PYROMAT ECO - · PDF fileKeyword index ... 3 sensor wells for buffer temperature sensors ......
-
Upload
truongdang -
Category
Documents
-
view
218 -
download
2
Transcript of PYROMAT ECO - · PDF fileKeyword index ... 3 sensor wells for buffer temperature sensors ......
Installation instructionsfor contractors
PYROMAT ECO
PYROMAT ECO
5604 445 GB 8/2012 Dispose after installation.
2
Please follow these safety instructions closely to prevent accidents and mate-rial losses.
Safety instructions explained
DangerThis symbol warns against therisk of injury.
! Please noteThis symbol warns against therisk of material losses and envi-ronmental pollution.
NoteDetails identified by the word "Note" con-tain additional information.
Target group
These instructions are exclusivelydesigned for qualified contractors.■ Work on electrical equipment must
only be carried out by a qualified elec-trician.
Regulations
Observe the following when working onthis system■ National installation requirements■ Legal instructions regarding the pre-
vention of accidents■ Legal instructions regarding environ-
mental protection
■ The Code of Practice of relevant tradeassociations
■ All current safety regulations asdefined by DIN, EN, DVGW, VDE andall locally applicable standards.a ÖNORM, EN and ÖVEc SEV, SUVA, SVTI, SWKI and
SVGW
Working on the system
■ Isolate the system from the power sup-ply and check that it is no longer 'live',e.g. by removing the separate fuse orby means of a main isolator.
■ Safeguard the system against unau-thorised reconnection.
Safety instructions
5604
445
GB
3
Safety and liability.............................................................................................. 4
Preparing for installation................................................................................... 6
Installation sequenceFitting the flue gas fan casing............................................................................... 16Fitting the flue gas fan.......................................................................................... 17Connecting the boiler on the flue side.................................................................. 18Connecting the boiler on the heating water side.................................................. 20■ Hydraulic connection......................................................................................... 20■ Connections...................................................................................................... 21Making the electrical connections........................................................................ 22■ Overview of top connector strip........................................................................ 22■ Overview of bottom connector strip.................................................................. 23■ Plug connections............................................................................................... 24Power supply........................................................................................................ 30■ Directives.......................................................................................................... 30Fitting the cleaning tool mounting bracket............................................................ 31Commissioning and adjustment........................................................................... 31
Appendix............................................................................................................. 32
Keyword index.................................................................................................... 34
Index56
04 4
45 G
B
4
Application
The Pyromat Eco, type PMEA boiler canbe used for the following:■ Central heating via a central heating
system■ DHW heating
Any use that differs from or goes beyondthis is considered inappropriate.
NoteThe Pyromat Eco, type PMEA must onlybe operated by authorised and trainedpersonnel.
Boiler application limits
Life cycle stagesLife cycle stages Responsible/participating personnelManufacture ■ External person
■ ManufacturerDelivery, moving, handling, installation ■ External person
■ Manufacturer■ Logistics■ Electrician/heating contractor
Installation ■ External person■ Electrician/heating contractor
Commissioning ■ System user■ External person■ Electrician/heating contractor
Operation ■ System user■ External person
Maintenance, repair, decommissioning ■ System user■ Electrician/heating contractor■ Service engineer
Dismantling, removal, collection ■ External person■ Logistics■ Electrician/heating contractor■ Disposal contractor
Disposal ■ External person■ Disposal contractor
Safety and liability
5604
445
GB
5
Occupational safety
DangerIncorrectly executed electricalinstallations can result in injuriesfrom electrical current and inappliance damage.
Connect the power supply andimplement all safety measures(e.g. RCD circuit) in accordancewith the following regulations:■ IEC 60364-4-41■ VDE regulations [IEE or local
regulations]■ Technical connection require-
ments of the local power supplyutility
DangerContact with 'live' componentscan lead to serious injury fromelectric current. Some compo-nents on the PCBs will remain'live' even after the power supplyhas been switched off.■ Isolate the system from its
power supply (e.g. at a sepa-rate MCB/fuse or mains isola-tor), check that there are nomore 'live' currents and safe-guard against reconnection.
NoteIn addition to the control circuit,there may be several power cir-cuits.
