    Quality control Notes

  • 8/12/2019 Quality Control in Production Management

    2/68

    TOPICS

    Standards and specifications, Quality Assurance and QualityCircles

    Statistical Quality Control

    Control Charts for Variables- Average, Range and S.D.,

    Control charts for Attributes- fraction defective and number ofdefects,

    Acceptance Sampling Plans, OC Curve,

    Work Study,

    Various techniques in the Methods Study for identifying the most

    appropriate method. Work measurement - its uses and different methods,

    computation of allowance and allowed time.

  • 8/12/2019 Quality Control in Production Management

    3/68

    INTRODUCTION

    The act of determining conformance or non-

    conformance of the expected performance is

    the function of inspection.

    Basis for inspection is usually aspecification: inspection standard or

    quality standard

  • 8/12/2019 Quality Control in Production Management

    4/68

    QUALITY

    Sum of att r ibutes or propert iesthat

    describe the product.

    The quality of product or service is a

    customerspercept ion of the degree towhich the product or service meets his or

    her expectat ions.

    It is anasset which may be offered to thepotential customer of a product or a service.

    CD LEWIS

  • 8/12/2019 Quality Control in Production Management

    5/68

    QQuest of excellence

    U- understanding customers needs

    AAction to achieve customers appreciation

    L- Leadershipdetermination to be a leader

    I- Involving all people

    TTeam spirit to work for a common goal Yyardstick to measure progress.

  • 8/12/2019 Quality Control in Production Management

    6/68

    QUALITY CHARACTERISTICS

    Technical

    Psychological

    Time based items

    Contractual

    ethical

  • 8/12/2019 Quality Control in Production Management

    7/68

    TYPES OF QUALITY

    Kanos : Indifferent quality, expected quality, one

    dimensional quality, exciting quality

    Shibas: Quality level-1: fitness to standard

    Quality level2: fitness to needs

    Quality level3: fitness to costs (preventive,

    appraisal, internal failure- rework,retest,downgrading , external failure

    Quality level -4: fitness to hidden needs

  • 8/12/2019 Quality Control in Production Management

    8/68

    DIMENSIONS OF PRODUCT

    QUALITY

    Performanceintended use

    Features - appeal

    Reliabilitylikelihood of breakdowns/repairs

    conformances

    Serviceabilityspeed, cost and convenienceof repairs & maintenance

    Appearance Deniability

    Perceived quality

  • 8/12/2019 Quality Control in Production Management

    9/68

    QUALITY CONTROL

    All those functions or activities that must be

    performed to fulfill the companys quality

    objectives

    According to Bethe, Atwater and Stackman:

    It is systemat ic con trol of those var iables

    encountered in a manufacturing process which

    affect the excellence of the end product. Suchvariables result from the appl icat ion of

    materials, men, machines and manu factu r ing

    cond i t ions

  • 8/12/2019 Quality Control in Production Management

    10/68

    Dr. W.EDWARDS DEMING

    Set quality standards

    P- Plan, D- Do( produce), CCheck(inspect,

    feedback), AActcorrection of process

    Replan for long-term quality control

    14 principles

    Quality control is the technique of management for achieving

    required standard of products

    PDCA cycle

  • 8/12/2019 Quality Control in Production Management

    11/68

    OBJECTIVES OF QUALITY

    CONTROL

    Assess the quality

    Satisfies the need of the customers

    Take necessary remedial steps

    Suggest suitable improvements

    Develop quality consciousness

    Assess the various techniqes Reduce wastages

  • 8/12/2019 Quality Control in Production Management

    12/68

    FUNCTIONS OF QUALITY

    CONTROL DEPARTMENT Design the product/servicemeets the customers

    requirement/safety

    Pass instructions and provide information/solutionproductionpersonnel

    Use standards materials/components

    Train staff/operators

    Develop quality awareness

    Evaluate critically the functioning of inspection,design andproduction department

    Reduce scrap, wastage & spoilage After sales service- satisfactory level

    To prevent rather than detect defectives

    Adoption of various measures/develop processess

  • 8/12/2019 Quality Control in Production Management

    13/68

    IMPORTANCE/ADVANTAGES OF

    QUALITY CONTROL Reduction of costs

    Improvement in the morale of employees

    Maximum utilization of resources

    Increase in sales

    Consumers/employees satisfaction

    Improves reputation

    Uniformity in quality

    Manufacturer and consumer relations

    Improvement in technical knowledge, design,process

    Higher operating efficiency

  • 8/12/2019 Quality Control in Production Management

    14/68

    STEPS IN QUALITY CONTROL

    Control of engineering quality

    assist, review,validate,audit,provide info

    Control of purchase material quality

    Assist,review,assure,intiate

    Control of manufacturing quality

    Evaluate &

    approve,assure,establish,perform,collect &

    analyse,,initiate,conduct,control Actions supporting the product after delivery

    QUALITY CONTROL IN MANUFACTURING ORGANISATION:

    Inspection: How often, when, where

    SQC

  • 8/12/2019 Quality Control in Production Management

    15/68

    Quality control through STANDARDS

    Documentsacceptable conditions orbehaviours

    Base-line

    Minimum criteria Written or unwritten

    Voluntary or mandatory

    Relative to time, materials, performance ,reliability and appearance or any quantifiablecharacteristics

  • 8/12/2019 Quality Control in Production Management

    16/68

    DIFFERENT STANDARDS Preparation of technical specification

    Procurement of raw material Engineering and design specification

    Manufacturing specifications

    Administrative specifications

    Test specifications

    Product specifications Preparation of standards on procedures and equipment used for

    inspection and testing

    Preparation of standards on manufacturing process, methodsand tooling

    Preparation of codes of practice to be used for guidance during

    manufacturing or inspection Preparation of standards on types and design of final products.

    Company level, group level, national levelBIS, international level - ISO

  • 8/12/2019 Quality Control in Production Management

    17/68

    PURPOSE OF STANDARDS

    Educate, simplify,conserve, base upon which

    to certify

  • 8/12/2019 Quality Control in Production Management

    18/68

    SPECIFICATIONS

    Marketing dept --- designengineering dept----committeeprepares detailedspecifications

    SPECIFICATIONS: detailed descriptions orlisting of the characteristics of material partsand components used in making a product.

    Technical specifications

    Performance specifications

    brand name

  • 8/12/2019 Quality Control in Production Management

    19/68

    QUALITY CONTROL METHODS

    Just in timestockless production/repetitive

    manufacturing system

    Quality at the source

    Inspection

    SQC

    Quality circles

  • 8/12/2019 Quality Control in Production Management

    20/68

    QUALITY CIRCLES

    A small group of employees who meet

    regularly to undertake work related

    projectsdesigned to improve working

    conditions, spur mutual self-development andto advance the company, all by using quality

    control concepts

    A steering committee of top managementofficials, facilitators, circle leaders and circle

    members.

  • 8/12/2019 Quality Control in Production Management

    21/68

    QUALITY CIRCLES

    Quality control

    Selfdevelopment

    Mutual development

    Flowcontrol

    Improvement within workshop

  • 8/12/2019 Quality Control in Production Management

    22/68

    FEATURES OF QUALITY CIRCLE

    Smoothens the production, creates

    confidence and trust among each other

    Voluntary participating groups

    Managements support

    Involves task performance

    Leads to continuous improvement

    Instructed and informal teams

  • 8/12/2019 Quality Control in Production Management

    23/68

    OBJECTIVE OF QUALITY CIRCLE

    Generating ideas

    Motivate

    Improve quality

    Identifying and solving problems

    Self development and mutual development.

  • 8/12/2019 Quality Control in Production Management

    24/68

    TECHNIQUES ADOPTED - QC

    Brain storming

    Cause and effect analysisherring bone or

    fish bone diagramgraphic aid

    Pareto diagrams

    Control charts

    Flow diagrams and process flow chart

    Data or information collection

  • 8/12/2019 Quality Control in Production Management

    25/68

    STAGES OF ADOPTION - QC

    1. Conduct general awareness programmes

    2. Quality circles are formed in the requiredareas.( 810 employees)

    3. First meetingleaders , facilitators ,choosen, steering committee formed

    4. Problem identifiedsolutions andalternativesrecommended to mgt.

    5. Suggestions and recommendationsstudied and implemented

  • 8/12/2019 Quality Control in Production Management

    26/68

    ADVANTAGES OF QC

    Preventing and problem solving attitude

    Promoted job involvement and sense of

    participation

    Improves quality and productivity

    Inspires team work and develop creativity

    and innovative spirit.

    Achieve cost reduction

    Develop job satisfaction

  • 8/12/2019 Quality Control in Production Management

    27/68

    QUALITY ASSURANCE

    It is the assu rance given to customersthat

    the purchased product to containing specified

    characteristics and is fit for the intended

    purpose. It is defined as the sys tem of pol ic ies,

    pro cedures and guidel inesthat establishes

    and maintains specified standards of productquality.

