    Questions on Shipbuilding

    1)How shipbuilding process commence witha)

    By means of contract

    b)By means of production processc)By means of bid proposald)By means of infrastructure

    2)What is IHOP in shipbuilding processa)Combined hull, outfitting & paintingb)It is classification supporting bodyc)

    Combination of navigation & piping

    d)It is advance system in ship building process3)What is nesting plan in shipbuilding process

    a)It is a grouping of all departmentsb)It is computerised planning & positioning of

    prefabricated item on a single plate for cutting.

    c)It is a function of planning departmentd)None of these

    4)Procurement department function isa)To plan the shipbuilding processb)To plan the production sequencesc)To raise to invoice & store the materialsd)Both b & c

    5)Sending of drawing to class approval after the design is acceptedby owner is

    a)Production departmentb)Planning departmentc)Production planning departmentd)Design department

    6)After receiving raw material (steel) from steel storage yard sendto

    a)Blasting & painting

  • 7/28/2019 Question:-Questions on Shipbuilding Process

    2/4

    b)Directly used for cuttingc)Quality inspectiond)Block fabrication

    7)The part which is used to support the panel at top or bottomrunning parallel to the centre line is calleda)Girdersb)Intercoastalsc)Longitudinalsd)Beams

    8)All machineries, cable laying, outfit items, hull integrated,painting which is done on what stage?a)On board outfitting stageb)Unit fitting stagec)On block staged)Both a & b

    9)Launching cannot be done by one of this methoda)Through slipwaysb)Through trailersc)Through shipliftd)Through anchoring

    10) In shipbuilding process what is the role of productionplanning department

    a)To make maintenance check listb)To make renewal of contractc)

    To make production check list

    d)To make production scheduling planning11) Shipss can be transfererred from one location to another

    location by means of

    a)Ship transporterb)Shipliftc)Trailersd)

    All the above

  • 7/28/2019 Question:-Questions on Shipbuilding Process

    3/4

    12) Who designs and plans the superstructure and hull of aship before construction?

    a) Civil engineers

    b) Marine engineers

    c) Naval architects

    d) Ship owners

    13) What statement is not true regarding ship building?a) Ship building begins at the design office

    b) Ships are built either on the sloping ways or in dry docks

    c) Naval architects design the superstructure, hull of a ship.

    d) The hull is painted after launching

    14) What is dry dock?

    a)It is submerged vesselb)It is a floating vesselc)Both a & bd)It is a transporting vessel

    15)How IHOP system will enhance the production inshipbuilding process?

    a)Decreases production timeb)Simplifies the production activitiesc)Production rate increasesd)All the above

    16)How basin trial test method will helpful for a ship duringsea trial test?

    a)Minimizes the error of sailing shipb)Actual ship can be built to float on water as per the

    basin test methods

    c)Useful during sea trial testd)None of these

  • 7/28/2019 Question:-Questions on Shipbuilding Process

    4/4

    17)Which test is indicating the ships turning ability under theaction of environmental effects during sea trial?

    a)Sea keeping testb)Maneuverability testc)Endurance testd)Both a & c

    18)Following is not the mode of ship launching?a)Shiplift launchingb)Side launchingc)End launchingd)Drop launching

    19)How shipyard infrastructure will useful in shipbuildingprocesses?

    a) For transportationb) Time required for loading & unloading of things

    minimizes, thus increase the production.

    c) a & bd) to some extent20)Drydocking is required for all vessels for how long?a) 12 Monthsb) 18 Monthsc) 24 Monthsd) 36 Months