Public Open House 1 Summary - Sustainability...10 // PUBLIC OPEN HOUSE 1 Results OPEN HOUSE October...
Transcript of Public Open House 1 Summary - Sustainability...10 // PUBLIC OPEN HOUSE 1 Results OPEN HOUSE October...
Public Open House 1 Summary
October 26th 2018
2 / / P U B L I C O P E N H O U S E 1
Out
reac
h Su
mm
ary
FLYERS, POSTERS
WORD OF MOUTH, PHONE CALLS
SOCIAL MEDIA, WEB, EMAIL
S O U T H N E W S T R E E T S T R E E T S C A P E / / 3
MATERIALS
The first public open house was advertised in print with flyers and posters as well as online via partner websites, eblasts, and social media.
Help design YOUR street!
October 17th 2018
Welcome to the1st Open House for the South New Street Streetscape Design!
op
en
ho
use
sta
tio
ns
1.) Welcome & Introductions
2.) Brief Presentation
Stop by and learn more about the project and the process.
Learn about the street today and tell us how you use it now.
Tell us what activities and programs you want to see.
TODAY’S AGENDA
STATION WELCOME
1
STATION THE STREET
2
STATION ACTIVITIES
3
Welcome to our 1st Open House!The South New Street Streetscape Enhancement Project envisions the improvement of pedestrian accessibility and safety, and embrace the cultural and institutional platform in South Bethlehem for public space utilization and economic sustainability.
Incorporating heritage and identity will provide a Gateway along South New Street between Lehigh University’s active pedestrian plaza, Farrington Square, and Fahy Bridge, a major north / south corridor in South Bethlehem that is continuing to grow as both a neighborhood and citywide destination.
OUR GOALS:Develop a welcoming
corridor between Lehigh University and Fahy Bridge, celebrate
local culture and business, and foster a
strong community.
CONNECTIVITYTransit ConnectionMult iuse Trail Connection
IDENTITYGateway to SouthSide
SAFETY & ACCESSIBILITY
Traf f ic Calming
STATION CHARACTER
4
Give us your vision for the street!
Help design YOUR street!
Join us @ the 1st Open House for the South New Street Streetscape Design!
WHEN: Wed. Oct. 17th.(drop in) 12-2pm or 5-7pm
WHERE: 306 So. New St.
What do you want to see? New trees, public art, better lighting, traffic calming, benches, new signage...drop by and bring YOUR ideas!
4 / / P U B L I C O P E N H O U S E 1
Mee
ting
Ove
rvie
wPRESENTATIONOctober 17th 2018 12-2pm or 5-7pm
The project team and partners gave a short presentation to kick-off the first public meeting. The presentation provided an overview of the project goals and partners and existing conditions. Existing conditions research included site context, existing transit, canopy trees, and lighting inventory.
S O U T H N E W S T R E E T S T R E E T S C A P E / / 5
Welcome to the1st Open House for the South New Street Streetscape Design!October 17th 2018
op
en
ho
use
sta
tio
ns
1.) Welcome & Introductions2.) Brief Presentation3.) interactive activity
Stop by and learn more about the project and the process.
Learn about the street today and tell us how you use it now.Challenge & Opportunities
Tell us what activities and programs you want to see.Safety/Accessibility; Connectivity; Identity
TODAY’S AGENDASTATION
WELCOME1
STATION THE STREET
2
STATION
ACTIVITIES3
STATION
CHARACTER4
Give us your vision for the street!
HELLO
wrtwr
t
wr
t
KEIKOTSURUTACRAMERP R I N C I PA L L A N D S C A P E A R C H I T E C T
MISACHENP R OJ E C T M A N A G E R + D E S I G N L E A D L A N D S C A P E A R C H I T E C T
ERIN K.M.ROARKL E A D A R C H I T E C T
wr
t
PRIME CONSULTANT
+ Landscape Architect + Architect+ Civic Engagement
SOUTH NEW STREET STREETSCAPE ENHANCEMENT PROJECT
+
STAKEHOLDERSCity of Bethlehem
KEYSTONE CONSULTING ENGINEERS, INC (KCE) Civil | Traffic Engineering | Surveying
BEAM, LTD Lighting Design
LEHIGH VALLEY ENGINEERING MEP Engineering
Develop a welcoming corridor between Lehigh University and Fahy Bridge where celebrate local culture and business, foster a strong community.