  • 8/12/2019 Quality Control in Production Management

    28/68

    STEPS FOR QUALITY ASSURANCE

    Assurance of

    Physical and chemical properties in a product

    Fitness of the product for its intended use

    Rated performance by the product

  • 8/12/2019 Quality Control in Production Management

    29/68

    ELEMENTS OF QA SYSTEM

    Customer

    prioritiesOrg. capacitiesQM objectives

    EMPLOYEESInputs

    Goods production

    System

    outputs

    Service

    Delivery

    system

    customers

    Product quality specifications

    QUALITY MONITORING

    Data about

    customer

    preferences

    Data about employeeExperience and skills

  • 8/12/2019 Quality Control in Production Management

    30/68

    TYPES OF INSPECTION

    Process

    Key point

    Shop centralised

    Final inspection and testing

    Inspection, SQC, automated control

    Inspection is the art of applying tests, preferably

    by the aid of measuring appliances to observe whether

    a given item or product is within the specified limits

    of variability or not

  • 8/12/2019 Quality Control in Production Management

    31/68

    SQCprocess control

    Settingup a process control system:

    Choose the characteristic for process control

    Choose the measurement method

    Choose an appropriate sampling procedure

    Choose the type of control chart

    Calculate the control limits

    Plot the data and analyse

  • 8/12/2019 Quality Control in Production Management

    32/68

    CONTROL CHART

    Determines the process variability anddetects unusual variations

    Ensures product quality level.

    Warns, rectifies Information about selection of process &

    setting of Tolerance Limits

    Builds reputation through customerssatisfaction

    Central limit theorem99.73% - 3 SD

  • 8/12/2019 Quality Control in Production Management

    33/68

    ACCEPTANCE SAMPLING It is the process of inferring the quality of a large

    numbers of items ( a batch or lot) based on thequality of a small sample of the items.

    For incoming and outgoing materials

    Acceptable quality:no. of defectives items in thesample is less than or equal to the specifiednumber.

    Average outgoing quality: the average no. ofdefects in a lot.

    AOQ = AVERAGE NO. OF DEFECTIVES X 100/NO.

    OF ITEMS IN LOT Average outgoing limitthe maximum quality

    which can be passed on the average

  • 8/12/2019 Quality Control in Production Management

    34/68

    AVERAGE OUTGOING QUALITY

    LEVEL

    It is a measure of the average or expected %

    of defective items that the producer would

    ship to the consumer under varying

    conditions of proportion defectives

  • 8/12/2019 Quality Control in Production Management

    35/68

    TYPES OF ACCEPTANCE SAMPLING

    PLANS

    Single sampling plan: nno. of items, acceptance numberc.

    Defective > centire lot reject or inspected 100

    % One sample selected, economical, easy, lower

    cost

    Double sampling plan:

    Sample size n1: c2 reject,between c1 & c2,take second sample n2, n1+ n2 :total no. of defectives exceed c2 : reject.

  • 8/12/2019 Quality Control in Production Management

    36/68

    Multiple sampling plansequential

    sampling plan:

    Natural extension of double sampling plan

    Sample size n1based on cut-off pointsto

    continue with one or more sample

    Choice of alternatives Smaller first samples

    Difficult, higher overhead cost

    Lower total inspection

    Some risk of making wrong inference

    Success depends on - randomness

  • 8/12/2019 Quality Control in Production Management

    37/68

    WORK STUDY

    Method study: to study and standardise methods of

    work for a job

    Work measurement : to measure work content of a

    job Both result in high productivity

    Aim:to assist mgt. to use available :

    human

    and material (plant and equipment ) resources effectivelypredetermined objectives

    Better ways of doing work and avoiding waste in all forms

  • 8/12/2019 Quality Control in Production Management

    38/68

    USES OF WORK STUDY

    Manufacturing budget

    Production plan

    Personnel policies

    Material planning

  • 8/12/2019 Quality Control in Production Management

    39/68

    OBJECTIVES OF METHOD STUDY

    Better design of plant, buildings andequipment

    Improved layout of factories and offices

    Effective material handling Better working conditions & environment

    Job satisfaction

    High standards of safety and health Improved flow of work and reduced time span

    Std

  • 8/12/2019 Quality Control in Production Management

    40/68

    Applications of method study

    Standardisationprocedures and methods

    Smooth flow of work

    Effective handling

    Better safety standards

    Improved layout, design, working conditions,

    achievement

    Effective utilization

    Reduce expenses

  • 8/12/2019 Quality Control in Production Management

    41/68

    STEPS IN METHOD STUDY

    1. Select

    2. Record

    3. Examine

    4.

