Purple Line Extension Construction Community Meeting September 18, 2014

Transcript of Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile...

Page 1: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Purple Line Extension Construction Community Meeting September 18, 2014

Page 2: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tonight’s Agenda

• Project Update and Look-Ahead

• Tree removal, replacement and landscape overview

• Break out session Q&A

2

Page 3: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Fare Change Started September 15

For more information, visit: metro.net/fares.

3

Page 4: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Project Update and Look-Ahead

4

Page 5: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Section 2 – Pursuit of Federal Funding

Under Construction Forecasted Schedule

Section 1 Section 2 Section 3

Length 3.9 Miles 2.6 Miles 2.9 Miles

New Stations Wilshire/La Brea

Wilshire/Fairfax

Wilshire/La Cienega

Wilshire/Rodeo

Century City

Westwood/UCLA

Westwood/VA

Hospital

Pre-Construction Activities Current - 2014 2017 - 2018 2025 - 2027

Construction 2014 - 2023 2019 - 2026 2027 - 2035

Operations 2023 2026 2035 5

Page 6: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Activity in the Area

• Wilshire Bus Rapid Transit Project, City of LA/Metro Wilshire Bust Rapid Transit Project Contact Info

www.wilshirebrt.com

[email protected]

(213) 922-2500

• Private Developments – Desmond (Wilshire/ near Burnside)

– The Mansfield (Wilshire/Orange)

– LACMA (Wilshire/Fairfax)

– Petersen Automotive Museum (Wilshire/Fairfax)

– Shalhevet High School (Wilshire/Fairfax)

– AMPAS/May Co. Building (Wilshire/Fairfax)

– Snyder Project (Wilshire/Curson)

6

Page 7: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Design-Build Contract

• January 2014: Proposals submitted from Design-Builder

finalists

• July 2014: Metro Board Awards Design-Build Contract

• Skanska, Traylor Bros. and J. F. Shea, a Joint Venture (STS)

• Contract award under protest

• Notice To Proceed (NTP) will be issued once resolved

7

Page 8: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

West and East Segments Map

8

1

2 4

5 3

• West Segment, Mindy Lake: 1-3 1: Wilshire/La Cienega

2: Wilshire/Fairfax

• East Segment, Michael Cortez: 3-5 4: Wilshire/La Brea

5: Tie-in at Wilshire/Western Station

Page 9: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Construction Activity Timeline Optimal Schedule Without Restrictions (Assumes extended work hours)

9

YEAR

QUARTER Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Advanced Utility Relocations

Shoring

Decking

Station Excavation

Tunneling

Station

Systems & Testing

Revenue Service

YEAR

QUARTER Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Advanced Utility Relocations

Shoring

Decking

Station Excavation

Tunneling

Station

Systems & Testing

Revenue Service

YEAR

QUARTER Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Advanced Utility Relocations

Shoring

Decking

Station Excavation

Tunneling

Station

Systems & Testing

Revenue Service

LA CIENEGA STATION AREA - SECTION 1 PURPLE LINE EXTENSION PROJECT2020 2021 2022 20232014 2015 2016 2017 2018 2019

LA BREA STATION AREA - SECTION 1 PURPLE LINE EXTENSION PROJECT2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

FAIRFAX STATION AREA - SECTION 1 PURPLE LINE EXTENSION PROJECT2014 2015 2016 2017 2018 2019 2020 2021 2022 2023

Below Deck

Shoring

Install Deck Remove Deck

Below Deck

Shoring

Install Deck Remove Deck

Below Deck

Shoring

Install Deck Remove Deck

Station Excavation

Systems & Testing

Systems & Testing

AUR

Tunneling

Station

Systems & Testing

AUR

Station Excavation

Tunneling

Station

AUR

Station Excavation

Tunneling

Station

Page 10: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tie-in at Western Station Optimal Schedule

10

YEAR

QUARTER Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Advanced Utility Relocations

Shoring

Decking

Shaft Excavation

Remove Tunnel Boring Machines (TBMs)

Construct Tunnel Crosspassages and Walkways

Construct Interface Chamber

Trackwork & Systems

Backfill access shaft & restore laydown area

TIE-IN AT EXISTING WESTERN STATION AREA - SECTION 1 PURUPLE LINE EXTENSION PROJECT2016 2017 2018 2019 2020 2021

Shoring

Install Deck

Construct Interface Chamber

Shaft Excavation

Remove TBMs

Cosntruct Tunnel Crosspassages & Walkways

AUR

Below

DeckBackfill access shaft and restore laydown area

Trackwork & Systems

Page 11: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tie-in at Western Station