CONNECTIVITY
Transit Connection
Multiuse Trail Connection
SAFETY & ACCESSIBILITY
Traffic Calming
IDENTITY
Gateway to SouthSide
GOALS
1 2
3 4
6 / / P U B L I C O P E N H O U S E 1
CONTEXT
TELL US ABOUT YOURSELF!PLACE A DOT TO TELL US WHERE YOU LIVE/WORK.
MA
RT
EL ST
BO
YC
E ST
MO
NC
LAIR
AV
E
BO
YER
ST
BIR
KEL A
VE
CA
RLT
ON
AV
E
100FT
EW
N
S 0 50
3RD ST
2ND STCOLUMBIA ST
2ND ST
LEHIGH RIVER FAH
Y B
RID
GE
WEB
STER
ST
S NEW
STN
NEW
ST
VIN
E ST
BR
OD
HEA
D A
VE
WY
AN
DO
TT
E ST
HILL B
RID
GE
TAY
LOR
ST
AD
AM
S ST
PO
LK ST
FILLMO
RE ST
MECHANIC ST
4TH ST
GRAHAM ST
MORTON ST
FARRINGTON SQUARE
BETHLEHEM CITY HALL
S BETHLEHEM GREENWAY
LEHIGHUNIVERSITY
+
+
BANANA FACTORY ARTS & EDUCATION CENTER
+THE SAYRE MANSION
+
CHABAD AT LEHIGH UNIVERSITY
+
SAND ISLAND PARK +
NISKY HILL CEMETERY +
SPRING ST PARKING LOT
+
NATIONAL MUSEUM OF INDUSTRIAL HISTORY
+
NORTHAMPTON COMMUNITY COLLEGE
+
BROUGHAL MIDDLE SCHOOL +
ZOELLNER ARTS CENTER +
PROJECT SITE
Steel WorkersMemorial
Greenway Extension
South Downtown
Bethlehem Bus Terminal
Lehigh River
BethlehemGreenway
FarringtonSquare
FahyBridge
Lehigh University
NorthDowntown
T.R.A.C.S.
Lorem ipsum
102
105
105103
Steel WorkersMemorial
Greenway Extension
BethlehemGreenway
FarringtonSquare
FahyBridge
Lehigh University
NorthDowntown
South Downtown
Lehigh River
TRANSIT
Steel WorkersMemorial
Greenway Extension
BethlehemGreenway
FarringtonSquare
FahyBridge
Lehigh University
NorthDowntown
South Downtown
Lehigh River
CANOPY TREES
5 6
7 8
S O U T H N E W S T R E E T S T R E E T S C A P E / / 7
Steel WorkersMemorial
Greenway Extension
BethlehemGreenway
FarringtonSquare
FahyBridge
Lehigh University
NorthDowntown
South Downtown
Lehigh River
STREET LIGHTS
Steel WorkersMemorial
Greenway Extension
South Downtown
Bethlehem Bus Terminal
Lehigh River
BethlehemGreenway
FarringtonSquare
FahyBridge
Lehigh Universi
NorthDowntown
Lehigh University Gateway
Fahy BridgeGateway
Bethlehem Greenway Gateway
VISION
PRELIMINARYDESIGN
10 WEEKS
#1
Open House #1
Project Kick-off
sep 2018 oct 2018 nov 2018 dec 2018 jan 2019 feb 2019 mar 2019 apr 2019 may 2019 jun 2019
FINAL DESIGN12 WEEKS
Ready for Construction
60% 100%CONCEPTUAL
DESIGN12 WEEKS
30%
Open House #2(tbd)
#2 #3 #4 #5 #6
# Commit t ee Mee t ing w i t h P r o jec t Funder s and S t akeho lder s
WE ’RE HERE!