■ Prior to removing the boilercovers, wait at least 4 min. topermit the voltage to decay.
DangerThe absence of componentearthing can result in seriousinjury from electrical current andin component damage in theevent of an electrical fault.■ Always reinstate all earth con-
nections.■ Boiler and pipework must be
grounded to the equipotentialbonding of the building.
Working on the boiler
! Please notePrior to commissioning and fol-lowing repair or maintenancework check that the boiler is in an appropriatecondition.
■ Wear appropriate protective clothing(e.g. safety boots) in compliance withapplicable regulations on accidentprevention and in line with trade asso-ciation recommendations.
Safety and liability (cont.)
5604
445
GB
6
Unloading and transportation
NoteBefore unloading, have the recipientcheck the consignment for possibledamage. Note down any damage on thedelivery note and notify the haulage con-tractor.
! Please noteJolting movements can damagethe combustion chamber lining.Ensure the boiler is not subjectedto excessive jolting movementsduring handling and installation.
Note■ The pre-installed lifting eye can be
used to transport the boiler.■ The boiler can be moved inside its
packaging subject to the physicalspace allowing such handling.
■ Wherever possible, transport theboiler to the installation location withthe shipping protection fitted.
■ Only transport the boiler with fittedshipping feet on a pallet truck.
Preparing for installation
5604
445
GB
7
Wall clearances
a c
b
> d
Preparing for installation (cont.)
5604
445
GB
8
Pyromat ECO... 35 - 65 61 81 101 151a mm ≥200 ≥400 ≥400 ≥400 ≥400b mm 600 730 730 730 730c mm 600 800 800 800 800d mm 800 800 800 800 800
! Please noteBoiler damage resulting fromincorrect installation.Position the boiler level anddirectly on the floor. Never useany plinths/supports.
NoteThe specified wall clearances arerequired for installation and mainte-nance work.
Requirements to be met by installa-tion area■ Avoid air contamination through halo-
genated hydrocarbons (e.g. as con-tained in sprays, paints, solvents andcleaning agents)
■ Avoid very dusty conditions■ Avoid high levels of humidity■ Prevent frost and ensure good venti-
lation■ Max. room temperature of 40 °C
Weights
Data on weights excluding fan installed
Wood boiler for logs up to 0.5 m long:Pyromat Eco 35 45 55 65Shipping weight kg 750 760 920 935
Wood boiler for logs up to 1 m long:Pyromat Eco 61 81 101 151Shipping weight kg 1300 1320 1680 1720
Preparing for installation (cont.)
5604
445
GB
9
Remove all loose components from the boiler interior
2.
4.
3.
1.
1. Open the hopper door.
2. Remove all loose components fromthe hopper interior.
3. Open ash door.
4. Remove ash box and all loose com-ponents.
Preparing for installation (cont.)
5604
445
GB
10
Components inside the boiler hopper:■ in case of Pyromat Eco 35-65:
– Fan and casing ready installed■ in case of Pyromat Eco 61-151:
– Fan housing– Fan
■ Buffer cylinder control valve■ Cleaning tool
Components in the boiler ash box:■ Sight glass■ 3 sensor wells for buffer temperature
sensors■ Mounting bracket for cleaning tool
Also delivered with the boiler:■ Set of technical documentation com-
prising the following:– Installation and service instructions– Operating instructions
■ Set of turbulator rods (subject to boileroutput)
■ Boiler output label
Preparing for installation (cont.)
5604
445
GB
11
Fitting the sight glass
2. 3.
1.
1. Open ash chamber door and removesight glass from ash box.
2. Undo lifting eye.
3. Insert sight glass.
Preparing for installation (cont.)
5604
445
GB
12
Removing the shipping feet
DangerRisk of injury due to slipping andtipping of boiler.Ensure the trolley jack is in a sta-ble position before removing theshipping feet.Take the boiler weight intoaccount. Only use appropriatetools and equipment.Only use a square timber that canbear the weight of the boiler toraise and lower it.
! Please noteDamage to the boiler and instal-lation location due to slippingand/or tipping of the boiler.Ensure the trolley jack is in a sta-ble position before removing theshipping feet.Take the boiler weight intoaccount. Only use appropriatetools and equipment.Only use a square timber that canbear the weight of the boiler toraise and lower it.
