QUANTITY SURVEYOR REPORT
Not for Bank Use
Source: Google Maps
Project: Proposed Boarding House Development At No. 35 Carinya Street Blacktown NSW 2148
Applicant: AMEZ Pty Ltd
C/- Designcorp Architects
Builder: Developer Managed
Report Date: 25 February 2019
Construction Consultants (QS) Quantity Survey Report – DA Submission only (Not for Bank use) 35 Carinya St, Blacktown
2 | P a g e
Table of Contents 1. Instruction ................................................................................................................... 3
2. Brief Development Description .................................................................................. 3
3. Construction Cost Estimate ........................................................................................ 3
4. Areas ........................................................................................................................... 4
5. Quality of Finishes ....................................................................................................... 5
6. Exclusions .................................................................................................................... 5
7. Design Assumptions / Parameters .............................................................................. 5
8. Documentation ........................................................................................................... 6
9. Contingency Allowance ............................................................................................... 6
10. Disclaimer ................................................................................................................... 6
Appendix A Council Schedule Appendix B Elemental Cost Estimate Summary Appendix C Assumed Schedule of Finishes Appendix D Reduced Architectural Drawings
Construction Consultants (QS) Quantity Survey Report – DA Submission only (Not for Bank use) 35 Carinya St, Blacktown
3 | P a g e
1. Instruction We have undertaken a study of the probable cost of construction for the above project, based on the supplied architectural drawings and other information provided. We have also taken into consideration the proposed method of procurement (Developer Managed). 2. Brief Development Description The proposal comprises the demolition of existing structure(s) and the construction of a six (6) storey Boarding House Development with associated basement car parking, at No. 35 Carinya St, Blacktown. The Proposed Development consists of:
• Thirty (30) x car spaces within Basement 2 to Basement 1;
• Five (5) x Communal rooms within Ground Floor to Level 4;
• Fifty Eight (58) x boarding rooms (incl. one (1) x Manager room) within Ground Floor to Level 4.
Typically, each boarding room comprises of an open plan bedroom/living area, bathroom and kitchenette. 3. Construction Cost Estimate
Description Amount ($)
Total Construction Cost 6,156,407
Add Consultants Fees 135,554
Total Development Cost (excl. GST) 6,291,961
Add GST 629,196
Total Development Cost (incl. GST) 6,921,157
The required Council Schedule, titled “Registered Quantity Surveyor’s Detailed Cost Report” is attached in Appendix A. Also, please refer to Appendix B for an Elemental Cost Estimate Summary prepared in accordance with the Environmental Planning and Assessment Regulation 2000 (Reg 25J) - Section 94A Levy - Determination of proposed cost of Development. A detailed report may be obtained upon request. Our Construction Cost Estimate may be considered as reasonable, based on the proposed level of finishes and in the absence of the Structural and Services drawings, the Contract Documents and DA Conditions.
Construction Consultants (QS) Quantity Survey Report – DA Submission only (Not for Bank use) 35 Carinya St, Blacktown
4 | P a g e
4. Areas According to the architectural drawings, the proposed approximate Floor Areas may be presented as follows:
Building Level Description F.E.C.A*
(m2) U.C.A**
(m2) G.F.A***
Total (m2)
Basement 2 Carpark 710 710
Basement 1 Carpark 709 709
Ground Floor Common Area incl. Communal Room 107 107
Ground Floor Boarding Room 125 125
Ground Floor Ramp + Entry + Garbage
Room 83 170 253
Mezzanine level Boarding Room 68 68
Mezzanine level Common Area 20 20
Level 1 Boarding Room 298 19 317
Level 1 Common Area 128 128
Level 2 Boarding Room 298 19 317
Level 2 Common Area 128 128
Level 3 Boarding Room 298 19 317
Level 3 Common Area 128 128
Level 4 Boarding Room (incl.
