    ECONOMIC ANALYSIS AND

    ENVIRONMENTAL IMPACTS OF A PV WITH

    DIESEL-BATTERY SYSTEM FOR REMOTE AREAS

    Abstract

    This project discusses the economic analysis and environmental impacts of

    integrating a photovoltaic (PV) array into diesel-electric power systems for remote

    villages. MATLAB Simulink is used to match the load with the demand and apportion

    the electrical production between the PV and diesel-electric generator. The economic part

    of the model calculates the fuel consumed, the kilo watt hours obtained per gallon of fuel

    supplied, and the total cost of fuel. The environmental part of the model calculates the 2,

    particulate matters (PM), and the x emitted to the atmosphere. Simulations based on an

    actual system in the remote Alaskan community of Lime Village were performed for

    three cases:

    1) Diesel only;

    2) diesel-battery; and

    3) PV with diesel-battery using a one-year time period.

    The simulation results were utilized to calculate the energy payback, the simple

    payback time for the PV module, and the avoided costs of 2, x, and PM. Post-simulation

    analysis includes the comparison of results with those predicted by Hybrid Optimization

    Model for Electric Renewables (HOMER). The life-cycle cost (LCC) and air emissions

    results of our Simulink model were comparable to those predicted by HOMER.

    Page 1

  • 8/8/2019 Pvdiesel Batter Doc

    2/79

  • 8/8/2019 Pvdiesel Batter Doc

    3/79

    the model can be used to optimize the performance of the hybrid power system.

    MATLAB Simulink is used to model the system and apportion the electrical production

    between the PV array and diesel-electric generator. In general, the Simulink model can be

    used to study the performance of any hybrid power system. Using Simulink, other

    renewable energy sources, dynamic operation, and control system strategies can be easily

    incorporated into the existing hybrid power system model to study the overall

    performance of the system. Simulations are performed for three cases: 1) diesel only; 2)

    diesel-battery; and 3) PV with diesel-battery using a one-year time period. The results of

    the simulations are used to perform an economic analysis and predict the environmental

    impacts of integrating a PV array into diesel-electric power systems for remote villages.

    The economic part of the model calculates the fuel, consumed, the kilo watt hours

    obtained per gallon of fuel supplied, and the total cost of fuel. The environmental part of

    the model calculates the CO, particulate matter (PM), and the NO emitted to the

    atmosphere. These results are then utilized to calculate the energy payback, the

    simplepaybacktime for the PV module, and the avoided costs of CO, NO, and PM.

    POWER SYSTEM MONITORING

    Monitoring of power system operating status may include measurements of

    analog signals, as well as measurements of CB contact status.

    Monitoring of local events

    The local events associated with operation of a substation include operation of digital

    relays in the event of a fault or simple switching of a circuit breaker as a consequence of

    operator action performed through SCADA. As a part of the monitoring of local events,

    the required measurements may be either local or system-wide.

    1. Use of local measurements.

    Typical situation where local measurements are used for local monitoring function is the

    case where a Digital Fault Recorder (DFR) is wired to monitor substation analog

    measurements and contacts from circuit breakers. In this case the sampling of all the

    measurements (signals) is synchronous across the entire substation. Detailed analysis of

    Page 3

  • 8/8/2019 Pvdiesel Batter Doc

    4/79

    protective relay operations can be performed to accurately determine the fault type and

    the timing in the switching sequences that include multiple circuit breaker operations.

    2. Use of system-wide measurements.

    System-wide measurements may be of interest in analyzing local events when the

    information about system topology and sparse measurements across the network are used

    to make conclusion about local events. The case in point is a new fault location algorithm

    that relies on a fitting procedure where the signals obtained from short circuit studies are

    compared to the signals recorded in the field. A fault is placed in the system model and

    simulations are performed to generate fault signals at the points in the system where field

    measurements with DFRs are made. By comparing the field-recorded and simulated

    signals, an optimization of the match is performed while moving the fault location in the

    model. An optimal match is obtained by minimizing the error between the field and

    simulated signals. The fault location in the model that leads to the minimum of the cost

    function is then taken as the actual fault location. Obviously, this method requires that

    both the network topology and system-wide measurements are determined for the same

    time instant.

    Monitoring of system-wide events

    Another monitoring situation is when the system wide events require the knowledge

    of individual control actions performed at local substations. The case in point is ananalysis of a cascading event leading to a blackout. In this case, the impact of local events

    causes broader impact at the system level.

    1. Use of local measurements.

    Local measurements of analog signals and contact status can contribute to the

    understanding of system-wide events. An example is when the measurements are helping

    in understanding actions from several protective relays. This is particularly important in

    the case when N-2 contingency happens in the system. This type of contingency, while

    still considered a local event, may significantly affect the operation of the entire power

    system.

    2. Use of system-wide measurements.

    Page 4

  • 8/8/2019 Pvdiesel Batter Doc

    5/79

    This case is very common in any of the energy management system (EMS)

    functions. Most of the EMS functions are system-wide and hence the measurements

    required to execute the function are system-wide. Examples of such situations are the

    state estimation and system stability monitoring functions.

    As a summary of the discussion related to the monitoring background, Table I gives set

    of examples where local and system-wide events may be monitored using either local or

    system-wide measurements. While the mentioned examples are well known applications

    in the power system, the specific use of the measurements given in Table 1 is a special

    case of the application implementation that is not commonly used today but has distinct

    benefits as described in the mentioned references.

    Table. Monitoring and Measurements

    Monitoring in real-time

    This type of monitoring requires that both the analog measurements of current and

    voltages, as well as measurements of CB status are taken. Depending on the events of

    interest, different type of measurements may be required as summarized in Table 2 and

    discussed in detail in the following text.

    1. Measurements of currents and voltages

    Currents and voltages may be measured to determine time-domain representation

    or to reconstruct a phasor. Various applications require different forms of current and

    voltages. In order to perform the measurements, samples of current and voltages need to

    be taken. Two distinctly different approaches in sampling synchronization may be

    implemented: a) synchronized sampling and b) unsynchronized sampling commonly

    Page 5

  • 8/8/2019 Pvdiesel Batter Doc

    6/79

    called signal scanning. Further discussion is focused on synchronized sampling, which is

    less common but yet more desirable from the applications stand-point.

    1.1. Sampling synchronization.

    When trying to implement synchronized sampling, two basic implementation

    requirements are considered: a) location of the signals to be sampled and b) source of the

    synchronization clock. Regarding the signal location, several options are possible: single

    three phase circuit, circuits in the same substation, circuits in the adjacent substations, or

    any circuits system wide. In this case the three phase circuit consists of three currents and

    three voltage signals. As a source of synchronization, two types of sampling

    synchronization clocks may be used, namely the local (relative) and system-wide

    (absolute). The local clock may be derived from the data acquisition system and may be

    used to strobe the sample and hold (S/H) circuits located on each signal that is being

    sampled. If the sampling synchronization is to be performed on a wider basis than just the

    single three-phase circuit, than a more effective way of synchronizing the sampling is to

    use a reference clock that may be received from the Global Positioning System (GPS) of

    satellites. The GPS synchronization signal may be transferred to the data acquisition

    system located anywhere in the power system through a GPS receiver, which is a low

    cost device that may serve several data acquisition systems in a given substation. This is

    done through a special arrangement for the GPS clock distribution offered by some

    vendors.

    1.2. Phasor synchronization.

    Many monitoring applications in power systems are based on tracking the phasor

    measurements of currents and voltages. Phasor-based models of power systems are

    commonly used to perform load-flow, short-circuit, and stability studies. In order to track

    the phasors, quite often it is important to compare the phasors at different points in the

    system. This leads to a need to measure phasors synchronously across the power system,

    which is accomplished with commonly known Wide Area Measurement Systems

    (WAMS) implemented using Phasor Measurement Units (PMUs) .

    Page 6

  • 8/8/2019 Pvdiesel Batter Doc

    7/79

    2. Equipment switching status

    While the measurements of analog signals are used by many power system

    applications, it is inherently assumed that measurements of the equipment switching

    status is also available since the analysis based on analog signals without knowing the

    system topology is not feasible in many instances.

    2.1. Status of single circuit breaker.

    Many events in power systems, such as a fault, start on a single power system

    element i.e. a transmission line, transformer, generator, etc. As a result, protective relays,

    that are designed to disconnect the faulted power system components, will operate the

    corresponding CB to disconnect the faulted element. In such cases, knowing the status of

    the switching element during the switching sequence is a crucial part of the monitoring

    task.

    2.2. Topology status.

    In many other applications, the switching status of the entire power system needs

    to be know, which places a requirement for monitoring the network topology with very

    accurate time synchronization.

