1 PUBLIC HEARING FOR AMERICAN F ALLS BRIDGES NIAGARA F ALLS STATE P ARK January 27, 2016

Transcript of Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ......

Page 1: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

1

PUBLIC HEARINGFOR

AMERICAN FALLS BRIDGESNIAGARA FALLS STATE PARK

January 27, 2016

Page 2: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

2

NYS Office of Parks Recreation &Historic Preservation

NYS Department of Transportation

Design Consultants

WELCOME AND INTRODUCTIONS

Page 3: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

3

INTRODUCTION

Mark ThomasNYSOPRHP

Director, Western District

Page 4: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

4

INTRODUCTION

Page 5: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

5

Project Background

Technical Discussion

Procedural Presentation

Comment Period

GENERAL MEETING ORIENTATION

Page 6: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

6

PROJECT BACKGROUND

Craig Mozrall, P.E.NYSDOT

Page 7: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

7

PROJECT LOCATION

GREEN ISLAND

GOAT ISLAND

MAINLAND USA

Page 8: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

8

PROJECT BACKGROUND

Mainland to Green Island Green Island to Goat Island

Page 9: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

9

NYSOPRHP Owns and maintains two structures,originally built in 1901

NYSOPRHP is responsible for funding thereplacement structure

In 2004 temporary (Mabey) truss structures wereinstalled over the arches of both bridges to ensure asafe crossing

PROJECT BACKGROUND

Page 10: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

10

PROJECT BACKGROUND

Temporary Mabey Truss Bridge

Page 11: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

11

Over the last several years Parks has worked withConsultants progressing various studies to evaluatethe existing structure conditions and possiblerehabilitation and replacement alternatives

A standby contract was used in the spring of 2013 tostabilize the piers on the Mainland to Green Islandstructure

PROJECT BACKGROUND

Page 12: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

12

The bridges provide a multi-modal connectionbetween Mainland USA and Goat Island;

Maintain a direct linkage within the Park for the parkvisitors;

Allow the park visitors to experience the rapids;

Carry critical utilities that support the Goat Islandamenities.

PROJECT IMPORTANCE

Page 13: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

13

NEED AND PURPOSE

The primary need is to

address the structural

deficiencies of the bridges.

The purpose is to maintain

the direct connection within

the park.

Page 14: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

14

Eliminate identified structural deficiencies and restore the bridge to good condition using cost effective techniques;

Ensure that consistency with the historical context of Fredrick Law Olmsted prepared plan for the Niagara Reservation, as part of the New York State and the Niagara Falls National Heritage Plan, is maintained;

Restore the visitor experience, the low to the water profile and return to the historic character of the existing structures;

PROJECT OBJECTIVES

Page 15: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

15

Provide Americans with Disabilities Act (ADA) accessibility to the crossing including well-defined pedestrian walkway areas;

Construct a structure that restores trolley service to the crossing and provides an emergency redundant route to the American Rapids Bridge; and

Minimize the disturbance of pedestrian use of the American Falls Bridges during construction during the peak tourism season (May 15th to September 30th).

PROJECT OBJECTIVES

Page 16: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

16

Parks requested that NYSDOT provide projecttechnical and engineering support

NYSDOT will advise Parks with regard to federally-required planning and project processes asappropriate.

