Quality assurance team - activities in the Netherlands (February-July 2013)

6
Quality assurance team - activities in the Netherlands (February-July 2013) IVN presentation – Nazilli meeting October 2013

description

Quality assurance team - activities in the Netherlands (February-July 2013). IVN presentation – Nazilli meeting October 2013. Agricultural College for VET and pre-VET students aged from 12 – 20 years. FEIGHT-partner AOC Nordwin College In the Province of Fryslan - PowerPoint PPT Presentation

Transcript of Quality assurance team - activities in the Netherlands (February-July 2013)

Page 1: Quality assurance team -  activities in the Netherlands (February-July 2013)

Quality assurance team - activities in the

Netherlands(February-July 2013)

IVN presentation – Nazilli meeting October 2013

Page 2: Quality assurance team -  activities in the Netherlands (February-July 2013)

Agricultural College for VET and pre-VETstudents aged from 12 – 20 years

FEIGHT-partnerAOC Nordwin College

In the Province of Fryslan(North-Netherlands)

Page 3: Quality assurance team -  activities in the Netherlands (February-July 2013)

AOC Nordwin College- 5 school locations- 1500 students- key role for Sustainabilityin curriculum and buildings

- Solar panels on every building- Eco-Schools

Page 4: Quality assurance team -  activities in the Netherlands (February-July 2013)

AOC Nordwin CollegeEco-teams = Quality assurance team FEIGHT

Early school leaving Nordwin College 2006 – ca 12 % - -> 2012 – ca 6 %(quality staff; individual student approach; absence system)

FEIGHT- Start Nordwin-location Buitenpost- Project Schools for Sustainability

(real assignment)- Peer education- Multiple intelligence

Page 5: Quality assurance team -  activities in the Netherlands (February-July 2013)

AOC Nordwin CollegeFEIGHT resultslocation Buitenpost - Q A teamleader4 locations (2013-2014) - new Q A team

Page 6: Quality assurance team -  activities in the Netherlands (February-July 2013)

FEIGHT Finances (best whishes from Frank)

- Quarterly report- In Euro’s (exchange rate) Frank

- Staff costs (salary/working days/daily rate/translation)- Travel & Subsistence costs (limit)- Other costs

- 40% + 40% + 20%