manager room) 117 10 127
Level 4 Common Area 70 20 91
Total 3,287 257 3,543
*F.E.C.A (Fully Enclosed Covered Area): The sum of all such areas at all building floor levels, including basements (except unexcavated portions), floored roof spaces and attics, garages, penthouses, enclosed porches and attached enclosed covered ways alongside building, equipment rooms, lift shafts, vertical ducts, staircases and any other fully enclosed spaces and useable areas of the building, computed by measuring from the normal inside face of exterior walls but ignoring any projections such as plinths, columns, piers and the like which project from the normal inside face of exterior walls. It shall not include open courts, light wells, connecting or isolated covered ways and net open areas of upper portions of rooms, lobbies, halls interstitial spaces and the like which extend through the storey being computed. **U.C.A (Unenclosed Covered Area): The sum of all such areas at all building floor levels, including roofed balconies, open verandahs, porches and porticos, attached open covered ways alongside buildings, undercrofts and useable space under buildings, unenclosed access galleries (including ground floor) and any other trafficable covered areas of the building which are not totally enclosed by full height walls, computed by measuring the area between the enclosing walls or balustrade (i.e. from the inside face of the UCA excluding the wall or balustrade thickness). When the covering element (i.e. roof or upper floor) is supported by columns, is cantilevered or is suspended, or any combination of these, the measurements shall be taken to the edge of the paving or to the edge of the cover, whichever is the lesser. UCA shall not include eaves overhangs, sun shading, awnings and the like where these do not relate to clearly defined trafficable covered areas, nor shall it include connecting or isolated covered ways. ***G.F.A (Gross Floor Area): The sum of the 'Fully Enclosed Covered Area' and 'Unenclosed Covered Area' as defined. The G.F.A definition used here is different to the Gross Building Area defined in the ANZRPGN 4 Methods of Measurement used by Valuation and Property Industry Professionals.
Construction Consultants (QS) Quantity Survey Report – DA Submission only (Not for Bank use) 35 Carinya St, Blacktown
5 | P a g e
5. Quality of Finishes The proposed finishes for the Development may be considered of standard commercial quality, as described in the attached Schedule of Finishes (Appendix C), prepared by Construction Consultants (QS) and based on information supplied by the Developer. The quality of finishes proposed, are appropriate to the type, scale and location of this project. 6. Exclusions
Our Cost Estimate does not include the following:
- Land Acquisition; - Marketing and financing; - Legal costs; - Project Management; - Building insurance costs; - Major services diversions, external connections and /or improvement; - Amplification / amendment to existing services; - Underpinning of existing structure; - Amendments to plans, incomplete documentation; - Taxes, levies and charges; - Disabled access; - Energy and water efficiency; - Electrical Substation Allowance; - Decontamination works (Asbestos Removal, etc); - Rock excavation; - Dewatering / Drainage pit & pump-out; - Loose & fixed furniture / FF&E’s; - Blinds / Flyscreens; - Roadworks / Public domain works; - Authorities Fees (S94 Contribution and the like); - Contingency allowance.
7. Design Assumptions / Parameters
In the absence of engineering drawings, the structure of the proposed buildings was assumed of conventional nature, comprising the following:
- Reinforced concrete soldier piles /shotcrete to basement shoring; - Reinforced concrete strip / pad footings; - Reinforced concrete columns and floor slabs (Framed structure).
Construction Consultants (QS) Quantity Survey Report – DA Submission only (Not for Bank use) 35 Carinya St, Blacktown
6 | P a g e
Our Indicative Cost Estimate was based on the assumption that the whole development will be constructed in a single stage (i.e. not a staged development). If the building is to be completed in stages, the cost of preliminaries and Building services may increase.
This Cost Estimate may provide no more than a rough guide to the probable cost of the proposed development. Costs may vary considerably, due to a range of variables:
- Further Geotechnical investigation; - Structural and services documentation; - Contract conditions; - Final PC Items and Provisional Allowances; - Variations in the proposed fixtures and finishes; - DA Conditions.
8. Documentation Our Cost Estimate was based on Architectural Drawings supplied by Designcorp Architects, Reference No. 2018-153, Sheet Nos. G00 to G15, Issue g, Dated 11/02/2019. Please refer to Appendix D for a reduced copy of part of these drawings. 9. Contingency Allowance A Contingency Allowance (generally between 5% and 10%) will not be included for the purpose of this report.
