QUALITY ASSURANCE QUALITY ASSURANCE TRAINING TRAINING
DOE O 414.1C DOE O 414.1C ANDAND
10 CFR 830, SUBPART A10 CFR 830, SUBPART AInstructor:
10/24/05 Revision 0 2
LEARNING OBJECTIVESLEARNING OBJECTIVES
• Articulate the Underlying Principles of Quality Assurance
• Discuss the interrelationships between Quality Assurance, Integrated Safety Management, and the Price-Anderson Amendments Act
• List Basic Quality Assurance Requirements
• Apply Quality Assurance to Your Work
10/24/05 Revision 0 3
PRESENTATION OUTLINEPRESENTATION OUTLINE
• Introduction– History
• Definitions• DOE Quality Assurance Program
– Responsibilities– Total Management System Overview– DOE Quality Assurance Culture– QA Rule and Order Integration
• Total Management System & Underlying Principles of:– Quality Assurance– Integrated Safety Management– Price-Anderson Amendments Act
• QA Program Basic Requirements & Criteria• Summary
10/24/05 Revision 0 4
INTRODUCTIONINTRODUCTION
Brief History of Quality Assurance• 1954 AEC issued QC-1, Weapons Quality Policy• 1969 AEC issued QAP standard for AEC reactors• 1970 AEC published 18 QA criteria 10 CFR 50, App. B• 1971 AEC & industry begin developing ANSI/ASME
standards QAP requirements, guidance, & work practices for nuclear power plant design & construction
• 1972 ANS issued standard for admin controls during power plant operation
• 1975 ASME NQA committee established• 1975 – 2004 Successive revisions to ASME QA
requirements, ASME NQA-1-2004 most recent revision.• 1980-2004 Successive revisions to DOE QA requirements,
DOE O 414.1C (2004) most recent revision.• 1994 DOE issued 10 CFR 830, Nuclear Safety Management
10/24/05 Revision 0 5
INTRODUCTION (continued)INTRODUCTION (continued)
• The Quality Assurance Program is part of a Total Management System
• Programmatic, but bottom line is it’s about:– People– The work they perform, and– Common sense
DEFINITIONSDEFINITIONS
10/24/05 Revision 0 7
QUALITY DEFINITIONSQUALITY DEFINITIONS
• Quality:The condition achieved when an item, service or process meets or exceeds the users’ requirements or expectations.
• Quality Assurance (QA):All those actions that provide confidence that quality is achieved.
• Quality Assurance Program (QAP):A management system established to assign responsibilities and authorities, define policies and requirements, and provide for the performance and assessment of work.
10/24/05 Revision 0 8
QUALITY DEFINITIONS (continued)QUALITY DEFINITIONS (continued)
• Graded Approach: The process of ensuring that actions used
to comply with a requirement are commensurate with:
• The relative importance to safety, safeguards, and security;
• The magnitude of any hazard involved;• The life cycle stage, mission and characteristics of a
facility;• The relative importance of hazards; and• Any other relevant factor.
10/24/05 Revision 0 9
QUALITY DEFINITIONS (continued)QUALITY DEFINITIONS (continued)
• System: An integrated composite of people, products, and processes that provide a capability to satisfy a stated need or objective.
• Management System:A set of interrelated processes that provides personnel what they need to effectively perform work which results in a product or service consistently meeting requirements and expectations.
DOE QUALITY ASSURANCE DOE QUALITY ASSURANCE PROGRAMPROGRAM
10/24/05 Revision 0 11
RESPONSIBLITIES FOR RESPONSIBLITIES FOR QUALITY ASSURANCEQUALITY ASSURANCE
MANAGERSMANAGERSRESPONSIBLE AND ACCOUNTABLE FOR ALL ASPECTS OF
QUALITY OF PERFORMANCE, INCLUDING PLANNING, ORGANIZATION, DIRECTION, CONTROL, AND SUPPORT
ASSESSORSASSESSORS RESPONSIBLE FOR EVALUATING EFFECTIVENESS
TO ACHIEVE QUALITY OF PERFORMANCE, IDENTIFY DEFICIENCIES, AND
ENSURE CORRECTIONS
PERFORMERSPERFORMERSRESPONSIBLE FOR ACHIEVING QUALITY OF
PERFORMANCE SO AS TO ENSURE SAFETY AND RELIABILITY
10/24/05 Revision 0 12
TOTAL MANAGEMENT SYSTEM TOTAL MANAGEMENT SYSTEM EXPECTATIONEXPECTATION
Total Management System integrates systems, programs, and processes utilizing Rules, Orders, other applicable Standards and Guides, and Best Industry Practices to achieve safe, reliable results.
