R01-SG-Transport Assessment V4apps.nuneatonandbedworth.gov.uk/BT_NBBC_Planning/planning/docu… ·...
Transcript of R01-SG-Transport Assessment V4apps.nuneatonandbedworth.gov.uk/BT_NBBC_Planning/planning/docu… ·...
Bermuda 01/01/2014 - 04/02/2017
20 Feb 2014 to 19 Oct 2016
Report produced: 13/03/2017
Road Safety Intelligence Team
Tel: 01926 412740
Email: [email protected]
ALL ROAD USERS - ACCIDENTS
TotalSlightSeriousFatalYear
2014 0 3 8 11
2015 0 1 1 2
2016 0 2 8 10
TotalSlightSeriousFatalMonth
January 0 0 1 1
February 0 0 3 3
March 0 1 0 1
April 0 1 0 1
May 0 0 1 1
June 0 1 3 4
July 0 1 0 1
August 0 0 4 4
September 0 0 1 1
October 0 2 2 4
November 0 0 1 1
December 0 0 1 1
TotalSlightSeriousFatalDay
Sunday 0 0 0 0
Monday 0 1 2 3
Tuesday 0 1 4 5
Wednesday 0 2 5 7
Thursday 0 1 4 5
Friday 0 1 2 3
Saturday 0 0 0 0
TotalSlightSeriousFatalPed Crossing
Not at crossing 0 5 17 22
Zebra 0 0 0 0
Pelican 0 1 0 1
Ped Phase 0 0 0 0
Footbridge 0 0 0 0
Refuge 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalBends (Veh Totals)
Left Hand Bend 0 1 2 3
Right Hand Bend 0 0 0 0
TotalSlightSeriousFatalTime
0000-0059 0 0 0 0
0100-0159 0 0 0 0
0200-0259 0 0 0 0
0300-0359 0 0 0 0
0400-0459 0 0 0 0
0500-0559 0 0 1 1
0600-0659 0 0 0 0
0700-0759 0 0 0 0
0800-0859 0 0 0 0
0900-0959 0 0 1 1
1000-1059 0 1 2 3
1100-1159 0 0 2 2
1200-1259 0 0 1 1
1300-1359 0 0 2 2
1400-1459 0 0 0 0
1500-1559 0 2 1 3
1600-1659 0 0 0 0
1700-1759 0 0 2 2
1800-1859 0 2 0 2
1900-1959 0 1 1 2
2000-2059 0 0 1 1
2100-2159 0 0 2 2
2200-2259 0 0 1 1
2300-2359 0 0 0 0
TotalSlightSeriousFatalLighting
Daylight 0 3 13 16
Darkness 0 3 4 7
TotalSlightSeriousFatalWeather
Fine without high winds 0 4 15 19
Raining without high winds 0 2 1 3
Snowing without high winds 0 0 0 0
Fine with high winds 0 0 1 1
Raining with high winds 0 0 0 0
Snowing with high winds 0 0 0 0
Fog or mist - if hazard 0 0 0 0
Other 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalRoad Surface
Dry 0 4 12 16
Wet/Damp 0 2 5 7
Snow 0 0 0 0
Frost/Ice 0 0 0 0
Flood 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalDistrict
Nuneaton and Bedworth 0 6 17 23
TotalSlightSeriousFatalRoad Class
M 0 0 0 0
A(M) 0 0 0 0
A 0 3 7 10
B 0 3 5 8
Other 0 0 5 5
TotalSlightSeriousFatalSpeed Limit
20 0 0 0 0
30 0 1 9 10
40 0 0 0 0
50 0 5 5 10
60 0 0 3 3
70 0 0 0 0
TotalSlightSeriousFatalObstruction (Veh Totals)
Sign/Signal 0 0 0 0
Lamp Post 0 0 0 0
Pole 0 0 0 0
Tree 0 0 1 1
Bus Stop 0 0 0 0
Barrier 0 0 0 0
Other 0 0 1 1
TotalSlightSeriousFatalJunction Type
Not at Junction 0 2 7 9
Roundabout 0 2 6 8
Mini R'about 0 1 2 3
T or Staggered 0 1 0 1
Slip Road 0 0 0 0
Crossroads 0 0 0 0
Multiple Junct 0 0 0 0
Private Drive 0 0 0 0
Other Junction 0 0 2 2
Unknown 0 0 0 0
ALL ROAD USERS - CASUALTIES
TotalSlightSeriousFatalYear
2014 0 3 12 15
2015 0 1 1 2
2016 0 2 14 16
TotalSlightSeriousFatalMonth
January 0 0 2 2
February 0 0 5 5
March 0 1 0 1
April 0 1 0 1
May 0 0 1 1
June 0 1 5 6
July 0 1 0 1
August 0 0 7 7
September 0 0 2 2
October 0 2 3 5
November 0 0 1 1
December 0 0 1 1
TotalSlightSeriousFatalDay
Sunday 0 0 0 0
Monday 0 1 2 3
Tuesday 0 1 5 6
Wednesday 0 2 8 10
Thursday 0 1 9 10
Friday 0 1 3 4
Saturday 0 0 0 0
TotalSlightSeriousFatalPed Crossing
Not at crossing 0 5 27 32
Zebra 0 0 0 0
Pelican 0 1 0 1
Ped Phase 0 0 0 0
Footbridge 0 0 0 0
Refuge 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalBends
Left Hand Bend 0 1 1 2
Right Hand Bend 0 0 0 0
TotalSlightSeriousFatalCasualty Age
0 - 5 0 0 0 0
6 - 10 0 0 0 0
11 - 16 0 1 1 2
17 - 25 0 2 10 12
26 - 35 0 1 5 6
36 - 45 0 0 4 4
46 - 55 0 0 4 4
56 - 64 0 2 3 5
65+ 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalTime
0000-0059 0 0 0 0
0100-0159 0 0 0 0
0200-0259 0 0 0 0
0300-0359 0 0 0 0
0400-0459 0 0 0 0
0500-0559 0 0 1 1
0600-0659 0 0 0 0
0700-0759 0 0 0 0
0800-0859 0 0 0 0
0900-0959 0 0 2 2
1000-1059 0 1 3 4
1100-1159 0 0 3 3
1200-1259 0 0 1 1
1300-1359 0 0 2 2
1400-1459 0 0 0 0
1500-1559 0 2 1 3
1600-1659 0 0 0 0
1700-1759 0 0 2 2
1800-1859 0 2 0 2
1900-1959 0 1 2 3
2000-2059 0 0 2 2
2100-2159 0 0 5 5
2200-2259 0 0 3 3
2300-2359 0 0 0 0
TotalSlightSeriousFatalLighting
Daylight 0 3 17 20
Darkness 0 3 10 13
TotalSlightSeriousFatalWeather
Fine without high winds 0 4 23 27
Raining without high winds 0 2 3 5
Snowing without high winds 0 0 0 0
Fine with high winds 0 0 1 1
Raining with high winds 0 0 0 0
Snowing with high winds 0 0 0 0
Fog or mist - if hazard 0 0 0 0
Other 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalRoad Surface
Dry 0 4 18 22
Wet/Damp 0 2 9 11
Snow 0 0 0 0
Frost/Ice 0 0 0 0
Flood 0 0 0 0
Unknown 0 0 0 0
TotalSlightSeriousFatalDistrict
Nuneaton and Bedworth 0 6 27 33
TotalSlightSeriousFatalRoad Class
M 0 0 0 0
A(M) 0 0 0 0
A 0 3 10 13
B 0 3 7 10
Other 0 0 10 10
TotalSlightSeriousFatalSpeed Limit
20 0 0 0 0
30 0 1 14 15
40 0 0 0 0
50 0 5 6 11
60 0 0 7 7
70 0 0 0 0
TotalSlightSeriousFatalObstruction
Sign/Signal 0 0 0 0
Lamp Post 0 0 0 0
Pole 0 0 0 0
Tree 0 0 2 2
Bus Stop 0 0 0 0
Barrier 0 0 0 0
Other 0 0 1 1
ALL ROAD USERS - CASUALTIES
TotalSlightSeriousFatalJunction Type
Not at Junction 0 2 10 12
Roundabout 0 2 9 11
Mini R'about 0 1 3 4
T or Staggered 0 1 0 1
Slip Road 0 0 0 0
Crossroads 0 0 0 0
Multiple Junct 0 0 0 0
Private Drive 0 0 0 0
Other Junction 0 0 5 5
Unknown 0 0 0 0
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No
Section SLIGHT
20/02/2014 22:10 DRK NSLGrid
Ref
436860E
289260N
Wet/Damp Fine 5 S.VEH1
GIPSY LANE,NUNEATON APPROX 295 M NE GIPSY LANE BRIDGE Nuneaton and Bedworth
Vehicles 1Casualties 3V1 TRAVELLING ALONG GIPSY LANE TOWARDS NUNEATON IS
DAZZLED BY LIGHTS OF ONCOMING VEHICLE. DR V1 SWERVES TO
RIGHT SLIGHTLY THEN TRIES TO RECTIFY THIS TURNING BACK
TOWARDS THE KERB HOWEVER SHE LOSES CONTROL AND V1
OVERTURNS
Veh1, car, SW -> NE
Road No A444
Section SLIGHT
26/02/2014 12:30 LGrid
Ref
435782E
289185N
Dry Fine 4 S.VEH2 GVN
A444 N/B APPROX 54 MT NB GRIFF ISLAND NUNEATON Nuneaton and Bedworth PED
Vehicles 1Casualties 1PED WALKING HER DOG ON GRASS VERGE WHEN V1 PULLED ONTO
VERGE IN FRONT OF HER, V1 THEN REV COLL/W PED KNOCKING HER
OVER
Veh1, goods < 3.5t, N -> S
Road No A444
Section SERIOUS
14/03/2014 19:45 DRK NSLGrid
Ref
435783E
289191N
Dry Fine 6 S.VEH3 W
A 444 GRIFF WAY NUNEATON 100 M N JW ST DAVIDS WAY. Nuneaton and Bedworth PED
Vehicles 1Casualties 1V1 TRAVELLING A 44 TOWARDS NUNEATON ON DARK UNLIT SECTION
OF RD WHEN HE SAW A PEDESTRIAN RUNS FROM OFFSIDE IN FRONT
OF HIM, V1 SLOWS BUT IS UNABLE TO AVOID COLLIDING CAS 1
RUNNING BEHIND THE FIST PEDESTRIAN.
Veh1, car, S -> N
Road No B4113
Section SERIOUS
04/06/2014 10:20 LGrid
Ref
436162E
290081N
Wet/Damp Rain 44
B4113 COVENTRY RD J/W DONNITHORNE AVE NUNEATON Nuneaton and Bedworth
Vehicles 2Casualties 2V1 APP MINI ISLAND FAILS TO SEE THAT V2 IS STAT COLL/W SAMES
REAR
Veh1, car, N -> S
Veh2, car, N -> S
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 1
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No B4113
Section SLIGHT
18/08/2014 10:30 LGrid
Ref
436161E
290074N
Dry Fine 25
R.TURN
M/C
B4113 COVENTRY RD J/W DONNITHORNE AVENUE HILL TOP NUNEATON Nuneaton and Bedworth
Vehicles 2Casualties 1V1 BEGINS TO NEG MINI ROUNDABOUT FAILING TO SEE V2
MOTORCYCLE ALREADY NEG ISLAND RESULTING IN COLL
Veh1, car, E -> N
Veh2, m/cycle 125 - 500cc, N -> S
Road No
Section SLIGHT
26/08/2014 10:30 LGrid
Ref
435913E
289361N
Dry Fine 36
R.TURN
HGV
ST GEORGES WAY, NUNEATON 130 M S JW BURLINGTON RD. Nuneaton and Bedworth
Vehicles 2Casualties 1V1 AND 2 TRAVELLING IN OP DIRECTIONS. V1 MADE A RT TURN TO
ENTER LAY BY ON OP SIDE OF ROAD FAILING TO SEE V2 TRAVELLING
IN OP DIRECTION.
Veh1, goods 3.5 - 7.5t, N -> W
Veh2, car, S -> N
Road No B4113
Section SLIGHT
30/09/2014 11:10 LGrid
Ref
436157E
290110N
Dry Fine 37
B4113 COVENTRY RD HILL TOP NUNEATON APPROX 30 MT N J/W DONNITHORNE AVE Nuneaton and Bedworth
Vehicles 2Casualties 2BOTH VEHS TRAV NB, V2 SLOWS TO PULL INTO THE N/S , V1 FAILS TO
SEE THIS AND COLL/W REAR V2 CAUSING V1 TO FLIP ONTO ROOF
Veh1, car, S -> N
Veh2, car, S -> N
Road No A444
Section SLIGHT
08/10/2014 17:40 LGrid
Ref
435801E
289107N
Wet/Damp Fine Wind 48 M/C
A 444, GRIFF ROINDABOUT NUNEATON JW ST DAVIDS WAY Nuneaton and Bedworth
Vehicles 2Casualties 1V1 HAS ENTERED THE A 444 GRIFF ROUNDABOUT FROM ST DAVIDS
WAY. V2 IS NEG GRIFF ROUNDABOUT PASSING ST DAVIDS WAY ON
THE NEARSIDE. FOS V1 HAS STRUCK REAR OF V2 CAUSING RIDER TO
FALL TO FLOOR.
Veh1, car, SW -> N
Veh2, m/cycle > 500cc, S -> N
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 2
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No B4113
Section SERIOUS
15/10/2014 18:15 DRK STLGrid
Ref
435941E
289105N
Wet/Damp Rain 4 S.VEH9 M/C
B4113 COVENTRY RD NUNEATON APPROX 46 MT NE A444 ISLAND Nuneaton and Bedworth
Vehicles 1Casualties 1MOTORCYCLE V1 LEAVING ISLAND ACCELERATED AWAY BUT LOST
CONTROL , BIKE SKIDDED AND RIDER FELL OFF
Veh1, m/cycle > 500cc, NW -> NE
Road No B4113
Section SLIGHT
13/11/2014 11:22 LGrid
Ref
436162E
290079N
Dry Fine 510
R.TURN
B 4113, COVENTRY RD, NUNEATON JW DONNITHORNE AVE. Nuneaton and Bedworth
Vehicles 2Casualties 1V1 TURNS RT OUT OF DONNITHORNE AVE INTO PATH V2 NEG
TRAFFIC ISLAND ON COVENTRY RD.
Veh1, car, E -> N
Veh2, car, N -> S
Road No
Section SLIGHT
19/12/2014 05:45 DRK STLGrid
Ref
435638E
288996N
Wet/Damp Fine 611
R.TURN
O/TAKE
P/C
ST DAVIDS WAY NUNEATON J/W TURN TO BERMUDA PARK Nuneaton and Bedworth
Vehicles 2Casualties 1V2 PCYCLE IN FILTER LANE WAITING TO TURN RGT INTO JCT,
ONCOMING VEH IS ABOUT TO TURN LEFT INTO SAME JCT WHEN
OVERTOOK BY V1 WHICH HAD FAILED TO SEE V2 AHEAD, V2 TRIED
TO MOVE OUT OF THE WAY BUT WAS STRUCK ON REAR WHEEL BY
V1, WHICH KNOCKED RIDER OFF BIKE, V1 FAILED TO STOP
Veh1, car, NE -> SW
Veh2, pedal cycle, SW -> SE
Road No B4113
Section SERIOUS
02/04/2015 15:45 LGrid
Ref
435909E
288877N
Dry Fine 512
R.TURN
M/C
B 4113. COVENTRY RD, BEDWORTH JW GIPSY LANE. Nuneaton and Bedworth
Vehicles 2Casualties 1V1 TRAVELLING NB TOWARDS GRIFF RD, V2 IS TRAVELLING IN THE OP
DIRECTION HAVING JUST EXITED GRIFF ISLAND. V1 TURNS RT
ACTROSS THE PATH OF V2 INTO GIPSY LANE, V2 COLLIDES NS V1.