10. Disclaimer This Certificate has been prepared for the sole purpose of providing an Initial Cost Plan for DA Council Submission only (not for bank use). This Quantity Survey Certificate is not to be used for any other purpose. This Report is confidential to the developer. The Writer does not accept any contractual, tortuous or other form of liability for any consequences, loss or damage which may arise as a result of any other person acting upon or using this report. Report and estimate prepared by
Michael M. Dakhoul B. Build (Hons. 1) AAIQS MAIB MCIOB ICECA AAIQS Reg. No. 3618
Elemental Summary35 Carinya, Blacktown
Code Item % Cost ($) / m2 Total Cost ($)
PR Preliminaries 11.33 201 712,766
AR Demolition 0.62 11 39,141
XP Site Preparation 0.14 2 8,698
SB
Substructure (Excavation, Footings and Ground Floor
Slab) 17.33 308 1,090,331
CL Columns 1.80 32 113,472
UF Upper floors 7.72 137 485,583
SC Staircases 1.55 28 97,839
RF Roof 1.55 28 97,839
EW External Walls 8.00 142 503,545
WW Windows 2.60 46 163,794
ED External Doors 0.77 14 48,319
NW Internal Walls 3.30 59 207,764
NS Internal Screens 0.49 9 30,923
ND Internal Doors 1.12 20 70,304
WF Wall Finishes 2.01 36 126,234
FF Floor Finishes 2.31 41 145,347
CF Ceiling Finishes 1.80 32 113,164
FT Fitments 4.10 73 257,786
PB Hydraulic Services (incl. External Services) 6.01 107 378,360
AC
Mechanical Services (Wet areas Ventilation, Air
Conditioning if applicable) 3.14 56 197,627
FP Fire Services 3.09 55 194,509
LP Electrical Services 4.58 81 288,330
TS Transportation Services (Lifts and the like) 3.00 53 188,660
XR/XN Siteworks (Boundary walls, Fencing and Gates, etc.) 0.62 11 39,141
XL Landscaping and Improvements 0.97 17 61,321
BM Builder's Margin 7.88 140 495,611
Total Construction Cost (excl. GST) 6,156,407
Add Consultants Fees 2.15 38 135,554
Total Development Cost (excl. GST) 100.00 1,776 6,291,961
Add GST 629,196
Total Development Cost (incl. GST) 6,921,157
Construction Consultants (QS)
1 of 1
25/02/2019
Construction Consultants (QS) 25/02/2019
1
Proposed Boarding House
35 Carinya, Blacktown
ASSUMED SCHEDULE OF FINISHES
BUILDING INTERIOR
Internal finishes and Fittings Internal Bathroom Doors Hollow core / plain / painted Room Front Doors Fire rated / plain / painted Door Handles Lockset to room doors Metal lever to internal doors Kitchen Stone benchtop and polyurethane doors Walls Generally face brickwork Ceilings Set plaster / painted Cornices Standard Cove
Bathroom Fittings Shower Screens Powder coated alum. Semi-Frameless / Safety glass WC Suite Vitreous China Suite with 6/3 dual flush Vanity Unit Laminated top with Semi-recessed basin Mirror Wall mounted mirror above each vanity unit Tapware Single Lever Mixer / Chrome Bathroom Fittings Stainless steel Floor Finishes Rooms Carpet Hallways Carpet Bathrooms Ceramic tiles Fixtures Hot water unit Basic Air conditioning Split system Intercom Excl. Alarm Excl. Transportation lift(s) Exclusions – FF&Es Loose furniture Artworks Signage Beds & Mattresses Bedside tables Coffee table and kettle Office table and chairs Manchester and curtains Utensils Fridges / Microwaves
Construction Consultants (QS) 25/02/2019
2
Washing Machine / Dryers Heaters
BUILDING EXTERIOR External walls Refer to architectural drawings Windows and sliding doors Powder coat / aluminum framed Handrails / balustrades Powder coated metal Roof Refer to architectural drawings Individual Garage Doors N/A Main Garage Door Overhead / automatic Letterboxes Powder coated classic
GSPublisherVersion 0.2.100.32
N
This document is COPYRIGHT and theproper ty o f DESIGNCORP ARCHITECTSPty. Ltd. It is not to be retained, copied orused without the prior written permission ofthe author.Al l dimensions must be checked on-siteprior to the commencement of any works.Any discrepancies are to be brought to theat tent ion of DESIGNCORP ARCHITECTS.
PR
OPO
SED
NEW
GEN
ERAT
ION
BOAR
DING
HO
USE
@ 3
5 CA
RINY
A ST
BLA
CK
TOW
N
chec
ked:
proj
ect
clie
ntAM
EZ P
TY L
TDdr
awn:
date
:20
18-1
53
as s
hown
E.K.
as s
hown
scal
e:
J.E.
