Quality Control & Quality Assurance.pptx
-
Upload
manish-patil -
Category
Documents
-
view
264 -
download
4
Transcript of Quality Control & Quality Assurance.pptx
Under The Guidance : 1) Prof AR Kolhe. 2) Prof Manish Khandare
Presented By : 1) Sanyam Soni 2) Aakash Chopda 3) Manish M. Patil 4) Sanket K Ghadge
Quality Control & Quality Assurance
AimThe aim of these project is present the role of Quality control with it’s analytical assurance in such a complex manufacturing process like building construction.
Contents
ABSTRACT
INTRODUCTION
LITERATURE REVIEW
OBJECTIVES
COMPARISION CHART
ECONOMY STATISTICS
SCHEDULING
LITERATURE REVIEW
REFERENCES
Abstract
It is noted that since the strength of a structure is a random variable, it is necessary to exercise good quality control on the various aspects of construction work which affect that parameter in order to minimize its variability.
We are examine various aspects of quality control as they affect the safety of structural concrete buildings.
There are different methods to control quality like Statistical Quality Control (SQC) and Statistical Process Control (SPC).
Introduction
With an evolution and advancement in this era there has been an urge in the development of the various entities and to meet or compensate this there has been a fast track boost in the manufacturing sector.
People are ready to pay a huge amount but are looking forward for the desired quality in the construction patterns.
Now Construction Industry is also a manufacturing sector in the core terms. Over here this manufacturing is a prolonged process, but now the standard of living has boosted of every individual living in urban areas.
Literature reviewSr No.
Author Paper Finding
1 G. Satyanarayana reddy Utility of quality control tool & statistical process control
International journal of review
2 S. Topolska The role of quality control operation in a process of plastic forming
Journal of achievement in material & manufacturing engineering
3 Sr maiti & Raj k. Aggrwal Concrete & Its quality
4 C. Arum Quality control & the safety of Structural concrete building
An international multi Disciplinary journal
5 Sandeep mantri Practical building construction and its management
Objectives
To study quality control and quality assurance in detail.
To study the various techniques of quality control.
To study the strength and weakness to admire quality assurance.
To study the after effect of quality assurance.
To analyze the quality based upon quality checks and questionare.
Analysis of existing and ongoing projects.
Analysis of sites in 1) Mumbai
2) Pune
Comparison chart
Quality Assurance
Quality Control
Definition
QA is a set of activities for ensuring quality in the processes by which products are developed.
QC is a set of activities for ensuring quality in products. The activities focus on identifying defects in the actual products produced.
Focus on
QA aims to prevent defects with a focus on the process used to make the product. It is a proactive quality process.
QC aims to identify (and correct) defects in the finished product. Quality control, therefore, is a reactive process.
GoalThe goal of QA is to improve development and test processes so that defects do not arise when the product is being developed.
The goal of QC is to identify defects after a product is developed and before it's released.
Quality Control
The ability to make the same thing the same way, over and over again
Customer buys today is same as what they bought last week or will buy next week
Product meets customer’s expectations 100% of the time
Quality Assurance
Quality Assurance (QA) is a way of preventing mistakes or defects in manufactured products and avoiding problems when delivering solutions or services to customers.
QA is applied to physical products in pre-production to verify what will be made meets specifications and requirements, and during manufacturing production runs by validating lot samples meet specified quality controls.
Quality Analysis
Examination of the quality goals of a product or service .
Quality analysis is done for finding out defect in product.
Quality analysis help to identify existing solution.
The ultimate use of quality analysis is to give quality data in hands of user.
Overview of construction industry in India
The construction industry is the second largest industry of the country after agriculture.
The Construction industry of India is an important indicator of the development as it creates investment opportunities across various related sectors.
The sector is labor-intensive and, including indirect jobs, provides employment to more than 35 million people.
India is the second fastest growing economy in the world.
Construction accounts for nearly 65 per cent of the total investment in infrastructure.
Real Estate is a €8 billion or Rs. 558.94 billion (by revenue) Industry in India.
Real Estate is linked to about 250 ancillary industries like cement, brick and steel through backward and forward linkages.
Opportunities in the Indian construction industry
The Indian real estate industry is likely to grow from Rs. 490.03 billion in 2005 to Rs. 4,060.24 billion in by 2015.
Foreign direct investment alone might see a close to six-fold jump to
Rs. 1,329.96 billion over the next 10 years.