PROJECT SCHEDULELEHIGHN NEW ST
E M
OR
TO
N S
TR
EET
E 4
TH
ST
REE
T
E G
RA
HA
M P
LAC
E
MEC
HA
NIC
ST
REE
T
E 3R
D S
TR
EET
FAHY BRID
GE
S B
ETH
LEH
EM G
REE
NW
AY FARRINGTON SQUARE
FOOD + DINING
RETAIL
PARKING
EDUCATION
SERVICE
GAS STATION
LEHIGHN NEW ST
W M
OR
TO
N ST
REET
FARRINGTON SQUARE
W 4
TH
STR
EET
RIN
K ST
REET
W 3R
D ST
REET
S BET
HLEH
EM G
REEN
WA
Y
W G
RA
HA
M P
LAC
E
UN
IVER
SITY
SQU
AR
E
FAHY BRID
GE
FOOD + DINING
RETAIL
PARKING
EDUCATION
SERVICE
GAS STATION
LEHIGH N NEW ST
E MO
RT
ON
STR
EET
E 4T
H ST
REET
E GR
AH
AM
PLA
CE
MEC
HA
NIC
STR
EET
E 3RD
STR
EET
FAHY BRIDGE
S BET
HLEH
EM G
REEN
WA
YFARRINGTON SQUARE
FOOD + DINING
RETAIL
PARKING
EDUCATION
SERVICE
GAS STATION
LEHIGH N NEW ST
W M
OR
TO
N S
TR
EET
FARRIN
GTON SQUARE
W 4
TH
ST
REE
T
RIN
K S
TR
EET
W 3
RD
ST
REE
T
S B
ETH
LEH
EM G
REE
NW
AY
W G
RA
HA
M P
LAC
E
UN
IVER
SIT
Y S
QU
AR
E
FAHY BRIDGE
FOOD + DINING
RETAIL
PARKING
EDUCATION
SERVICE
GAS STATION
TODAY
9 10
11 12
8 / / P U B L I C O P E N H O U S E 1
TRAFFIC CALMING / SAFETY IMPROVEMENTS(BUMP-OUTS, PED-CROSSING AREA, ETC.)
LANDSCAPING (SHADE TREES WITH NATIVE PLANTS, ETC.)
GATEWAYS/ POCKET PARKS(GREENWAY PARK, PLAZAS, PARKLETS, ETC.)
BICYCLE & TRANSIT AMENITIES (BUS SHELTERS, BIKE RACKS, ETC.)
PEDESTRIAN AMENITIES (LIGHTING, SEATING, ETC.)
PUBLIC ART / IMPROVED SIGNAGE(MURAL ART, ENVIRONMENTAL GRAPHIC, ETC.)
WHAT ARE YOUR PRIORITIES FOR STREETSCAPE IMPROVEMENTS?
CHALLENGES & OPPORTUNITIES
PLACE A DOT IN THE BOXES BELOW!PRIORITIES SAFETY & ACCESSIBILITY
PLACE A DOT IN THE BOXES BELOW!
BUMP-OUTS CROSSWALK ART LIGHTING
WHAT WOULD MAKE A PEDESTRIAN-FRIENDLY STREET?
OTHERS?
+ + +
PLANTING
CONNECTIVITY
PLACE A DOT IN THE BOXES BELOW!
LIGHTING ART PLAZA
WHAT WOULD MAKE A ICONIC GATEWAY TO SOUTHSIDE?
OTHERS?BUS SHELTER
++ +
PLACE A DOT IN THE BOXES BELOW!
WHAT WOULD MAKE A COHESIVE STREETSCAPE?
IDENTITY
SPECIAL PAVINGSTREET FURNITURE LIGHTING GRAPHICS OTHERS?
13 14
15 16
S O U T H N E W S T R E E T S T R E E T S C A P E / / 9
1 0 / / P U B L I C O P E N H O U S E 1
Res
ults
OPEN HOUSE
October 17th 2018 12-2pm + 5-7pm
The final portion of the meeting was an interactive openhouse with 4 stations organized around the topics ofvisioning and identity, quality of life, and connectivity. The following pages contain the original boardsas well as the responses the project team received fromcommunity members, agency partners, and stakeholders.
Present from the WRT team was: Keiko Cramer, Misa Chen, Erin Roark, Mary Morton, Kristine Pedersen and Jingran Yu. In addition to the WRT led Planning and Design Team, KSE Engineers were present at the Open House at stations.
S O U T H N E W S T R E E T S T R E E T S C A P E / / 1 1
1 2 / / P U B L I C O P E N H O U S E 1
S O U T H N E W S T R E E T S T R E E T S C A P E / / 1 3
1 4 / / P U B L I C O P E N H O U S E 1
PLACE A POST-IT NOTE WITH YOUR THOUGHTS!
WHAT IS ONE THING YOU WOULD CHANGE?