    Table. Monitoring location and time Synchronization

    Monitoring of Circuit Breaker Status

    System wide real-time monitoring of circuit breaker operation and statuses

    currently is implemented using RTUs of SCADA system. Based on detected voltage

    Page 7

  • 8/8/2019 Pvdiesel Batter Doc

    8/79

    levels on circuit breaker contacts, these units are providing information on final status of

    the circuit breakers such as OPEN or CLOSE. The transitions in time of control

    signals, such as Trip or Close Initiate, X and Y coil currents, Control and Yard DC

    voltages, Closing Coil and others, used by protection and maintenance engineers for

    evaluation of CB performance cannot be monitored using RTU and SCADA approach.

    Table 3 lists the CB control circuit signals that an alternative approach, proposed in this

    paper, aims to monitor.

    1. Architecture

    The proposed solution is based on a new CB Monitor (CBM) which would be

    permanently connected to the substation CBs. CBM captures detailed information about

    each CB operation in real time, regardless of whether the operation is initiated manually

    by the operator or automatically by the protection and control equipment and stores them

    in COMTRADE file format. As shown in Fig.1, the relevant CB control circuit signals

    are recorded and transmitted by wireless link to the concentrator PC, which automatically

    performs the analysis.

    Table 3. Signals of circuit breaker control circuit monitored by CBMA

    Page 8

  • 8/8/2019 Pvdiesel Batter Doc

    9/79

    Figure CB monitoring system architecture

    1.1. Multiple uses of CB Status.

    The CB status information can be used at the local substation level as well as thesystem level. At the substation level, the monitored signals can provide information about

    the state of circuit breaker and whether it needs maintenance. At the system level, the

    status information can be used to verify network topology and make topology data more

    robust. As a result, different groups of utility staff may be involved in accessing the

    Page 9

  • 8/8/2019 Pvdiesel Batter Doc

    10/79

    information and analyzing it, as suggested in Figure 1. In order to make the information

    accessible to a wide range of users, an automated system for analysis of data coming

    from the CB called Circuit Breaker Monitoring Analysis System. (CBMAS) has been

    developed. Such system uses Data Acquisition Unit (DAU) to collect data from various

    CBs. After the data is collected it is automatically processed to extract the information of

    interest, which is then distributed to various users.

    1.2. Client Server Solution.

    The CBMA system supports client/server architecture. The client part resides in

    substation. It consists of the DAUs attached to the CBs and software running on

    concentrator PC, both permanently installed in the substation, as shown in Figure.

    Figure Client server solution

    When breaker operates, recorded files are wirelessly transmitted to the

    concentrator PC. The client application automatically performs the analysis of recorded

    signals. For more efficient data manipulation, IEEE file naming convention is used for

    naming the recordings files. The signal processing module of the analysis software

    extracts various parameters from recorded signal samples and expert system evaluates

    them against empirically obtained values and tolerances selected for specific type of

    circuit breaker.

    The resulting report describes detected abnormalities and possible causes of the

    problem. If discovered problem presents serious threat to the reliability of future circuit

    breaker operation, programmable notification is sent to the server located in the central

    office. The notification is then processed and a warning is sent via email or pager to the

    Page 10

  • 8/8/2019 Pvdiesel Batter Doc

    11/79

    maintenance and protection personal. Reporting is provided for both local and

    geographically dislocated users through implementation of local database and web server

    supporting information exchange through dynamic HTML pages. Recorded files and

    reports can be downloaded to the server via Ethernet network relying on standard, fast

    and reliable TCP/IP protocol. In the central office or control center, the server part of

    CBMAS consisting of the analysis module, a central database and master web server is

    running. The central database allows for easy archiving and retrieving of the records and

    analysis reports from all system substations. Master web application allows remote users

    to search for the records and/or analysis reports from anywhere on the corporate network

    (Intranet).

    2. Hardware, software and communications

    The system hardware in substation consists of DAUs located on each breaker in

    the switch yard and a concentrator PC, used for gathering data, placed in the control

    room.

    2.1. DAU for CB monitoring. The data acquisition unit (DAU) has three main tasks:

    Perform data acquisition of signals from the CB control circuit and record sequences of

    tripping and closing

    Convert captured signals into files according to COMTRADE file specifications

    Transmit files wirelessly to the concentrator device.

    Figure Circuit Breaker Control Circuit

    Page 11

  • 8/8/2019 Pvdiesel Batter Doc

    12/79

    The DAU captures 15 electrical signals, listed earlier, from the circuit breaker

    control circuit shown in Figure 3. The signals are generated during either tripping or

    closing of the breaker. Of these 15 signals, 11 are analog and four are status signals. The

    system is shown in Figure 4. It consists of:

    Signal conditioning. The signal conditioning boards provide conditioning, galvanic

    isolation and convert the signals to appropriate voltage levels for data acquisition. The

    voltage levels of signals at circuit breaker are either 130VDC or 1 VDC. The signal

    conditioning module scales the input signals to be in the [-5V, +5V] range as required at

    the input of the A/D converter module.

    Analog to digital converter.

    The A/D converter takes the input from signal conditioning board and converts it

    to digital form. All signals are sampled synchronously to get accurate signal

    reproduction.

    Microprocessor. A microprocessor is used for controlling the data acquisition and

    running the communication protocols.

    Wireless Transmitter.

    A wireless transmission system, which employs commonly available Frequency

    Hopping Spread Spectrum technology, is capable of transmitting data to distances over

    300m is used for transmitting the recorded data to the concentrator PC.

    Figure Functional block diagram of DAU

    Page 12

  • 8/8/2019 Pvdiesel Batter Doc

    13/79

    2.2. Master-Slave data transfer.

    The master unit communicates with the slave units using a wireless link. When an

    event occurs, the slave unit records the electrical signals and upon completion of

    recording sends a request to master unit for accepting data. If the master unit is ready to

    accept data it sends a begin transfer message to slave. The slave then transmits the

    header, configuration and data files in COMTRADE format to the master. A protocol for

    data transfer is established and the receiving software is set up appropriately. The master

    unit receives the COMTRADE files and stores them in a database. Figure 5 shows the

    master-slave system diagram.

    Figure Master-slave communication

    5. Application benefits

    The ability to closely monitor CB status has multiple benefits. They relate to

    different application functions that involve information about combined analog signal and

    contact status measurements where the status is either taken from a single CB or from the

    entire population of CBs in the network topology. To illustrate the benefits, two

    important applications, namely fault analysis and state estimation, are described next. In

    each case, due to a close monitoring of CBs, together with accurate measurements of

    analog signals, new implementation algorithms for the mentioned functions are feasible.

    1. Fault Analysis

    Page 13

  • 8/8/2019 Pvdiesel Batter Doc

    14/79

    Fault analysis includes an accurate determination of fault clearing sequence, as

    well as calculation of the fault location. The applications are improved with better CB

    monitoring and better measurements of analog signals.

    1.1. Sequence of events.

    One aspect of fault analysis is to determine, as precisely as possible, a detailed

    sequence of events involved in a fault clearing sequence. This involves fault detection,

    fault classification, relay communication channel actions, relay trip decision, circuit

    breaker operation, interruption of fault currents, auto-reclosing sequence, etc. An

    automated analysis of field recordings of currents and voltages, as well as contact statuses

    from circuit breakers and communication channels is possible if synchronous sampling of

    all the mentioned signals is performed across the substation. This is typically available if

    all the signals are wired to a single instrument such as DFR. If recordings from Digital

    Protective Relays (DPRs) are used to implement the automated analysis, then there may

    be some difficulty in performing an automated analysis if some of the signals needed in

    the analysis come from multiple relays. The problem is the signal sampling

    synchronization, which would only be provided for the signals related to one relay but

    will not in general be available for the signals that involve multiple relays since the

    sampling synchronization across the relays is not readily available today.

    The analysis capabilities coming from CB monitoring improvements are multiple.

    The existing analysis depends on the reliability of CB a and b contacts, while the

    new CB monitoring expands the number of signals to verify the opening and closing

    sequence for CB. In addition, the new monitoring scheme monitors CB currents allowing

    for confirmation of the final status of the CB by verifying the existence of the CB

    currents. Finally, if the signal sampling for CB monitoring is synchronized with the

    sampling of other signals available for other IEDs, a powerful correlation between signals

    coming from different IEDs observing the same event, such as DFRs, DPRs and CBMs,

    can be performed to enhance the analysis of the switching sequence.