10/24/05 Revision 0 13
ISM Orders/Guides Rules PAAA NQA-1 ISO INPO QC-1 Lessons Learned ANSI ASQ Best Practices Other Standards
TOTAL MANAGEMENT SYSTEMTOTAL MANAGEMENT SYSTEM
10/24/05 Revision 0 14
QUALITY ASSURANCE PROGRAM IS QUALITY ASSURANCE PROGRAM IS PART OF A TOTAL MANAGEMENT PART OF A TOTAL MANAGEMENT
SYSTEMSYSTEM
• Objectives/goals are to:– Ensure requirements & expectations are met– Provide confidence in achieved results– Comply with applicable regulations &
requirements
• Fundamental to Total Management System
• Applies to all work
10/24/05 Revision 0 15
DOE QA CULTURE REFLECTED IN DOE QA CULTURE REFLECTED IN TOTAL MANAGEMENT SYSTEMTOTAL MANAGEMENT SYSTEM
• Quality is everyone's responsibility • All contribute to quality in a concerted & cost
effective manner• Achieving quality products & services is the measure
of success• Quality achievement is verified or validated by either
individuals or groups other than those who performed the work.
• Quality is "built in" by providing every person:– Correct training, resources, and motivation– Focus to safely do the job right the first time
• Assessors of work are:– Technically knowledgeable and performance oriented– Focused on improving quality
10/24/05 Revision 0 16
The QA RULE, QA ORDER, & PAAAThe QA RULE, QA ORDER, & PAAA
• 10 CFR 830, Nuclear Safety Management
• Subpart A applies to all contractors at DOE nuclear facilities (including radiological facilities)
• DOE O 414.1 applies to DOE elements and contractors
• Price-Anderson Amendments Act establishes requirements, indemnification and enforcement
UNDERLYING PRINCIPLESUNDERLYING PRINCIPLES
QUALITY ASSURANCEINTEGRATED SAFETY MANAGEMENT
PRICE-ANDERSON AMMENDEMENTS ACT
10/24/05 Revision 0 18
QUALITY ASSURANCE (QA) QUALITY ASSURANCE (QA) UNDERLYING PRINCIPLES UNDERLYING PRINCIPLES
1. Define policies and objectives. Ensure they are understood and accepted.
2. Specify roles, responsibilities, & authorities. Ensure they are understood and accepted.
3. Specify and communicate expectations. Identify & allocate resources to achieve them.
4. Establish a culture that is conducive to quality achievement and continuous improvement.
10/24/05 Revision 0 19
QUALITY ASSURANCE (QA) QUALITY ASSURANCE (QA) UNDERLYING PRINCIPLES UNDERLYING PRINCIPLES
(continued)(continued)5. Ensure people are competent at the
work they do.6. Ensure the right people have the
right tools and information at the right time.
7. Seek and use relevant experience.8. Plan and control the work.9. Use the right materials, tools, and
processes. Control any changes to them.
10/24/05 Revision 0 20
QUALITY ASSURANCE (QA)QUALITY ASSURANCE (QA)UNDERLYING PRINCIPLES UNDERLYING PRINCIPLES
(continued)(continued)