CHALLENGES & OPPORTUNITIES
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 1 5
+ DECORATIVE SIDEWALKS AND CROSSWALKS (1 LIKE)
+ FACADES ARE NOT INTERESTING (1 LIKE)
+ MORE GREENSPACE (2 LIKE)
+ MORE LIGHTS (2 LIKES)
+ MORE PLACES FOR CHILDREN OR RETIRED PEOPLE - BOTH GROUPS NEED PUBLIC SPACE (1 LIKE)
+ SIDEWALKS ARE TOO NARROW, MAKE MORE WALKABLE (2 LIKES)
+ CONTINUE THE GREENWAY (4 LIKES)
+ MORE LANDSCAPING BEDS AND TREES ( 1 LIKE)
+ TOO GREY, ADD MORE COLORS AND MULTI-DIMENSIONS (2 LIKE)
+ MORE OUTSIDE SEATING AND DINING OPPORTUNITIES (6 LIKES)
+ WINDTUNNEL
+ TAKE WALL DOWN AT FARRINGTON SQUARE (4 LIKES)
+ MAKE IT SAFER FOR PEDESTRIANS TO CROSS FAHY BRIDGE (2 LIKE)
+ SIGNS W/ TIMES IT TAKE TO WALK TO NORTH SIDE AND SENSORS FOR LIGHTS
+ MORE BIKE FRIENDLY (6 LIKE)
+ DEFINE GREENWAY CROSSING AND INTRODUCE TABLE TOP
W H AT I S O N E T H I N G Y O U W O U L D C H A N G E ?
+ CROSSWALK SAFETY (4 LIKES)
+ TRAFFIC CALMING MEASURES (2 LIKES)
+ WANT TO FEEL LIKE YOUR ENTERING AN ART DISTRICT (1 LIKES)
+ ENHANCE GREENWAY CROSSING AND ADD FORMAL ENTRANCE TO GREENWAY THAT SAYS “YOU’RE HERE” (2 LIKES)
+ SIGNAGE ABOUT HISTORIC BUILDINGS
+ MORE OF A WELCOMING ENTRANCE
RE
SU
LTS
/WH
AT
WE
HE
AR
D
1 6 / / P U B L I C O P E N H O U S E 1
PLACE A POST-IT NOTE WITH YOUR THOUGHTS!
WHAT IS THE BEST THING ABOUT SOUTH NEW STREET NOW?
CHALLENGES & OPPORTUNITIES
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 1 7 R
ES
ULT
S/W
HA
T W
E H
EA
RD
ITS CLEAN
2
RECIEVES A LOT OF NATURAL SUNLIGHT
THERE IS NEW CONSTRUCTION + BUSINESS COMING TO THE AREA
ITS AXIAL RELATIONSHIP TO THE CAMPUS
MURAL AT THE END OF THE BRIDGE
IT IS THE GATEWAY TO THE GREENWAY
THERE IS ACCESS TO PARKING IN THE NEW GARAGE
EXISTIC BUSINESSES WITH HISTORIC FACADES
1 9 1 1
13
W H AT I S T H E B E S T T H I N G A B O U T S O U T H N E W S T R E E T N O W ?
1 8 / / P U B L I C O P E N H O U S E 1
NIGHT
AFTERNO
ON
MORNIN
G
PLACE A DOTOR POST-IT NOTE WITH YOUR THOUGHTS!
HOW DO YOU INTERACT WITH THE STREET NOW?
CHALLENGES & OPPORTUNITIES
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 1 9
30TOTAL RESPONSES
W I N T E RMAJORITY OF PEOPLE... FEW PEOPLE...
WALK AND DRIVE THROUGH IN THE MORNING AND AFTERNOON (22 RESPONSES)
VISIT RESTAURANTS AND SHOPS AT NIGH TIME (3 RESPONSES)
BIKE
RUN ERRANDS
GET LUNCH ON GREENWAY
23TOTAL RESPONSES
S P R I N GMAJORITY OF PEOPLE... FEW PEOPLE...
GETTING COFFEE IN THE MORNING (3 RESPONSES)
WALKING THROUGH IN THE AFTERNOON (5 RESPONSES)
VISITING RESTAURANTS IN THE EVENING (4 RESPONSES)
DRIVING THRU
BIKING
SHOPPING
ERRANDS
RUNNING
GOING TO LIBRARY
19TOTAL RESPONSES
S U M M E RMAJORITY OF PEOPLE... FEW PEOPLE...
