ADDITIONAL NOTES
1. THE STANDARD LOADING AS PER IRC 6.
2. 100 MM DIA PVC PIPES AS WEEP HOLES SHALL BE PROVIDED IN THE ABUTMENT AND RETAINING WALLS AT AN
INTERVAL OF 1000 MM C/C (APPENDIX 6 OF IRC 78-2014). VERTICALLY AND HORIZONTALLY STAGGERED.
3. DIMENSIONS OF INDIVIDUAL MEMBERS SHOWN IN DWG. SUCH AS, SHAPES AND SIZES OF ABUTMENTS, PIERS,
PIER-CAPS AND FOOTINGS ARE INDICATIVE.
4. SHAPES AND SIZE OF STEEL PLATE GIRDER, PTFE BEARINGS, PEDESTAL, RCC ABUTMENT, ABUTMENT CAP AND
FOUNDATIONS SHOWN IN THIS DRAWINGS ARE TENTATIVE AND ARE SUBJECT TO CHANGE IN FINAL EXECUTION
DRAWING AND DESIGN. SIZES OF STRUCTURAL MEMBERS ARE TENTATIVE AND MAY BE REVISED AT THE TIME OF
DETAIL DESIGN.
5. WORK WITHIN THE RAILWAY BOUNDARY SHOULD BE CARRIED OUT UNDER THE SUPERVISION OF RAILWAY
REPRESENTATIVE.
6. STAIRCASES ARE TO BE PROVIDE ON THE BOTH SIDES OF THE ROB OUTSIDE RAILWAY BOUNDARY TO SUIT TO THE
PEDESTRIAN TRAFFIC.
7. THE DESIGN IS ACCORDING TO THE FOLLOWING CODES:
(1. IRC: 5-2015
(2. IRC: 6-2017
(3. IRC: 21-2000
(4. IRC: 22-2015
(5. IRC: 24-2010
(6. IRC: 78-2014
(7. IRC:112:2011
8. CRASH BARRIERS SHALL BE PROVIDED AS PER M.O.S.T. STANDARD.
9. WEARING COAT SHALL BE PROVIDED AS PER THE SPECIFICATIONS. IRC: 16-2008
10.ENGINEER-IN-CHARGE WILL ENSURE SAFETY OF EXISTING ROAD, WHEN WORKING CLOSE TO IT. BY PROVIDING
TEMPORARY SAFETY MEASURE SUCH AS SHEET PILES, BARRICADES, ROAD SIGN ETC IN CONSULTATION WITH
TRAFFIC DEPARTMENT.
11.FABRICATION OF STEEL GIRDERS SHALL NOT BE PERMITTED OVER THE TRACKS. THEY SHALL BE FABRICATED
OUTSIDE AND THEN LAUNCHED.
12.PAINTING OF NEW STEEL WORK OF ROB SAND BLASTING OF STEEL GIRDER / MEMBER METALIZING AND PAINTING
OF STEEL COMPONENTS COMPLETE WITH APPROVED ALUMINIUM / ZINC-METAL FOLLOWED BY PROTECTIVE
COATING PAINTING AS IRBM1998 OF PARA-218.
13.THIS DRAWING SUPERSEDED EARLIER APPROVED DRAWING NO. GM(E) MB-95047. IN EARLIER APPROVED
DRAWING TWO PIERS PLANNED INSIDE RAILWAY BOUNDARY, OUT OF ONE PIER PLANNED AT THE LOCATION OF
EXISTING GATE LODGE AND S&T STORE ROOM WHICH NEED TO BE DISMANTLE AT THE TIME OF CONSTRUCTION.
BUT IN THIS NEWLY REVISED GAD 71110 MM OPEN WEB THROUGH GIRDER OPTED OVER RAILWAY PORTION AND
PIERS PLANNED OUTSIDE RAILWAY BOUNDARY AS PER RAILWAY BOARD GUIDELINE.
TVU - 148512 YEAR OF CENSUS- JULY.-2014
TYPE OF ROAD:- STATE HIGHWAY (SH)
CLASS OF LC :- SPL
PHASE WORK: -
1.CONSTRUCT OF ROB (RAILWAY SPAN) & VIADUCT AS PER APPROVED PLAN.
2. ASSEMBLY OF STEEL GIRDER IN RAILWAY PORTION SHALL BE DONE AT SAME
LOCATION IN CONSULTATION WITH RAILWAY AUTHORITIES IN NON - BLOCK PERIOD.
