Annexure-A
Page 1 of 5
SRLDC Agenda for 44th meeting of Commercial Sub-Committee of SRPC
1. Audit of SR DSM, RRAS & Reactive Energy accounts
The details of payments and disbursements of DSM, Reactive and RRAS accounts from 09.12.19 to 02.02.20 are tabled in Annexure-I, II & III in line with clause No.15 of Annexure-I (Section 6.1 (d) of CERC (IEGC) regulations, 2010 for audit by the Commercial sub Committee.
2. Reconciliation of DSM, RRAS and Reactive charges
Regional Entity-wise details of Deviation, RRAS and Reactive pool payment/receipt have been sent to the pool members on a monthly basis for the period from Dec’19 to Jan’20 for reconciliation. Status of Receipt of signed reconciliation statement is enclosed in Annexure IV. All other pool members who are yet to reconcile are once again requested to verify the statements compulsorily and send a signed copy to SRLDC for our records to enable us to comply with audit requirements .
3. Status of outstanding charges to the pool accounts.
A) Following are the outstanding payments to DSM pool account as on 25-02-2020 asinterest payable due to delayed weekly charges.
Sl. No. Constituent Interest payable (Rs.)
1 AP 21593 2 AZURE NPKUNTA 625 3 COASTAL ENERGEN 77932 4 GIREL TUTICORN 2088 5 LANCO ST-II 128166 6 LANCO ST-III 56801 7 MEL PH2 132232 8 MEL 26009 9 MYTRAH TUTICORIN 40844
10 SBE NPKUNTA 16 11 SBG Cleantech Pavagada 183 12 SEIL PROJECT II 23 13 SEL 41607 14 TATA NPKUNTA 543
Total 528663
The breakup of above outstating amount is enclosed in Annexure – V
Annexure-A
Page 2 of 5
B) Outstanding Weekly payments to DSM pool account as on 25-02-2020 is as below:
S.NO. Regional Entity Due to be paid to pool (Rs.)
1 AZURE NPKUNTA 247683 2 COASTAL ENERGEN 714907 3 MEL 19209169 4 MEL PH2 5221689 5 MYTRAH TUTICORIN 6159016 6 SEL 7933537
Total 39486001
The breakup of above outstanding amount is enclosed in Annexure – VI.
In this regard it is to mention that none of the above entities have opened LC in compliance of Cl.10.4 of CERC (Deviation Settlement Mechanism and related matters) Regulations, 2014.
“As per CERC deviation settlement mechanism & related matters regulations,2014 and any amendments thereof, the constituents to pay the deviation charge from time to time to a regional pool account known as ‘DSM pool’ maintained by the RLDC.
If any regional entity fails to make payment of charges for deviation including additional charges for deviation by the time specified in these regulations during the current financial year, it shall be required to open a letter of credit (LC) equal to 110% of weekly outstanding liability in favour of respective regional load despatch centre within a fortnight from the due date of payment.”
4. Reconciliation of Short Term Open Access (STOA) disbursements
The details of disbursements of CTU, STU & SLDC charges of STOA for the periodfrom Dec’19 to Jan’20 are enclosed in Annexure-VII. The same has been uploaded in SRLDC website on a monthly basis for verification and reconciliation. The statements for monthly reconciliation are available in SRLDC website in the path http://srldc.org >> Open Access >> STOA Reconciliation Statement >> STOA Refund Details / STU/SLDC Reconciliation / CTU Reconciliation. Disbursements made for which no discrepancy was pointed out are treated as reconciled. However, members may note that it is compulsory to return the signed copies of the statements as record for statutory audits.
Annexure-A
Page 3 of 5
5. PSDF fund transfer from SRLDC Status: as on 25.02.2020 is enclosed in Annexure VIII.
6. SEM Agenda: Tamil Nadu has yet to replace meters which have failed, the list is as mentioned in the following table. This issue has been already discussed in past CSCM. The status of the Replacement of meter may be intimated by TN
Station Name Location Description Meter No
Kaythar TK-50 400KV KARAIKUDI LINE 2 AT KAYTHAR NP-9634-A Kaythar TK-51 400KV KARAIKUDI LINE 1 AT KAYTHAR NP-9629-A THIRUVALEM TT-86 400KV BUS SECTION 2 AT THIRUVALAM (TNEB) NP-9626-A
7. Time Drift Portal: A web portal for uploading Time Drift Statements has been operationalized. Users can access it by going to SRLDC website>Commercial>SEM Time drift.All Time Drift Statements are to be uploaded in this portal without fail by the 1st Monday of the Month 1200 hrs. Particular users may have to enter the same weekly as directed by SRLDC.
8. Improvements in the Commercial Settlement of URS power :
8.1 In the present URS scheme, the beneficiary availing URS power has to pay the capacity charges, in addition to the variable cost for the quantum of power scheduled by him, under URS. It is currently treated as a temporary reallocation of Capacity. 8.2 The following practical problems of scheduling are currently observed i. Smaller beneficiary not getting power due to low schedule on generator ii. Frequent start and stop of machines due to deterrent of Fixed cost iii. No incentive to states who have scheduled bearing fixed cost using URS
8.3 Accordingly it has been proposed to discuss in CCM, the improved commercial
settlement of URS power . As per the new scheme with URS power with ZERO fixed cost liability is as follows.
i. If a beneficiary is helping ISGS generator to be on bar by scheduling over and above its
share in that station for meeting requirement of keeping machine available, then it should get the URS power with zero fixed cost for that portion.
ii. Original beneficiary can get schedule as per his entitlement in 4 time blocks as per existing scheduling mechanism.
iii. The fixed cost will be borne by the original beneficiary as per share allocation percentage up to the Technical minimum
iv. Any URS power availed above Technical minimum, the URS availed by a beneficiary shall bear the Fixed Cost.
v. There is no change in scheduling procedure at RLDC end in WBES.
Annexure-A
Page 4 of 5
vi. All commercial calculation shall be done by RPC at the end of the month along withREA .
vii. A separate sheet will be issued by RPC showing the booking of URS for commercialpayment.
viii. RLDC need to provide some extra data to RPC for preparation of this statement suchas, a. Normative DC & Tech Min of the stations under this scheme for the entire monthb. The URS Availed –Pro rata allocation from the Pool for the monthc. The URS breakup – The requisition available beneficiary wise for the month
8.4 Merits of this scheme:
i. There is utilization of power on merit order up to technical minimum basis since Fixedcost is not getting added, the URS power will get higher priority in MOD.
ii. There will be lesser start-stop of a machine.iii. Because of non-availability of power due to less schedule by bigger beneficiaries and
small beneficiary were constraint to bear his fixed costs if they take URS to keep theUnits on Bar
iv. Availability of machine during peak hours is automatically ensured.v. Better utilization of available coal stock.
vi. The beneficiary can always get his schedule back in four time blocks as per existingScheduling mechanism.
x----x----x
Annexure-A
Page 5 of 5
MEL* ₹ 171 17/08/2018 ₹ 0 ₹ 171
MEL* ₹ 116 17/08/2018 ₹ 0 ₹ 116
MEL PH2* ₹ 1,213 17/08/2018 ₹ 0 ₹ 1,213
MEL* ₹ 49 17/08/2018 ₹ 0 ₹ 49
MEL PH2* ₹ 308 17/08/2018 ₹ 0 ₹ 308
MEL PH2 * ₹ 1,228 21/09/2018 ₹ 0 ₹ 1,228
MEL* ₹ 85 21/09/2018 ₹ 0 ₹ 85
MEL PH2 * ₹ 995 21/09/2018 ₹ 0 ₹ 995
MEL PH2 * ₹ 8,882 21/09/2018 ₹ 0 ₹ 8,882
MEL PH2 * ₹ 5,145 21/09/2018 ₹ 0 ₹ 5,145
MEL PH2 * ₹ 2,242 21/09/2018 ₹ 0 ₹ 2,242
MEL PH2 * ₹ 3,449 19/10/2018 ₹ 0 ₹ 3,449
MEL PH2 * ₹ 906 19/10/2018 ₹ 0 ₹ 906
MEL PH2 * ₹ 1,157 19/10/2018 ₹ 0 ₹ 1,157
MEL* ₹ 29 19/10/2018 ₹ 0 ₹ 29
MEL PH2 * ₹ 1,145 19/10/2018 ₹ 0 ₹ 1,145
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2018/7161
dt.09.11.2018
MEL PH2* ₹ 951 19/11/2018 ₹ 0 ₹ 951
MEL PH2* ₹ 289 16-Dec-18 ₹ 0 ₹ 289
MEL PH2* ₹ 476 16-Dec-18 ₹ 0 ₹ 476
MEL PH2* ₹ 1,185 7-Jan-19 ₹ 0 ₹ 1,185
MEL PH2* ₹ 328 7-Jan-19 ₹ 0 ₹ 328
MEL PH2* ₹ 1,319 7-Jan-19 ₹ 0 ₹ 1,319
MEL PH2* ₹ 3,394 18-Feb-19 ₹ 0 ₹ 3,394
MEL PH2* ₹ 2,223 18-Feb-19 ₹ 0 ₹ 2,223
MEL PH2* ₹ 1,717 18-Feb-19 ₹ 0 ₹ 1,717
MEL PH2* ₹ 904 18-Feb-19 ₹ 0 ₹ 904
MEL PH2 * ₹ 1,994 18-Feb-19 ₹ 0 ₹ 1,994
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/1374
dt.11.03.2019
MEL PH2* ₹ 525 21-Mar-19 ₹ 0 ₹ 525
MEL PH2* ₹ 372 21-Apr-19 ₹ 0 ₹ 372
MEL PH2* ₹ 2,688 21-Apr-19 ₹ 0 ₹ 2,688
MEL PH2* ₹ 13,055 29-May-19 ₹ 0 ₹ 13,055
MEL PH2* ₹ 15,556 29-May-19 ₹ 0 ₹ 15,556
MEL PH2* ₹ 5,254 29-May-19 ₹ 0 ₹ 5,254
MEL PH2* ₹ 9,832 29-May-19 ₹ 0 ₹ 9,832
MEL PH2* ₹ 8,557 29-May-19 ₹ 0 ₹ 8,557
MEL PH2* ₹ 13,856 29-May-19 ₹ 0 ₹ 13,856
MEL PH2* ₹ 9,055 29-May-19 ₹ 0 ₹ 9,055
AP* ₹ 5,375 29-May-19 ₹ 0 ₹ 5,375
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2018/5972
dt.11.09.2018
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2018/6541
dt.09.10.2018
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2018/7649
dt.06.12.2018
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2018/212 dt.07.01.2019
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2018/875 dt.08.02.2019
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/13586
dt.19.06.2019
Interest for delayed payment as per SRPC
letter - SRPC/SE-I/DSM/2018/ dt. 07/08/18
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period Constituent
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/1913
dt.11.04.2019
Date of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
Annexure- A(I)
Page 1 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
MEL PH2* ₹ 5,397 18-Aug-19 ₹ 0 ₹ 5,397
MEL PH2* ₹ 4,912 18-Aug-19 ₹ 0 ₹ 4,912
MEL PH2* ₹ 1,722 18-Aug-19 ₹ 0 ₹ 1,722
AP* ₹ 118 18-Aug-19 ₹ 0 ₹ 118
SEL* ₹ 8,264 15-Sep-19 ₹ 0 ₹ 8,264
SEL* ₹ 6,599 15-Sep-19 ₹ 0 ₹ 6,599
SEL* ₹ 5,032 15-Sep-19 ₹ 0 ₹ 5,032
SEL* ₹ 4,793 15-Sep-19 ₹ 0 ₹ 4,793
SEL* ₹ 253 15-Sep-19 ₹ 0 ₹ 253
COASTAL ENERGEN* ₹ 60,669 15-Sep-19 7-Sep-19 ₹ 37,849 ₹ 22,820
PONDY ₹ 695 20-Oct-19 26-Dec-19 ₹ 695 ₹ 0
GIREL TUTICORN* ₹ 1,820 20-Oct-19 ₹ 1,820
COASTAL ENERGEN * ₹ 15,884 17-Nov-19 ₹ 0 ₹ 15,884
COASTAL ENERGEN * ₹ 12,205 17-Nov-19 ₹ 0 ₹ 12,205
COASTAL ENERGEN * ₹ 3,557 17-Nov-19 ₹ 0 ₹ 3,557
GIREL TUTICORN * ₹ 268 17-Nov-19 ₹ 0 ₹ 268
LANCO ST-II* ₹ 16,221 19-Dec-19 ₹ 0 ₹ 16,221
LANCO ST-II* ₹ 14,363 19-Dec-19 ₹ 0 ₹ 14,363
LANCO ST-II* ₹ 11,634 19-Dec-19 ₹ 0 ₹ 11,634
LANCO ST-II* ₹ 11,292 19-Dec-19 ₹ 0 ₹ 11,292
LANCO ST-II* ₹ 15,864 19-Dec-19 ₹ 0 ₹ 15,864
LANCO ST-II* ₹ 9,924 19-Dec-19 ₹ 0 ₹ 9,924
LANCO ST-II* ₹ 8,777 19-Dec-19 ₹ 0 ₹ 8,777
LANCO ST-II* ₹ 7,005 19-Dec-19 ₹ 0 ₹ 7,005
LANCO ST-II* ₹ 6,881 19-Dec-19 ₹ 0 ₹ 6,881
LANCO ST-II* ₹ 7,000 19-Dec-19 ₹ 0 ₹ 7,000
LANCO ST-II* ₹ 1,499 19-Dec-19 ₹ 0 ₹ 1,499
LANCO ST-III* ₹ 5,334 19-Dec-19 ₹ 0 ₹ 5,334
COASTAL ENERGEN* ₹ 1,675 19-Dec-19 ₹ 0 ₹ 1,675
MYTRAH TUTICORIN * ₹ 4,454 19-Dec-19 ₹ 0 ₹ 4,454
MYTRAH TUTICORIN* ₹ 7,345 19-Dec-19 ₹ 0 ₹ 7,345
SEL* ₹ 16,666 19-Jan-19 ₹ 0 ₹ 16,666
LANCO ST-III* ₹ 7,831 19-Jan-19 ₹ 0 ₹ 7,831
LANCO ST-III* ₹ 6,527 19-Jan-19 ₹ 0 ₹ 6,527
LANCO ST-III* ₹ 5,860 19-Jan-19 ₹ 0 ₹ 5,860
LANCO ST-III* ₹ 3,926 19-Jan-19 ₹ 0 ₹ 3,926
LANCO ST-III* ₹ 5,411 19-Jan-19 ₹ 0 ₹ 5,411
LANCO ST-III* ₹ 4,419 19-Jan-19 ₹ 0 ₹ 4,419
LANCO ST-III* ₹ 5,783 19-Jan-19 ₹ 0 ₹ 5,783
COASTAL ENERGEN* ₹ 16,262 19-Jan-19 10-Feb-20 ₹ 16,262 ₹ 0
LANCO ST-III* ₹ 3,987 19-Jan-19 ₹ 0 ₹ 3,987
MYTRAH, TUTICORIN ₹ 10,836 19-Jan-19 14-Feb-20 ₹ 10,836 ₹ -0
AP* ₹ 14,995 19-Jan-19 ₹ 0 ₹ 14,995
AZURE NPKUNTA* ₹ 357 19-Jan-19 ₹ 0 ₹ 357
TATA NPKUNTA* ₹ 229 19-Jan-19 ₹ 0 ₹ 229
MYTRAH, TUTICORIN ₹ 10,760 19-Jan-19 14-Feb-20 ₹ 10,760 ₹ 0
FRV NPKUNTA ₹ 511 19-Jan-19 31-Jan-20 ₹ 511 ₹ 0
MYTRAH, TUTICORIN ₹ 3,839 19-Jan-19 14-Feb-20 ₹ 3,839 ₹ 0
FRV II NPKUNTA ₹ 162 19-Jan-19 31-Jan-20 ₹ 162 ₹ 0
AP* ₹ 1,105 19-Jan-19 ₹ 0 ₹ 1,105
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/4976
dt.08.08.2019
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/5648
dt.05.09.2019
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/6393
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/7112
dt.07.11.2019
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2019/7910
dt.09.12.2019
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2020/368 dt.09.01.2020
Annexure- A(I)
Page 2 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
FRV NPKUNTA ₹ 1,878 19-Jan-19 31-Jan-20 ₹ 1,878 ₹ 0
TATA NPKUNTA* ₹ 314 19-Jan-19 ₹ 0 ₹ 314
FRV II NPKUNTA ₹ 643 19-Jan-19 31-Jan-20 ₹ 643 ₹ 0
ORANGE TUTICORIN ₹ 2,040 19-Jan-19 27-Jan-20 ₹ 2,040 ₹ 0
BETAM TUTICORIN ₹ 11 19-Jan-19 23-Jan-20 ₹ 11 ₹ 0
AZURE NPKUNTA* ₹ 268 19-Jan-19 ₹ 0 ₹ 268
LANCO ST-III* ₹ 6,609 16-Feb-19 ₹ 6,609
LANCO ST-II* ₹ 3,531 16-Feb-19 ₹ 3,531
MEL* ₹ 6,447 16-Feb-19 ₹ 6,447
LANCO ST-III* ₹ 1,115 16-Feb-19 ₹ 1,115
LANCO ST-II* ₹ 4,096 16-Feb-19 ₹ 4,096
MEL* ₹ 5,568 16-Feb-19 ₹ 5,568
LANCO ST-II* ₹ 3,808 16-Feb-19 ₹ 3,808
MEL* ₹ 5,141 16-Feb-19 ₹ 5,141
MYTRAH TUTICORIN* ₹ 535 16-Feb-19 ₹ 535
LANCO ST-II* ₹ 2,444 16-Feb-19 ₹ 2,444
MEL* ₹ 3,561 16-Feb-19 ₹ 3,561
COASTAL ENERGEN* ₹ 3,014 16-Feb-19 ₹ 3,014
MYTRAH TUTICORIN * ₹ 20,588 16-Feb-19 ₹ 20,588
LANCO ST-II * ₹ 2,006 16-Feb-19 ₹ 2,006
MEL* ₹ 2,715 16-Feb-19 ₹ 2,715
FRV NPKUNTA ₹ 2,133 16-Feb-19 19-Feb-20 ₹ 2,133 ₹ 0
FRV II NPKUNTA ₹ 5,901 16-Feb-19 19-Feb-20 ₹ 5,901 ₹ 0
MYTRAH TUTICORIN* ₹ 5,681 16-Feb-19 ₹ 5,681
LANCO ST-II* ₹ 1,345 16-Feb-19 ₹ 1,345
MEL* ₹ 2,128 16-Feb-19 ₹ 2,128
MYTRAH TUTICORIN* ₹ 2,240 16-Feb-19 ₹ 2,240
BETAM TUTICORIN ₹ 85 16-Feb-19 15-Feb-20 ₹ 85 ₹ 0
SBG Cleantech Pavagada ₹ 183 16-Feb-19 ₹ 183
LANCO ST-II* ₹ 476 16-Feb-19 ₹ 476
COASTAL ENERGEN* ₹ 18,776 16-Feb-19 ₹ 18,776
FRV NPKUNTA ₹ 492 16-Feb-19 19-Feb-20 ₹ 492 ₹ 0
FRV II, NPKUNTA ₹ 330 16-Feb-19 19-Feb-20 ₹ 330 ₹ 0
SEIL PROJECT II* ₹ 23 16-Feb-19 ₹ 23
ACME KARNAL NPKUNTA ₹ 72 16-Feb-19 13-Feb-20 ₹ 72 ₹ 0
FRV NPKUNTA ₹ 78 16-Feb-19 19-Feb-20 ₹ 78 ₹ 0
SBE NPKUNTA* ₹ 16 16-Feb-19 ₹ 16
7 (14.05.18-20.05.18) MEL* ₹ 670,281 8-Jun-18 18-Jun-18 ₹ 139,792 ₹ 530,489
7 (14.05.18-20.05.18) TOTAL ₹ 670,281 ₹ 139,792 ₹ 530,489
8 (21.05.18-27.05.18) MEL* ₹ 665,507 15-Jun-18 18-Jun-18 ₹ 133,575 ₹ 531,932
8 (21.05.18-27.05.18) TOTAL ₹ 665,507 ₹ 133,575 ₹ 531,932
9 (28.05.18-03.06.18) MEL* ₹ 556,346 22-Jun-18 26-Jun-18 ₹ 162,525 393821
9 (28.05.18-03.06.18) TOTAL ₹ 556,346 ₹ 162,525 ₹ 393,821
10 (04.06.18-10.06.18) MEL* 483420 29-Jun-18 27-Jun-18 ₹ 101,358 382062
10 (04.06.18-10.06.18) TOTAL ₹ 483,420 ₹ 101,358 ₹ 382,062
11 (11.06.18-17.06.18) MEL* ₹ 474,465 6-Jul-18 13-Jul-18 ₹ 85,355 389110
11 (11.06.18-17.06.18) TOTAL ₹ 474,465 ₹ 85,355 ₹ 389,110
12 (18.06.18-24.06.18) MEL* ₹ 654,305 13-Jul-18 18-Jul-18 ₹ 96,652 557653
12 (18.06.18-24.06.18) TOTAL ₹ 654,305 ₹ 96,652 ₹ 557,653
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2020/1034
dt.06.02.2020
Interest for delayed payment as per SRPC
letter - SE(C)/SRPC/2020/368 dt.09.01.2020
Annexure- A(I)
Page 3 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
13 (25.06.18-01.07.18) MEL* ₹ 467,842 20-Jul-18 21-Jul-18 ₹ 75,123 392719
13 (25.06.18-01.07.18) TOTAL ₹ 467,842 ₹ 75,123 ₹ 392,719
14 (02.07.18-08.07.18) MEL* ₹ 471,056 27-Jul-18 30-Jul-18 ₹ 121,290 349766
14 (02.07.18-08.07.18) TOTAL ₹ 471,056 ₹ 121,290 ₹ 349,766
15 (09.07.18-15.07.18) MEL* ₹ 355,962 3-Aug-18 8-Aug-18 ₹ 70,872 285090
15 (09.07.18-15.07.18) TOTAL ₹ 355,962 ₹ 70,872 ₹ 285,090
16 (16.07.18-22.07.18) MEL* ₹ 70,401 10-Aug-18 ₹ 0 70401
16 (16.07.18-22.07.18) TOTAL ₹ 70,401 ₹ 0 ₹ 70,401
17 (23.07.18-29.07.18) MEL* ₹ 54,605 17-Aug-18 ₹ 0 54605
17 (23.07.18-29.07.18) TOTAL ₹ 54,605 ₹ 0 ₹ 54,605
18 (30.07.18-05.08.18) MEL* ₹ 41,664 24-Aug-18 ₹ 0 41664
18 (30.07.18-05.08.18) TOTAL ₹ 41,664 ₹ 0 ₹ 41,664
19 (06.08.18-12.08.18) MEL* ₹ 44,023 31-Aug-18 ₹ 0 44023
19 (06.08.18-12.08.18) TOTAL ₹ 44,023 ₹ 0 ₹ 44,023
20 (13.08.18-19.08.18) MEL* ₹ 34,570 7-Sep-18 ₹ 0 34570
20 (13.08.18-19.08.18) TOTAL ₹ 34,570 ₹ 0 ₹ 34,570
21 (20.08.18-26.08.18) MEL* ₹ 36,051 14-Sep-18 ₹ 0 36051
21 (20.08.18-26.08.18) TOTAL ₹ 36,051 ₹ 0 ₹ 36,051
22 (27.08.18-02.09.18) MEL* ₹ 67,064 21-Sep-18 ₹ 0 67064
22 (27.08.18-02.09.18) TOTAL ₹ 67,064 ₹ 0 ₹ 67,064
23 (03.09.18-09.09.18) MEL* ₹ 194,297 28-Sep-18 5-Oct-18 ₹ 14,406 ₹ 179,891
23 (03.09.18-09.09.18) TOTAL ₹ 194,297 ₹ 14,406 ₹ 179,891
24 (10.09.18-16.09.18) MEL* ₹ 233,660 5-Oct-18 5-Oct-18 ₹ 14,095 ₹ 219,565
24 (10.09.18-16.09.18) TOTAL ₹ 233,660 ₹ 14,095 ₹ 219,565
25 (17.09.18-23.09.18) MEL* ₹ 162,322 13-Oct-18 12-Oct-18 ₹ 12,581 ₹ 149,741
25 (17.09.18-23.09.18) TOTAL ₹ 162,322 ₹ 12,581 ₹ 149,741
26 (24.09.18-30.09.18) MEL* ₹ 183,952 19-Oct-18 ₹ 0 ₹ 183,952
26 (24.09.18-30.09.18) TOTAL ₹ 183,952 ₹ 0 ₹ 183,952
27 (01.10.18-07.10.18) MEL* ₹ 186,562 26-Oct-18 ₹ 0 ₹ 186,562
27 (01.10.18-07.10.18) TOTAL ₹ 186,562 ₹ 0 ₹ 186,562
28 (08.10.18-14.10.18) MEL* ₹ 151,365 2-Nov-18 ₹ 0 ₹ 151,365
28 (08.10.18-14.10.18) TOTAL ₹ 151,365 ₹ 0 ₹ 151,365
29 (15.10.18-21.10.18) MEL* ₹ 169,640 9-Nov-18 ₹ 0 ₹ 169,640
29 (15.10.18-21.10.18) TOTAL ₹ 169,640 ₹ 0 ₹ 169,640
30 (22.10.18-28.10.18) MEL * ₹ 147,927 16-Nov-18 ₹ 0 ₹ 147,927
Annexure- A(I)
Page 4 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
30 (22.10.18-28.10.18) TOTAL ₹ 147,927 ₹ 0 ₹ 147,927
31 (29.10.18-04.11.18) MEL* ₹ 165,530 23-Nov-18 ₹ 0 ₹ 165,530
31 (29.10.18-04.11.18) TOTAL ₹ 165,530 ₹ 0 ₹ 165,530
Rev.Wk16 Wk20 Wk 21( 18-19 )dt.06.08.18 MEL PH2 * ₹ 133 16-Nov-18 ₹ 0 ₹ 133
Rev.Wk16 Wk20 Wk 21( 18-19 )dt.06.08.18 MEL * ₹ 7 16-Nov-18 ₹ 0 ₹ 7
TOTAL ₹ 140 ₹ 0 ₹ 140
32 (05.11.18-11.11.18) MEL* ₹ 157,334 30-Nov-18 ₹ 0 ₹ 157,334
32 (05.11.18-11.11.18) TOTAL ₹ 157,334 ₹ 0 ₹ 157,334
33 (12.11.18-18.11.18) MEL* ₹ 161,750 7-Dec-18 ₹ 0 ₹ 161,750
33 (12.11.18-18.11.18) TOTAL ₹ 161,750 ₹ 0 ₹ 161,750
