Quality Forum 2013 ASES Improvement Program 19/09/2013 CSQSD Renault-Avtovaz Supplier Project...
-
Upload
wendy-dalton -
Category
Documents
-
view
227 -
download
6
Transcript of Quality Forum 2013 ASES Improvement Program 19/09/2013 CSQSD Renault-Avtovaz Supplier Project...
Quality Forum 2013ASES Improvement Program
19/09/2013
CSQSD Renault-Avtovaz
Supplier Project Quality Department
2
0. Content
1. What it is ASES & Rank Up
2. ASES Benchmark Results
3. ASES/Rank Up Road Map 2013-2016
4. SWOT: ASES/Rank Up
1.1. What it is ASES & Rank Up
ASES : Alliance Supplier Evaluation Standard
Evaluation of supplier Quality Management Systemand shopfloor
ASES is used for following purposes. New supplier evaluation for sourcing
Current supplier evaluation for improvement
Common to Renault and Nissan group.
ASES result is shared between Renault and Nissan.
Scoring since 2001 based on evaluation of 5000 supplier sites
1.2. What it is ASES & Rank Up
-Warranty 50 points-PPM 50 points-Recall camp - 20 points
Result indicator(optional)
Process Indicator better
bett
er
abcd
14
32TOTAL : 100 points
Evaluation :
8 subjects in room (70 points)1 shopfloor evaluation (30 points)
TOTAL :
100 points
A
B
C
D
20 40 60 80 100
2040
6080
100
Good
Improvement needed
Does not meet requirements
Judgment criteria
ASES result rank
ASES result rank is provided as A, B, C and D rank shown as above chart.
Excellent (80 ~ 100)
Satisfactory (60 ~ 79)
Acceptable (40 ~ 59)
1.3. What it is ASES & Rank Up
What is evaluated ?
Shopfloor evaluation
1. Quality Management by top management
2. Analysis of defects and recurrence prevention
8. Shopfloor
ASES is structured by following 9 chapters
Renault / NISSAN
Supplier
scre
en
OHP
Documents (Standards, Procedures , Files etc.)
explanation
In-room evaluation
Supplier
critical item with demerit, based on past experience
Control of start-up & equipment conditionTrainingManagement of NG parts (rule, rework, mixing)Management of unusual situationsSafety characteristicsContinuous improvement in shopfloor
Warranty Information analysis / Cause analysis/ Prevention of reoccurence
Design review / Design FMEA
Process FMEA / Control plan
3. Quality target setting for new project
4. Project management at design phase
5. PFMEA & Control Plan
6. Project management at pre-production phase
7. Ramp-up
8. Change management – Process / Product
9. Sub supplier control
Certification and internal audits
1.4. What it is ASES & Rank Up
Activity to improve D rank suppliers to C rank suppliers
(improvement to B for Excellence Plan and risky suppliers)
Joint Activity by Supplier and R/A ( led by Supplier )
14
32
abcd
D
CB
ARank-up
What is Rank up activity
What is Rank up activity
・・ A rankA rank : : ExcellentExcellent・・ B rankB rank : : SatisfactorySatisfactory
・・ C rankC rank : : MarginalMarginal
・・ D rankD rank : : Does not Does not meet meet R/A requirementsR/A requirements
OOKK
1.5. What it is ASES & Rank Up
Candidate suppliers
ASES
A
B
C
OK
Review meeting to decide on possibility of
rank upSQA & supplier
Purchasing dept Sourcing
decision
Re-ASESRank-Up achieved
Kick-off Followup#1
Action
Rank-Up Activity
4 ~ 6 months
D
RFQ
A
B
C
D
Action
Followup#2
Action
Rank up possible
Rank up Kick off meetingWith supplier &
Contract sign off
Rank up Activity
start SOP
Basic schedule
2. ASES Benchmark Results*
*April 2013
3. ASES/Rank Up Road Map 2013-2016
2013 AB Ranking
Forecast: ASES Rankup for nominated supplier (A,B)(Renault + Renault/Avtovaz)
0%19%
70%
25%
60%
40%
25%25%25%
55%
21% 20%
35%
50%
0%10%20%30%40%50%60%70%80%
2012 Aug 13 2013 2014 2015 2016
% or A+B TARGET COMMITMENT
4. SWOT: ASES/Rank Up S our strengths W our weak points
- Renault & Avtovaz one voice to suppliers for quality
- Young and motivated team, strong ASES training program
- Tool box & coaching support from DQDA Central & LT in Togliatty & Moscow
- CSQSD Management Involvement
- The same suppliers for some projects & serial suppliers
- Two teams in Moscow and Togliatti
- Benchmark visits- Training on quality & industrial basics by outsourcing bodies- AvtoVAZ purchases are involved in the quality (PPM)- Recognition of CSQSD value by AVTOVAZ and Renault- Quality targets deployment through Purchasing Department in RNPO & CPO
- Still low level of QMS & Production competence of the suppliers
- Lack of technological specialization, deep knowledge product/process
- Large number of specialists, but lack of expertise level experts- Long lead time to get an expert at expertise level (~1,5 year at least for ASES)
- Limited Mobility of OOO-origins- Different HR systems between Renault and AVTOVAZ
O opportunities we could have T threats from external factors
- Alliance quality tools trainings organization for suppliers
- Cooperation with Nissan
- Opportunities for more WW suppliers come to Russia- Quality targets deployment through Purchasing Department both in Renault & Avtovaz- Many experiences from many new projects- Motivation to study foreign language, management skills with robust training program- Contribution to the Alliance projects out of DQDA work scope- Tier-N improvement (Steel, critical components)
- ASES/ANPQP qualified people turnover
- Large number of new projects + Volume ramp up + Increase of localization,
- Some suppliers degrades after Rank Up/PPM action plan are finished,
- CSQSD negative opinion is not taken into account at ASC in some cases (mostly for Avtovaz projects)
- Poor project management at Avtovaz (ANPQP)
- Supplier Top management often is not involved in quality issues, - A lot of internal communications within Renault & Avtovaz
- The high level of staff turnover at suppliers- Unexpected the restriction of the activities due to financial issue
11
Thank you for your attention!