QUALITY MANAGEMENTAGA – BEST PRACTICE ROUNDTABLE
Sara Peralta, Director – Quality & Improvement
Philadelphia February,
2013
2
PRESENTATION AGENDA
Pacific Gas & Electric (PG&E)• System Overview• Quality Movement• PG&E’s Vision & Top 10 Priorities
Organizational/Business Structure• Organizational Overview• Key Processes & Asset Families• Gas Safety Excellence (PAS 55)
Quality Program Deep Dive• Corrective Action Program• Procedures• Quality Control
3
SYSTEM OVERVIEW
PG&E’s system is comprised of:
● ~ 42,000 miles of natural gas distribution pipelines
● ~ 5,700 miles of gas transmission pipelines ( w/~ 1000 miles of High Consequence Areas)
● ~ 42 miles of gas gathering pipelines
The entire transmission, distribution and gathering network serves ~ 4.4 million gas customers
4
SAFETY QUALITY
The National Transportation Safety Board determines that one ofthe probable causes of the accident was the Pacific Gas and Electric
Company's (PG&E) (1) inadequate quality assurance and quality control
in 1956 during its Line 132 relocation project…
It’s all about Safety. Out of tragedy should come change …
5
QUALITY MOVEMENT
192.605 (b)(8) Each operator shall prepare a manual of written procedures for conducting operations and maintenance which must include procedures for periodically reviewing the work done by operator personnel to determine the effectiveness and adequacy of the procedures and modifying the procedures when deficiencies are found.
• 2011 Gas Transmission ANPRM
• NTSB’s 2011 “Most Wanted List” – Safety Management Systems
• 192.305 – Independent inspections for transmission construction
• CPUC 2012 Gas Safety Plan
o Perform targeted and random field checks of facilities
o Promote continuous improvement in work quality
o Will develop/utilize risk-based safety programs
6
TOP 10 GAS OPERATION PRIORITIES
1. Build a culture that puts public and personal safety first
2. Establish a clear organizational structure
3. Engage workforce and recruit talent
4. Rebuild integrity management process
5. Develop accurate asset knowledge
6. Achieve full regulatory compliance (rebuild trust)
7. Create and implement consistent standards, work methods and procedures
8. Establish an investment planning function
9. Improve gas transmission system control and build distribution control system
10. Revamp Quality Assurance/Quality Control capability
7
ORGANIZATIONAL/BUSINESS STRUCTURE
Gas Operations Org Structure
9
Q&I PROGRAM ELEMENTS & FOCUS AREAS
Quality & Improvement Sara Peralta
AdvisoryCorrective Action Program
Quality Control Manager
QC Focus Areas:ConstructionDamage PreventionLeak RepairLeak Survey
Quality Control Manager
QC Focus Areas:Corrosion ControlField ServicesMeteringRegulation MaintValve Maint
Quality Engineering & Improvement
Manager
AssessmentEmployee Feedback
InvestigationsLessons Learned
Observations
Quality Systems
Manager
Information SystemsMetrics & Reporting
ProceduresQuality Records Mgmt
Quality Training
AuditSupervisor
Auditing
(23) (13)(16)
(5)
(6)
10
Backbone Transmission
Regulator Station
Upstream Fire Valve
Downstream Fire Valve
Emergency Zone Valve
Distribution Feeder Main≥20% SMYS
Distrib
utio
n M
ain
Tee
Excess Flow Valve
CurbValve
Service
RiserM
Residential or Commercial Customer
NOT DRAWN TO SCALE
Regulator
C
Compressor Station
Storage
Transmission Pipe
Distribution ServicesMeasurement & Control
Distribution Mains
Not included in gas asset system
M
Meter
Gathering Lines
Cathodic Protection
Station Protection
M
Meter
Interconnecting Pipeline
Interconnect
M
Turbine & Ultrasonic Metered Customers
S
Odorizer
Separator
Distribution Feeder Main<20% SMYS
Local Transmission
Meter
Master Meter
Regulator
CNG/LNG
CNG/LNG
Compression & Processing
- - - - - - - - - - - - - 8 Gas Asset Families - - - - - - - - - - - - -
Customer Connected Equipment
GC
US
T
HPR
~
~~
Storage Reservoirs
WellWell
ProcessingS C
PG&E’s GAS ASSET FAMILIES
11
KEY GAS PROCESSES
Process Process Owner Process Champion
1 Damage Prevention John Higgins Roland Trevino
2 Corrective Action Program Sara Peralta Jane Yura
3a Leak Management (Survey) Steve Redding Kevin Knapp
3b Leak Management (Repair) Jodie Kubota Kevin Knapp
4a Emergency Response (IR) Rod Williams Kevin Knapp
4b Emergency Response (Make Safe) Rich Yamaguchi Kevin Knapp
5 Class Location / HCA Determination Joe Medina Sumeet Singh
6 Instrumentation & Regulation Ross Leverett Kevin Knapp