WALKING THROUGH IN THE MORNING AND AFTERNOON (7 RESPONSES)
VISITING RESTAURANTS AND SHOPS (3 RESPONSES)
DRIVE THRU
LUNCH ON GREENWAY
EVENTS
ERRANDS
WALK AT NIGHT
GET COFFEE
24TOTAL RESPONSES
F A L LMAJORITY OF PEOPLE... FEW PEOPLE...
WALK AND DRIVE THROUGH IN THE MORNING AND AFTERNOON (10 RESPONSES)
GETTING COFFEE OR DINING IN THE MORNING (4 RESPONSES)
BIKE
SHOP
DRIVE THRU AT NIGHT
ERRANDS
LUNCH ON GREENWAY
H O W D O Y O U I N T E R A C T W I T H T H E S P A C E N O W ?
RE
SU
LTS
/WH
AT
WE
HE
AR
D
2 0 / / P U B L I C O P E N H O U S E 1
TRAFFIC CALMING / SAFETY IMPROVEMENTS(BUMP-OUTS, PED-CROSSING AREA, ETC.)
LANDSCAPING (SHADE TREES WITH NATIVE PLANTS, ETC.)
GATEWAYS/ POCKET PARKS(GREENWAY PARK, PLAZAS, PARKLETS, ETC.)
BICYCLE & TRANSIT AMENITIES (BUS SHELTERS, BIKE RACKS, ETC.)
PEDESTRIAN AMENITIES (LIGHTING, SEATING, ETC.)
PUBLIC ART / IMPROVED SIGNAGE(MURAL ART, ENVIRONMENTAL GRAPHIC, ETC.)
WHAT ARE YOUR PRIORITIES FOR STREETSCAPE IMPROVEMENTS?
CHALLENGES & OPPORTUNITIES
PLACE A DOT IN THE BOXES BELOW!
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 2 1
TRAFFIC CALMING/SAFETY IMPROVEMENTS (BUMP-OUTS, PED-CROSSING AREA, ETC.)
BICYCLE & TRANSIT AMENITES (BUS SHELTERS, BIKE RACKS, ETC.)
LANDSCAPING (SHADE TREES WITH NATIVE PLANTS, ETC.)
PEDESTRIAN AMENITIES ( LIGHTING, SEATING, ETC.)
PUBLIC ART / IMPROVED SIGNAGE (MURAL ART, ENVIRONMENTAL GRAPHIC, ETC.)
GATEWAYS / POCKET PARKS (GREENWAY PARK, PLAZAS, PARKLETS, ETC.)
22%29 VOTES
16%20 VOTES
12%16 VOTES
16%21 VOTES
16% 18%20 VOTES 23 VOTES
W H AT A R E Y O U R P R I O R I T I E S F O R S T R E E T S C A P E I M P R O V E M E N T S ?
RE
SU
LTS
/WH
AT
WE
HE
AR
D
2 2 / / P U B L I C O P E N H O U S E 1
SAFETY & ACCESSIBILITY
PLACE A DOT IN THE BOXES BELOW!
BUMP-OUTS CROSSWALK ART LIGHTING
WHAT WOULD MAKE A PEDESTRIAN-FRIENDLY STREET?
OTHERS?
+ + +
PLANTING
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 2 3
OTHER SUGGESTIONS
EXPAND SIDEWALKS SO THERE CAN BE MORE SEATING AND SPACE FOR PEOPLE
ADDITIONAL HANDICAP AND ACCESSIBLE PARKING
USE JANE JACOBS PRINCIPALS TO ADD LIFE TO THE STREET
ENFORCE NO TURN ON RED AT FAHY 6AM-6PM
CORRECT TRAFFIC LIGHT TIMING AT 3RD AND 4TH ST INTERSECTIONS
BUMP-OUTSCROSSWALK
ART
21 VOTES
19 VOTES
20 VOTES
17 VOTES
LIGHTING PLANTING
W H AT W O U L D M A K E A P E D E S T R I A N F R I E N D L Y S T R E E T ?
RE
SU
LTS
/WH
AT
WE
HE
AR
D
24 / / P U B L I C O P E N H O U S E 1
CONNECTIVITY
PLACE A DOT IN THE BOXES BELOW!
LIGHTING ART PLAZA
WHAT WOULD MAKE AN ICONIC GATEWAY TO SOUTHSIDE?