ref:
scal
e:Co
unci
l
FEB
18
16 dunlop streetnorth parramatta nsw 2151
ph: +61 2 9630 9911fax: + 61 2 9630 9922
mob: 0431 111 777admin@ designcorp.com.au
w w w .designcorp.com.au
G 5
BCC
issu
e a:
nominated architect - joe el-sabbagh 8707
Clie
nt s
ketc
h 2
5/05
/201
8 C
lient
ske
tch
issu
e b:
01/
06/2
018
issu
e c:
13/
06/2
018
Am
ende
d Pa
rkin
gis
sue
d: 2
7/06
/208
Pre
-DA
issu
e e:
30/
08/2
018
Red
esig
n - t
urnt
able
issu
e f:
30/
10/2
018
Red
esig
n fo
r Gar
bage
truc
kis
sue
g: 1
1/02
/201
9 D
evel
opm
ent A
pplic
atio
nis
sue
h:is
sue
i:is
sue
j:is
sue
k:
Clie
nt s
ketc
h
16 x 188 = 3,000
1
2
3
4
5
D03
D03
D03D03
1 2 3 4 5
5,40
06,
100
5,40
0
200 4,500 4,400 8,600 7,100 300 2,400 2,400 2,500 300 2,500 2,500 300 2,500 300 200 2,600 200
9,0005,789
2,500 2,500 300 2,500 2,500 300 2,500 2,500 300 2,500 2,500 300 2,500 2,500 1,000
9,000
1,90
0
6,363
47,500
48,050
RAMP1:8
RAMP 1:8
RAMP 1:4
RAMP 1:8
Traffic signal
12BICYCLE PARKING
SERVICES
1617181920
21222324252627282930
BASEMENT 2 PARKING15 CAR SPACES
MECH ROOM
7 M
OTOR
CYCL
E P
ARKI
NG
MECH
BollardLIFT
A11
A11
B11
B11
C12
C12
D12
D12
16 x 188 = 3,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
19 x 190 = 3,610
1
2
3
4 5 6 7 8 9
D03
D03D03
D03
D03
6 7 8 9 10 11 12 13 14 151 2 3 4 5
4,500 2,000 3,560 2,000 5,440 200 6,700 200 300 2,400 2,400 2,500 300 2,500 2,500 300 2,500 300 200 2,600 200
4,50
02,
000
2,70
02,
000
4,50
0
200 4,500 2,000 3,100 2,000 4,300 300 2,500 2,500 300 2,500 2,500 300 2,500 2,500 300 2,500 2,500 300 2,500 2,500 1,000 200
5,791
5,40
06,
100
5,40
0 9,000
6,311
1,90
0
700
288
50,500
51,890
49,225
A11
A11
B11
B11
48.35 m2
110.62 m2
RAMP1:8
RAMP 1:8
RAMP 1:4
RAMP 1:8
RAMP1:8
RAMP1:8
RAMP1:4
RAMP1:8
RAMP1:4
Traffic signal
12345
6789101112131415
5 M
OTOR
CYCL
E P
ARKI
NG
SERVICES
BASEMENT 1 PARKING15 CAR SPACES
MECH
BollardLIFT
DEEP SOILZONE
DEEP SOILZONE
DEEP SOIL ZONE min 3m - 159m2 14.8%
C12
C12
D12
D12
BASEMENT 2 FLOOR PLAN1:200
BASEMENT 1 FLOOR PLAN1:200
GSPublisherVersion 0.2.100.32
N
This document is COPYRIGHT and theproper ty o f DESIGNCORP ARCHITECTSPty. Ltd. It is not to be retained, copied orused without the prior written permission ofthe author.Al l dimensions must be checked on-siteprior to the commencement of any works.Any discrepancies are to be brought to theat tent ion of DESIGNCORP ARCHITECTS.
PR
OPO
SED
NEW
GEN
ERAT
ION
BOAR
DING
HO
USE
@ 3
5 CA
RINY
A ST
BLA
CK
TOW
N
chec
ked:
proj
ect
clie
ntAM
EZ P
TY L
TDdr
awn:
date
:20
18-1
53
as s
hown
E.K.
as s
hown
scal
e:
J.E.