    1.2. Fault location.

    It is well known that fault location can be quite accurate if phasors of voltages and

    currents area available from both ends of the transmission line, and if both phasor sets are

    synchronized. What is not as widely known is that fault location can be significantly

    Page 14

  • 8/8/2019 Pvdiesel Batter Doc

    15/79

  • 8/8/2019 Pvdiesel Batter Doc

    16/79

    possible to determine the switching state of the entire network very accurately, which in

    turn would provide a state estimator with a topology processor that is indeed reliable.

    This feature is not presently available for any state estimator implementation, but can be

    easily added by performing the topology analysis at the substation level and uploading

    the information to the SCADA database.

    2.2. Two-stage estimator.

    This approach requires a re-formulation of the state estimator for the case when

    the estimator indicates an error at a suspect substation. Since it is not easy to determine if

    the error is caused by a wrong topology or measurement, this approach allows expansion

    of the system model to include a precise topology of the substation. By doing this a

    possible cause of error associated with the topology is eliminated and further analysis

    may be focused on the measurement errors. Determining the substation topology and

    maintaining dynamic changes is a task that can significantly be improved through the

    new CB monitoring system. If signal sampling on all the CBM DAUs is synchronized

    through GPS receiver, than the topology analysis is much easier to perform.

    Future needs

    Based on the discussion of the real time approach for CB monitoring, changes in

    the present practice will be desirable. The changes bring significant benefits, theimplementation requirements for the changes are rather simple and the involved cost is

    reasonable. Further discussion is focused on some of the immediate needs for the

    improvements that may be met by development of the new approach.

    1. Change in measurement architecture

    The architecture for making measurements of analog current and voltage signals,

    as well as digital contact statuses is quite inadequate today if one wants to make the

    improvements discussed in this paper. If one relies on SCADA to perform the

    measurements, the analog signals are scanned and reported by exception if the values of

    RMS exceed a threshold. The contact signals are also scanned and reported by exception

    where the entire conclusion about the CB status depends on how reliable the a and b

    contacts and related communications are. Further discussion indicates how the

    measurements may be improved through introduction of the CBMAS and an expansion

    Page 16

  • 8/8/2019 Pvdiesel Batter Doc

    17/79

    of the measurement points through the use of other substation IEDs. The focus of the

    improvements are the introduction of synchronized sampling through the use of GPS

    receivers and the ability to correlate measurements from the Circuit Breaker Monitoring

    Analysis System (CBMAS) and a Wide Area Measurement System (WAMS) that uses

    Phasor Measurement Units (PMUs).

    1.1. Synchronized sampling.

    While many different techniques were used in the past to synchronize signal

    sampling across different IEDs, the prevailing method in use today is to perform the

    synchronization using a reference time signal from the Global Positioning System (GPS)

    of satellites [19]. The systems that are designed to perform precise measurement of

    voltage phasors are the WAMS systems that rely on the use of PMUs. The problem that

    we are addressing in this paper, namely the topology determination in real time, does not

    seem to be related to the WAMS system when in fact a close correlation between the

    measurements from the two systems can indeed be beneficial. To make sure the

    correlation is meaningful, both systems need to be synchronized through a common or

    separate GPS receiver. The CBM system may be synchronized to GPS time reference

    signal by introducing a GPS synchronization input at the DAU level. Once the CBM

    system is GPS synchronized, further benefits of correlating changes in the voltage

    phasors detecting by the WAMS to the to the changes in the status signal and

    corresponding current signals detected by the CBM system can be explored.

    1.2. Correlation between analog and status measurements.

    One obvious benefit of the correlation between the analog and CB status signals is

    an ability to precisely define the sequence of events related to fault clearing. This is not

    only improving the analysis of operation of a single breaker, but enables analysis of

    operation of multiple breakers, including the case when two breakers need to be operated

    to clear a fault on a transmission line terminating in a substation with a breaker and a half

    bus arrangement.

    Another situation where the correlation helps is when a dynamic change in the

    substation topology needs to be verified using analog measurements. This can be

    significantly facilitated if both the CB contact changes and phasor changes are measured

    with a common time reference, which assures that a given measurement scan is aligned

    Page 17

  • 8/8/2019 Pvdiesel Batter Doc

    18/79

    in time avoiding possible confusions about the sequence of events. Some techniques for

    fault location mentioned earlier can also benefit from the alignment between the phasor

    and status measurements across the entire power system network. The measurements are

    used to match simulations in the system, which can be accomplished if all the

    measurements are taken using the same time reference.

    2 Change in data processing

    To achieve the correlation between the analog and status measurements across

    different measurement infrastructures, a new approach to data integration and

    information exchange is needed. Further discussion concentrates on the data integration

    at the substation level where the data from different IEDs is collected in a common

    database and process to extract the relevant information, which can be then shared among

    a variety of applications.

    2.1. Data integration

    To perform data integration, one has to design a corresponding substation

    database which will be interfaced to different substation IEDs. The data base may reside

    on a separate substation PC or may be integrated in an expanded RTU. Creation of the

    database enables merger of the data coming from different infrastructures such as WAMS

    and CBM system. Through such integration, correlation between accurate measurements

    of phasors and CB contact statuses may be achieved. To illustrate this concept, Figure 6

    and Figure 7 are showing an existing and future monitoring infrastructure respectively.

    Page 18

  • 8/8/2019 Pvdiesel Batter Doc

    19/79

    A- Analogue inputs S- Status (contact) inputs

    SC-substation computer MS-master station

    CFL-centralized fault loc. EM-energy management

    PE-protection engineer IS- integrated systems

    DFR-Digital fault recorder FL-Fault locator

    IED-Intelligent Electronic Device

    RTU-Remote terminal unit

    SER-Sequence of events recorder

    DPR-Digital protective relay

    Figure Legacy infrastructure

    Page 19

  • 8/8/2019 Pvdiesel Batter Doc

    20/79

    DDR- Digital Disturbance Recorder

    Figure Future infrastructure

    2.2 Information exchange

    Once the mentioned data integration infrastructure is available, it becomes

    straight forward to process the data to extract information of interest. As the information

    about local substation events is extracted, the next step is to share the information with

    the appropriate users, including EMS. This may be represented with the functional

    diagram shown in Figure 8. The information exchange concept allows the information

    about substation topology to be exchanged among different applications that may reside

    at other substations or at the centralized level. The utility groups that may be interest in

    the topology status are, besides operations, protection, substation control, maintenance

    and planning.

    Page 20

  • 8/8/2019 Pvdiesel Batter Doc

    21/79

    PLC-Programmable logic controller

    PQM-Power Quality Monitor

    CBM-Circuit Breaker Monitor

    Figure Information Exchange Concept

    Diesel engine systems

    Diesel engines comprise the vast majority of prime movers for standby power

    generators because of their reliability, durability and performance under load. Diesel

    powered generators are depended on for back-up power systems in the most critical

    locations: hospitals, airports, government buildings, telecommunications facilities, and

    even nuclear power plants. In standby power applications, diesel generators can start and

    assume full-rated load in less than 10 seconds, and they typically can go 30,000 hours or

    more between major overhauls.

    This remarkable set of credentials is unique to diesel engines, but like any

    mechanical device, maintenance is critical for ensuring that a diesel powered standby

    generator will start and run when needed. Facilities with qualified in-house technical

    personnel can often perform required preventive maintenance on diesel generators. Other

    facility managers prefer to contract with a local service provider or power system

    distributor for regular maintenance serviceespecially if they have generators in

    multiple locations. (For unplanned maintenance, engine repairs or overhauls, it is always

    best to use qualified diesel service technicians.)

    Page 21

  • 8/8/2019 Pvdiesel Batter Doc

    22/79

    A well-planned maintenance program is essential to the operation of any power

    generation system.

    Preventive maintenance

    Because of the durability of diesel engines, most maintenance is preventive in

    nature. Preventive diesel engine maintenance consists of the following operations:

    General inspection

    Lubrication service

    Cooling system service

    Fuel system service

    Servicing and testing starting batteries

    Regular engine exercise

    It is generally a good idea to establish and adhere to a schedule of maintenance and

    service based on the specific power application and the severity of the environment. For

    example, if the generator set will be used frequently or subjected to extreme operating

    conditions, the recommended service intervals should be reduced accordingly. Some of

    the factors that can affect the maintenance schedule include:

    Using the diesel generator set for continuous duty (prime power)

    Extreme ambient temperatures

    Page 22

  • 8/8/2019 Pvdiesel Batter Doc

    23/79

    Exposure to weather

    Exposure to salt water

    Exposure to dust, sand or other airborne contaminates

    If the generator set will be subjected to some or all of these extreme operating

    conditions, it is best to consult with the engine manufacturer to develop an appropriate

    maintenance schedule. The best way to keep track of maintenance intervals is to use the

    running time meter on the generator set to keep an accurate log of all service performed.