3. LAUNCHING OF THE ASSEMBLED GIRDER IN TRAFFIC & POWER BLOCK.
4. CONSTRUCT IN CONSULTATION WITH ROAD AUTHORITIES.
5. COMMISSION OF ROB FOR TRAFFIC.
6. ELIMINATION OF LEVEL CROSSING.
NOTES
1. ALL DIMENSIONS ARE SHOWN IN MM AND LEVELS ARE IN METER UNLESS OTHERWISE MENTIONED.
2. CHAINAGE AND CURVE DETAILS OF ALIGNMENT HAS BEEN TAKEN ALONG THE CENTER LINE OF THE BRIDGE.
3. ROAD LEVEL HAS BEEN TAKEN AT END OF CARRIAGEWAY (I.E. INNER SIDE OF THE CURVE.)
4. COMMON BENCHMARK TO BE ESTABLISHED BY THE FIELD ENGINEER IN CONSULTATION WITH R & B ENGINEERS
BEFORE STARTING THE WORK.
5. GROUND LEVEL AND CLEARANCE OF TRACK AT ROB SHALL BE VERIFIED AT THE SITE BEFORE EXECUTION.
6. ALL THE DIMENSIONS SHOWN SHOULD BE VERIFIED AT SITE BEFORE TAKING UP DESIGN WORK IN HAND. ANY
DISCREPANCY NOTED SHOULD BE FORWARDED THROUGH ALTERATIONS DULY SIGNED, SUITABLE SPEED
RESTRICTION, IF REQUIRED SHOULD BE IMPOSED BEFORE TAKING UP THE EXECUTION OF WORK WITH THE
APPROVAL OF ENGINEER IN CHARGE.
7. DURING CONSTRUCTION OF ROB ALL THE EXISTING STRUCTURE/TRACK SHOULD BE PROTECTED.
8. DURING CONSTRUCTION A MINIMUM CLEARANCE OF 2.360 M TO BE MAINTAINED BETWEEN THE CENTER LINE
OF EXISTING TRACK TO THE FACE OF TEMPORARY ARRANGEMENTS STRUCTURE.
9. REPRESENTATIVE OF TELECOM / SIGNALING, DEPARTMENT OF RAILWAYS SHOULD BE AVAILABLE AT SITE
DURING EXECUTION IN THE VICINITY OF SIGNALING AND TELECOM CABLES OF RAILWAYS.
10.CRS SANCTION SHOULD BE TAKEN BEFORE STARTING WORKS AFFECTING SAFETY OF RUNNING LINES.
11.ALL THE PRE FABRICATED STEEL GIRDERS SHOULD BE LAUNCHED WITH SUITABLE LAUNCHING SCHEME
APPROVAL.
12.COLLECTOR CONSENT TO BE OBTAINED FOR CLOSING OF LC.
13. LC GATE WILL BE CLOSED AFTER CONSTRUCTION OF ROB.
14.THE MAINTENANCE OF BRIDGE WITHIN RAILWAY PORTION SHALL BE DONE BY RAILWAY & MAINTENANCE OF
BRIDGE OUT SIDE RAILWAY PORTION SHALL BE DONE BY ROAD AUTHORITY.
15.DESIGN SHOULD BE AS PER RELEVANT IRC / IS CODES.
16.GRADE OF CONCRETE TO BE ADOPTED FOR VARIOUS MEMBERS OF BRIDGE IS AS UNDER:
FOUNDATION PIER / ABUTMENT M30.
PIER CAP / ABUTMENT CAP. DECK SLAB: CRASH BARRIER - M30, PEDESTAL - M35.
STEEL: FE 415/500
17.TYPE OF BEARING :- ELASTOMERIC/POT PTFE
18.FULL FLEDGED LOAD TEST OF SUPER STRUCTURE SHOULD BE DONE AS PER IRC-SP-51 TO ENSURE QUALITY
WORK.
19.STRIP SEAL TYPE EXPANSION JOINT SHOULD BE PROVIDED AS PER LATEST MORTH / MOST REQUIREMENT
CONTRACTOR SHOULD FURNISH DESIGN/DRAWING OF EXPANSION JOINT FROM FIRMS APPROVED BY MOST AT
VARIOUS RELEVANT AMBIENT TEMPERATURES TO SUIT SITE CONDITIONS WITH THE APPROVAL OF
ENGINEER-IN-CHARGE.
