIN arranged by PT Hutama Karya The job will be completed at price as follow : 155,576,988 Rp SAYS :"ONE HUNDRED FIFETY-FIVE MILLION FIVE HUNDRED SEVENTY-SIX THOUSAND NINE HUNDRED EIGHTY-EIGH ONLY RUPIAH " Scope of Work : 1 Fab, errection and Installation 2 Material provide by PT Hutama Karya 3 Consumable + Tools provide by Contractor Term of quotation : 1. Validity : 30 days 2. Term of payment : Payment will be paid after one month the invoice is received 3. Price excluded VAT 10% 4. Price include PPh We trust we have fully met to your requirements and remain at your approval for discussion and clarification as you may require. Thank you for your attention and are looking forward to your reply. Sincerely yours, Engineering, Procurement, Construction, Maintenance : BANYU URIP PROJECT PIPING LINE OF BUILDING TO BASIN : Mr. Erricson TK Bayu Kristianto Eng/Est

description

SURAT PENAWARAN 1

Transcript of RAB EP CEPU 1

  • REVISI-0

    Jakarta April 24, 2015

    Ref. No : 0001/MJB-Q/IV/2015

    To :

    PT. HUTAMA KARYAJl. Letjen MT. Haryono Kav. 8 Cawang

    Jakarta Timur-13340

    Attention : Mr. Fajar Agung Rahmadi

    Cc

    Subject : RAB/Commercial Proposal

    Area

    Dear Sir,

    Based on project drawings email you send, so I intend to give the plan calculation fee for such work, this below :

    PIPING LINE OF BUILDING TO BASIN

    arranged by PT Hutama Karya

    The job will be completed at price as follow : 155,576,988Rp

    SAYS :"ONE HUNDRED FIFETY-FIVE MILLION FIVE HUNDRED SEVENTY-SIX THOUSAND NINE HUNDRED EIGHTY-EIGH ONLY RUPIAH "

    Scope of Work :

    1 Fab, errection and Installation

    2 Material provide by PT Hutama Karya

    3 Consumable + Tools provide by Contractor

    Term of quotation :

    1. Validity : 30 days

    2. Term of payment : Payment will be paid after one month the invoice is received

    3. Price excluded VAT 10%

    4. Price include PPh

    We trust we have fully met to your requirements and remain at your approval for discussion and

    clarification as you may require.

    Thank you for your attention and are looking forward to your reply.

    Sincerely yours,

    Engineering, Procurement, Construction, Maintenance

    : BANYU URIP PROJECT

    PIPING LINE OF BUILDING TO BASIN

    : Mr. Erricson TK

    Bayu Kristianto

    Eng/Est