7 Corrosion Bennie Barnes Roland Trevino
8 As-Built Robert Henley Sumeet Singh
9 Welding Pierre Bigras Kirk Johnson
10 Non-Destructive Examination Peter Kenny Kirk Johnson
11 Right Of Way Management / Patrols Mike Falk Kirk Johnson
12 Materials Management Michael Ritter Sumeet Singh
13 Construct Distribution Facilities Jon Little (interim) Kevin Knapp
14 Work Requested Others / Public Works Coordination Jeff Gravelle Jesus Soto
15 New Business Sini Jacob Mel Christopher
12
GAS SAFETY EXCELLENCE VISION
PG&E’s goal is to become the safest gas utility in the nation:
Nurture a safety-first culture
Understand and know our assets and their condition
Continuously assess, re-assess risks, and adjust our risk management
plans
Design safety into our process and asset management systems
Safely operate our system and respond appropriately to emergencies
Embed continuous improvement in all that we do
13
PAS 55: QUALITY in ASSET MANAGEMENT
• PAS 55 was developed in 2004 as the first publicly available specification for optimized management of physical assets.
• There has been broad adoption in utilities, transport, mining, process and manufacturing industries worldwide.
• The International Standards Organization (ISO) has now accepted PAS 55 as the basis for development of the new ISO 55000 series of international standards.
CORRECTIVE ACTION PROGRAM & PROCEDURES
15
CORRECTIVE ACTION PROGRAM (CAP)
• CAP is a program that: • Captures incidents (events that have already happened) and potential
incidents (events that haven’t happened but are identified as a risk);
• Analyzes incidents & potential risks;
• Recommends corrective actions to address issue and prevent future recurrence;
• Recommends preventive actions to prevent occurrence in first place; and • Continuously assesses effectiveness; monitors trends; and communicates
results.
16
CAP in GAS OPERATIONS
16
2
Advisory Recommendations
Employee Feedback
13
Observation Results
7
Lessons Learned
CAP:• Issues into CAP system• Assign risk-based significance level• Perform causal evaluation (root cause
analysis, etc..)• Identify corrective/preventive actions• Track actions to completion• Monitor, trend, assess effectiveness
Quality Control Issues
Improvements
Assessment Results
Incident Investigations
• Reduced Risk• Increased Safety• Improved
Compliance
AuditFindings
17
PROCEDURES
A major areas of anticipated improvement through CAP is in the area of improvements to PG&E’s guidance documents (policies, standards, procedures)
External factors: Updated technology / tools Regulatory changes CAP improvements
StandardsPrioritization
Doc Development
Implementation PlanningImplementation
Sustainability
QUALITY CONTROL
19
QUALITY CONTROL (QC)
GENERAL QC PROGRAM FRAMEWORK
• Define regulations, policies, standards, work procedures governing
the work
• Develop a risk-based scorecard
• Identify the population of completed work
• Perform real time or after-the-fact field assessments on a random
sampling basis
• Communicate findings
• Adjust the sampling based on findings
• Develop local or system corrective actions for any findings as
appropriate
QC PROGRAM STATUS DESCRIPTION
Field Services Operational since the 1990’s
Performs in field quality control reviews of Gas Service Rep completed tags including customer appliance inspections and leak investigations
Leak Survey Operational since 2009
Measures the quality of leak survey maintenance process including whether any Grade 1’s were missed
Leak Repair Operational since 2009 Evaluates completed leak repairs for the presence of gas 90 days post-repair
Locate & Mark (L&M)
Operational since 2011 Validates and scores completed L&M tags including “No Conflict” tags
Transmission Construction
Actively under development
Will focus primarily on measuring the quality of transmission construction work performed by PG&E employees and contractors as the work is being
performedDistribution Construction (Re-Dig)
Actively under development
Will focus primarily on short cycle distribution installation and leak repair work performed by PG&E employees and contractors after the work has been
completed
Pipeline Patrol Actively under development
Will perform quality control field inspections behind patrol activities including corrective action documentation, follow-up , and completion
Metering Actively under development Pilot planned for 2nd quarter. System-wide rollout by end of 2013.