20.SUITABLE UTILITY DUCTS IF REQUIRED SHOULD BE PROVIDED BELOW FOOTPATH SLAB WITH THE APPROVAL
OF ENGINEER-IN-CHARGE
21.DRAINAGE SPOUT SHALL BE PROVIDED AS PER MOST SPECIFICATION DESIGN CONSULTANT SHOULD SUBMIT
SEPARATE SHEET OF DRAINAGE SPOUTS AS PER LATEST MOST STANDARDS.
22.TYPE OF FOUNDATION SHOULD BE DECIDED BY ENGINEER-IN-CHARGE, BASED ON DETAILED GEOTECHNICAL
INVESTIGATION AT THE TIME OF STRUCTURAL DESIGN, OPEN FOUNDATION PREFERABLY SHOULD BE PROVIDED
AS FAR AS POSSIBLE KEEPING SITE CONDITIONS IN VIEW FOR ANY OTHER SUITABLE FOUNDATION.
23.THE FOUNDATION SHOULD BE DESIGNED TO CATER FOR LOAD COMING FROM NEARBY FUTURE RAILWAY
TRACK, IF APPLICABLE.
24.NO WORK SHOULD BE TAKEN UP IN HAND TILL PROOF CHECKED DESIGN DRAWING WITHIN RAILWAY PORTION
AREA APPROVED BY RAILWAYS.
25.ROAD AUTHORITY SHOULD ENSURE THAT BEFORE LAYING ANY NEW WEARING COAT IN FUTURE EXITING
WEARING COAT SHOULD BE COMPLETELY REMOVED.
26. ALL SITE RECORDS AND RELEVANT DOCUMENTS OF COMPLETION THE ROB IN DUPLICATE SHOULD BE HANDED
OVER TO THE DIVISION FOR PROPER UP KEEP AND MAINTENANCE OF THE ROB.
27. IF ANY UTILITIES IN RAILWAY PORTION AND ON APPROACHES ARE REQUIRED TO BE SHIFTED DURING
EXECUTION
28. THE ROB WILL BE CONSTRUCTED IN TERMS OF MOU BETWEEN RAILWAYS, MORTH AND GOVERNMENT OF
MAHARASHTRA F.NO. 34066/2/2013 - S&R(B) Pt DATED 19TH/ DECEMBER 2017 MRIDC WILL EXECUTE THE WORK
OF ROB PROPER AS WELL AS APPROACHES ON BEHALF OF GOVERNMENT OF MAHARASHTRA.
29.FABRICATION SHALL BE DONE BY RDSO APPROVAL FIRM & INSPECTION SHALL BE DONE IN ACCORDANCE TO
RAILWAY BOARD LETTER NO : 2017/16/CE-III/BR/GIRDER DATED 26.05.2018.
30.PROVISION OF PROTECTION ARRANGEMENT ON IS AS PER IRPWM AND RAILWAY BOARD`S CIRCULAR
INSTRUCTION.
31.RAILWAY LAND BOUNDARY HAS BEEN VERIFIED FROM CERTIFIED LAND PLAN NO. IS TO BE MENTIONED IN
NOTICES.
32.SAFETY, RELIABILITY AND LONG TERM DURABILITY OF THE OVERHEAD STRUCTURE SHALL BE ENSURED
DURING THE DESIGN EXECUTION STAGE AS PER CENTRAL RAILWAY LETTER NO W.641.BR.POLICY DATED
10.10.2018.
33.WHILE SUBMITTING THE DESIGN OF ROB FOR APPROVAL TO HEADQUARTERS, GUIDELINES ISSUED BY HD.QRS.
OFFICE WIDE LETTER NO. W.294.BR.PROOF CHECKING DATED 27.08.2018 MAY BE FOLLOWED.
34.AS PER RAILWAY BOARD`S LETTER NO 2016/4/CE-III/BR/DSC/84 SEMINAR DATED 28.07.2017 HIGH STRENGTH
DEFORMED STAINLESS STEEL REINFORCEMENT BARS AS PER IS:16651:2017 SHOULD BE USED IN THIS CASE AS
THE BRIDGE FALL WITHIN 30 Km FROM COASTAL AREA.