10. Assess work to ensure it meets expectations.
11. Identify and remedy errors and deficiencies.
12. Periodically review management processes to improve effectiveness and efficiency.
10/24/05 Revision 0 21
INTEGRATED SAFETY INTEGRATED SAFETY MANAGEMENT (ISM) - MANAGEMENT (ISM) -
UNDERLYING PRINCIPLESUNDERLYING PRINCIPLES1. Line management responsibility for safety2. Clear roles and responsibilities3. Competence commensurate with
responsibilities4. Balanced priorities5. Identification of safety standards and
requirements6. Hazard controls tailored to work being
performed7. Operations Authorization
10/24/05 Revision 0 22
INTEGRATED SAFETY INTEGRATED SAFETY MANAGEMENT (ISM) – CORE MANAGEMENT (ISM) – CORE
FUNCTIONSFUNCTIONS1. Define the Scope of Work2. Analyze the hazards3. Develop and implement hazard
controls4. Perform work within controls5. Provide feedback and continuous
improvement
10/24/05 Revision 0 23
QA CRITERIA/ISM PRINCIPLES AND QA CRITERIA/ISM PRINCIPLES AND FUNCTION CROSSWALK TABLEFUNCTION CROSSWALK TABLE
QA Criteria
ISM Requirements Pro
gra
m
Tra
inin
g &
Q
ua
lifi
ca
tio
n
Qu
ali
ty
Imp
rove
me
nt
Do
cu
me
nts
&
Re
co
rds
Wo
rk
Pro
ce
sse
s
De
sig
n
Pro
cu
rem
ent
Ins
pec
tio
n
Ac
ce
pt.
Te
st
Ma
nag
em
en
t A
ss
es
sm
en
t
Ind
ep
end
en
tA
ss
es
sm
en
t
Line Management Responsibilities X X X
Clear Roles & Responsibilities X X X X
Competence Commensurate Responsibilities
X X X X
Balanced Priorities X X X X
Define Work X X X X X X X
Analyze Hazards X X X X X X X
Identify Safety Standards, Requirements & Develop & Implement Controls
X X X X X X X
Operations Authorization/ControlsX X X X X X
Feedback & Improvement X X X X X X
QA Criteria
ISM Requirements Pro
gra
m
Tra
inin
g &
Q
ua
lifi
ca
tio
n
Qu
ali
ty
Imp
rove
me
nt
Do
cu
me
nts
&
Re
co
rds
Wo
rk
Pro
ce
sse
s
De
sig
n
Pro
cu
rem
ent
Ins
pec
tio
n
Ac
ce
pt.
Te
st
Ma
nag
em
en
t A
ss
es
sm
en
t
Ind
ep
end
en
tA
ss
es
sm
en
t
QA Criteria
ISM Requirements Pro
gra
m
Tra
inin
g &
Q
ua
lifi
ca
tio
n
Qu
ali
ty
Imp
rove
me
nt
Do
cu
me
nts
&
Re
co
rds
Wo
rk
Pro
ce
sse
s
De
sig
n
Pro
cu
rem
ent
Ins
pec
tio
n
Ac
ce
pt.
Te
st
Ma
nag
em
en
t A
ss
es
sm
en
t
Ind
ep
end
en
tA
ss
es
sm
en
t
Line Management Responsibilities X X X
Clear Roles & Responsibilities X X X X
Line Management Responsibilities X X X
Clear Roles & Responsibilities X X X X
Competence Commensurate Responsibilities
X X X XCompetence Commensurate Responsibilities
X X X X
Balanced Priorities X X X XBalanced Priorities X X X X
Define Work X X X X X X XDefine Work X X X X X X X
Analyze Hazards X X X X X X X
Identify Safety Standards, Requirements & Develop & Implement Controls
X X X X X X X
Analyze Hazards X X X X X X X
Identify Safety Standards, Requirements & Develop & Implement Controls
X X X X X X X
Operations Authorization/ControlsX X X X X X
Operations Authorization/ControlsX X X X X X
Feedback & Improvement X X X X X XFeedback & Improvement X X X X X X
10/24/05 Revision 0 24
PRICE-ANDERSON AMENDMENTS PRICE-ANDERSON AMENDMENTS ACT (PAAA) - PURPOSEACT (PAAA) - PURPOSE
• Promotes protection of the environment, health, and safety of the public and workers
• Indemnifies (insures) DOE contractors against public liability due to a nuclear incident
• Establishes nuclear safety requirements