Veh1, car, SW -> E
Veh2, m/cycle 50 - 125cc, NE -> SW
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 3
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No
Section SLIGHT
14/05/2015 13:57 LGrid
Ref
435915E
289357N
Wet/Damp Fine 513 GVHGV
ST GEORGES WAY NUNEATON APPROX 135 MT SB BURLINGTON RD Nuneaton and Bedworth
Vehicles 2Casualties 1V1 HGV HAD JUST DROPPED OFF HIS TRAILER IN LAYBY NEXT TO THE
RD , V1 THEN MOVES OFF INTO RD TO DO A UTURN AND COLL/W
PASSING V2
Veh1, goods > 7.5t, N -> N
Veh2, goods < 3.5t, N -> S
Road No A444
Section SLIGHT
29/01/2016 09:00 LGrid
Ref
435849E
289076N
Dry Fine 614
GRIFF ISLAND A444 B4113 Nuneaton and Bedworth
Vehicles 2Casualties 2V001 DROVE INTO V002 NO DAMAGE TO V002 BUT 2 X CASUALTIES. Veh1, car, S -> N
Veh2, car, S -> N
Road No A444
Section SLIGHT
09/02/2016 17:05 LGrid
Ref
435773E
289211N
Dry Fine 315
NUNEATON INVICINTY OF BERMUDA IND EST A444 Nuneaton and Bedworth
Vehicles 2Casualties 1VEHICLE 2 TRAVELLING ON A444 TOWARDS NUNEATON WHEN
STRUCK FROM BEHIND BY VEHICLE 1. BOTH PARTIES STOPPED AND
EXCHANGED DETAILS
Veh1, car, S -> N
Veh2, car, S -> N
Road No B4113
Section SLIGHT
20/06/2016 21:35 LGrid
Ref
436170E
290249N
Dry Fine 216
P/C
COVENTRY ROAD B4113 Nuneaton and Bedworth
Vehicles 2Casualties 1PEDAL CYCLE ON CYCLE PATH WHEN VEH01 DROVE ACROSS THE
CYCLE PATH AND COLLIDED WITH PEDAL CYCLE. VEH01 DETAILS
UNKNOWN. NO DETAILS OFFERED BY DRIVER OF VEH01
Veh1, car, E -> W
Veh2, pedal cycle, S -> N
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 4
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No A444
Section SLIGHT
28/06/2016 13:20 LGrid
Ref
435816E
289148N
Dry Fine 317
GRIFF WAY ISLAND NUNEATON A444 B4113 Nuneaton and Bedworth
Vehicles 2Casualties 1POLICE VEHICLE V002 HAS BEEN STATIONARY AT A FIXED TRAFFIC
SIGNAL IN GOOD WEATHER, WHEN STRUCK FROM BEHIND BY A
MOVING VEHICLE V001
Veh1, car, W -> E
Veh2, car, W -> E
Road No A444
Section SLIGHT
29/06/2016 19:10 LGrid
Ref
435838E
288984N
Wet/Damp Rain 4 S.VEH18
BEDWORTH BY PASS NUNEATON A444 GRIFF ISLAND NUNEATON B4113 Nuneaton and Bedworth
Vehicles 1Casualties 2DRIVER OF VEH01 HAS ENTERED THE CARRIAGEWAY FROM THE
ISLAND & THE REAR OF THE VEHICLE HAS SLIPPED AND LOST
YTACTION ON THE SLIPPY ROAD SURFACE. VEHICLE HAS COME OFF
THE ROAD & ROLLED AS HIT THE GRASS. VEH01 IS A KIT CAR & LOW
TO THE GROUND
Veh1, car, S -> SW
Road No A444
Section SERIOUS
05/07/2016 15:50 LGrid
Ref
435900E
289118N
Dry Fine 319 M/C
COVENTRY ROAD NUNEATON A444 1 METRES SOUTH OF JUNCTION WITH COVENTRY RD
NUNEATON B4113
Nuneaton and Bedworth
Vehicles 2Casualties 1VEH01 AND VEH02 NEGOTIATING A444 GRIFF TRAFFIC ISLAND. VEH01
AND VEH02 TRAVELLING TOWARDS B4113. VEH02 CONTINUES
STRAIGHT AHEAD, VEH01 ATTEMPTS TO PULL INFRONT OF VEH02 TO
TAKE EXIT ONTO B4113 DURING WHICH VEH02 COLLIDES WITH VEH01
CAUSING INJURY.
Veh1, m/cycle > 500cc, N -> E
Veh2, car, N -> S
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 5
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No U0
Section SLIGHT
18/08/2016 21:16 DRK STLGrid
Ref
435642E
288996N
Dry Fine 520
ST DAVID'S WAY NUNEATON UNSPECIFIED ROAD OR LOCATION TURN TO MACDONALDS Nuneaton and Bedworth
Vehicles 2Casualties 4VEH01 TRAVELLING OUT FROM MCDONALDS WAITING AT JUNCTION
TO TURN RIGHT ONTO ST DAVIDS WAY. VEH02 TRAVELLING FROM
A444 ON ST DAVID'S TOWARDS MCDONALDS JUNCTION, VEH02
POSSIBLY INDICATING LEFT. VEH01SEEING THIS HAS PULLED OUT.
VEH02 HAS CONTINUED STRATIGHT ON AFTER CANCELLING
INDICATOR. VEH02 HAS DRIVEN INTO SIDE OF VEH01.
Veh1, car, S -> E
Veh2, car, E -> W
Road No B4113
Section SLIGHT
31/08/2016 15:30 LGrid
Ref
435917E
289110N
Dry Fine 421
COVENTRY ROAD B4113 GRIFF ROUNDABOUT A444 Nuneaton and Bedworth
Vehicles 2Casualties 1VEH01 HAS HIT VEH02 WHILST VEH01B WAS SPEEDING ON A BEND.
VEH01 DID NOT STOP. VEH01 NO INSURANCE AS PER PNC
Veh1, car, NW -> NE
Veh2, car, NW -> NE
Road No A444
Section SERIOUS
03/10/2016 18:44 DRK STLGrid
Ref
435797E
289150N
Dry Fine 2 S.VEH22 E
TORWARDS NUNEATON A444 GRIF ROUNDABOUT A444 Nuneaton and Bedworth PED
Vehicles 1Casualties 1VEH 01 DRIVING TOWARDS NUNEATON COMING OFF THE GRIFF
ROUNDABOUT APPROACHING PEDESTRIAN CROSSING. STRUCK
PEDESTRIAN WHO WAS CROSSING ROAD CAUSING INJURY AND
DAMAGE TO VEHICLE.
Veh1, car, S -> N
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 6
D-PRINT CRASH REPORT 13-Mar-2017
09:50:43
TimeNo Location Date Street
Lighting
Road Surface Weather Pedestrian
Direction
Factors InvolvedDaySeverity
Road No A444
Section SLIGHT
19/10/2016 20:40 DRK STLGrid
Ref
435888E
289134N
Dry Fine 423
BY KFC A444 ST GEORGES WAY Nuneaton and Bedworth
Vehicles 2Casualties 2TRAVELLING IN VEH002 TOWARDS THE ROUNDABOUT VEH001 PULLED
AWAY. VEH002 CONTINUED TO GO ACROSS ROUNDABOUT WHEN
VEH001 STOPPED SUDDENLY NOT USING BRAKE LIGHTS CAUSING
VEH002 TO HIT REAR OF VEH001.
Veh1, car, NE -> S
Veh2, car, NE -> S
Involved
PED Pedestrian
HGV Heavy Goods Vehicle
GV Goods Vehicle
M/C Motor Cycle
P/C Pedal Cycle
PSV Bus/Coach
Street Lighting
L Daylight
STL Street Lights
USL Street LIghts Unlit
NSL No Street Lights
STU Street Lights Unknown
FACTORS
+VE Positive Breath Test
R.TURN Right Turn Manoeuvre
O/TAKE Overtaking Manoeuvre
S.VEH Single Vehicle
Special Conditions
ATS OUT Traffic Lights Not Working
ATS DEF Traffic Lights Defective
SIGNS Road Signs Defective or Obscurred
RD WRKS Road Works
Surface Road Surface Defective
Key
Page 7
APPENDIX E – TRICS OUTPUT
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 1
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
Calculation Reference: AUDIT-152303-170320-0339TRIP RATE CALCULATION SELECTION PARAMETERS:
Land Use : 03 - RESIDENTIALCategory : A - HOUSES PRIVATELY OWNEDVEHICLES
Selected regions and areas:
02 SOUTH EAST
ES EAST SUSSEX 1 daysHC HAMPSHIRE 1 daysSC SURREY 1 daysWS WEST SUSSEX 1 days
03 SOUTH WEST
DC DORSET 2 daysDV DEVON 3 daysSM SOMERSET 1 days
04 EAST ANGLIA
CA CAMBRIDGESHIRE 1 daysNF NORFOLK 3 daysSF SUFFOLK 2 days
05 EAST MIDLANDS
LN LINCOLNSHIRE 1 days06 WEST MIDLANDS
SH SHROPSHIRE 4 daysST STAFFORDSHIRE 1 daysWK WARWICKSHIRE 2 days
07 YORKSHIRE & NORTH LINCOLNSHIRE
NY NORTH YORKSHIRE 6 daysSY SOUTH YORKSHIRE 1 days
08 NORTH WEST
CH CHESHIRE 4 daysGM GREATER MANCHESTER 1 daysMS MERSEYSIDE 1 days
09 NORTH
CB CUMBRIA 2 daysTW TYNE & WEAR 2 days
10 WALES
PS POWYS 1 days
This section displays the number of survey days per TRICS® sub-region in the selected set
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 2
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
Secondary Filtering selection:
This data displays the chosen trip rate parameter and its selected range. Only sites that fall within the parameter range
are included in the trip rate calculation.
Parameter: Number of dwellingsActual Range: 6 to 129 (units: )Range Selected by User: 6 to 150 (units: )
Public Transport Provision:Selection by: Include all surveys
Date Range: 01/01/08 to 13/11/15
This data displays the range of survey dates selected. Only surveys that were conducted within this date range are
included in the trip rate calculation.
Selected survey days:
Monday 8 daysTuesday 9 daysWednesday 9 daysThursday 8 daysFriday 8 days
This data displays the number of selected surveys by day of the week.
Selected survey types:
Manual count 42 daysDirectional ATC Count 0 days
This data displays the number of manual classified surveys and the number of unclassified ATC surveys, the total adding
up to the overall number of surveys in the selected set. Manual surveys are undertaken using staff, whilst ATC surveys are
undertaking using machines.
Selected Locations:
Suburban Area (PPS6 Out of Centre) 23Edge of Town 18Neighbourhood Centre (PPS6 Local Centre) 1
This data displays the number of surveys per main location category within the selected set. The main location categories
consist of Free Standing, Edge of Town, Suburban Area, Neighbourhood Centre, Edge of Town Centre, Town Centre and
Not Known.
Selected Location Sub Categories:
Residential Zone 35Village 1No Sub Category 6
This data displays the number of surveys per location sub-category within the selected set. The location sub-categories
consist of Commercial Zone, Industrial Zone, Development Zone, Residential Zone, Retail Zone, Built-Up Zone, Village, Out
of Town, High Street and No Sub Category.
Secondary Filtering selection:
Use Class:
C 1 1 days C 3 40 days
This data displays the number of surveys per Use Class classification within the selected set. The Use Classes Order 2005
has been used for this purpose, which can be found within the Library module of TRICS®.
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 3
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
Secondary Filtering selection (Cont.):
Population within 1 mile:
1,001 to 5,000 6 days5,001 to 10,000 12 days10,001 to 15,000 9 days15,001 to 20,000 5 days20,001 to 25,000 5 days25,001 to 50,000 5 days
This data displays the number of selected surveys within stated 1-mile radii of population.
Population within 5 miles:
5,001 to 25,000 6 days25,001 to 50,000 5 days50,001 to 75,000 3 days75,001 to 100,000 10 days100,001 to 125,000 4 days125,001 to 250,000 6 days250,001 to 500,000 7 days500,001 or More 1 days
This data displays the number of selected surveys within stated 5-mile radii of population.
Car ownership within 5 miles:
0.6 to 1.0 13 days1.1 to 1.5 29 days
This data displays the number of selected surveys within stated ranges of average cars owned per residential dwelling,
within a radius of 5-miles of selected survey sites.
Travel Plan:
Yes 3 daysNo 39 days
This data displays the number of surveys within the selected set that were undertaken at sites with Travel Plans in place,
and the number of surveys that were undertaken at sites without Travel Plans.
PTAL Rating:
No PTAL Present 42 days
This data displays the number of selected surveys with PTAL Ratings.
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 4
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
LIST OF SITES relevant to selection parameters
1 CA-03-A-04 DETACHED CAMBRIDGESHIRE
THORPE PARK ROADPETERBOROUGHSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 9
Survey date: TUESDAY 18/10/11 Survey Type: MANUAL
2 CB-03-A-03 SEMI DETACHED CUMBRIA
HAWKSHEAD AVENUE
WORKINGTONEdge of TownResidential ZoneTotal Number of dwellings: 4 0
Survey date: THURSDAY 20/11/08 Survey Type: MANUAL
3 CB-03-A-04 SEMI DETACHED CUMBRIA
MOORCLOSE ROADSALTERBACKWORKINGTONEdge of TownNo Sub CategoryTotal Number of dwellings: 8 2
Survey date: FRIDAY 24/04/09 Survey Type: MANUAL
4 CH-03-A-05 DETACHED CHESHIRE
SYDNEY ROADSYDNEYCREWEEdge of TownResidential ZoneTotal Number of dwellings: 1 7
Survey date: TUESDAY 14/10/08 Survey Type: MANUAL
5 CH-03-A-06 SEMI-DET./BUNGALOWS CHESHIRE
CREWE ROAD
CREWESuburban Area (PPS6 Out of Centre)No Sub CategoryTotal Number of dwellings: 1 2 9
Survey date: TUESDAY 14/10/08 Survey Type: MANUAL
6 CH-03-A-08 DETACHED CHESHIRE
WHITCHURCH ROADBOUGHTON HEATHCHESTERSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 1 1
Survey date: TUESDAY 22/05/12 Survey Type: MANUAL
7 CH-03-A-09 TERRACED HOUSES CHESHIRE
GREYSTOKE ROADHURDSFIELDMACCLESFIELDEdge of TownResidential ZoneTotal Number of dwellings: 2 4
Survey date: MONDAY 24/11/14 Survey Type: MANUAL
8 DC-03-A-01 DETACHED DORSET
ISAACS CLOSE
POOLESuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 5 1
Survey date: WEDNESDAY 16/07/08 Survey Type: MANUAL
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 5
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
LIST OF SITES relevant to selection parameters (Cont.)
9 DC-03-A-08 BUNGALOWS DORSET
HURSTDENE ROADCASTLE LANE WESTBOURNEMOUTHEdge of TownResidential ZoneTotal Number of dwellings: 2 8
Survey date: MONDAY 24/03/14 Survey Type: MANUAL
10 DV-03-A-01 TERRACED HOUSES DEVON
BRONSHILL ROAD
TORQUAYSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 3 7
Survey date: WEDNESDAY 30/09/15 Survey Type: MANUAL
11 DV-03-A-02 HOUSES & BUNGALOWS DEVON
MILLHEAD ROAD
HONITONSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 1 1 6
Survey date: FRIDAY 25/09/15 Survey Type: MANUAL
12 DV-03-A-03 TERRACED & SEMI DETACHED DEVON
LOWER BRAND LANE
HONITONSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 7 0
Survey date: MONDAY 28/09/15 Survey Type: MANUAL
13 ES-03-A-02 PRIVATE HOUSING EAST SUSSEX
SOUTH COAST ROAD
PEACEHAVENEdge of TownResidential ZoneTotal Number of dwellings: 3 7
Survey date: FRIDAY 18/11/11 Survey Type: MANUAL
14 GM-03-A-10 DETACHED/SEMI GREATER MANCHESTER
BUTT HILL DRIVEP R E S T W I C H MANCHESTEREdge of TownResidential ZoneTotal Number of dwellings: 2 9
Survey date: WEDNESDAY 12/10/11 Survey Type: MANUAL
15 HC-03-A-17 HOUSES & FLATS HAMPSHIRE
CANADA WAY
LIPHOOKSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 3 6
Survey date: THURSDAY 12/11/15 Survey Type: MANUAL
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 6
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
LIST OF SITES relevant to selection parameters (Cont.)
16 LN-03-A-03 SEMI DETACHED LINCOLNSHIRE
ROOKERY LANEBOULTHAMLINCOLNSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 2 2
Survey date: TUESDAY 18/09/12 Survey Type: MANUAL
17 MS-03-A-03 DETACHED MERSEYSIDE
BEMPTON ROADOTTERSPOOLLIVERPOOLSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 1 5
Survey date: FRIDAY 21/06/13 Survey Type: MANUAL
18 NF-03-A-01 SEMI DET. & BUNGALOWS NORFOLK
YARMOUTH ROAD
CAISTER-ON-SEASuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 2 7
Survey date: TUESDAY 16/10/12 Survey Type: MANUAL
19 NF-03-A-02 HOUSES & FLATS NORFOLK
DEREHAM ROAD
NORWICHSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 9 8
Survey date: MONDAY 22/10/12 Survey Type: MANUAL
20 NF-03-A-03 DETACHED HOUSES NORFOLK
HALING WAY
THETFORDEdge of TownResidential ZoneTotal Number of dwellings: 1 0
Survey date: WEDNESDAY 16/09/15 Survey Type: MANUAL
21 NY-03-A-06 BUNGALOWS & SEMI DET. NORTH YORKSHIRE
HORSEFAIR
BOROUGHBRIDGESuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 1 1 5
Survey date: FRIDAY 14/10/11 Survey Type: MANUAL
22 NY-03-A-07 DETACHED & SEMI DET. NORTH YORKSHIRE
CRAVEN WAY
BOROUGHBRIDGEEdge of TownNo Sub CategoryTotal Number of dwellings: 2 3
Survey date: TUESDAY 18/10/11 Survey Type: MANUAL
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 7
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
LIST OF SITES relevant to selection parameters (Cont.)