35.FABRICATION SHALL BE DONE BY RDSO APPROVAL FIRM & INSPECTION SHALL BE DONE IN ACCORDANCE TO
RAILWAY BOARD LETTER NO: 2017/18/CE-III/BR/GIRDER DATED 26.05.2018.
36.PROTECTION ARRANGEMENT OF TRACK SHALL BE DONE AS PER IRPWM AND RLY BOARD CIRCULAR
INSTRUCTION.
37.RAILWAY BOUNDARY HAS BEEN VERIFIED AT SITE AS PER EXISTING ROW PILLARS.
38.SAFETY, RELIABILITY AND LONG TERM DURABILITY OF THE OVERHEAD STRUCTURE SHALL BE ENSURED
DURING THE DESIGN EXECUTION STAGE AS PER CENTRAL RAILWAY LETTER NO. W 641 POLICY DATED 1.10.2018
32.WHILE SUBMITTING THE DESIGN OF ROB FOR APPROVAL TO HEAD QUARTERS, GUIDELINE ISSUED BY HD. QRS.
OFFICE VIDE LETTER NO. W.294.BR.PROOF CHECKING DATED 27.08.2018 MAY BE FOLLOWED.
33.AS PER RAILWAY BOARD LETTER NO. 2016/4/CE-III/BR/DSC/84 SEMINAR DATED 28.07.2017 HIGH STRENGTH
DEFORMED STAINLESS STEEL REINFORCED BARS AS PER IS:16651:2017 SHOULD BE USED IN THIS CASE AS THE
BRIDGE FALLS WITHIN 30 KM FROM COASTAL AREA.
34.RAILWAY BOUNDARY HAS BEEN VERIFIED WITH LAND PLAN NO.2340.
35.IF ANY UTILITIES(DRAINAGE / PIPE LINE / OHE POLE / SIGNALING POLE / SIGNALING CABLE ETC) WICH ARE
REQUIRED TO BE SHIFT, WILL BE SHIFTED.
36.ANTI CRASH BARRIER TO BE PROVIDE AS PWE APPROVED DRAWING OF MORTH STANDARD.
37.WHILE CARRYING OUT EXCAVATION FOR FOUNDATION, PROPER ARRANGEMENT FOR SAFETY OF TRACK
SHOULD BE PROVIDED TO PROTECT THE SLIPPING OF SOIL.
38.GALVANIZED SACRIFICIAL SHUTTERING TO BE PROVIDED FOR CASTING OF DECK SLAB.
39.GUARD RAIL TO BE PROVIDED AS PER RAILWAY STANDARD DRAWING.
40.CRS SANCTION TO BE OBTAINED BEFORE COMMENCEMENT OF WORK.
41.THE GAD OF LHS SHALL BE SUBMITTED SEPARATELY AS PER JOINT FEASIBILITY CONDUCTED BY DIVISION
OFFICIALS ON 26 FEB 2019.
EXISTING PULGAON ARVI ROAD2) AA2) AA
2) AA
2) AA
FORMATION LEVEL 98.540FORMATION LEVEL 98.540
ARVI SIDE NACHANGAON SIDE ( PANCHADHARA)
PR
OP
OS
ED
LIN
E
UP
S
ID
IN
G LIN
E
RAIL TOP LEVEL 99.290
ROAD TOP LEVEL 108.465
UP
LO
OP
LIN
E
UP
M
AIN
LIN
E
DO
WN
M
AIN
LIN
E
DO
WN
LO
OP
LIN
E
DO
WN
S
ID
IN
G LIN
E
C.L. O
F
PR
OP
OS
ED
LIN
E
SOFFIT LEVEL 107.250
82
15
RA
ILW
AY
B
OU
ND
AR
Y
RA
ILW
AY
B
OU
ND
AR
Y
5300 SQ
5640 SK
4750 SQ
5055 SK
4900 SQ
5214 SK
4720 SQ
5023 SK
4710 SQ
5012 SK
5300 SQ
5640 SK
A
A2) AA2) AA
2) AA
2) AA
15
00
12
20
SOIL &SOFT
MURUM5.50 m
SOIL & SOFT MURUM
SOFT ROCK
HARD FRACTURED ROCK
G.L. 98.100
GROUND LEVEL
AT CH 37 ARVI SIDE
SOFTROCK2.00m.
HARDFRACTURED
ROCK(BASALT)
5.00m.
