R miller firm_profile_feb_2013
-
Upload
david-hilgers -
Category
Documents
-
view
272 -
download
0
description
Transcript of R miller firm_profile_feb_2013
![Page 1: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/1.jpg)
![Page 2: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/2.jpg)
OUR VALUES SET US APART
WHO WE ARE
OUR VALUES SET US APART
At R|MILLER, we value excellence,integrity, communication, mutual respect,
and constructive self-evaluation Ñ all ofwhich lead to continuous improvement.
R|MILLER is a general contracting company with a reputation for quality, expertise, and highly successful
collaborations with owners, architects, and developers. Led by founder Rob Miller, our team has been building
landmark projects for satisfied clients for more than 30 years. As a full service General Contractor, our firm is
comfortable with a wide range of project types and roles. Our diverse staff includes experienced project manag-
ers, architects, landscape architects, superintendents, and skilled tradesmen.
MEDICAL: Hospital, Clinic, Laboratories
OFFICE: Shell & Core, Tenant Improvement
RETAIL: Shell & Core, Tenant Improvement
RESTAURANTS and HOSPITALITY
CUSTOM RESIDENTIAL and ESTATES
MARKET EXPERTISE
INDUSTRIAL and MANUFACTURING: Shell & Core, Tenant Improvement
HEALTH and FITNESS
INSTITUTIONAL: Public Use, Libraries
ENERGY EFFICIENCY: Upgrades, Smart Building Systems
![Page 3: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/3.jpg)
COMMITTED TO OUR CUSTOMERS
OUR PROCESS & APPROACH
COMMITTED TO OUR CUSTOMERS
Our commitment to ourcustomers, our partners,
and our employees is reflectedin our clients' loyalty, referrals,
and in our repeat business.
We begin each project by clearly understanding your project goals and working diligently, at all staff levels, to
exceed these goals. We understand the benefit of comprehensive pre-construction services. Using the varied
talents of our team, we thoroughly research and identify hidden risks, options, and opportunities to maximize
value and ensure quality control. R|MILLER works hard to develop unique strategies for solving difficult
challenges and to provide timely data that allows our clients to make informed decisions.
Our approach centers on forming long-term relationships with each client we work with. We strive to be a
trusted business partner and advisor for you while working to meet all of your construction needs. The success
of our approach is evidenced by our many repeat clients and referrals.
Meriwether Partners, LLC
William E. Boeing Enterprises
Aldarra Management
The Space Needle Corporation
Hilton Hotels
Simvest Properties
Restaurants Unlimited
Consolidated Restaurants
Schwartz Brothers Restaurants
Business Property Development
Westfield Capital, LLC
Watermark Estate Management
Odom Corporation
Odwalla
KP Corporation
CLIENT RELATIONSHIPS
![Page 4: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/4.jpg)
WE RAISE THE BAR
PROJECTS & SERVICES
WE RAISE THE BAR
We embrace new technologiesand new ways to solve the commercial
construction industry's greatest challenges.Clients look to our team for cost-effective
solutions, cutting-edge materials,and a can-do attitude.
R|MILLER is a full-service contractor with expertise in every aspect of construction, from land asset evaluation
to finish craftsmanship. We can customize a solution to meet your needs, whether you're upgrading a tenant
improvement or building an office campus.
Work with us in pre-construction to get trusted advice, accurate schedules and cost estimates for your project,
no matter what the size. Put our design management, construction and self-performing skills to your advantage,
ensuring a high level of quality and service.
LAND DUE DILIGENCE and ENTITLEMENTS
DESIGN: Conceptual, Schematic
DESIGN DEVELOPMENT MANAGEMENT
ESTIMATING: Conceptual, Schematic, CD Level
VALUE ENGINEERING
PROJECT FEASIBILITY STUDIES
SCHEDULING
PRE-CONSTRUCTION SERVICES
CONSTRUCTION and PROPERTY MANAGEMENT
IN-HOUSE CONSTRUCTION SERVICES
LEED ACCREDITED PROFESSIONALS
VALUE SERVICES
![Page 5: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/5.jpg)
CONSISTENCY MATTERS
QUALITY
CONSISTENCY MATTERS
Our rigorous construction protocol andfull-service approach allow us to deliver
certainty in schedule management,cost control, and quality.
R|MILLER takes quality control seriously as our past and current clients will attest to this. Our firm believes our
attention to detail and expectation of high quality from our staff to that of the subcontractors we choose for
each project separates us from the competition. Our Team recognizes and understands that quality control goes
beyond the aesthetics of a final product as it also includes what you cannot see. Defects or failures in
constructed facilities can result in additional costs down the line. Our project managers and superintendents
follow structured procedures to ensure that this does not happen.