• Provides DOE enforcement authority
QUALITY ASSURANCE PROGRAMQUALITY ASSURANCE PROGRAM
BASIC REQUIREMENTSAND
CRITERIA
10/24/05 Revision 0 26
BASIC QA PROGRAM BASIC QA PROGRAM REQUIREMENTSREQUIREMENTS
• Rule & Order Requirements and Applicability
• Consensus Standards• Integration of Requirements• Responsibilities for a Documented &
Approved Management System• Flow-down of QA Program Requirements• QA Criteria
10/24/05 Revision 0 27
QA RULE & ORDER REQUIREMENTS QA RULE & ORDER REQUIREMENTS AND APPLICABILITYAND APPLICABILITY
Order– Enforceable by contract– Applicability/Scope– Responsibilities– Definitions (consistent)– Graded Approach– Consensus Standards– Integration of Requirements– Flow-down of Requirements– Criteria (same)– Safety Software
Requirements– S/CI Prevention
Requirements – CAMP (Feds)
Rule– Enforceable by law– Applicability/Scope – Responsibilities– Definitions (consistent)– Graded Approach– Consensus Standards– Integration of
Requirements– Flow-down of
Requirements– Criteria (same)
10/24/05 Revision 0 28
CONSENSUS STANDARDS CONSENSUS STANDARDS • Consensus Standards must be used to
develop and implement the QA Program– Appropriate standards include ASME NQA-1, ISO
9001, ANSI/ASQ Z1.13– Must be practicable and consistent with contractual or
regulatory requirements• ASME NQA-1, Quality Assurance
Requirements for Nuclear Facility Applications – Key national consensus standard for nuclear quality &
safety– Unique focus on nuclear facilities & activities – Single most rigorous and comprehensive standard– First choice for DOE nuclear facility applications– Supports compliance with DOE QA Requirements– Establishes criteria for the performance of work
10/24/05 Revision 0 29
DOE QA CRITERIA/NQA-1-2004 DOE QA CRITERIA/NQA-1-2004 REQUIREMENTS CROSSWALKREQUIREMENTS CROSSWALK
X X X X X X X 10. Independent Assess.
X X 9. Management Assess.
X X X X 8. Inspect & Accept. Test
X X 7. Procurement
X 6 Design
X X X X X X 5. Work Processes
X X X 4. Documents & Records
X X X 3. Quality Improvement
X 2. Training & Qualification
X X 1. Program
18
. Au
dit
s
17
. QA
Re
co
rds
16
. Co
rre
cti
ve A
cti
on
15
. Co
ntr
ol
of
No
nc
on
form
ing
Ite
ms
14
. In
sp
ecti
on
, T
es
t, &
O
pe
rati
ng
Sta
tus
13
. Ha
nd
lin
g, S
tora
ge
, &
Sh
ipp
ing
12
. Co
ntr
ol
of
Mea
su
rin
g &
T
est
Eq
uip
me
nt
11
. Te
st
Co
ntr
ol
10
. In
sp
ecti
on
9.
Co
ntr
ol
of
Sp
ecia
l P
roc
es
ses
8.
Ide
nti
fic
ati
on
& C
on
tro
l o
f It
em
s
7.
Co
ntr
ol
of
Pu
rch
as
ed
Ite
ms
& S
erv
ice
s
6.
Do
cu
me
nt
Co
ntr
ol
5.
Ins
tru
cti
on
s,
Pro
ce
du
res
&
Dra
win
gs
4.P
roc
ure
men
t D
oc
. C
on
tro
l
3.
De
sig
n C
on
tro
l
2.
QA
Pro
gra
m
1.
Org
aniz
ati
on
NQA-1-2004 Requirements
DOE QA Criteria
10/24/05 Revision 0 30
CONSENSUS STANDARDS - CONSENSUS STANDARDS - ContinuedContinued
• ISO 9001-2000, Quality Management System– Applies to all types of organizations that are involved in
non-nuclear activities– Based on 8 quality management principles– ISO chose these principles because they can be used to
improve organizational performance and achieve success
• ANSI/ASQ Z1.13, Quality Guide for Research, 1999– Applies to non-nuclear research activities– This document can be used in the development of a
quality system for basic and applied research.
