PULL / JIT. LT6 Training Module. INTRODUCTION. INTRODUCTION. What are Pull & JIT?. An inventory strategy Improves the return on investment of a business by… Reducing in-process inventory Reducing cycle time Driven by signals, or Kanban, to… Make the next part, or Move the next part. - PowerPoint PPT Presentation

Transcript of PULL / JIT

Page 1: PULL / JIT

PULL / JITLT6 Training Module

Page 2: PULL / JIT

INTRODUCTION

Page 3: PULL / JIT

What are Pull & JIT?

» An inventory strategy » Improves the return on investment

of a business by…– Reducing in-process inventory – Reducing cycle time

» Driven by signals, or Kanban, to…– Make the next part, or– Move the next part

INTRODUCTION

PULL/JIT| LT6 Training Module

Page 4: PULL / JIT

» First used by the Ford Motor Company (early 1900’s)

– "dock to factory floor" – not stored in warehouse, on factory floor

» Adopted by Toyota as part of its Toyota Production System (TPS)» Little space for inventory» Required shortening Set Up Times, through

SMED» Changed assumptions about Economic Lot

Quantity (ELQ)» ELQ fell to 1 unit

» When a part disappeared, a signal to produce or order a replacement.

HISTORY

PULL/JIT| LT6 Training Module

Page 5: PULL / JIT

JIT AND PULL, related to……

WHY JIT & PULL

PULL/JIT| LT6 Training Module

Page 6: PULL / JIT

But why is it important?

WHY JIT & PULL

PULL/JIT| LT6 Training Module

8 WastesDefects OverproductionWaitingNon-utilized talentTransportationInventoryMotionExtra processing

Page 7: PULL / JIT

So…

What’s So Bad About Inventory?

Why Inventory?

PULL/JIT| LT6 Training Module

Page 8: PULL / JIT

It HIDES problems

Why Inventory?

PULL/JIT| LT6 Training Module

What’s So Bad About Inventory?

Poor Quality

Work in process inventory level(hides problems)

Unreliable Vendors

Capacity Imbalances

Page 9: PULL / JIT

Why Inventory?

PULL/JIT| LT6 Training Module

What’s So Bad About Inventory?

ScrapUnreliable Vendors

Capacity Imbalances

WIP

Lower Inventory level to expose problems, then…» Work on problems by:

– Reducing variability– Eliminating waste– Streamlining production and material flows– Accurate information

Page 10: PULL / JIT

JIT

PULL/JIT| LT6 Training Module

So, Pull & JIT are……?

» A management philosophy of continuous and forced problem solving

» Supplies and components are ‘pulled’ through system to arrive where they are needed when they are needed

» Goal: Achieve the minimal level of resources required to add the necessary value in the production system.

» A means of making WASTE easy to see.

Page 11: PULL / JIT

JIT

PULL/JIT| LT6 Training Module

JIT Philosophy……

» JIT means the right quantity at the right place and the right time.

» Minimize or eliminate wastes (hidden rocks)

» Simpler is better» Focuses on improving all operations» Flexibility to produce different

models/features with minimal set up

Page 12: PULL / JIT

JIT

PULL/JIT| LT6 Training Module

JIT Elements……

» Inventory reduction - exposes problems

» Kanbans & pull production systems» Small lots & quick setups» Uniform plant loading (leveling the

load)» Flexible resources» Efficient facility layouts

Page 13: PULL / JIT

JIT

PULL/JIT| LT6 Training Module

JIT Objectives……

» To eliminate waste, by…..– Producing the needed item– at the right time– and the exact quantityAND….– When a problem is identified, fixing it

Page 14: PULL / JIT

JIT

PULL/JIT| LT6 Training Module

JIT Principles……

» Produce only what the customer wants

» Produce only at the rate the customer wants

» Produce with perfect quality» Produce with minimum lead time» Produce with no waste of labor,

material or equipment

» Produce with “flow”

Page 15: PULL / JIT

Flow

PULL/JIT| LT6 Training Module

What is Flow?

» One piece at a time, opposite of batching

» Minimal distance between operations» Small flexible equipment VS Large

inflexible » Cross Functional VS Departmentalized» Cross Trained operators, easily moved» Produce to the Takt, » Level Loaded production

Page 16: PULL / JIT

Enablers

PULL/JIT| LT6 Training Module

What ENABLES JIT to work» Quick set ups (SMED) » Stable processes» Use of standard containers » Doable stable schedules with adequate visibility» TAKT-Time» 5-S efforts » Kaizen Events » Visual controls » Flexible workers » Tools at the point of need » Products designed for manufacturing » Group Technology (product families)» Total Productive Maintenance» Kanban

Page 17: PULL / JIT

Benefits

PULL/JIT| LT6 Training Module

What kind of benefits can you expect with JIT?

