Quality control Notes
-
8/12/2019 Quality Control in Production Management
2/68
TOPICS
Standards and specifications, Quality Assurance and QualityCircles
Statistical Quality Control
Control Charts for Variables- Average, Range and S.D.,
Control charts for Attributes- fraction defective and number ofdefects,
Acceptance Sampling Plans, OC Curve,
Work Study,
Various techniques in the Methods Study for identifying the most
appropriate method. Work measurement - its uses and different methods,
computation of allowance and allowed time.
-
8/12/2019 Quality Control in Production Management
3/68
INTRODUCTION
The act of determining conformance or non-
conformance of the expected performance is
the function of inspection.
Basis for inspection is usually aspecification: inspection standard or
quality standard
-
8/12/2019 Quality Control in Production Management
4/68
QUALITY
Sum of att r ibutes or propert iesthat
describe the product.
The quality of product or service is a
customerspercept ion of the degree towhich the product or service meets his or
her expectat ions.
It is anasset which may be offered to thepotential customer of a product or a service.
CD LEWIS
-
8/12/2019 Quality Control in Production Management
5/68
QQuest of excellence
U- understanding customers needs
AAction to achieve customers appreciation
L- Leadershipdetermination to be a leader
I- Involving all people
TTeam spirit to work for a common goal Yyardstick to measure progress.
-
8/12/2019 Quality Control in Production Management
6/68
QUALITY CHARACTERISTICS
Technical
Psychological
Time based items
Contractual
ethical
-
8/12/2019 Quality Control in Production Management
7/68
TYPES OF QUALITY
Kanos : Indifferent quality, expected quality, one
dimensional quality, exciting quality
Shibas: Quality level-1: fitness to standard
Quality level2: fitness to needs
Quality level3: fitness to costs (preventive,
appraisal, internal failure- rework,retest,downgrading , external failure
Quality level -4: fitness to hidden needs
-
8/12/2019 Quality Control in Production Management
8/68
DIMENSIONS OF PRODUCT
QUALITY
Performanceintended use
Features - appeal
Reliabilitylikelihood of breakdowns/repairs
conformances
Serviceabilityspeed, cost and convenienceof repairs & maintenance
Appearance Deniability
Perceived quality
-
8/12/2019 Quality Control in Production Management
9/68
QUALITY CONTROL
All those functions or activities that must be
performed to fulfill the companys quality
objectives
According to Bethe, Atwater and Stackman:
It is systemat ic con trol of those var iables
encountered in a manufacturing process which
affect the excellence of the end product. Suchvariables result from the appl icat ion of
materials, men, machines and manu factu r ing
cond i t ions
-
8/12/2019 Quality Control in Production Management
10/68
Dr. W.EDWARDS DEMING
Set quality standards
P- Plan, D- Do( produce), CCheck(inspect,
feedback), AActcorrection of process
Replan for long-term quality control
14 principles
Quality control is the technique of management for achieving
required standard of products
PDCA cycle
-
8/12/2019 Quality Control in Production Management
11/68
OBJECTIVES OF QUALITY
CONTROL
Assess the quality
Satisfies the need of the customers
Take necessary remedial steps
Suggest suitable improvements
Develop quality consciousness
Assess the various techniqes Reduce wastages
-
8/12/2019 Quality Control in Production Management
12/68
FUNCTIONS OF QUALITY
CONTROL DEPARTMENT Design the product/servicemeets the customers
requirement/safety
Pass instructions and provide information/solutionproductionpersonnel
Use standards materials/components
Train staff/operators
Develop quality awareness
Evaluate critically the functioning of inspection,design andproduction department
Reduce scrap, wastage & spoilage After sales service- satisfactory level
To prevent rather than detect defectives
Adoption of various measures/develop processess
-
8/12/2019 Quality Control in Production Management
13/68
IMPORTANCE/ADVANTAGES OF
QUALITY CONTROL Reduction of costs
Improvement in the morale of employees
Maximum utilization of resources
Increase in sales
Consumers/employees satisfaction
Improves reputation
Uniformity in quality
Manufacturer and consumer relations
Improvement in technical knowledge, design,process
Higher operating efficiency
-
8/12/2019 Quality Control in Production Management
14/68
STEPS IN QUALITY CONTROL
Control of engineering quality