ref:
scal
e:Co
unci
l
FEB
18
16 dunlop streetnorth parramatta nsw 2151
ph: +61 2 9630 9911fax: + 61 2 9630 9922
mob: 0431 111 777admin@ designcorp.com.au
w w w .designcorp.com.au
G 6
BCC
issu
e a:
nominated architect - joe el-sabbagh 8707
Clie
nt s
ketc
h 2
5/05
/201
8 C
lient
ske
tch
issu
e b:
01/
06/2
018
issu
e c:
13/
06/2
018
Am
ende
d Pa
rkin
gis
sue
d: 2
7/06
/208
Pre
-DA
issu
e e:
30/
08/2
018
Red
esig
n - t
urnt
able
issu
e f:
30/
10/2
018
Red
esig
n fo
r Gar
bage
truc
kis
sue
g: 1
1/02
/201
9 D
evel
opm
ent A
pplic
atio
nis
sue
h:is
sue
i:is
sue
j:is
sue
k:
Clie
nt s
ketc
h
19 x 190 = 3,610
1
2
3
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
31.00 m2
F
F
F FF
FF
WW
WW
W
11.31 m2 11.31 m2
10.93 m2
11.31 m2 10.66 m2
11.05 m2 11.05 m2
W17 W05 W17
W11
W11
D07
W06
W03
W03
D06
W03 W03 W03 W03 W03 W03D06 D06 D06
W10
W10 W10
D02D03 D02D02 D07
D05
D02 D02 D02 D02
D04
D02
D02D02
D02
D02
D02
6 7 8 9 10 11 12 13 14 15
1
2
3
4
5
6
1 2 3 4 5 6
D01
D01
D01
D01
D01
D01
D01
W17 W05 W17 W17 W05 W17W17 W05 W17
A11
A11
B11
B11
9,000
3,50
0
16,741
4,08
8
3,00
0
6,2008,
200
12,6
88
10,3
88
700
1,20
0
300
3,50
028
8
3,00
0
9,000
6,68
8
10,656
3,300
1,80
0
53,415
53,415
54,2
15
54,2
15
53,040
53,415
53,500
54,215
C12
C12
D12
D12
17.53 m2
17.15 m2
17.53 m2 17.53 m217.53 m2
17.27 m217.27 m2
227.64 m2
Garbage 110L per week x 60 - 6 x 1100L or 27 x 240LRecycling 90L per week x 60 - 5 x 1100L or 22 x 240L
DRIVEWAY CROSSING4%
RAMP 1:8
RAMP 1:4
RAMP 1:8
RAMP1:13.3
RAMP1:8
Mesh cage to screen bulky wasteBulky Waste 4m3 for 40 units + 1m3 every following 20 units