34 (19.11.18-25.11.18) MEL* ₹ 129,902 14-Dec-18 ₹ 0 ₹ 129,902
34 (19.11.18-25.11.18) TOTAL ₹ 129,902 ₹ 0 ₹ 129,902
35 (26.11.18-02.12.18) MEL* ₹ 138,207 21-Dec-18 ₹ 0 ₹ 138,207
35 (26.11.18-02.12.18) TOTAL ₹ 138,207 ₹ 0 ₹ 138,207
36 (03.12.18-09.12.18) MEL* ₹ 136,863 28-Dec-18 ₹ 0 ₹ 136,863
36 (03.12.18-09.12.18) TOTAL ₹ 136,863 ₹ 0 ₹ 136,863
37 (10.12.18-16.12.18) MEL* ₹ 150,906 5-Jan-19 ₹ 0 ₹ 150,906
37 (10.12.18-16.12.18) TOTAL ₹ 150,906 ₹ 0 ₹ 150,906
38 (17.12.18-23.12.18) MEL* ₹ 144,493 11-Jan-19 ₹ 0 ₹ 144,493
38 (17.12.18-23.12.18) TOTAL ₹ 144,493 ₹ 0 ₹ 144,493
39 (24.12.18-30.12.18) MEL* ₹ 121,128 18-Jan-19 ₹ 0 ₹ 121,128
39 (24.12.18-30.12.18) TOTAL ₹ 121,128 ₹ 0 ₹ 121,128
40 (31.12.18-06.01.19)# MEL * ₹ 157,538 26-Jan-19 ₹ 0 ₹ 157,538
40 (31.12.18-06.01.19)# ACME HISSAR NPKUNTA ₹ 115,990 26-Jan-19 22-Apr-19 ₹ 269,089 ₹ -153,099
40 (31.12.18-06.01.19)# ACME KARNAL NPKUNTA ₹ 93,994 26-Jan-19 14-Feb-19 ₹ 123,045 ₹ -29,051
TOTAL ₹ 367,522 ₹ 392,134 ₹ -24,612
41 (07.01.19-11.01.19) MEL* ₹ 160,519 1-Feb-19 ₹ 0 ₹ 160,519
41 (07.01.19-11.01.19) TOTAL ₹ 160,519 ₹ 0 ₹ 160,519
42 (14.01.19-20.01.19) MEL* ₹ 148,733 8-Feb-19 ₹ 0 ₹ 148,733
42 (14.01.19-20.01.19) TOTAL ₹ 148,733 ₹ 0 ₹ 148,733
43 (21.01.19-27.01.19) MEL* ₹ 148,687 15-Feb-19 ₹ 0 ₹ 148,687
43 (21.01.19-27.01.19) TOTAL ₹ 148,687 ₹ 0 ₹ 148,687
44 (28.01.19-03.02.19) MEL* ₹ 246,831 22-Feb-19 ₹ 0 ₹ 246,831
44 (28.01.19-03.02.19) TOTAL ₹ 246,831 ₹ 0 ₹ 246,831
45 (04.02.19-10.02.19) MEL* ₹ 155,675 2-Mar-19 ₹ 0 ₹ 155,675
45 (04.02.19-10.02.19) TOTAL ₹ 155,675 ₹ 0 ₹ 155,675
Annexure- A(I)
Page 5 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
46 (11.02.19-17.02.19) MEL* ₹ 179,031 8-Mar-19 ₹ 0 ₹ 179,031
46 (11.02.19-17.02.19) TOTAL ₹ 179,031 ₹ 0 ₹ 179,031
47 (18.02.19-24.02.19) MEL* ₹ 139,978 15-Mar-19 ₹ 0 ₹ 139,978
47 (18.02.19-24.02.19) TOTAL ₹ 139,978 ₹ 0 ₹ 139,978
48 (25.02.19-03.03.19) MEL* ₹ 158,077 22-Mar-19 ₹ 0 ₹ 158,077
48 (25.02.19-03.03.19) TOTAL ₹ 158,077 ₹ 0 ₹ 158,077
Rev. Wk 31 , 32 , 33 , 34 , 35 , 39 , 40
rev.( 18-19 ) dt. 15.03.19MEL PH2* ₹ 2,312 25-Mar-19 ₹ 0 ₹ 2,312
Rev. Wk 31 , 32 , 33 , 34 , 35 , 39 , 40
rev.( 18-19 ) dt. 15.03.19MEL* ₹ 412 25-Mar-19 ₹ 0 ₹ 412
Rev. Wk 31 , 32 , 33 , 34 , 35 , 39 , 40 TOTAL ₹ 2,724 ₹ 0 ₹ 2,724
49 (04.03.19-10.03.19) MEL* ₹ 188,552 29-Mar-19 ₹ 0 ₹ 188,552
49 (04.03.19-10.03.19) TOTAL ₹ 188,552 ₹ 0 ₹ 188,552
50 (11.03.19-17.03.19) MEL* ₹ 195,657 5-Apr-19 ₹ 0 ₹ 195,657
50 (11.03.19-17.03.19) TOTAL ₹ 195,657 ₹ 0 ₹ 195,657
51 (18.03.19-24.03.19) MEL* ₹ 149,683 12-Apr-19 ₹ 0 ₹ 149,683
51 (18.03.19-24.03.19) TOTAL ₹ 149,683 ₹ 0 ₹ 149,683
52 (25.03.19-31.03.19) MEL* ₹ 201,966 19-Apr-19 ₹ 0 ₹ 201,966
52 (25.03.19-31.03.19) ER* ₹ 12 19-Apr-19 ₹ 0 ₹ 12
52 (25.03.19-31.03.19) TOTAL ₹ 201,978 ₹ 0 ₹ 201,978
1 (01.04.19-07.04.19) MEL* ₹ 383,765 26-Apr-19 ₹ 0 ₹ 383,765
1 (01.04.19-07.04.19) MEL PH2* ₹ 1,222,801 26-Apr-19 30-May-19 ₹ 707,446 ₹ 515,355
1 (01.04.19-07.04.19) TOTAL ₹ 1,606,566 ₹ 707,446 ₹ 899,120
2 (08.04.19-14.04.19) MEL* ₹ 1,405,611 3-May-19 ₹ 0 ₹ 1,405,611
2 (08.04.19-14.04.19) TOTAL ₹ 1,405,611 ₹ 0 ₹ 1,405,611
3 (15.04.19-21.04.19) MEL* ₹ 155,938 10-May-19 ₹ 0 ₹ 155,938
3 (15.04.19-21.04.19) MEL PH2* ₹ 507,942 10-May-19 ₹ 0 ₹ 507,942
3 (15.04.19-21.04.19) TOTAL ₹ 663,880 ₹ 0 ₹ 663,880
4 (22.04.19-28.04.19) MEL* ₹ 192,218 17-May-19 ₹ 0 ₹ 192,218
4 (22.04.19-28.04.19) MEL PH2* ₹ 291,982 17-May-19 25-Jul-19 ₹ 201,367 ₹ 90,615
4 (22.04.19-28.04.19) TOTAL ₹ 484,200 ₹ 201,367 ₹ 282,833
5 (29.04.19-05.05.19) MEL* ₹ 146,070 24-May-19 ₹ 0 ₹ 146,070
5 (29.04.19-05.05.19) MEL PH2 ₹ 204,659 24-May-19 25-Jul-19 ₹ 204,659 ₹ 0
5 (29.04.19-05.05.19) TOTAL ₹ 350,729 ₹ 204,659 ₹ 146,070
6 (06.05.19-12.05.19) MEL* ₹ 207,494 31-May-19 ₹ 0 ₹ 207,494
6 (06.05.19-12.05.19) MEL PH2* ₹ 436,457 31-May-19 25-Jul-19 ₹ 81,216 ₹ 355,241
6 (06.05.19-12.05.19) TOTAL ₹ 643,951 ₹ 81,216 ₹ 562,735
7 (13.05.19-19.05.19) MEL* ₹ 207,345 7-Jun-19 ₹ 0 ₹ 207,345
7 (13.05.19-19.05.19) MEL PH2* ₹ 420,469 7-Jun-19 ₹ 0 ₹ 420,469
7 (13.05.19-19.05.19) TOTAL ₹ 627,814 ₹ 0 ₹ 627,814
Annexure- A(I)
Page 6 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
8 (20.05.19-26.05.19) MEL* ₹ 438,941 14-Jun-19 ₹ 0 ₹ 438,941
8 (20.05.19-26.05.19) TOTAL ₹ 438,941 ₹ 0 ₹ 438,941
9 (27.05.19-02.06.19) MEL* ₹ 457,730 21-Jun-19 ₹ 0 ₹ 457,730
9 (27.05.19-02.06.19) TOTAL ₹ 457,730 ₹ 0 ₹ 457,730
10 (03.06.19-09.06.19) MEL * ₹ 592,121 28-Jun-19 ₹ 0 ₹ 592,121
10 (03.06.19-09.06.19) TOTAL ₹ 592,121 ₹ 0 ₹ 592,121
11(10.06.19-16.06.19) MEL* ₹ 139,089 5-Jul-19 ₹ 0 ₹ 139,089
11(10.06.19-16.06.19) MEL PH2* ₹ 302,086 5-Jul-19 ₹ 0 ₹ 302,086
11(10.06.19-16.06.19) TOTAL ₹ 441,175 ₹ 0 ₹ 441,175
12 (17.06.19-23.06.19) MEL PH2 * ₹ 655,449 12-Jul-19 ₹ 0 ₹ 655,449
12 (17.06.19-23.06.19) TOTAL ₹ 655,449 ₹ 0 ₹ 655,449
13 (24.06.19-30.06.19) SEL* ₹ 297,824 19-Jul-19 ₹ 0 ₹ 297,824
13 (24.06.19-30.06.19) MEL PH2* ₹ 536,233 19-Jul-19 ₹ 0 ₹ 536,233
13 (24.06.19-30.06.19) TOTAL ₹ 834,057 ₹ 0 ₹ 834,057
14 (01.07.19-07.07.19) SEL* ₹ 306,332 26-Jul-19 ₹ 0 ₹ 306,332
14 (01.07.19-07.07.19) MEL PH2* ₹ 370,898 26-Jul-19 ₹ 0 ₹ 370,898
14 (01.07.19-07.07.19) TOTAL ₹ 677,230 ₹ 0 ₹ 677,230
Wk 41 , 42 , 43 , 44 , 45 , 46 , 47 , 48 , 49
and 50 rev.( 2018-2019 ) dt. 17.07.2019MEL PH2 * ₹ 1 27-Jul-19 ₹ 0 ₹ 1 # # # LANCO ST-III ₹ 2,117,442 ₹ 0 1-Aug-19 ₹ 2,117,442
Wk 41 , 42 , 43 , 44 , 45 , 46 , 47 , 48 , 49
and 50 rev.( 2018-2019 ) dt. 17.07.2019# # # LANCO ST-II ₹ 2,539,522 27-Jul-19 1-Aug-19 ₹ 2,117,442 ₹ 422,080 ₹ 0
Wk 41 , 42 , 43 , 44 , 45 , 46 , 47 , 48 , 49
and 50 rev.( 2018-2019 ) dt. 17.07.2019TOTAL ₹ 2,539,523 ₹ 2,117,442 ₹ 422,081 TOTAL ₹ 2,117,442 ₹ 0 ₹ 2,117,442
disb completed
Wk. 51 , 1 , 2 , 3 and 4 rev.( 2018-2019 ) dt.
19.07.19MEL PH2* ₹ 2,241,022 29-Jul-19 ₹ 0 ₹ 2,241,022 ₹ 0
Wk. 51 , 1 , 2 , 3 and 4 rev.( 2018-2019 ) dt.
19.07.19MEL* ₹ 347,149 29-Jul-19 ₹ 0 ₹ 347,149 ₹ 0
Wk. 51 , 1 , 2 , 3 and 4 rev.( 2018-2019 ) dt.
19.07.19TOTAL ₹ 2,588,171 ₹ 0 ₹ 2,588,171 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
15 (08.07.19-14.07.19) SEL* ₹ 231,934 2-Aug-19 ₹ 0 ₹ 231,934 ₹ 0
15 (08.07.19-14.07.19) MEL PH2 * ₹ 418,115 2-Aug-19 ₹ 0 ₹ 418,115 ₹ 0
15 (08.07.19-14.07.19) TOTAL ₹ 650,049 ₹ 0 ₹ 650,049 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
16 (15.07.19-21.07.19) SEL* ₹ 253,587 9-Aug-19 ₹ 0 ₹ 253,587 ₹ 0
16 (15.07.19-21.07.19) MEL PH2* ₹ 525,826 9-Aug-19 ₹ 0 ₹ 525,826 ₹ 0
16 (15.07.19-21.07.19) TOTAL ₹ 779,413 ₹ 0 ₹ 779,413 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
17 (22.07.19-28.07.19) SEL* ₹ 241,393 16-Aug-19 ₹ 0 ₹ 241,393 ₹ 0
17 (22.07.19-28.07.19) MEL PH2* ₹ 370,919 16-Aug-19 ₹ 0 ₹ 370,919 ₹ 0
17 (22.07.19-28.07.19) TOTAL ₹ 612,312 ₹ 0 ₹ 612,312 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
18 (29.07.19-04.08.19) SEL* ₹ 298,802 23-Aug-19 ₹ 0 ₹ 298,802 ₹ 0
Annexure- A(I)
Page 7 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
18 (29.07.19-04.08.19) MEL* ₹ 131,855 23-Aug-19 ₹ 0 ₹ 131,855 ₹ 0
18 (29.07.19-04.08.19) MEL PH2* ₹ 152,541 23-Aug-19 ₹ 0 ₹ 152,541 ₹ 0
18 (29.07.19-04.08.19) TOTAL ₹ 583,198 ₹ 0 ₹ 583,198 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
19 (05.08.19-11.08.19) SEL* ₹ 251,266 30-Aug-19 ₹ 0 ₹ 251,266 ₹ 0
19 (05.08.19-11.08.19) MEL* ₹ 263,888 30-Aug-19 ₹ 0 ₹ 263,888 ₹ 0
19 (05.08.19-11.08.19) TOTAL ₹ 515,154 ₹ 0 ₹ 515,154 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
20 (12.08.19-18.08.19) SEL* ₹ 241,397 6-Sep-19 ₹ 0 ₹ 241,397 ₹ 0
20 (12.08.19-18.08.19) MEL* ₹ 307,797 6-Sep-19 ₹ 0 ₹ 307,797 ₹ 0
20 (12.08.19-18.08.19) TOTAL ₹ 549,194 ₹ 0 ₹ 549,194 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
21 (19.08.19-25.08.19) SEL* ₹ 326,528 13-Sep-19 ₹ 0 ₹ 326,528 ₹ 0
21 (19.08.19-25.08.19) MEL* ₹ 244,505 13-Sep-19 ₹ 0 ₹ 244,505 ₹ 0
21 (19.08.19-25.08.19) TOTAL ₹ 571,033 ₹ 0 ₹ 571,033 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
22 (26.08.19-01.09.19) SEL* ₹ 340,081 21-Sep-19 ₹ 0 ₹ 340,081 ₹ 0
22 (26.08.19-01.09.19) MEL* ₹ 240,932 21-Sep-19 ₹ 0 ₹ 240,932 ₹ 0
22 (26.08.19-01.09.19) TOTAL ₹ 581,013 ₹ 0 ₹ 581,013 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
ERPC Rev. Wk.02 and Wk. 03( 2019-2020 )
,Lt. Ref. 5965 and 6000 dt. 09.09.2019 ER ₹ 18,221,196 19-Sep-19 11-Sep-19 ₹ 18,115,249 ₹ 105,947 ₹ 0
ERPC Rev. Wk.02 and Wk. 03( 2019-2020 )
,Lt. Ref. 5965 and 6000 dt. 09.09.2019 ER 19-Sep-19 4-Feb-20 ₹ 105,948 ₹ -105,948 ₹ 0
ERPC Rev. Wk.02 and Wk. 03( 2019-2020 )
,Lt. Ref. 5965 and 6000 dt. 09.09.2019 TOTAL ₹ 18,221,196 ₹ 18,221,197 ₹ -1 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
23 (02.09.19-08.09.19) SEL* ₹ 253,517 27-Sep-19 ₹ 0 ₹ 253,517 ₹ 0
23 (02.09.19-08.09.19) MEL* ₹ 273,722 27-Sep-19 ₹ 0 ₹ 273,722 ₹ 0
23 (02.09.19-08.09.19) TOTAL ₹ 527,239 ₹ 0 ₹ 527,239 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
24 (09.09.19-15.09.19) MEL* ₹ 251,084 4-Oct-19 ₹ 0 ₹ 251,084 ₹ 0
24 (09.09.19-15.09.19) SEL* ₹ 330,717 4-Oct-19 ₹ 0 ₹ 330,717 ₹ 0
24 (09.09.19-15.09.19) TOTAL ₹ 581,801 ₹ 0 ₹ 581,801 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
25 (16.09.19-22.09.19) SEL* ₹ 325,257 11-Oct-19 ₹ 0 ₹ 325,257 ₹ 0
25 (16.09.19-22.09.19) MEL* ₹ 275,321 11-Oct-19 ₹ 0 ₹ 275,321 ₹ 0
25 (16.09.19-22.09.19) TOTAL ₹ 600,578 ₹ 0 ₹ 600,578 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
26 (23.09.19-29.09.19) SEL* ₹ 182,807 19-Oct-19 ₹ 0 ₹ 182,807 ₹ 0
26 (23.09.19-29.09.19) MEL* ₹ 261,629 19-Oct-19 ₹ 0 ₹ 261,629 ₹ 0
26 (23.09.19-29.09.19) TOTAL ₹ 444,436 ₹ 0 ₹ 444,436 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
27 (30.09.19-06.10.19) SEL* ₹ 240,927 25-Oct-19 ₹ 0 ₹ 240,927 ₹ 0
27 (30.09.19-06.10.19) MEL* ₹ 304,483 25-Oct-19 ₹ 0 ₹ 304,483 ₹ 0
27 (30.09.19-06.10.19) TOTAL ₹ 545,410 ₹ 0 ₹ 545,410 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
28 (07.10.19-13.10.19) SEL* ₹ 278,264 1-Nov-19 ₹ 0 ₹ 278,264 ₹ 0
28 (07.10.19-13.10.19) MEL* ₹ 178,261 1-Nov-19 ₹ 0 ₹ 178,261 ₹ 0
28 (07.10.19-13.10.19) TOTAL ₹ 456,525 ₹ 0 ₹ 456,525 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
Annexure- A(I)
Page 8 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
29 (14.10.19-20.10.19) SEL* ₹ 294,543 8-Nov-19 ₹ 0 ₹ 294,543 ₹ 0
29 (14.10.19-20.10.19) MEL* ₹ 352,322 8-Nov-19 ₹ 0 ₹ 352,322 ₹ 0
29 (14.10.19-20.10.19) TOTAL ₹ 646,865 ₹ 0 ₹ 646,865 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
30 (21.10.19-27.10.19) SEL* ₹ 197,708 15-Nov-19 ₹ 0 ₹ 197,708 ₹ 0
30 (21.10.19-27.10.19) MEL* ₹ 297,564 15-Nov-19 ₹ 0 ₹ 297,564 ₹ 0
30 (21.10.19-27.10.19) TOTAL ₹ 495,272 ₹ 0 ₹ 495,272 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
31 (28.10.19-03.11.19) SEL* ₹ 170,415 23-Nov-19 ₹ 0 ₹ 170,415 ₹ 0
31 (28.10.19-03.11.19) MEL* ₹ 349,807 23-Nov-19 ₹ 0 ₹ 349,807 ₹ 0
31 (28.10.19-03.11.19) LANCO ST-III ₹ 330,455 23-Nov-19 14-Jan-20 ₹ 330,455 ₹ 0 ₹ 0
31 (28.10.19-03.11.19) TOTAL ₹ 850,677 ₹ 330,455 ₹ 520,222 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
32 (04.11.19-10.11.19) LANCO ST-II ₹ 200,642 29-Nov-19 14-Jan-20 ₹ 200,642 ₹ 0 ₹ 0
32 (04.11.19-10.11.19) SEL* ₹ 161,678 29-Nov-19 ₹ 0 ₹ 161,678 ₹ 0
32 (04.11.19-10.11.19) MEL ₹ 298,469 29-Nov-19 24-Jan-20 ₹ 298,469 ₹ 0 ₹ 0
32 (04.11.19-10.11.19) LANCO ST-III ₹ 63,327 29-Nov-19 14-Jan-20 ₹ 63,327 ₹ 0 ₹ 0
32 (04.11.19-10.11.19) TOTAL ₹ 724,116 ₹ 562,438 ₹ 161,678 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
33 (11.11.19-17.11.19) LANCO ST-II ₹ 276,755 6-Dec-19 14-Jan-20 ₹ 276,755 ₹ 0 ₹ 0
33 (11.11.19-17.11.19) SEL* ₹ 173,994 6-Dec-19 ₹ 0 ₹ 173,994 ₹ 0
33 (11.11.19-17.11.19) MEL ₹ 296,170 6-Dec-19 24-Jan-20 ₹ 296,170 ₹ 0 ₹ 0
33 (11.11.19-17.11.19) TOTAL ₹ 746,919 ₹ 572,925 ₹ 173,994 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
34 (18.11.19-24.11.19) LANCO ST-II ₹ 317,305 13-Dec-19 14-Jan-20 ₹ 317,305 ₹ 0 ₹ 0
34 (18.11.19-24.11.19) SEL * ₹ 234,872 13-Dec-19 ₹ 0 ₹ 234,872 ₹ 0
34 (18.11.19-24.11.19) MEL ₹ 321,333 13-Dec-19 24-Jan-20 ₹ 321,333 ₹ 0 ₹ 0
34 (18.11.19-24.11.19) MYTRAH TUTICORIN ₹ 58,188 13-Dec-19 7-Jan-20 ₹ 58,188 ₹ 0 ₹ 0
34 (18.11.19-24.11.19) TOTAL ₹ 931,698 ₹ 696,826 ₹ 234,872 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
35 (25.11.19-01.12.19) LANCO ST-II ₹ 265,677 20-Dec-19 14-Jan-20 ₹ 265,677 ₹ 0 ₹ 0
35 (25.11.19-01.12.19) SEL * ₹ 226,429 20-Dec-19 ₹ 0 ₹ 226,429 ₹ 0
35 (25.11.19-01.12.19) MEL ₹ 269,803 20-Dec-19 24-Jan-20 ₹ 269,803 ₹ 0 ₹ 0
35 (25.11.19-01.12.19) COASTAL ENERGEN ₹ 198,313 20-Dec-19 29-Jan-20 ₹ 198,313 ₹ 0 ₹ 0
35 (25.11.19-01.12.19) MYTRAH TUTICORIN ₹ 3,216,912 20-Dec-19 7-Jan-20 ₹ 3,216,912 ₹ 0 ₹ 0
35 (25.11.19-01.12.19) TOTAL ₹ 4,177,134 ₹ 3,950,705 ₹ 226,429 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
36 (02.12.19-08.12.19) LANCO ST-II ₹ 278,563 27-Dec-19 16-Jan-20 ₹ 278,563 ₹ 0 ER as per SRPC ₹ 155,490,573 ₹ 124,741,844 31-Dec-19 ₹ 30,748,729
36 (02.12.19-08.12.19) SEL * ₹ 229,554 27-Dec-19 ₹ 0 ₹ 229,554 ER as per SRPC ₹ 30,748,729 7-Jan-20 ₹ -30,748,729
36 (02.12.19-08.12.19) MEL ₹ 261,056 27-Dec-19 24-Jan-20 ₹ 261,056 ₹ 0 ₹ 0
36 (02.12.19-08.12.19) FRV NPKUNTA ₹ 1,333,171 27-Dec-19 2-Jan-20 ₹ 1,333,171 ₹ 0 ₹ 0
36 (02.12.19-08.12.19) FRV II NPKUNTA ₹ 922,102 27-Dec-19 14-Jan-20 ₹ 922,102 ₹ 0 ₹ 0
36 (02.12.19-08.12.19) MYTRAH TUTICORIN ₹ 1,420,203 27-Dec-19 8-Jan-20 ₹ 1,420,203 ₹ 0 ₹ 0
36 (02.12.19-08.12.19) TOTAL ₹ 4,444,649 ₹ 4,215,095 ₹ 229,554 TOTAL ₹ 155,490,573 ₹ 155,490,573 ₹ 0
disb completed
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.AP ₹ 46,901 29-Dec-19 31-Jan-19 ₹ 46,901 ₹ 0 KSEB ₹ 4,277 ₹ 4,277 21-Jan-20 ₹ 0
Annexure- A(I)
Page 9 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.KPTCL ₹ 1,872,605 29-Dec-19 2-Jan-20 ₹ 1,872,605 ₹ 0 TN ₹ 257 ₹ 257 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.TELANGANA ₹ 6,892 29-Dec-19 27-Dec-19 ₹ 6,892 ₹ 0 GOA-SR ₹ 1,821,181 ₹ 1,821,181 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.SIMHADRI-I ₹ 29,135 29-Dec-19 31-Jan-19 ₹ 29,135 ₹ 0 RSTPS STG-I&II ₹ 6,049 ₹ 6,049 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.ACME KARNAL NPKUNTA ₹ 98,783 29-Dec-19 20-Jan-20 ₹ 98,783 ₹ 0 TALCHER-II ₹ 1,536 ₹ 1,536 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.MYTRAH TUTICORIN ₹ 3,806 29-Dec-19 8-Jan-20 ₹ 3,806 ₹ 0 WR ₹ 19,617 ₹ 19,617 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 ER ₹ 29,020 ₹ 29,020 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 ACME HISSAR NPKUNTA ₹ 1,541 ₹ 1,541 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 ACME BHIWADI NPKUNTA ₹ 16,560 ₹ 16,560 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 AZURE NPKUNTA ₹ 1,541 ₹ 1,541 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 FRV NPKUNTA ₹ 1,883 ₹ 1,883 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 TATA NPKUNTA ₹ 1,998 ₹ 1,998 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 FRV II NPKUNTA ₹ 2,284 ₹ 2,284 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.₹ 0 GIREL TUTICORN ₹ 714,001 ₹ 714,001 21-Jan-20 ₹ 0
SRPC Rev. from 05.08. 2019 to
03.11.2019 (2019 -2020 ) . DT. 19.12.2019.TOTAL ₹ 2,058,122 ₹ 2,058,122 ₹ 0 TOTAL ₹ 2,621,745 ₹ 2,621,745 ₹ 0
disb completed
SRPC Rev. from 28.12.2015 to 03.01.2016
dt. 06.01.2020KSEB ₹ 1,514,568 16-Jan-20 3-Feb-20 ₹ 1,514,568 ₹ 0 SEIL ( TPCIL ) ₹ 5,529,854 ₹ 5,529,854 25-Feb-20 ₹ 0
SRPC Rev. from 28.12.2015 to 03.01.2016
dt. 06.01.2020TN ₹ 3,629,681 16-Jan-20 14-Jan-20 ₹ 3,629,681 ₹ 0 ₹ 0
SRPC Rev. from 28.12.2015 to 03.01.2016
dt. 06.01.2020COASTAL ENERGEN ₹ 78,655 16-Jan-20 14-Jan-20 ₹ 78,655 ₹ 0 ₹ 0
SRPC Rev. from 28.12.2015 to 03.01.2016
dt. 06.01.2020LANCO ST-III ₹ 59,817 16-Jan-20 ₹ 0 ₹ 59,817 ₹ 0
SRPC Rev. from 28.12.2015 to 03.01.2016
dt. 06.01.2020LANCO ST-III ( Infirm ) ₹ 31,556 16-Jan-20 ₹ 0 ₹ 31,556 ₹ 0
Annexure- A(I)
Page 10 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
SRPC Rev. from 28.12.2015 to 03.01.2016
dt. 06.01.2020TOTAL ₹ 5,314,277 ₹ 5,222,904 ₹ 91,373 TOTAL ₹ 5,529,854 ₹ 5,529,854 ₹ 0
disb completed
37 (09.12.19-15.12.19) AP ₹ 4,254,370 3-Jan-20 3-Jan-20 ₹ 4,254,370 ₹ 0 PONDY ₹ 4,287,314 ₹ 4,287,314 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) KPTCL ₹ 21,368,916 3-Jan-20 2-Jan-20 ₹ 21,368,916 ₹ 0 PG-HVDC ₹ 1,358,945 ₹ 1,358,945 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) KSEB ₹ 15,474,122 3-Jan-20 3-Jan-20 ₹ 15,474,122 ₹ 0 RSTPS STG-III ₹ 75,629 ₹ 75,629 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) TN ₹ 102,991,520 3-Jan-20 3-Jan-20 ₹ 102,991,520 ₹ 0 NLC TS-II STG-I ₹ 3,091,860 ₹ 3,091,860 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) GOA-SR ₹ 3,052,831 3-Jan-20 1-Jan-20 ₹ 3,052,831 ₹ 0 NLC TS-II STG-II ₹ 3,864,595 ₹ 3,864,595 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) RSTPS STG-I&II ₹ 824,988 3-Jan-20 4-Jan-20 ₹ 824,988 ₹ 0 NLC TS-I EXP ₹ 6,984,953 ₹ 6,984,953 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) SIMHADRI-II ₹ 2,391,059 3-Jan-20 4-Jan-20 ₹ 2,391,059 ₹ 0 COASTAL ENERGEN ₹ 1,025,359 ₹ 1,025,359 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) TALCHER-II ₹ 30,711 3-Jan-20 4-Jan-20 ₹ 30,711 ₹ 0 TELANGANA ₹ 8,301,451 ₹ 8,301,451 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) VALLUR ₹ 4,326,410 3-Jan-20 3-Jan-20 ₹ 4,326,410 ₹ 0 NNTPP ₹ 65,004,632 ₹ 65,004,632 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) LANCO ST-II ₹ 305,695 3-Jan-20 16-Jan-20 ₹ 305,695 ₹ 0 ACME HISSAR NPKUNTA ₹ 10,560 ₹ 10,560 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) SEL* ₹ 268,568 3-Jan-20 ₹ 0 ₹ 268,568 ACME BHIWADI NPKUNTA ₹ 23,053 ₹ 23,053 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) MEL ₹ 279,965 3-Jan-20 24-Jan-20 ₹ 279,965 ₹ 0 AZURE NPKUNTA ₹ 28,828 ₹ 28,828 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) WR ₹ 184,280,803 3-Jan-20 3-Jan-20 ₹ 184,280,803 ₹ 0 FRV NPKUNTA ₹ 82,440 ₹ 82,440 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) SEIL ₹ 122,330 3-Jan-20 2-Jan-20 ₹ 122,330 ₹ 0 TATA NPKUNTA ₹ 2,071,450 ₹ 2,071,450 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) NLC TPS-II (EXPN) ₹ 5,527,246 3-Jan-20 30-Dec-19 ₹ 5,527,246 ₹ 0 NTPC NPKUNTA ₹ 2,847,851 ₹ 2,847,851 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) IL&FS ₹ 1,416,476 3-Jan-20 3-Jan-20 ₹ 1,416,476 ₹ 0 FRV II NPKUNTA ₹ 332,548 ₹ 332,548 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) NTPL ₹ 2,558,384 3-Jan-20 27-Dec-19 ₹ 2,558,384 ₹ 0 ER ₹ 217,740,205 ₹ 217,740,205 7-Jan-20 ₹ 0