assist, review,validate,audit,provide info
Control of purchase material quality
Assist,review,assure,intiate
Control of manufacturing quality
Evaluate &
approve,assure,establish,perform,collect &
analyse,,initiate,conduct,control Actions supporting the product after delivery
QUALITY CONTROL IN MANUFACTURING ORGANISATION:
Inspection: How often, when, where
SQC
-
8/12/2019 Quality Control in Production Management
15/68
Quality control through STANDARDS
Documentsacceptable conditions orbehaviours
Base-line
Minimum criteria Written or unwritten
Voluntary or mandatory
Relative to time, materials, performance ,reliability and appearance or any quantifiablecharacteristics
-
8/12/2019 Quality Control in Production Management
16/68
DIFFERENT STANDARDS Preparation of technical specification
Procurement of raw material Engineering and design specification
Manufacturing specifications
Administrative specifications
Test specifications
Product specifications Preparation of standards on procedures and equipment used for
inspection and testing
Preparation of standards on manufacturing process, methodsand tooling
Preparation of codes of practice to be used for guidance during
manufacturing or inspection Preparation of standards on types and design of final products.
Company level, group level, national levelBIS, international level - ISO
-
8/12/2019 Quality Control in Production Management
17/68
PURPOSE OF STANDARDS
Educate, simplify,conserve, base upon which
to certify
-
8/12/2019 Quality Control in Production Management
18/68
SPECIFICATIONS
Marketing dept --- designengineering dept----committeeprepares detailedspecifications
SPECIFICATIONS: detailed descriptions orlisting of the characteristics of material partsand components used in making a product.
Technical specifications
Performance specifications
brand name
-
8/12/2019 Quality Control in Production Management
19/68
QUALITY CONTROL METHODS
Just in timestockless production/repetitive
manufacturing system
Quality at the source
Inspection
SQC
Quality circles
-
8/12/2019 Quality Control in Production Management
20/68
QUALITY CIRCLES
A small group of employees who meet
regularly to undertake work related
projectsdesigned to improve working
conditions, spur mutual self-development andto advance the company, all by using quality
control concepts
A steering committee of top managementofficials, facilitators, circle leaders and circle
members.
-
8/12/2019 Quality Control in Production Management
21/68
QUALITY CIRCLES
Quality control
Selfdevelopment
Mutual development
Flowcontrol
Improvement within workshop
-
8/12/2019 Quality Control in Production Management
22/68
FEATURES OF QUALITY CIRCLE
Smoothens the production, creates
confidence and trust among each other
Voluntary participating groups
Managements support
Involves task performance
Leads to continuous improvement
Instructed and informal teams
-
8/12/2019 Quality Control in Production Management
23/68
OBJECTIVE OF QUALITY CIRCLE
Generating ideas
Motivate
Improve quality
Identifying and solving problems
Self development and mutual development.
-
8/12/2019 Quality Control in Production Management
24/68
TECHNIQUES ADOPTED - QC
Brain storming
Cause and effect analysisherring bone or
fish bone diagramgraphic aid
Pareto diagrams
Control charts
Flow diagrams and process flow chart
Data or information collection
-
8/12/2019 Quality Control in Production Management
25/68
STAGES OF ADOPTION - QC
1. Conduct general awareness programmes
2. Quality circles are formed in the requiredareas.( 810 employees)
3. First meetingleaders , facilitators ,choosen, steering committee formed
4. Problem identifiedsolutions andalternativesrecommended to mgt.
5. Suggestions and recommendationsstudied and implemented
-
8/12/2019 Quality Control in Production Management
26/68
ADVANTAGES OF QC
Preventing and problem solving attitude
Promoted job involvement and sense of
participation
Improves quality and productivity
Inspires team work and develop creativity
and innovative spirit.
Achieve cost reduction
Develop job satisfaction
-
8/12/2019 Quality Control in Production Management
27/68
QUALITY ASSURANCE
It is the assu rance given to customersthat
the purchased product to containing specified
characteristics and is fit for the intended
purpose. It is defined as the sys tem of pol ic ies,
pro cedures and guidel inesthat establishes
and maintains specified standards of productquality.