    This log will also be important for warranty support. FIGURE shows a typical diesel

    engine maintenance schedule for generator sets.

    General inspection

    When the generator set is running, operators need to be alert for mechanical

    problems that could create unsafe or hazardous conditions. Following are several areas

    that should be inspected frequently to maintain safe and reliable operation.

    Exhaust system: With the generator set operating, inspect the entire exhaust system

    including the exhaust manifold, muffler and exhaust pipe. Check for leaks at all

    connections, welds, gaskets and joints, and make sure that the exhaust pipes are not

    heating surrounding areas excessively. Repair any leaks immediately.

    Fuel system: With the generator set operating, inspect the fuel supply lines, return

    lines, filters and fittings for cracks or abrasions. Make sure the lines are not rubbing

    against anything that could cause an eventual breakage. Repair any leaks or alter line

    routing to eliminate wear immediately.

    DC electrical system: Check the terminals on the starting batteries for clean and tight

    connections. Loose or corroded connections create resistance which can hinder starting.

    Engine: Monitor fluid levels, oil pressure and coolant temperatures frequently. Most

    engine problems give an early warning. Look and listen for changes in engine

    performance, sound, or appearance that will indicate that service or repair is needed. Be

    alert for misfires, vibration, excessive exhaust smoke, and loss of power or increases in

    oil or fuel consumption.

    Page 23

  • 8/8/2019 Pvdiesel Batter Doc

    24/79

    FIGURE Typical diesel maintenance schedule.

    Lubrication service

    Check the engine oil level when the engine is shut down at the interval specified

    in FIGURE 1. For accurate readings on the engines dipstick, shut off the engine and wait

    approximately 10 minutes to allow the oil in the upper portions of the engine to drain

    back into the crankcase. Follow the engine manufacturers recommendations for API oil

    classification and oil viscosity.

    Keep the oil level as near as possible to the full mark on the dipstick by adding

    the same quality and brand of oil.

    Change the oil and filter at the intervals recommended in FIGURE 1. Check with

    the engine manufacturer for procedures for draining the oil and replacing the oil filter.

    Page 24

  • 8/8/2019 Pvdiesel Batter Doc

    25/79

    Used oil and filters must be disposed of properly to avoid environmental damage or

    liability cooling system service

    Check the coolant level during shutdown periods at the interval specified in

    FIGURE 1. Remove the radiator cap after allowing the engine to cool and, if necessary,

    add coolant until the level is about 3/4-inch below the radiator cap lower sealing surface.

    Heavy duty diesel engines require a balanced coolant mixture of water, antifreeze and

    coolant additives. Use a coolant solution as recommended by the engine manufacturer.

    Inspect the exterior of the radiator for obstructions and remove all dirt or foreign material

    with a soft brush or cloth. Use care to avoid damaging the fins. If available, use low

    pressure compressed air or a stream of water in the opposite direction of normal air flow

    to clean the radiator. Check the operation of the coolant heater by verifying that hot

    coolant is being discharged from the outlet hose.

    Fuel system service

    Diesel fuel is subject to contamination and deterioration over time, and one reason

    for regular generator set exercise is to use up stored fuel over the course of a year before

    it degrades. In additional to other fuel system service recommended by the engine

    manufacturer, the fuel filters should be drained at the interval indicated in FIGURE

    Water vapor accumulates and condenses in the fuel tank and must also be periodically

    drained from the tank along with any sediment present. The charge-air piping and hoses

    should be inspected daily for leaks, holes, cracks or loose connections. Tighten the hose

    clamps as necessary. Also, inspect the charge-air cooler for dirt and debris that may be

    blocking the fins. Check for cracks, holes or other damage.

    The engine air intake components should be checked at the interval indicated in FIGURE.

    The frequency of cleaning or replacing air cleaner filter elements is primarily determined

    by the conditions in which the generator set operates. Air cleaners typically contain a

    paper cartridge filter element which can be cleaned and reused if not damaged.

    Starting batteries

    Weak or undercharged starting batteries are the most common cause of standby

    power system failures. Even when kept fully charged and maintained, lead-acid starting

    batteries are subject to deterioration over time and must be periodically replaced when

    they no longer hold a proper charge. Only a regular schedule of inspection and testing

    Page 25

  • 8/8/2019 Pvdiesel Batter Doc

    26/79

    under load can prevent generator starting problems. See FIGURE for the recommended

    inspection interval for the batteries and charging system.

    Testing batteries: Merely checking the output voltage of the batteries is not indicative

    of their ability to deliver adequate starting power. As batteries age, their internal

    resistance to current flow goes up, and the only accurate measure of terminal voltage

    must be done under load. This test is performed automatically every time the generator is

    started on Cummins Power Generation generator sets equipped with Power command. On

    other generators, use a manual battery load tester to verify the condition of each starting

    battery.

    Cleaning batteries: Keep the batteries clean by wiping them with a damp cloth

    whenever dirt appears excessive. If corrosion is present around the terminals, remove the

    battery cables and wash the terminals with a solution of baking soda and water (1/4-

    pound baking soda to one quart of water). Be careful to prevent the solution from

    entering the battery cells, and flush the batteries with clean water when done. After

    replacing the connections, coat the terminals with a light application of petroleum jelly.

    Checking specific gravity: Use a battery hydrometer to check the specific gravity of

    the electrolyte in each battery cell. A fully charged battery will have a specific gravity of

    1.260. Charge the battery if the specific gravity reading is below

    Checking electrolyte level: Check the level of the electrolyte in the batteries at least

    every 200 hours of operation. If low, fill the battery cells to the bottom of the filler neck

    with distilled water.

    Generator set exercise

    Generator sets on continuous standby must be able to go from a cold start to being

    fully operational in a matter of seconds. This can impose a severe burden on engine parts.

    However, regular exercising keeps engine parts lubricated, prevents oxidation of

    electrical contacts, uses up fuel before it deteriorates, and, in general, helps provide

    reliable engine starting. Exercise the generator set at least once a month for a minimum of

    30 minutes loaded to no less than one-third of the nameplate rating. Periods of no-load

    operation should be held to a minimum, because unburned fuel tends to accumulate in the

    exhaust system. If connecting to the normal load is not convenient for test purposes, the

    Page 26

  • 8/8/2019 Pvdiesel Batter Doc

    27/79

    best engine performance and longevity will be obtained by connecting it to a load bank of

    at least one-third the nameplate rating.

    > White paper_ By Timothy A.

    HYBRID POWER SYSTEMS

    Introduction

    Electrical energy requirements for many remote applications are too large to

    allow the cost-effective use of stand-alone or autonomous PV systems. In these cases, it

    may prove more feasible to combine several different types of power sources to form

    what is known as a "hybrid" system. To date, PV has been effectively combined with

    other types of power generators such as wind, hydro, thermoelectric, petroleum-fueled

    and even hydrogen. The selection process for hybrid power source types at a given site

    can include a combination of many factors including site topography, seasonal

    availability of energy sources, cost of source implementation, cost of energy storage and

    delivery, total site energy requirements, etc.

    Hybrid power systems use local renewable resource to provide power.

    Village hybrid power systems can range in size from small household systems (100

    Wh/day) to ones supplying a whole area (10s MWh/day).

    They combine many technologies to provide reliable power that is tailored to the local

    resources and community.

    Potential components include: PV, wind, micro-hydro, river-run hydro, biomass,

    batteries and conventional generators.

    A. Configuration of hybrid system

    Figure shows the basic configuration of hybrid system discussed in this study.

    The hybrid system was consisted of reduction gear, main-motor (EM1), sub- motor

    (EM2), engine, power controller and battery. It was supposed that a double-motor system

    was prepared for the driving system discussed in this study. At first, acceleration was

    assisted by was applied only by main motor when the driving speed was low, while the

    corporation by two motors was often achieved to drive the system.

    Page 27

  • 8/8/2019 Pvdiesel Batter Doc

    28/79

    If the SOC (state of charge) of battery was decreased below the specific threshold,

    the battery was charged by sub-motor. This operation was priority to over other actions.

    Figure 2 shows the modified configuration of hybrid system proposed in this study. In the

    modified system, CVT was utilized to keep constant revolution numbers of the sub-motor

    when the sub-motor contributed to assist the system.

    Schematic view of double motor hybrid system with CVT

    Petroleum-fueled engine generators (Gensets)

    Petroleum-fueled gensets (operating continuously in many cases) are presently the

    most common method of supplying power at sites remote from the utility grid such as

    villages, lodges, resorts, cottages and a variety of industrial sites including

    telecommunications, mining and logging camps, and military and other government

    operated locations. Although gensets are relatively inexpensive in initial cost, they are not

    inexpensive to operate. Costs for fuel and maintenance can increase exponentially when

    these needs must be met in a remote location. Environmental factors such as noise,

    carbon oxide emissions, transport and storage of fuel must also be considered.