37 (09.12.19-15.12.19) KUDGI U1 ₹ 5,632,746 3-Jan-20 4-Jan-20 ₹ 5,632,746 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) SIMHADRI-I ₹ 882,403 3-Jan-20 4-Jan-20 ₹ 882,403 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) ACME KARNAL NPKUNTA ₹ 707,219 3-Jan-20 31-Dec-19 ₹ 707,219 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) GIREL TUTICORN ₹ 927,587 3-Jan-20 3-Jan-20 ₹ 927,587 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) MYTRAH TUTICORIN ₹ 1,867,029 3-Jan-20 8-Jan-20 ₹ 1,867,029 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) ORANGE TUTICORIN ₹ 1,106,377 3-Jan-20 2-Jan-20 ₹ 1,106,377 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) SEIL PROJECT II ₹ 575,638 3-Jan-20 2-Jan-20 ₹ 575,638 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) BETAM TUTICORIN ₹ 211,356 3-Jan-20 6-Jan-20 ₹ 211,356 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) SBG Cleantech Pavagada ₹ 457,322 3-Jan-20 6-Jan-20 ₹ 457,322 ₹ 0 ₹ 0
37 (09.12.19-15.12.19) TOTAL ₹ 361,842,071 ₹ 361,573,503 ₹ 268,568 TOTAL ₹ 317,131,673 ₹ 317,131,673 ₹ 0
disb completed
38 (16.12.19-22.12.19) AP ₹ 22,932,189 10-Jan-20 10-Jan-20 ₹ 22,932,189 ₹ 0 PONDY ₹ 3,210,430 ₹ 3,210,430 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) KPTCL ₹ 28,393,236 10-Jan-20 8-Jan-20 ₹ 28,393,236 ₹ 0 PG-HVDC ₹ 1,287,323 ₹ 1,287,323 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) KSEB ₹ 20,258,641 10-Jan-20 10-Jan-20 ₹ 20,258,641 ₹ 0 RSTPS STG-III ₹ 556,439 ₹ 556,439 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) TN ₹ 67,791,969 10-Jan-20 10-Jan-20 ₹ 67,791,969 ₹ 0 TALCHER-II ₹ 1,898,968 ₹ 1,898,968 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) RSTPS STG-I&II ₹ 1,587,721 10-Jan-20 9-Jan-20 ₹ 1,587,721 ₹ 0 NLC TS-II STG-I ₹ 7,102,286 ₹ 7,102,286 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) SIMHADRI-II ₹ 1,275,143 10-Jan-20 9-Jan-20 ₹ 1,275,143 ₹ 0 NLC TS-II STG-II ₹ 5,678,607 ₹ 5,678,607 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) VALLUR ₹ 4,519,593 10-Jan-20 10-Jan-20 ₹ 4,519,593 ₹ 0 NLC TS-I EXP ₹ 6,572,882 ₹ 6,572,882 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) LANCO ST-II ₹ 297,501 10-Jan-20 16-Jan-20 ₹ 297,501 ₹ 0 TATA NPKUNTA ₹ 605,554 ₹ 605,554 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) SEL* ₹ 224,130 10-Jan-20 ₹ 0 ₹ 224,130 SEIL PROJECT II ₹ 197,197 ₹ 197,197 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) MEL* ₹ 336,019 10-Jan-20 ₹ 0 ₹ 336,019 NNTPP ₹ 65,569,032 ₹ 65,569,032 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) WR as per WRPC ₹ 28,293,404 10-Jan-20 10-Jan-20 ₹ 28,293,404 ₹ 0 ER as per SRPC ₹ 126,387,424 ₹ 126,387,424 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19) COASTAL ENERGEN ₹ 2,761,182 10-Jan-20 29-Jan-20 ₹ 2,761,182 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) SEIL ₹ 1,216,892 10-Jan-20 8-Jan-20 ₹ 1,216,892 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) TELANGANA ₹ 4,752,766 10-Jan-20 10-Jan-20 ₹ 4,752,766 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) NLC TPS-II (EXPN) ₹ 1,625,799 10-Jan-20 6-Jan-20 ₹ 1,625,799 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) IL&FS ₹ 3,206,201 10-Jan-20 9-Jan-20 ₹ 3,206,201 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) NTPL ₹ 1,843,363 10-Jan-20 4-Jan-20 ₹ 1,843,363 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) KUDGI U1 ₹ 4,524,618 10-Jan-20 9-Jan-20 ₹ 4,524,618 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) SIMHADRI-I ₹ 1,680,089 10-Jan-20 9-Jan-20 ₹ 1,680,089 ₹ 0 ₹ 0
Annexure- A(I)
Page 11 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
38 (16.12.19-22.12.19) ACME HISSAR NPKUNTA ₹ 421,317 10-Jan-20 8-Jan-20 ₹ 421,317 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) ACME BHIWADI NPKUNTA ₹ 159,794 10-Jan-20 7-Jan-20 ₹ 159,794 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) ACME KARNAL NPKUNTA ₹ 515,089 10-Jan-20 7-Jan-20 ₹ 515,089 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) AZURE NPKUNTA ₹ 399,902 10-Jan-20 19-Feb-20 ₹ 386,334 ₹ 13,568 ₹ 0
38 (16.12.19-22.12.19) AZURE NPKUNTA 10-Jan-20 26-Sep-19 ₹ 13,568 ₹ -13,568 ₹ 0
38 (16.12.19-22.12.19) FRV NPKUNTA ₹ 614,720 10-Jan-20 14-Jan-20 ₹ 614,720 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) NTPC NPKUNTA ₹ 1,248,867 10-Jan-20 9-Jan-20 ₹ 1,248,867 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) GIREL, TUTICORN ₹ 3,395,244 10-Jan-20 3-Jan-20 ₹ 3,395,244 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) MYTRAH, TUTICORIN ₹ 3,161,844 10-Jan-20 8-Jan-20 ₹ 3,161,844 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) FRV II, NPKUNTA ₹ 412,954 10-Jan-20 14-Jan-20 ₹ 412,954 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) ORANGE, TUTICORIN ₹ 2,081,742 10-Jan-20 7-Jan-20 ₹ 2,081,742 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) BETAM TUTICORIN ₹ 580,737 10-Jan-20 6-Jan-20 ₹ 580,737 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) SBG Cleantech Pavagada ₹ 1,586,953 10-Jan-20 6-Jan-20 ₹ 1,586,953 ₹ 0 ₹ 0
38 (16.12.19-22.12.19) TOTAL ₹ 212,099,619 ₹ 211,539,470 ₹ 560,149 TOTAL ₹ 219,066,142 ₹ 219,066,142 ₹ 0
disb completed
Transfer of surplus from NER NER ₹ 73,034,850 7-Jan-20 ₹ 73,034,850 ₹ 0 ₹ 0
Transfer of surplus from NER TOTAL ₹ 73,034,850 ₹ 73,034,850 ₹ 0 TOTAL ₹ 0 ₹ 0 ₹ 0
disb completed
39 (23.12.19-29.12.19) AP ₹ 4,439,954 17-Jan-20 17-Jan-20 ₹ 4,439,954 ₹ 0 PONDY ₹ 4,750,885 ₹ 4,750,885 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) KPTCL ₹ 48,051,716 17-Jan-20 16-Jan-20 ₹ 48,051,716 ₹ 0 PG-HVDC ₹ 1,125,814 ₹ 1,125,814 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) KSEB ₹ 23,040,029 17-Jan-20 17-Jan-20 ₹ 23,040,029 ₹ 0 NLC TS-II STG-I ₹ 5,102,907 ₹ 5,102,907 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) TN ₹ 19,919,756 17-Jan-20 14-Jan-20 ₹ 19,919,756 ₹ 0 NLC TS-II STG-II ₹ 3,454,528 ₹ 3,454,528 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) GOA-SR ₹ 7,620,266 17-Jan-20 14-Jan-20 ₹ 7,620,266 ₹ 0 NLC TS-I EXP ₹ 5,640,163 ₹ 5,640,163 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) RSTPS STG-I&II ₹ 769,878 17-Jan-20 16-Jan-20 ₹ 769,878 ₹ 0 COASTAL ENERGEN ₹ 503,947 ₹ 503,947 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) RSTPS STG-III ₹ 317,427 17-Jan-20 16-Jan-20 ₹ 317,427 ₹ 0 TELANGANA ₹ 14,152,598 ₹ 14,152,598 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) SIMHADRI-II ₹ 774,959 17-Jan-20 16-Jan-20 ₹ 774,959 ₹ 0 ACME HISSAR NPKUNTA ₹ 214,841 ₹ 214,841 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) VALLUR ₹ 4,092,003 17-Jan-20 17-Jan-20 ₹ 4,092,003 ₹ 0 ACME BHIWADI NPKUNTA ₹ 231,519 ₹ 231,519 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) LANCO ST-II ₹ 282,494 17-Jan-20 16-Jan-20 ₹ 282,494 ₹ 0 AZURE NPKUNTA ₹ 368,891 ₹ 368,891 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) SEL* ₹ 141,882 17-Jan-20 ₹ 0 ₹ 141,882 TATA NPKUNTA ₹ 1,441,269 ₹ 1,441,269 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) MEL* ₹ 350,557 17-Jan-20 ₹ 0 ₹ 350,557 NTPC NPKUNTA ₹ 2,500,604 ₹ 2,500,604 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) SEIL PROJECT II ₹ 28,606 17-Jan-20 21-Jan-20 ₹ 28,606 ₹ 0 FRV II NPKUNTA ₹ 45,073 ₹ 45,073 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) NLC TPS-II (EXPN) ₹ 4,796,004 17-Jan-20 13-Jan-20 ₹ 4,796,004 ₹ 0 TALCHER-II ₹ 1,066,316 ₹ 1,066,316 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) IL&FS ₹ 2,941,881 17-Jan-20 14-Jan-20 ₹ 2,941,881 ₹ 0 NNTPP ₹ 4,413,052 ₹ 4,413,052 21-Jan-20 ₹ 0
39 (23.12.19-29.12.19) NTPL ₹ 2,015,375 17-Jan-20 10-Jan-20 ₹ 2,015,375 ₹ 0 ER as per SRPC ₹ 139,342,978 ₹ 130,213,157 21-Jan-20 ₹ 9,129,822
39 (23.12.19-29.12.19) KUDGI U1 ₹ 1,089,134 17-Jan-20 16-Jan-20 ₹ 1,089,134 ₹ 0 ER as per SRPC ₹ 9,129,822 28-Jan-20 ₹ -9,129,822
39 (23.12.19-29.12.19) SIMHADRI-I ₹ 419,983 17-Jan-20 16-Jan-20 ₹ 419,983 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) NNTPP ₹ 1,937,725 17-Jan-20 14-Jan-20 ₹ 1,937,725 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) ACME KARNAL NPKUNTA ₹ 179,058 17-Jan-20 20-Jan-20 ₹ 179,058 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) FRV NPKUNTA ₹ 195,176 17-Jan-20 20-Jan-20 ₹ 195,176 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) GIREL TUTICORN ₹ 1,659,804 17-Jan-20 10-Jan-20 ₹ 1,659,804 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) MYTRAH TUTICORIN ₹ 2,376,758 17-Jan-20 14-Feb-20 ₹ 2,376,758 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) ORANGE TUTICORIN ₹ 681,393 17-Jan-20 14-Jan-20 ₹ 681,393 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) BETAM TUTICORIN ₹ 129,660 17-Jan-20 9-Jan-20 ₹ 129,660 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) SBG CLEANTECH PAVAGADA ₹ 2,554,655 17-Jan-20 10-Jan-20 ₹ 2,554,655 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) SBE NPKUNTA ₹ 20,093 17-Jan-20 21-Jan-20 ₹ 20,093 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) SEIL ₹ 414,041 17-Jan-20 16-Jan-20 ₹ 414,041 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) # # WR as per SRPC / WRPC ₹ 0 17-Jan-20 ₹ 0 ₹ 0
39 (23.12.19-29.12.19) TOTAL ₹ 131,240,267 ₹ 130,747,828 ₹ 492,439 TOTAL ₹ 184,355,385 ₹ 184,355,385 ₹ 0
disb completed
Annexure- A(I)
Page 12 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
40 (30.12.19-05.01.20) KPTCL ₹ 74,741,524 24-Jan-20 23-Jan-20 ₹ 74,741,524 ₹ 0 AP ₹ 19,590,506 ₹ 19,590,506 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) KSEB ₹ 18,241,811 24-Jan-20 24-Jan-20 ₹ 18,241,811 ₹ 0 PONDY ₹ 4,748,382 ₹ 4,748,382 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) TN ₹ 41,843,966 24-Jan-20 24-Jan-20 ₹ 41,843,966 ₹ 0 PG-HVDC ₹ 1,550,765 ₹ 1,550,765 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) Goa Rev.01 Dt. 24.01.2020 ₹ 683,154 24-Jan-20 23-Jan-20 ₹ 32,964,657 ₹ -32,281,503 TALCHER-II ₹ 1,821,320 ₹ 1,821,320 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) RSTPS STG-I&II ₹ 1,542,856 24-Jan-20 23-Jan-20 ₹ 1,542,856 ₹ 0 NLC TS-II STG-I ₹ 5,896,749 ₹ 5,896,749 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) RSTPS STG-III ₹ 238,310 24-Jan-20 23-Jan-20 ₹ 238,310 ₹ 0 NLC TS-II STG-II ₹ 4,297,488 ₹ 4,297,488 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) SIMHADRI-II ₹ 1,221,723 24-Jan-20 23-Jan-20 ₹ 1,221,723 ₹ 0 NLC TS-I EXP ₹ 6,485,687 ₹ 6,485,687 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) VALLUR ₹ 6,731,482 24-Jan-20 24-Jan-20 ₹ 6,731,482 ₹ 0 COASTAL ENERGEN ₹ 664,338 ₹ 664,338 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) LANCO ST-II ₹ 328,737 24-Jan-20 23-Jan-20 ₹ 328,737 ₹ 0 TELANGANA ₹ 21,605,585 ₹ 21,605,585 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) SEL* ₹ 251,583 24-Jan-20 ₹ 0 ₹ 251,583 SEIL PROJECT II ₹ 634,420 ₹ 634,420 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) MEL* ₹ 336,571 24-Jan-20 ₹ 0 ₹ 336,571 NNTPP ₹ 19,395,808 ₹ 19,395,808 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) SEIL ₹ 4,113 24-Jan-20 21-Jan-20 ₹ 4,113 ₹ 0 NNTPP ₹ 959,305 ₹ 959,305 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) NLC TPS-II (EXPN) ₹ 4,319,812 24-Jan-20 21-Jan-20 ₹ 4,319,812 ₹ 0 Goa Excess Refund ₹ 0 ₹ 32,281,503 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20) IL&FS ₹ 3,143,709 24-Jan-20 23-Jan-20 ₹ 3,143,709 ₹ 0 WR as per SRPC ₹ 212,102,820 ₹ 76,796,025 28-Jan-20 ₹ 135,306,796
40 (30.12.19-05.01.20) NTPL ₹ 1,180,550 24-Jan-20 18-Jan-20 ₹ 1,180,550 ₹ 0 WR as per SRPC ₹ 3,497,310 4-Feb-20 ₹ -3,497,310
40 (30.12.19-05.01.20) KUDGI U1 ₹ 2,591,939 24-Jan-20 23-Jan-20 ₹ 2,591,939 ₹ 0 WR as per SRPC ₹ 103,304,807 11-Feb-20 ₹ -103,304,807
40 (30.12.19-05.01.20) SIMHADRI-I ₹ 959,312 24-Jan-20 23-Jan-20 ₹ 959,312 ₹ 0 WR as per SRPC ₹ 28,504,679 18-Feb-20 ₹ -28,504,679
40 (30.12.19-05.01.20) ACME HISSAR NPKUNTA ₹ 596,103 24-Jan-20 24-Jan-20 ₹ 596,103 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) ACME BHIWADI NPKUNTA ₹ 582,169 24-Jan-20 24-Jan-20 ₹ 582,169 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) ACME KARNAL NPKUNTA ₹ 851,833 24-Jan-20 24-Jan-20 ₹ 851,833 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) AZURE NPKUNTA ₹ 542,371 24-Jan-20 19-Feb-20 ₹ 542,371 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) FRV NPKUNTA ₹ 825,499 24-Jan-20 20-Jan-20 ₹ 825,499 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) TATA NPKUNTA ₹ 544,876 24-Jan-20 21-Jan-20 ₹ 544,876 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) NTPC NPKUNTA ₹ 913,188 24-Jan-20 23-Jan-20 ₹ 913,188 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) GIREL TUTICORN ₹ 3,934,829 24-Jan-20 23-Jan-20 ₹ 3,934,829 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) MYTRAH TUTICORIN ₹ 4,979,618 24-Jan-20 14-Feb-20 ₹ 4,979,618 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) FRV II NPKUNTA ₹ 432,471 24-Jan-20 20-Jan-20 ₹ 432,471 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) ORANGE TUTICORIN ₹ 2,589,091 24-Jan-20 20-Jan-20 ₹ 2,589,091 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) BETAM TUTICORIN ₹ 217,389 24-Jan-20 17-Jan-20 ₹ 217,389 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) SBE NPKUNTA ₹ 47,000 24-Jan-20 17-Jan-20 ₹ 47,000 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) SBG CLEANTECH PAVAGADA ₹ 2,493,247 24-Jan-20 22-Jan-20 ₹ 2,493,247 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) ER as per ERPC ₹ 18,570,051 24-Jan-20 4-Feb-20 ₹ 18,570,051 ₹ 0 ₹ 0
40 (30.12.19-05.01.20) TOTAL ₹ 196,480,887 ₹ 228,174,236 ₹ -31,693,349 TOTAL ₹ 299,753,173 ₹ 332,034,676 ₹ 0
disb completed
41 (06.01.20-12.01.20) KSEB ₹ 24,304,351 31-Jan-20 30-Jan-20 ₹ 24,304,351 ₹ 0 AP ₹ 18,754,814 ₹ 18,754,814 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) TN ₹ 21,959,025 31-Jan-20 30-Jan-20 ₹ 21,959,025 ₹ 0 KPTCL ₹ 9,078,323 ₹ 9,078,323 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) GOA-SR ₹ 484,003 31-Jan-20 29-Jan-20 ₹ 484,003 ₹ 0 PONDY ₹ 3,929,019 ₹ 3,929,019 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) RSTPS STG-I&II ₹ 205,440 31-Jan-20 30-Jan-20 ₹ 205,440 ₹ 0 PG-HVDC ₹ 1,671,056 ₹ 1,671,056 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) RSTPS STG-III ₹ 296,662 31-Jan-20 30-Jan-20 ₹ 296,662 ₹ 0 TALCHER-II ₹ 1,593,088 ₹ 1,593,088 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) SIMHADRI-II ₹ 723,486 31-Jan-20 30-Jan-20 ₹ 723,486 ₹ 0 NLC TS-II STG-I ₹ 6,344,103 ₹ 6,344,103 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) VALLUR ₹ 3,931,980 31-Jan-20 31-Jan-20 ₹ 3,931,980 ₹ 0 NLC TS-II STG-II ₹ 7,874,640 ₹ 7,874,640 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) LANCO ST-II ₹ 276,580 31-Jan-20 23-Jan-20 ₹ 276,580 ₹ 0 NLC TS-I EXP ₹ 6,125,308 ₹ 6,125,308 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) SEL * ₹ 254,052 31-Jan-20 ₹ 0 ₹ 254,052 TELANGANA ₹ 6,893,245 ₹ 6,893,245 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) MEL * ₹ 267,446 31-Jan-20 ₹ 0 ₹ 267,446 NNTPP ₹ 17,077,259 ₹ 17,077,259 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) WR as per WRPC ₹ 13,171,909 31-Jan-20 31-Jan-20 ₹ 13,171,909 ₹ 0 ACME HISSAR NPKUNTA ₹ 688,509 ₹ 688,509 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) COASTAL ENERGEN ₹ 443,949 31-Jan-20 10-Feb-20 ₹ 443,949 ₹ 0 ACME BHIWADI NPKUNTA ₹ 932,560 ₹ 932,560 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) SEIL ₹ 673,712 31-Jan-20 29-Jan-20 ₹ 673,712 ₹ 0 ACME KARNAL NPKUNTA ₹ 681,409 ₹ 681,409 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) NLC TS-II EXP ₹ 854,013 31-Jan-20 27-Jan-20 ₹ 854,013 ₹ 0 AZURE NPKUNTA ₹ 518,007 ₹ 518,007 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) IL&FS ₹ 2,463,158 31-Jan-20 29-Jan-20 ₹ 2,463,158 ₹ 0 TATA NPKUNTA ₹ 961,495 ₹ 961,495 4-Feb-20 ₹ 0
Annexure- A(I)
Page 13 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
41 (06.01.20-12.01.20) NTPL ₹ 1,859,421 31-Jan-20 23-Jan-20 ₹ 1,859,421 ₹ 0 NTPC NPKUNTA ₹ 1,553,574 ₹ 1,553,574 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) KUDGI U1 ₹ 5,799,180 31-Jan-20 30-Jan-20 ₹ 5,799,180 ₹ 0 FRV II, NPKUNTA ₹ 293,522 ₹ 293,522 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) SIMHADRI-I ₹ 668,896 31-Jan-20 30-Jan-20 ₹ 668,896 ₹ 0 NNTPP ₹ 697,476 ₹ 697,476 4-Feb-20 ₹ 0
41 (06.01.20-12.01.20) FRV NPKUNTA ₹ 61,736 31-Jan-20 19-Feb-20 ₹ 61,736 ₹ 0 ER as per SRPC ₹ 31,941,679 ₹ 31,941,679 18-Feb-20 ₹ 0
41 (06.01.20-12.01.20) GIREL, TUTICORN ₹ 1,021,718 31-Jan-20 27-Jan-20 ₹ 1,021,718 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) MYTRAH, TUTICORIN ₹ 454,814 31-Jan-20 14-Feb-20 ₹ 454,814 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) ORANGE, TUTICORIN ₹ 720,348 31-Jan-20 28-Jan-20 ₹ 720,348 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) BETAM TUTICORIN ₹ 1,197,749 31-Jan-20 28-Jan-20 ₹ 1,197,749 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) SBG CLEANTECH PAVAGADA ₹ 840,058 31-Jan-20 30-Jan-20 ₹ 840,058 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) SBE NPKUNTA ₹ 56,871 31-Jan-20 30-Jan-20 ₹ 56,871 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) SEIL PROJECT II ₹ 4,693,468 31-Jan-20 30-Jan-20 ₹ 4,693,468 ₹ 0 ₹ 0