OTHERS?BUS SHELTER
++ +
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 2 5
OTHER SUGGESTIONS
CONSTRUCT AND ARCH (6 LIKES)
FOOD, MUSIC, AND SEATING AREAS FOR A MONTHLY COMMUNITY EVENT LIKE SAN FRANCISCO’S “OFF THE GRID”
FACADE, AWNING IMPROVEMENTS BETWEEN 4TH AND GREENWAY
KOI/REFLECTION POND
BRAND IT AND GIVE IT A NAME
INDUSTRIAL BOLD COLORS, ART
FOUR SEASON PLANTING INTEREST
INTRODUCE PROGRAMMING TO ATTRACT PEOPLE THERE
ROCK CLIMBING WALL
BUS SHELTER
LIGHTING
5 VOTES
7 VOTES
23 VOTES
24 VOTES
ART PLAZA
W H AT W O U L D M A K E A N I C O N I C G AT E W AY T O S O U T H S I D E ?
RE
SU
LTS
/WH
AT
WE
HE
AR
D
2 6 / / P U B L I C O P E N H O U S E 1
PLACE A DOT IN THE BOXES BELOW!
WHAT WOULD MAKE A COHESIVE STREETSCAPE?
IDENTITY
SPECIAL PAVINGSTREET FURNITURE LIGHTING GRAPHICS OTHERS?
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 2 7
OTHER SUGGESTIONS
REMOVE THE WALL AT HARRINGTON SQUARE TO MAKE PLAZA MORE OPEN (2 LIKES)
DO NOT ABANDON WHAT CURRENTLY EXISTS, EMBRACE OLDER BUILDINGS, AMPLIFY HISTORIC FACADES (2 LIKES)
SIGNS AND MAPS FOR POPULAR SPOTS (2 LIKES)
SMALL CONCERT SPACE
ICONS THAT CAN BE CARRIED THROUGHOUT SOUTH NEW STREET
INTERACTIVE CALENDAR OF EVENTS FOR WHATS HAPPENING
STREET FURNITURE
LIGHTING
18 VOTES
21 VOTES
14 VOTES
19 VOTES
SPECIAL PAVING GRAPHICS
W H AT W O U L D M A K E A C O H E S I V E S T R E E T S C A P E ?
RE
SU
LTS
/WH
AT
WE
HE
AR
D
2 8 / / P U B L I C O P E N H O U S E 1
I WOULD CONSIDER THE REDESIGN OF SOUTH NEW STREET A SUCCESS IF...
GOALS
PLACE A POST-IT NOTE WITH YOUR THOUGHTS TO FINISH THE SENTENCE!
EX
ER
CIS
E
S O U T H N E W S T R E E T S T R E E T S C A P E / / 2 9
MORE OUTDOOR SEATING MORE LOCAL RESTAURANTS
PEOPLE FROM ALL BACKGROUNDS CAN EQUALLY ENJOY THE SPACE
IMPROVED BIKE LANES FOR SAFETY
INCREASED LIGHTING FOR PEOPLE TO BE ACTIVE AT NIGHT
COMMITS TO BEING AND ARTS DISTRICT
MORE OPEN ENTRANCE TO HARRINGTON SQUARE
INCREASED USAGE OF THE GREENWAY
REDUCED CONGESTION AND CALM VEHICLE TRAFFIC
TRASH CANS REMOVED FROM PEDESTRIAN WALKING ZONES
IT RESULTS IN A VIBRANT STREETSCAPE
THERE IS A DISTINCT ENTRANCE TO THE GREENWAY
IMPROVED CROSSWALK AND SIDEWALK SAFETY
WE PRESERVE THE HISTORY, COMMERCE, AND ARCHITECTURE
ATTRACTS PEOPLE FROM OUTSIDE IMMEDIATE AREA
OUTDOOR ACTIVITIES FOR PEOPLE TO SPEND MORE TIME
8
8
7 1
3
2 7
1
1
3
6
1 1 4
BENCHES DIRECTED AT POINTS OF INTEREST
RE
SU
LTS
/WH
AT
WE
HE
AR
D
3 0 / / P U B L I C O P E N H O U S E 1
ENGAGEMENT
S O U T H N E W S T R E E T S T R E E T S C A P E / / 3 1
3 2 / / P U B L I C O P E N H O U S E 1