Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer,...

15
Q&A With The Joint Commission COVID-19 Webinar for Hospital Accreditation September 3, 2020

Transcript of Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer,...

Page 1: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

Q&A With The Joint CommissionCOVID-19 Webinar for Hospital Accreditation

September 3, 2020

Page 2: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2020 The Joint Commission. All Rights Reserved.

Panel

Kelley McCannAssociate Director AccreditationAccreditation and Certification OperationsThe Joint Commission

Jennifer Welch, MBAAssociate Director AccreditationAccreditation and Certification OperationsThe Joint Commission

Diane Cullen, MSN, MBA, RN, CICAssociate DirectorStandards Interpretation GroupThe Joint Commission

Theresa Hendricksen, RN, MS, FACHEField Director, HAP and CAHThe Joint Commission

Sylvia Garcia-Houchins, MBA, RN, CICDirector, Infection Preventionand ControlThe Joint Commission

Gayle Jensen-Savoie, PhD, LOC-S, LMFT-S, LCDCField Director, Surveyor Management and SupportThe Joint Commission

Maura Naddy, MSN, RNC-OBAssociate Director, Standards Interpretation GroupThe Joint Commission

Robert Campbell, PharmDDirector, Clinical Standards InterpretationHospital/Ambulatory ProgramsDirector, Medication ManagementThe Joint Commission

John Raisch, CHFMEngineer, Department of EngineeringThe Joint Commission

Page 3: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

Room Turnover−Considerations− Size of room−Number of ACH (air changes

per hour)− Length of time patient was in

room− Patient coughing/sneezing− Patient wearing face covering−Aerosol generating procedure− PPE used

The number of air changes per hour (ACH) and time and efficiency.

ACH

Time (mins.) required for

removal99% efficiency

Time (mins.) required for

removal99.9% efficiency

2 138 207

4 69 104

6 46 69

8 35 52

10 28 41

12 23 35

15 18 28

20 14 21

50 6 8

https://www.cdc.gov/infectioncontrol/guidelines/environmental/appendix/air.html#tableb1

https://www.cdc.gov/coronavirus/2019-ncov/hcp/infection-control-faq.html

Page 4: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2019 The Joint Commission. All Rights Reserved.

Page 5: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2019 The Joint Commission. All Rights Reserved.

Community TransmissionType of Community Transmission Definition

Substantial community transmission Large scale community transmission, including communal settings (e.g., schools, workplaces)

Minimal to moderate community transmission:

Sustained transmission with high likelihood or confirmed exposure within communal settings and potential for rapid increase in cases

No to minimal community transmission Evidence of isolated cases or limited community transmission, case investigations underway; no evidence of exposure in large communal setting

https://www.cdc.gov/coronavirus/2019-ncov/hcp/infection-control-recommendations.html

Page 6: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

6© 2020 The Joint Commission. All Rights Reserved.

Patient Procedure CommunitySpread PPE required

COVID-19 Patient? Aerosol Generating Procedure?

Spread of COVID in community?

Type of PPE

Yes Yes Any levelFFR, face/eye protection, gloves, gown

Yes No N/AFFR or mask, face/eye protection, gown, gloves

No/ Unknown Yes Moderate or substantialFFR and face/eye protection, gloves, gown

No/Unknown Yes Minimal or limitedFFR or mask *

No/Unknown No Moderate or Substantial Mask and eye protection *

No/ Unknown No Minimal or LimitedMask or cloth covering (source control) *

PPE Selection: Risk= Resources Needed

* Additional PPE as required by Standard and Transmission based PrecautionsFFR: Filtering Facepiece Respirator

Page 7: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2019 The Joint Commission. All Rights Reserved.

Need for PPE Limited Resources

https://www.cdc.gov/coronavirus/2019-ncov/hcp/infection-control.html

PPE Challenges

Page 8: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

CDC: PPE Optimization Strategy

https://www.cdc.gov/coronavirus/2019-ncov/hcp/ppe-strategy/strategies-optimize-ppe-shortages.html

Page 9: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

9© 2020 The Joint Commission. All Rights Reserved.

Are You in Crisis Capacity?

Page 10: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

10© 2020 The Joint Commission. All Rights Reserved.https://www.cdc.gov/coronavirus/2019-ncov/hcp/ppe-strategy/decontamination-reuse-

respirators.html

Page 11: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2019 The Joint Commission. All Rights Reserved.

How do I reprocess N95 respirators?

https://www.cdc.gov/coronavirus/2019-ncov/hcp/ppe-strategy/decontamination-reuse-respirators.html

Pre-Submitted Questions

Page 12: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2020 The Joint Commission. All Rights Reserved.

Pre-Submitted Questions

Page 13: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2020 The Joint Commission. All Rights Reserved.

COVID-19 resources

Page 14: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2020 The Joint Commission. All Rights Reserved.

Thank You

We support your efforts in response to the COVID-19 pandemic and hope to provide helpful resources

Page 15: Q&A With The Joint Commisson...2020/09/03  · The Joint Commission John Raisch, CHFM Engineer, Department of Engineering The Joint Commission Room Turnover −Considerations −Size

© 2020 The Joint Commission. All Rights Reserved.

Resources−COVID Resources− https://www.jointcommission.org/covid-19/

−Standards Interpretation− https://www.jointcommission.org/standards/standard-

faqs/