23 NY-03-A-08 TERRACED HOUSES NORTH YORKSHIRE
NICHOLAS STREET
YORKSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 2 1
Survey date: MONDAY 16/09/13 Survey Type: MANUAL
24 NY-03-A-09 MIXED HOUSING NORTH YORKSHIRE
GRAMMAR SCHOOL LANE
NORTHALLERTONSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 5 2
Survey date: MONDAY 16/09/13 Survey Type: MANUAL
25 NY-03-A-10 HOUSES AND FLATS NORTH YORKSHIRE
BOROUGHBRIDGE ROAD
RIPONEdge of TownNo Sub CategoryTotal Number of dwellings: 7 1
Survey date: TUESDAY 17/09/13 Survey Type: MANUAL
26 NY-03-A-11 PRIVATE HOUSING NORTH YORKSHIRE
HORSEFAIR
BOROUGHBRIDGEEdge of TownResidential ZoneTotal Number of dwellings: 2 3
Survey date: WEDNESDAY 18/09/13 Survey Type: MANUAL
27 PS-03-A-02 DETACHED/SEMI-DETACHED POWYS
GUNROG ROAD
WELSHPOOLSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 2 8
Survey date: MONDAY 11/05/15 Survey Type: MANUAL
28 SC-03-A-04 DETACHED & TERRACED SURREY
HIGH ROAD
BYFLEETEdge of TownResidential ZoneTotal Number of dwellings: 7 1
Survey date: THURSDAY 23/01/14 Survey Type: MANUAL
29 SF-03-A-04 DETACHED & BUNGALOWS SUFFOLK
NORMANSTON DRIVE
LOWESTOFTSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 7
Survey date: TUESDAY 23/10/12 Survey Type: MANUAL
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 8
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
LIST OF SITES relevant to selection parameters (Cont.)
30 SF-03-A-05 DETACHED HOUSES SUFFOLK
VALE LANE
BURY ST EDMUNDSEdge of TownResidential ZoneTotal Number of dwellings: 1 8
Survey date: WEDNESDAY 09/09/15 Survey Type: MANUAL
31 SH-03-A-03 DETATCHED SHROPSHIRE
SOMERBY DRIVEBICTON HEATHSHREWSBURYEdge of TownNo Sub CategoryTotal Number of dwellings: 1 0
Survey date: FRIDAY 26/06/09 Survey Type: MANUAL
32 SH-03-A-04 TERRACED SHROPSHIRE
ST MICHAEL'S STREET
SHREWSBURYSuburban Area (PPS6 Out of Centre)No Sub CategoryTotal Number of dwellings: 1 0 8
Survey date: THURSDAY 11/06/09 Survey Type: MANUAL
33 SH-03-A-05 SEMI-DETACHED/TERRACED SHROPSHIRE
SANDCROFTSUTTON HILLTELFORDEdge of TownResidential ZoneTotal Number of dwellings: 5 4
Survey date: THURSDAY 24/10/13 Survey Type: MANUAL
34 SH-03-A-06 BUNGALOWS SHROPSHIRE
ELLESMERE ROAD
SHREWSBURYEdge of TownResidential ZoneTotal Number of dwellings: 1 6
Survey date: THURSDAY 22/05/14 Survey Type: MANUAL
35 SM-03-A-01 DETACHED & SEMI SOMERSET
WEMBDON ROADNORTHFIELDBRIDGWATEREdge of TownResidential ZoneTotal Number of dwellings: 3 3
Survey date: THURSDAY 24/09/15 Survey Type: MANUAL
36 ST-03-A-05 TERRACED & DETACHED STAFFORDSHIRE
WATERMEET GROVEETRURIASTOKE-ON-TRENTSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 1 4
Survey date: WEDNESDAY 26/11/08 Survey Type: MANUAL
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 9
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
LIST OF SITES relevant to selection parameters (Cont.)
37 SY-03-A-01 SEMI DETACHED HOUSES SOUTH YORKSHIRE
A19 BENTLEY ROADBENTLEY RISEDONCASTERSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 5 4
Survey date: WEDNESDAY 18/09/13 Survey Type: MANUAL
38 TW-03-A-02 SEMI-DETACHED TYNE & WEAR
WEST PARK ROAD
GATESHEADSuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 1 6
Survey date: MONDAY 07/10/13 Survey Type: MANUAL
39 TW-03-A-03 MIXED HOUSES TYNE & WEAR
STATION ROADBACKWORTHNEAR NEWCASTLENeighbourhood Centre (PPS6 Local Centre)VillageTotal Number of dwellings: 3 3
Survey date: FRIDAY 13/11/15 Survey Type: MANUAL
40 WK-03-A-01 TERRACED/SEMI/DET. WARWICKSHIRE
ARLINGTON AVENUE
LEAMINGTON SPASuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 6
Survey date: FRIDAY 21/10/11 Survey Type: MANUAL
41 WK-03-A-02 BUNGALOWS WARWICKSHIRE
NARBERTH WAYPOTTERS GREENCOVENTRYEdge of TownResidential ZoneTotal Number of dwellings: 1 7
Survey date: THURSDAY 17/10/13 Survey Type: MANUAL
42 WS-03-A-05 TERRACED & FLATS WEST SUSSEX
UPPER SHOREHAM ROAD
SHOREHAM BY SEASuburban Area (PPS6 Out of Centre)Residential ZoneTotal Number of dwellings: 4 8
Survey date: WEDNESDAY 18/04/12 Survey Type: MANUAL
This section provides a list of all survey sites and days in the selected set. For each individual survey site, it displays a
unique site reference code and site address, the selected trip rate calculation parameter and its value, the day of the week
and date of each survey, and whether the survey was a manual classified count or an ATC count.
TRICS 7.3.4 120117 B17.46 (C) 2017 TRICS Consortium Ltd Monday 20/03/17
Page 10
Vectos (South) Ltd Prince Street Bristol Licence No: 152303
TRIP RATE for Land Use 03 - RESIDENTIAL/A - HOUSES PRIVATELY OWNEDVEHICLES
Calculation factor: 1 DWELLS
BOLD print indicates peak (busiest) period
ARRIVALS DEPARTURES TOTALSNo. Ave. Trip No. Ave. Trip No. Ave. Trip
Time Range Days DWELLS Rate Days DWELLS Rate Days DWELLS Rate00:00 - 01:0001:00 - 02:0002:00 - 03:0003:00 - 04:0004:00 - 05:0005:00 - 06:0006:00 - 07:00
42 41 0.075 42 41 0.271 42 41 0.34607:00 - 08:0042 41 0.146 42 41 0.377 42 41 0.52308:00 - 09:0042 41 0.152 42 41 0.180 42 41 0.33209:00 - 10:0042 41 0.154 42 41 0.162 42 41 0.31610:00 - 11:0042 41 0.160 42 41 0.171 42 41 0.33111:00 - 12:0042 41 0.175 42 41 0.164 42 41 0.33912:00 - 13:0042 41 0.169 42 41 0.163 42 41 0.33213:00 - 14:0042 41 0.157 42 41 0.167 42 41 0.32414:00 - 15:0042 41 0.246 42 41 0.181 42 41 0.42715:00 - 16:0042 41 0.281 42 41 0.169 42 41 0.45016:00 - 17:0042 41 0.337 42 41 0.174 42 41 0.51117:00 - 18:0042 41 0.215 42 41 0.147 42 41 0.36218:00 - 19:00
19:00 - 20:0020:00 - 21:0021:00 - 22:0022:00 - 23:0023:00 - 24:00
Total Rates: 2.267 2.326 4.593
This section displays the trip rate results based on the selected set of surveys and the selected count type (shown just
above the table). It is split by three main columns, representing arrivals trips, departures trips, and total trips (arrivals plus
departures). Within each of these main columns are three sub-columns. These display the number of survey days where
count data is included (per time period), the average value of the selected trip rate calculation parameter (per time
period), and the trip rate result (per time period). Total trip rates (the sum of the column) are also displayed at the foot of
the table.
To obtain a trip rate, the average (mean) trip rate parameter value (TRP) is first calculated for all selected survey days
that have count data available for the stated time period. The average (mean) number of arrivals, departures or totals
(whichever applies) is also calculated (COUNT) for all selected survey days that have count data available for the stated
time period. Then, the average count is divided by the average trip rate parameter value, and multiplied by the stated
calculation factor (shown just above the table and abbreviated here as FACT). So, the method is: COUNT/TRP*FACT. Trip
rates are then rounded to 3 decimal places.
Parameter summary
Trip rate parameter range selected: 6 - 129 (units: )Survey date date range: 01/01/08 - 13/11/15Number of weekdays (Monday-Friday): 42Number of Saturdays: 0Number of Sundays: 0Surveys automatically removed from selection: 1Surveys manually removed from selection: 0
This section displays a quick summary of some of the data filtering selections made by the TRICS® user. The trip rate
calculation parameter range of all selected surveys is displayed first, followed by the range of minimum and maximum
survey dates selected by the user. Then, the total number of selected weekdays and weekend days in the selected set of
surveys are show. Finally, the number of survey days that have been manually removed from the selected set outside of
the standard filtering procedure are displayed.
APPENDIX F – LINSIG OUTPUT: SITE ACCESS
Basic Results Summary Basic Results Summary User and Project Details
Project: Faultlands Farm, Nuneaton
Title:
Location: Site Access
Additional detail:
File name: Site Access.lsg3x
Author:
Company:
Address:
Scenario 1: 'Scenario 1' (FG3: 'Base 2027 AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 98.0 %Total Traffic Delay: 6.1 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31983
1278
15.7%
1985
1279
15.7%
1985
0
0.0%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1985
926
45.4
%
1985
922
45.4
%
1780
4
45.4
%
Arm 3 - Site Access (Entry)
1
19851760.0%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
10.3%
1985
1985
10.1%
Arm 5 -
B4113 South (E
xit)
12
19851985
21.2%
19851985
21.5%
Arm 6 - Site Access (Exit)
1
1985
1985
0.0%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
8.3%A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 45.4% 0 0 0 6.1 - -
Site Access
- - - - - - - - - 45.4% 0 0 0 6.1 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 57 - 200 1983 1278 15.7% - - - 0.4 8.0 2.0
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 57:7 - 201 1985:1985 1279+0
15.7 : 0.0%
- - - 0.4 8.0 2.0
2/1 B4113 North
(Entry) Ahead Left
U B 1 41 - 421 1985 926 45.4% - - - 2.3 19.8 7.4
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 41:7 - 421 1985:1780 922+4 45.4 : 45.4%
- - - 2.3 19.9 7.4
3/1 Site Access (Entry) Right
Left U F 1 7 - 0 1985 176 0.0% - - - 0.0 0.0 0.0
4/1 B4113 North
(Exit) U - - - - 204 1985 1985 10.3% - - - 0.1 1.0 0.1
4/2 B4113 North
(Exit) U - - - - 201 1985 1985 10.1% - - - 0.1 1.0 0.1
5/1 B4113 South
(Exit) U - - - - 421 1985 1985 21.2% - - - 0.1 1.2 0.1
5/2 B4113 South
(Exit) U - - - - 426 1985 1985 21.5% - - - 0.1 1.2 0.1
6/1 Site Access
(Exit) U - - - - 0 1985 1985 0.0% - - - 0.0 0.0 0.0
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 13 1764 157 8.3% - - - 0.2 50.3 0.3
C1 PRC for Signalled Lanes (%): 98.0 Total Delay for Signalled Lanes (pcuHr): 5.72 Cycle Time (s): 90 PRC Over All Lanes (%): 98.0 Total Delay Over All Lanes(pcuHr): 6.10
Basic Results Summary Scenario 2: 'New Scenario' (FG4: 'Base 2027 PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 88.1 %Total Traffic Delay: 9.0 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31983
1278
44.2%
1985
1279
44.2%
1985
0
0.0%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1985
926
47.6
%
1985
915
47.9
%
1780
1347
.9%
Arm 3 - Site Access (Entry)
1
19851760.0%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
28.3%
1985
1985
28.5%
Arm 5 -
B4113 South (E
xit)
12
19851985
22.2%
19851985
22.2%
Arm 6 - Site Access (Exit)
1
1985
1985
0.0%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
3.2%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 47.9% 0 0 0 9.0 - -
Site Access
- - - - - - - - - 47.9% 0 0 0 9.0 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 57 - 565 1983 1278 44.2% - - - 1.6 10.5 7.3
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 57:7 - 565 1985:1985 1279+0
44.2 : 0.0%
- - - 1.6 10.5 7.3
2/1 B4113 North
(Entry) Ahead Left
U B 1 41 - 441 1985 926 47.6% - - - 2.5 20.2 7.9
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 41:7 - 444 1985:1780 915+13 47.9 : 47.9%
- - - 2.5 20.4 7.9
3/1 Site Access (Entry) Right
Left U F 1 7 - 0 1985 176 0.0% - - - 0.0 0.0 0.0
4/1 B4113 North
(Exit) U - - - - 561 1985 1985 28.3% - - - 0.2 1.3 0.2
4/2 B4113 North
(Exit) U - - - - 565 1985 1985 28.5% - - - 0.2 1.3 0.2
5/1 B4113 South
(Exit) U - - - - 441 1985 1985 22.2% - - - 0.1 1.2 0.1
5/2 B4113 South
(Exit) U - - - - 441 1985 1985 22.2% - - - 0.1 1.2 0.1
6/1 Site Access
(Exit) U - - - - 0 1985 1985 0.0% - - - 0.0 0.0 0.0
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 5 1764 157 3.2% - - - 0.1 49.7 0.1
C1 PRC for Signalled Lanes (%): 88.1 Total Delay for Signalled Lanes (pcuHr): 8.35 Cycle Time (s): 90 PRC Over All Lanes (%): 88.1 Total Delay Over All Lanes(pcuHr): 9.03
Basic Results Summary Scenario 3: 'New Scenario' (FG7: '2027 + Dev AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 67.8 %Total Traffic Delay: 10.8 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31984
1234
32.5%
1985
0
0.0%
1847
185
53.6%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1938
861
53.3
%
1985
878
53.6
%
1780
4
53.6
%
Arm 3 - Site Access (Entry)
1
176417652.7%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
20.4%
1985
1985
2.2%
Arm 5 -
B4113 South (E
xit)
12
19851985
21.0%
19851985
24.1%
Arm 6 - Site Access (Exit)
1
1985
1985
9.5%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
8.3%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 53.6% 0 0 0 10.8 - -