• Ongoing: Acquiring properties on NE corner of Wilshire/Manhattan Pl

• Summer 2016: Construction is anticipated to begin with AUR work

• Staging yard will be built with 20ft sound wall fence

• Other work will include – Shoring and piling

– Street decking

– Excavation

– Tunnel Boring Machine Removal

11

Wilshire/Western Station on NE

Corner of Wilshire/Western

Properties to be Acquired on NE Corner

Wilshire/Manhattan Pl

Page 12: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Crenshaw Yard Staging Site Wilshire/Crenshaw

• Will be used throughout Section 1 utility relocation and construction

• Sound wall is almost complete – Majority of wall in place

– Installing soundblankets

– Working around water main

– Installing sound wall on two gates

• Ongoing: – Noise awareness training

– Maintenance inside and outside of yard

– Nightly noise readings

Crenshaw Yard on SE corner of

Wilshire/Lorraine

12

Page 13: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Brea Utility Relocation 1 Year

2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Fiber

Power

Water

LADWP Cable Pulling

ATT Construction

Gas

13

Page 14: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Metro Advanced Utility Relocation (AUR) Work

• Completed: – Fiber-optic cable relocation

– Electrical work (vaults/duct works)

• March 2013: Water relocation work began – Fire services, meter, duct, iron steel pipes

• February 2014: LADWP cable pulling began

• June 2014: AT&T construction began

• Work Hours:

La Brea Station What’s Happened So Far

Typical cross-section of

underground utilities

14

Day work:

Saturday: 8AM - 6PM

Night work:

Sunday – Friday: 8PM - 6AM

Page 15: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Brea Station What’s Next

• Fall 2014: Southern California Gas work anticipated to begin

• Fall 2014: AT&T construction scheduled to be completed

• Early 2015: LADWP scheduled to complete water and electrical connections

• 2015: Design-Builder expected to begin work on staging yard

Sample of recent AUR work around La Brea

15

Page 16: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Brea Station Former Metro Customer Service Center

• Signage and artwork will be removed and preserved

• Additional lighting added for safety and security

• Building demolition anticipated early 2015

• Nearest location to buy and reload TapCard:

Ralphs

5601 Wilshire Blvd.

Los Angeles, CA 90036

310-884-4232

Former Metro Customer Service Center on

NW Wilshire/La Brea

New location: Wilshire/Vermont Station 3183 Wilshire Blvd, Suite 174 Monday - Friday, 10 a.m. - 6 p.m.

16

Page 17: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Brea Station Mitigation

Avalon Wilshire Apartments on Wilshire

between Orange and Mansfield

Museum Gardens Apartments on NW corner of

Wilshire/Detroit

• Ongoing: Business and residential profiles for advanced utility relocation

• Business and Resident Communications

– Avalon Management

– 5200 Wilshire Management

– Museum Gardens Management

– Greater Wilshire Neighborhood Council

17

Page 18: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Exploratory Shaft Wilshire/Ogden

• March 2014: Excavation completed

• April 2014: Monitoring period began

• September 2014: Shaft will be filled in and site restore

• Early 2015: Design-Builder scheduled to take ownership of site for staging yard

Exploratory Shaft on SW corner Wilshire/Ogden

18

Page 19: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Fairfax Utility Relocation 2 Years

> Bulleted copy.

> Bulleted copy.

2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Fiber

ATT Construction

Power

Water

LADWP Cable Pulling

Gas

19

Page 20: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Slide Fairfax Station What’s Happened So Far

Metro Advanced Utility Relocation (AUR) Work

• March 2014: Fiber-Optic Cable Relocation began

• July 2014: Electrical work began

• Work Hours:

Photos of AUR work for Fairfax Station

20

Day work:

Monday – Friday: 9AM - 3:30PM Saturday: 8AM - 6PM

Night work:

Sunday – Thursday: 8PM - 6AM

Page 21: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Fairfax Station What’s Next

• November 2014: Water relocation work anticipated to start

• April 2015: Design-Builder anticipated to start in Ogden staging yard

• Early 2016: AUR work anticipated to be completed

Sample photos of recent AUR work for Fairfax Station

21

Page 22: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Fairfax Station Mitigation

• Ongoing: Business and residential profiles

• Fairfax Coordinated Construction Projects (FCCP):

– Ongoing coordination meetings with current and future projects slated for the Wilshire/Fairfax area.