10/24/05 Revision 0 31
CONSENSUS STANDARDS - CONSENSUS STANDARDS - ContinuedContinued
• Standards for Specific Applications – Address unique/specific work activities such as:
• Development and use of safety software – ASME NQA-1-2000 (Required by DOE O 414.1C)
• Establishing the competence of a testing and calibration laboratory – ISO 17025
10/24/05 Revision 0 32
INTEGRATION OF REQUIREMENTSINTEGRATION OF REQUIREMENTS
• Quality Assurance requirements as defined in Rule and/or QA Order must be integrated with Safety Management System including:– Suspect/Counterfeit Items (S/CI)– Corrective Action Management Program
(CAMP)– Safety Quality Assurance (SQA)
10/24/05 Revision 0 33
ROLES AND RESPONSIBILITIES
• EH roles and responsibilities for a documented and approved Management System:– DOE’s independent element responsible for safety
of the public, worker and environment– Develops and maintains QA policy requirements,
guides, and standards for all DOE work– Provides advise and assistance to DOE elements
and contractors implementing DOE QA policy– Identifies and proposes resolutions for crosscutting
QA issues– Develops and maintains the EH QAP
10/24/05 Revision 0 34
ROLES AND RESPONSIBILITIES - - Continued
• PSO roles and responsibilities for a documented and approved Management System:– Ensure HQ, field elements, and contractors
implement the requirements in the QA Order– Set priorities and schedule for compliance– Provide direction and resources, including
prioritization, for implementing the QA requirements– Review and approve QAPs or other documents that
include implementation approaches for the QA requirements
– Design and implement line management oversight programs
10/24/05 Revision 0 35
FLOWDOWN OF QA PROGRAM FLOWDOWN OF QA PROGRAM REQUIREMENTSREQUIREMENTS
• Quality Assurance Program must:– Flow-down requirements to subcontractors and
suppliers to ensure criteria are satisfied– Flow-down should employ graded approach so
that subcontractor requirements are commensurate with subcontractor scope of work
• Requirement in both the QA Rule and Order
10/24/05 Revision 0 36
QUALITY ASSURANCE CRITERIAQUALITY ASSURANCE CRITERIA
BASICBASIC
REQUIREMENTSREQUIREMENTS
PERFORMANCEMANAGEMENT
5. WORK PROCESSES
6. DESIGN 7. PROCUREMENT 8. INSPECTION &
ACCEPTANCE TESTING
9. MANAGEMENT ASSESSMENT
10.INDEPENDENT ASSESSMENT
1. PROGRAM2. PERSONNEL
TRAINING & QUALIFICATION
3. QUALITY IMPROVEMENT
4. DOCUMENTS & RECORDS
ASSESSMENT
More detail on each of the 10 criteria to follow.
QUALITY ASSURANCE CRITERIAQUALITY ASSURANCE CRITERIA
10/24/05 Revision 0 38
QA CRITERIA QA CRITERIA
• Management/Criterion 1—Program– Establish an organizational structure, functional
responsibilities, levels of authority, and interfaces for those managing, performing, and assessing work.
– Establish management processes, including planning, scheduling, and providing resources for work.
• Key Elements– Senior management ownership– Performance objectives established– Responsibilities, authorities, and interfaces established– Individuals empowered– Application based on graded approach
10/24/05 Revision 0 39
QA CRITERIA QA CRITERIA (continued)
• Management/Criterion 2—Personnel Training and Qualification– Train and qualify personnel to be capable of performing
assigned work.– Provide continuing training to personnel to maintain job
proficiency.
• Key Elements– Affects all personnel– Stimulate professional development– Designed to address specific needs– Maintain proficiency and promote improvement– Conduct on-going review of training effectiveness
10/24/05 Revision 0 40
QA CRITERIA QA CRITERIA (continued)
• Management/Criterion 3—Quality Improvement– Establish & implement processes to detect and prevent
quality problems.– Identify, control, and correct items, services, and
processes that do not meet established requirements.– Identify the causes of problems, and include prevention of
recurrence as a part of corrective action planning.– Review item characteristics, process implementation, &
other quality-related information to identify items, services, & processes needing improvement.
• Key Elements– Standards and measures for performance– Problem identification, control, resolution, and follow-up– Cause analysis– Continuous improvement– Prevent problems
10/24/05 Revision 0 41
QA CRITERIA QA CRITERIA (continued)
• Management/Criterion 4—Documents and Records– Prepare, review, approve, issue, use, and
revise documents to prescribe processes, specify requirements, or establish design.
– Specify, prepare, review, approve, and maintain records.
• Key Elements– Scope of documents and records defined– Documents identified and controlled– Records identified and controlled
10/24/05 Revision 0 42
QA CRITERIA QA CRITERIA (continued)
• Performance/Criterion 5—Work Processes– Perform work consistent with technical standards,
administrative controls, and hazard controls adopted to meet regulatory or contract requirements using approved instructions, procedures, etc.