    Page 28

  • 8/8/2019 Pvdiesel Batter Doc

    29/79

    Figure Hybrid PV/Generator System Example; Courtesy Photron Canada Inc., Location:

    Sheep Mountain Interpretive Centre, Parks Canada Kluone National Park, Yukon

    Territories, Canada, 63 North Latitude; Components shown include: generator (120/240

    V), battery (deep cycle industrial rated @ 10 kWh capacity), DC to AC stand-alone

    inverter (2500 W @ 120 V output), miscellaneous safety + control equipment including

    PV array disconnect, PV control/regulator, automatic generator start/-stop control,

    DC/AC system metering etc.; -Components not shown: PV array (800 W peak).

    Fuel to power conversion efficiencies may be as high as 25% (for a diesel fueled

    unit operating at rated capacity). Under part load conditions, however, efficiencies may

    decline to a few percent. Considerable waste heat is therefore available and may be

    utilized for other requirements such as space and/or water heating.

    Page 29

  • 8/8/2019 Pvdiesel Batter Doc

    30/79

    Figure: Genset fuel efficiency vs. capacity utilized.

    Why a PV/genset hybrid?

    PV and genset systems do not have much in common. It is precisely for this

    reason that they can be mated to form a hybrid system that goes far in overcoming the

    drawbacks to each technology. Table 10.1 lists the respective advantages and

    disadvantages. As the sun is a variable energy source, PV system designs are increased in

    size (and therefore cost) to allow for a degree of system autonomy. Autonomy is requiredto allow for provision of reliable power during "worst case" situations, which are usually

    periods of adverse weather, seasonally low solar isolation values or an unpredicted

    increased demand for power. The addition of autonomy to the system is accomplished by

    increasing the size of the PV array and its requisite energy storage system (the battery).

    Page 30

  • 8/8/2019 Pvdiesel Batter Doc

    31/79

    When a genset is added, additional battery charging and direct AC load supply

    capabilities are provided. The need to build in system autonomy is therefore greatly

    reduced. When energy demands cannot be met by the PV portion of the system for any

    reason, the genset is brought on line to provide the required backup power. Substantial

    cost savings can be achieved and overall system reliability is enhanced.

    PV/genset hybrid systems have been utilized at sites with daily energy

    requirements ranging from as low as 1 kWh per day to as high as 1 MWh per day, which

    illustrates their extreme flexibility. They are a proven and reliable method for efficient

    and cost-effective power supply at remote sites.

    PV/genset hybrid system description

    The PV/genset hybrid utilizes two diverse energy sources to power a site's loads.

    The PV array is employed to generate DC energy that is consumed by any existing DC

    loads, with the balance (if any) being used to charge the system's DC energy storage

    battery. The PV array is automatically on line and feeding power into the system

    whenever solar insulation is available and continues to produce system power during

    daylight hours until its rate of production exceeds what all existing DC loads and the

    storage battery can absorb. Should this occur, the array is inhibited by the system

    controller from feeding any further energy into the loads or battery? A genset is

    employed to generate AC energy that is consumed by any existing AC loads, with the

    balance (if any) being used by the battery charger to generate DC energy that is used in

    the identical fashion to that described for the PV array above.

    Page 31

  • 8/8/2019 Pvdiesel Batter Doc

    32/79

    Figure Block diagram of a hybrid PV-Genset system.

    At times when the genset is not running, all site AC power is derived from the

    system's power conditioner or inverter, which automatically converts system DCenergy

    into AC energy whenever AC loads are being operated. The genset is operated cyclically

    in direct response to the need for maintaining a suitable state of charge level in the

    system's battery storage bank.

    Figure Hybrid PV/Generator System Example. Courtesy Photron Inc., Location:

    Caples Lake, California, USA; 65 kVA 3 0 @ 480 V generator which includes co-

    generation equipment (i.e. heat exchangers to utilize the thermal energy created by unit

    operation).

    Page 32

  • 8/8/2019 Pvdiesel Batter Doc

    33/79

    Other PV/hybrid types

    Certain specific site locations may offer access to other forms of power

    generation. Access to flowing water presents the potential for hydro power. Access to

    consistent wind at sufficient velocity presents the potential for wind power. PV/hydro and

    PV/wind hybrid systems have been utilized at sites with daily energy requirement ranges

    similar to those described for PV/genset hybrids. Their use, however, is much more site

    dependent, as their energy source is a factor of that locations' topography.

    PV/Thermoelectric generator hybrid systems have been used effectively at sites

    whose daily energy requirement is relatively low, ranging from 1 to 20 kWh per day.

    Propane is the fuel source for the thermoelectric process, and conversion efficiencies of

    up to 8% can be achieved. Considerable waste heat is therefore available which may be

    utilized for other requirements. In cold climates, this heat is often used to maintain the

    battery storage system at desired temperature levels. Table 10.1 Relative Advantages of

    Energy Sources: Genset vs. PV

    Page 33

  • 8/8/2019 Pvdiesel Batter Doc

    34/79

    Architectural Integration

    Motivation

    The last two decades have brought significant changes to the design profession. In

    the wake of traumatic escalations in energy prices, shortages, embargoes and war alongwith heightened concerns over pollution, environmental degradation and resource

    depletion, awareness of the environmental impact of our work as design professionals has

    dramatically increased. In the process, the shortcomings of yesterday's buildings have

    also become increasingly clear: inefficient electrical and climate conditioning systems

    squander great amounts of energy. Combustion of fossil fuels on-site and at power plants

    adds greenhouse gases, acid rain and other pollutants to the environment. Inside, many

    building materials, furnishings and finishes give off toxic by-products contributing to

    indoor air pollution. Poorly designed lighting and ventilation systems can induce

    headaches and fatigue.

    Architects with vision have come to understand it is no longer the goal of good

    design to simply create a building that is aesthetically pleasing - buildings of the future

    must be environmentally responsive as well. They have responded by specifying

    increased levels of thermal insulation, healthier interiors, higher-efficiency lighting,

    better glazing and HVAC (heating, ventilation and air conditioning) equipment, air-to-air

    heat exchangers and heat-recovery ventilation systems. Significant advances have been

    made and this progress is a very important first step in the right direction. However, it is

    not enough. For the developed countries to continue to enjoy the comforts of the late

    twentieth century and for the developing world to ever hope to attain them, sustainability

    must become the cornerstone of our design philosophy. Rather than merely using less

    non-renewable fuels and creating less pollution, we must come to design sustainable

    buildings that rely on renewable resources to produce some or all of their own energy and

    create no pollution. One of the most promising renewable energy technologies is

    photovoltaics. Photovoltaics (PV) are a truly elegant means of producing electricity on

    site, directly from the sun, without concern for energy supply or environmental harm.

    These solid-state devices simply make electricity out of sunlight, silently with no

    maintenance, no pollution and no depletion of materials. Photovoltaics are also

    Page 34

  • 8/8/2019 Pvdiesel Batter Doc

    35/79

    exceedingly versatile - the same technology that can pump water, grind grain and provide

    communications and village electrification in the developing world can produce

    electricity for the buildings and distribution grids of the industrialized countries.

    Figure HEW, Hamburg, Germany: 16.8 kWp facade-integrated PV system. The

    polycrystalline PV modules are installed as fixed shading devices.

    There is a growing consensus that distributed photovoltaic systems which provide

    electricity at the point of use will be the first to reach widespread commercialization.

    Chief among these distributed applications are PV power systems for individual

    buildings. Interest in the building integration of photovoltaics, where the PV elements

    actually become an integral part of the building, often serving as the exterior weathering

    skin, is growing world-wide. PV specialists from some 15 countries are working within

    Page 35

  • 8/8/2019 Pvdiesel Batter Doc

    36/79

    the International Energy Agency's Task 16 on a 5-year effort to optimize these systems

    and architects are now beginning to explore innovative ways of incorporating solar

    electricity into their building designs.

    Figure SOS Kinderdorf, Zwickau, Germany: 2.9 kWp roof-integrated PV system.

    Frameless architectural laminated glass with amorphous silicon cells.