15000
GROUND LEVEL 98.000
AT CH 40 PULGAON SIDE
BORE HOLE No. : - BH - 2
15000
HARDFRACTURED
ROCK(BASALT)
5.00m.
SOFTROCK2.00m.
SOIL &SOFT
MURUM5.50 m
SOIL & SOFT MURUM
SOFT ROCK
HARD FRACTURED ROCK
P1 P2
82
15
82
15
13829 SQ
13102 SK
9681 SQ
11722 SK
13722 SQ
14192 SK
PW
3128
62061 SK
61087 SQ
80
64
71785 C/C PIER
71110 C/C BEARING
71685 C/C OVERALL
10
49
1
1533
1500
R.C.C. GIRDER R.C.C. GIRDER
15
00
83
52
PW
1200 mm Ø PILE
49
6
PILE CAP TOP 98.040PILE CAP TOP 98.040
75 mm WEARING COAT
5783 5470 5470 5470 5470 5470 5470 5470 5470 5470 5470
125
5832
75
00
SLOPE - 1:25SLOPE - 1:25
19
50
1500
3130
19
50
1500
15001500
10332
14347
69225
SBC 20 T/M SQSBC 20 T/M SQ
SBC 40 T/M SQ
SBC 50 T/M SQ
SBC 40 T/M SQ
SBC 50 T/M SQ
W
A
R
D
H
A
S
I
D
E
U
P
S
I
D
I
N
G
L
I
N
E
P
R
O
P
O
S
E
D
L
I
N
E
P
R
O
P
O
S
E
D
L
I
N
E
D
O
W
N
S
I
D
I
N
G
L
I
N
E
D
O
W
N
L
O
O
P
L
I
N
E
D
O
W
N
M
A
I
N
L
I
N
E
U
P
M
A
I
N
L
I
N
E
U
P
L
O
O
P
L
I
N
E
R
A
IL
W
A
Y
B
O
U
N
D
A
R
Y
9
2
7
3
1500 MM WIDE FOOTPATH
11
00
0 M
M C
AR
RIG
EW
AY
2
4
8
1
0
4548
7
1
°
1
0
3
3
2
6
4
3
1
9681
TOP
71110 C/C BEARING
37003700
74
00
71685 C/C OVERALL
71785 C/C PIER
1
4
3
4
7
15497
13692
NACHANGAON SIDE ( PANCHADHARA)ARVI SIDE
900
12900
1500
FOOT PATH
BOTTOM CHORD
1221
CRASH BARRIER
VERTICAL
TOP BRACING
1.5% SLOPE
DECK SLAB 240 THK
7500
TOP CHORD
1950
14800
5614
11000
ROAD TOP LEVEL-108.465
SOFFIT LEVEL 107.250
RAIL TOP LEVEL 99.290
FORMATION LEVEL 98.540
75 mm WEARING COAT
300
1050
PILE CAP TOP 98.040
RCC PEDESTAL1050 x 1050 x 500
1200 mm Ø PILE
POT-PTFE BEARING 500 x 500 x 150
1220
14800
11800
15001500
SP.LC No. 80 WILL BE CLOSED
ON CONSTRUCTION OF R.O.B.
AT 728/6-8
PULG
AO
N R
AIL
WA
Y S
TATI
ON
728.