Clothes drying rack
Gate with remote controlled access
Gate
Existing trees on site to be removed shown dashed
Potential locationof hydrant booster
Traffic signal
53.54
54.74
54.71
54.47 54
.5354
.49
54.44
53.73
TK
53.89
TK
53.99
TK
54.24
TK
54.45
TK
54.58
TK
54.66 TK
53.43
53.35
53.20
53.00
52.75
52.59
52.61
52.75
53.91
54.31
54.58
53.83
54.64
54.01
54.14
53.13
52.84
52.94
53.19
53.37
53.21
53.08 53.22
53.55
53.7253
.36
54.00
54.19
54.01
54.05
53.60
54.38
54.20
53.41
53.37
53.25
53.27
53.26
53.23
52.99
52.98
53.44
53.53
54.10
54.06 54.08
54.19
53.83
53.90 53
.90
54.32
54.29
54.2554
.22
WM
53.93
53.67
53.58
53.31
53.13
53.33
53.88
53.86
54.15
53.89
61.94
59.97 TG
57.24 TG53.09
IPSIGN
COMM
COMMP.POLE
V. C.
V. C.
V. C.
BM NAIL TOP KERBRL 54.64 (AHD)
SILL 55.87HEAD 56.82
SILL 55.87HEAD 56.82
GFW GFW
BALCONY
METAL PANEL FENCE TEMPORARY FENCE
PALING FENCE METAL PANELFENCE WELDMESH FENCE
CONCRETE
DRIVEWAY
CONCRETE
DRIVEWAY
WELDMESH
FENCE
170
D P 13619
CAR
INYA
STR
EET
171
D P 13619
167
D P 13619169
D P 13619
168
D P 13619
209
D P 13619
METAL PANEL FENCE
53
54
54
CONCRETE
KERB
AND
GUTTER
97°42'
59.18
58.52
277°42'
18.29
18.3
5°
39'
30"
42
187°
CONSTRUCTION SITE
CONSTRUCTION
SQUARE
1076m `
(BY CALC )
GarbageRoom
LDRY
LIFT
7 ROOMS
Robe
Ens
Robe
Ens
Lobby
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
COMMUNALROOM
AIRLOCK
Loadingarea
LANDSCAPE SWALELANDSCAPE SWALE LANDSCAPE SWALE
MECH 01020304
05 06 07
GROUND FLOOR
mail b
ox
101DHW54.62
184CONC
13104EC 13004EC 12904EC12803 EC12703EC12603EC10802EC 10702EC 10602EC10501EC10401 EC10301 EC
117VC116VC115TK114TK113VC112VC111VC110VC109TK198F197F196F195F194F
193F 192F191F 190F
172F 171F 125F
118F
123TEL
119TEL 120SIGN
212SH211SH 210SH209SH 208SH207SH189SH 188SH 187SH 186SH181SH
178SH 177SH176SH 144SH
141SH
122SH121SH
132PP
124PP220T*S4 219T*S8218T*S6217T*S8216T *S10215T *S6214T*S6 213T*S6 180T*S8 179T*S6
161T *S4 160T *S4 159T *S2.5 158T*S2
140T*S3 139T*S2 137T *S1.5
136T*S4135T*S2134T*S3133T*S4
138206BLD
202BLD201BLD
200BLD199BLD 175BLD
168BLD 165BLD*1ST164BLD163BLD 162BLD
152BLD
143BLD
142BLD230231
249
145BM-NAIL54.64
146WIRES182RIDGE 15602RIDGE15502RIDGE15402RIDGE 15302RIDGE
15001 RIDGE14901RIDGE 14801RIDGE 14701RIDGE232
233
203GUTT183GUTT
151GUTT
17002W*S16902W*H16701 W*S 16601 W*H
205AWN
204AWN 174AWN 173AWN
185IP
222FL 221FL
234235239
WC
BULKY WASTE AREA5.94 m2
RAMP5%
RWORWORWORWORWORWO
RWO
RWO
10.22 m2
W17 W05 W17
W11
W11
D07
W06
W03
W03
D06
W03 W03 W03 W03 W03 W03D06 D06 D06
D07
D04
7
8
9
10
11
12
7
89101112
1
2
3
4
5
6
1 2 3 4 5 6
W17 W05 W17 W17 W05 W17W17 W05 W17
A11
A11
B11
B11
C12
C12
D12
D12
5,829
3,00
0
3,00
0
9,0004,
088
31,918
9,000
6,68
8
55,900
55,800
55,800
55,800 55,800 55,800
55,800
55,80055,8009.40 m2
9.40 m2 9.40 m29.40 m2
9.40 m29.40 m2
Line of floor above shown dashed
void
void
Robe bed
void
bedRobe
void
bedRobe
void
bed Robe
void
Robe bed
void
Robebed
void
void
Robe
bed
void
void
MECH
void
01020304
05 06 07
droppedceiling
LIFT
3,50
0
00
00m2
ROOM NUMBER
ACCOMODATION SIZE
ROOM SIZE00m2
SHADING DENOTES OVERLOOKING
SHADING DENOTES SINGLE ROOM
SHADING DENOTES DOUBLE ROOM
SHADING DENOTES COMMUNAL AREAS
GROUND FLOOR PLAN1:200
MEZZANINE LEVEL1:200
GSPublisherVersion 0.2.100.32
N
This document is COPYRIGHT and theproper ty o f DESIGNCORP ARCHITECTSPty. Ltd. It is not to be retained, copied orused without the prior written permission ofthe author.Al l dimensions must be checked on-siteprior to the commencement of any works.Any discrepancies are to be brought to theat tent ion of DESIGNCORP ARCHITECTS.
PR
OPO
SED
NEW
GEN
ERAT
ION
BOAR
DING
HO
USE
@ 3
5 CA
RINY
A ST
BLA
CK
TOW
N
chec
ked:
proj
ect
clie
ntAM
EZ P
TY L
TDdr
awn:
date
:20
18-1
53
as s
hown
E.K.
as s
hown
scal
e:
J.E.