    Planning context of an energy conscious design project

    The possibilities of an active and passive solar energy use in buildings are greatly

    influenced by the form, design, and construction and manufacturing process of the

    building envelope. A promising possibility of active solar energy use is the production of

    electricity with photovoltaics. This technology can be adapted to existing buildings as

    well as to new buildings. It can be integrated into the roof, into the facade or into

    different building components, such as a Photovoltaic roof tile. Such integration makes

    sense for various reasons:

    The solar irradiation is a distributed energy source; the energy demand is distributed as

    well.The building envelopes supply sufficient area for PV generators and therefore

    additional land use is avoided as well as costs for mounting structures and energy

    transport.

    Page 36

  • 8/8/2019 Pvdiesel Batter Doc

    37/79

    Active and Passive Solar Design Principles ( Ingo Hagemann

    In order to use PV together with other available techniques of active and passive

    solar energy, it must be considered that some techniques fit well together and others

    exclude each other. For example: As a kind of a "passive cooling system", creepers are

    used for covering the south facade of building. The leaves evaporate water and provide

    shade on the facade. This helps to avoid penetration of direct sunlight and reduces the

    temperature in the rooms behind the facade. At the same time the leaves create shading

    on PV modules that may be mounted on the facade resulting in a far lower electricity

    production. To avoid such design faults it is necessary to compare and evaluate the

    different techniques that are available for creating an energy conscious building. An

    Page 37

  • 8/8/2019 Pvdiesel Batter Doc

    38/79

    overall energy concept for a building should be made at the beginning of the design

    process. Therefore, the architect and the other experts involved in the design and

    planning process need to work together right from the beginning of the design and

    planning process. All together they have to search right from the beginning for the best

    design for a building project.

    Photovoltaics and Architecture

    Photovoltaics and Architecture are a challenge for a new generation of buildings.

    Installations fulfilling a number of technical approaches do not automatically represent

    aesthetical solutions. Collaboration between engineers and architects is essential to create

    outstanding overall designs. This again will support the wide use of PV. These systems

    will acquire a new image, ceasing to be a toy or a solar module reserved for a mountain

    chalet but becoming a modern building unit, integrated into the design of roofs and

    facades. The architects, together with the engineers involved are asked to integrate PV at

    least on four levels during the planning and realization of a building:

    Design of a building (shape, size, orientation, color)

    Mechanical integration (multi functionality of a PV element)

    Electrical integration (grid connection and/or direct use of the power)

    Maintenance and operation control of the PV system must be integrated into the usualbuilding maintenance and control.

    Page 38

  • 8/8/2019 Pvdiesel Batter Doc

    39/79

    Planning Responsibilities and Lay Down of Energy Consumption.

    THE PHOTOVOLTAIC ARRAY

    A PV array consists of a number of PV modules, mounted in the same plane and

    electrically connected to give the required electrical output for the application. The PV

    array can be of any size from a few hundred watts to hundreds of kilowatts, although the

    larger systems are often divided into several electrically independent sub arrays each

    feeding into their own power conditioning system.

    Page 39

  • 8/8/2019 Pvdiesel Batter Doc

    40/79

    PHOTOVOLTAIC TECHNOLOGY

    Photovoltaics is the field of technology and research related to the devices which

    directly convert sunlight into electricity using semiconductors that exhibit thephotovoltaic effect. Photovoltaic effect involves the creation of voltage in a material upon

    exposure to electro magnetic radiation.

    The photovoltaic effect was first noted by a French physicist, Edmund Bequerel,

    in 1839, who found that certain materials would produce small amounts of electric

    current when exposed to light. In 1905, Albert Einstein described the nature of light and

    the photoelectric effect on which photovoltaic technology is based, for which he later

    won a Nobel prize in physics. The first photovoltaic module was built by Bell

    Laboratories in 1954. It was billed as a solar battery and was mostly just a curiosity as it

    was too expensive to gain widespread use. In the 1960s, the space industry began to make

    the first serious use of the technology to provide power aboard spacecraft. Through the

    space programs, the technology advanced, its reliability was established, and the cost

    began to decline. During the energy crisis in the 1970s, photovoltaic technology gained

    recognition as a source of power for non-space applications.

    The solar cell is the elementary building block of the photovoltaic technology.

    Solar cells are made of semiconductor materials, such as silicon. One of the properties of

    semiconductors that makes them most useful is that their conductivity may easily be

    modified by introducing impurities into their crystal lattice. For instance, in the

    fabrication of a photovoltaic solar cell, silicon, which has four valence electrons, is

    treated to increase its conductivity. On one side of the cell, the impurities, which are

    phosphorus atoms with five valence electrons (n-donor), donate weakly bound valence

    electrons to the silicon material, creating excess negative charge carriers. On the other

    side, atoms of boron with three valence electrons (p-donor) create a greater affinity than

    silicon to attract electrons. Because the p-type silicon is in intimate contact with the n-

    type silicon a p-n junction is established and a diffusion of electrons occurs from the

    region of high electron concentration (the n-type side) into the region of low electron

    concentration (p-type side). When the electrons diffuse across the p-n junction, they

    Page 40

  • 8/8/2019 Pvdiesel Batter Doc

    41/79

    recombine with holes on the p-type side. However, the diffusion of carriers does not

    occur indefinitely, because the imbalance of charge immediately on either sides of the

    junction originates an electric field. This electric field forms a diode that promotes

    current to flow in only one direction.

    Ohmic metal-semiconductor contacts are made to both the n-type and p-type sides

    of the solar cell, and the electrodes are ready to be connected to an external load. When

    photons of light fall on the cell, they transfer their energy to the charge carriers. The

    electric field across the junction separates photo-generated positive charge carriers

    (holes) from their negative counterpart (electrons). In this way an electrical current is

    extracted once the circuit is closed on an external load.

    SOLAR CELL

    The photovoltaic effect was first reported by Edmund Bequerel in 1839 when he

    observed that the action of light on a silver coated platinum electrode immersed in

    electrolyte produced an electric current. Forty years later the _rst solid state photovoltaic

    devices were constructed by workers investigating the recently discovered

    photoconductivity of selenium. In 1876 William Adams and Richard Day found that a

    photocurrent could be produced in a sample of selenium when contacted by two heated

    platinum contacts. The photovoltaic action of the selenium di_ered from its

    photoconductive action in that a current was produced spontaneously by the action of

    light. No external power supply was needed. In this early photovoltaic device, a

    rectifying junction had been formed between the semiconductor and the metal contact. In

    1894, Charles Fritts prepared what was probably the _rst large area solar cell by pressing

    Page 41

  • 8/8/2019 Pvdiesel Batter Doc

    42/79

    a layer of selenium between gold and another metal. In the following years photovoltaic

    e_ects were observed in copper {copper oxide thin _lm structures, in lead sulphide and

    thallium sulphide. These early cells were thin _lm Schottky barrier devices, where a

    semitransparent layer of metal deposited on top of the semiconductor provided both the

    asymmetric electronic junction, which is necessary for photovoltaic action and access to

    the junction for the incident light. The photovoltaic eject of structures like this was

    related to the existence of a barrier to current ow at one of the semiconductor {metal

    interfaces (i.e., rectifying action) by Goldman and Brodsky in 1914. Later, during the

    1930s, the theory of metal {semiconductor barrier layers was developed by Walter

    Schottky, Neville Mott and others.

    However, it was not the photovoltaic properties of materials like selenium which

    excited researchers, but the photoconductivity. The fact that the current produced was

    proportional to the intensity of the incident light, and related to the wavelength in a

    definite way meant that photoconductive materials were ideal for photographic light

    meters. The photovoltaic effect in barrier structures was an added benefit, meaning that

    the light meter could operate without a power supply. It was not until the 1950s, with the

    development of good quality silicon wafers for applications in the new solid state

    electronics, that potentially useful quantities of power were produced by photovoltaic

    devices in crystalline silicon.

    In the 1950s, the development of silicon electronics followed the discovery of a

    way to manufacture p{n junctions in silicon. Naturally n type silicon wafers developed a

    p type skin when exposed to the gas boron trichloride. Part of the skin could be etched

    away to give access to the n type layer beneath. These p {n junction structures produced

    much better rectifying action than Schottky barriers, and better photovoltaic behaviour.

    The first silicon solar cell was reported by Chapin, Fuller and Pearson in 1954 and

    converted sunlight with an efficiency of 6%, six times higher than the best previous

    attempt. That _figure was to rise significantly over the following years and decades but,

    at an estimated production cost of some $200 per Watt, these cells were not seriously

    considered for power generation for several decades. Nevertheless, the early silicon solar

    cell did introduce the possibility of power generation in remote locations where fuel

    could not easily be delivered. The obvious application was to satellites where the

    Page 42

  • 8/8/2019 Pvdiesel Batter Doc

    43/79

    requirement of reliability and low weight made the cost of the cells unimportant and

    during the 1950s and 60s, silicon solar cells were widely developed for applications in

    space.

