    Results Analysis(RA)Posted onJanuary 6, 2008

    In the future this post will be maintained here.

    http://www.scmfocus.com/projectsystems/2008/01/06/results-analysis-ra/

    Overview:

    The objective for calculating Work in Process (WIP) is to determine the value of manufacturing activity in

    process at the end of a fiscal period, during a fiscal period and to properly reflect this value on the financial

    statements. WIP calculation is a facet of Results Analysis (RA). RA is a specialized tool within the controlling

    module that computes and analyzes the value of WIP. The terms WIP calculation and RA are generally

    interchangeable.

    Results analysis is used to:

    a. Calculate the inventory value of finished and unfinished products in a non-valuated project stock or non-

    valuated sales stock environment or

    b. You are using a valuated sales order stock or valuated project stock and want to capitalize goods that havebeen delivered but not yet invoiced.

    The difference between SAP and other systems is in the treatment of material consumption for manufacturing.

    Component issues to production orders, run schedules, WBSs, etc is immediately treated as an expense to the

    P&L statement. The issue is not treated as a reclassification from raw or semi-finished inventory to WIP

    inventory. SAP considers WIP to be a snapshot of values that can be computed on demand and passed to the

    general ledger as required to re-class the values to the balance sheet. This process demands a specific,

    methodical approach to be used for period-end and mid-period processing. Rules used to calculate the value of

    WIP and settle WIP to the G/L are defined in multiple RA tables depending upon the requirements of the

    company. RA is designed to support a variety of calculation techniques and there may and are alternate settings

    depending on the demands of the company. To support the configuration, scenarios and unit testing need to be

    thorough. RA needs to be configured towards the middle of the of the implementation with subsequent testing.

    This will allow for configuration of the data needed to support WIP and RA (chart of accounts, production

    orders, projects, cost centers, cost elements, etc.)

    Configuration Transactions:

    OKG1Create Results Analysis Key

    OKG2Results Analysis Version

    OKG9Results Analysis Version

    OKGCOKGDValuation Methods

    IMG SPRO

    Define Line IDsOKGBDefine Assignment Mapping by incoming charges by cost element to line IDs

    OKG5Define Assignment Mapping by incoming charges by cost element to line IDs

    OKG4Define Update

    OKG6Define Number Ranges

    http://projectsystems.wordpress.com/2008/01/06/results-analysis-ra/http://projectsystems.wordpress.com/2008/01/06/results-analysis-ra/http://projectsystems.wordpress.com/2008/01/06/results-analysis-ra/http://www.scmfocus.com/projectsystems/2008/01/06/results-analysis-ra/http://www.scmfocus.com/projectsystems/2008/01/06/results-analysis-ra/http://www.scmfocus.com/projectsystems/2008/01/06/results-analysis-ra/http://projectsystems.wordpress.com/2008/01/06/results-analysis-ra/