Site Access
- - - - - - - - - 53.6% 0 0 0 10.8 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 55 - 401 1984 1234 32.5% - - - 1.1 10.2 4.9
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 55:8 - 99 1985:1847 0+185
0.0 : 53.6%
- - - 1.6 59.3 2.9
2/1 B4113 North
(Entry) Ahead Left
U B 1 39 - 459 1938 861 53.3% - - - 2.9 22.7 8.9
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 39:8 - 473 1985:1780 878+4 53.6 : 53.6%
- - - 3.0 22.7 9.1
3/1 Site Access (Entry) Right
Left U F 1 8 - 93 1764 176 52.7% - - - 1.5 59.8 2.7
4/1 B4113 North
(Exit) U - - - - 405 1985 1985 20.4% - - - 0.1 1.1 0.1
4/2 B4113 North
(Exit) U - - - - 44 1985 1985 2.2% - - - 0.0 0.9 0.0
5/1 B4113 South
(Exit) U - - - - 417 1985 1985 21.0% - - - 0.1 1.1 0.1
5/2 B4113 South
(Exit) U - - - - 479 1985 1985 24.1% - - - 0.2 1.2 0.2
6/1 Site Access
(Exit) U - - - - 189 1985 1985 9.5% - - - 0.1 1.0 0.1
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 13 1764 157 8.3% - - - 0.2 50.3 0.3
C1 PRC for Signalled Lanes (%): 67.8 Total Delay for Signalled Lanes (pcuHr): 10.36 Cycle Time (s): 90 PRC Over All Lanes (%): 67.8 Total Delay Over All Lanes(pcuHr): 10.85
Basic Results Summary Scenario 4: 'New Scenario' (FG8: '2027 + Dev PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 52.4 %Total Traffic Delay: 14.8 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31983
1146
49.8%
1985
1098
50.9%
1847
67
50.9%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1968
787
57.5
%
1985
785
58.2
%
1780
1058
.2%
Arm 3 - Site Access (Entry)
1
176427459.0%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
28.8%
1985
1985
31.8%
Arm 5 -
B4113 South (E
xit)
12
19851985
25.4%
19851985
23.3%
Arm 6 - Site Access (Exit)
1
1985
1985
3.3%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
3.2%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 59.0% 0 0 0 14.8 - -
Site Access
- - - - - - - - - 59.0% 0 0 0 14.8 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 51 - 571 1983 1146 49.8% - - - 2.3 14.4 8.9
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 51:7 - 593 1985:1847 1098+67
50.9 : 50.9%
- - - 2.6 15.9 8.8
2/1 B4113 North
(Entry) Ahead Left
U B 1 35 - 453 1968 787 57.5% - - - 3.3 26.4 9.5
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 35:7 - 463 1985:1780 785+10 58.2 : 58.2%
- - - 3.4 26.7 9.6
3/1 Site Access (Entry) Right
Left U F 1 13 - 162 1764 274 59.0% - - - 2.3 51.2 4.4
4/1 B4113 North
(Exit) U - - - - 572 1985 1985 28.8% - - - 0.2 1.3 0.2
4/2 B4113 North
(Exit) U - - - - 631 1985 1985 31.8% - - - 0.2 1.3 0.2
5/1 B4113 South
(Exit) U - - - - 504 1985 1985 25.4% - - - 0.2 1.2 0.2
5/2 B4113 South
(Exit) U - - - - 463 1985 1985 23.3% - - - 0.2 1.2 0.2
6/1 Site Access
(Exit) U - - - - 65 1985 1985 3.3% - - - 0.0 0.9 0.0
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 5 1764 157 3.2% - - - 0.1 49.7 0.1
C1 PRC for Signalled Lanes (%): 52.4 Total Delay for Signalled Lanes (pcuHr): 14.02 Cycle Time (s): 90 PRC Over All Lanes (%): 52.4 Total Delay Over All Lanes(pcuHr): 14.79
Basic Results Summary Scenario 5: 'New Scenario' (FG11: 'Base 2031 AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 92.1 %Total Traffic Delay: 6.3 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31983
1278
16.1%
1985
1279
16.2%
1985
0
0.0%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1985
926
46.7
%
1985
922
46.9
%
1780
4
46.9
%
Arm 3 - Site Access (Entry)
1
19851760.0%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
10.6%
1985
1985
10.4%
Arm 5 -
B4113 South (E
xit)
12
19851985
21.8%
19851985
22.1%
Arm 6 - Site Access (Exit)
1
1985
1985
0.0%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
8.3%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 46.9% 0 0 0 6.3 - -
Site Access
- - - - - - - - - 46.9% 0 0 0 6.3 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 57 - 206 1983 1278 16.1% - - - 0.5 8.0 2.1
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 57:7 - 207 1985:1985 1279+0
16.2 : 0.0%
- - - 0.5 8.0 2.1
2/1 B4113 North
(Entry) Ahead Left
U B 1 41 - 433 1985 926 46.7% - - - 2.4 20.0 7.8
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 41:7 - 434 1985:1780 922+4 46.9 : 46.9%
- - - 2.4 20.1 7.8
3/1 Site Access (Entry) Right
Left U F 1 7 - 0 1985 176 0.0% - - - 0.0 0.0 0.0
4/1 B4113 North
(Exit) U - - - - 210 1985 1985 10.6% - - - 0.1 1.0 0.1
4/2 B4113 North
(Exit) U - - - - 207 1985 1985 10.4% - - - 0.1 1.0 0.1
5/1 B4113 South
(Exit) U - - - - 433 1985 1985 21.8% - - - 0.1 1.2 0.1
5/2 B4113 South
(Exit) U - - - - 439 1985 1985 22.1% - - - 0.1 1.2 0.1
6/1 Site Access
(Exit) U - - - - 0 1985 1985 0.0% - - - 0.0 0.0 0.0
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 13 1764 157 8.3% - - - 0.2 50.3 0.3
C1 PRC for Signalled Lanes (%): 92.1 Total Delay for Signalled Lanes (pcuHr): 5.94 Cycle Time (s): 90 PRC Over All Lanes (%): 92.1 Total Delay Over All Lanes(pcuHr): 6.34
Basic Results Summary Scenario 6: 'New Scenario' (FG12: 'Base 2031 PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 82.3 %Total Traffic Delay: 9.4 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31983
1278
45.5%
1985
1279
45.5%
1985
0
0.0%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1985
926
49.0
%
1985
916
49.4
%
1780
1249
.4%
Arm 3 - Site Access (Entry)
1
19851760.0%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
29.1%
1985
1985
29.3%
Arm 5 -
B4113 South (E
xit)
12
19851985
22.9%
19851985
23.0%
Arm 6 - Site Access (Exit)
1
1985
1985
0.0%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
3.8%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 49.4% 0 0 0 9.4 - -
Site Access
- - - - - - - - - 49.4% 0 0 0 9.4 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 57 - 582 1983 1278 45.5% - - - 1.7 10.6 7.7
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 57:7 - 582 1985:1985 1279+0
45.5 : 0.0%
- - - 1.7 10.6 7.7
2/1 B4113 North
(Entry) Ahead Left
U B 1 41 - 454 1985 926 49.0% - - - 2.6 20.4 8.3
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 41:7 - 458 1985:1780 916+12 49.4 : 49.4%
- - - 2.6 20.7 8.3
3/1 Site Access (Entry) Right
Left U F 1 7 - 0 1985 176 0.0% - - - 0.0 0.0 0.0
4/1 B4113 North
(Exit) U - - - - 578 1985 1985 29.1% - - - 0.2 1.3 0.2
4/2 B4113 North
(Exit) U - - - - 582 1985 1985 29.3% - - - 0.2 1.3 0.2
5/1 B4113 South
(Exit) U - - - - 454 1985 1985 22.9% - - - 0.1 1.2 0.1
5/2 B4113 South
(Exit) U - - - - 456 1985 1985 23.0% - - - 0.1 1.2 0.1
6/1 Site Access
(Exit) U - - - - 0 1985 1985 0.0% - - - 0.0 0.0 0.0
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 6 1764 157 3.8% - - - 0.1 49.7 0.2
C1 PRC for Signalled Lanes (%): 82.3 Total Delay for Signalled Lanes (pcuHr): 8.73 Cycle Time (s): 90 PRC Over All Lanes (%): 82.3 Total Delay Over All Lanes(pcuHr): 9.44
Basic Results Summary Scenario 7: 'New Scenario' (FG13: '2031 + Dev AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 63.4 %Total Traffic Delay: 11.1 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31984
1234
33.5%
1985
0
0.0%
1847
185
53.6%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1939
862
54.7
%
1985
878
55.1
%
1780
4
55.1
%
Arm 3 - Site Access (Entry)
1
176417652.7%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
21.0%
1985
1985
2.2%
Arm 5 -
B4113 South (E
xit)
12
19851985
21.6%
19851985
24.8%
Arm 6 - Site Access (Exit)
1
1985
1985
9.5%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
8.3%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 55.1% 0 0 0 11.1 - -
Site Access
- - - - - - - - - 55.1% 0 0 0 11.1 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 55 - 413 1984 1234 33.5% - - - 1.2 10.3 5.1
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 55:8 - 99 1985:1847 0+185
0.0 : 53.6%
- - - 1.6 59.3 2.9
2/1 B4113 North
(Entry) Ahead Left
U B 1 39 - 471 1939 862 54.7% - - - 3.0 22.9 9.2
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 39:8 - 486 1985:1780 878+4 55.1 : 55.1%
- - - 3.1 23.0 9.5
3/1 Site Access (Entry) Right
Left U F 1 8 - 93 1764 176 52.7% - - - 1.5 59.8 2.7
4/1 B4113 North
(Exit) U - - - - 417 1985 1985 21.0% - - - 0.1 1.1 0.1
4/2 B4113 North
(Exit) U - - - - 44 1985 1985 2.2% - - - 0.0 0.9 0.0
5/1 B4113 South
(Exit) U - - - - 429 1985 1985 21.6% - - - 0.1 1.2 0.1
5/2 B4113 South
(Exit) U - - - - 492 1985 1985 24.8% - - - 0.2 1.2 0.2
6/1 Site Access
(Exit) U - - - - 189 1985 1985 9.5% - - - 0.1 1.0 0.1
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 13 1764 157 8.3% - - - 0.2 50.3 0.3
C1 PRC for Signalled Lanes (%): 63.4 Total Delay for Signalled Lanes (pcuHr): 10.64 Cycle Time (s): 90 PRC Over All Lanes (%): 63.4 Total Delay Over All Lanes(pcuHr): 11.14
Basic Results Summary Scenario 8: 'New Scenario' (FG14: '2031 + Dev PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
Site AccessPRC: 50.1 %Total Traffic Delay: 15.4 pcuHr
Arm 1 - B
4113 South (E
ntry)
12
31983
1146
51.3%
1985
1099
52.4%
1847
65
52.4%
Arm 2
- B41
13 Nor
th (E
ntry
)
12
3 1969
788
59.2
%
1985
786
60.0
%
1780
1060
.0%
Arm 3 - Site Access (Entry)
1
176427459.0%
Arm 4 - B
4113 North
(Exit
)
12
1985
1985
29.7%
1985
1985
32.6%
Arm 5 -
B4113 South (E
xit)
12
19851985
26.0%
19851985
24.1%
Arm 6 - Site Access (Exit)
1
1985
1985
3.3%
Arm 7 - C
aravan Park (Exit)
1
Inf
Inf0.0%
Arm 8 - Caravan Park (Entry)
1
1764
157
3.8%
A
B
C
D
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network - - - - - - - - - 60.0% 0 0 0 15.4 - -
Site Access
- - - - - - - - - 60.0% 0 0 0 15.4 - -
1/1 B4113 South (Entry) Ahead
Left U A 1 51 - 588 1983 1146 51.3% - - - 2.4 14.6 9.3
1/2+1/3 B4113 South (Entry) Ahead
Right U A C 1 51:7 - 610 1985:1847 1099+65
52.4 : 52.4%
- - - 2.7 16.0 9.3
2/1 B4113 North
(Entry) Ahead Left
U B 1 35 - 466 1969 788 59.2% - - - 3.5 26.8 9.8
2/2+2/3 B4113 North
(Entry) Ahead Right
U B D 1 35:7 - 477 1985:1780 786+10 60.0 : 60.0%
- - - 3.6 27.1 9.9
3/1 Site Access (Entry) Right
Left U F 1 13 - 162 1764 274 59.0% - - - 2.3 51.2 4.4
4/1 B4113 North
(Exit) U - - - - 589 1985 1985 29.7% - - - 0.2 1.3 0.2
4/2 B4113 North
(Exit) U - - - - 648 1985 1985 32.6% - - - 0.2 1.3 0.2
5/1 B4113 South
(Exit) U - - - - 517 1985 1985 26.0% - - - 0.2 1.2 0.2
5/2 B4113 South
(Exit) U - - - - 478 1985 1985 24.1% - - - 0.2 1.2 0.2
6/1 Site Access
(Exit) U - - - - 65 1985 1985 3.3% - - - 0.0 0.9 0.0
8/1 Caravan Park
(Entry) Left Right Ahead
U E 1 7 - 6 1764 157 3.8% - - - 0.1 49.7 0.2
C1 PRC for Signalled Lanes (%): 50.1 Total Delay for Signalled Lanes (pcuHr): 14.55 Cycle Time (s): 90 PRC Over All Lanes (%): 50.1 Total Delay Over All Lanes(pcuHr): 15.36
APPENDIX G – LINSIG OUTPUT: GRIFF ROUNDABOUT
Basic Results Summary Basic Results Summary User and Project Details
Project: Faultlands Farm, Nuneaton
Title: Griff Roundabout (Existing)
Location: Nuneaton
Additional detail:
File name: Griff Roundabout (Homogenous).lsg3x
Author:
Company:
Address:
Scenario 1: '2015 Base, AM' (FG1: '2015 Base AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 15.5 %Total Traffic Delay: 30.0 pcuHrController: 1
J2: Griff Roundabout SEPRC: 30.8 %Total Traffic Delay: 9.3 pcuHrController: 2
Arm
J1:1 - A444N
12
31900
590
43.6%
1900
950
50.2%
1900
950
59.1%
Arm J1:2 -
123
1900554
37.9% 1900554
44.6% 1900554
12.3%
Arm
J1:
3 -
A4
44N
(E
xit)
1 2
1900
1148
75.3
%
1900
1148
77.1
%
Arm J1:4 - St Davids Way
123
190055536.6%190047715.7%190026115.7%
Arm
J1
:5 -
1 2 3 4
1900
1900
35.5
%
1900
1900
45.9
%
1900
1900
9.5
%
1900
1900
12.0
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
792
75.7
%
1900
792
77.9
%
1900
201
77.9
%
Arm J1:7 - 123
1900
71374.2%
1900
71355.4%
1900
71315.7%
Arm J1:8 - A444 (S) (E
xit)
12 1900
118765.9%
19001187
62.1%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900764
51.2%
1900709
68.8%
Arm J2:2 -
12
31900 190041.0%
1900 190031.5%
1900 190015.8%
Arm J2:3 - B4113 (North)
123
1900
253
58.1%
1900
515
58.1%
1900
515
52.7%
Arm
J2
:4 -
123
1900
990
28.7
%
1 900
990
54.9
%
1900
990
6 3.5
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
1187
12.5%
1900
1187
16.7%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
259
10.0
%
1900
648
10.0
%
Arm J2:7 -
12
34
1900
1900
7.3%
1900
1900
24.5%
1900
1900
28.4%
1900
1900
29.8%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 77.9% 2375 0 0 39.3 - -
J1: Griff Roundabout