    Also in 1954, a cadmium sulphide p{n junction was produced with an efficiency

    of 6%, and in the following years studies of p{n junction photovoltaic devices in gallium

    arsenide, indium phosphide and cadmium telluride were stimulated by theoretical work

    indicating that these materials would over a higher effciency. However, silicon remained

    and remains the foremost photovoltaic material, benethting from the advances of silicon

    technology for the microelectronics industry. Short histories of the solar cell are given

    elsewhere [Shive, 1959; Wolf, 1972; Green, 1990].

    In the 1970s the crisis in energy supply experienced by the oil-dependent western

    world led to a sudden growth of interest in alternative sources of energy, and funding for

    research and development in those areas. Photovoltaics were a subject of intense interest

    during this period, and a range of strategies for producing photovoltaic devices and

    materials more cheaply and for improving device efficiency were explored. Routes to

    lower cost included photo electrochemical junctions, and alternative materials such as

    polycrystalline silicon, amorphous silicon, other `thin _lm' materials and organic

    conductors. Strategies for higher efficiency included tandem and other multiple band gap

    designs. Although none of these led to widespread commercial development, our

    understanding of the science of photovoltaics is mainly rooted in this period.

    During the 1990s, interest in photovoltaics expanded, along with growing

    awareness of the need to secure sources of electricity alternative to fossil fuels. The trend

    coincides with the widespread deregulation of the electricity markets and growing

    recognition of the viability of decentralized power. During this period, the economics of

    photovoltaics improved primarily through economies of scale. In the late 1990s the

    photovoltaic production expanded at a rate of 15{25% per annum, driving a reduction in

    cost. Photovoltaics first became competitive in contexts where conventional electricity

    supply is most expensive, for instance, for remote low power applications such as

    navigation, telecommunications, and rural electri_cation and for enhancement of supply

    in grid-connected loads at peak use. As prices fall, new markets are opened up. An

    Page 43

  • 8/8/2019 Pvdiesel Batter Doc

    44/79

  • 8/8/2019 Pvdiesel Batter Doc

    45/79

    ELECTRICAL CONNECTION OF THE CELLS

    The electrical output of a single cell is dependent on the design of the device and

    the Semi-conductor material(s) chosen, but is usually insufficient for most applications.

    In order to provide the appropriate quantity of electrical power, a number of cells must beelectrically connected. There are two basic connection methods: series connection, in

    which the top contact of each cell is connected to the back contact of the next cell in the

    sequence, and parallel connection, in which all the top contacts are connected together, as

    are all the bottom contacts. In both cases, this results in just two electrical connection

    points for the group of cells.

    Series connection:

    Figure shows the series connection of three individual cells as an example and the

    resultant group of connected cells is commonly referred to as a series string. The current

    output of the string is equivalent to the current of a single cell, but the voltage output is

    increased, being an addition of the voltages from all the cells in the string (i.e. in this

    case, the voltage output is equal to 3Vcell).

    Page 45

  • 8/8/2019 Pvdiesel Batter Doc

    46/79

    Fig. Series connection of cells, with resulting currentvoltage characteristic.

    It is important to have well matched cells in the series string, particularly with

    respect to current. If one cell produces a significantly lower current than the other cells

    (under the same illumination conditions), then the string will operate at that lower current

    level and the remaining cells will not be operating at their maximum power points. Parallel connection

    Figure shows the parallel connection of three individual cells as an example. In this

    case, the current from the cell group is equivalent to the addition of the current from each

    cell (in this case, 3 Icell), but the voltage remains equivalent to that of a single cell.

    As before, it is important to have the cells well matched in order to gain

    maximum output, but this time the voltage is the important parameter since all cells must

    be at the same operating voltage. If the voltage at the maximum power point is

    substantially different for one of the cells, then this will force all the cells to operate off

    their maximum power point, with the poorer cell being pushed towards its open-circuit

    voltage value and the better cells to voltages below the maximum power point voltage. In

    all cases, the power level will be reduced below the optimum.

    Page 46

  • 8/8/2019 Pvdiesel Batter Doc

    47/79

    Fig. Parallel connection of cells, with resulting currentvoltage characteristic.

    MOUNTING STRUCTURE

    The main purpose of the mounting structure is to hold the modules in the required

    position without undue stress. The structure may also provide a route for the electrical

    wiring and may be free standing or part of another structure (e.g. a building). At itssimplest, the mounting structure is a metal framework, securely fixed into the ground. It

    must be capable of withstanding appropriate environmental stresses, such as wind

    loading, for the location. As well as the mechanical issues, the mounting has an influence

    on the operating temperature of the system, depending on how easily heat can be

    dissipated by the module.

    TILT ANGLE AND ORIENTATION

    The orientation of the module with respect to the direction of the Sun determines

    the intensity of the sunlight falling on the module surface. Two main parameters are

    defined to describe this. The first is the tilt angle, which is the angle between the plane of

    the module and the horizontal. The second parameter is the azimuth angle, which is the

    angle between the plane of the module and due south (or sometimes due north depending

    Page 47

  • 8/8/2019 Pvdiesel Batter Doc

    48/79

    on the definition used). Correction of the direct normal irradiance to that on any surface

    can be determined using the cosine of the angle between the normal to the Sun and the

    module plane.

    The optimum array orientation will depend on the latitude of the site, prevailing

    weather conditions and the loads to be met. It is generally accepted that, for low latitudes,

    the maximum annual output is obtained when the array tilt angle is roughly equal to the

    latitude angle and the array faces due south (in the northern hemisphere) or due north (for

    the southern hemisphere). For higher latitudes, such as those in northern Europe, the

    maximum output is usually obtained for tilt angles of approximately the latitude angle

    minus 1015 degrees. The optimum tilt angle is also affected by the proportion of diffuse

    radiation in the sunlight, since diffuse light is only weakly directional. Therefore, for

    locations with a high proportion of diffuse sunlight, the effect of tilt angle is reduced.

    However, although this condition will give the maximum output over the year,

    there can be considerable variation in output with season. This is particularly true in high-

    latitude locations where the day length varies significantly between summer and winter.

    Therefore, if a constant or reasonably constant load is to be met or, particularly, if the

    winter load is higher than the summer load, then the best tilt angle may be higher in order

    to boost winter output. Prevailing weather conditions can influence the optimisation of

    the array orientation if they affect the sunlight levels available at certain times of the day.

    Alternatively, the load to be met may also vary during the day and the array can be

    designed to match the output with this variable demand by varying the azimuth angle.

    Notwithstanding the ability to tailor the output profile by altering the tilt and azimuth

    angles, the overall array performance does not vary substantially for small differences in

    array orientation. Figure shows the percentage variation in annual insolation levels for

    the location of London as tilt angle is varied between 0 and 90 degrees and azimuth angle

    is varied between 45o (south east) and +45o (south west). The maximum insolation

    level is obtained for a south-facing surface at a tilt angle of about 35 degrees, as would be

    expected for latitude of about 51oN. However, the insolation level varies by less than

    10% with changing azimuth angle at this tilt angle. A similarly low variation is observed

    for south facing surfaces for a variation of +/- 30 degrees from the optimum tilt angle.

    Page 48

  • 8/8/2019 Pvdiesel Batter Doc

    49/79

    Fig. Percentage variation of annual sunlight levels as a function of tilt angle and azimuth

    angle.

    The calculations were carried out for the location of London using Meteonorm

    Version 3.0. The final aspect to consider when deciding on array orientation is the

    incorporation in the support structure. For building-integrated applications, the system

    orientation is also dictated by the nature of the roof or faade in which it is to be

    incorporated. It may be necessary to trade off the additional output from the optimum

    orientation against any additional costs that might be incurred to accomplish this. The

    aesthetic issues must also be considered.

    SUN-TRACKING/CONCENTRATOR SYSTEMS

    The previous section has assumed a fixed array with no change of orientation

    during operation. This is the usual configuration for a flat-plate array. However, somearrays are designed to track the path of the Sun. This can account fully for the suns

    movements by tracking in two axes or can account partially by tracking only in one axis,

    from east to west. For a flat-plate array, single-axis tracking, where the array follows the

    east-west movement of the Sun, has been shown to increase the output by up to 30% for a

    Page 49

  • 8/8/2019 Pvdiesel Batter Doc

    50/79

    location with predominantly clear sky conditions. Two-axis tracking, where the array

    follows both the daily east-west and north-south movement of the sun, could provide a

    further increase of about 20% (Lepley, 1990). For locations where there are frequent

    overcast conditions, such as northern Europe, the benefits of tracking are considerably

    less. It is usually more economical to install a larger panel for locations with less than

    about 3000 hours of direct sunshine per annum. For each case, the additional output from

    the system must be compared to the additional cost of including the tracking system,

    which includes both the control system and the mechanism for moving the array. For

    concentrator systems, the system must track the Sun to maintain the concentrated light

    falling on the cell. The accuracy of tracking, and hence the cost of the tracking system,

    increases as the concentration ratio increases.

