Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ......
Transcript of Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ......
![Page 1: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/1.jpg)
1
![Page 2: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/2.jpg)
2 2
Purpose of Today’s Meeting
• Introduce you to the project
• Update you on project progress
• Present conceptual alternatives
• Gain your feedback
![Page 3: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/3.jpg)
3
Study Purpose
• Examine transportation needs • Develop solutions • For the replacement of the existing bridge
that carries U.S. 52 over the Mississippi River between Savanna, IL and Sabula, IA
![Page 4: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/4.jpg)
4
Project Overview
![Page 5: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/5.jpg)
5
Study Needs
• Bridge deficiencies – Originally built in 1932; functionally obsolete – At 20 feet wide, doesn’t meet current
standards • Safety deficiencies
– Narrow roadway forces wider vehicles into opposing lane
– Substandard roadway width has contributed to crashes
![Page 6: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/6.jpg)
6
Study Needs
• System Linkage – U.S. 52 bridge provides crucial regional
transportation link – Nearest crossings almost 20 miles south and
45 miles north
![Page 7: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/7.jpg)
7
Project Study Group (PSG)
• Consists of representatives of: – Illinois Department of Transportation
(IDOT) – Iowa Department of Transportation
(IADOT) – Federal Highway Administration (FHWA) – Project consultant teams – Other technical agencies, as appropriate
![Page 8: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/8.jpg)
8 8
PSG’s Role
• Primary responsibility for project development process – Identifies and resolves project development
issues – Promotes partnerships with stakeholders – Work to develop general understanding
among stakeholders
The PSG will make the ultimate project recommendations and decisions.
![Page 9: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/9.jpg)
9
IDOT Project Phases
Phase I Phase II Phase III
Construction Contract Plan Preparation
& Land
Acquisition
Preliminary Engineering & Environmental
Study
![Page 10: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/10.jpg)
10
Where are We?
• Step I: Analyze existing and future conditions
• Step II: Purpose and Need • Step III: Detailed
environmental and technical studies
• Step IV: Environmental Assessment (EA) with Preferred Alternative
Phase I
Preliminary Engineering & Environmental
Study
![Page 11: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/11.jpg)
11
Anticipated Project Timeline
![Page 12: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/12.jpg)
12 12
Project Constraints
• Need to keep existing bridge open during construction to the extent possible – New bridge on alternate alignment – 40-mile detour/adverse travel
• Location of navigational channel • Vertical profile of bridge • Impacts to properties along IL 84 and
natural environment
![Page 13: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/13.jpg)
13
Proposed Bridge Alignment
Proposed Alignment
![Page 14: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/14.jpg)
14
Bridge Type Evaluation Factors
• Initial Cost • Inspection and
Maintenance • Aesthetics • Durability • Constructability • River traffic impacts
during construction
• Environmental impact • Influence of structure
depth on vertical profile
• Geotechnical considerations
• Hydraulic considerations
• Flexibility for future widening
![Page 15: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/15.jpg)
15
Tied-Arch Bridge Alternative
Tied-Arch Bridge
![Page 16: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/16.jpg)
16
Cable-Stayed Bridge Alternative
Cable-Stayed Bridge
![Page 17: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/17.jpg)
17
IL 84 Reconstruction Plan
IL-84
![Page 18: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/18.jpg)
18
Next Steps
• Continued input and technical analysis • Ongoing stakeholder participation • Evaluation and
refinement of the Concepts – Continued contact
with local officials • Selection of
Preferred Alternative for further detailed study
• Public Hearing - Early 2013
![Page 19: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/19.jpg)
19
We want to hear from you
• Adjourn to Exhibit Area • Meet the Study Team • Fill Out Comment Forms Today • Visit http://www.dot.state.il.us/us52il64/infocenter.html
– Project updates available – Submit project comments on-line
• IDOT contact information is available in the exhibit area
![Page 20: Purpose of Today’s Meeting - Illinois Department of ......Purpose of Today’s Meeting ... Cable-Stayed Bridge Alternative Cable-Stayed Bridge . 17 IL 84 Reconstruction Plan IL-84](https://reader034.fdocuments.net/reader034/viewer/2022042102/5e7f67e4d1a7070375335852/html5/thumbnails/20.jpg)
20
Thank you PLEASE PROCEED TO EXHIBIT DISPLAY AREA