NW - - - - - - - - - 77.9% 435 0 0 30.0 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 23 - 734 1900:1900 950+590
50.2 : 43.6%
- - - 2.0 9.9 4.7
1/3 A444N Ahead U C1:H 1 23 - 561 1900 950 59.1% - - - 2.0 13.1 6.0
2/1 Right Ahead U C1:G 1 13 - 210 1900 554 37.9% - - - 1.1 18.0 2.6
2/2 Right U C1:G 1 13 - 247 1900 554 44.6% - - - 1.3 19.0 3.0
2/3 Right U C1:G 1 13 - 68 1900 554 12.3% - - - 0.3 17.3 0.8
3/1 A444N (Exit)
Ahead U C1:J 1 28 - 864 1900 1148 75.3% - - - 2.2 9.4 4.9
3/2 A444N (Exit)
Ahead U C1:J 1 28 - 885 1900 1148 77.1% - - - 3.0 12.0 7.8
4/1 St Davids Way Left
O - - - - 203 1900 555 36.6% 203 0 0 0.3 5.1 0.3
4/2+4/3 St Davids
Way Ahead O - - - - 116 1900:1900 477+261
15.7 : 15.7%
232 0 0 0.1 2.9 0.1
5/1 Ahead U - - - - 674 1900 1900 35.5% - - - 0.3 1.5 0.3
5/2 Ahead U - - - - 872 1900 1900 45.9% - - - 0.4 1.7 0.4
5/3 Right U - - - - 181 1900 1900 9.5% - - - 0.1 1.0 0.1
5/4 Right U - - - - 228 1900 1900 12.0% - - - 0.1 1.1 0.1
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 19 - 599 1900 792 75.7% - - - 3.5 21.1 8.2
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 19 - 774 1900:1900 792+201
77.9 : 77.9%
- - - 4.2 19.5 8.8
7/1 Right Ahead U C1:A 1 17 - 529 1900 713 74.2% - - - 3.1 21.3 6.8
7/2 Right U C1:A 1 17 - 395 1900 713 55.4% - - - 2.0 18.2 4.9
7/3 Right U C1:A 1 17 - 112 1900 713 15.7% - - - 0.4 13.7 1.1
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 29 - 783 1900 1187 65.9% - - - 2.0 9.1 5.9
8/2 A444 (S)
(Exit) Ahead U C1:E 1 29 - 738 1900 1187 62.1% - - - 1.6 7.7 4.8
J2: Griff Roundabout
SE - - - - - - - - - 68.8% 1940 0 0 9.3 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 879 1900:1900 764+709
51.2 : 68.8%
1758 0 0 0.8 3.2 2.5
2/1 Ahead U - - - - 779 1900 1900 41.0% - - - 0.3 1.6 0.3
2/2 Ahead U - - - - 599 1900 1900 31.5% - - - 0.2 1.4 0.2
2/3 Right U - - - - 300 1900 1900 15.8% - - - 0.1 1.1 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 12 - 446 1900:1900 515+253
58.1 : 58.1%
- - - 2.5 20.3 4.1
3/3 B4113 (North)
Ahead U C2:B 1 12 - 271 1900 515 52.7% - - - 1.7 22.2 3.6
4/1 Ahead U C2:A 1 24 - 284 1900 990 28.7% - - - 0.5 6.6 1.3
4/2 Right Ahead U C2:A 1 24 - 543 1900 990 54.9% - - - 1.1 7.3 2.0
4/3 Right U C2:A 1 24 - 628 1900 990 63.5% - - - 1.2 6.7 2.0
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 149 1900 1187 12.5% - - - 0.1 2.3 0.2
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 198 1900 1187 16.7% - - - 0.1 1.9 0.1
6/1+6/2 St Georges Way Ahead
Left O - - - - 91 1900:1900 259+648
10.0 : 10.0%
182 0 0 0.1 2.6 0.2
7/1 Ahead U - - - - 139 1900 1900 7.3% - - - 0.0 1.0 0.0
7/2 Right Ahead U - - - - 466 1900 1900 24.5% - - - 0.2 1.3 0.2
7/3 Right U - - - - 540 1900 1900 28.4% - - - 0.2 1.3 0.2
7/4 Right U - - - - 566 1900 1900 29.8% - - - 0.2 1.3 0.2
C1 Stream: 1 PRC for Signalled Lanes (%): 15.5 Total Delay for Signalled Lanes (pcuHr): 13.27 Cycle Time (s): 48 C1 Stream: 2 PRC for Signalled Lanes (%): 36.5 Total Delay for Signalled Lanes (pcuHr): 3.56 Cycle Time (s): 48 C1 Stream: 3 PRC for Signalled Lanes (%): 52.4 Total Delay for Signalled Lanes (pcuHr): 6.74 Cycle Time (s): 48 C1 Stream: 4 PRC for Signalled Lanes (%): 16.7 Total Delay for Signalled Lanes (pcuHr): 5.21 Cycle Time (s): 48 C2 Stream: 1 PRC for Signalled Lanes (%): 41.8 Total Delay for Signalled Lanes (pcuHr): 6.98 Cycle Time (s): 48 C2 Stream: 2 PRC for Signalled Lanes (%): 439.8 Total Delay for Signalled Lanes (pcuHr): 0.20 Cycle Time (s): 48 PRC Over All Lanes (%): 15.5 Total Delay Over All Lanes(pcuHr): 39.29
Basic Results Summary
Basic Results Summary Scenario 2: '2015 Base, PM' (FG2: '2015 Base PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 23.1 %Total Traffic Delay: 19.2 pcuHrController: 1
J2: Griff Roundabout SEPRC: 71.7 %Total Traffic Delay: 8.5 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
475
66.5%
1900
60
66.5%
1900
475
40.2%
Arm J1:2 -
123
1900897
56.8% 1900897
58.7% 1900897
40.6%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
897
53.9
%
1900
897
46.5
%
Arm J1:4 - St Davids Way
123
190070520.2%190050432.3%190050433.9%
Arm
J1
:5 -
1 2 3 4
1900
1900
20.0
%
1900
1900
19.9
%
1900
1900
25.6
%
1900
1900
30.6
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
792
49.1
%
1900
792
73.1
%
1900
792
62.3
%
Arm J1:7 - 123
1900
58172.3%
1900
58131.7%
1900
58132.7%
Arm J1:8 - A444 (S) (E
xit)
12 1900
95036.4%
1900950
24.4%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900772
30.9%
1900969
36.0%
Arm J2:2 -
12
31900 190015.0%
1900 190010.9%
1900190015.3%
Arm J2:3 - B4113 (North)
123
1900
473
51.2%
1900
581
51.2%
1900
581
37.2%A
rm J
2:4
-
123
1900
792
44.2
%
1 900
792
48.0
%
1900
792
3 5.7
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
950
49.2%
1900
950
52.4%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
689
8.4%
1900
609
11.2
%
Arm J2:7 -
12
34
1900
1900
24.3%
1900
1900
41.9%
1900
1900
20.0%
1900
1900
11.3%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 73.1% 2238 0 0 27.7 - -
J1: Griff Roundabout
NW - - - - - - - - - 73.1% 810 0 0 19.2 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 8 - 356 1900:1900 60+475
66.5 : 66.5%
- - - 2.2 21.9 3.8
1/3 A444N Ahead U C1:H 1 8 - 191 1900 475 40.2% - - - 0.9 17.6 1.9
2/1 Right Ahead U C1:G 1 16 - 510 1900 897 56.8% - - - 1.1 7.9 2.4
2/2 Right U C1:G 1 16 - 527 1900 897 58.7% - - - 1.4 9.5 3.1
2/3 Right U C1:G 1 16 - 364 1900 897 40.6% - - - 0.7 7.4 1.6
3/1 A444N (Exit)
Ahead U C1:J 1 16 - 484 1900 897 53.9% - - - 0.9 6.8 1.5
3/2 A444N (Exit)
Ahead U C1:J 1 16 - 417 1900 897 46.5% - - - 1.1 9.5 2.8
4/1 St Davids Way Left
O - - - - 142 1900 705 20.2% 142 0 0 0.1 3.2 0.1
4/2+4/3 St Davids
Way Ahead O - - - - 334 1900:1900 504+504
32.3 : 33.9%
668 0 0 0.3 3.5 0.8
5/1 Ahead U - - - - 380 1900 1900 20.0% - - - 0.1 1.2 0.1
5/2 Ahead U - - - - 379 1900 1900 19.9% - - - 0.1 1.2 0.1
5/3 Right U - - - - 486 1900 1900 25.6% - - - 0.2 1.3 0.2
5/4 Right U - - - - 581 1900 1900 30.6% - - - 0.2 1.4 0.2
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 14 - 389 1900 792 49.1% - - - 1.3 12.2 3.3
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 14 - 1072 1900:1900 792+792
73.1 : 62.3%
- - - 3.6 12.1 5.9
7/1 Right Ahead U C1:A 1 10 - 420 1900 581 72.3% - - - 2.4 20.6 4.3
7/2 Right U C1:A 1 10 - 184 1900 581 31.7% - - - 0.7 14.0 1.6
7/3 Right U C1:A 1 10 - 190 1900 581 32.7% - - - 0.8 14.2 1.7
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 17 - 346 1900 950 36.4% - - - 0.4 4.1 0.9
8/2 A444 (S)
(Exit) Ahead U C1:E 1 17 - 232 1900 950 24.4% - - - 0.5 8.2 1.4
J2: Griff Roundabout
SE - - - - - - - - - 52.4% 1428 0 0 8.5 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 588 1900:1900 772+969
30.9 : 36.0%
1176 0 0 0.3 1.6 0.3
2/1 Ahead U - - - - 285 1900 1900 15.0% - - - 0.1 1.1 0.1
2/2 Ahead U - - - - 208 1900 1900 10.9% - - - 0.1 1.1 0.1
2/3 Right U - - - - 291 1900 1900 15.3% - - - 0.1 1.1 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 10 - 539 1900:1900 581+473
51.2 : 51.2%
- - - 2.0 13.6 2.9
3/3 B4113 (North)
Ahead U C2:B 1 10 - 216 1900 581 37.2% - - - 0.9 14.7 2.0
4/1 Ahead U C2:A 1 14 - 350 1900 792 44.2% - - - 0.9 8.9 3.3
4/2 Right Ahead U C2:A 1 14 - 380 1900 792 48.0% - - - 1.4 13.6 2.8
4/3 Right U C2:A 1 14 - 283 1900 792 35.7% - - - 0.7 8.4 2.6
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 467 1900 950 49.2% - - - 0.7 5.2 1.0
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 498 1900 950 52.4% - - - 0.7 5.1 1.2
6/1+6/2 St Georges Way Ahead
Left O - - - - 126 1900:1900 689+609
8.4 : 11.2%
252 0 0 0.1 1.5 0.1
7/1 Ahead U - - - - 461 1900 1900 24.3% - - - 0.2 1.3 0.2
7/2 Right Ahead U - - - - 796 1900 1900 41.9% - - - 0.4 1.6 0.4
7/3 Right U - - - - 380 1900 1900 20.0% - - - 0.1 1.2 0.1
7/4 Right U - - - - 215 1900 1900 11.3% - - - 0.1 1.1 0.1
C1 Stream: 1 PRC for Signalled Lanes (%): 23.1 Total Delay for Signalled Lanes (pcuHr): 8.79 Cycle Time (s): 36 C1 Stream: 2 PRC for Signalled Lanes (%): 147.1 Total Delay for Signalled Lanes (pcuHr): 0.92 Cycle Time (s): 36 C1 Stream: 3 PRC for Signalled Lanes (%): 35.3 Total Delay for Signalled Lanes (pcuHr): 6.37 Cycle Time (s): 36 C1 Stream: 4 PRC for Signalled Lanes (%): 66.8 Total Delay for Signalled Lanes (pcuHr): 2.01 Cycle Time (s): 36 C2 Stream: 1 PRC for Signalled Lanes (%): 75.9 Total Delay for Signalled Lanes (pcuHr): 5.89 Cycle Time (s): 36 C2 Stream: 2 PRC for Signalled Lanes (%): 71.7 Total Delay for Signalled Lanes (pcuHr): 1.37 Cycle Time (s): 36 PRC Over All Lanes (%): 23.1 Total Delay Over All Lanes(pcuHr): 27.70
Basic Results Summary
Basic Results Summary Scenario 3: '2027 Base, AM' (FG3: '2027 Base AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 1.6 %Total Traffic Delay: 42.0 pcuHrController: 1
J2: Griff Roundabout SEPRC: -3.6 %Total Traffic Delay: 14.1 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
584
50.1%
1900
990
57.9%
1900
990
62.0%
Arm J1:2 -
123
1900515
50.7% 1900515
54.2% 1900515
11.7%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
1148
85.5
%
1900
1148
88.6
%
Arm J1:4 - St Davids Way
123
190051345.2%190042525.9%19008925.9%
Arm
J1
:5 -
1 2 3 4
1900
1900
39.8
%
1900
1900
53.1
%
1900
1900
12.0
%
1900
1900
12.6
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
831
85.3
%
1900
831
83.5
%
1900
198
83.5
%
Arm J1:7 - 123
1900
67384.1%
1900
67372.7%
1900
67319.0%
Arm J1:8 - A444 (S) (E
xit)
12 1900
118777.0%
19001187
69.4%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900542
75.1%
1900640
93.3%
Arm J2:2 -
12
31900 190048.1%
1900 190034.8%
1900190018.0%
Arm J2:3 - B4113 (North)
123
1900
283
60.1%
1900
551
60.1%
1900
554
57.2%A
rm J
2:4
-
123
1900
950
36.0
%
1 900
950
66.8
%
1900
950
7 2.2
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
1187
16.0%
1900
1187
17.4%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
237
12.6
%
1900
585
12.6
%
Arm J2:7 -
12
34
1900
1900
9.5%
1900
1900
27.8%
1900
1900
33.1%
1900
1900
32.5%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 93.3% 2714 0 0 56.0 - -
J1: Griff Roundabout
NW - - - - - - - - - 88.6% 498 0 0 42.0 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 24 - 866 1900:1900 990+584
57.9 : 50.1%
- - - 2.4 10.0 5.7
1/3 A444N Ahead U C1:H 1 24 - 614 1900 990 62.0% - - - 2.2 12.9 6.4
2/1 Right Ahead U C1:G 1 12 - 261 1900 515 50.7% - - - 1.2 16.8 2.9
2/2 Right U C1:G 1 12 - 279 1900 515 54.2% - - - 1.6 21.3 3.9
2/3 Right U C1:G 1 12 - 60 1900 515 11.7% - - - 0.2 12.2 0.6
3/1 A444N (Exit)
Ahead U C1:J 1 28 - 981 1900 1148 85.5% - - - 3.6 13.3 8.1
3/2 A444N (Exit)
Ahead U C1:J 1 28 - 1017 1900 1148 88.6% - - - 5.5 19.4 14.9
4/1 St Davids Way Left
O - - - - 232 1900 513 45.2% 232 0 0 0.4 6.4 0.4
4/2+4/3 St Davids
Way Ahead O - - - - 133 1900:1900 425+89
25.9 : 25.9%
266 0 0 0.2 4.9 0.6
5/1 Ahead U - - - - 757 1900 1900 39.8% - - - 0.3 1.6 0.3
5/2 Ahead U - - - - 1009 1900 1900 53.1% - - - 0.6 2.0 0.6
5/3 Right U - - - - 228 1900 1900 12.0% - - - 0.1 1.1 0.1
5/4 Right U - - - - 239 1900 1900 12.6% - - - 0.1 1.1 0.1
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 20 - 709 1900 831 85.3% - - - 5.2 26.2 11.2
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 20 - 859 1900:1900 831+198
83.5 : 83.5%
- - - 5.1 21.6 10.6
7/1 Right Ahead U C1:A 1 16 - 566 1900 673 84.1% - - - 4.6 29.5 9.2
7/2 Right U C1:A 1 16 - 489 1900 673 72.7% - - - 3.0 22.1 6.3
7/3 Right U C1:A 1 16 - 128 1900 673 19.0% - - - 0.5 13.6 1.1
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 29 - 914 1900 1187 77.0% - - - 2.8 11.0 9.9
8/2 A444 (S)
(Exit) Ahead U C1:E 1 29 - 824 1900 1187 69.4% - - - 2.3 10.2 8.8
J2: Griff Roundabout
SE - - - - - - - - - 93.3% 2216 0 0 14.1 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 1004 1900:1900 542+640
75.1 : 93.3%
2008 0 0 3.0 10.8 9.7
2/1 Ahead U - - - - 914 1900 1900 48.1% - - - 0.5 1.8 0.5
2/2 Ahead U - - - - 661 1900 1900 34.8% - - - 0.3 1.5 0.3
2/3 Right U - - - - 342 1900 1900 18.0% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 13 - 501 1900:1900 551+283
60.1 : 60.1%
- - - 2.7 19.5 4.5
3/3 B4113 (North)
Ahead U C2:B 1 13 - 317 1900 554 57.2% - - - 1.9 22.0 4.2
4/1 Ahead U C2:A 1 23 - 342 1900 950 36.0% - - - 0.8 8.0 2.0
4/2 Right Ahead U C2:A 1 23 - 635 1900 950 66.8% - - - 1.8 10.1 3.1
4/3 Right U C2:A 1 23 - 686 1900 950 72.2% - - - 1.9 10.2 3.1
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 190 1900 1187 16.0% - - - 0.1 2.2 0.2