41 (06.01.20-12.01.20) TOTAL ₹ 87,684,025 ₹ 87,162,527 ₹ 521,498 TOTAL ₹ 117,609,086 ₹ 117,609,086 ₹ 0
disb completed
42 (13.01.20-19.01.20) KSEB ₹ 21,242,201 7-Feb-20 7-Feb-20 ₹ 21,242,201 ₹ 0 AP ₹ 17,600,679 ₹ 17,600,679 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) TN ₹ 8,648,336 7-Feb-20 7-Feb-20 ₹ 8,648,336 ₹ 0 KPTCL ₹ 8,314,288 ₹ 8,314,288 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) GOA-SR ₹ 992,451 7-Feb-20 5-Feb-20 ₹ 992,451 ₹ 0 PONDY ₹ 6,052,267 ₹ 6,052,267 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) RSTPS STG-I&II ₹ 1,609,676 7-Feb-20 6-Feb-20 ₹ 1,609,676 ₹ 0 PG-HVDC ₹ 1,525,681 ₹ 1,525,681 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) SIMHADRI-II ₹ 1,545,574 7-Feb-20 6-Feb-20 ₹ 1,545,574 ₹ 0 RSTPS STG-III ₹ 318,008 ₹ 318,008 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) VALLUR ₹ 3,656,152 7-Feb-20 7-Feb-20 ₹ 3,656,152 ₹ 0 NLC TS-II STG-I ₹ 9,204,011 ₹ 9,204,011 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) LANCO ST-II ₹ 298,928 7-Feb-20 11-Feb-20 ₹ 298,928 ₹ 0 NLC TS-II STG-II ₹ 7,796,830 ₹ 7,796,830 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) SEL* ₹ 224,377 7-Feb-20 ₹ 0 ₹ 224,377 NLC TS-I EXP ₹ 7,240,181 ₹ 7,240,181 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) MEL* ₹ 245,659 7-Feb-20 ₹ 0 ₹ 245,659 TELANGANA ₹ 22,664,336 ₹ 22,664,336 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) COASTAL ENERGEN ₹ 174,722 7-Feb-20 10-Feb-20 ₹ 174,722 ₹ 0 NNTPP ₹ 17,373,762 ₹ 17,373,762 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) SEIL ₹ 993,592 7-Feb-20 4-Feb-20 ₹ 993,592 ₹ 0 ACME HISSAR NPKUNTA ₹ 692,092 ₹ 692,092 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) NLC TPS-II (EXPN) ₹ 3,287,827 7-Feb-20 4-Feb-20 ₹ 3,287,827 ₹ 0 ACME BHIWADI NPKUNTA ₹ 1,110,491 ₹ 1,110,491 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) IL&FS ₹ 1,325,402 7-Feb-20 5-Feb-20 ₹ 1,325,402 ₹ 0 ACME KARNAL NPKUNTA ₹ 838,507 ₹ 838,507 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) NTPL ₹ 825,509 7-Feb-20 30-Jan-20 ₹ 825,509 ₹ 0 AZURE NPKUNTA ₹ 379,873 ₹ 379,873 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) KUDGI U1 ₹ 947,391 7-Feb-20 6-Feb-20 ₹ 947,391 ₹ 0 FRV NPKUNTA ₹ 232,291 ₹ 232,291 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) SIMHADRI-I ₹ 801,257 7-Feb-20 6-Feb-20 ₹ 801,257 ₹ 0 TATA NPKUNTA ₹ 1,792,178 ₹ 1,792,178 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) GIREL, TUTICORN ₹ 3,873,943 7-Feb-20 7-Feb-20 ₹ 3,873,943 ₹ 0 NTPC NPKUNTA ₹ 3,519,352 ₹ 3,519,352 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) ORANGE, TUTICORIN ₹ 4,735,716 7-Feb-20 5-Feb-20 ₹ 4,735,716 ₹ 0 FRV II, NPKUNTA ₹ 387,889 ₹ 387,889 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) BETAM TUTICORIN ₹ 741,063 7-Feb-20 31-Jan-20 ₹ 741,063 ₹ 0 TALCHER-II ₹ 1,653,155 ₹ 1,653,155 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) SBE NPKUNTA ₹ 1,860,823 7-Feb-20 10-Feb-20 ₹ 1,860,823 ₹ 0 SEIL PROJECT II ₹ 858,521 ₹ 858,521 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) SBE NPKUNTA ₹ 19,219 7-Feb-20 10-Feb-20 ₹ 19,219 ₹ 0 SBG CLEANTECH PAVAGADA ₹ 2,330,316 ₹ 2,330,316 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) WR as per WRPC ₹ 139,701,006 7-Feb-20 4-Feb-20 ₹ 139,701,006 ₹ 0 NNTPP ( Inf.) ₹ 295,661 ₹ 295,661 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20) MYTRAH, TUTICORIN ₹ 5,418,818 7-Feb-20 14-Feb-20 ₹ 5,418,818 ₹ 0 ER as per SRPC ₹ 168,356,948 ₹ 60,157,418 18-Feb-20 ₹ 108,199,531
42 (13.01.20-19.01.20) ₹ 0 ER as per SRPC ₹ 56,533,030 25-Feb-20 ₹ -56,533,030
42 (13.01.20-19.01.20) TOTAL ₹ 203,169,642 ₹ 202,699,606 ₹ 470,036 TOTAL ₹ 280,537,317 ₹ 228,870,817 ₹ 51,666,501
disb not yet completed
43 (20.01.20-26.01.20) KSEB ₹ 24,287,837 14-Feb-20 14-Feb-20 ₹ 24,287,837 ₹ 0 AP ₹ 2,296,575 ₹ 2,296,575 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) TN ₹ 21,355,644 14-Feb-20 14-Feb-20 ₹ 21,355,644 ₹ 0 KPTCL ₹ 5,968,692 ₹ 5,968,692 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) GOA-SR ₹ 1,653,558 14-Feb-20 12-Feb-20 ₹ 1,653,558 ₹ 0 PONDY ₹ 4,511,515 ₹ 4,511,515 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) RSTPS STG-I&II ₹ 80,931 14-Feb-20 13-Feb-20 ₹ 80,931 ₹ 0 PG-HVDC ₹ 1,528,403 ₹ 1,528,403 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) SIMHADRI-II ₹ 1,114,462 14-Feb-20 13-Feb-20 ₹ 1,114,462 ₹ 0 RSTPS STG-III ₹ 447,849 ₹ 447,849 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) VALLUR ₹ 4,147,428 14-Feb-20 14-Feb-20 ₹ 4,147,428 ₹ 0 TALCHER-II ₹ 109,883 ₹ 109,883 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) LANCO ST-II ₹ 302,153 14-Feb-20 13-Feb-20 ₹ 302,153 ₹ 0 NLC TS-II STG-I ₹ 8,147,936 ₹ 8,147,936 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) SEL* ₹ 226,536 14-Feb-20 ₹ 0 ₹ 226,536 NLC TS-II STG-II ₹ 7,388,674 ₹ 7,388,674 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) MEL* ₹ 262,493 14-Feb-20 ₹ 0 ₹ 262,493 NLC TS-I EXP ₹ 7,392,319 ₹ 7,392,319 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) COASTAL ENERGEN* ₹ 714,907 14-Feb-20 ₹ 0 ₹ 714,907 TELANGANA ₹ 19,418,670 ₹ 19,418,670 18-Feb-20 ₹ 0
Annexure- A(I)
Page 14 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
43 (20.01.20-26.01.20) SEIL ₹ 670,707 14-Feb-20 6-Feb-20 ₹ 670,707 ₹ 0 NNTPP ₹ 15,544,675 ₹ 15,544,675 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) NLC TPS-II (EXPN) ₹ 988,176 14-Feb-20 10-Feb-20 ₹ 988,176 ₹ 0 ACME HISSAR NPKUNTA ₹ 324,734 ₹ 324,734 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) IL&FS ₹ 2,049,315 14-Feb-20 11-Feb-20 ₹ 2,049,315 ₹ 0 ACME BHIWADI NPKUNTA ₹ 853,596 ₹ 853,596 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) NTPL ₹ 1,607,662 14-Feb-20 11-Feb-20 ₹ 1,607,662 ₹ 0 AZURE NPKUNTA ₹ 1,058,223 ₹ 1,058,223 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) KUDGI U1 ₹ 2,595,172 14-Feb-20 13-Feb-20 ₹ 2,595,172 ₹ 0 FRV NPKUNTA ₹ 662,142 ₹ 662,142 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) SIMHADRI-I ₹ 684,623 14-Feb-20 13-Feb-20 ₹ 684,623 ₹ 0 TATA NPKUNTA ₹ 3,244,215 ₹ 3,244,215 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) GIREL, TUTICORN ₹ 256,184 14-Feb-20 7-Feb-20 ₹ 256,184 ₹ 0 NTPC NPKUNTA ₹ 6,029,696 ₹ 6,029,696 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) MYTRAH, TUTICORIN ₹ 925,052 14-Feb-20 14-Feb-20 ₹ 925,052 ₹ 0 FRV II, NPKUNTA ₹ 1,100,326 ₹ 1,100,326 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ORANGE, TUTICORIN ₹ 3,779,496 14-Feb-20 7-Feb-20 ₹ 3,779,496 ₹ 0 SEIL PROJECT II ₹ 776,754 ₹ 776,754 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) BETAM TUTICORIN ₹ 1,601,467 14-Feb-20 12-Feb-20 ₹ 1,601,467 ₹ 0 ADYAH BLOCK 13 PAVAGADA ₹ 276,321 ₹ 0 18-Feb-20 ₹ 276,321
43 (20.01.20-26.01.20) WR as per WRPC ₹ 149,678,108 14-Feb-20 14-Feb-20 ₹ 149,678,108 ₹ 0 SBG CLEANTECH PAVAGADA ₹ 1,833,671 ₹ 1,833,671 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 SBE NPKUNTA ₹ 468,114 ₹ 468,114 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ACME KARNAL NPKUNTA ₹ 461,272 ₹ 461,272 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 AVAADA PAVAGADA ₹ 2,800,147 ₹ 0 18-Feb-20 ₹ 2,800,147
43 (20.01.20-26.01.20) ₹ 0 ADYAH BLOCK 1 PAVAGADA ₹ 388,737 ₹ 0 18-Feb-20 ₹ 388,737
43 (20.01.20-26.01.20) ₹ 0 ADYAH BLOCK 2 PAVAGADA ₹ 1,259,559 ₹ 0 18-Feb-20 ₹ 1,259,559
43 (20.01.20-26.01.20) ₹ 0 TATA PAVAGADA ₹ 4,885,484 ₹ 4,885,484 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0ACME KURUKSHETRA
PAVAGADA₹ 1,275,123 ₹ 1,275,123 25-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ACME REWARI PAVAGADA ₹ 947,056 ₹ 947,056 25-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 FORTUM FINSURYA PAVAGADA ₹ 3,138,104 ₹ 3,138,104 25-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 PARAMPUJYA PAVAGADA ₹ 4,220,417 ₹ 4,220,417 25-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 RENEW-TN2 PAVAGADA ₹ 403,025 ₹ 0 18-Feb-20 ₹ 403,025
43 (20.01.20-26.01.20) ₹ 0 YARROW PAVAGADA ₹ 1,402,545 ₹ 1,402,545 25-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 NNTPP ( Inf.) ₹ 799,209 ₹ 799,209 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ER as per SRPC ₹ 304,937,763 ₹ 0 18-Feb-20 ₹ 304,937,763
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) ₹ 0 ₹ 0
43 (20.01.20-26.01.20) TOTAL ₹ 218,981,911 ₹ 217,777,975 ₹ 1,203,936 TOTAL ₹ 416,301,424 ₹ 106,235,872 ₹ 310,065,552
disb not yet completed
44 (27.01.20-02.02.20) AP ₹ 9,683,278 21-Feb-20 20-Feb-20 ₹ 9,683,278 ₹ 0 KPTCL ₹ 34,357,377 ₹ 34,357,377 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) KSEB ₹ 29,626,001 21-Feb-20 20-Feb-20 ₹ 29,626,001 ₹ 0 PG-HVDC ₹ 1,514,919 ₹ 1,514,919 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) TN ₹ 65,078,492 21-Feb-20 21-Feb-20 ₹ 65,078,492 ₹ 0 RSTPS STG-I&II ₹ 643,956 ₹ 643,956 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) GOA-SR ₹ 1,145,722 21-Feb-20 20-Feb-20 ₹ 1,145,722 ₹ 0 RSTPS STG-III ₹ 108,963 ₹ 108,963 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) SIMHADRI-II ₹ 1,678,778 21-Feb-20 20-Feb-20 ₹ 1,678,778 ₹ 0 TALCHER-II ₹ 1,133,914 ₹ 1,133,914 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) VALLUR ₹ 3,782,377 21-Feb-20 21-Feb-20 ₹ 3,782,377 ₹ 0 NLC TS-II STG-I ₹ 6,150,288 ₹ 6,150,288 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) LANCO ST-II ₹ 328,446 21-Feb-20 14-Feb-20 ₹ 328,446 ₹ 0 NLC TS-II STG-II ₹ 5,163,684 ₹ 5,163,684 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) SEL* ₹ 252,583 21-Feb-20 ₹ 0 ₹ 252,583 NLC TS-I EXP ₹ 3,497,501 ₹ 3,497,501 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) MEL* ₹ 264,229 21-Feb-20 ₹ 0 ₹ 264,229 COASTAL ENERGEN ₹ 491,594 ₹ 491,594 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) SEIL ₹ 229,414 21-Feb-20 19-Feb-20 ₹ 229,414 ₹ 0 TELANGANA ₹ 8,042,124 ₹ 8,042,124 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) NLC TPS-II (EXPN) ₹ 4,844,388 21-Feb-20 18-Feb-20 ₹ 4,844,388 ₹ 0 TATA NPKUNTA ₹ 1,091,112 ₹ 1,091,112 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) IL&FS ₹ 2,401,251 21-Feb-20 20-Feb-20 ₹ 2,401,251 ₹ 0 SEIL PROJECT II ₹ 1,179,692 ₹ 1,179,692 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) NTPL ₹ 2,325,856 21-Feb-20 14-Feb-20 ₹ 2,325,856 ₹ 0 NNTPP ₹ 18,542,776 ₹ 18,542,776 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) KUDGI U1 ₹ 5,406,156 21-Feb-20 20-Feb-20 ₹ 5,406,156 ₹ 0 PONDY ₹ 2,341,720 ₹ 2,341,720 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) SIMHADRI-I ₹ 1,112,517 21-Feb-20 20-Feb-20 ₹ 1,112,517 ₹ 0 AVAADA PAVAGADA ₹ 80,165 ₹ 0 25-Feb-20 ₹ 80,165
Annexure- A(I)
Page 15 of 16
Date of
disbursement
Amount
received (Rs.)
DSM Amount
disbursible (Rs. )Constituent
Due date for
receipt
Amount
receivable to
pool (Rs.)
Receipt and Disbursement details of Deviation Charges during Jan' 2020 to Feb ' 2020 Annex- I
Details of receipts into DSM pool Details of disbursement from DSM pool
Wk No. & period ConstituentDate of
receipt
(+) Due to be
received to pool
/ (-) to be
disbursed from
pool
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Total amt.
disbursed (Rs. )
44 (27.01.20-02.02.20) NNTPP ( Infirm ) ₹ 1,055,294 21-Feb-20 14-Feb-20 ₹ 1,055,294 ₹ 0 ADYAH BLOCK 1 PAVAGADA ₹ 37,412 ₹ 0 25-Feb-20 ₹ 37,412
44 (27.01.20-02.02.20) ACME HISSAR NPKUNTA ₹ 475,650 21-Feb-20 15-Feb-20 ₹ 475,650 ₹ 0 ADYAH BLOCK 2 PAVAGADA ₹ 379,143 ₹ 0 25-Feb-20 ₹ 379,143
44 (27.01.20-02.02.20) ACME BHIWADI NPKUNTA ₹ 253,471 21-Feb-20 15-Feb-20 ₹ 253,471 ₹ 0 TATA PAVAGADA ₹ 856,819 ₹ 856,819 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) ACME KARNAL NPKUNTA ₹ 360,837 21-Feb-20 15-Feb-20 ₹ 360,837 ₹ 0 ACME REWARI PAVAGADA ₹ 267,840 ₹ 267,840 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) AZURE NPKUNTA* ₹ 247,683 21-Feb-20 ₹ 0 ₹ 247,683 FORTUM FINSURYA PAVAGADA ₹ 860,824 ₹ 860,824 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) FRV NPKUNTA ₹ 137,655 21-Feb-20 19-Feb-20 ₹ 137,655 ₹ 0 PARAMPUJYA PAVAGADA ₹ 2,310,502 ₹ 2,310,502 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) NTPC NPKUNTA ₹ 2,347,863 21-Feb-20 20-Feb-20 ₹ 2,347,863 ₹ 0 YARROW PAVAGADA ₹ 607,401 ₹ 607,401 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20) GIREL TUTICORN ₹ 4,041,023 21-Feb-20 18-Feb-20 ₹ 4,041,023 ₹ 0 ER as per SRPC ₹ 205,689,042 ₹ 0 25-Feb-20 ₹ 205,689,042
44 (27.01.20-02.02.20) MYTRAH TUTICORIN* ₹ 6,159,016 21-Feb-20 ₹ 0 ₹ 6,159,016 WR as per SRPC ₹ 40,413,648 ₹ 0 25-Feb-20 ₹ 40,413,648
44 (27.01.20-02.02.20) FRV II NPKUNTA ₹ 41,214 21-Feb-20 19-Feb-20 ₹ 41,214 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ORANGE TUTICORIN ₹ 4,181,301 21-Feb-20 15-Feb-20 ₹ 4,181,301 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) BETAM TUTICORIN ₹ 383,870 21-Feb-20 15-Feb-20 ₹ 383,870 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) SBG CLEANTECH PAVAGADA ₹ 1,336,868 21-Feb-20 20-Feb-20 ₹ 1,336,868 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) SBE NPKUNTA ₹ 2,161,736 21-Feb-20 20-Feb-20 ₹ 2,161,736 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ADYAH BLOCK 13 PAVAGADA ₹ 289,057 21-Feb-20 18-Feb-20 ₹ 289,057 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) RENEW-TN2 PAVAGADA ₹ 611,451 21-Feb-20 18-Feb-20 ₹ 611,451 ₹ 0 ₹ 0
44 (27.01.20-02.02.20)ACME KURUKSHETRA
PAVAGADA₹ 166,797 21-Feb-20 20-Feb-20 ₹ 166,797 ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) ₹ 0 ₹ 0
44 (27.01.20-02.02.20) TOTAL ₹ 152,410,274 ₹ 145,486,763 ₹ 6,923,511 TOTAL ₹ 335,762,416 ₹ 89,163,006 ₹ 246,599,410
disb not yet completed
* Yet to pay
# Net Amount Payable /disbursible as per SRPC A/C Statement for 31.12.18 and Week - 01.01.19 -06.01.01.19 is considered .
# # # for Wk 41- 50 rev.( 2018-2019 ) dt. 17.07.2019 Lanco confirm vide e-mail dt. 01.08.2019 that earlier the bills were raised on Lanco - Phase 3 and in the revision the same bills are raised on Lanco -Phase 2. The net payable from Lanco ( II ) is Rs. 4,22,080/-.
Annexure- A(I)
Page 16 of 16
Payable Constituent Due dateAmount due
in Rs.
Date of
realisation
Amount
realised (in
Rs.)
Balance
due, if any
(in Rs.)
Receivable Constituent
Reactive Amount
disbursible as per
SRPC
Amount disbursed
Date of
Disburse-
ment
Balance due,
if any (in Rs.)
0 0
37 (09.12.19-15.12.19) AP 3-Jan-20 ₹ 14,898,229 3-Jan-20 ₹ 14,898,229 0 KPTCL ₹ 8,784,225 ₹ 8,784,225 7-Jan-20 0
37 (09.12.19-15.12.19) KSEB ₹ 1,835,741 ₹ 1,835,741 7-Jan-20 0
37 (09.12.19-15.12.19) TANGEDCO ₹ 3,211,743 ₹ 3,211,743 7-Jan-20 0
37 (09.12.19-15.12.19) PUDUCHERRY ₹ 690,911 ₹ 690,911 7-Jan-20 0
37 (09.12.19-15.12.19) TELANGANA ₹ 375,610 ₹ 375,610 7-Jan-20 0
37 (09.12.19-15.12.19) TOTAL 14898229 14898229 0 TOTAL ₹ 14,898,230 ₹ 14,898,230 0
0 0
38 (16.12.19-22.12.19) AP 10-Jan-20 ₹ 1,106,439 10-Jan-20 ₹ 1,106,439 ₹ 0 KPTCL ₹ 1,783,836 ₹ 1,783,836 14-Jan-20 0
38 (16.12.19-22.12.19) TELANGANA 10-Jan-20 ₹ 1,651,179 10-Jan-20 ₹ 1,651,179 ₹ 0 KSEB ₹ 345,543 ₹ 345,543 14-Jan-20 0
38 (16.12.19-22.12.19) TANGEDCO ₹ 476,288 ₹ 476,288 14-Jan-20 0
38 (16.12.19-22.12.19) PUDUCHERRY ₹ 151,952 ₹ 151,952 14-Jan-20 0
38 (16.12.19-22.12.19) TOTAL 2757618 2757618 ₹ 0 TOTAL ₹ 2,757,619 ₹ 2,757,619 0
0 0
39 (23.12.19-29.12.19) AP 17-Jan-20 ₹ 366,148 17-Jan-20 ₹ 366,148 0 KPTCL ₹ 235,210 ₹ 235,210 21-Jan-20 0
39 (23.12.19-29.12.19) KSEB ₹ 47,140 ₹ 47,140 21-Jan-20 0
39 (23.12.19-29.12.19) TANGEDCO ₹ 61,994 ₹ 61,994 21-Jan-20 0
39 (23.12.19-29.12.19) PUDUCHERRY ₹ 18,313 ₹ 18,313 21-Jan-20 0
39 (23.12.19-29.12.19) TELANGANA ₹ 3,491 ₹ 3,491 21-Jan-20 0
39 (23.12.19-29.12.19) TOTAL 366148 366148 0 TOTAL ₹ 366,148 ₹ 366,148 0
0 0
40 (30.12.19-05.01.20) AP 24-Jan-20 ₹ 674,384 24-Jan-20 ₹ 674,384 0 KPTCL ₹ 882,692 ₹ 882,692 28-Jan-20 0
40 (30.12.19-05.01.20) TELANGANA 24-Jan-20 ₹ 680,772 24-Jan-20 ₹ 680,772 0 KSEB ₹ 161,415 ₹ 161,415 28-Jan-20 0
40 (30.12.19-05.01.20) TANGEDCO ₹ 242,538 ₹ 242,538 28-Jan-20 0
40 (30.12.19-05.01.20) PUDUCHERRY ₹ 68,510 ₹ 68,510 28-Jan-20 0
40 (30.12.19-05.01.20) TOTAL 1355156 1355156 0 TOTAL ₹ 1,355,155 ₹ 1,355,155 0
0 0
41 (06.01.20-12.01.20) AP 31-Jan-20 ₹ 1,981,908 30-Jan-20 ₹ 1,981,908 0 KPTCL ₹ 1,455,727 ₹ 1,455,727 4-Feb-20 0
41 (06.01.20-12.01.20) TELANGANA 31-Jan-20 ₹ 53,646 30-Jan-20 ₹ 53,646 0 KSEB ₹ 289,089 ₹ 289,089 4-Feb-20 0
41 (06.01.20-12.01.20) TANGEDCO ₹ 192,916 ₹ 192,916 4-Feb-20 0
41 (06.01.20-12.01.20) PUDUCHERRY ₹ 97,822 ₹ 97,822 4-Feb-20 0
41 (06.01.20-12.01.20) TOTAL 2035554 2035554 0 TOTAL ₹ 2,035,554 ₹ 2,035,554 0
0 0
42 (13.01.20-19.01.20) TANGEDCO 7-Feb-20 ₹ 336,066 7-Feb-20 ₹ 336,066 0 KPTCL ₹ 941,446 ₹ 941,446 11-Feb-20 0
42 (13.01.20-19.01.20) TELANGANA 7-Feb-20 ₹ 1,097,403 7-Feb-20 ₹ 1,097,403 0 KSEB ₹ 199,646 ₹ 199,646 11-Feb-20 0
42 (13.01.20-19.01.20) AP ₹ 223,419 ₹ 223,419 11-Feb-20 0
42 (13.01.20-19.01.20) PUDUCHERRY ₹ 68,959 ₹ 68,959 11-Feb-20 0
42 (13.01.20-19.01.20) TOTAL 1433469 1433469 0 TOTAL ₹ 1,433,470 ₹ 1,433,470 0
0 0
43 (20.01.20-26.01.20) TELANGANA 14-Feb-20 ₹ 186,849 14-Feb-20 ₹ 186,849 0 AP ₹ 51,993 ₹ 51,993 18-Feb-20 0
43 (20.01.20-26.01.20) KPTCL ₹ 103,231 ₹ 103,231 18-Feb-20 0
43 (20.01.20-26.01.20) KSEB ₹ 18,959 ₹ 18,959 18-Feb-20 0
43 (20.01.20-26.01.20) TANGEDCO ₹ 6,460 ₹ 6,460 18-Feb-20 0
43 (20.01.20-26.01.20) PUDUCHERRY ₹ 6,206 ₹ 6,206 18-Feb-20 0
43 (20.01.20-26.01.20) TOTAL 186849 186849 0 TOTAL ₹ 186,849 ₹ 186,849 0
disb Completed
Receipt and disbursement details of Reactive Energy charges during Jan' 2020 to Feb' 2020 Annex- II
WEEK NO.AND PERIOD
Reactive charges dues as per weekly A/c. issued by
SRPC Details of realisation Details of Disbursement
disb Completed
disb Completed
disb Completed
disb Completed
disb Completed
disb Completed
Annexure-A(II)
Page 1 of 2
Payable Constituent Due dateAmount due
in Rs.