NoteUse a trolley jack to remove the shippingfeet.
Removing the rear shipping feet
4.
1.
2.
3.
Preparing for installation (cont.)
5604
445
GB
13
1. Remove the Lambda probe from thecasing. Push square timber as far asit will go into the boiler's flue outlet.
2. Position the trolley jack against thesquare timber. Lift the boiler.
3. Remove rear transport feet.
4. Lower boiler slowly with trolley jack.
Removing the front shipping feet
1.
4.
2.
3.
5.
1. Open chamber door at the front of theboiler.
2. Push square timber as far as it will gointo the hopper chamber.
3. Lift the boiler with the trolley jack.
4. Remove front transport feet.
5. Lower boiler slowly with trolley jack.
Preparing for installation (cont.)
5604
445
GB
14
Mounting the turbulator set (if available)
The boiler turbulator set consists of tur-bulators with corresponding mountingbrackets.
4.
1.
3.
2.
1. Release the cleaning cover of theheat exchanger via the mushroom-shaped handle.
2. Open the cleaning cover.
3. Hook mounting brackets into turbula-tors.
4. Introduce turbulators on the mount-ing brackets into the heat exchangerpipes.
5. Close cleaning cover and lock inplace.
Preparing for installation (cont.)
5604
445
GB
15
Affixing the boiler output label
ACE
A Boiler type plate
1. Remove boiler output label from itspackaging.
2. NoteEnsure that the surface of the typeplate to which the label is to be affixedis free of dust and grease.
Affix the label to the boiler type plate(A).
Preparing for installation (cont.)
5604
445
GB
16
1.
NoteThe fan and housing is supplied readyassembled for the wood boiler for logs upto 0.5 m long (Pyromat Eco 35, 45, 55and 65).
1. Secure the casing with fan on the pro-truding flue outlet using the screws.
2. Fit the Lambda probe.
3. Fit and connect the flue gas temper-ature sensor.
4. Push plugs aG, a-Ö and a-ÖA ontothe connector strip on the back of theboiler.
Fitting the flue gas fan casing
5604
445
GB
17
NoteThis installation step is not required forwood boilers for logs up to 0.5 m long(Pyromat Eco 35, 45, 55 and 65).
1.
2.
1. Push fan onto the casing and securewith wing nuts.
2. Cable conduit only for Pyromat Eco61, 81, 101 and 151.Fit cable conduit with winged screw.
3. Tighten wing nuts.
Fitting the flue gas fan56
04 4
45 G
B
18
NoteWe recommend you install a flexible connection piece in the flue. This preventstransmission of sound produced by the induced draught fan.Never grout the flue pipe into the chimney.
NoteNever fit any secondary air device(draught stabiliser).
A
B
A Thermal insulation B Flexible flue adaptor
Connecting the boiler on the flue side
5604
445
GB
19
1. Install the flue pipe rising to the chim-ney (preferably 45°).Max. flue pipe length: 3000 mm.
Flue pipe (internal diameter)40 - 100 kW 7 200 mm120 - 170 kW 7 250 mm
2. The entire flue pipe with cleaningapertures must be gas-tight.
3. Thermally insulate the flue pipe withat least 30 mm thick insulation.
NoteIf you expect condensate to form insidethe chimney, we recommend you pushthe flue several centimetres into thechimney, ensuring the required mini-mum cross-section of the chimney ismaintained.
Connecting the boiler on the flue side (cont.)
5604
445
GB
20
Hydraulic connection
BA C
D
E
F
G
H
K
X X XX
A Boiler returnB Boiler flowC Thermally activated safety valve,
safety heat exchanger installed inthe boiler
D Sensor, thermally activated safetyvalve
E Valve, thermally activated safetyvalve
F Shut-off valveG Particle filterH Check valveK Pressure reducer
Connecting the boiler on the heating water side
5604
445
GB
21
Connections
ECO 33 to 55 and 65 ECO 61 to 151Flow DN 32 40 R 1¼” 1½”Return DN 32 40 R 1¼” 1½”Cold water supply*1
On-siteDN 15 15
R ½” ½”Cold water outletOn-site
R ¾” ¾”
*1 Fixed metal pipe, 2.5 to 4 bar
Connecting the boiler on the heating water side (cont.)