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 207 1900 1187 17.4% - - - 0.1 1.9 0.1
6/1+6/2 St Georges Way Ahead
Left O - - - - 104 1900:1900 237+585
12.6 : 12.6%
208 0 0 0.1 3.2 0.3
7/1 Ahead U - - - - 180 1900 1900 9.5% - - - 0.1 1.0 0.1
7/2 Right Ahead U - - - - 529 1900 1900 27.8% - - - 0.2 1.3 0.2
7/3 Right U - - - - 629 1900 1900 33.1% - - - 0.2 1.4 0.2
7/4 Right U - - - - 618 1900 1900 32.5% - - - 0.2 1.4 0.2
C1 Stream: 1 PRC for Signalled Lanes (%): 5.5 Total Delay for Signalled Lanes (pcuHr): 18.43 Cycle Time (s): 48 C1 Stream: 2 PRC for Signalled Lanes (%): 16.9 Total Delay for Signalled Lanes (pcuHr): 5.13 Cycle Time (s): 48 C1 Stream: 3 PRC for Signalled Lanes (%): 45.1 Total Delay for Signalled Lanes (pcuHr): 7.67 Cycle Time (s): 48 C1 Stream: 4 PRC for Signalled Lanes (%): 1.6 Total Delay for Signalled Lanes (pcuHr): 9.10 Cycle Time (s): 48 C2 Stream: 1 PRC for Signalled Lanes (%): 24.6 Total Delay for Signalled Lanes (pcuHr): 9.14 Cycle Time (s): 48 C2 Stream: 2 PRC for Signalled Lanes (%): 416.3 Total Delay for Signalled Lanes (pcuHr): 0.23 Cycle Time (s): 48 PRC Over All Lanes (%): -3.6 Total Delay Over All Lanes(pcuHr): 56.02
Basic Results Summary
Basic Results Summary Scenario 4: '2027 Base, PM' (FG4: '2027 Base PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 7.8 %Total Traffic Delay: 25.8 pcuHrController: 1
J2: Griff Roundabout SEPRC: 54.9 %Total Traffic Delay: 10.3 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
422
83.1%
1900
70
83.1%
1900
422
50.9%
Arm J1:2 -
123
1900950
62.7% 1900950
61.7% 1900950
43.8%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
897
62.5
%
1900
897
52.3
%
Arm J1:4 - St Davids Way
123
190068423.7%190046540.4%190046541.3%
Arm
J1
:5 -
1 2 3 4
1900
1900
24.4
%
1900
1900
21.3
%
1900
1900
28.4
%
1900
1900
35.7
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
739
64.0
%
1900
739
83.5
%
1900
739
78.2
%
Arm J1:7 - 123
1900
63375.8%
1900
63333.3%
1900
63334.3%
Arm J1:8 - A444 (S) (E
xit)
12 1900
95041.8%
1900950
27.7%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900772
35.4%
1900936
42.6%
Arm J2:2 -
12
31900 190016.8%
1900 190012.8%
1900190017.5%
Arm J2:3 - B4113 (North)
123
1900
498
55.7%
1900
581
56.7%
1900
581
44.3%A
rm J
2:4
-
123
1900
792
49.1
%
1 900
792
56.5
%
1900
792
4 0.4
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
950
57.8%
1900
950
58.1%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
622
10.6
%
1900
538
14.5
%
Arm J2:7 -
12
34
1900
1900
28.5%
1900
1900
46.5%
1900
1900
23.5%
1900
1900
12.7%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 83.5% 2554 0 0 36.2 - -
J1: Griff Roundabout
NW - - - - - - - - - 83.5% 922 0 0 25.8 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 7 - 409 1900:1900 70+422
83.1 : 83.1%
- - - 3.8 33.6 5.6
1/3 A444N Ahead U C1:H 1 7 - 215 1900 422 50.9% - - - 1.3 20.9 2.4
2/1 Right Ahead U C1:G 1 17 - 596 1900 950 62.7% - - - 1.4 8.6 3.0
2/2 Right U C1:G 1 17 - 586 1900 950 61.7% - - - 1.6 9.7 3.5
2/3 Right U C1:G 1 17 - 416 1900 950 43.8% - - - 0.9 8.0 2.1
3/1 A444N (Exit)
Ahead U C1:J 1 16 - 561 1900 897 62.5% - - - 1.1 7.1 1.7
3/2 A444N (Exit)
Ahead U C1:J 1 16 - 469 1900 897 52.3% - - - 1.4 11.0 3.5
4/1 St Davids Way Left
O - - - - 162 1900 684 23.7% 162 0 0 0.2 3.4 0.2
4/2+4/3 St Davids
Way Ahead O - - - - 380 1900:1900 465+465
40.4 : 41.3%
760 0 0 0.5 5.0 1.1
5/1 Ahead U - - - - 463 1900 1900 24.4% - - - 0.2 1.3 0.2
5/2 Ahead U - - - - 405 1900 1900 21.3% - - - 0.1 1.2 0.1
5/3 Right U - - - - 540 1900 1900 28.4% - - - 0.2 1.3 0.2
5/4 Right U - - - - 678 1900 1900 35.7% - - - 0.3 1.5 0.3
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 13 - 473 1900 739 64.0% - - - 2.1 15.7 4.7
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 13 - 1195 1900:1900 739+739
83.5 : 78.2%
- - - 5.3 16.1 7.6
7/1 Right Ahead U C1:A 1 11 - 480 1900 633 75.8% - - - 2.7 20.3 4.9
7/2 Right U C1:A 1 11 - 211 1900 633 33.3% - - - 0.8 13.1 1.8
7/3 Right U C1:A 1 11 - 217 1900 633 34.3% - - - 0.8 13.3 1.9
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 17 - 397 1900 950 41.8% - - - 0.5 4.6 0.9
8/2 A444 (S)
(Exit) Ahead U C1:E 1 17 - 263 1900 950 27.7% - - - 0.6 8.7 1.5
J2: Griff Roundabout
SE - - - - - - - - - 58.1% 1632 0 0 10.3 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 672 1900:1900 772+936
35.4 : 42.6%
1344 0 0 0.3 1.7 0.3
2/1 Ahead U - - - - 319 1900 1900 16.8% - - - 0.1 1.1 0.1
2/2 Ahead U - - - - 244 1900 1900 12.8% - - - 0.1 1.1 0.1
2/3 Right U - - - - 333 1900 1900 17.5% - - - 0.1 1.1 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 10 - 606 1900:1900 581+498
56.7 : 55.7%
- - - 2.4 14.2 3.4
3/3 B4113 (North)
Ahead U C2:B 1 10 - 257 1900 581 44.3% - - - 1.1 15.6 2.4
4/1 Ahead U C2:A 1 14 - 389 1900 792 49.1% - - - 1.0 8.9 3.7
4/2 Right Ahead U C2:A 1 14 - 447 1900 792 56.5% - - - 1.8 14.6 3.5
4/3 Right U C2:A 1 14 - 320 1900 792 40.4% - - - 0.7 8.2 2.9
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 549 1900 950 57.8% - - - 0.9 6.0 1.5
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 552 1900 950 58.1% - - - 0.9 5.7 2.8
6/1+6/2 St Georges Way Ahead
Left O - - - - 144 1900:1900 622+538
10.6 : 14.5%
288 0 0 0.1 1.8 0.2
7/1 Ahead U - - - - 541 1900 1900 28.5% - - - 0.2 1.3 0.2
7/2 Right Ahead U - - - - 883 1900 1900 46.5% - - - 0.4 1.8 0.4
7/3 Right U - - - - 447 1900 1900 23.5% - - - 0.2 1.2 0.2
7/4 Right U - - - - 242 1900 1900 12.7% - - - 0.1 1.1 0.1
C1 Stream: 1 PRC for Signalled Lanes (%): 7.8 Total Delay for Signalled Lanes (pcuHr): 11.69 Cycle Time (s): 36 C1 Stream: 2 PRC for Signalled Lanes (%): 115.4 Total Delay for Signalled Lanes (pcuHr): 1.14 Cycle Time (s): 36 C1 Stream: 3 PRC for Signalled Lanes (%): 8.3 Total Delay for Signalled Lanes (pcuHr): 9.01 Cycle Time (s): 36 C1 Stream: 4 PRC for Signalled Lanes (%): 43.9 Total Delay for Signalled Lanes (pcuHr): 2.54 Cycle Time (s): 36 C2 Stream: 1 PRC for Signalled Lanes (%): 58.8 Total Delay for Signalled Lanes (pcuHr): 7.00 Cycle Time (s): 36 C2 Stream: 2 PRC for Signalled Lanes (%): 54.9 Total Delay for Signalled Lanes (pcuHr): 1.79 Cycle Time (s): 36 PRC Over All Lanes (%): 7.8 Total Delay Over All Lanes(pcuHr): 36.15
Basic Results Summary
Basic Results Summary Scenario 5: '2027 Base + Development, AM' (FG7: '2027 + Dev AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 0.5 %Total Traffic Delay: 42.6 pcuHrController: 1
J2: Griff Roundabout SEPRC: -6.5 %Total Traffic Delay: 15.2 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
661
47.8%
1900
990
55.8%
1900
990
64.2%
Arm J1:2 -
123
1900515
47.8% 1900515
60.4% 1900515
21.4%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
1148
85.5
%
1900
1148
89.6
%
Arm J1:4 - St Davids Way
123
190051145.4%190041117.8%190041114.6%
Arm
J1
:5 -
1 2 3 4
1900
1900
39.6
%
1900
1900
53.9
%
1900
1900
10.8
%
1900
1900
17.3
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
831
83.6
%
1900
831
80.0
%
1900
326
80.0
%
Arm J1:7 - 123
1900
67385.4%
1900
67373.0%
1900
67321.1%
Arm J1:8 - A444 (S) (E
xit)
12 1900
118776.4%
19001187
72.2%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900556
74.6%
1900629
95.8%
Arm J2:2 -
12
31900 190047.7%
1900 190036.5%
1900190018.6%
Arm J2:3 - B4113 (North)
123
1900
276
64.2%
1900
551
64.2%
1900
554
59.7%A
rm J
2:4
-
123
1900
950
30.7
%
1 900
950
68.9
%
1900
950
7 5.4
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
1187
17.0%
1900
1187
24.0%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
229
13.1
%
1900
564
13.1
%
Arm J2:7 -
12
34
1900
1900
9.9%
1900
1900
29.5%
1900
1900
34.5%
1900
1900
33.8%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 95.8% 2742 0 0 57.8 - -
J1: Griff Roundabout
NW - - - - - - - - - 89.6% 498 0 0 42.6 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 24 - 868 1900:1900 990+661
55.8 : 47.8%
- - - 2.3 9.7 5.5
1/3 A444N Ahead U C1:H 1 24 - 635 1900 990 64.2% - - - 2.4 13.3 6.9
2/1 Right Ahead U C1:G 1 12 - 246 1900 515 47.8% - - - 1.3 18.6 2.9
2/2 Right U C1:G 1 12 - 311 1900 515 60.4% - - - 1.7 20.2 4.3
2/3 Right U C1:G 1 12 - 110 1900 515 21.4% - - - 0.4 14.4 1.1
3/1 A444N (Exit)
Ahead U C1:J 1 28 - 981 1900 1148 85.5% - - - 3.6 13.3 7.6
3/2 A444N (Exit)
Ahead U C1:J 1 28 - 1028 1900 1148 89.6% - - - 5.8 20.4 16.2
4/1 St Davids Way Left
O - - - - 232 1900 511 45.4% 232 0 0 0.4 6.4 0.8
4/2+4/3 St Davids
Way Ahead O - - - - 133 1900:1900 411+411
17.8 : 14.6%
266 0 0 0.1 3.4 0.4
5/1 Ahead U - - - - 752 1900 1900 39.6% - - - 0.3 1.6 0.3
5/2 Ahead U - - - - 1025 1900 1900 53.9% - - - 0.6 2.1 0.6
5/3 Right U - - - - 206 1900 1900 10.8% - - - 0.1 1.1 0.1
5/4 Right U - - - - 328 1900 1900 17.3% - - - 0.1 1.1 0.1
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 20 - 695 1900 831 83.6% - - - 4.8 24.7 10.6
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 20 - 926 1900:1900 831+326
80.0 : 80.0%
- - - 4.8 18.5 9.5
7/1 Right Ahead U C1:A 1 16 - 575 1900 673 85.4% - - - 4.9 31.0 9.7
7/2 Right U C1:A 1 16 - 491 1900 673 73.0% - - - 3.0 22.3 6.3
7/3 Right U C1:A 1 16 - 142 1900 673 21.1% - - - 0.5 13.8 1.3
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 29 - 907 1900 1187 76.4% - - - 2.7 10.9 9.6
8/2 A444 (S)
(Exit) Ahead U C1:E 1 29 - 857 1900 1187 72.2% - - - 2.6 11.0 9.5
J2: Griff Roundabout
SE - - - - - - - - - 95.8% 2244 0 0 15.2 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 1018 1900:1900 556+629
74.6 : 95.8%
2036 0 0 3.3 11.6 9.6
2/1 Ahead U - - - - 907 1900 1900 47.7% - - - 0.5 1.8 0.5
2/2 Ahead U - - - - 694 1900 1900 36.5% - - - 0.3 1.5 0.3
2/3 Right U - - - - 353 1900 1900 18.6% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 13 - 531 1900:1900 551+276
64.2 : 64.2%
- - - 3.0 20.3 4.9
3/3 B4113 (North)
Ahead U C2:B 1 13 - 331 1900 554 59.7% - - - 2.1 22.6 4.5
4/1 Ahead U C2:A 1 23 - 292 1900 950 30.7% - - - 0.5 6.8 1.2
4/2 Right Ahead U C2:A 1 23 - 655 1900 950 68.9% - - - 2.0 11.1 3.9
4/3 Right U C2:A 1 23 - 716 1900 950 75.4% - - - 2.2 11.2 3.4
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 202 1900 1187 17.0% - - - 0.2 2.8 0.4
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 285 1900 1187 24.0% - - - 0.2 2.0 0.2
6/1+6/2 St Georges Way Ahead
Left O - - - - 104 1900:1900 229+564
13.1 : 13.1%
208 0 0 0.1 3.3 0.3
7/1 Ahead U - - - - 188 1900 1900 9.9% - - - 0.1 1.1 0.1
7/2 Right Ahead U - - - - 561 1900 1900 29.5% - - - 0.2 1.3 0.2
7/3 Right U - - - - 655 1900 1900 34.5% - - - 0.3 1.4 0.3
7/4 Right U - - - - 642 1900 1900 33.8% - - - 0.3 1.4 0.3
C1 Stream: 1 PRC for Signalled Lanes (%): 5.3 Total Delay for Signalled Lanes (pcuHr): 18.07 Cycle Time (s): 48 C1 Stream: 2 PRC for Signalled Lanes (%): 17.8 Total Delay for Signalled Lanes (pcuHr): 5.36 Cycle Time (s): 48 C1 Stream: 3 PRC for Signalled Lanes (%): 40.3 Total Delay for Signalled Lanes (pcuHr): 8.14 Cycle Time (s): 48 C1 Stream: 4 PRC for Signalled Lanes (%): 0.5 Total Delay for Signalled Lanes (pcuHr): 9.47 Cycle Time (s): 48 C2 Stream: 1 PRC for Signalled Lanes (%): 19.4 Total Delay for Signalled Lanes (pcuHr): 9.86 Cycle Time (s): 48 C2 Stream: 2 PRC for Signalled Lanes (%): 275.0 Total Delay for Signalled Lanes (pcuHr): 0.32 Cycle Time (s): 48 PRC Over All Lanes (%): -6.5 Total Delay Over All Lanes(pcuHr): 57.83
Basic Results Summary
Basic Results Summary Scenario 6: '2027 Base + Development, PM' (FG8: '2027 + Dev PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 0.5 %Total Traffic Delay: 28.0 pcuHrController: 1
J2: Griff Roundabout SEPRC: 44.3 %Total Traffic Delay: 11.0 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
422
89.5%
1900
40
89.5%
1900
422
51.6%
Arm J1:2 -
123
1900950
63.7% 1900950
61.1% 1900950
45.9%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
897
62.7
%
1900
897
54.3
%
Arm J1:4 - St Davids Way
123
190068023.8%190045640.6%190045642.7%
Arm
J1
:5 -
1 2 3 4
1900
1900
24.0
%
1900
1900
22.7
%
1900
1900
28.4
%
1900
1900
36.9
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
739
63.1
%
1900
739
84.7
%
1900
739
80.4
%
Arm J1:7 - 123
1900
63375.8%
1900
63336.5%
1900
63335.1%
Arm J1:8 - A444 (S) (E
xit)
12 1900
95043.8%
1900950
30.4%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900766
35.6%
1900917
44.0%
Arm J2:2 -
12
31900 190018.4%
1900 190013.6%
1900190018.6%
Arm J2:3 - B4113 (North)