» Smaller inventories» Shorter lead times» Quicker response to customer demand» Improved quality» Reduced space requirements» Lower production costs» Increased productivity» Greater flexibility» Lower inventory carry costs (%25)

Page 18: PULL / JIT

Works Best

PULL/JIT| LT6 Training Module

JIT works best when….

» Trust is present– labor/management– suppliers/consumers

» Individuals are familiar with problem solving» Quality at the source is emphasized» There is agreement over value and waste» Applied in the growth to maturity phases of Product Life Cycle » Products are somewhat “standard”» Standard/fixed pay-rate

– Problems with piece-rate systems» Universal agreement that change is needed

Page 19: PULL / JIT

Key Enablers…

PULL/JIT| LT6 Training Module

Quality at the Source

» For JIT to work, quality must be high– There should be no extra inventory to buffer against the

production or use of defective units

» Producing poor-quality items, and reworking or rejecting them is wasteful

» The workers must be responsible for inspection & production quality

» The philosophy is, “NEVER pass along a defective item

Page 20: PULL / JIT

Key Enablers…

PULL/JIT| LT6 Training Module

One Piece Flow, Continuous Flow

» The opposite of batch, lot, or mass processing» Product should move (flow) from operation to

operation, only when it is needed, in the smallest increment possible

» One piece is the ultimate (single-piece-flow)» Cross train operators

» Operators float to the bottleneck

Page 21: PULL / JIT

Key Enablers…

PULL/JIT| LT6 Training Module

Pull Production, an feature of JIT

» Actual customer demand drives the manufacturing process

» It creates a system of cascading production and delivery signals from downstream demand to upstream production in which nothing is produced by the upstream supplier until the downstream customer signals a need– Big Benefit – Schedule only one point the value stream

» The rate of production for each product is equal to the rate of customer consumption

Page 22: PULL / JIT

Key Enablers…

PULL/JIT| LT6 Training Module

Pull Example

Sub

Sub

Fab

Fab

Fab

Fab

Customer Request Final Assy

Vendor

Vendor

Vendor

Vendor

Production

Schedule

LeveledSchedule

A

AC

AB

Page 23: PULL / JIT

Key Enablers…

PULL/JIT| LT6 Training Module

Work Balancing / TAKT Time

» Work balancing maximizes operator efficiency by matching work content to TAKT time

» TAKT time is the rate at which customers require your product

» TAKT time is calculated as follows:

Available work time per day

Daily required customer demand in parts per day

Available work time per day

Daily required customer demand in parts per day

Page 24: PULL / JIT

Simulation…

PULL/JIT| LT6 Training Module

Let’s see how this works

» YESCO Aviation – Brand new operation– Building planes– 4 Assembly Operators– 1 Material Delivery– 1 Timer– 1 Customer– 1 Manager

Page 25: PULL / JIT

Simulation…

PULL/JIT| LT6 Training Module

Let’s see how this works

» YESCO Aviation – Brand new operation– Customer watches for defects– Building and moving 3 at a time (ELQ)– Call Mtl Handler to move product– Customer will take all you can build– Don’t change layout– Colored paper will track “Lead Time”– Will run until enough work in process to capture data

Page 26: PULL / JIT

Simulation…

PULL/JIT| LT6 Training Module

Let’s see how this works

» YESCO Aviation – How’d we do?Run #1 Run # 2 Diff

Lot SizeWIP

Lead TimeTotal Run Time 7.25 1.65 0.23

Deiveries 18 10 56%# of People 6 5 83%

SpaceProductivity 0.41 1.21 2.93

Defectives

Page 27: PULL / JIT

Simulation…

PULL/JIT| LT6 Training Module

Let’s see how this works

» YESCO Aviation – Run # 2– Move however you like– Lot Size – 1

– Introduce Single Piece Flow discipline

» How’d we do

» Wrap up

Page 28: PULL / JIT

Conclusion

PULL/JIT| LT6 Training Module

What’s next?

» Ensure quality» Remove clutter & minimize storage» Reduce setup times» Level load orders, produce to takt » Implement layout changes

– Cellular manufacturing &/or close proximity

» Cross train and teach to float to the bottleneck» Move to pull production» Extend methods to suppliers» Review and improve

Page 29: PULL / JIT

Conclusion

PULL/JIT| LT6 Training Module

Q & A