![Page 6: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/6.jpg)
As founder of R|MILLER over 30 years ago, Rob credits the success of his company to delivering on
commitment. Integrity and relationship building have earned him industry respect and a repeat client
base. In addition to his extensive knowledge of commercial, office, industrial, and retail construction
Rob understands that a company is made up of more than an individual. He has assembled a team of
highly capable and motivated professionals with comprehensive knowledge in all phases of commercial
construction. Rob lends his expert leadership, guidance and high-level supervision to our senior project
manager and individual project managers in every project R|MILLER builds.
PETER MEYERSenior Project Manager
Peter provides management and direction for all of the project managers and superintendents at
R|MILLER. One of his main roles is to develop a high level project plan and approach for each project
which he then communicates to the client and team. With over 18 plus years of experience, Peter has
been responsible for the successful management and supervision of large scale commercial, office,
retail and industrial type projects. Peter specializes in difficult projects with tight schedules and
budgets. He can take projects from concept to completion using a variety of construction methods
designed to optimize efficiency and timing without sacrificing quality. Peter earned a degree in
Construction Management and continues to keep himself informed of the industryÕ s best practices and
latest innovations.
ROBIN MILLERPresident
COMPANY LEADERSHIP
![Page 7: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/7.jpg)
OUR PROJECTS
![Page 8: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/8.jpg)
KING COUNTY DDES
PRE-CONSTRUCTION SERVICES PROVIDED:
• Value Engineering
• Review and Analysis
• Material Coordination
• Cost Estimating
• Construction Scheduling
PROJECT TYPE: Office Ñ Tenant Improvement
LOCATION: Snoqualmie, WA
SIZE: 19,045 Square Feet
PROJECT DESCRIPTION:
R|Miller was the general contractor for the tenant improvement of King County's Department of Permitting and Environmental Review's
new offices in Snoqualmie. Our team collaborated with the building owners, King County staff, and the design team to complete this
project within the budget while meeting King County's move in date. The scope of work included interior demolition, construction of
interior working and office spaces, substantial HVAC and electrical upgrades, and modifications to the existing fire protection and life
safety systems. In addition, the project included many sustainable features including reclaimed wood countertops, efficient energy
management controls, exposed polished concrete floors, efficient layout to utilize natural daylight, low VOC paints and adhesives, and
construction re-use of several existing items.
![Page 9: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/9.jpg)
HUMANA HEALTHCARE
PRE-CONSTRUCTION SERVICES PROVIDED:
• Early design coordination
• Cost review and input
• Material coordination
• Value engineering
PROJECT TYPE: Office Ñ Tenant Improvement
LOCATION: Federal Way, WA
SIZE: 9,000 Square Feet
PROJECT DESCRIPTION:
Demolition of the existing entry, acoustical ceilings, and floating floors in preparation for the tenant improvements. 9,000 SF build out
including reception area, offices, conference room, break room with kitchen, education room, and server room. HVAC, electrical, plumbing
and fire sprinkler system reconfiguration. Project included sustainable material selection for low VOC interior finishes. Project was
completed within budget and tenant move in date.
![Page 10: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/10.jpg)
ROCKWELL COLLINS
PRE-CONSTRUCTION SERVICES PROVIDED:
• Pre-design building assessment and systems analysis
• Design coordination
• Construction scheduling
• Constructability review
• Manage sub-consultants for mechanical and electrical and fire permit drawings
• Cost estimating
• Value engineering recommendations
PROJECT TYPE: Commercial Ñ Tenant Improvement
LOCATION: Federal Way, WA
SIZE: 16,000 Square Feet
PROJECT DESCRIPTION:
Project scope was a commercial tenant improvement of 16,000 square feet of office and additional building lobby alterations to
accommodate an aerospace, avionics and electronics company. Project included demolition of existing walls, electrical, finishes, and the
relocation of a metal stairwell, emergency generator, and transfer switches. Other construction services included installation of new wall
layout, electrical circuitry, finishes, lobby features, and HVAC modifications. One of the major challenges with this project was the relocation
of the buildings critical systems uninterrupted power supply. This work required a high level of management and scheduling by R|MILLERÕ s
project managers to ensure the relocation was completed quickly with minimal disruption to the existing tenants within the building.
![Page 11: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/11.jpg)
RAM RESTAURANT& BREWERY
PRE-CONSTRUCTION SERVICES PROVIDED:
• Design coordination
• Construction scheduling
• Constructability review
• Manage sub-consultants for mechanical, electrical, and fire permit drawings
• Cost estimating, and provide
• Value engineering review and recommendations
PROJECT TYPE: Restaurant
LOCATION: Tulalip, WA
SIZE: 7,200 Square Feet
PROJECT DESCRIPTION:
The Tulalip RAM Restaurant & Brewery was a full ground up construction of a 7000 square foot restaurant next to the outlet mall near
Marysville. This project was fast tracked and completed in 113 working days in order to get the restaurant open for business and generating
cash flow for the owners. R|Miller crews self-performed all of the carpentry work related to framing and millwork for the project. Unique
features of the RAM include a steel radius roof dining area, hanging wood clouds in the bar, stained concrete floors, extensive detailed
millwork, energy efficient LED lighting, and high-end AV equipment.