– Identify and control items to ensure their proper use.– Maintain items to prevent their damage, loss, or
deterioration.– Calibrate and maintain equipment used for process
monitoring or data collection.
• Key Elements– Management provides training, resources, and direction– Employees are responsible for their work– Review and improve processes
10/24/05 Revision 0 43
QA CRITERIA QA CRITERIA (continued)
• Performance/Criterion 6—Design– Design items and processes using sound engineering/scientific
principles and appropriate standards.– Incorporate applicable requirements and design bases in
design work and design changes.– Identify and control design interfaces.– Verify/validate the adequacy of design products using
individuals or groups other than those who performed the work.
– Verify/validate work before approval and implementation of the design.
• Key Elements– Design based on sound engineering/scientific principles– Changes must be justified– Interfaces must be identified and coordinated– Verification must be conducted
10/24/05 Revision 0 44
QA CRITERIA QA CRITERIA (continued)
• Performance/Criterion 7—Procurement– Procure items and services that meet established
requirements and perform as specified.– Evaluate and select prospective suppliers on the basis
of specified criteria.– Establish and implement processes to ensure that
approved suppliers continue to provide acceptable items and services.
• Key Elements– Procured items and services must perform as specified
and meet requirements– Use qualified suppliers– Acceptance of procured items and services in
accordance with specified methodology
10/24/05 Revision 0 45
QA CRITERIA QA CRITERIA (continued)
• Performance/Criterion 8—Inspection and Acceptance Testing– Inspect and test specified items, services, and
processes using established acceptance and performance criteria.
– Calibrate and maintain equipment used for inspections & tests.
• Key Elements– Inspection
• Conducted by, or for, the line organization• Inspection criteria specified
– Acceptance Testing• Conducted by or for the line organization• Test and acceptance criteria specified
10/24/05 Revision 0 46
QA CRITERIA QA CRITERIA (continued)
• Assessment/Criterion 9—Management AssessmentEnsure that managers assess their management
processes and identify and correct problems that hinder the organization from achieving its objectives.
• Key Elements– Focuses on broad categories of management
issues– Addresses how well integrated management
system is working– Management responsibility and participation
10/24/05 Revision 0 47
QA CRITERIA QA CRITERIA (continued)
• Assessment/Criterion 10—Independent Assessment– Plan and conduct independent assessments to measure
item and service quality and the adequacy of work performance & to promote improvement.
– Establish sufficient authority and freedom from line management for independent assessment teams.
– Ensure that persons conducting independent assessments are technically qualified and knowledgeable in the areas to be assessed.
• Key Elements– Implemented by independent organization representing
senior management– Performance-based approach– Technically knowledgeable personnel– Focus on improving performance– Scheduling based on performance
10/24/05 Revision 0 48
SUMMARYSUMMARYAPPLYING QA TO YOUR WORKAPPLYING QA TO YOUR WORK
• Quality Assurance for all work is based on the development and maintenance of a single, integrated, effective Total Management System
• Each manager and worker must review and comply with QA requirements in planning and executing work
• Each employee is responsible for:– Achieving and maintaining quality– Maximizing reliability and performance of work products,
while– Minimizing environmental, safety, and health risks and
impacts
10/24/05 Revision 0 49
DOE QA INFORMATION SOURCESDOE QA INFORMATION SOURCES
• DOE G 414.1-1A, 05/31/2001, Management Assessment and Independent Assessment Guide
• DOE G 414.1-2A, 06/17/2005, Quality Assurance Management System Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance
• DOE G 414.1-3, 11/03/2004, Suspect/Counterfeit Items Guide for Use with 10 CFR 830 Subpart A, Quality Assurance Requirements
• DOE G 414.1-4, 06/17/2005, Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance
BACKUP SLIDESBACKUP SLIDES
10/24/05 Revision 0 51
SUPPLEMENTAL HIGH-RELIABILITY SUPPLEMENTAL HIGH-RELIABILITY PRINCIPLESPRINCIPLES
• Highly-Reliable Operational Performance• Individual Attitude and Responsibility• Performance Assurance• Organizational Performance Improvement