ref:
scal
e:Co
unci
l
FEB
18
16 dunlop streetnorth parramatta nsw 2151
ph: +61 2 9630 9911fax: + 61 2 9630 9922
mob: 0431 111 777admin@ designcorp.com.au
w w w .designcorp.com.au
G 7
BCC
issu
e a:
nominated architect - joe el-sabbagh 8707
Clie
nt s
ketc
h 2
5/05
/201
8 C
lient
ske
tch
issu
e b:
01/
06/2
018
issu
e c:
13/
06/2
018
Am
ende
d Pa
rkin
gis
sue
d: 2
7/06
/208
Pre
-DA
issu
e e:
30/
08/2
018
Red
esig
n - t
urnt
able
issu
e f:
30/
10/2
018
Red
esig
n fo
r Gar
bage
truc
kis
sue
g: 1
1/02
/201
9 D
evel
opm
ent A
pplic
atio
nis
sue
h:is
sue
i:is
sue
j:is
sue
k:
Clie
nt s
ketc
h
21.68 m2 21.68 m221.68 m2 21.68 m2
52.39 m2
F
F FF F
F F FFF F FF
27.02 m2
12.00 m2 12.00 m2 12.00 m212.00 m212.00 m2 12.00 m2 12.00 m212.00 m2
12.04 m2 12.04 m216.14 m2 16.14 m216.14 m2 16.14 m2
14.92 m2
W07
W09
D11
W04
W16
D08
D08
W08
W01
W04
W01
W01 W01 W01
W08
W01 W01
D02
W18W18 W18
D02 D02 D02 D02
D02 D02 D02D03
D02 D02 D02 D02
D02 D02D02 D02
D01
D01
D03
W01 W01 W01 W01 W01 W01 W01 W01 W01
D04
D04
7
8
9
10
11
12
7
89101112
1
2
3
4
5
1 2 3 4 5
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
D01
A11
A11
B11
B11
C12
C12
D12
D12
9,000
10,100
3,00
0
4,08
8
6,00
0
9,000
3,00
03,
000
3,50
0
3,00
0
9,00
0
8,00
016,2
00
9,00
0
8,94
0
6,029
12,000
9,422
13,135
10,24
6
1,150 1,100
1,10
085
011
0
1,550
1,550
58,300
17.48 m2 17.48 m2
17.53 m2 17.53 m2 17.53 m217.53 m217.53 m2 17.53 m2 17.53 m217.53 m2 4.11 m2
Robe
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
COMMUNAL ROOM8 ROOMS 7 ROOMS
MECH 08091011
12 13
14
15161718
19 20 21 22
LIFT
Ens
F F
21.68 m2 21.68 m221.68 m2 21.68 m2
52.39 m2
F FF F
F F FF F F FF
F
12.00 m2 12.00 m2 12.00 m212.00 m2
16.14 m2 16.14 m216.14 m2 16.14 m2
12.00 m2 12.00 m2 12.00 m212.00 m2
12.04 m2 12.04 m2
27.02 m2
14.92 m2D01
D01
6
7
8
9
10
11
12
13
14
15
6 7
8
9101112131415
1
2
3
4
5
1 2 3 4 5
W07
W09
D11
W04
W16
D08
D08
W01 W01 W01
D02 D02 D02 D02
D03 D02 D02D02
W01
W04
W01
W01 W01 W01
W08
W01 W01
D01
D01
D01
D01
D01
D01
D01
D01
D02 D02 D02 D02
D02 D02D02 D02
W01 W01 W01 W01 W01 W01 W01 W01 W01
D03
D04
W08
D04
D01
D01
D01
D01
D02
A11
A11
B11
B11
C12
C12
D12
D12
3,00
0
3,00
0
9,000
3,00
0
8,350
9,000
3,00
0
6,029
6,00
0
1,1001,100
1,10
0
1,550
1,550
61,300
17.53 m2 17.53 m2 17.53 m217.53 m2 17.53 m2 17.53 m2 17.53 m217.53 m2
17.48 m2 17.48 m2
4.11 m2
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
EnsRobe
Ens
Robe
8 ROOMS 7 ROOMSCOMMUNAL ROOM
MECH 23242526
27 28
29
30313233
34 35 36 37
LIFT
Ens
F F
00
00m2
ROOM NUMBER
ACCOMODATION SIZE
ROOM SIZE00m2
SHADING DENOTES OVERLOOKING
SHADING DENOTES SINGLE ROOM
SHADING DENOTES DOUBLE ROOM
SHADING DENOTES COMMUNAL AREAS
FIRST FLOOR PLAN1:200
6. SECOND FLOOR PLAN1:200
GSPublisherVersion 0.2.100.32
N
This document is COPYRIGHT and theproper ty o f DESIGNCORP ARCHITECTSPty. Ltd. It is not to be retained, copied orused without the prior written permission ofthe author.Al l dimensions must be checked on-siteprior to the commencement of any works.Any discrepancies are to be brought to theat tent ion of DESIGNCORP ARCHITECTS.
