Question Solutions2

6
Operations and Production Management MGMT 405 Answer set 2 MGMT 405 Operations and Production Management Answer set 2 (Reference chapter 2 – William J. Stevenson-2007, ninth edition) Problems and Solutions 1. Suppose that a company produced 300 standard bookcases last week using eight workers and produced 240 standard bookcases this week using six workers. In which was productivity higher? Explain. Ans: Productivity last week = standard bookcases produced as output / labor= 300/8= 37.8 sbc/worker Productivity this week = standard bookcases produced as output / labor= 240/6= 40 sbc/worker The ouput of this week shows that it has higher productivity than last week. This answer can be improved. 2. The manager of a crew that installs carpeting has tracked the crew’s output over the past several weeks, obtaining these figures. © 2010/11, Sami Fethi, EMU, All Right Reserved, McGraw- Hill, 2007, 9. Ed. 1

description

q and a

Transcript of Question Solutions2

Page 1: Question Solutions2

Operations and Production Management MGMT 405 Answer set 2

MGMT 405 Operations and Production Management

Answer set 2

(Reference chapter 2 – William J. Stevenson-2007, ninth edition)

Problems and Solutions

1. Suppose that a company produced 300 standard bookcases last week using eight

workers and produced 240 standard bookcases this week using six workers. In

which was productivity higher? Explain.

Ans: Productivitylast week = standard bookcases produced as output / labor= 300/8=

37.8 sbc/worker

Productivity this week = standard bookcases produced as output / labor= 240/6= 40

sbc/worker

The ouput of this week shows that it has higher productivity than last week. This

answer can be improved.

2. The manager of a crew that installs carpeting has tracked the crew’s output

over the past several weeks, obtaining these figures.

Week Crew size Yards Installed

1 4 960

2 3 702

3 4 968

© 2010/11, Sami Fethi, EMU, All Right Reserved, McGraw-Hill, 2007, 9. Ed. 1

Page 2: Question Solutions2

Operations and Production Management MGMT 405 Answer set 2

4 2 500

5 3 698

6 2 500

(a) Compute the labor productivity for each of the weeks.

(b) On the basis of your calculation, what can you conclude about crew size and

productivity?

Ans:

(a) Productivity= Yards of carpet installed/ crew size=960/4= 240 yards/number of

crew.

Week Crew size Yards Installed Labor productivity

1 4 960 240

2 3 702 234

3 4 968 242

4 2 500 250

5 3 698 232

6 2 500 250

© 2010/11, Sami Fethi, EMU, All Right Reserved, McGraw-Hill, 2007, 9. Ed. 2

Page 3: Question Solutions2

Operations and Production Management MGMT 405 Answer set 2

(b) Probably even-sized crews are better than odd-sizes and a crew of 2 seems to

work best amongst the others.

2. (a) Compute the multi-factor productivity measure for each of the weeks

shown. (b) What do the productivity figures suggest? Assume 40 hour weeks

and an hourly wage of $12. Overhead is 1.5 times weekly labor cost. Material

cost is $ 6 per pound.

Week Output (units) Workers Materials (lbs)

1 30,000 6 450

2 33,600 7 470

3 32,200 7 460

4 35,400 8 480

Ans:

(a)

WeekOutput

(units)

Worker cost

12*40

Overhead

cost Materials

cost

Total

cost

MFP

© 2010/11, Sami Fethi, EMU, All Right Reserved, McGraw-Hill, 2007, 9. Ed. 3

Page 4: Question Solutions2

Operations and Production Management MGMT 405 Answer set 2

1 30,000 2880 4320 2700 9900 3.03

2 33,600 3360 5040 2820 11220 2.99

3 32,200 3360 5040 2760 11160 2.89

4 35,400 3840 5740 2880 12480 2.84

Week 1- 12*40*6 =2880= worker cost

Week 1- 12*40*6 =2880* 1.5=4320= overhead cost

Week 1- 450*6 = 2700=material cost

Week 1- 2880+4320+2700=9900 total cost

Week 1-MFP=output (units)/(labor+materials+overhead) =30000/9900= 3.03

unit per dollar input

(c) Multi-factor productivity dropped steadily from a high of 3.03 to about 2.84

4. A manager checked production records and found out that a worker

produced 160 units while working 40 hours. In the previous week, the same

worker produced 138 units while working 36 hours. Compute the worker’s

productivity. (b) Did his productivity increase, decrease or remain the same?

Briefly explain.

(a) Current productivity= produced units as output/ labor hour=160/40=4 unit per

hour

Current productivity= produced units as output/ labor hour=138/36=3.83 unit per

hour

© 2010/11, Sami Fethi, EMU, All Right Reserved, McGraw-Hill, 2007, 9. Ed. 4

Page 5: Question Solutions2

Operations and Production Management MGMT 405 Answer set 2

(b)

Growth productivity= Current Period Productivity – Previous Period ProductivityPrevious Period Productivity

Growth productivity=4-3.83/3.83=0.044

Thus there was an increase of 4.4 % in productivity.

© 2010/11, Sami Fethi, EMU, All Right Reserved, McGraw-Hill, 2007, 9. Ed. 5