123
1900
463
62.4%
1900
581
62.4%
1900
581
49.8%A
rm J
2:4
-
123
1900
792
49.0
%
1 900
792
56.2
%
1900
792
4 0.8
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
950
59.4%
1900
950
59.8%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
612
10.8
%
1900
530
14.7
%
Arm J2:7 -
12
34
1900
1900
29.2%
1900
1900
47.4%
1900
1900
23.4%
1900
1900
12.9%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 89.5% 2564 0 0 39.1 - -
J1: Griff Roundabout
NW - - - - - - - - - 89.5% 922 0 0 28.0 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 7 - 414 1900:1900 40+422
89.5 : 89.5%
- - - 5.2 45.6 7.3
1/3 A444N Ahead U C1:H 1 7 - 218 1900 422 51.6% - - - 1.3 21.1 2.4
2/1 Right Ahead U C1:G 1 17 - 605 1900 950 63.7% - - - 1.5 8.9 3.1
2/2 Right U C1:G 1 17 - 580 1900 950 61.1% - - - 1.6 9.7 3.4
2/3 Right U C1:G 1 17 - 436 1900 950 45.9% - - - 1.0 8.2 2.2
3/1 A444N (Exit)
Ahead U C1:J 1 16 - 563 1900 897 62.7% - - - 1.1 7.2 1.9
3/2 A444N (Exit)
Ahead U C1:J 1 16 - 487 1900 897 54.3% - - - 1.5 11.4 3.9
4/1 St Davids Way Left
O - - - - 162 1900 680 23.8% 162 0 0 0.2 3.5 0.2
4/2+4/3 St Davids
Way Ahead O - - - - 380 1900:1900 456+456
40.6 : 42.7%
760 0 0 0.5 5.2 1.2
5/1 Ahead U - - - - 456 1900 1900 24.0% - - - 0.2 1.2 0.2
5/2 Ahead U - - - - 432 1900 1900 22.7% - - - 0.1 1.2 0.1
5/3 Right U - - - - 539 1900 1900 28.4% - - - 0.2 1.3 0.2
5/4 Right U - - - - 702 1900 1900 36.9% - - - 0.3 1.5 0.3
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 13 - 466 1900 739 63.1% - - - 2.0 15.5 4.6
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 13 - 1220 1900:1900 739+739
84.7 : 80.4%
- - - 5.7 16.8 7.9
7/1 Right Ahead U C1:A 1 11 - 480 1900 633 75.8% - - - 2.7 20.3 4.9
7/2 Right U C1:A 1 11 - 231 1900 633 36.5% - - - 0.9 13.4 2.1
7/3 Right U C1:A 1 11 - 222 1900 633 35.1% - - - 0.8 13.4 2.0
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 17 - 416 1900 950 43.8% - - - 0.5 4.4 0.8
8/2 A444 (S)
(Exit) Ahead U C1:E 1 17 - 289 1900 950 30.4% - - - 0.7 8.7 1.6
J2: Griff Roundabout
SE - - - - - - - - - 62.4% 1642 0 0 11.0 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 677 1900:1900 766+917
35.6 : 44.0%
1354 0 0 0.3 1.8 0.3
2/1 Ahead U - - - - 349 1900 1900 18.4% - - - 0.1 1.2 0.1
2/2 Ahead U - - - - 259 1900 1900 13.6% - - - 0.1 1.1 0.1
2/3 Right U - - - - 353 1900 1900 18.6% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 10 - 651 1900:1900 581+463
62.4 : 62.4%
- - - 2.7 15.1 3.8
3/3 B4113 (North)
Ahead U C2:B 1 10 - 289 1900 581 49.8% - - - 1.3 16.4 2.8
4/1 Ahead U C2:A 1 14 - 388 1900 792 49.0% - - - 0.9 8.2 3.7
4/2 Right Ahead U C2:A 1 14 - 445 1900 792 56.2% - - - 1.8 14.9 3.4
4/3 Right U C2:A 1 14 - 323 1900 792 40.8% - - - 0.7 8.3 3.0
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 564 1900 950 59.4% - - - 1.0 6.2 1.8
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 568 1900 950 59.8% - - - 0.9 6.0 3.0
6/1+6/2 St Georges Way Ahead
Left O - - - - 144 1900:1900 612+530
10.8 : 14.7%
288 0 0 0.1 1.9 0.2
7/1 Ahead U - - - - 554 1900 1900 29.2% - - - 0.2 1.3 0.2
7/2 Right Ahead U - - - - 900 1900 1900 47.4% - - - 0.4 1.8 0.4
7/3 Right U - - - - 445 1900 1900 23.4% - - - 0.2 1.2 0.2
7/4 Right U - - - - 245 1900 1900 12.9% - - - 0.1 1.1 0.1
C1 Stream: 1 PRC for Signalled Lanes (%): 6.2 Total Delay for Signalled Lanes (pcuHr): 12.08 Cycle Time (s): 36 C1 Stream: 2 PRC for Signalled Lanes (%): 105.5 Total Delay for Signalled Lanes (pcuHr): 1.21 Cycle Time (s): 36 C1 Stream: 3 PRC for Signalled Lanes (%): 0.5 Total Delay for Signalled Lanes (pcuHr): 10.56 Cycle Time (s): 36 C1 Stream: 4 PRC for Signalled Lanes (%): 43.4 Total Delay for Signalled Lanes (pcuHr): 2.67 Cycle Time (s): 36 C2 Stream: 1 PRC for Signalled Lanes (%): 44.3 Total Delay for Signalled Lanes (pcuHr): 7.52 Cycle Time (s): 36 C2 Stream: 2 PRC for Signalled Lanes (%): 50.5 Total Delay for Signalled Lanes (pcuHr): 1.92 Cycle Time (s): 36 PRC Over All Lanes (%): 0.5 Total Delay Over All Lanes(pcuHr): 39.06
Basic Results Summary
Basic Results Summary Scenario 7: '2031 Base, AM' (FG9: '2031 Base AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: -1.2 %Total Traffic Delay: 46.9 pcuHrController: 1
J2: Griff Roundabout SEPRC: -9.2 %Total Traffic Delay: 15.6 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
583
52.0%
1900
990
60.0%
1900
990
63.5%
Arm J1:2 -
123
1900515
51.7% 1900515
56.0% 1900515
12.2%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
1148
88.2
%
1900
1148
91.1
%
Arm J1:4 - St Davids Way
123
190050347.5%190041226.2%190010726.2%
Arm
J1
:5 -
1 2 3 4
1900
1900
40.9
%
1900
1900
54.8
%
1900
1900
11.9
%
1900
1900
13.4
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
831
87.3
%
1900
831
85.2
%
1900
213
85.2
%
Arm J1:7 - 123
1900
67386.9%
1900
67374.6%
1900
67319.6%
Arm J1:8 - A444 (S) (E
xit)
12 1900
118779.1%
19001187
71.7%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900554
76.2%
1900623
98.3%
Arm J2:2 -
12
31900 190049.4%
1900 190036.0%
1900190018.6%
Arm J2:3 - B4113 (North)
123
1900
284
61.7%
1900
551
61.7%
1900
554
59.5%A
rm J
2:4
-
123
1900
950
36.9
%
1 900
950
68.8
%
1900
950
7 4.4
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
1187
16.3%
1900
1187
18.0%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
225
13.3
%
1900
571
13.3
%
Arm J2:7 -
12
34
1900
1900
9.6%
1900
1900
28.7%
1900
1900
34.3%
1900
1900
33.4%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 98.3% 2791 0 0 62.5 - -
J1: Griff Roundabout
NW - - - - - - - - - 91.1% 511 0 0 46.9 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 24 - 897 1900:1900 990+583
60.0 : 52.0%
- - - 2.5 10.2 6.1
1/3 A444N Ahead U C1:H 1 24 - 628 1900 990 63.5% - - - 2.3 13.2 6.8
2/1 Right Ahead U C1:G 1 12 - 266 1900 515 51.7% - - - 1.3 17.6 3.0
2/2 Right U C1:G 1 12 - 288 1900 515 56.0% - - - 1.7 21.2 4.0
2/3 Right U C1:G 1 12 - 63 1900 515 12.2% - - - 0.2 12.7 0.7
3/1 A444N (Exit)
Ahead U C1:J 1 28 - 1013 1900 1148 88.2% - - - 4.4 15.7 9.4
3/2 A444N (Exit)
Ahead U C1:J 1 28 - 1046 1900 1148 91.1% - - - 6.6 22.8 16.9
4/1 St Davids Way Left
O - - - - 239 1900 503 47.5% 239 0 0 0.5 6.8 0.8
4/2+4/3 St Davids
Way Ahead O - - - - 136 1900:1900 412+107
26.2 : 26.2%
272 0 0 0.2 5.0 0.6
5/1 Ahead U - - - - 778 1900 1900 40.9% - - - 0.3 1.6 0.3
5/2 Ahead U - - - - 1042 1900 1900 54.8% - - - 0.6 2.1 0.6
5/3 Right U - - - - 227 1900 1900 11.9% - - - 0.1 1.1 0.1
5/4 Right U - - - - 254 1900 1900 13.4% - - - 0.1 1.1 0.1
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 20 - 726 1900 831 87.3% - - - 5.7 28.4 11.9
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 20 - 889 1900:1900 831+213
85.2 : 85.2%
- - - 5.6 22.6 11.2
7/1 Right Ahead U C1:A 1 16 - 585 1900 673 86.9% - - - 5.3 32.8 10.2
7/2 Right U C1:A 1 16 - 502 1900 673 74.6% - - - 3.3 23.4 6.8
7/3 Right U C1:A 1 16 - 132 1900 673 19.6% - - - 0.5 14.1 1.2
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 29 - 939 1900 1187 79.1% - - - 3.1 11.8 10.5
8/2 A444 (S)
(Exit) Ahead U C1:E 1 29 - 852 1900 1187 71.7% - - - 2.6 10.8 9.4
J2: Griff Roundabout
SE - - - - - - - - - 98.3% 2280 0 0 15.6 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 1034 1900:1900 554+623
76.2 : 98.3%
2068 0 0 3.9 13.7 11.1
2/1 Ahead U - - - - 939 1900 1900 49.4% - - - 0.5 1.9 0.5
2/2 Ahead U - - - - 684 1900 1900 36.0% - - - 0.3 1.5 0.3
2/3 Right U - - - - 353 1900 1900 18.6% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 13 - 515 1900:1900 551+284
61.7 : 61.7%
- - - 2.8 19.8 4.7
3/3 B4113 (North)
Ahead U C2:B 1 13 - 330 1900 554 59.5% - - - 2.1 22.6 4.5
4/1 Ahead U C2:A 1 23 - 351 1900 950 36.9% - - - 0.8 8.0 2.0
4/2 Right Ahead U C2:A 1 23 - 654 1900 950 68.8% - - - 1.9 10.4 3.3
4/3 Right U C2:A 1 23 - 707 1900 950 74.4% - - - 2.1 10.9 3.3
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 194 1900 1187 16.3% - - - 0.1 2.3 0.2
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 214 1900 1187 18.0% - - - 0.1 1.9 0.1
6/1+6/2 St Georges Way Ahead
Left O - - - - 106 1900:1900 225+571
13.3 : 13.3%
212 0 0 0.1 3.4 0.3
7/1 Ahead U - - - - 183 1900 1900 9.6% - - - 0.1 1.0 0.1
7/2 Right Ahead U - - - - 546 1900 1900 28.7% - - - 0.2 1.3 0.2
7/3 Right U - - - - 651 1900 1900 34.3% - - - 0.3 1.4 0.3
7/4 Right U - - - - 634 1900 1900 33.4% - - - 0.3 1.4 0.3
C1 Stream: 1 PRC for Signalled Lanes (%): 3.0 Total Delay for Signalled Lanes (pcuHr): 20.42 Cycle Time (s): 48 C1 Stream: 2 PRC for Signalled Lanes (%): 13.8 Total Delay for Signalled Lanes (pcuHr): 5.63 Cycle Time (s): 48 C1 Stream: 3 PRC for Signalled Lanes (%): 41.8 Total Delay for Signalled Lanes (pcuHr): 8.06 Cycle Time (s): 48 C1 Stream: 4 PRC for Signalled Lanes (%): -1.2 Total Delay for Signalled Lanes (pcuHr): 11.02 Cycle Time (s): 48 C2 Stream: 1 PRC for Signalled Lanes (%): 20.9 Total Delay for Signalled Lanes (pcuHr): 9.72 Cycle Time (s): 48 C2 Stream: 2 PRC for Signalled Lanes (%): 399.4 Total Delay for Signalled Lanes (pcuHr): 0.24 Cycle Time (s): 48 PRC Over All Lanes (%): -9.2 Total Delay Over All Lanes(pcuHr): 62.50
Basic Results Summary
Basic Results Summary Scenario 8: '2031 Base, PM' (FG10: '2031 Base PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 3.8 %Total Traffic Delay: 28.1 pcuHrController: 1
J2: Griff Roundabout SEPRC: 50.3 %Total Traffic Delay: 10.8 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
422
86.7%
1900
66
86.7%
1900
422
52.3%
Arm J1:2 -
123
1900950
65.1% 1900950
63.3% 1900950
45.3%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
897
64.3
%
1900
897
53.9
%
Arm J1:4 - St Davids Way
123
190067924.6%190045542.6%190045543.7%
Arm
J1
:5 -
1 2 3 4
1900
1900
25.5
%
1900
1900
21.6
%
1900
1900
28.9
%
1900
1900
37.2
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
739
67.0
%
1900
739
84.5
%
1900
739
81.3
%
Arm J1:7 - 123
1900
63378.0%
1900
63334.3%
1900
63335.4%
Arm J1:8 - A444 (S) (E
xit)
12 1900
95042.5%
1900950
29.1%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900770
36.5%
1900929
44.4%
Arm J2:2 -
12
31900 190017.2%
1900 190013.4%
1900190018.0%
Arm J2:3 - B4113 (North)
123
1900
499
57.0%
1900
581
58.0%
1900
581
46.0%A
rm J
2:4
-
123
1900
792
51.0
%
1 900
792
58.0
%
1900
792
4 1.6
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
950
59.7%
1900
950
59.9%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
603
11.3
%
1900
521
15.4
%
Arm J2:7 -
12
34
1900
1900
29.5%
1900
1900
47.9%
1900
1900
24.2%
1900
1900
13.1%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 86.7% 2635 0 0 39.0 - -
J1: Griff Roundabout
NW - - - - - - - - - 86.7% 953 0 0 28.1 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 7 - 423 1900:1900 66+422
86.7 : 86.7%
- - - 4.5 38.6 6.4
1/3 A444N Ahead U C1:H 1 7 - 221 1900 422 52.3% - - - 1.3 21.2 2.4
2/1 Right Ahead U C1:G 1 17 - 618 1900 950 65.1% - - - 1.6 9.1 3.3
2/2 Right U C1:G 1 17 - 601 1900 950 63.3% - - - 1.7 10.0 3.6
2/3 Right U C1:G 1 17 - 430 1900 950 45.3% - - - 1.0 8.3 2.2
3/1 A444N (Exit)
Ahead U C1:J 1 16 - 577 1900 897 64.3% - - - 1.2 7.4 1.8
3/2 A444N (Exit)
Ahead U C1:J 1 16 - 484 1900 897 53.9% - - - 1.5 11.3 3.9
4/1 St Davids Way Left
O - - - - 167 1900 679 24.6% 167 0 0 0.2 3.5 0.2
4/2+4/3 St Davids
Way Ahead O - - - - 393 1900:1900 455+455
42.6 : 43.7%
786 0 0 0.6 5.4 1.2
5/1 Ahead U - - - - 484 1900 1900 25.5% - - - 0.2 1.3 0.2
5/2 Ahead U - - - - 410 1900 1900 21.6% - - - 0.1 1.2 0.1
5/3 Right U - - - - 549 1900 1900 28.9% - - - 0.2 1.3 0.2
5/4 Right U - - - - 707 1900 1900 37.2% - - - 0.3 1.5 0.3
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 13 - 495 1900 739 67.0% - - - 2.3 16.4 5.0
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 13 - 1225 1900:1900 739+739
84.5 : 81.3%
- - - 5.8 16.9 7.9
7/1 Right Ahead U C1:A 1 11 - 494 1900 633 78.0% - - - 3.0 21.6 5.2
7/2 Right U C1:A 1 11 - 217 1900 633 34.3% - - - 0.8 13.2 1.9
7/3 Right U C1:A 1 11 - 224 1900 633 35.4% - - - 0.8 13.5 2.0
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 17 - 404 1900 950 42.5% - - - 0.5 4.6 1.0
8/2 A444 (S)
(Exit) Ahead U C1:E 1 17 - 276 1900 950 29.1% - - - 0.7 8.7 1.6
J2: Griff Roundabout
SE - - - - - - - - - 59.9% 1682 0 0 10.8 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 693 1900:1900 770+929
36.5 : 44.4%
1386 0 0 0.3 1.8 0.3
2/1 Ahead U - - - - 326 1900 1900 17.2% - - - 0.1 1.1 0.1