-
8/12/2019 Quality Control in Production Management
28/68
STEPS FOR QUALITY ASSURANCE
Assurance of
Physical and chemical properties in a product
Fitness of the product for its intended use
Rated performance by the product
-
8/12/2019 Quality Control in Production Management
29/68
ELEMENTS OF QA SYSTEM
Customer
prioritiesOrg. capacitiesQM objectives
EMPLOYEESInputs
Goods production
System
outputs
Service
Delivery
system
customers
Product quality specifications
QUALITY MONITORING
Data about
customer
preferences
Data about employeeExperience and skills
-
8/12/2019 Quality Control in Production Management
30/68
TYPES OF INSPECTION
Process
Key point
Shop centralised
Final inspection and testing
Inspection, SQC, automated control
Inspection is the art of applying tests, preferably
by the aid of measuring appliances to observe whether
a given item or product is within the specified limits
of variability or not
-
8/12/2019 Quality Control in Production Management
31/68
SQCprocess control
Settingup a process control system:
Choose the characteristic for process control
Choose the measurement method
Choose an appropriate sampling procedure
Choose the type of control chart
Calculate the control limits
Plot the data and analyse
-
8/12/2019 Quality Control in Production Management
32/68
CONTROL CHART
Determines the process variability anddetects unusual variations
Ensures product quality level.
Warns, rectifies Information about selection of process &
setting of Tolerance Limits
Builds reputation through customerssatisfaction
Central limit theorem99.73% - 3 SD
-
8/12/2019 Quality Control in Production Management
33/68
ACCEPTANCE SAMPLING It is the process of inferring the quality of a large
numbers of items ( a batch or lot) based on thequality of a small sample of the items.
For incoming and outgoing materials
Acceptable quality:no. of defectives items in thesample is less than or equal to the specifiednumber.
Average outgoing quality: the average no. ofdefects in a lot.
AOQ = AVERAGE NO. OF DEFECTIVES X 100/NO.
OF ITEMS IN LOT Average outgoing limitthe maximum quality
which can be passed on the average
-
8/12/2019 Quality Control in Production Management
34/68
AVERAGE OUTGOING QUALITY
LEVEL
It is a measure of the average or expected %
of defective items that the producer would
ship to the consumer under varying
conditions of proportion defectives
-
8/12/2019 Quality Control in Production Management
35/68
TYPES OF ACCEPTANCE SAMPLING
PLANS
Single sampling plan: nno. of items, acceptance numberc.
Defective > centire lot reject or inspected 100
% One sample selected, economical, easy, lower
cost
Double sampling plan:
Sample size n1: c2 reject,between c1 & c2,take second sample n2, n1+ n2 :total no. of defectives exceed c2 : reject.
-
8/12/2019 Quality Control in Production Management
36/68
Multiple sampling plansequential
sampling plan:
Natural extension of double sampling plan
Sample size n1based on cut-off pointsto
continue with one or more sample
Choice of alternatives Smaller first samples
Difficult, higher overhead cost
Lower total inspection
Some risk of making wrong inference
Success depends on - randomness
-
8/12/2019 Quality Control in Production Management
37/68
WORK STUDY
Method study: to study and standardise methods of
work for a job
Work measurement : to measure work content of a
job Both result in high productivity
Aim:to assist mgt. to use available :
human
and material (plant and equipment ) resources effectivelypredetermined objectives
Better ways of doing work and avoiding waste in all forms
-
8/12/2019 Quality Control in Production Management
38/68
USES OF WORK STUDY
Manufacturing budget
Production plan
Personnel policies
Material planning
-
8/12/2019 Quality Control in Production Management
39/68
OBJECTIVES OF METHOD STUDY
Better design of plant, buildings andequipment
Improved layout of factories and offices
Effective material handling Better working conditions & environment
Job satisfaction
High standards of safety and health Improved flow of work and reduced time span
Std
-
8/12/2019 Quality Control in Production Management
40/68
Applications of method study
Standardisationprocedures and methods
Smooth flow of work
Effective handling
Better safety standards
Improved layout, design, working conditions,
achievement
Effective utilization
Reduce expenses
-
8/12/2019 Quality Control in Production Management
41/68
STEPS IN METHOD STUDY
1. Select
2. Record
3. Examine
4.