Corrosion Control Future Development starting in 2013.
Regulation Maintenance Future Development starting in 2013.
Valve Maintenance Future Development starting in 2013.
21
QC RESULTS - 2012
QC Program Assessments Completed
YTD Results(pass rate) Comments
Locate & Mark 451 77% • System wide pass rate was <40% a year ago
Leak Survey 208 70%
• Started measuring end-to-end process in July (52% pass rate)
• Previously only measuring performance on missed Grade 1 leaks (3 so far this year)
• QC process updated to include zero’d out leaks
Leak Repair 871 97%
A-forms 382 90% • Started 2012 with 81% pass rate, last two month2 have achieved 100%
Field Services 581 98%
22
QC RESULTS & TRENDS
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12Aug-12
Sep-12
90%
92%
94%
96%
98%
100%
Leak Repair QC – % Assessments Passed
Repaired Leak Evals Monthly Trend Line
Month
Pa
ss
Ra
te
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12Aug-12
Sep-12
40%
50%
60%
70%
80%
90%
100%
A-Form Reviews
A-Form Review Results Trend Line
Month
Pa
ss
Ra
te
23
QC RESULTS & TRENDS CONT..
Sep-11Oct-11
Nov-11Dec-11
Jan-12Feb-12
Mar-12Apr-12
May-12Jun-12
Jul-12Aug-12
Sep-12
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
% Assessments Passed Trendline Pass/Fail Line
Locate & Mark QC - % Assessments Passed
Jun-12 Jul-12 Aug-12 Sep-1230%
50%
70%
90%
Leak Survey Next Day Assessments% Assessments Passed
Pass/Fail Line
Leak Survey Next Day Assessments Monthly
Month
Pa
ss
Ra
te
What you observe, focus on, emphasize, etc.. will improve. If you want to improve it, measure it.
24
DISTRIBUTION CONSTRUCTION (Re-Dig)
PROGRAM GOAL: • To implement a QC Re-Dig program that is statistically valid with a primary focus on
gas distribution short cycle new installation and repair work performed by PG&E employees and contractors.
25
RE-DIG SCORECARD LIST
• Pre Job Package quality
• Backfill material/Compaction
• Placement of sleeves, casing bushings, and overall “as left” condition
• Quality of Wrap installation
• Weld appearance
• Stab depths
• Locating wire continuity
• Proper material including EFV's installation/repair method used
• Accuracy of Measurements to property lines/building/landmarks
• As Built drawings/information for fittings, offsets and material types
• Completed Job package quality
• Job close out and documentation
26
RE-DIG PILOT RESULTS
• 52 Re-Digs performed
• Overall pass rate was 48%
• Top Findings: • Documentation Issues• Process Adherence
• Handling of pre-1972 wrap• Equipment Calibration
• Workmanship• Locating wire issues• Primer not used when necessary• Fittings not properly installed
• Pilot surfaced several areas of procedural conflict/confusion targeted for resolution
27
PG&E’s BELIEF
“.. Quality management includes the activities and processes that an organization uses to achieve quality. These include formulating policy, setting objectives, planning, quality control, quality assurance, performance monitoring, and quality improvement.
Achieving quality is critical to gas transmission pipeline design, construction, and operations. PHMSA recognizes that pipeline operators strive to achieve quality, but our experience has shown varying degrees of success in accomplishing this objective among pipeline operators.
PHMSA believes that an ordered and structured approach to quality management can help pipeline operators achieve a more consistent state of quality and thus improve pipeline safety. PHMSA is considering whether and how to impose requirements related to QMS…”1
1 Department of Transportation, Pipeline and Hazardous Materials Safety Administration, 49 CFR Part 192, [Docket No. PHMSA-2011-0023] RIN 2137-AE72, Pipeline Safety: Safety of Gas Transmission Pipelines