49
TO P
ULG
AO
N
TO W
AR
DH
ATO
BA
DN
ERA
SERVICE ROAD
NACHANGAON SIDE
( PANCHADHARA) SIDE
PWD
PWD
PWD
PWD
PWD
PWD
PWD
PWDPWD
SHO
P
SHO
P
SHO
P
BU
ILD
ING
AP 1'D 19°
AP 2'D 17°
MO
UL
BU
ILD
ING
CHIM
AN
I
PR 1
PWD
1100012000
PR2
ARVI SIDE
728/5
728/7
728/8
728/6
500377
9869
16157
35111
8666
5611
7
1
1
1
0
7
1
24810
58617
TO T
ALN
I71
8.69
6698
58248
11092
14286
1033214317
34009
PROPOSE LHS
11516
7
4
3
7
6431
TO
B
AD
NE
RA
WA
RD
HA
S
ID
E
RP 2
RP 1
EXISTING PULGAON ARVI ROAD
UP
S
ID
IN
G LIN
E
PR
OP
OS
ED
LIN
E
PR
OP
OS
ED
LIN
E
DO
WN
S
ID
IN
G LIN
E
DO
WN
LO
OP
LIN
E
DO
WN
M
AIN
LIN
E
UP
M
AIN
LIN
E
UP
LO
OP
LIN
E
PWD
RA
ILW
AY
B
OU
ND
AR
Y
RA
ILW
AY
B
OU
ND
AR
Y
N
A
C
H
A
N
G
A
O
N
S
ID
E
(
P
A
N
C
H
A
D
H
A
R
A
)
A
R
V
I
S
I
D
E
1
4
5
8
6
1
3
5
0
3
BH 2
BH 1
PR1
PR2
9273
12223
1
5
0
0
M
M
W
I
D
E
F
O
O
T
P
A
T
H
1
1
0
0
0
M
M
C
A
R
R
IG
E
W
A
Y
728/6
1500
1500
8049
1500
1500
8049
24
81
0
728/5
1
4
1
9
2
13722
1
3
8
2
9
13102
11722
4
5
4
8
5300 4750 4900 4720 4710 13722 5300 1382912256
PWD
7
1
1
1
0
C
/C
B
E
A
R
IN
G
7
1
°
58617
66
98
34
00
9
35
60
9
14347
10332
E - 220302.53N - 2294225.73
E - 220323.97N - 2294280.29
7
4
3
7
6431
11516
9
6
8
1
NAGPUR DIVISION
REV.R0
TITLE
SCALE :- AS SHOWN
DRAWING APPROVAL
DESIGNATIONSIGN
DIVISIONAL RLY.
DESIGNATION
SIGN
GENERAL ARRANGEMENT DRAWING
DRG.NO. MRIDC/CR/NGP/ROB/GAD/2019/LC 80 SHEET 1 OF 1
WARDHA BADNERA SECTION
HEAD QUARTER
L-XING No. 80 (MANNED) ON C.RLY. KM 728/6-7
PINK BOOK ITEM NO. 90
MAHARASHTRA RAIL INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.
CBE
R.K.GOEL
DRM
Sr. DEE(G)
Sr. DEN (CO)
ADRM(INFRA)
Sr.DOM
Sr.DSTE(CO.)
Sr.DEE(TD)
TRILOK KOTHARI
ATUL RANE
VIKAS PARASHAR
SHISHIR TYAGI
NAMDEV RABDE
P.R. PATIL
SOMESH KUMAR
DY CE(Br.II)
XEN (Br.)
A.K.SAXENA
LEGENDS:
RAILWAY BOUNDARY
EXISTING TRACK
FUTURE TRACK
EXISTING ROAD
DRG REFERENCE
PCE NO. 23038-HQ OF WESTERN RAILWAY 4-D
Sr. DEN (CENTRAL)
PANKAJ DHAWARE
SCALE 1 : 100
HALF TOP HALF BOTTOM
KEY PLAN
SCALE 1 : 1000
N
NE SE
NW SW
S
E
W
SECTION A-A
SCALE 1 : 100
BORELOG DETAIL - BH1
SCALE 1 : 100
BORELOG DETAIL - BH2
SCALE 1 : 100
DESIGNATION SIGN.
CONSTRUCTION
DESIGNATION SIGN.
MRIDC
DyCE (C)
XEN
EXECUTIVE ENGINEER
GOVERNMENT OF MAHARAHTRA
DESIGNATION SIGN.
SUPERINTENDENT ENGINEER
CHIEF ENGINEER
(PWD)
(PWD)
(PWD)
CAD DRAUGHTSMAN
SANKET MANE
DRAWN BY
Sr. EXECUTIVE (CIVIL)
TEJAS S. KAMBLE
CHECKED BY
Dy. GENERAL MANAGER (CIVIL)
ABHAY ATKARE
Dy. GENERAL MANAGER (CIVIL)
AK SHARMA
Addl. GM
SANJAY KUMAR
PLAN
SCALE 1 : 100
RAILWAY PORTION SPAN
SCALE 1 : 100
PROP 3RD LINE
JOEL THOMOS
PROPOSED TWO LANE ROAD OVER BRIDGE IN LIEU OF LEVEL CROSSING
GATE NO. 80 RLY KM 728/6-7 AT PULGAON YARD NAGPUR DIVISION
50-50% COST SHARING BASIS
DRG.NO. GM(W)DRG.NO. DRM(W)
DIRECTOR (PROJECT & PLANNING)
RAJU BHADKE