Purva Westend Apr15

download Purva Westend Apr15

of 9

Transcript of Purva Westend Apr15

  • 8/17/2019 Purva Westend Apr15

    1/9

    Construction Status - APR 2015Location : Hosur Main Road, Bengaluru

  • 8/17/2019 Purva Westend Apr15

    2/9

    A block

  • 8/17/2019 Purva Westend Apr15

    3/9

    B block

  • 8/17/2019 Purva Westend Apr15

    4/9

    C block

  • 8/17/2019 Purva Westend Apr15

    5/9

    D block

  • 8/17/2019 Purva Westend Apr15

    6/9

    E block

  • 8/17/2019 Purva Westend Apr15

    7/9

    F block

  • 8/17/2019 Purva Westend Apr15

    8/9

    PWE MARKETING PROGRESS REPORT -APRIL 2015

    S. No ACTIVITIESWINGS/BLOCKS

    As On

    25.04.2015

    A B C D E F Retaining wall

    A LOWER BASEMENT FLOOR

    1 Earth Work Excavation 100% 100% 100% 100% 100% 98% 97%

    2 Plain Cement Concrete 100% 100% 100% 100% 100% 97% 52%

    3 Raft/Footing Reinforcement 100% 100% 100% 100% 100% 90% 48%

    4 Raft/Footing Concrete 100% 100% 100% 100% 100% 90% 48%

    5 Retaining Wall Concrete (1st lift) 97% 100% 100% 15%

    6 Retaining Wall Concrete (2nd lift) 97% 100% 100% 15%

    7 Grade Slab concreting 100% 100% 100% 100% 100%

    FIRST SLAB - UPPERBASEMENT FLOOR

    1 Column Concrete (up to 1st slab - Upper basement floor) 100% 100% 100% 100% 100%

    2 Upper basement Floor Slab Shuttering 100% 100% 100% 100% 100%

    3 Upper basement Floor Slab Reinforcement 100% 100% 100% 100% 100%

    4 Upper basement Floor Slab Concrete 100% 100% 100% 100% 100%

    B SECOND SLAB - GROUND FLOOR

    1 Retaining Wall Concrete (1st lift) 40% 100% 100%

    2 Retaining Wall Concrete (2nd lift) 100% 100%

    3 Column Concrete (up to 2nd slab - Ground floor) 100% 100% 85% 100% 100%

    4 Ground Floor Slab Shuttering 100% 100% 40% 100% 100%

    5 Ground Floor Slab Reinforcement 100% 100% 15% 100% 100%

    6 Ground Floor Slab Concrete 100% 100% 100% 100%

    C THIRD SLAB - FIRST FLOOR

    1 Column Concrete ( Ground floor -First floor ) 80% 15% 98% 100%

    2 First Floor Slab Shuttering 45% 90% 100%

    3 First Floor Slab Reinforcement 50% 100%

    4 First Floor Slab Concrete 100%

    C FOURTH SLAB - SECOND FLOOR

    1 Column Concrete (First floor - Second floor ) 15%

    2 Second Floor Slab Shuttering

    3 Second Floor Slab Reinforcement

    4 Second Floor Slab Concrete

  • 8/17/2019 Purva Westend Apr15

    9/9

    Puravankara Projects Limited, 130/1, Ulsoor Road, Bangalore - 560 042,

    Call - 080 – 43439499, Email: [email protected]