    Developbestmethod, mosteconomical, practical,effective

    5. Installstandard

    practice

    6. Maintainregularchecks

    WORKMEASUREMENT

    Select

    Record

    Examine

    Measure

    define

  • 8/12/2019 Quality Control in Production Management

    42/68

    RECORDING TECHNIQUES

    Chartsfor processes

    Outline process chart ( principal operations and inspectionmake ready, putaway, do )

    Flow process chart (of men, material or equipmentoperation(, inspection( , transport ( , delay (D) and storage( )

    Two handed process charthands & limbs Multiple activity chartsimultaneousinterrelated activities of

    operators/machine

    SIMOSimultaneous motion cyclemovement of bodytherbligs

    Timerecordsdiagrams and models Flow & string diagram

    Two or three dimensional models

    Cycle graphs or chrono cycle graphs

  • 8/12/2019 Quality Control in Production Management

    43/68

    SIMO

    Based on film analysis

    To record simultaneously on the common

    time scale the therbligs/group of therbligs

    performed by different parts of the body ofone or more workers

  • 8/12/2019 Quality Control in Production Management

    44/68

    FLOW DIAGRAM

    Relative position of production machinery,

    jigs, fixturesand marks the path followed by

    men & materials

  • 8/12/2019 Quality Control in Production Management

    45/68

    STRING DIAGRAM

    Model or a scale plan of the shop, in which

    every machine or equipment is marked and a

    peg/pin is truck by or in the area representing

    the facility. A continous coloured thread/string traces

    the path taken up by men or materials while

    performing the operation

  • 8/12/2019 Quality Control in Production Management

    46/68

    CYCLE GRAPH

    Micro-motion studygraphic technique

    Small electric bulb attached to finger/other

    &photographed by still camerapath of light

  • 8/12/2019 Quality Control in Production Management

    47/68

    CHRONO CYCLE GRAPH

    Interrupter placed in electric circuit with the

    bulbflashed quickly & off slowlypath of

    lightdotted line with pear shaped

    Space between the dotsspeed

    Size and shapeacceleration/retardation

    No.of dots

  • 8/12/2019 Quality Control in Production Management

    48/68

    MOTION STUDYpart of method

    study

    Formal engineering analysis of motions

    performed to accomplish work

    Motion or movement of limbs

    Motion study consist of dividing work into themost fundamental elements possible;

    studying these elements separately and in

    relation to one another and from thesestudied elements when times, building

    methods of least waste.

  • 8/12/2019 Quality Control in Production Management

    49/68

  • 8/12/2019 Quality Control in Production Management

    50/68

    TECHNIQUES AVAIBLABLE

    WORK STUDY

    1. Time study

    2. Synthesis

    3. Analytical estimating

    4. Activity sampling

    5. Predetermined motion time standards

    (PMTS)

  • 8/12/2019 Quality Control in Production Management

    51/68

    1.TIME STUDY/STOP WATCH

    STUDY

    Work measurement technique which records

    the times and working rate for the

    constituents of a specified job performed

    under certain conditions. and also analyses the data to ascertain the

    time required to perform a job at a predefined

    level.

  • 8/12/2019 Quality Control in Production Management

    52/68

    OBJECTIVES OF TIME STUDY

    the quantity of human work -specified task

    establish the std time - avg worker working at anormal pace

    Basis of comparison

    Set labour std

    Determine std costs, requirements, basic/normaltime, no. of machineshandle

    Balance the work

    Basis for setting piece rate or incentive wages

    Schedules, cycle time

  • 8/12/2019 Quality Control in Production Management

    53/68

    Types of allowances

    Fixed allowances (personal needs and basic fatigue)

    Relaxation allowancesrest,compensatory rest, fatigue

    Variable allowances( stress & strain, environmental)

    Policy allowance Process allowance5% of basic time

    Special allowancepermanent/temporary

    Interference allowance

    Periodic activity allowance

    contingency

  • 8/12/2019 Quality Control in Production Management

    54/68

    2. SYNTHESIS

    Used where time study techniques can be

    avoided.