5604
445
GB
22
Overview of top connector strip14
5212223 L2P
EN L1L3
182
L1PEN
29 179
L1PEN NPEL1
40 181
L1PE
NL2 T1T2S3B4
9
M 1~
CA
N
230V
/50H
z 6AY1Y2N Y1Y2N
Pt1
000
N
13
1411
12
11
12
Pt1
000
NP
t100
0N
A B C D FE G
A Plug aVG : KM BUSB Plug a;S : Boiler control valveC Plug sL : Boiler circuit pumpD Plug aML : Enabling additional boilers or oil/gas burner (with safety chain exam-
ple)E Plug fÖ : Power supplyF Plug a;A : Buffer cylinder control valveG Plug ) : Buffer temperature sensors PTS (from left to right: bottom, centre,
top)
Making the electrical connections
5604
445
GB
23
Overview of bottom connector strip212223
1
212223
146
212223
15
212223
100A
S3T2T1 L1PEN
100
50A
M1~
Pt1
000
N
Pt1
000
N
A B C D E
A Plug ! : Outside temperature sen-sor
B Plug aVHC Plug aG and a-ÖA : Flue gas tem-
perature sensor and hall sensor
D Plug gÖA : External fault messageE Plug a-Ö : Flue gas fan
Making the electrical connections (cont.)
5604
445
GB
24
Plug connections
Connect plug aVG: KM BUS for extension kits
21
22
23
KM-BUS
145
Assignment Function Additional information23 KM BUS + —22 KM BUS - —
Recommended cable type:■ H05VV-F2X 0.75 mm²■ H05RN-F2X 0.75 mm²
Min. and max. diameter (strain relief): 6.5- 8.3 mm
For extension kit installation:
Extension kit installation instruc-tions
For adjustment at the extension kit and the connection of sensors at the exten-sion kit:
Service section of these instruc-tions
Plug aML: Connecting the oil/gasburner enable signal
NoteShould an oil/gas burner be used in theboiler, make connections as described inthe following: Alternatively an additionalheat source can be connected to plugaML.
Making the electrical connections (cont.)
5604
445
GB
25
L1
PE
N
131411121112
179A
max. 2 A
A Example of a safety chain
Connector DescriptionN Neutral conductorPE EarthL1 Phase conductor 230 V, max. 2 A
Implement the safety chain A in accord-ance with current regulations.
NoteThe door contact switch for the chargecover and the burner withdrawal facilityswitch are part of the standard deliveryof the optional burner withdrawalfacility.
Plug aML: Connecting an additional boiler enable signal
NoteIf an additional heat source is employed,make all connections as described in thefollowing: Alternatively an oil/gas burnermay be connected to plug aML (see pre-vious diagram).
Making the electrical connections (cont.)
5604
445
GB
26
L1
PE
N
179
A
L1
A Boiler enable
Connector DescriptionN Neutral conductorPE EarthL1 Phase conductor 230 V, max. 2 A
Recommended cable type:■ H05VV-F2X 1.5 mm²■ H05RN-F2X 1.5 mm²
Min. and max. diameter (strain relief): 6.5- 8.3 mm
Plug fÖ: Connecting the power supply
N
PE
L1
230V/50Hz 6A
40
Making the electrical connections (cont.)
5604
445
GB
27
Assignment Function Additional informationL1 230 V AC / 50 Hz max. backup fuse 6 APE — —N — —
Backup fuse on site: 6 A
Recommended cable type:■ H05VV-F3G 1.5 mm²■ H05RN-F3G 1.5 mm²
Min. and max. diameter (strain relief): 6.5- 8.3 mm
Plug a;A: Connecting a buffer cylinder control valve
L1
PE
N
L2
Y1
Y2
N
181
Valve connection Connector Colour DescriptionN N blue Neutral conductorY2 L2 white Actuating signal
CLOSE (230 V AC)Y1 L1 black Actuating signal
OPEN (230 V AC)
Recommended cable type:■ H05VV-F4G 0.75 mm²■ H05RN-F4G 0.75 mm²
Min. and max. diameter (strain relief): 9.0- 11.5 mm
Making the electrical connections (cont.)