2/2 Ahead U - - - - 254 1900 1900 13.4% - - - 0.1 1.1 0.1
2/3 Right U - - - - 342 1900 1900 18.0% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 10 - 621 1900:1900 581+499
58.0 : 57.0%
- - - 2.5 14.3 3.5
3/3 B4113 (North)
Ahead U C2:B 1 10 - 267 1900 581 46.0% - - - 1.2 15.8 2.6
4/1 Ahead U C2:A 1 14 - 404 1900 792 51.0% - - - 1.0 9.1 3.9
4/2 Right Ahead U C2:A 1 14 - 459 1900 792 58.0% - - - 1.9 14.8 3.6
4/3 Right U C2:A 1 14 - 329 1900 792 41.6% - - - 0.8 8.3 3.0
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 567 1900 950 59.7% - - - 1.0 6.1 1.8
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 569 1900 950 59.9% - - - 0.9 6.0 2.9
6/1+6/2 St Georges Way Ahead
Left O - - - - 148 1900:1900 603+521
11.3 : 15.4%
296 0 0 0.1 2.0 0.2
7/1 Ahead U - - - - 561 1900 1900 29.5% - - - 0.2 1.3 0.2
7/2 Right Ahead U - - - - 911 1900 1900 47.9% - - - 0.5 1.8 0.5
7/3 Right U - - - - 459 1900 1900 24.2% - - - 0.2 1.2 0.2
7/4 Right U - - - - 249 1900 1900 13.1% - - - 0.1 1.1 0.1
C1 Stream: 1 PRC for Signalled Lanes (%): 6.6 Total Delay for Signalled Lanes (pcuHr): 12.61 Cycle Time (s): 36 C1 Stream: 2 PRC for Signalled Lanes (%): 111.6 Total Delay for Signalled Lanes (pcuHr): 1.19 Cycle Time (s): 36 C1 Stream: 3 PRC for Signalled Lanes (%): 3.8 Total Delay for Signalled Lanes (pcuHr): 10.07 Cycle Time (s): 36 C1 Stream: 4 PRC for Signalled Lanes (%): 39.9 Total Delay for Signalled Lanes (pcuHr): 2.69 Cycle Time (s): 36 C2 Stream: 1 PRC for Signalled Lanes (%): 55.0 Total Delay for Signalled Lanes (pcuHr): 7.31 Cycle Time (s): 36 C2 Stream: 2 PRC for Signalled Lanes (%): 50.3 Total Delay for Signalled Lanes (pcuHr): 1.91 Cycle Time (s): 36 PRC Over All Lanes (%): 3.8 Total Delay Over All Lanes(pcuHr): 38.95
Basic Results Summary
Basic Results Summary Scenario 9: '2031 Base + Development AM' (FG11: '2031 + Dev AM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: -1.5 %Total Traffic Delay: 49.2 pcuHrController: 1
J2: Griff Roundabout SEPRC: -11.3 %Total Traffic Delay: 16.4 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
636
51.3%
1900
990
59.6%
1900
990
63.9%
Arm J1:2 -
123
1900515
56.7% 1900515
59.8% 1900515
16.3%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
1148
88.9
%
1900
1148
91.3
%
Arm J1:4 - St Davids Way
123
190050147.7%190039721.2%190024621.2%
Arm
J1
:5 -
1 2 3 4
1900
1900
41.7
%
1900
1900
54.6
%
1900
1900
13.3
%
1900
1900
15.6
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
831
87.6
%
1900
831
86.5
%
1900
256
86.5
%
Arm J1:7 - 123
1900
67388.9%
1900
67374.2%
1900
67321.7%
Arm J1:8 - A444 (S) (E
xit)
12 1900
118780.2%
19001187
72.8%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900601
72.4%
1900612100.1%
Arm J2:2 -
12
31900 190050.1%
1900 190036.7%
1900190019.2%
Arm J2:3 - B4113 (North)
123
1900
280
64.9%
1900
551
64.9%
1900
554
63.0%A
rm J
2:4
-
123
1900
950
34.7
%
1 900
950
70.5
%
1900
950
7 4.9
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
1187
20.4%
1900
1187
21.6%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
217
13.8
%
1900
550
13.8
%
Arm J2:7 -
12
34
1900
1900
12.2%
1900
1900
29.8%
1900
1900
35.2%
1900
1900
33.6%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 100.1% 2817 0 0 65.6 - -
J1: Griff Roundabout
NW - - - - - - - - - 91.3% 511 0 0 49.2 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 24 - 916 1900:1900 990+636
59.6 : 51.3%
- - - 2.6 10.1 6.1
1/3 A444N Ahead U C1:H 1 24 - 632 1900 990 63.9% - - - 2.3 13.3 6.8
2/1 Right Ahead U C1:G 1 12 - 292 1900 515 56.7% - - - 1.5 19.0 3.5
2/2 Right U C1:G 1 12 - 308 1900 515 59.8% - - - 1.8 21.0 4.3
2/3 Right U C1:G 1 12 - 84 1900 515 16.3% - - - 0.3 14.4 0.9
3/1 A444N (Exit)
Ahead U C1:J 1 28 - 1021 1900 1148 88.9% - - - 4.7 16.4 9.6
3/2 A444N (Exit)
Ahead U C1:J 1 28 - 1049 1900 1148 91.3% - - - 6.7 23.1 17.0
4/1 St Davids Way Left
O - - - - 239 1900 501 47.7% 239 0 0 0.5 6.8 0.7
4/2+4/3 St Davids
Way Ahead O - - - - 136 1900:1900 397+246
21.2 : 21.2%
272 0 0 0.2 4.0 0.5
5/1 Ahead U - - - - 793 1900 1900 41.7% - - - 0.4 1.6 0.4
5/2 Ahead U - - - - 1038 1900 1900 54.6% - - - 0.6 2.1 0.6
5/3 Right U - - - - 252 1900 1900 13.3% - - - 0.1 1.1 0.1
5/4 Right U - - - - 296 1900 1900 15.6% - - - 0.1 1.1 0.1
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 20 - 728 1900 831 87.6% - - - 5.8 28.7 12.0
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 20 - 940 1900:1900 831+256
86.5 : 86.5%
- - - 6.0 23.1 11.7
7/1 Right Ahead U C1:A 1 16 - 598 1900 673 88.9% - - - 6.0 35.8 11.1
7/2 Right U C1:A 1 16 - 500 1900 673 74.2% - - - 3.2 23.1 6.7
7/3 Right U C1:A 1 16 - 146 1900 673 21.7% - - - 0.6 14.2 1.4
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 29 - 952 1900 1187 80.2% - - - 3.3 12.3 10.7
8/2 A444 (S)
(Exit) Ahead U C1:E 1 29 - 865 1900 1187 72.8% - - - 2.7 11.2 9.6
J2: Griff Roundabout
SE - - - - - - - - - 100.1% 2306 0 0 16.4 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 1048 1900:1900 601+612
72.4 : 100.1%
2094 0 0 4.0 13.8 20.7
2/1 Ahead U - - - - 952 1900 1900 50.1% - - - 0.5 1.9 0.5
2/2 Ahead U - - - - 697 1900 1900 36.7% - - - 0.3 1.5 0.3
2/3 Right U - - - - 364 1900 1900 19.2% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 13 - 540 1900:1900 551+280
64.9 : 64.9%
- - - 3.1 20.5 5.0
3/3 B4113 (North)
Ahead U C2:B 1 13 - 349 1900 554 63.0% - - - 2.3 23.5 4.8
4/1 Ahead U C2:A 1 23 - 330 1900 950 34.7% - - - 0.7 7.5 1.7
4/2 Right Ahead U C2:A 1 23 - 670 1900 950 70.5% - - - 2.1 11.1 3.6
4/3 Right U C2:A 1 23 - 712 1900 950 74.9% - - - 2.2 11.0 3.4
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 242 1900 1187 20.4% - - - 0.2 2.7 0.4
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 29 - 256 1900 1187 21.6% - - - 0.1 2.0 0.2
6/1+6/2 St Georges Way Ahead
Left O - - - - 106 1900:1900 217+550
13.8 : 13.8%
212 0 0 0.1 3.5 0.3
7/1 Ahead U - - - - 232 1900 1900 12.2% - - - 0.1 1.1 0.1
7/2 Right Ahead U - - - - 566 1900 1900 29.8% - - - 0.2 1.3 0.2
7/3 Right U - - - - 668 1900 1900 35.2% - - - 0.3 1.5 0.3
7/4 Right U - - - - 638 1900 1900 33.6% - - - 0.3 1.4 0.3
C1 Stream: 1 PRC for Signalled Lanes (%): 1.3 Total Delay for Signalled Lanes (pcuHr): 21.58 Cycle Time (s): 48 C1 Stream: 2 PRC for Signalled Lanes (%): 12.3 Total Delay for Signalled Lanes (pcuHr): 5.95 Cycle Time (s): 48 C1 Stream: 3 PRC for Signalled Lanes (%): 40.9 Total Delay for Signalled Lanes (pcuHr): 8.56 Cycle Time (s): 48 C1 Stream: 4 PRC for Signalled Lanes (%): -1.5 Total Delay for Signalled Lanes (pcuHr): 11.39 Cycle Time (s): 48 C2 Stream: 1 PRC for Signalled Lanes (%): 20.1 Total Delay for Signalled Lanes (pcuHr): 10.27 Cycle Time (s): 48 C2 Stream: 2 PRC for Signalled Lanes (%): 317.5 Total Delay for Signalled Lanes (pcuHr): 0.32 Cycle Time (s): 48 PRC Over All Lanes (%): -11.3 Total Delay Over All Lanes(pcuHr): 65.63
Basic Results Summary
Basic Results Summary Scenario 10: '2031 Base + Development PM' (FG12: '2031 + Dev PM', Plan 1: 'Network Control Plan 1') Network Layout Diagram
J1: Griff Roundabout NWPRC: 1.1 %Total Traffic Delay: 29.5 pcuHrController: 1
J2: Griff Roundabout SEPRC: 41.6 %Total Traffic Delay: 11.6 pcuHrController: 2
Arm
J1:1 - A444N
123
1900
422
89.1%
1900
58
89.1%
1900
422
53.1%
Arm J1:2 -
123
1900950
66.0% 1900950
63.8% 1900950
46.2%
Arm
J1:
3 -
A44
4N (
Exi
t)
1 2
1900
897
65.5
%
1900
897
54.9
%
Arm J1:4 - St Davids Way
123
190067524.7%190044842.6%190044845.0%
Arm
J1
:5 -
1 2 3 4
1900
1900
25.9
%
1900
1900
22.2
%
1900
1900
29.5
%
1900
1900
37.8
%
Arm
J1:
6 -
A44
4 S
outh
(E
ntry
)
1 2 3
1900
739
68.1
%
1900
739
85.0
%
1900
739
82.2
%
Arm J1:7 - 123
1900
63378.0%
1900
63337.4%
1900
63336.2%
Arm J1:8 - A444 (S) (E
xit)
12 1900
95045.2%
1900950
31.2%
Arm
J1:9 -
1 2InfInf
0.0%
InfInf0.0
%
Arm J1:10 -
1
Inf
Inf
0.0%
Arm J1
:11
-
12
Inf In
f0.0%
Inf In
f0.0%
Arm J2:1 - B4113 (South)
12
1900765
36.7%
1900910
45.8%
Arm J2:2 -
12
31900 190018.7%
1900 190014.2%
1900190019.1%
Arm J2:3 - B4113 (North)
123
1900
466
63.6%
1900
581
63.6%
1900
581
51.7%A
rm J
2:4
-
123
1900
792
50.1
%
1 900
792
58.5
%
1900
792
4 1.9
%
Arm J2:5 - B4113 (N) (Exit)
12
1900
950
61.2%
1900
950
61.7%
Arm
J2:
6 -
St G
eorg
es W
ay12
1900
595
11.4
%
1900
513
15.6
%
Arm J2:7 -
12
34
1900
1900
30.2%
1900
1900
48.5%
1900
1900
24.4%
1900
1900
13.3%
Arm
J2
:8 -
12In
fIn
f0.
0%
Inf
Inf
0.0
%
Arm J2:9 -
12
InfInf0.0%
InfInf0.0%
Arm J2
:10 -
1
Inf
Inf
0.0%
A
B
C
D
E
F
Basic Results Summary Network Results
Item Lane Description
Lane Type
Full Phase
Arrow Phase
Num Greens
Total Green (s)
Arrow Green (s)
Demand Flow (pcu)
Sat Flow (pcu/Hr)
Capacity (pcu)
Deg Sat (%)
Turners In Gaps (pcu)
Turners When Unopposed (pcu)
Turners In Intergreen (pcu)
Total Delay (pcuHr)
Av. Delay Per PCU (s/pcu)
Mean Max Queue (pcu)
Network: Griff Roundabout
(Existing) - - - - - - - - - 89.1% 2645 0 0 41.1 - -
J1: Griff Roundabout
NW - - - - - - - - - 89.1% 953 0 0 29.5 - -
1/2+1/1 A444N Ahead
Left U C1:H 1 7 - 428 1900:1900 58+422
89.1 : 89.1%
- - - 5.2 43.4 7.1
1/3 A444N Ahead U C1:H 1 7 - 224 1900 422 53.1% - - - 1.3 21.4 2.5
2/1 Right Ahead U C1:G 1 17 - 627 1900 950 66.0% - - - 1.6 9.2 3.3
2/2 Right U C1:G 1 17 - 606 1900 950 63.8% - - - 1.7 10.1 3.7
2/3 Right U C1:G 1 17 - 439 1900 950 46.2% - - - 1.0 8.4 2.3
3/1 A444N (Exit)
Ahead U C1:J 1 16 - 588 1900 897 65.5% - - - 1.2 7.6 2.0
3/2 A444N (Exit)
Ahead U C1:J 1 16 - 493 1900 897 54.9% - - - 1.6 11.7 4.0
4/1 St Davids Way Left
O - - - - 167 1900 675 24.7% 167 0 0 0.2 3.5 0.2
4/2+4/3 St Davids
Way Ahead O - - - - 393 1900:1900 448+448
42.6 : 45.0%
786 0 0 0.6 5.5 1.2
5/1 Ahead U - - - - 492 1900 1900 25.9% - - - 0.2 1.3 0.2
5/2 Ahead U - - - - 422 1900 1900 22.2% - - - 0.1 1.2 0.1
5/3 Right U - - - - 561 1900 1900 29.5% - - - 0.2 1.3 0.2
5/4 Right U - - - - 718 1900 1900 37.8% - - - 0.3 1.5 0.3
6/1 A444 South
(Entry) Ahead Left
U C1:B 1 13 - 503 1900 739 68.1% - - - 2.3 16.7 5.1
6/2+6/3 A444 South
(Entry) Ahead U C1:B 1 13 - 1235 1900:1900 739+739
85.0 : 82.2%
- - - 5.9 17.2 8.1
7/1 Right Ahead U C1:A 1 11 - 494 1900 633 78.0% - - - 3.0 21.5 5.2
7/2 Right U C1:A 1 11 - 237 1900 633 37.4% - - - 0.9 13.5 2.1
7/3 Right U C1:A 1 11 - 229 1900 633 36.2% - - - 0.9 13.5 2.0
Basic Results Summary
8/1 A444 (S)
(Exit) Ahead U C1:E 1 17 - 429 1900 950 45.2% - - - 0.6 4.6 1.0
8/2 A444 (S)
(Exit) Ahead U C1:E 1 17 - 296 1900 950 31.2% - - - 0.7 8.6 1.7
J2: Griff Roundabout
SE - - - - - - - - - 63.6% 1692 0 0 11.6 - -
1/1+1/2 B4113 (South)
Ahead Left O - - - - 698 1900:1900 765+910
36.7 : 45.8%
1396 0 0 0.4 1.8 0.4
2/1 Ahead U - - - - 355 1900 1900 18.7% - - - 0.1 1.2 0.1
2/2 Ahead U - - - - 270 1900 1900 14.2% - - - 0.1 1.1 0.1
2/3 Right U - - - - 362 1900 1900 19.1% - - - 0.1 1.2 0.1
3/2+3/1 B4113 (North)
Ahead Left U C2:B 1 10 - 665 1900:1900 581+466
63.6 : 63.6%
- - - 2.8 15.3 4.0
3/3 B4113 (North)
Ahead U C2:B 1 10 - 300 1900 581 51.7% - - - 1.4 16.7 2.9
4/1 Ahead U C2:A 1 14 - 397 1900 792 50.1% - - - 1.0 8.8 3.8
4/2 Right Ahead U C2:A 1 14 - 463 1900 792 58.5% - - - 1.9 14.9 3.6
4/3 Right U C2:A 1 14 - 332 1900 792 41.9% - - - 0.8 8.4 3.1
5/1 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 581 1900 950 61.2% - - - 1.0 6.4 1.9
5/2 B4113 (N)
(Exit) Ahead U C2:E 1 17 - 586 1900 950 61.7% - - - 1.0 6.3 3.4
6/1+6/2 St Georges Way Ahead
Left O - - - - 148 1900:1900 595+513
11.4 : 15.6%
296 0 0 0.1 2.0 0.2
7/1 Ahead U - - - - 574 1900 1900 30.2% - - - 0.2 1.4 0.2
7/2 Right Ahead U - - - - 922 1900 1900 48.5% - - - 0.5 1.8 0.5
7/3 Right U - - - - 463 1900 1900 24.4% - - - 0.2 1.3 0.2
7/4 Right U - - - - 252 1900 1900 13.3% - - - 0.1 1.1 0.1
C1 Stream: 1 PRC for Signalled Lanes (%): 5.9 Total Delay for Signalled Lanes (pcuHr): 12.95 Cycle Time (s): 36 C1 Stream: 2 PRC for Signalled Lanes (%): 99.3 Total Delay for Signalled Lanes (pcuHr): 1.26 Cycle Time (s): 36 C1 Stream: 3 PRC for Signalled Lanes (%): 1.1 Total Delay for Signalled Lanes (pcuHr): 10.83 Cycle Time (s): 36 C1 Stream: 4 PRC for Signalled Lanes (%): 37.3 Total Delay for Signalled Lanes (pcuHr): 2.84 Cycle Time (s): 36 C2 Stream: 1 PRC for Signalled Lanes (%): 41.6 Total Delay for Signalled Lanes (pcuHr): 7.87 Cycle Time (s): 36 C2 Stream: 2 PRC for Signalled Lanes (%): 45.9 Total Delay for Signalled Lanes (pcuHr): 2.05 Cycle Time (s): 36 PRC Over All Lanes (%): 1.1 Total Delay Over All Lanes(pcuHr): 41.09
Basic Results Summary