    Std time computed by adding various

    elemental times- work Std datamade availablelibrary

    Used for estimating labour timescost

    estimates

  • 8/12/2019 Quality Control in Production Management

    55/68

    3. ANALYTICAL ESTIMATING

    Determine the time values for jobs, having longand non-repetitive operations

    Time values determined : synthetic data or pastexperience

    PROCEDURE:1. Find out job detailsstd procedure,dimension

    2. Break the job into its elements

    3. Select time values from the std datasynthetic data

    4.

    Estimate the time valuespast knowledge or exp.5. Add the time3 , 4- total basic/normal time

    6. Add the relaxation allowance

    7. Add any other allowancesarrive std. time

    4 ACT T SA P G /

  • 8/12/2019 Quality Control in Production Management

    56/68

    4.ACTIVITY SAMPLING /WORK

    SAMPLING

    Involves defining the state of working,

    observing the job over time and computing

    the portion of time the worker is working

    Ratio delay/snap reading method ofobserving

    Method of finding the ratio of delay and work

    element to the total process time by randomobservations

    Process, machines or workers

    USES OF WORK SAMPLING

  • 8/12/2019 Quality Control in Production Management

    57/68

    USES OF WORK SAMPLING

    TECHNIQUES

    Estimate the percentage of a protracted timeperiod consumed by various activity states

    Determine allowances

    Nature of distribution of work activities Estimate the % of utilisation of

    machines/equip

    Indicate the usage

    Bases for indirect labour time stds

    Determine Std time

    PROCEDURE FOR WORK

  • 8/12/2019 Quality Control in Production Management

    58/68

    PROCEDURE FOR WORK

    SAMPLING STUDY

    Identify the activities

    Calculate the time proportion

    Choose the derived accuracy while arriving at

    study results

    Calculate specific times for each

    Recompute the required sample at least at 2

    - 3 levels

    5 PREDETERMINED MOTION TIME

  • 8/12/2019 Quality Control in Production Management

    59/68

    5. PREDETERMINED MOTION TIME

    SYSTEM

    Technique by which normal or basic times

    are established for basic human motions and

    these time values are used to build up the

    time for a job at the defined level ofperformance

    Observing or thinking

    Types of PMTS: Methods time measurement (MTM)

  • 8/12/2019 Quality Control in Production Management

    60/68

    1. METHODS TIME MEASURMENT

    Predetermined time values for basic motions

    or therbligsTMU (time measurement units) 1 TMU = 10 power of -5 hr

    2. Work factor:

    basic motions which are modified elementsof difficultymovement slowermodifies

    basic time value

    3. Basic motion times (BMT)Times were derived from the laboratory

    experiments -

    PROCEDURE OF PMTS

  • 8/12/2019 Quality Control in Production Management

    61/68

    PROCEDURE OF PMTS

    Observe the job or think it

    Itemize the job elements

    Record std for each motion units

    Find the sum of the stds

    Estimate the allowance :

    Total sum is the predetermined time std for

    the job.

  • 8/12/2019 Quality Control in Production Management

    62/68

    Total Quality Management

    New Thinking About Quality

    Old Quality is smallq New Quality is BigQ

    About products About organisations

    Technical Strategic

    For inspectors For everyone

    Led by experts Led by Management

    High grade The appropriate grade

    About control About improvement

  • 8/12/2019 Quality Control in Production Management

    63/68

  • 8/12/2019 Quality Control in Production Management

    64/68

    Principles of Total Quality

    1. Focus on the customer (Both internal & external

    2. Participation and Team work

    3. Employee involvement and empowerment

    4. Continuous improvement and learning.

    Q li H bi

  • 8/12/2019 Quality Control in Production Management

    65/68

    Quality Habit

  • 8/12/2019 Quality Control in Production Management

    66/68

    Three Levels of Quality

    1. Organisation level Meeting external customerrequirements

    2. .Process level Meeting the needs of internal

    customers3. Performer level (job level Meeting the requirements of

    or task design level) accuracy, completeness innovation,

    timeliness and cost.

  • 8/12/2019 Quality Control in Production Management

    67/68

    END OF UNIT III

    QUALITY MOVEMENT IN INDIA

  • 8/12/2019 Quality Control in Production Management

    68/68

    QUALITY MOVEMENT IN INDIA

    Heritagemonuments,handicrafts US, Japan1950s

    1980SConsolidated, synergy by pioneering effortsof CII

    Walter Shewartfather of SQC visited india for3mths (1947- 1948): initiated SQC

    Dr. Edward Demingdeming cycle 1950s

    Dr. Juran

    Launch of TQM1980striggered movement inindia.