Onyx Tower on the SW corner of

Wilshire/Fairfax

Former May Co./AMPAS NE corner

of Wilshire/Fairfax 22

Page 23: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Cienega Utility Relocation 30 Months

2014 2015 2016

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Fiber

Water, Sewer, Storm Drain, Power

ATT Construction

Gas

23

Page 24: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Cienega Station What’s Happened So Far

Metro Advanced Utility Relocation (AUR) Work

• May 2014: Fiber relocation began – Wilshire between Gale and San Vicente

• August 2014: City of Beverly Hills approved Memorandum of Agreement (MOA) for AUR work

Photos of AUR work for La Cienega Station

24

Page 25: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Cienega Station What’s Next

• October 2014: Exploratory potholing within the station box perimeter to take 30 days

• Start of 2015: AUR work will begin once contractor is selected

• Late 2016: Utility relocation anticipated to be completed

Wilshire/La Cienega conceptual entrance

25

Page 26: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

La Cienega Station Mitigation

• AUR business and residential profiles continue

• Community Outreach and Business Mitigation component has been approved as part of MOA.

The Saban Theatre on SE corner of

Wilshire/Hamilton

8484 Wilshire Building on SE corner of Wilshire/La

Cienega

26

Page 27: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Noise Mitigation Night time work permit: Ambient +5 Db

Crenshaw Yard Wilshire/La Brea

Wilshire/La Cienega Wilshire/Fairfax

27

Page 28: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tree Removal, Replacement and Landscape Overview

28

Page 29: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Landscape Overview

• Ahead of the Design-Builder, Metro has employed an arborist and a landscape architect to draft plans

– Same landscape architect who drafted original median plans

• Metro has met with Miracle Mile Civic Coalition/Wilshire Median Advisory Group

Washingtonias around Wilshire/Fairfax

29

Page 30: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tree Removal

• Estimate 100 trees need to be removed

• Trees were evaluated on: – Size

– Health

– Condition

– Viability

– Suitability for boxing, storage and reuse

– Replacement methods

• These factors determine the eligibility for relocation

Mexican fan palms around

Wilshire /La Cienega

30

Page 31: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tree Relocation/Adoption • Relocation can be difficult due to:

– Condition/health of trees

– Cost exceeds current value

– Timing of season

– Size

• Metro has reached out to 30 organizations to gauge interest including:

– Santa Monica Mountains Conversancy, California Native Plant Society, Tree People, Million Trees LA, Griffith Park, LA Zoo, County Parks and Rec, LA Conservation Corp, and local gardens and nurseries

• Of those interested, many have specified certain criteria that the trees must meet, especially sizes of trees.

• Will relocate trees to Crenshaw Yard

Jacaranda around Wilshire/La Brea

31

Page 32: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Tree Removal Process City of Los Angeles

• Metro will submit tree removal application to Urban Forestry Division (UFD)

• UFD will submit report to Board of Public Works for approval

• 3+ trees requires 30-day posting period to allow for public comment

• Tree removal notification system – http://bsspermits.lacity.org/treepostings/

• Trees will be removed incrementally based on construction phasing

• Anticipate first removals beginning 2015

Lagerstroemia around

Wilshire/Fairfax

32

Page 33: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Landscape Plan Overview

• Final Environmental Impact Report (FEIR) outlines required landscape plan

• Design-Builder responsible for finalization of landscape plan

• Landscape palate dictated by existing palate and by city requirements

• Miracle Mile Civic Coalition will be included in draft discussions

• Workshops will be hosted by Design-Builder for community input

• Trees will be replaced 2:1

• City of Los Angeles has agreed to 36” box trees

• New irrigation, controllers and lighting for affected areas

• Furnish and install new Miracle Mile median signs

Phoenix dactylifera around

Wilshire/Fairfax

33

Page 34: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Landscape Plan Process

• Design-Builder will use city requirements and existing palate to create draft plans

• Plans reviewed by Miracle Mile Civic Coalition and community for input

• Plans approved by – City of Los Angeles: Bureau of Street Services

– City of Beverly Hills: Urban Forest & Park Maintenance Division, Community Services Department

Cinnamomum around

Wilshire/Western 34

Page 35: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Landscape Exhibits

35

Page 36: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Future Community Meetings

• Next Community Meeting: January 2015

• Community Meetings held every 2 months

• Community Meeting location will rotate along the alignment

• Section 1 Advisory Group will meet as needed to discuss station specific issues. Meetings will be open to the public.

36

Page 37: Purple Line Extension - Metromedia.metro.net/projects_studies/westside/images/...• Miracle Mile Civic Coalition will be included in draft discussions • Workshops will be hosted

Stay in Touch

www.metro.net/purplelineext

twitter.com/purplelineext

facebook.com/purplelineext

213.922.6934

[email protected]

37