5604
445
GB
28
Plug ): Connecting the buffer temperature sensors
T1
T2
S3
B4
NN
N
A
B
C
9
A Buffer temperature sensor PTS,bottom (Pt1000)
B Buffer temperature sensor PTS,centre (Pt1000)
C Buffer temperature sensor PTS, top(Pt1000)
Assignment Function Additional informationT1 Top buffer temperature sensor PTS Pt1000T2 Centre buffer temperature sensor PTS Pt1000S3 Bottom buffer temperature sensor PTS Pt1000B4 GND (for all 3 sensors) —
Recommended cable type:■ H05VV-F5G 0.75 mm²■ H05RN-F5G 0.75 mm²
Min. and max. diameter (strain relief): 7.5- 10.5 mm
Making the electrical connections (cont.)
5604
445
GB
29
Plug !: Connecting the outside temperature sensor
21
22
23
N
1
A
A Pt1000
Assignment Function Additional information22 Outside temperature sensor Pt100021 Outside temperature sensor GND —
Recommended cable type:■ H05VV-F2X 0.75 mm²■ H05RN-F2X 0.75 mm²
Min. and max. diameter (strain relief): 6.5- 8.3 mm
Making the electrical connections (cont.)
5604
445
GB
30
Plug gÖA: Connecting the central fault message
S3
T2
T1
50A
A
N
L
A Signalling device (e.g. horn)
Assignment Function Additional informationT2 Fault message (common contact) floating contactS3 Fault message max. 250 V, 4 A
Recommended cable type:■ H05VV-F2X 1.5 mm²■ H05RN-F2X 1.5 mm²
Min. and max. diameter (strain relief): 6.5- 8.3 mm
Power supply
Directives
Regulations
Carry out the power supply connectionand all earthing measures (i.e. RCD cir-cuit) in accordance with IEC 364, therequirements of your local power supplyutility and VDE [or local regulations].Protect the power cable to the controlunit with an appropriate fuse/MCB.
Mains isolator requirements
For combustion equipment to DIN VDE0116, the mains isolator installed on sitemust comply with the requirements ofDIN VDE 0116 "section 6" [or local reg-ulations].
Making the electrical connections (cont.)
5604
445
GB
31
Fit the mains isolator outside the instal-lation room; it must be able to isolateall non-earthed conductors simultane-ously with at least 3 mm contact separa-tion.
Fitting the cleaning tool mounting bracket
■ Fit the cleaning tool mounting bracketon the wall near the boiler.
Commissioning and adjustment
Boiler service instructions
Power supply (cont.)
5604
445
GB
32
Plugs already connected in the delivered condition
Plug a;S : Boiler control valve
L2
PE
N
L1
L3
Y1
Y2
N
182
Connector Colour DescriptionN blue Neutral conductorL2 white Actuating signal CLOSE
(230 V AC)L1 black Actuating signal OPEN
(230 V AC)
Plug sL: Boiler circuit pump
L1
PE
N
M1~
29
Appendix
5604
445
GB
33
Plug aG flue gas temperature sensor and a¢ÖA hall sensor
21
22
23
21
22
23
N
15
100A
A
B C D
A Pt1000
Terminal on plug a-ÖA Cable21 Hall sensor D (red)22 Hall sensor C (white)23 Hall sensor B (black)
Plug a¢Ö: Flue gas fan
L1
PE
N
M1~
100
Appendix (cont.)
5604
445
GB
34
CConnection■ On the flue side..............................18■ On the heating water side...............20
EElectrical connections........................22
MMains isolator.....................................30
PPower supply.....................................30
Keyword index
5604
445
GB
35
56
04 4
45 G
B
36
Köb Holzheizsysteme GmbHFlotzbachstrasse 33A-6922 WolfurtTelefon: +43 (0)5574 6770-0Telefax: +43 (0)5574 65707www.kob.cc
Viessmann Werke GmbH&Co KGD-35107 AllendorfTelephone: +49 6452 70-0Fax: +49 6452 70-2780www.viessmann.com
5604
445
GB
Sub
ject
to te
chni
cal m
odifi
catio
ns.