Scheduling
Analytical details
Comparisifinal onal analysis on quality control and quality assurance.
Analysis of various sites in Mumbai.
Analysis of various sites in Pune.
Graphical representation after analyzing site data.
Result and conclusion after analyzing data.
Future scope:
1. Improvisation in project due to quality assurance and quality control.
2. Increment in life span of project.
3. Durability of project increase with quality control.
4. It helps in achieving the environmental aspects.
Deciding Objectives
Introduction
Literature review
Deciding Parameters
Collection Of Technical Papers
Study And Analysis Of
Data
Site Visit Mumbai Pune
Analysis Of site data
Graphical representation of site data
Result & Conclusion
Methodology
Study of various quality manual used on building construction site.
Preparation of quality control checklist as per referring different quality manuals used while construction .
Rating different construction sites as per our quality control checklist
with reference to their consult authorities .
Collecting all the data and categories' into different construction
sector such as small ,medium , large.
Analyze the data by using statistical method and give final conclusion .
Contents of quality control checklist
ORGANIZATION AND STRUCTURE OF COMPANY(QUALITY CONTROL & MAINTENANCE DIVISION)
SITE TRAINING AND TRAINING OF STAFF
STORAGE OF MATERIALS AND STOREKEEPING
PROVISION OF QUALITY CONTROL LAB
TESTS CONDUCTED ON VARIOUS MATERIALS
EQUIPMENTS , MATERIALS AND SPECIAL TECHNIQUES USED
LABOUR PRODUCTIVITY
ANALYTIC HIERARCHY PROCESS
A B C D E F GA 1 0.333333 0.2 0.142857 0.25 0.5 0.333333B 3 1 2 0.2 3 5 0.25C 5 0.5 1 0.166667 4 0.333333 0.142857D 7 5 6 1 4 7 3E 4 0.333333 0.25 0.25 1 4 0.5F 2 0.2 3 0.142857 0.25 1 0.25G 3 4 7 0.333333 2 4 1
TOTAL 25 11.36667 19.45 2.235714 14.5 21.83333 5.47619
AVERAGE %
A 0.04 0.029326 0.010283 0.063898 0.017241 0.022901 0.06087 0.034931 3.493111B 0.12 0.087977 0.102828 0.089457 0.206897 0.229008 0.045652 0.125974 12.59739C 0.2 0.043988 0.051414 0.074547 0.275862 0.015267 0.026087 0.098167 9.816653D 0.28 0.439883 0.308483 0.447284 0.275862 0.320611 0.547826 0.374278 37.42785E 0.16 0.029326 0.012853 0.111821 0.068966 0.183206 0.091304 0.093925 9.392515F 0.08 0.017595 0.154242 0.063898 0.017241 0.045802 0.045652 0.060633 6.063283G 0.12 0.351906 0.359897 0.149095 0.137931 0.183206 0.182609 0.212092 21.2092
1 100
A) ORGANIZATION AND STRUCTURE OF COMPANY(QUALITY CONTROL & MAINTENANCE DIVISION)B) SITE TRAINING AND TRAINING OF STAFFC) STORAGE OF MATERIALS AND STOREKEEPINGD) PROVISION OF QUALITY CONTROL LABE) TESTS CONDUCTED ON VARIOUS MATERIALSF) EQUIPMENTS , MATERIALS AND SPECIAL TECHNIQUES USEDG) LABOUR PRODUCTIVITY
Results
A B C D E F G0
5
10
15
20
25
30
35
40
3.49311087158407
12.59739330457349.81665347776985
37.4278453775501
9.392514883331076.06328280973321
21.2091992754583
RESULT (AHP)
RESULT (AHP)
Results
3.4931108715840712.5973933045734
9.81665347776985
37.4278453775501
9.39251488333107
6.06328280973321
21.2091992754583
RESULT (AHP)
A B C D E F G
CONCLUSION
All the parameters and clauses mentioned in the questionnaire show equal importance for achieving the total quality, but according to the AHP Analysis we can make a conclusion that organization and structure of the company that is maintenance and quality control division have a very low weightage which highlights that the above parameter lacks its formation which is causing a setback in the achievement of the working quality.
The second parameter which has the highest weightage and ranking that is quality control laboratory gives us a true impression that the quality control of the materials while execution achieves the desired standards.
But altogether all the parameters are very much important for the achievement of the quality during the middle stage construction order.