Developbestmethod, mosteconomical, practical,effective
5. Installstandard
practice
6. Maintainregularchecks
WORKMEASUREMENT
Select
Record
Examine
Measure
define
-
8/12/2019 Quality Control in Production Management
42/68
RECORDING TECHNIQUES
Chartsfor processes
Outline process chart ( principal operations and inspectionmake ready, putaway, do )
Flow process chart (of men, material or equipmentoperation(, inspection( , transport ( , delay (D) and storage( )
Two handed process charthands & limbs Multiple activity chartsimultaneousinterrelated activities of
operators/machine
SIMOSimultaneous motion cyclemovement of bodytherbligs
Timerecordsdiagrams and models Flow & string diagram
Two or three dimensional models
Cycle graphs or chrono cycle graphs
-
8/12/2019 Quality Control in Production Management
43/68
SIMO
Based on film analysis
To record simultaneously on the common
time scale the therbligs/group of therbligs
performed by different parts of the body ofone or more workers
-
8/12/2019 Quality Control in Production Management
44/68
FLOW DIAGRAM
Relative position of production machinery,
jigs, fixturesand marks the path followed by
men & materials
-
8/12/2019 Quality Control in Production Management
45/68
STRING DIAGRAM
Model or a scale plan of the shop, in which
every machine or equipment is marked and a
peg/pin is truck by or in the area representing
the facility. A continous coloured thread/string traces
the path taken up by men or materials while
performing the operation
-
8/12/2019 Quality Control in Production Management
46/68
CYCLE GRAPH
Micro-motion studygraphic technique
Small electric bulb attached to finger/other
&photographed by still camerapath of light
-
8/12/2019 Quality Control in Production Management
47/68
CHRONO CYCLE GRAPH
Interrupter placed in electric circuit with the
bulbflashed quickly & off slowlypath of
lightdotted line with pear shaped
Space between the dotsspeed
Size and shapeacceleration/retardation
No.of dots
-
8/12/2019 Quality Control in Production Management
48/68
MOTION STUDYpart of method
study
Formal engineering analysis of motions
performed to accomplish work
Motion or movement of limbs
Motion study consist of dividing work into themost fundamental elements possible;
studying these elements separately and in
relation to one another and from thesestudied elements when times, building
methods of least waste.
-
8/12/2019 Quality Control in Production Management
49/68
-
8/12/2019 Quality Control in Production Management
50/68
TECHNIQUES AVAIBLABLE
WORK STUDY
1. Time study
2. Synthesis
3. Analytical estimating
4. Activity sampling
5. Predetermined motion time standards
(PMTS)
-
8/12/2019 Quality Control in Production Management
51/68
1.TIME STUDY/STOP WATCH
STUDY
Work measurement technique which records
the times and working rate for the
constituents of a specified job performed
under certain conditions. and also analyses the data to ascertain the
time required to perform a job at a predefined
level.
-
8/12/2019 Quality Control in Production Management
52/68
OBJECTIVES OF TIME STUDY
the quantity of human work -specified task
establish the std time - avg worker working at anormal pace
Basis of comparison
Set labour std
Determine std costs, requirements, basic/normaltime, no. of machineshandle
Balance the work
Basis for setting piece rate or incentive wages
Schedules, cycle time
-
8/12/2019 Quality Control in Production Management
53/68
Types of allowances
Fixed allowances (personal needs and basic fatigue)
Relaxation allowancesrest,compensatory rest, fatigue
Variable allowances( stress & strain, environmental)
Policy allowance Process allowance5% of basic time
Special allowancepermanent/temporary
Interference allowance
Periodic activity allowance
contingency
-
8/12/2019 Quality Control in Production Management
54/68
2. SYNTHESIS
Used where time study techniques can be
avoided.