    SHADING

    Shading of any part of the array will reduce its output, but this reduction will vary

    in magnitude depending on the electrical configuration of the array. Clearly, the output of

    any cell or module which is shaded will be reduced according to the reduction of light

    intensity falling on it. However, if this shaded cell or module is electrically connected to

    other cells and modules which are unshaded, their performance may also be reduced

    since this is essentially a mismatch situation.

    For example, if a single module of a series string is partially shaded, its current

    output will be reduced and this will then dictate the operating point of the whole string. If

    several modules are shaded, the string voltage may be reduced to the point where the

    open-circuit voltage of that string is below the operating point of the rest of the array, and

    then that string will not contribute to the array output. If this is likely to occur, it is often

    useful to include a blocking diode for string protection, as discussed earlier.

    Thus, the reduction in output from shading of an array can be significantly greater

    than the reduction in illuminated area, since it results from

    The loss of output from shaded cells and modules;

    The loss of output from illuminated modules in any severely shaded strings that cannot

    maintain operating voltage; and

    The loss of output from the remainder of the array because the strings are not operating

    at their individual maximum power points.

    Page 50

  • 8/8/2019 Pvdiesel Batter Doc

    51/79

    For some systems, such as those in a city environment, it may be impossible to

    avoid all shading without severely restricting the size of the array and hence losing output

    at other times. In these cases, good system design, including the optimum interconnection

    of modules, the use of string or module inverters and, where appropriate, the use of

    protection devices such as blocking diodes, can minimize the reduction in system output

    for the most prevalent shading conditions.

    THE PHOTOVOLTAIC SYSTEM

    A PV system consists of a number of interconnected components designed to

    accomplish a desired task, which may be to feed electricity into the main distribution

    grid, to pump water from a well, to power a small calculator or one of many more

    possible uses of solar-generated electricity. The design of the system depends on the task

    it must perform and the location and other site conditions under which it must operate.

    This section will consider the components of a PV system, variations in design according

    to the purpose of the system, system sizing and aspects of system operation and

    maintenance.

    System design

    There are two main system configurations stand-alone and grid-connected. As

    its name implies, the stand-alone PV system operates independently of any other power

    supply and it usually supplies electricity to a dedicated load or loads. It may include a

    storage facility (e.g. battery bank) to allow electricity to be provided during the night or

    at times of poor sunlight levels. Stand-alone systems are also often referred to as

    autonomous systems since their operation is independent of other power sources. By

    contrast, the grid-connected PV system operates in parallel with the conventional

    electricity distribution system. It can be used to feed electricity into the grid distribution

    system or to power loads which can also be fed from the grid.

    It is also possible to add one or more alternative power supplies (e.g. diesel

    generator, wind turbine) to the system to meet some of the load requirements. These

    systems are then known as hybrid systems. Hybrid systems can be used in both stand-

    alone and grid-connected applications but are more common in the former because,

    Page 51

  • 8/8/2019 Pvdiesel Batter Doc

    52/79

    provided the power supplies have been chosen to be complementary, they allow

    reduction of the storage requirement without increased loss of load probability. Figures

    below illustrate the schematic diagrams of the three main system types.

    Fig. Schematic diagram of a stand-alone photovoltaic system.

    Fig. Schematic diagram of grid-connected photovoltaic system.

    Page 52

  • 8/8/2019 Pvdiesel Batter Doc

    53/79

    Fig. Schematic diagram of hybrid system incorporating a photovoltaic array and a motor

    generator (e.g. diesel or wind).

    GREENHOUSE GAS EMISSIONS

    THE rising concentrations of greenhouse gases (GHGs) of anthropogenic origin

    in the atmosphere such as carbon dioxide (CO2), methane (CH4) and nitrous oxide

    (N2O) have increased, since the late 19th century. According to the Third Assessment

    Report (TAR) of the Intergovernmental Panel on Climate Change1, because of the

    increase in concentration of greenhouse gases in the atmosphere (for e.g., CO2 by 29 per

    cent, CH4 by 150 per cent and N2O by 15 per cent) in the last 100 years, the mean

    surface temperature has risen by 0.40.8C globally. The precipitation has become

    spatially variable and the intensity and frequency of extreme events has increased. The

    sea level also has risen at an average annual rate of 12 mm during this period. The

    continued increase in concentration of GHG in the atmosphere is likely to lead to climate

    change resulting in large changes in ecosystems, leading to possible catastrophic

    disruptions of livelihoods, economic activity, living conditions, and human health2.

    The United Nations Framework Convention on Climate Change3 requires the

    parties to protect the climate system in accordance with their common but differentiated

    responsibilities and respective capabilities. It enjoins upon developed countries to take

    the lead role for combating climate change and the adverse effects thereof, considering

    their historically higher contribution to the total anthropogenic load of greenhouse gases

    Page 53

  • 8/8/2019 Pvdiesel Batter Doc

    54/79

    in the atmosphere. In the year 1990, the developed world (Australia, Canada, USA,

    Europe, former USSR and Japan) emitted around 66 per cent of the total global GHG

    emissions, which though has reduced to 54 per cent in 2000, mainly offset by the rise in

    Chinese emissions (see Figure 1). The South Asian region, including three-fourths

    emission share of India, contributed only 3 per cent of the total global GHG emissions in

    1990 and the share of emissions from South Asia has grown merely by 4 per cent in

    2000. In accordance with the Article 12 of the climate convention, the parties are required

    to report on a continuous basis an information on implementation of the convention inter

    alia an inventory of greenhouse gases by sources and removals by sinks (see note 1) and

    also the steps taken to address climate change. Towards the fulfillment of the obligations

    under the convention, India submitted its Initial National Communication to the

    UNFCCC on 22 June 2004.

    This analyses the improvements made in GHG inventory estimation reported

    therein with respect to earlier published estimates and highlights the strengths, the gaps

    that still exist and the future challenges for its refinement. Further, the paper examines the

    key sources where efforts are needed to develop a more refined inventory with attendant

    reduction in uncertainties. The also makes an assessment of the current and projected

    trends of GHG emission from India and some selected countries.

    Figure Regionwise GHG emissions in (a) 1990 and (b) 2000

    Page 54

  • 8/8/2019 Pvdiesel Batter Doc

    55/79

    Summary of greenhouse gas emissions in Gg (thousand tonnes) from India in

    1994 by sources and sinks

    Greenhouse gas inventory estimation

    Estimations of anthropogenic GHG emission inventories in India, began in a

    limited scale in 1991, which were enlarged and revised and the first definitive report for

    the base year 1990 was published4 in 1992. Since then, several papers and reports have

    been published which have upgraded the methodologies for estimation, included country-

    specific emission factors (see note 2) and activity data (see note 3)5, accounted for new

    sources of emissions and new gases or pollutants610. A comprehensive inventory of the

    Indian emissions from all energy, industrial processes, agriculture activities, land use,

    land use change and forestry and waste management practices has recently been reported

    in Indias Initial National Communication to the UNFCCC11 for the base year 1994. All

    these emission estimates reported have been made using the IPCC guidelines for

    preparing national greenhouse gas inventories, either by Tier I, Tier II or Tier III. The use

    of any of these tiers depended upon the level of disaggregated activity data available for a

    particular source of GHG emissions and its relative importance as a GHG emission

    source with respect to the total emissions from the country. Table 1 summarizes the GHG

    inventory estimates reported under the aegis of Indias initial national communication11.

    In 1994, 1228 million tonnes of CO2 equivalent (see note 7) emissions took place

    from all anthropogenic activities in India, accounting for 3 per cent of the total globalemissions. About 794 million tonnes, i.e. about 63 per cent of the total CO2 equivalent

    emissions was emitted as CO2, while 33 per cent of the total emissions (18 million

    tonnes) was CH4, and the rest 4 per cent (178 thousand tonnes) was N2O. The CO2

    emissions were dominated by emissions due to fuel combustion in the energy and

    Page 55

  • 8/8/2019 Pvdiesel Batter Doc

    56/79

    transformation activities, road transport, cement and steel production. The CH4 emissions

    were dominated by emissions from enteric fermentation in ruminant livestock and rice

    cultivation.The major contribution to the total N2O emissions came from the agricultural

    soils due to fertilizer applications. At a sectoral l