Date of
realisation
Amount
realised (in
Rs.)
Balance
due, if any
(in Rs.)
Receivable Constituent
Reactive Amount
disbursible as per
SRPC
Amount disbursed
Date of
Disburse-
ment
Balance due,
if any (in Rs.)
WEEK NO.AND PERIOD
Reactive charges dues as per weekly A/c. issued by
SRPC Details of realisation Details of Disbursement
0 0
37 (09.12.19-15.12.19) Rev.
dt.06.02.2020KPTCL 16-Feb-20 ₹ 7,246,428 12-Feb-20 ₹ 7,246,428 0 AP ₹ 12,290,093 ₹ 12,290,093 19-Feb-20 0
37 (09.12.19-15.12.19) Rev.
dt.06.02.2020KSEB 16-Feb-20 ₹ 1,514,370 14-Feb-20 ₹ 1,514,370 0 0
37 (09.12.19-15.12.19) Rev.
dt.06.02.2020TANGEDCO 16-Feb-20 ₹ 2,649,484 14-Feb-20 ₹ 2,649,484 0 0
37 (09.12.19-15.12.19) Rev.
dt.06.02.2020PUDUCHERRY 16-Feb-20 ₹ 569,958 19-Feb-20 ₹ 569,958 0 0
37 (09.12.19-15.12.19) Rev.
dt.06.02.2020TELANGANA 16-Feb-20 ₹ 309,854 15-Feb-20 ₹ 309,854 0 0
37 (09.12.19-15.12.19) Rev.
dt.06.02.2020TOTAL 12290094 12290094 0 TOTAL ₹ 12,290,093 ₹ 12,290,093 0
0 0
44 (27.01.20-02.01.20) TANGEDCO 21-Feb-20 ₹ 686,505 21-Feb-20 ₹ 686,505 0 AP ₹ 239,329 ₹ 239,329 25-Feb-20 0
44 (27.01.20-02.01.20) TELANGANA 21-Feb-20 ₹ 557,812 20-Feb-20 ₹ 557,812 0 KPTCL ₹ 805,524 ₹ 805,524 0
44 (27.01.20-02.01.20) KSEB ₹ 153,711 ₹ 153,711 0
44 (27.01.20-02.01.20) PUDUCHERRY ₹ 45,753 ₹ 45,753 0
44 (27.01.20-02.01.20) TOTAL 1244317 1244317 0 TOTAL ₹ 1,244,317 ₹ 1,244,317 0
0 0
disb Completed
disb Completed
disb Completed
Annexure-A(II)
Page 2 of 2
33 P1(11.11.19-17.11.19) RSTPS STG-I&II ₹ 1,926,557 06-Dec-19 05-Dec-19 ₹ 1,926,557 ₹ 0 RSTPS STG-I&II ₹ 2,727,673 ₹ 563,420 16-Dec-19 ₹ 2,164,253
33 P2(11.11.19-17.11.19) RSTPS STG-I&II ₹ 693,810 24-Dec-19 ₹ -693,810
33 P3(11.11.19-17.11.19) RSTPS STG-I&II ₹ 484,732 31-Dec-19 ₹ -484,732
33 P4(11.11.19-17.11.19) RSTPS STG-I&II ₹ 985,711 07-Jan-20 ₹ -985,711
33 P1(11.11.19-17.11.19) RSTPS STG-III ₹ 492,102 06-Dec-19 05-Dec-19 ₹ 492,102 ₹ 0 RSTPS STG-III ₹ 740,000 ₹ 152,852 16-Dec-19 ₹ 587,148
33 P2(11.11.19-17.11.19) RSTPS STG-III ₹ 188,226 24-Dec-19 ₹ -188,226
33 P3(11.11.19-17.11.19) RSTPS STG-III ₹ 131,505 31-Dec-19 ₹ -131,505
33 P4(11.11.19-17.11.19) RSTPS STG-III ₹ 267,417 07-Jan-20 ₹ -267,417
33 P1(11.11.19-17.11.19) SIMHADRI-II ₹ 274,219 06-Dec-19 05-Dec-19 ₹ 274,219 ₹ 0 SIMHADRI-II ₹ 5,825,722 ₹ 1,203,344 16-Dec-19 ₹ 4,622,378
33 P2(11.11.19-17.11.19) SIMHADRI-II ₹ 1,481,829 24-Dec-19 ₹ -1,481,829
33 P3(11.11.19-17.11.19) SIMHADRI-II ₹ 1,035,284 31-Dec-19 ₹ -1,035,284
33 P4(11.11.19-17.11.19) SIMHADRI-II ₹ 2,105,266 07-Jan-20 ₹ -2,105,266
33 P1(11.11.19-17.11.19) TALCHER-II ₹ 1,006,329 06-Dec-19 05-Dec-19 ₹ 1,006,329 ₹ 0 TALCHER-II ₹ 251,184 ₹ 51,884 16-Dec-19 ₹ 199,300
33 P2(11.11.19-17.11.19) TALCHER-II ₹ 63,891 24-Dec-19 ₹ -63,891
33 P3(11.11.19-17.11.19) TALCHER-II ₹ 44,638 31-Dec-19 ₹ -44,638
33 P4(11.11.19-17.11.19) TALCHER-II ₹ 90,771 07-Jan-20 ₹ -90,771
33 P1(11.11.19-17.11.19) NTECL VALLUR ₹ 2,194,758 06-Dec-19 06-Dec-19 ₹ 2,194,758 ₹ 0 NTECL VALLUR ₹ 27,515,893 ₹ 5,683,602 16-Dec-19 ₹ 21,832,291
33 P2(11.11.19-17.11.19) NTECL VALLUR ₹ 6,998,933 24-Dec-19 ₹ -6,998,933
33 P3(11.11.19-17.11.19) NTECL VALLUR ₹ 4,889,823 31-Dec-19 ₹ -4,889,823
33 P4(11.11.19-17.11.19) NTECL VALLUR ₹ 9,943,535 07-Jan-20 ₹ -9,943,535
33 P1(11.11.19-17.11.19) NLC TS-II STG-I ₹ 946,640 06-Dec-19 28-Nov-19 ₹ 946,640 ₹ 0 NLC TS-II STG-I ₹ 2,820,319 ₹ 582,557 16-Dec-19 ₹ 2,237,762
33 P2(11.11.19-17.11.19) NLC TS-II STG-I ₹ 717,375 24-Dec-19 ₹ -717,375
33 P3(11.11.19-17.11.19) NLC TS-II STG-I ₹ 501,196 31-Dec-19 ₹ -501,196
33 P4(11.11.19-17.11.19) NLC TS-II STG-I ₹ 1,019,191 07-Jan-20 ₹ -1,019,191
33 P1(11.11.19-17.11.19) NLC TS-II STG-II ₹ 1,213,765 06-Dec-19 28-Nov-19 ₹ 1,213,765 ₹ 0 NLC TS-II STG-II ₹ 4,982,454 ₹ 1,029,161 16-Dec-19 ₹ 3,953,293
33 P2(11.11.19-17.11.19) NLC TS-II STG-II ₹ 1,267,335 24-Dec-19 ₹ -1,267,335
33 P3(11.11.19-17.11.19) NLC TS-II STG-II ₹ 885,427 31-Dec-19 ₹ -885,427
33 P4(11.11.19-17.11.19) NLC TS-II STG-II ₹ 1,800,531 07-Jan-20 ₹ -1,800,531
33 P1(11.11.19-17.11.19) NLC TPS-I EXP ₹ 496,686 06-Dec-19 02-Dec-19 ₹ 496,686 ₹ 0 NLC TPS-I EXP ₹ 908,676 ₹ 187,693 16-Dec-19 ₹ 720,983
33 P2(11.11.19-17.11.19) NLC TPS-I EXP ₹ 231,131 24-Dec-19 ₹ -231,131
33 P3(11.11.19-17.11.19) NLC TPS-I EXP ₹ 161,480 31-Dec-19 ₹ -161,480
33 P4(11.11.19-17.11.19) NLC TPS-I EXP ₹ 328,372 07-Jan-20 ₹ -328,372
33 P1(11.11.19-17.11.19) NLC TPS-II EXP ₹ 105,938 06-Dec-19 30-Nov-19 ₹ 105,938 ₹ 0 NLC TPS-II EXP ₹ 531,169 ₹ 109,717 16-Dec-19 ₹ 421,452
33 P2(11.11.19-17.11.19) NLC TPS-II EXP ₹ 135,108 24-Dec-19 ₹ -135,108
33 P3(11.11.19-17.11.19) NLC TPS-II EXP ₹ 94,394 31-Dec-19 ₹ -94,394
33 P4(11.11.19-17.11.19) NLC TPS-II EXP ₹ 191,951 07-Jan-20 ₹ -191,951
33 P1(11.11.19-17.11.19) NTPL ₹ 0 06-Dec-19 ₹ 0 ₹ 0 NTPL ₹ 0 ₹ 0 16-Dec-19 ₹ 0
33 P2(11.11.19-17.11.19) NTPL ₹ 0 24-Dec-19 ₹ 0
33 P3(11.11.19-17.11.19) NTPL ₹ 0 31-Dec-19 ₹ 0
33 P4(11.11.19-17.11.19) NTPL ₹ 0 07-Jan-20 ₹ 0
33 P1(11.11.19-17.11.19) SIMHADRI-I ₹ 2,026,484 06-Dec-19 05-Dec-19 ₹ 2,026,484 ₹ 0 SIMHADRI-I ₹ 3,627,227 ₹ 749,229 16-Dec-19 ₹ 2,877,998
33 P2(11.11.19-17.11.19) SIMHADRI-I ₹ 922,620 24-Dec-19 ₹ -922,620
33 P3(11.11.19-17.11.19) SIMHADRI-I ₹ 644,591 31-Dec-19 ₹ -644,591
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
Annexure-A(III)
Page 1 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
33 P4(11.11.19-17.11.19) SIMHADRI-I ₹ 1,310,786 07-Jan-20 ₹ -1,310,786
33 P1(11.11.19-17.11.19) KUDGI U-I ₹ 0 06-Dec-19 ₹ 0 ₹ 0 KUDGI U-I ₹ 0 ₹ 0 16-Dec-19 ₹ 0
33 P2(11.11.19-17.11.19) KUDGI U-I ₹ 0 24-Dec-19 ₹ 0
33 P3(11.11.19-17.11.19) KUDGI U-I ₹ 0 31-Dec-19 ₹ 0
33 P4(11.11.19-17.11.19) KUDGI U-I ₹ 0 07-Jan-20 ₹ 0
33 P1(11.11.19-17.11.19) SIMHADRI-II -AGC ₹ 0 06-Dec-19 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 1,791,360 ₹ 370,018 16-Dec-19 ₹ 1,421,342
33 P2(11.11.19-17.11.19) SIMHADRI-II -AGC ₹ 455,650 24-Dec-19 ₹ -455,650
33 P3(11.11.19-17.11.19) SIMHADRI-II -AGC ₹ 318,341 31-Dec-19 ₹ -318,341
33 P4(11.11.19-17.11.19) SIMHADRI-II -AGC ₹ 647,351 07-Jan-20 ₹ -647,351
33 (11.11.19-17.11.19) Total 10683478 10683478 0 Total 51721677 51721677 0
0 0
34P1(18.11.19-24.11.19) RSTPS STG-I&II ₹ 3,076,300 13-Dec-19 12-Dec-19 ₹ 3,076,300 ₹ 0 RSTPS STG-I&II ₹ 4,036,543 ₹ 970,658 16-Dec-19 ₹ 3,065,885
34P2(18.11.19-24.11.19) RSTPS STG-I&II ₹ 1,301,819 07-Jan-20 ₹ -1,301,819
34P3(18.11.19-24.11.19) RSTPS STG-I&II ₹ 1,764,066 14-Jan-20 ₹ -1,764,066
34P1(18.11.19-24.11.19) RSTPS STG-III ₹ 981,989 13-Dec-19 12-Dec-19 ₹ 981,989 ₹ 0 RSTPS STG-III ₹ 858,358 ₹ 206,407 16-Dec-19 ₹ 651,951
34P2(18.11.19-24.11.19) RSTPS STG-III ₹ 276,828 07-Jan-20 ₹ -276,828
34P3(18.11.19-24.11.19) RSTPS STG-III ₹ 375,123 14-Jan-20 ₹ -375,123
34P1(18.11.19-24.11.19) SIMHADRI-II ₹ 129,761 13-Dec-19 12-Dec-19 ₹ 129,761 ₹ 0 SIMHADRI-II ₹ 5,245,220 ₹ 1,261,306 16-Dec-19 ₹ 3,983,914
34P2(18.11.19-24.11.19) SIMHADRI-II ₹ 1,691,627 07-Jan-20 ₹ -1,691,627
34P3(18.11.19-24.11.19) SIMHADRI-II ₹ 2,292,286 14-Jan-20 ₹ -2,292,286
34P1(18.11.19-24.11.19) TALCHER-II ₹ 431,312 13-Dec-19 12-Dec-19 ₹ 431,312 ₹ 0 TALCHER-II ₹ 2,123,266 ₹ 510,577 16-Dec-19 ₹ 1,612,689
34P2(18.11.19-24.11.19) TALCHER-II ₹ 684,771 07-Jan-20 ₹ -684,771
34P3(18.11.19-24.11.19) TALCHER-II ₹ 927,918 14-Jan-20 ₹ -927,918
34P1(18.11.19-24.11.19) NTECL VALLUR ₹ 826,497 13-Dec-19 13-Dec-19 ₹ 826,497 ₹ 0 NTECL VALLUR ₹ 12,323,774 ₹ 2,963,470 16-Dec-19 ₹ 9,360,304
34P2(18.11.19-24.11.19) NTECL VALLUR ₹ 3,974,520 07-Jan-20 ₹ -3,974,520
34P3(18.11.19-24.11.19) NTECL VALLUR ₹ 5,385,783 14-Jan-20 ₹ -5,385,783
34P1(18.11.19-24.11.19) NLC TS-II STG-I ₹ 862,571 13-Dec-19 09-Dec-19 ₹ 862,571 ₹ 0 NLC TS-II STG-I ₹ 2,125,793 ₹ 511,185 16-Dec-19 ₹ 1,614,608
34P2(18.11.19-24.11.19) NLC TS-II STG-I ₹ 685,586 07-Jan-20 ₹ -685,586
34P3(18.11.19-24.11.19) NLC TS-II STG-I ₹ 929,022 14-Jan-20 ₹ -929,022
34P1(18.11.19-24.11.19) NLC TS-II STG-II ₹ 1,389,434 13-Dec-19 09-Dec-19 ₹ 1,389,434 ₹ 0 NLC TS-II STG-II ₹ 1,451,933 ₹ 349,143 16-Dec-19 ₹ 1,102,790
34P2(18.11.19-24.11.19) NLC TS-II STG-II ₹ 468,261 07-Jan-20 ₹ -468,261
34P3(18.11.19-24.11.19) NLC TS-II STG-II ₹ 634,529 14-Jan-20 ₹ -634,529
34P1(18.11.19-24.11.19) NLC TPS-I EXP ₹ 508,246 13-Dec-19 05-Dec-19 ₹ 508,246 ₹ 0 NLC TPS-I EXP ₹ 657,629 ₹ 158,139 16-Dec-19 ₹ 499,490
34P2(18.11.19-24.11.19) NLC TPS-I EXP ₹ 212,091 07-Jan-20 ₹ -212,091
34P3(18.11.19-24.11.19) NLC TPS-I EXP ₹ 287,400 14-Jan-20 ₹ -287,400
34P1(18.11.19-24.11.19) NLC TPS-II EXP ₹ 131,500 13-Dec-19 06-Dec-19 ₹ 131,500 ₹ 0 NLC TPS-II EXP ₹ 1,041,983 ₹ 250,563 16-Dec-19 ₹ 791,420
34P2(18.11.19-24.11.19) NLC TPS-II EXP ₹ 336,048 07-Jan-20 ₹ -336,048
34P3(18.11.19-24.11.19) NLC TPS-II EXP ₹ 455,371 14-Jan-20 ₹ -455,371
34P1(18.11.19-24.11.19) NTPL ₹ 0 13-Dec-19 ₹ 0 ₹ 0 NTPL ₹ 0 ₹ 0 16-Dec-19 ₹ 0
34P2(18.11.19-24.11.19) NTPL ₹ 0 07-Jan-20 ₹ 0
34P3(18.11.19-24.11.19) NTPL ₹ 0 14-Jan-20 ₹ 0
34P1(18.11.19-24.11.19) SIMHADRI-I ₹ 123,413 13-Dec-19 12-Dec-19 ₹ 123,413 ₹ 0 SIMHADRI-I ₹ 3,164,915 ₹ 761,060 16-Dec-19 ₹ 2,403,855
34P2(18.11.19-24.11.19) SIMHADRI-I ₹ 1,020,712 07-Jan-20 ₹ -1,020,712
disb. Completed
Annexure-A(III)
Page 2 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
34P3(18.11.19-24.11.19) SIMHADRI-I ₹ 1,383,143 14-Jan-20 ₹ -1,383,143
34P1(18.11.19-24.11.19) KUDGI U-I ₹ 0 13-Dec-19 ₹ 0 ₹ 0 KUDGI U-I ₹ 0 ₹ 0 16-Dec-19 ₹ 0
34P2(18.11.19-24.11.19) KUDGI U-I ₹ 0 07-Jan-20 ₹ 0
34P3(18.11.19-24.11.19) KUDGI U-I ₹ 0 14-Jan-20 ₹ 0
34P1(18.11.19-24.11.19) SIMHADRI-II -AGC ₹ 0 13-Dec-19 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 2,156,271 ₹ 518,514 16-Dec-19 ₹ 1,637,757
34P2(18.11.19-24.11.19) SIMHADRI-II -AGC ₹ 695,415 07-Jan-20 ₹ -695,415
34P3(18.11.19-24.11.19) SIMHADRI-II -AGC ₹ 942,342 14-Jan-20 ₹ -942,342
34(18.11.19-24.11.19) Total 8461023 8461023 0 Total 35185685 35185685 0
0 0
35P1(25.11.19-01.12.19) RSTPS STG-I&II ₹ 10,697,585 20-Dec-19 19-Dec-19 ₹ 10,697,585 ₹ 0 RSTPS STG-I&II ₹ 2,170,707 ₹ 901,668 24-Dec-19 ₹ 1,269,039
35P2(25.11.19-01.12.19) RSTPS STG-I&II ₹ 1,269,039 14-Jan-20 ₹ -1,269,039
35P1(25.11.19-01.12.19) RSTPS STG-III ₹ 2,824,758 20-Dec-19 19-Dec-19 ₹ 2,824,758 ₹ 0 RSTPS STG-III ₹ 565,510 ₹ 234,902 24-Dec-19 ₹ 330,608
35P2(25.11.19-01.12.19) RSTPS STG-III ₹ 330,608 14-Jan-20 ₹ -330,608
35P1(25.11.19-01.12.19) SIMHADRI-II ₹ 1,570,055 20-Dec-19 19-Dec-19 ₹ 1,570,055 ₹ 0 SIMHADRI-II ₹ 6,850,763 ₹ 2,845,669 24-Dec-19 ₹ 4,005,094
35P2(25.11.19-01.12.19) SIMHADRI-II ₹ 4,005,094 14-Jan-20 ₹ -4,005,094
35P1(25.11.19-01.12.19) TALCHER-II ₹ 4,307,673 20-Dec-19 19-Dec-19 ₹ 4,307,673 ₹ 0 TALCHER-II ₹ 2,253,961 ₹ 936,250 24-Dec-19 ₹ 1,317,711
35P2(25.11.19-01.12.19) TALCHER-II ₹ 1,317,711 14-Jan-20 ₹ -1,317,711
35P1(25.11.19-01.12.19) NTECL VALLUR ₹ 656,894 20-Dec-19 20-Dec-19 ₹ 656,894 ₹ 0 NTECL VALLUR ₹ 10,354,576 ₹ 4,301,083 24-Dec-19 ₹ 6,053,493
35P2(25.11.19-01.12.19) NTECL VALLUR ₹ 6,053,493 14-Jan-20 ₹ -6,053,493
35P1(25.11.19-01.12.19) NLC TS-II STG-I ₹ 468,166 20-Dec-19 13-Dec-19 ₹ 468,166 ₹ 0 NLC TS-II STG-I ₹ 825,564 ₹ 342,923 24-Dec-19 ₹ 482,641
35P2(25.11.19-01.12.19) NLC TS-II STG-I ₹ 482,641 14-Jan-20 ₹ -482,641
35P1(25.11.19-01.12.19) NLC TS-II STG-II ₹ 859,780 20-Dec-19 13-Dec-19 ₹ 859,780 ₹ 0 NLC TS-II STG-II ₹ 1,064,903 ₹ 442,339 24-Dec-19 ₹ 622,564
35P2(25.11.19-01.12.19) NLC TS-II STG-II ₹ 622,564 14-Jan-20 ₹ -622,564
35P1(25.11.19-01.12.19) NLC TPS-I EXP ₹ 695,255 20-Dec-19 12-Dec-19 ₹ 695,255 ₹ 0 NLC TPS-I EXP ₹ 432,650 ₹ 179,714 24-Dec-19 ₹ 252,936
35P2(25.11.19-01.12.19) NLC TPS-I EXP ₹ 252,936 14-Jan-20 ₹ -252,936
35P1(25.11.19-01.12.19) NLC TPS-II EXP ₹ 46,277 20-Dec-19 16-Dec-19 ₹ 46,277 ₹ 0 NLC TPS-II EXP ₹ 44,922 ₹ 18,660 24-Dec-19 ₹ 26,262
35P2(25.11.19-01.12.19) NLC TPS-II EXP ₹ 26,262 14-Jan-20 ₹ -26,262
35P1(25.11.19-01.12.19) NTPL ₹ 0 20-Dec-19 ₹ 0 ₹ 0 NTPL ₹ 0 ₹ 0 24-Dec-19 ₹ 0
35P2(25.11.19-01.12.19) NTPL ₹ 0 14-Jan-20 ₹ 0
35P1(25.11.19-01.12.19) SIMHADRI-I ₹ 2,127,755 20-Dec-19 19-Dec-19 ₹ 2,127,755 ₹ 0 SIMHADRI-I ₹ 2,092,545 ₹ 869,201 24-Dec-19 ₹ 1,223,344
35P2(25.11.19-01.12.19) SIMHADRI-I ₹ 1,223,344 14-Jan-20 ₹ -1,223,344
35P1(25.11.19-01.12.19) KUDGI U-I ₹ 0 20-Dec-19 ₹ 0 ₹ 0 KUDGI U-I ₹ 24,495,778 ₹ 10,175,055 24-Dec-19 ₹ 14,320,723
35P2(25.11.19-01.12.19) KUDGI U-I ₹ 14,320,723 14-Jan-20 ₹ -14,320,723
35P1(25.11.19-01.12.19) SIMHADRI-II -AGC 20-Dec-19 ₹ 0 SIMHADRI-II -AGC ₹ 7,238,515 ₹ 3,006,734 24-Dec-19 ₹ 4,231,781
35P2(25.11.19-01.12.19) SIMHADRI-II -AGC ₹ 4,231,781 14-Jan-20 ₹ -4,231,781
35P1(25.11.19-01.12.19) Total 24254198 24254198 0 Total 58390394 58390394 0
0 0
37 (02.12.19-08.12.19 ) RSTPS STG-I&II ₹ 11,907,553 03-Jan-20 04-Jan-20 ₹ 11,907,553 ₹ 0 RSTPS STG-I&II ₹ 696,095 ₹ 696,095 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) RSTPS STG-III ₹ 3,164,444 03-Jan-20 04-Jan-20 ₹ 3,164,444 ₹ 0 RSTPS STG-III ₹ 187,210 ₹ 187,210 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) SIMHADRI-II ₹ 3,140,646 03-Jan-20 04-Jan-20 ₹ 3,140,646 ₹ 0 SIMHADRI-II ₹ 5,738,536 ₹ 5,738,536 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) TALCHER-II ₹ 7,475,654 03-Jan-20 04-Jan-20 ₹ 7,475,654 ₹ 0 TALCHER-II ₹ 431,184 ₹ 431,184 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) NTECL VALLUR ₹ 5,581,172 03-Jan-20 03-Jan-20 ₹ 5,581,172 ₹ 0 NTECL VALLUR ₹ 21,592,897 ₹ 21,592,897 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) NLC TS-II STG-I ₹ 1,659,145 03-Jan-20 30-Dec-19 ₹ 1,659,145 ₹ 0 NLC TS-II STG-I ₹ 689,664 ₹ 689,664 07-Jan-20 ₹ 0
disb. Completed
disb. Completed
Annexure-A(III)
Page 3 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
37 (02.12.19-08.12.19 ) NLC TS-II STG-II ₹ 3,693,200 03-Jan-20 30-Dec-19 ₹ 3,693,200 ₹ 0 NLC TS-II STG-II ₹ 1,254,564 ₹ 1,254,564 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) NLC TPS-I EXP ₹ 2,041,355 03-Jan-20 27-Dec-19 ₹ 2,041,355 ₹ 0 NLC TPS-I EXP ₹ 99,153 ₹ 99,153 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) NLC TPS-II EXP ₹ 31,922 03-Jan-20 27-Dec-19 ₹ 31,922 ₹ 0 NLC TPS-II EXP ₹ 0 ₹ 0 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) NTPL ₹ 0 03-Jan-20 ₹ 0 ₹ 0 NTPL ₹ 1,811,250 ₹ 1,811,250 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) SIMHADRI-I ₹ 13,672,192 03-Jan-20 04-Jan-20 ₹ 13,672,192 ₹ 0 SIMHADRI-I ₹ 145,909 ₹ 145,909 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) KUDGI U-I ₹ 0 03-Jan-20 ₹ 0 ₹ 0 KUDGI U-I ₹ 0 ₹ 0 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) SIMHADRI-II -AGC ₹ 0 03-Jan-20 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 1,587,861 ₹ 1,587,861 07-Jan-20 ₹ 0
37 (02.12.19-08.12.19 ) Total 52367283 52367283 0 Total 34234323 34234323 0
0 0
38 (16.12.19-22.12.19 ) RSTPS STG-I&II ₹ 12,726,749 10-Jan-20 09-Jan-20 ₹ 12,726,749 ₹ 0 RSTPS STG-I&II ₹ 332,824 ₹ 332,824 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) RSTPS STG-III ₹ 3,160,233 10-Jan-20 09-Jan-20 ₹ 3,160,233 ₹ 0 RSTPS STG-III ₹ 208,777 ₹ 208,777 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) SIMHADRI-II ₹ 3,981,694 10-Jan-20 09-Jan-20 ₹ 3,981,694 ₹ 0 SIMHADRI-II ₹ 4,333,470 ₹ 4,333,470 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) TALCHER-II ₹ 4,431,475 10-Jan-20 09-Jan-20 ₹ 4,431,475 ₹ 0 TALCHER-II ₹ 895,060 ₹ 895,060 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) NTECL VALLUR ₹ 1,124,714 10-Jan-20 10-Jan-20 ₹ 1,124,714 ₹ 0 NTECL VALLUR ₹ 3,371,616 ₹ 3,371,616 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) NLC TS-II STG-I ₹ 1,414,530 10-Jan-20 04-Jan-20 ₹ 1,414,530 ₹ 0 NLC TS-II STG-I ₹ 894,387 ₹ 894,387 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) NLC TS-II STG-II ₹ 2,841,410 10-Jan-20 04-Jan-20 ₹ 2,841,410 ₹ 0 NLC TS-II STG-II ₹ 1,047,268 ₹ 1,047,268 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) NLC TPS-I EXP ₹ 1,423,059 10-Jan-20 06-Jan-20 ₹ 1,423,059 ₹ 0 NLC TPS-I EXP ₹ 272,161 ₹ 272,161 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) NLC TPS-II EXP ₹ 0 10-Jan-20 ₹ 0 ₹ 0 NLC TPS-II EXP ₹ 0 ₹ 0 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) NTPL ₹ 871,133 10-Jan-20 04-Jan-20 ₹ 871,133 ₹ 0 NTPL ₹ 1,722,293 ₹ 1,722,293 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) SIMHADRI-I ₹ 15,834,540 10-Jan-20 09-Jan-20 ₹ 15,834,540 ₹ 0 SIMHADRI-I ₹ 25 ₹ 25 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) KUDGI U-I ₹ 0 10-Jan-20 ₹ 0 ₹ 0 KUDGI U-I ₹ 3,811,359 ₹ 3,811,359 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) SIMHADRI-II -AGC ₹ 0 10-Jan-20 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 6,490,727 ₹ 6,490,727 14-Jan-20 ₹ 0