Std time computed by adding various
elemental times- work Std datamade availablelibrary
Used for estimating labour timescost
estimates
-
8/12/2019 Quality Control in Production Management
55/68
3. ANALYTICAL ESTIMATING
Determine the time values for jobs, having longand non-repetitive operations
Time values determined : synthetic data or pastexperience
PROCEDURE:1. Find out job detailsstd procedure,dimension
2. Break the job into its elements
3. Select time values from the std datasynthetic data
4.
Estimate the time valuespast knowledge or exp.5. Add the time3 , 4- total basic/normal time
6. Add the relaxation allowance
7. Add any other allowancesarrive std. time
4 ACT T SA P G /
-
8/12/2019 Quality Control in Production Management
56/68
4.ACTIVITY SAMPLING /WORK
SAMPLING
Involves defining the state of working,
observing the job over time and computing
the portion of time the worker is working
Ratio delay/snap reading method ofobserving
Method of finding the ratio of delay and work
element to the total process time by randomobservations
Process, machines or workers
USES OF WORK SAMPLING
-
8/12/2019 Quality Control in Production Management
57/68
USES OF WORK SAMPLING
TECHNIQUES
Estimate the percentage of a protracted timeperiod consumed by various activity states
Determine allowances
Nature of distribution of work activities Estimate the % of utilisation of
machines/equip
Indicate the usage
Bases for indirect labour time stds
Determine Std time
PROCEDURE FOR WORK
-
8/12/2019 Quality Control in Production Management
58/68
PROCEDURE FOR WORK
SAMPLING STUDY
Identify the activities
Calculate the time proportion
Choose the derived accuracy while arriving at
study results
Calculate specific times for each
Recompute the required sample at least at 2
- 3 levels
5 PREDETERMINED MOTION TIME
-
8/12/2019 Quality Control in Production Management
59/68
5. PREDETERMINED MOTION TIME
SYSTEM
Technique by which normal or basic times
are established for basic human motions and
these time values are used to build up the
time for a job at the defined level ofperformance
Observing or thinking
Types of PMTS: Methods time measurement (MTM)
-
8/12/2019 Quality Control in Production Management
60/68
1. METHODS TIME MEASURMENT
Predetermined time values for basic motions
or therbligsTMU (time measurement units) 1 TMU = 10 power of -5 hr
2. Work factor:
basic motions which are modified elementsof difficultymovement slowermodifies
basic time value
3. Basic motion times (BMT)Times were derived from the laboratory
experiments -
PROCEDURE OF PMTS
-
8/12/2019 Quality Control in Production Management
61/68
PROCEDURE OF PMTS
Observe the job or think it
Itemize the job elements
Record std for each motion units
Find the sum of the stds
Estimate the allowance :
Total sum is the predetermined time std for
the job.
-
8/12/2019 Quality Control in Production Management
62/68
Total Quality Management
New Thinking About Quality
Old Quality is smallq New Quality is BigQ
About products About organisations
Technical Strategic
For inspectors For everyone
Led by experts Led by Management
High grade The appropriate grade
About control About improvement
-
8/12/2019 Quality Control in Production Management
63/68
-
8/12/2019 Quality Control in Production Management
64/68
Principles of Total Quality
1. Focus on the customer (Both internal & external
2. Participation and Team work
3. Employee involvement and empowerment
4. Continuous improvement and learning.
Q li H bi
-
8/12/2019 Quality Control in Production Management
65/68
Quality Habit
-
8/12/2019 Quality Control in Production Management
66/68
Three Levels of Quality
1. Organisation level Meeting external customerrequirements
2. .Process level Meeting the needs of internal
customers3. Performer level (job level Meeting the requirements of
or task design level) accuracy, completeness innovation,
timeliness and cost.
-
8/12/2019 Quality Control in Production Management
67/68
END OF UNIT III
QUALITY MOVEMENT IN INDIA
-
8/12/2019 Quality Control in Production Management
68/68
QUALITY MOVEMENT IN INDIA
Heritagemonuments,handicrafts US, Japan1950s
1980SConsolidated, synergy by pioneering effortsof CII
Walter Shewartfather of SQC visited india for3mths (1947- 1948): initiated SQC
Dr. Edward Demingdeming cycle 1950s
Dr. Juran
Launch of TQM1980striggered movement inindia.