PR
OPO
SED
NEW
GEN
ERAT
ION
BOAR
DING
HO
USE
@ 3
5 CA
RINY
A ST
BLA
CK
TOW
N
chec
ked:
proj
ect
clie
ntAM
EZ P
TY L
TDdr
awn:
date
:20
18-1
53
as s
hown
E.K.
as s
hown
scal
e:
J.E.
ref:
scal
e:Co
unci
l
FEB
18
16 dunlop streetnorth parramatta nsw 2151
ph: +61 2 9630 9911fax: + 61 2 9630 9922
mob: 0431 111 777admin@ designcorp.com.au
w w w .designcorp.com.au
G 8
BCC
issu
e a:
nominated architect - joe el-sabbagh 8707
Clie
nt s
ketc
h 2
5/05
/201
8 C
lient
ske
tch
issu
e b:
01/
06/2
018
issu
e c:
13/
06/2
018
Am
ende
d Pa
rkin
gis
sue
d: 2
7/06
/208
Pre
-DA
issu
e e:
30/
08/2
018
Red
esig
n - t
urnt
able
issu
e f:
30/
10/2
018
Red
esig
n fo
r Gar
bage
truc
kis
sue
g: 1
1/02
/201
9 D
evel
opm
ent A
pplic
atio
nis
sue
h:is
sue
i:is
sue
j:is
sue
k:
Clie
nt s
ketc
h
21.68 m2 21.68 m221.68 m2 21.68 m2
52.39 m2
F FF F
F F FF F F FF
F
6.94 m2
12.00 m2 12.00 m2 12.00 m212.00 m2
16.14 m2 16.14 m216.14 m2 16.14 m2
12.00 m2 12.00 m2 12.00 m212.00 m2
12.04 m2 12.04 m2
27.02 m2
14.92 m2
7.04 m2
D01
D01
6
7
8
9
10
11
12
13
14
15
6 7
8
9101112131415
1
2
3
4
5
1 2 3 4 5
W07
W09
D11
W04
D08
W08
W01W01W01
D02 D02 D02 D02
D03 D02D02 D02
D02 D02 D02 D02
D02 D02D02 D02
D01
D01
D01
D01
D01
D01
D01
D01
W01 W01 W01 W01 W01 W01 W01 W01 W01
D03
D01
D01
D01
D01
D02
W16
D08
D04
D04
A11
A11
B11
B11
C12
C12
D12
D12
W01
W04
W01
W01 W01 W01
W08
W01 W01
3,00
0
3,00
0
10,100
6,029
3,00
0
1,1001,100
1,10
0
1,550
1,550
64,300
17.53 m2 17.53 m2 17.53 m217.53 m2 17.53 m2 17.53 m2 17.53 m217.53 m2
17.48 m2 17.48 m2
4.11 m2
COMMUNAL ROOM8 ROOMS
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
Ens
Robe
7 ROOMS
MECH 38394041
42 43
44
45464748
49 50 51 52
LIFT
Ens
F F
52.39 m2
17.91 m2
18.59 m2 18.59 m2
23.24 m2
12.15 m2
16.97 m2 12.82 m2 12.82 m2
12.56 m2
16.97 m2
D04
D09
D04
6
7
8
9
10
11
12
13
14
15
1 2 3 4 5 6 7
8
9101112131415
F
F
F
F
F12.12 m2 12.12 m2
F
W15W16 W15
W13D02 D02D02
W16
D10
D09
W14 W16 W16 W14
D01
D03
D01
D02 D02
W02 W02 W02 W02 W02 W02 W02 W02 W02
D03
W12
D01
D02
A11
A11
B11
B11
C12
C12
D12
D12
D01
6,00
0
11,500
6,00
0 4,32
6
3,50
06,00
04,
800
4,80
0
8,822
1,10
0
3,250
67,300
10.30 m2
23.17 m2
Void above for solar accessto communal open space
Manager's deskCCTV screens Line of slab below
Fixed privacy screens
Roof above
Robe
Ens
Robe
Robe
MANAGERMANAGER'S
POS
COMMUNAL ROOM
COS
2 ROOMS + MANAGER
3 ROOMS
MECH
5354
55
5657
LIFT
PLANTER
PLANTER
PLANTER PLANTER
D01
D01
Robe
Ens
Robe
Robe
09 am
03 pm
00
00m2
ROOM NUMBER
ACCOMODATION SIZE
ROOM SIZE00m2
SHADING DENOTES OVERLOOKING
SHADING DENOTES SINGLE ROOM
SHADING DENOTES DOUBLE ROOM
SHADING DENOTES COMMUNAL AREASSOLAR ACCESS
09 am
03 pm
THIRD FLOOR PLAN1:200
FOURTH FLOOR PLAN1:200