![Page 12: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/12.jpg)
TOMMY BAHAMACALL CENTER
PRE-CONSTRUCTION SERVICES PROVIDED:
• Pre-design building assessment and systems analysis
• Design coordination
• Construction scheduling
• Constructability review
• Manage sub-consultants for mechanical and electrical and fire permit drawings
• Cost estimating, and provide
• Value engineering review and recommendations
PROJECT DESCRIPTION:
Demolition of the existing, acoustical ceilings, and floating floors in preparation for the tenant improvements. 15,700 SF build out including
reception area, offices, conference room, break room with kitchen, education room, and server room. HVAC, electrical, plumbing, and fire
sprinkler system reconfiguration. Pre-construction services included early design coordination, cost review and input, and material coordi-
nation. Project was completed within budget and before tenantÕ s move-in date.
PROJECT TYPE: Office Ñ Tenant Improvement
LOCATION: Federal Way, WA
SIZE: 15,700 Square Feet
![Page 13: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/13.jpg)
215 COLUMBIA BUILDING
PRE-CONSTRUCTION SERVICES PROVIDED:
• Design Coordination
• Constructability Review
• Material Coordination
• Value Engineering Review and Recommendations
• Project Scheduling
• Cost Estimating
PROJECT TYPE: Office Ñ Tenant Improvement
LOCATION: Seattle, WA
SIZE: 43,000 Square Feet
PROJECT DESCRIPTION:
R|Miller was contracted by the building owners to complete a full interior renovation for this four-story, 50,000+ square foot, historic build-
ing in downtown Seattle. Improvements included demolition of interior walls and construction of new office space, new flooring through-
out, and interior paint per the finish schedule. The building also required a complete overhaul of the HVAC systems and front end-controls,
electrical systems, and fire sprinkler system. An interesting feature of this project included the conversion of the building's original theater
space into a contemporary auditorium for the new tenant.
![Page 14: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/14.jpg)
AZALEOS
PRE-CONSTRUCTION SERVICES PROVIDED:
• Early design coordination
• Cost review and input
• Material coordination
• Value engineering
PROJECT TYPE: Office Ñ Tenant Improvement
LOCATION: Seattle, WA
SIZE: 10,320 Square Feet
PROJECT DESCRIPTION:
Demolition of the existing space in preparation for the tenant improvements. Full build out including new wall layout, offices, conference
rooms, server room, and provisions for server equipment. HVAC improvements and cooling systems for server rooms, electrical, plumbing,
and fire sprinkler system reconfiguration. Project was completed within budget and without schedule alterations.
![Page 15: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/15.jpg)
I would like to express my appreciation to R. Miller Inc. Commercial Contractors for the outstanding
job they did constructing our new 35,000 square foot office and manufacturing building at Harbour
Pointe. Although initially unknown to us, R. Miller was recommended by our construction manager,
Bob MacDonald. Selecting R. Miller was an excellent choice for us, as all aspects of the building
process were handled professionally and with care and consideration. We look forward to working
with the R. Miller team again.Ó
Ñ Ed Kommers, Senior Vice-President, University Mechanical Contractors, Inc.
Ñ Jeffrey L. Murdoch, Department of the Navy Engineering Field Activity, Northwest Facilities Engineering Command
I want to express my thanks and appreciation for the excellent effort you and your firm provided to
convert a retail structure to office space for the Navy. The quality and timeliness of your performance
during construction of the initial alterations for our 32,000 square feet leased premises in Kitsap
County was exemplary. The effort was under the pressure of extremely tight deadlines requiring an
extraordinary degree of coordination with the tenantÕ s staff. Your firmÕ s work produced a showplace
for the Naval Region, Northwest and was accomplished on time and within budget.Ó
Ñ Marc Pevoto, Johnston Architects
R. Miller Commercial Contractors managed [our] project (as well as performing a great deal of the
construction) with integrity and timeliness, often going above and beyond what was required of
their contract to assist us in producing a world-class building. Subsequently, the Maple Valley
Library has been awarded numerous regional and national design awards. This fact is a testament to
the diligence and teamwork exemplified by all at R. Miller.Ó
TESTIMONIALS
![Page 16: R miller firm_profile_feb_2013](https://reader033.fdocuments.net/reader033/viewer/2022051817/548bb58ab47959d30c8b6217/html5/thumbnails/16.jpg)
PETER MEYERSenior Project Manager
206.459.8206
425.775.3822
146 Third Avenue SouthEdmonds, WA 98020
www.rmillerinc.com
CELL
OFFICE
ADDRESS
WEB
CONTACT US
ROB MILLERPresident
206.459.0645
425.775.3822
146 Third Avenue SouthEdmonds, WA 98020
www.rmillerinc.com
CELL
OFFICE
ADDRESS
WEB