38 (16.12.19-22.12.19 ) Total 47809537 47809537 0 Total 23379967 23379967 0
0 0
39P1 (23.12.19-29.12.19 ) RSTPS STG-I&II ₹ 10,317,656 17-Jan-20 16-Jan-20 ₹ 10,317,656 ₹ 0 RSTPS STG-I&II ₹ 3,581,215 ₹ 1,228,427 21-Jan-20 ₹ 2,352,788
39P2 (23.12.19-29.12.19 ) RSTPS STG-I&II ₹ 514,421 28-Jan-20 ₹ -514,421
39P3 (23.12.19-29.12.19 ) RSTPS STG-I&II ₹ 1,507,263 11-Feb-20 ₹ -1,507,263
39P4 (23.12.19-29.12.19 ) RSTPS STG-I&II ₹ 331,103 18-Feb-20 ₹ -331,103
39P1 (23.12.19-29.12.19 ) RSTPS STG-III ₹ 4,890,914 17-Jan-20 16-Jan-20 ₹ 4,890,914 ₹ 0 RSTPS STG-III ₹ 80,787 ₹ 27,712 21-Jan-20 ₹ 53,075
39P2 (23.12.19-29.12.19 ) RSTPS STG-III ₹ 11,605 28-Jan-20 ₹ -11,605
39P3 (23.12.19-29.12.19 ) RSTPS STG-III ₹ 34,002 11-Feb-20 ₹ -34,002
39P4 (23.12.19-29.12.19 ) RSTPS STG-III ₹ 7,469 18-Feb-20 ₹ -7,469
39P1 (23.12.19-29.12.19 ) SIMHADRI-II ₹ 6,655,645 17-Jan-20 16-Jan-20 ₹ 6,655,645 ₹ 0 SIMHADRI-II ₹ 8,975,306 ₹ 3,078,707 21-Jan-20 ₹ 5,896,599
39P2 (23.12.19-29.12.19 ) SIMHADRI-II ₹ 1,289,251 28-Jan-20 ₹ -1,289,251
39P3 (23.12.19-29.12.19 ) SIMHADRI-II ₹ 3,777,531 11-Feb-20 ₹ -3,777,531
39P4 (23.12.19-29.12.19 ) SIMHADRI-II ₹ 829,817 18-Feb-20 ₹ -829,817
39P1 (23.12.19-29.12.19 ) TALCHER-II ₹ 4,530,342 17-Jan-20 16-Jan-20 ₹ 4,530,342 ₹ 0 TALCHER-II ₹ 1,110,879 ₹ 381,053 21-Jan-20 ₹ 729,826
39P2 (23.12.19-29.12.19 ) TALCHER-II ₹ 159,571 28-Jan-20 ₹ -159,571
39P3 (23.12.19-29.12.19 ) TALCHER-II ₹ 467,547 11-Feb-20 ₹ -467,547
39P4 (23.12.19-29.12.19 ) TALCHER-II ₹ 102,707 18-Feb-20 ₹ -102,707
39P1 (23.12.19-29.12.19 ) NTECL VALLUR ₹ 2,114,380 17-Jan-20 17-Jan-20 ₹ 2,114,380 ₹ 0 NTECL VALLUR ₹ 12,598,993 ₹ 4,321,703 21-Jan-20 ₹ 8,277,290
39P2 (23.12.19-29.12.19 ) NTECL VALLUR ₹ 1,809,773 28-Jan-20 ₹ -1,809,773
39P3 (23.12.19-29.12.19 ) NTECL VALLUR ₹ 5,302,670 11-Feb-20 ₹ -5,302,670
disb Completed
disb Completed
Annexure-A(III)
Page 4 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
39P4 (23.12.19-29.12.19 ) NTECL VALLUR ₹ 1,164,847 18-Feb-20 ₹ -1,164,847
39P1 (23.12.19-29.12.19 ) NLC TS-II STG-I ₹ 1,596,829 17-Jan-20 17-Jan-20 ₹ 1,596,829 ₹ 0 NLC TS-II STG-I ₹ 1,753,373 ₹ 601,442 21-Jan-20 ₹ 1,151,931
39P2 (23.12.19-29.12.19 ) NLC TS-II STG-I ₹ 251,862 28-Jan-20 ₹ -251,862
39P3 (23.12.19-29.12.19 ) NLC TS-II STG-I ₹ 737,960 11-Feb-20 ₹ -737,960
39P4 (23.12.19-29.12.19 ) NLC TS-II STG-I ₹ 162,109 18-Feb-20 ₹ -162,109
39P1 (23.12.19-29.12.19 ) NLC TS-II STG-II ₹ 2,326,019 17-Jan-20 17-Jan-20 ₹ 2,326,019 ₹ 0 NLC TS-II STG-II ₹ 1,972,196 ₹ 676,502 21-Jan-20 ₹ 1,295,694
39P2 (23.12.19-29.12.19 ) NLC TS-II STG-II ₹ 283,295 28-Jan-20 ₹ -283,295
39P3 (23.12.19-29.12.19 ) NLC TS-II STG-II ₹ 830,059 11-Feb-20 ₹ -830,059
39P4 (23.12.19-29.12.19 ) NLC TS-II STG-II ₹ 182,340 18-Feb-20 ₹ -182,340
39P1 (23.12.19-29.12.19 ) NLC TPS-I EXP ₹ 1,924,941 17-Jan-20 13-Jan-20 ₹ 1,924,941 ₹ 0 NLC TPS-I EXP ₹ 328,999 ₹ 112,853 21-Jan-20 ₹ 216,146
39P2 (23.12.19-29.12.19 ) NLC TPS-I EXP ₹ 47,259 28-Jan-20 ₹ -47,259
39P3 (23.12.19-29.12.19 ) NLC TPS-I EXP ₹ 138,469 11-Feb-20 ₹ -138,469
39P4 (23.12.19-29.12.19 ) NLC TPS-I EXP ₹ 30,418 18-Feb-20 ₹ -30,418
39P1 (23.12.19-29.12.19 ) NLC TPS-II EXP ₹ 1,344,264 17-Jan-20 13-Jan-20 ₹ 1,344,264 ₹ 0 NLC TPS-II EXP ₹ 232,990 ₹ 79,920 21-Jan-20 ₹ 153,070
39P2 (23.12.19-29.12.19 ) NLC TPS-II EXP ₹ 33,468 28-Jan-20 ₹ -33,468
39P3 (23.12.19-29.12.19 ) NLC TPS-II EXP ₹ 98,061 11-Feb-20 ₹ -98,061
39P4 (23.12.19-29.12.19 ) NLC TPS-II EXP ₹ 21,541 18-Feb-20 ₹ -21,541
39P1 (23.12.19-29.12.19 ) NTPL ₹ 0 17-Jan-20 ₹ 0 ₹ 0 NTPL ₹ 23,019 ₹ 7,896 21-Jan-20 ₹ 15,123
39P2 (23.12.19-29.12.19 ) NTPL ₹ 3,307 28-Jan-20 ₹ -3,307
39P3 (23.12.19-29.12.19 ) NTPL ₹ 9,688 11-Feb-20 ₹ -9,688
39P4 (23.12.19-29.12.19 ) NTPL ₹ 2,128 18-Feb-20 ₹ -2,128
39P1 (23.12.19-29.12.19 ) SIMHADRI-I ₹ 13,249,448 17-Jan-20 16-Jan-20 ₹ 13,249,448 ₹ 0 SIMHADRI-I ₹ 1,381,729 ₹ 473,960 21-Jan-20 ₹ 907,769
39P2 (23.12.19-29.12.19 ) SIMHADRI-I ₹ 198,477 28-Jan-20 ₹ -198,477
39P3 (23.12.19-29.12.19 ) SIMHADRI-I ₹ 581,543 11-Feb-20 ₹ -581,543
39P4 (23.12.19-29.12.19 ) SIMHADRI-I ₹ 127,749 18-Feb-20 ₹ -127,749
39P1 (23.12.19-29.12.19 ) KUDGI U-I ₹ 317,516 17-Jan-20 16-Jan-20 ₹ 317,516 ₹ 0 KUDGI U-I ₹ 109,549,231 ₹ 37,577,547 21-Jan-20 ₹ 71,971,684
39P2 (23.12.19-29.12.19 ) KUDGI U-I ₹ 15,736,120 28-Jan-20 ₹ -15,736,120
39P3 (23.12.19-29.12.19 ) KUDGI U-I ₹ 46,107,129 11-Feb-20 ₹ -46,107,129
39P4 (23.12.19-29.12.19 ) KUDGI U-I ₹ 10,128,436 18-Feb-20 ₹ -10,128,436
39P1 (23.12.19-29.12.19 ) SIMHADRI-II -AGC ₹ 0 17-Jan-20 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 2,041,374 ₹ 700,232 21-Jan-20 ₹ 1,341,142
39P2 (23.12.19-29.12.19 ) SIMHADRI-II -AGC ₹ 293,232 28-Jan-20 ₹ -293,232
39P3 (23.12.19-29.12.19 ) SIMHADRI-II -AGC ₹ 859,174 11-Feb-20 ₹ -859,174
39P4 (23.12.19-29.12.19 ) SIMHADRI-II -AGC ₹ 188,736 18-Feb-20 ₹ -188,736
39 (23.12.19-29.12.19 ) Total 49267954 49267954 0 Total 143630091 143630091 0
0 0
Transfer of surplus from NER NER ₹ 37,764,729 06-Feb-20 ₹ 37,764,729 ₹ 0 ₹ 0
0 0
40 (30.12.19-05.01.20 ) RSTPS STG-I&II ₹ 13,854,734 24-Jan-20 23-Jan-20 ₹ 13,854,734 ₹ 0 RSTPS STG-I&II ₹ 873,094 ₹ 873,094 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) RSTPS STG-III ₹ 4,930,099 24-Jan-20 23-Jan-20 ₹ 4,930,099 ₹ 0 RSTPS STG-III ₹ 165,518 ₹ 165,518 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) SIMHADRI-II ₹ 6,845,174 24-Jan-20 23-Jan-20 ₹ 6,845,174 ₹ 0 SIMHADRI-II ₹ 7,251,301 ₹ 7,251,301 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) TALCHER-II ₹ 4,101,113 24-Jan-20 23-Jan-20 ₹ 4,101,113 ₹ 0 TALCHER-II ₹ 366,555 ₹ 366,555 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) NTECL VALLUR ₹ 6,216,645 24-Jan-20 24-Jan-20 ₹ 6,216,645 ₹ 0 NTECL VALLUR ₹ 8,973,055 ₹ 8,973,055 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) NLC TS-II STG-I ₹ 2,956,773 24-Jan-20 18-Jan-20 ₹ 2,956,773 ₹ 0 NLC TS-II STG-I ₹ 1,794,245 ₹ 1,794,245 28-Jan-20 ₹ 0
disb Completed
disb Completed
Annexure-A(III)
Page 5 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
40 (30.12.19-05.01.20 ) NLC TS-II STG-II ₹ 5,171,081 24-Jan-20 18-Jan-20 ₹ 5,171,081 ₹ 0 NLC TS-II STG-II ₹ 2,243,844 ₹ 2,243,844 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) NLC TPS-I EXP ₹ 3,198,607 24-Jan-20 18-Jan-20 ₹ 3,198,607 ₹ 0 NLC TPS-I EXP ₹ 268,763 ₹ 268,763 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) NLC TPS-II EXP ₹ 22,400 24-Jan-20 21-Jan-20 ₹ 22,400 ₹ 0 NLC TPS-II EXP ₹ 0 ₹ 0 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) NTPL ₹ 0 24-Jan-20 ₹ 0 ₹ 0 NTPL ₹ 0 ₹ 0 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) SIMHADRI-I ₹ 5,338,368 24-Jan-20 23-Jan-20 ₹ 5,338,368 ₹ 0 SIMHADRI-I ₹ 1,821,517 ₹ 1,821,517 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) KUDGI U-I ₹ 757,414 24-Jan-20 23-Jan-20 ₹ 757,414 ₹ 0 KUDGI U-I ₹ 8,046,527 ₹ 8,046,527 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) SIMHADRI-II -AGC ₹ 0 24-Jan-20 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 956,349 ₹ 956,349 28-Jan-20 ₹ 0
40 (30.12.19-05.01.20 ) Total 53392408 53392408 0 Total 32760768 32760768 0
0 0
41P1 (06.01.20-12.01.20 ) RSTPS STG-I&II ₹ 13,200,610 31-Jan-20 30-Jan-20 ₹ 13,200,610 ₹ 0 RSTPS STG-I&II ₹ 1,582,871 ₹ 576,362 04-Feb-20 ₹ 1,006,509
41P2 (06.01.20-12.01.20 ) ₹ 0 RSTPS STG-I&II ₹ 899,386 18-Feb-20 ₹ -899,386
41P3 (06.01.20-12.01.20 ) ₹ 0 RSTPS STG-I&II ₹ 107,123 24-Feb-20 ₹ -107,123
41P1 (06.01.20-12.01.20 ) RSTPS STG-III ₹ 5,003,856 31-Jan-20 30-Jan-20 ₹ 5,003,856 ₹ 0 RSTPS STG-III ₹ 0 ₹ 0 04-Feb-20 ₹ 0
41P2 (06.01.20-12.01.20 ) ₹ 0 RSTPS STG-III ₹ 0 18-Feb-20 ₹ 0
41P3 (06.01.20-12.01.20 ) ₹ 0 RSTPS STG-III ₹ 0 24-Feb-20 ₹ 0
41P1 (06.01.20-12.01.20 ) SIMHADRI-II ₹ 3,232,976 31-Jan-20 30-Jan-20 ₹ 3,232,976 ₹ 0 SIMHADRI-II ₹ 8,115,267 ₹ 2,954,968 04-Feb-20 ₹ 5,160,299
41P2 (06.01.20-12.01.20 ) ₹ 0 SIMHADRI-II ₹ 4,611,086 18-Feb-20 ₹ -4,611,086
41P3 (06.01.20-12.01.20 ) ₹ 0 SIMHADRI-II ₹ 549,213 24-Feb-20 ₹ -549,213
41P1 (06.01.20-12.01.20 ) TALCHER-II ₹ 7,895,107 31-Jan-20 30-Jan-20 ₹ 7,895,107 ₹ 0 TALCHER-II ₹ 0 ₹ 0 04-Feb-20 ₹ 0
41P2 (06.01.20-12.01.20 ) ₹ 0 TALCHER-II ₹ 0 18-Feb-20 ₹ 0
41P3 (06.01.20-12.01.20 ) ₹ 0 TALCHER-II ₹ 0 24-Feb-20 ₹ 0
41P1 (06.01.20-12.01.20 ) NTECL VALLUR ₹ 936,835 31-Jan-20 31-Jan-20 ₹ 936,835 ₹ 0 NTECL VALLUR ₹ 30,560,067 ₹ 11,127,672 04-Feb-20 ₹ 19,432,395
41P2 (06.01.20-12.01.20 ) ₹ 0 NTECL VALLUR ₹ 17,364,196 18-Feb-20 ₹ -17,364,196
41P3 (06.01.20-12.01.20 ) ₹ 0 NTECL VALLUR ₹ 2,068,200 24-Feb-20 ₹ -2,068,200
41P1 (06.01.20-12.01.20 ) NLC TS-II STG-I ₹ 901,789 31-Jan-20 27-Jan-20 ₹ 901,789 ₹ 0 NLC TS-II STG-I ₹ 916,021 ₹ 333,546 04-Feb-20 ₹ 582,475
41P2 (06.01.20-12.01.20 ) ₹ 0 NLC TS-II STG-I ₹ 520,482 18-Feb-20 ₹ -520,482
41P3 (06.01.20-12.01.20 ) ₹ 0 NLC TS-II STG-I ₹ 61,993 24-Feb-20 ₹ -61,993
41P1 (06.01.20-12.01.20 ) NLC TS-II STG-II ₹ 1,902,550 31-Jan-20 27-Jan-20 ₹ 1,902,550 ₹ 0 NLC TS-II STG-II ₹ 1,260,235 ₹ 458,883 04-Feb-20 ₹ 801,352
41P2 (06.01.20-12.01.20 ) ₹ 0 NLC TS-II STG-II ₹ 716,064 18-Feb-20 ₹ -716,064
41P3 (06.01.20-12.01.20 ) ₹ 0 NLC TS-II STG-II ₹ 85,288 24-Feb-20 ₹ -85,288
41P1 (06.01.20-12.01.20 ) NLC TPS-I EXP ₹ 3,641,867 31-Jan-20 28-Jan-20 ₹ 3,641,867 ₹ 0 NLC TPS-I EXP ₹ 96,663 ₹ 35,197 04-Feb-20 ₹ 61,466
41P2 (06.01.20-12.01.20 ) ₹ 0 NLC TPS-I EXP ₹ 54,924 18-Feb-20 ₹ -54,924
41P3 (06.01.20-12.01.20 ) ₹ 0 NLC TPS-I EXP ₹ 6,542 24-Feb-20 ₹ -6,542
41P1 (06.01.20-12.01.20 ) NLC TPS-II EXP ₹ 0 31-Jan-20 ₹ 0 ₹ 0 NLC TPS-II EXP ₹ 0 ₹ 0 04-Feb-20 ₹ 0
41P2 (06.01.20-12.01.20 ) ₹ 0 NLC TPS-II EXP ₹ 0 18-Feb-20 ₹ 0
41P3 (06.01.20-12.01.20 ) ₹ 0 NLC TPS-II EXP ₹ 0 24-Feb-20 ₹ 0
41P1 (06.01.20-12.01.20 ) NTPL ₹ 0 31-Jan-20 ₹ 0 ₹ 0 NTPL ₹ 0 ₹ 0 04-Feb-20 ₹ 0
41P2 (06.01.20-12.01.20 ) ₹ 0 NTPL ₹ 0 18-Feb-20 ₹ 0
41P3 (06.01.20-12.01.20 ) ₹ 0 NTPL ₹ 0 24-Feb-20 ₹ 0
41P1 (06.01.20-12.01.20 ) SIMHADRI-I ₹ 5,929,430 31-Jan-20 30-Jan-20 ₹ 5,929,430 ₹ 0 SIMHADRI-I ₹ 0 ₹ 0 04-Feb-20 ₹ 0
41P2 (06.01.20-12.01.20 ) ₹ 0 SIMHADRI-I ₹ 0 18-Feb-20 ₹ 0
41P3 (06.01.20-12.01.20 ) ₹ 0 SIMHADRI-I ₹ 0 24-Feb-20 ₹ 0
41P1 (06.01.20-12.01.20 ) KUDGI U-I ₹ 498,978 31-Jan-20 30-Jan-20 ₹ 498,978 ₹ 0 KUDGI U-I ₹ 74,074,605 ₹ 26,972,384 04-Feb-20 ₹ 47,102,221
disb Completed
Annexure-A(III)
Page 6 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
41P2 (06.01.20-12.01.20 ) ₹ 0 KUDGI U-I ₹ 42,089,107 18-Feb-20 ₹ -42,089,107
41P3 (06.01.20-12.01.20 ) ₹ 0 KUDGI U-I ₹ 5,013,113 24-Feb-20 ₹ -5,013,113
41P1 (06.01.20-12.01.20 ) NNTPP ₹ 0 31-Jan-20 ₹ 0 NNTPP ₹ 0 ₹ 0 04-Feb-20 ₹ 0
41P2 (06.01.20-12.01.20 ) ₹ 0 NNTPP ₹ 0 18-Feb-20 ₹ 0
41P3 (06.01.20-12.01.20 ) ₹ 0 NNTPP ₹ 0 24-Feb-20 ₹ 0
41P1 (06.01.20-12.01.20 ) SIMHADRI-II -AGC ₹ 0 31-Jan-20 ₹ 0 SIMHADRI-II -AGC ₹ 1,881,186 ₹ 684,986 04-Feb-20 ₹ 1,196,200
41P2 (06.01.20-12.01.20 ) ₹ 0 SIMHADRI-II -AGC ₹ 1,068,888 18-Feb-20 ₹ -1,068,888
41P3 (06.01.20-12.01.20 ) ₹ 0 SIMHADRI-II -AGC ₹ 127,312 24-Feb-20 ₹ -127,312
41 (06.01.20-12.01.20 ) Total 43143998 43143998 0 Total 118486915 118486915 0
0 0
42 (13.01.20-19.01.20 ) RSTPS STG-I&II ₹ 13,026,344 07-Feb-20 06-Feb-20 ₹ 13,026,344 ₹ 0 RSTPS STG-I&II ₹ 1,230,142 ₹ 1,230,142 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) RSTPS STG-III ₹ 3,617,470 07-Feb-20 06-Feb-20 ₹ 3,617,470 ₹ 0 RSTPS STG-III ₹ 170,201 ₹ 170,201 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) SIMHADRI-II ₹ 7,392,605 07-Feb-20 06-Feb-20 ₹ 7,392,605 ₹ 0 SIMHADRI-II ₹ 1,931,273 ₹ 1,931,273 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) TALCHER-II ₹ 5,880,009 07-Feb-20 06-Feb-20 ₹ 5,880,009 ₹ 0 TALCHER-II ₹ 475,398 ₹ 475,398 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NTECL VALLUR ₹ 1,818,977 07-Feb-20 07-Feb-20 ₹ 1,818,977 ₹ 0 NTECL VALLUR ₹ 5,887,429 ₹ 5,887,429 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NLC TS-II STG-I ₹ 2,536,196 07-Feb-20 04-Feb-20 ₹ 2,536,196 ₹ 0 NLC TS-II STG-I ₹ 1,611,411 ₹ 1,611,411 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NLC TS-II STG-II ₹ 5,292,799 07-Feb-20 04-Feb-20 ₹ 5,292,799 ₹ 0 NLC TS-II STG-II ₹ 68,809 ₹ 68,809 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NLC TPS-I EXP ₹ 2,203,808 07-Feb-20 04-Feb-20 ₹ 2,203,808 ₹ 0 NLC TPS-I EXP ₹ 356,373 ₹ 356,373 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NLC TPS-II EXP ₹ 257,999 07-Feb-20 04-Feb-20 ₹ 257,999 ₹ 0 NLC TPS-II EXP ₹ 32,640 ₹ 32,640 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NTPL ₹ 0 07-Feb-20 ₹ 0 ₹ 0 NTPL ₹ 156,209 ₹ 156,209 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) SIMHADRI-I ₹ 23,633,796 07-Feb-20 06-Feb-20 ₹ 23,633,796 ₹ 0 SIMHADRI-I ₹ 603,375 ₹ 603,375 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) KUDGI U-I ₹ 332,935 07-Feb-20 06-Feb-20 ₹ 332,935 ₹ 0 KUDGI U-I ₹ 25,467,247 ₹ 25,467,247 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) NNTPP ₹ 3,171,874 07-Feb-20 07-Feb-20 ₹ 3,171,874 ₹ 0 NNTPP ₹ 1,138,148 ₹ 1,138,148 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) SIMHADRI-II -AGC ₹ 0 07-Feb-20 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 7,349,790 ₹ 7,349,790 11-Feb-20 ₹ 0
42 (13.01.20-19.01.20 ) Total 69164812 69164812 0 Total 46478445 46478445 0
0 0
43 (20.01.20-26.01.20 ) RSTPS STG-I&II ₹ 19,680,847 14-Feb-20 13-Feb-20 ₹ 19,680,847 ₹ 0 RSTPS STG-I&II ₹ 1,419,811 ₹ 1,419,811 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) RSTPS STG-III ₹ 3,188,213 14-Feb-20 13-Feb-20 ₹ 3,188,213 ₹ 0 RSTPS STG-III ₹ 0 ₹ 0 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) SIMHADRI-II ₹ 14,941,264 14-Feb-20 13-Feb-20 ₹ 14,941,264 ₹ 0 SIMHADRI-II ₹ 1,905,899 ₹ 1,905,899 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) TALCHER-II ₹ 7,630,424 14-Feb-20 13-Feb-20 ₹ 7,630,424 ₹ 0 TALCHER-II ₹ 142,769 ₹ 142,769 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NTECL VALLUR ₹ 4,034,157 14-Feb-20 14-Feb-20 ₹ 4,034,157 ₹ 0 NTECL VALLUR ₹ 12,424,687 ₹ 12,424,687 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NLC TS-II STG-I ₹ 4,580,905 14-Feb-20 07-Feb-20 ₹ 4,580,905 ₹ 0 NLC TS-II STG-I ₹ 390,593 ₹ 390,593 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NLC TS-II STG-II ₹ 9,126,754 14-Feb-20 07-Feb-20 ₹ 9,126,754 ₹ 0 NLC TS-II STG-II ₹ 65,760 ₹ 65,760 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NLC TPS-I EXP ₹ 2,144,316 14-Feb-20 07-Feb-20 ₹ 2,144,316 ₹ 0 NLC TPS-I EXP ₹ 51,906 ₹ 51,906 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NLC TPS-II EXP ₹ 443,189 14-Feb-20 10-Feb-20 ₹ 443,189 ₹ 0 NLC TPS-II EXP ₹ 24,481 ₹ 24,481 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NTPL ₹ 160,321 14-Feb-20 11-Feb-20 ₹ 160,321 ₹ 0 NTPL ₹ 0 ₹ 0 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) SIMHADRI-I ₹ 42,267,631 14-Feb-20 13-Feb-20 ₹ 42,267,631 ₹ 0 SIMHADRI-I ₹ 248,100 ₹ 248,100 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) KUDGI U-I ₹ 41,614 14-Feb-20 13-Feb-20 ₹ 41,614 ₹ 0 KUDGI U-I ₹ 4,670,415 ₹ 4,670,415 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) NNTPP ₹ 615,309 14-Feb-20 13-Feb-20 ₹ 615,309 ₹ 0 NNTPP ₹ 109,132 ₹ 109,132 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) SIMHADRI-II -AGC ₹ 0 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 6,797,858 ₹ 6,797,858 18-Feb-20 ₹ 0
43 (20.01.20-26.01.20 ) Total 108854944 108854944 0 Total 28251411 28251411 0
0 0
44 (27.01.20-02.02.20 ) RSTPS STG-I&II ₹ 14,948,976 21-Feb-20 20-Feb-20 ₹ 14,948,976 ₹ 0 RSTPS STG-I&II ₹ 393,420 ₹ 393,420 25-Feb-20 ₹ 0
disb. Completed
disb Completed
disb Completed
Annexure-A(III)
Page 7 of 8
Details of disbursement from RRAS pool
Amount
received (Rs.)
Date of
receipt
RRAS
Amount
disbursible
(Rs. )
Date of
disbursementWk No. & period Constituent
(+) Due to be
received to
pool / (-) to be
disbursed
from pool
Total amt.
disbursed
(Rs. )
(+) Due to be
disbursed from
pool / (-) to be
recd to pool
Receipt and Disbursement details of RRAS Charges during Jan ' 2020 to Feb ' 2020 Annexure - III
Details of receipts into RRAS pool
Constituent
Amount
receivable to
pool (Rs.)
Due date for
receipt
44 (27.01.20-02.02.20 ) RSTPS STG-III ₹ 3,098,216 21-Feb-20 20-Feb-20 ₹ 3,098,216 ₹ 0 RSTPS STG-III ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) SIMHADRI-II ₹ 8,638,940 21-Feb-20 20-Feb-20 ₹ 8,638,940 ₹ 0 SIMHADRI-II ₹ 1,139,141 ₹ 1,139,141 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) TALCHER-II ₹ 1,374,381 21-Feb-20 20-Feb-20 ₹ 1,374,381 ₹ 0 TALCHER-II ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NTECL VALLUR ₹ 3,323,170 21-Feb-20 21-Feb-20 ₹ 3,323,170 ₹ 0 NTECL VALLUR ₹ 6,978,264 ₹ 6,978,264 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NLC TS-II STG-I ₹ 2,534,570 21-Feb-20 13-Feb-20 ₹ 2,534,570 ₹ 0 NLC TS-II STG-I ₹ 452,593 ₹ 452,593 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NLC TS-II STG-II ₹ 5,288,936 21-Feb-20 13-Feb-20 ₹ 5,288,936 ₹ 0 NLC TS-II STG-II ₹ 263,040 ₹ 263,040 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NLC TPS-I EXP ₹ 1,274,926 21-Feb-20 17-Feb-20 ₹ 1,274,926 ₹ 0 NLC TPS-I EXP ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NLC TPS-II EXP ₹ 268,385 21-Feb-20 17-Feb-20 ₹ 268,385 ₹ 0 NLC TPS-II EXP ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NTPL ₹ 0 21-Feb-20 ₹ 0 ₹ 0 NTPL ₹ 213,176 ₹ 213,176 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) SIMHADRI-I ₹ 22,595,822 21-Feb-20 20-Feb-20 ₹ 22,595,822 ₹ 0 SIMHADRI-I ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) KUDGI U-I ₹ 581,108 21-Feb-20 20-Feb-20 ₹ 581,108 ₹ 0 KUDGI U-I ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) NNTPP ₹ 200,171 21-Feb-20 15-Feb-20 ₹ 200,171 ₹ 0 NNTPP ₹ 0 ₹ 0 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) SIMHADRI-II -AGC ₹ 0 ₹ 0 ₹ 0 SIMHADRI-II -AGC ₹ 5,150,110 ₹ 5,150,110 25-Feb-20 ₹ 0
44 (27.01.20-02.02.20 ) Total 64127601 64127601 0 Total 14589744 14589744 0
0 0
* Yet to Pay
disb Completed
Annexure-A(III)
Page 8 of 8
Date Updated 27/02/2020
Annexure IV
Dec-19 Jan-201 APTRANSCO
2 KPTCL
3 KSEB Yes
4 TANGEDCO
5 PONDY Yes
6 GOA Yes
7 TSTRANSCO Yes
8 PG-HVDC Yes Yes
9 RSTPS Stg 1 & 2 Yes
10 RSTPS Stg 3 Yes
11 Talcher Stg 2 Yes
12 Simhadri 2 Yes
13 Simhadri 1 Yes
14 NTPC Kudgi Yes
15 NLC TS2 Stg 1 Yes
16 NLC TS2 Stg 2 Yes
17 NLC Ts 1 Expn Yes
18 NLC Ts 2 Expn Yes
19 NNTPP Yes
20 NTECL, Vallur Yes Yes
21 LANCO ST II Yes Yes
22 LANCO ST III Yes Yes
23 SEL
24 MEL
25 Coastal Energen
26 SEIL Yes
27 NTPL
28 IL&FS Yes
29 SEIL Project - II ( SGPL ) Yes
30 ERLDC Yes
31 WRLDC
32 MEL Ph2
33 TATA NPKUNTA
34 AZURE NPKUNTA
35 ACME HISSAR NPKUNTA
36 ACME BHIWADI NPKUNTA
37 ACME KARNAL NPKUNTA
38 FRV NPKUNTA
39 GIREL TUTICORN
40 NTPC NPKUNTA Yes
41 MYTRAH TUTICORIN
Sl No: Pool Member
Status of Receipt of Signed Reconciliation Statement at SRLDC - DSM Charges
Month
Annexure-A(IV)
Page 1 of 4
42 FRV-II NPKUNTA
43 ORANGE TUTICORIN
44 BETAM TUTICORIN
45 SBE NPKUNTA
46 SBG Cleantech Pavagada
Annexure-A(IV)
Page 2 of 4
Date Updated 27/02/2020
Annexure IV
Dec-19 Jan-20
1 RSTPS STG-I&II Yes
2 RSTPS STG-III Yes
3 SIMHADRI-II Yes
4 SIMHADRI-I Yes
5 TALCHER-II Yes
6 KUDGI U 1 Yes
7 NTECL VALLUR Yes Yes
8 NLC TS-II STG-I Yes
9 NLC TS-II STG-II Yes
10 NLC TPS-I EXP Yes
11 NLC TPS-II EXP Yes
12 NTPL
13 SIMHADRI-II AGC Yes
Sl. No. Pool Member
Status of Receipt of Signed Reconciliation Statement at SRLDC
- RRAS Charges
Month
Annexure-A(IV)
Page 3 of 4
Date Updated 27/02/2020
Annexure IV
Dec-19 Jan-201 APTRANSCO
2 KPTCL Yes
3 KSEB Yes
4 TANTRANSCO
5 TSTRANSCO Yes
6 PONDY
Sl No: Pool Member
Status of Receipt of Signed Reconciliation Statement at SRLDC - Reactive
Charges
Month
Annexure-A(IV)
Page 4 of 4
Status of outstanding interest charges as on 25-02-2020 Annexure-VI528663
Sl. No. Constituent Interest payable (Rs.) Statement issue date.1 MEL* 171 07/08/20182 MEL* 116 07/08/20183 MEL PH2* 1213 07/08/20184 MEL* 49 07/08/20185 MEL PH2* 308 07/08/20186 MEL PH2 * 1228 11/09/20187 MEL* 85 11/09/20188 MEL PH2 * 995 11/09/20189 MEL PH2 * 8882 11/09/2018
10 MEL PH2 * 5145 11/09/201811 MEL PH2 * 2242 11/09/201812 MEL PH2 * 3449 09/10/201813 MEL PH2 * 906 09/10/201814 MEL PH2 * 1157 09/10/201815 MEL* 29 09/10/201816 MEL PH2 * 1145 09/10/201817 MEL PH2* 951 09/11/201818 MEL PH2* 289 06/11/201819 MEL PH2* 476 06/11/201820 MEL PH2* 1185 07/01/2019
21 MEL PH2* 328 07/01/2019
22 MEL PH2* 1319 07/01/2019
23 MEL PH2* 3394 08/02/2019
24 MEL PH2* 2223 08/02/2019
25 MEL PH2* 1717 08/02/2019
26 MEL PH2* 904 08/02/2019
27 MEL PH2 * 1994 08/02/2019
28 MEL PH2* 525 11/03/2019
29 MEL PH2* 372 11/04/2019
30 MEL PH2* 2688 11/04/2019
31 MEL PH2* 13055 19/06/2019
32 MEL PH2* 15556 19/06/2019
33 MEL PH2* 5254 19/06/2019
34 MEL PH2* 9832 19/06/2019
35 MEL PH2* 8557 19/06/2019
36 MEL PH2* 13856 19/06/2019
37 MEL PH2* 9055 19/06/2019
38 AP* 5375 19/06/2019
39 MEL PH2* 5397 08/08/2019
40 MEL PH2* 4912 08/08/2019
41 MEL PH2* 1722 08/08/2019
42 AP* 118 08/08/2019
43 SEL* 8264 05/09/2019
Annexure-A(V)
Page 1 of 3
44 SEL* 6599 05/09/2019
45 SEL* 5032 05/09/2019
46 SEL* 4793 05/09/2019
47 SEL* 253 05/09/2019
48 COASTAL ENERGEN* 22820 05/09/2019
49 GIREL TUTICORN* 1820 10/10/2019
50 COASTAL ENERGEN * 15884 07/11/2019
51 COASTAL ENERGEN * 12205 07/11/2019
52 COASTAL ENERGEN * 3557 07/11/2019
53 GIREL TUTICORN * 268 07/11/2019
54 LANCO ST-II* 16221 09/12/2019
55 LANCO ST-II* 14363 09/12/2019
56 LANCO ST-II* 11634 09/12/2019
57 LANCO ST-II* 11292 09/12/2019
58 LANCO ST-II* 15864 09/12/2019
59 LANCO ST-II* 9924 09/12/2019
60 LANCO ST-II* 8777 09/12/2019
61 LANCO ST-II* 7005 09/12/2019
62 LANCO ST-II* 6881 09/12/2019
63 LANCO ST-II* 7000 09/12/2019
64 LANCO ST-II* 1499 09/12/2019
65 LANCO ST-III* 5334 09/12/2019
66 COASTAL ENERGEN* 1675 09/12/2019
67 MYTRAH TUTICORIN * 4454 09/12/2019
68 MYTRAH TUTICORIN* 7345 09/12/2019
69 SEL* 16666 09/01/2020
70 LANCO ST-III* 7831 09/01/2020
71 LANCO ST-III* 6527 09/01/2020
72 LANCO ST-III* 5860 09/01/2020
73 LANCO ST-III* 3926 09/01/2020
74 LANCO ST-III* 5411 09/01/2020
75 LANCO ST-III* 4419 09/01/2020
76 LANCO ST-III* 5783 09/01/2020
77 LANCO ST-III* 3987 09/01/2020
78 AP* 14995 09/01/2020
79 AZURE NPKUNTA* 357 09/01/2020
80 TATA NPKUNTA* 229 09/01/2020
81 AP* 1105 09/01/2020
82 TATA NPKUNTA* 314 09/01/2020
83 AZURE NPKUNTA* 268 09/01/2020
84 LANCO ST-III* 6609 06/02/2020
85 LANCO ST-II* 3531 06/02/2020
86 MEL* 6447 06/02/2020
87 LANCO ST-III* 1115 06/02/2020
88 LANCO ST-II* 4096 06/02/2020
89 MEL* 5568 06/02/2020
90 LANCO ST-II* 3808 06/02/2020
Annexure-A(V)
Page 2 of 3
91 MEL* 5141 06/02/2020
92 MYTRAH TUTICORIN* 535 06/02/2020
93 LANCO ST-II* 2444 06/02/2020
94 MEL* 3561 06/02/2020
95 COASTAL ENERGEN* 3014 06/02/2020
96 MYTRAH TUTICORIN * 20588 06/02/2020
97 LANCO ST-II * 2006 06/02/2020
98 MEL* 2715 06/02/2020
99 MYTRAH TUTICORIN* 5681 06/02/2020
100 LANCO ST-II* 1345 06/02/2020
101 MEL* 2128 06/02/2020
102 MYTRAH TUTICORIN* 2240 06/02/2020
103 SBG Cleantech Pavagada 183 06/02/2020
104 LANCO ST-II* 476 06/02/2020
105 COASTAL ENERGEN* 18776 06/02/2020
106 SEIL PROJECT II* 23 06/02/2020
107 SBE NPKUNTA* 16 06/02/2020
Annexure-A(V)
Page 3 of 3
Outstanding Payments to DSM pool Account as on 25-02-2020 Annexure VII
39486001.1
1 7 (14.05.18-20.05.18) MEL* ₹ 670,281 ₹ 139,792 ₹ 530,489
2 8 (21.05.18-27.05.18) MEL* ₹ 665,507 ₹ 133,575 ₹ 531,932
3 9 (28.05.18-03.06.18) MEL* ₹ 556,346 ₹ 162,525 ₹ 393,821
4 10 (04.06.18-10.06.18) MEL* 483420 ₹ 101,358 ₹ 382,062
5 11 (11.06.18-17.06.18) MEL* ₹ 474,465 ₹ 85,355 ₹ 389,110
6 12 (18.06.18-24.06.18) MEL* ₹ 654,305 ₹ 96,652 ₹ 557,653
7 13 (25.06.18-01.07.18) MEL* ₹ 467,842 ₹ 75,123 ₹ 392,719
8 14 (02.07.18-08.07.18) MEL* ₹ 471,056 ₹ 121,290 ₹ 349,766
9 15 (09.07.18-15.07.18) MEL* ₹ 355,962 ₹ 70,872 ₹ 285,090
10 16 (16.07.18-22.07.18) MEL* ₹ 70,401 ₹ 0 ₹ 70,401
11 17 (23.07.18-29.07.18) MEL* ₹ 54,605 ₹ 0 ₹ 54,605
12 18 (30.07.18-05.08.18) MEL* ₹ 41,664 ₹ 0 ₹ 41,664
13 19 (06.08.18-12.08.18) MEL* ₹ 44,023 ₹ 0 ₹ 44,023
14 20 (13.08.18-19.08.18) MEL* ₹ 34,570 ₹ 0 ₹ 34,570
15 21 (20.08.18-26.08.18) MEL* ₹ 36,051 ₹ 0 ₹ 36,051
16 22 (27.08.18-02.09.18) MEL* ₹ 67,064 ₹ 0 ₹ 67,064
17 23 (03.09.18-09.09.18) MEL* ₹ 194,297 ₹ 14,406 ₹ 179,891
18 24 (10.09.18-16.09.18) MEL* ₹ 233,660 ₹ 14,095 ₹ 219,565
19 25 (17.09.18-23.09.18) MEL* ₹ 162,322 ₹ 12,581 ₹ 149,741
20 26 (24.09.18-30.09.18) MEL* ₹ 183,952 ₹ 0 ₹ 183,952
21 27 (01.10.18-07.10.18) MEL* ₹ 186,562 ₹ 0 ₹ 186,562
22 28 (08.10.18-14.10.18) MEL* ₹ 151,365 ₹ 0 ₹ 151,365
23 29 (15.10.18-21.10.18) MEL* ₹ 169,640 ₹ 0 ₹ 169,640
24 30 (22.10.18-28.10.18) MEL * ₹ 147,927 ₹ 0 ₹ 147,927
25 31 (29.10.18-04.11.18) MEL* ₹ 165,530 ₹ 0 ₹ 165,530
26 32 (05.11.18-11.11.18) MEL* ₹ 157,334 ₹ 0 ₹ 157,334
27 33 (12.11.18-18.11.18) MEL* ₹ 161,750 ₹ 0 ₹ 161,750
28 34 (19.11.18-25.11.18) MEL* ₹ 129,902 ₹ 0 ₹ 129,902
29 35 (26.11.18-02.12.18) MEL* ₹ 138,207 ₹ 0 ₹ 138,207
30 36 (03.12.18-09.12.18) MEL* ₹ 136,863 ₹ 0 ₹ 136,863
31 37 (10.12.18-16.12.18) MEL* ₹ 150,906 ₹ 0 ₹ 150,906
32 38 (17.12.18-23.12.18) MEL* ₹ 144,493 ₹ 0 ₹ 144,493
33 39 (24.12.18-30.12.18) MEL* ₹ 121,128 ₹ 0 ₹ 121,128
34 40 (31.12.18-06.01.19)# MEL * ₹ 157,538 ₹ 0 ₹ 157,538
35 41 (07.01.19-11.01.19) MEL* ₹ 160,519 ₹ 0 ₹ 160,519
36 42 (14.01.19-20.01.19) MEL* ₹ 148,733 ₹ 0 ₹ 148,733
37 43 (21.01.19-27.01.19) MEL* ₹ 148,687 ₹ 0 ₹ 148,687
38 44 (28.01.19-03.02.19) MEL* ₹ 246,831 ₹ 0 ₹ 246,831
39 45 (04.02.19-10.02.19) MEL* ₹ 155,675 ₹ 0 ₹ 155,675
40 46 (11.02.19-17.02.19) MEL* ₹ 179,031 ₹ 0 ₹ 179,031
41 47 (18.02.19-24.02.19) MEL* ₹ 139,978 ₹ 0 ₹ 139,978
42 48 (25.02.19-03.03.19) MEL* ₹ 158,077 ₹ 0 ₹ 158,077
43 49 (04.03.19-10.03.19) MEL* ₹ 188,552 ₹ 0 ₹ 188,552
44 50 (11.03.19-17.03.19) MEL* ₹ 195,657 ₹ 0 ₹ 195,657
45 51 (18.03.19-24.03.19) MEL* ₹ 149,683 ₹ 0 ₹ 149,683
46 52 (25.03.19-31.03.19) MEL* ₹ 201,966 ₹ 0 ₹ 201,966
47 1 (01.04.19-07.04.19) MEL* ₹ 383,765 ₹ 0 ₹ 383,765
48 1 (01.04.19-07.04.19) MEL PH2* ₹ 1,222,801 ₹ 707,446 ₹ 515,355
49 2 (08.04.19-14.04.19) MEL* ₹ 1,405,611 ₹ 0 ₹ 1,405,611
50 3 (15.04.19-21.04.19) MEL* ₹ 155,938 ₹ 0 ₹ 155,938
51 3 (15.04.19-21.04.19) MEL PH2* ₹ 507,942 ₹ 0 ₹ 507,942
52 4 (22.04.19-28.04.19) MEL* ₹ 192,218 ₹ 0 ₹ 192,218
53 4 (22.04.19-28.04.19) MEL PH2* ₹ 291,982 ₹ 201,367 ₹ 90,615
54 5 (29.04.19-05.05.19) MEL* ₹ 146,070 ₹ 0 ₹ 146,070
55 6 (06.05.19-12.05.19) MEL* ₹ 207,494 ₹ 0 ₹ 207,494
S.no.
Wk No. & period
Details of Payments into Deviation pool
Regional EntityAmount Payable
into pool (Rs.)
Amount Paid
(Rs.)
(+) Due to be
paid to pool / (-)
Excess Payment
Annexure-A(VI)
Page 1 of 3
56 6 (06.05.19-12.05.19) MEL PH2* ₹ 436,457 ₹ 81,216 ₹ 355,241
57 7 (13.05.19-19.05.19) MEL* ₹ 207,345 ₹ 0 ₹ 207,345
58 7 (13.05.19-19.05.19) MEL PH2* ₹ 420,469 ₹ 0 ₹ 420,469
59 8 (20.05.19-26.05.19) MEL* ₹ 438,941 ₹ 0 ₹ 438,941
60 9 (27.05.19-02.06.19) MEL* ₹ 457,730 ₹ 0 ₹ 457,730
61 10 (03.06.19-09.06.19) MEL * ₹ 592,121 ₹ 0 ₹ 592,121
62 11(10.06.19-16.06.19) MEL* ₹ 139,089 ₹ 0 ₹ 139,089
63 11(10.06.19-16.06.19) MEL PH2* ₹ 302,086 ₹ 0 ₹ 302,086
64 12 (17.06.19-23.06.19) MEL PH2 * ₹ 655,449 ₹ 0 ₹ 655,449
65 13 (24.06.19-30.06.19) SEL* ₹ 297,824 ₹ 0 ₹ 297,824
66 13 (24.06.19-30.06.19) MEL PH2* ₹ 536,233 ₹ 0 ₹ 536,233
67 14 (01.07.19-07.07.19) SEL* ₹ 306,332 ₹ 0 ₹ 306,332
68 14 (01.07.19-07.07.19) MEL PH2* ₹ 370,898 ₹ 0 ₹ 370,898
69 15 (08.07.19-14.07.19) SEL* ₹ 231,934 ₹ 0 ₹ 231,934
70 15 (08.07.19-14.07.19) MEL PH2 * ₹ 418,115 ₹ 0 ₹ 418,115
71 16 (15.07.19-21.07.19) SEL* ₹ 253,587 ₹ 0 ₹ 253,587
72 16 (15.07.19-21.07.19) MEL PH2* ₹ 525,826 ₹ 0 ₹ 525,826
73 17 (22.07.19-28.07.19) SEL* ₹ 241,393 ₹ 0 ₹ 241,393
74 17 (22.07.19-28.07.19) MEL PH2* ₹ 370,919 ₹ 0 ₹ 370,919
75 18 (29.07.19-04.08.19) SEL* ₹ 298,802 ₹ 0 ₹ 298,802
76 18 (29.07.19-04.08.19) MEL* ₹ 131,855 ₹ 0 ₹ 131,855
77 18 (29.07.19-04.08.19) MEL PH2* ₹ 152,541 ₹ 0 ₹ 152,541
78 19 (05.08.19-11.08.19) SEL* ₹ 251,266 ₹ 0 ₹ 251,266
79 19 (05.08.19-11.08.19) MEL* ₹ 263,888 ₹ 0 ₹ 263,888
80 20 (12.08.19-18.08.19) SEL* ₹ 241,397 ₹ 0 ₹ 241,397
81 20 (12.08.19-18.08.19) MEL* ₹ 307,797 ₹ 0 ₹ 307,797
82 21 (19.08.19-25.08.19) SEL* ₹ 326,528 ₹ 0 ₹ 326,528
83 21 (19.08.19-25.08.19) MEL* ₹ 244,505 ₹ 0 ₹ 244,505
84 22 (26.08.19-01.09.19) SEL* ₹ 340,081 ₹ 0 ₹ 340,081
85 22 (26.08.19-01.09.19) MEL* ₹ 240,932 ₹ 0 ₹ 240,932
86 23 (02.09.19-08.09.19) SEL* ₹ 253,517 ₹ 0 ₹ 253,517
87 23 (02.09.19-08.09.19) MEL* ₹ 273,722 ₹ 0 ₹ 273,722
88 24 (09.09.19-15.09.19) MEL* ₹ 251,084 ₹ 0 ₹ 251,084
89 24 (09.09.19-15.09.19) SEL* ₹ 330,717 ₹ 0 ₹ 330,717
90 25 (16.09.19-22.09.19) SEL* ₹ 325,257 ₹ 0 ₹ 325,257
91 25 (16.09.19-22.09.19) MEL* ₹ 275,321 ₹ 0 ₹ 275,321
92 26 (23.09.19-29.09.19) SEL* ₹ 182,807 ₹ 0 ₹ 182,807
93 26 (23.09.19-29.09.19) MEL* ₹ 261,629 ₹ 0 ₹ 261,629
94 27 (30.09.19-06.10.19) SEL* ₹ 240,927 ₹ 0 ₹ 240,927
95 27 (30.09.19-06.10.19) MEL* ₹ 304,483 ₹ 0 ₹ 304,483
96 28 (07.10.19-13.10.19) SEL* ₹ 278,264 ₹ 0 ₹ 278,264
97 28 (07.10.19-13.10.19) MEL* ₹ 178,261 ₹ 0 ₹ 178,261
98 29 (14.10.19-20.10.19) SEL* ₹ 294,543 ₹ 0 ₹ 294,543
99 29 (14.10.19-20.10.19) MEL* ₹ 352,322 ₹ 0 ₹ 352,322
100 30 (21.10.19-27.10.19) SEL* ₹ 197,708 ₹ 0 ₹ 197,708
101 30 (21.10.19-27.10.19) MEL* ₹ 297,564 ₹ 0 ₹ 297,564
102 31 (28.10.19-03.11.19) SEL* ₹ 170,415 ₹ 0 ₹ 170,415
103 31 (28.10.19-03.11.19) MEL* ₹ 349,807 ₹ 0 ₹ 349,807
104 32 (04.11.19-10.11.19) SEL* ₹ 161,678 ₹ 0 ₹ 161,678
105 33 (11.11.19-17.11.19) SEL* ₹ 173,994 ₹ 0 ₹ 173,994
106 34 (18.11.19-24.11.19) SEL * ₹ 234,872 ₹ 0 ₹ 234,872
107 35 (25.11.19-01.12.19) SEL * ₹ 226,429 ₹ 0 ₹ 226,429
108 36 (02.12.19-08.12.19) SEL * ₹ 229,554 ₹ 0 ₹ 229,554
109 37 (09.12.19-15.12.19) SEL* ₹ 268,568 ₹ 0 ₹ 268,568
110 38 (16.12.19-22.12.19) SEL* ₹ 224,130 ₹ 0 ₹ 224,130
111 38 (16.12.19-22.12.19) MEL* ₹ 336,019 ₹ 0 ₹ 336,019
112 39 (23.12.19-29.12.19) SEL* ₹ 141,882 ₹ 0 ₹ 141,882
113 39 (23.12.19-29.12.19) MEL* ₹ 350,557 ₹ 0 ₹ 350,557
114 40 (30.12.19-05.01.20) SEL* ₹ 251,583 ₹ 0 ₹ 251,583
115 40 (30.12.19-05.01.20) MEL* ₹ 336,571 ₹ 0 ₹ 336,571
116 41 (06.01.20-12.01.20) SEL * ₹ 254,052 ₹ 0 ₹ 254,052
117 41 (06.01.20-12.01.20) MEL * ₹ 267,446 ₹ 0 ₹ 267,446
118 42 (13.01.20-19.01.20) SEL* ₹ 224,377 ₹ 0 ₹ 224,377
Annexure-A(VI)
Page 2 of 3
119 42 (13.01.20-19.01.20) MEL* ₹ 245,659 ₹ 0 ₹ 245,659
120 43 (20.01.20-26.01.20) SEL* ₹ 226,536 ₹ 0 ₹ 226,536
121 43 (20.01.20-26.01.20) MEL* ₹ 262,493 ₹ 0 ₹ 262,493
122 43 (20.01.20-26.01.20) COASTAL ENERGEN* ₹ 714,907 ₹ 0 ₹ 714,907
123 44 (27.01.20-02.02.20) SEL* ₹ 252,583 ₹ 0 ₹ 252,583
124 44 (27.01.20-02.02.20) MEL* ₹ 264,229 ₹ 0 ₹ 264,229
125 44 (27.01.20-02.02.20) AZURE NPKUNTA* ₹ 247,683 ₹ 0 ₹ 247,683
126 44 (27.01.20-02.02.20) MYTRAH TUTICORIN* ₹ 6,159,016 ₹ 0 ₹ 6,159,016
Annexure-A(VI)
Page 3 of 3
I Disbursement of PoC Charges Dec'19 to Jan'20
Month
MWH PoC Charges MWH PoC Charges
Dec-19 894,670 226,741,269 894,670 274,785,216 501,526,485 20,145,402 481,381,083
Jan-20 702,092 163,056,890 702,092 202,845,106 365,901,996 19,781,674 346,120,322
II Disbursement of STU/SLDC Charges from Dec'19 to Jan'20
Month STATESTU
Charges
TDS deducted
by applicantsNet Payable SLDC Charges
TDS deducted
by applicantsNet Payable S/B A/C No. & RTGS Code as furnished by utilities
GUJARAT 0 0 0 37,000 3600 33,400Bank of India, A/c. No. 250120910000003, RTGS Code:
BKID0002501
MPPTCL 0 0 0 18,000 300 17,700
(1) STU Charge : Union Bank A/c.No.552901110050000,
IFSC- UBIN0555291
(2) SLDC Charge : Union Bank A/c.No.571701010050209,
IFSC- UBIN0557170
WBSETCL 151,965 0 151,965 3,000 0 3,000UCO Bank S/B A/c. No.17130202000905, RTGS Code
UCBA0001713
APTRANSCO 99086421 1072777 98013644 383,000 11680 371,320
Transmission Corp. of Andhra Pradesh Ltd , Specialised Mid
Corporate , VIJAYAWADA , State Bank of India , A/c.No.
00000062033399935, IFSC Code SBIN0016576 .
KPTCL 2,999,046 357,120 2,641,926 68,000 620 67,380SBI A/c. No.54037881199, Madhavanagar Branch. RTGS
Code: SBIN 0040196
TNEB 18,403,558 1,698,291 16,705,267 67,176 5,821 61,355TANTRANSCO, Canara Bank A/c.No.0911201022266, Anna
Salai Branch, Chennai-2, IFSC Code:CNRB0000911
TELANGANA 2,286,050 64,355 2,221,695 155,000 4,340 150,660TGTRANSCO,STATE BANK OF
INDIA,A/c.No.62344544325,IFSC Code::SBIN0020066
GUJARAT 0 0 0 34000 3300 30700Bank of India, A/c. No. 250120910000003, RTGS Code:
BKID0002501
HPSEB 528 0 528 2000 0 2000
1) STU charge: State Bank of India , A/c No. 30731547992
IFSC CODE : SBIN0004122 2) SLDC charge: Punjab
National Bank A/C No. 0892000101069932
PUNB0089200
MPPTCL 0 0 0 27000 480 26520
(1) STU Charge : Union Bank A/c.No.552901110050000,
IFSC- UBIN0555291
(2) SLDC Charge : Union Bank A/c.No.571701010050209,
IFSC- UBIN0557170
WBSETCL 22593 0 22593 1000 0 1000UCO Bank S/B A/c. No.17130202000905, RTGS Code
UCBA0001713
APTRANSCO 55916641.15 1130734 54785907.15 297000 10500 286500
Transmission Corp. of Andhra Pradesh Ltd , Specialised Mid
Corporate , VIJAYAWADA , State Bank of India , A/c.No.
00000062033399935, IFSC Code SBIN0016576 .
KPTCL 3793682.4 357120 3436562.4 66000 620 65380SBI A/c. No.54037881199, Madhavanagar Branch. RTGS
Code: SBIN 0040196
TNEB 13608870.09 334309 13274561.09 58516 4367 54149TANTRANSCO, Canara Bank A/c.No.0911201022266, Anna
Salai Branch, Chennai-2, IFSC Code:CNRB0000911
TELANGANA 2237456.613 48487 2188969.613 151000 3060 147940TGTRANSCO,STATE BANK OF
INDIA,A/c.No.62344544325,IFSC Code::SBIN0020066
Dec-19
Jan-20
Injection Withdrawal Total PoC
Charges
TDS by
applicant
SBI(CAG Branch),New Delhi,Current A/c
No.31858364382,IFSC Code:SBIN0009996
Disbursed to
CTUBank A/C No. & RTGS Code
Annexure-A(VII)
Page 1 of 1
SRLDC - Status of Surplus Fund Transfer to PSDF as on 27/02/2020All amounts in Rs.
Total amount
Transferred
Date Amount Date Amount Date Amount Date Amount Date Amount
1 29.10.2010 1,820,000,000 30.10.2010 1,000,000,000 29.10.2010 6,000,000 05.08.2015 24,119,766 30.03.2012 33,338,191 2,883,457,957
2 27.12.2010 200,000,000 02.11.2010 820,000,000 27.12.2010 3,242,169 16.01.2013 23,054,067 1,046,296,236
3 09.03.2011 50,000,000 09.03.2011 200,000,000 25.11.2011 15,000,000 28.03.2013 1,600,000,000 1,865,000,000
4 05.05.2011 170,000,000 09.05.2011 10,000,000 25.07.2012 4,500,000 19.04.2013 1,513,805,146 1,698,305,146
5 25.11.2011 700,000,000 21.05.2012 4,200,000 23.05.2013 832,268 29.04.2013 100,760,071 805,792,339
6 27.03.2012 460,000,000 29.03.2014 2,400,000 23.05.2013 2,152,485,485 2,614,885,485
7 25.07.2012 650,000,000 08.05.2014 1,000,000 13.04.2016 114,096,513 765,096,513
8 27.11.2012 107,500,000 05.09.2014 4,965,992 13.06.2016 25,568,400 138,034,392
9 28.03.2013 170,000,000 20.03.2017 3,521,875 173,521,875
10 23.05.2013 100,000,000 12.04.2017 43,753,750 143,753,750
11 26.07.2013 70,000,000 12.05.2017 5,462,500 75,462,500
12 29.08.2013 19,000,000 14.05.2018 1014300 20,014,300
13 01.10.2013 13,000,000 13,000,000
14 17.12.2013 25,000,000 25,000,000
15 29.03.2014 6,200,000 6,200,000
16 29.03.2014 31,400,000 31,400,000
17 08.05.2014 80,000,000 80,000,000
18 13.06.2014 66,900,000 66,900,000
19 08.07.2014 140,000,000 140,000,000
20 23.07.2014 200,000,000 200,000,000
21 19.08.2014 523,772,408 523,772,408
22 05.09.2014 131,764,848 131,764,848
23 10.10.2014 193,422,568 193,422,568
24 10.11.2014 26,289,310 26,289,310
25 10.11.2014 349,393,364 349,393,364
26 10.12.2014 225,084,593 225,084,593
27 06.01.2015 83,484,064 83,484,064
28 04.02.2015 157,282,113 157,282,113
29 09.03.2015 139,005,176 139,005,176
30 27.03.2015 39,381,713 39,381,713
31 11.05.2015 262,876,237 262,876,237
32 08.06.2015 290,107,368 290,107,368
33 12.06.2015 24,237,230 24,237,230
34 08.07.2015 167,657,677 167,657,677
35 05.08.2015 209,991,509 209,991,509
36 04.09.2015 300,321,954 300,321,954
37 16.10.2015 853,675,731 853,675,731
38 06.11.2015 323,025,533 323,025,533
39 15.12.2015 330,815,791 330,815,791
40 06.01.2016 252,030,725 252,030,725
41 09.02.2016 267,104,962 267,104,962
42 09.03.2016 170,520,134 170,520,134
43 31.03.2016 212,867,411 212,867,411
44 10.05.2016 131,747,100 131,747,100
45 09.06.2016 423,961,609 423,961,609
46 11.07.2016 188,038,441 188,038,441
47 16.05.2017 300,000,000 300,000,000
48 09.08.2017 500,000,000 500,000,000
49 01.10.2019 890,969,067 01.10.2019 315920 891,284,987
50 04.12.2019 6,657 04.12.2019 4380 04.12.2019 71,991,374 72,002,411
Total 13,047,828,636 2,034,200,000 37,947,086 24,440,066 5,688,851,672 20,833,267,460
* STOA E-bidding charges treated as congestion amount and transferred to PSDF.
STOA e-Bidding ChargesSl.No
From UI/DSM pool account From capping accountFrom Reactive energy pool
accountCongestion charges
Annexure-A(VIII)
Page 1 of 1
Annexure-B
Page 1 of 5
Annexure-B
Page 2 of 5
Annexure-B
Page 3 of 5
Annexure-B
Page 4 of 5
Annexure-B
Page 5 of 5
Annexure-C
Page 1 of 2
Annexure-C
Page 2 of 2
05/03/2020 Gmail - FW: REGISTRATION OF PUGALUR HVDC STATION AS USER - REGARDING
https://mail.google.com/mail/u/0?ik=00a3b8867b&view=pt&search=all&permthid=thread-f%3A1659497511482707483%7Cmsg-f%3A1659497511… 1/2
COMMERCIALDATA SRPC <[email protected]>
FW: REGISTRATION OF PUGALUR HVDC STATION AS USER - REGARDING1 message
Sivakumar R {आर. िशव कुमार} <[email protected]> Tue, Feb 25, 2020 at 2:07 PMTo: "[email protected]" <[email protected]>, "[email protected]"<[email protected]>, "[email protected]" <[email protected]>Cc: Naresh Kumar Angaru {अंगा� नरेश कुमार} <[email protected]>
Dear Sir,
As per the trailing mail, we request you create Pugalur HVDC as a separate user while issuing Accounts. This isrequired as per the requirement of the Contract, accounting has to be done for HVDC system separately.
Regards,
R Sivakumar
Sr.DGM(F&A)
RPT-HVDC
9449596040
From: Sivakumar R {आर. िशव कुमार} Sent: Tuesday, February 25, 2020 2:02 PMTo: '[email protected]' <[email protected]>; '[email protected]' <[email protected]>Cc: Naresh Kumar Angaru {अंगा� नरेश कुमार} <[email protected]>; Gomathinayagam R {गोम्तीनयागमआर.} <[email protected]>; '[email protected]' <[email protected]>Subject: REGISTRATION OF PUGALUR HVDC STATION AS USER - REGARDING
Dear Sir,
We have been allocated One MW for Pugalur HVDC Station. In this connection it is to mention that as per therequirement of the Contract, accounting has to be done HVDC system separately. Therefore you are requested toRegister Pugalur HVDC as a separate User. Formalities for the Registration may please be sent by reply mail, so thatthe same will be complied with.
With Regards,
R Sivakumar,
Sr.DGM(F&A)
RPT-HVDC,
POWERGRID, Bangalore
Annexure-D
Page 1 of 2
05/03/2020 Gmail - FW: REGISTRATION OF PUGALUR HVDC STATION AS USER - REGARDING
https://mail.google.com/mail/u/0?ik=00a3b8867b&view=pt&search=all&permthid=thread-f%3A1659497511482707483%7Cmsg-f%3A1659497511… 2/2
9449596040
दावा�ाग : यह ईमेल पावरि�ड के दावा�ाग िनयम व शत� �ारा शािसत है िजसे http://apps.powergridindia.com/Disclaimer.htm पर देखा जा सकता है। Disclaimer: This e-mail is governed by the Disclaimer Terms & Conditions of POWERGRID which may be viewed at http://apps.powergridindia.com/Disclaimer.htm
Annexure-D
Page 2 of 2
SI.No Assets SystemDOCO
(00:00 Hrs)
Reference of Approval
details(Standing
Committee/
RPC/Empowered
Committee)
*Monthly
transmision charges
(MTC)
(Provisional)
in Rs. Cr
1
+/- 200 MVAR Dynamic Compensation (STATCOM) along with 2x125 MVAR
Mechanically Switched Reactor (MSR) and 1x125 MVAR Mechanically
Switched Capacitor (MSC) and coordinated control mechanism of MSCs and
MSRs at 400kV Hyderabad Substation
System Strengthening in Southern
Region- XXI04-Sep-19
36th Standing Committee
Meetings of SR dtd 04.09.13
and 23rd SRPC Meeting dtd
26.10.13
2.40
2
04 Nos. 765kV Line Bays (GIS) at Maheshwaram SS and 02 Nos. of 400kV Line
Bays at Warangal SS
SUBSTATION WORKS ASSOCIATED WITH
ADDITIONAL INTER-REGIONAL AC LINK
FOR IMPORT OF POWER INTO
SOUTHERN REGON i.e., WARORA-
WARANGAL AND C’PETA- HYDERABAD-
KURNOOL 765KV LINK
Ready from 10-Nov-19 but yet to be
declared under commercial operation
as downstream is not commissioned.
Referred to CERC for approval of
DOCO as per Regulation 5 of CERC
Tariff Regulations 2019
37th Standing Committee
Meeting of SR Meeting dtd
31.07.14 & 26th SRPC dtd
20.12.14
2.23
3
• 02 nos. of 765kV line bays at Cuddapah SS for termination of Chilakaluripeta
– Cuddapah 765kV D/c line
• 01 no. of 240 MVAR Switchable Line Reactor on each circuit of
Chilakaluripeta – Cuddapah 765kV D/c line at Cuddapah SS (02 nos. 240 MVAR
reactors at Cuddapah SS)
SUBSTATION WORKS ASSOCIATED WITH
STRENGTHENING OF TRANSMISSION
SYSTEM BEYOND VEMAGIRI
18-Jan-20
37th Standing Committee
Meeting (SCM) of SR dtd
31.07.14, & 26th SRPC
Meeting dtd 20.12.14 and
further discussed in 39th
SCM dated 28.12.15
3.03
Assets declared under commercial operation by SRTS-I from Apr'19 to Feb'20
Amounts in Cr
* Note: The monthly transmisson charges indicated above are provisional in nature and the actual billing would be based on CERC orders only.
Annexure-E
Page 1 of 5
SI.No Assets SystemDOCO
(00:00 Hrs)
Reference of Approval
details(Standing
Committee/
RPC/Empowered
Committee)
Monthly transmision
charges (MTC)
(Pre determined)
in Rs. Cr
1400kV Chilakaluripeta- Narsaraopeta (Quad) D/c Line
02 Nos 400kV line bays at Sattenapalli (Narsaraopeta) Substation of APTRANSCO31-Jul-19 1.39
2 765 kV Chilakaluripeta Substation with 2x1500 MVA and 2x240 MVAR Bus Reactors 31-Jul-19 6.42
3Vemagiri-II – Chilakaluripeta 765kV D/C line with 240 MVAR switchable line
reactors at Chilakaluripeta end of each circuit18-Jan-20 13.92
4Chilakaluripeta – Cuddapah 765kV D/C line with 240 MVAR switchable line
reactors at Chilakaluripeta end of each circuit18-Jan-20 12.82
5765/400 kV substation at Chilakaluripeta with 2x1500 MVA transformers and
2x240 MVAR (7x80 MVAR units, one spare unit) bus reactors each. 18-Jan-20 6.42
List of Assets commissioned under TBCB- PSITSL
TBCB- Beyond Vemagiri
37th Standing Committee
Meeting (SCM) of SR dtd
31.07.14, & 26th SRPC
Meeting dtd 20.12.14
Annexure-E
Page 2 of 5
Rs. In Crores
Sl.No. Assets System DOCOReference of approval details
(Standing Committee/RPC)
*Monthly transmision
charges (MTC)
( Provisional) in Crs
11 no. 500MVA 400/220KV transformer along with its associated bays and
equipment's at Tumkur(Pavagada) pooling station
Transmission System for Ultra Mega Solar Power
Park at Tumkur (Pavagada), Karnataka -Phase-II (
PART-A)
28.04.201939th SCM of Southern Region
Constituents0.44
21 X 125 MVAR 400kV Bus Reactor along with its associated bays and
equipment's at Tumkur (Pavagada) pooling station.
Transmission System for Ultra Mega Solar Power
Park at Tumkur (Pavagada), Karnataka -Phase-II (
PART-A)
03.06.201939th SCM of Southern Region
Constituents0.16
32 X 240 MVAR 765kV Bus Reactor along with its associated bays and
equipment's at Thiruvalam 765/400kV (POWERGRID) Substation
Installation of Bus Reactors at Cuddapah, Nellore,
Kurnool, Raichur and Thiruvalam07.06.2019
39th SCM of Southern Region
Constituents1.55
41X 500MVA 400/220KV transformer along with associated bays and
equipments at Tumkur(Vasantnarsapur) Substation
Transmission System for Ultra Mega Solar Power
Park at Tumkur (Pavagada), Karnataka -Phase-II (
PART-A)
17.06.201939th SCM of Southern Region
Constituents0.42
5
1. Fixed Series Capacitor (40%) on Circuit-I of 400kV Tumkur (Pavagada) –
Tumkur (Vasantnarsapura) D/c Quad line at Tumkur (Pavagada) PS end & 2.
Fixed Series Capacitor (40%) on Circuit –II of 400kV Tumkur (Pavagada) –
Tumkur (Vasantnarsapura) D/c Quad line at Tumkur (Pavagada) PS end
“Transmission System for Ultra Mega Solar Power
Park at Tumkur (Pavagada), Karnataka -Phase-II
(PART-C)”
01.09.201940th SCM of Southern Region
Constituents1.45
List Of SR-II Assets-(F.Y.2019-20 as on date)
Annexure-E
Page 3 of 5
6Circuit-I of Tirunelveli – Muvathapuza (Cochin) 400kV quad D/c line
(Tirunelveli to Edamon on Multi Ckt Line and Edamon to Cochin on D/C line)
“Transmission System associated with
Kudamkulam Atomic Power Project (2X1000MW)” 27.09.2019
18th SCM of Southern Region
Constituents13.58
7Circuit-II of Tirunelveli – Muvattupuzha (Cochin) 400kV quad D/c line
(Tirunelveli to Edamon on Multi Ckt Line and Edamon to Cochin on D/C line)
“Transmission System associated with
Kudamkulam Atomic Power Project (2X1000MW)” 20.12.2019
18th SCM of Southern Region
Constituents1.67
8
Installation of +/- 200 MVAR Dynamic Compensation (STATCOM) along with
2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR
Mechanically Switched Capacitor (MSC) and coordinated control mechanism
of MSCs and MSRs at 400/230 KV Udumalpet Substation.
System Strengthening in Southern Region-XXI 20.12.201936th SCM of Southern Region
Constituents3.00
9
Installation of +/- 200 MVAR Dynamic Compensation (STATCOM) along with
2x125 MVAR Mechanically Switched Reactor (MSR) and 1x125 MVAR
Mechanically Switched Capacitor (MSC) and coordinated control mechanism
of MSCs and MSRs at 400/230 KV Trichy Substation.
System Strengthening in Southern Region-XXI 28.12.201936th SCM of Southern Region
Constituents2.45
10
1 x 63 MVAR 400 KV Bus Reactor along with associated bays & Equipment’s at
Yelahanka GIS ( 1 of 2 nos. of surplus 400KV bays at Yelahanka GIS due to
scope change under SRSS-XII is utilized for this Bus reactor as agreed in 36th
meeting of standing committee on Power system planning of SR held on
04.09.2013).
“System strengthening in Southern Region -XXIII” 02.01.202035th & 36th SCM of Southern
Region Constituents0.20
Annexure-E
Page 4 of 5
11
1 x 63 MVAR 400 KV Bus Reactor along with associated bays & Equipment’s at
Yelahanka GIS ( 2 of 2 nos. of surplus 400KV bays at Yelahanka GIS due to
scope change under SRSS-XII is utilized for this Bus reactor as agreed in 36th
meeting of standing committee on Power system planning of SR held on
04.09.2013).
“System strengthening in Southern Region -XXIII” 13.01.202035th & 36th SCM of Southern
Region Constituents0.19
12
Madhugiri (Tumkur-Vasantnarsapur)-Yelahanka 400 KV D/C (Quad) line (with a
small portion strung on multi-circuit tower of the SRSS-XII scheme with high
ampacity conductor in Bengaluru area) along with associated bays &
equipments at Madhugiri SS (Tumkur-Vasantnarsapur) and Yelahanka GIS SS.
System Strengthening in Southern Region-XIII 02.02.202028th SCM of Southern Region
Constituents5.00
* Note: The monthly transmisson charges indicated above are provisional in nature and the actual billing would be based on CERC orders only.
Annexure-E
Page 5 of 5