NYSDOT’S ROLE

Page 17: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

17

PROJECT DEVELOPMENT PROCESS

Completed Fall 2013Completed Fall 2013

Page 18: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

18

PROJECT DEVELOPMENT PROCESS

Completed Fall 2013Completed Fall 2013

Page 19: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

19

PROJECT DEVELOPMENT PROCESS

Page 20: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

20

ENVIRONMENTAL, SOCIAL AND ECONOMICCONSIDERATIONS

Primary Environmental ConsiderationsWater Quality

Water Resources including wetlands

Historic and Cultural Resources

Park and Recreational Resources

Socioeconomics

Secondary EnvironmentalConsiderations

Air Quality

Noise

Coastal Zone Management

General Ecology

Cumulative Impacts

Page 21: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

21

TECHNICAL DISCUSSION

Brian Carlson, P.E.GPI

Page 22: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

22

Brief History

Existing Bridge Conditions

Alternatives Under Consideration

Cost of Alternatives

Construction Sequencing

TECHNICAL DISCUSSION

Page 23: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

23

Existing Filled Concrete Arch Bridges Built 1900-1901

State-of-the-Art When Built

Rehabilitated several times – Most recently 1969, 1980, 2004 and 2013

TECHNICAL DISCUSSION

Page 24: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

24

TECHNICAL DISCUSSION

Timber Falsework for the Bridge Scientific American November 23, 1901

Page 25: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

25

TECHNICAL DISCUSSION

Reinforcing & Forms Scientific American November 23, 1901

Page 26: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

26

TECHNICAL DISCUSSION

Mainland to Green island Bridge Scientific American November 23, 1901

Page 27: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

27

TECHNICAL DISCUSSION

Page 28: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

28

Existing Conditions

Deterioration/Age has compromised the load carrying ability

TECHNICAL DISCUSSION

Page 29: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

29

TECHNICAL DISCUSSION

Page 30: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

30

TECHNICAL DISCUSSION

Reinforcing & Forms Scientific American November 23, 1901

Page 31: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

31

TECHNICAL DISCUSSION

Page 32: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

32

Existing Conditions

Rehabilitation of the Existing superstructures is not viable

TECHNICAL DISCUSSION

Page 33: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

33

Design Considerations Pedestrians and Parks Trolleys

Legal Highway Loads

30 mph Design Speed

15 mph Operating Speed

Typical Section

Alignment Existing alignment Downstream alignment

TECHNICAL DISCUSSION

Page 34: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

34

TECHNICAL DISCUSSION

Page 35: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

35

TECHNICAL DISCUSSION

Alignments

Green Island

Mainland

Goat Island

Existing AlignmentAlternate Alignment

Page 36: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

36

Alternatives Under Consideration

Precast Arch

Steel Multi-Girder

Steel Tied-Arch

TECHNICAL DISCUSSION

Page 37: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

37

Precast Arch Similar to Existing Bridges

Mainland to Green Island 3 spans - 104’-0” 104’-0” 104’-0” Arch rise – 15’-5” 2 piers – 16’-0” wide with overlooks

Green Island to Goat Island 3 spans - 49’-0” 54’-0” 49’-0” Arch rise – 10’-7” 2 piers – 10’-0” wide with overlooks

TECHNICAL DISCUSSION

Page 38: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

38

Precast Arch Typical SectionTECHNICAL DISCUSSION

Page 39: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

39

Precast Arch

TECHNICAL DISCUSSION

Viewed from Mainland Shoreline Trail

Page 40: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

40

Precast ArchTECHNICAL DISCUSSION

Viewed from Mainland Pedestrian Trail

Page 41: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

41

Precast ArchTECHNICAL DISCUSSION

Viewed from American Rapids Bridge

Page 42: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

42

Precast ArchTECHNICAL DISCUSSION

Viewed from Mainland Approach

Page 43: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

43

Steel Multi-Girder Minimalist Design

Mainland to Green Island 3 spans - 115’-6” 115’-6” 115’-6” 2 piers – 9’-0” wide

Green Island to Goat Island 2 spans - 100’-0” 100’-0” 1 pier – 9’-0” wide

TECHNICAL DISCUSSION

Page 44: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

44

Steel Multi-Girder Typical SectionTECHNICAL DISCUSSION

Page 45: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

45

Steel Multi-Girder

TECHNICAL DISCUSSION

Viewed from Mainland Shoreline Trail

Page 46: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

46

Steel Multi-GirderTECHNICAL DISCUSSION

Viewed from Mainland Pedestrian Trail

Page 47: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

47

Steel Multi-GirderTECHNICAL DISCUSSION

Viewed from American Rapids Bridge

Page 48: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

48

Steel Multi-GirderTECHNICAL DISCUSSION

Viewed from Mainland Approach

Page 49: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

49

Steel Tied-Arch Reminiscent of Whipple Trusses

Mainland to Green Island 2 spans - 172’-0” 172’-0” Arch rise – 26’-6” above road 1 pier – 9’-0” wide

Green Island to Goat Island Single span - 180’-0” Arch rise – 26’-6” above road

TECHNICAL DISCUSSION

Page 50: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

50

Steel Tied-Arch Typical SectionTECHNICAL DISCUSSION

Page 51: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

51

Steel Tied-ArchTECHNICAL DISCUSSION

Viewed from Mainland Shoreline Trail

Page 52: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

52

Steel Tied-ArchTECHNICAL DISCUSSION

Viewed from Mainland Pedestrian Trail

Page 53: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

53

Steel Tied-ArchTECHNICAL DISCUSSION

Viewed from American Rapids Bridge

Page 54: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

54

Steel Tied-ArchTECHNICAL DISCUSSION

Viewed from Mainland Approach

Page 55: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

55

Construction Cost of Alternatives Costs in Million Dollars (2016) Design Report Exhibits 3.2.1A-3.2.1D Includes both bridges and approach work Based on a standard (two-year) Construction Schedule

TECHNICAL DISCUSSION

Rehabilitation Alternative

Replacement Alternative

Existing Align.

ReplacementAlternative

Alternate Align.Precast Arches $24.21 $24.32 $25.03Steel Multi-Girder $23.87 $24.06 $24.74Steel Tied-Arch N/A $34.13 $34.82

Page 56: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

56

Anticipated Construction Sequence Standard (two-year) Construction Schedule Single Contract Two Contracts

Dewatering Technique Large Cofferdam - Between Goat Island and the

Mainland USA

Small Cofferdam - Between Green Island & Goat Island

TECHNICAL DISCUSSION

Page 57: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

57

Single Contract Construction Sequence – Yr 1

BIN 5522010 Install Small Cofferdam 3rd week of April to 1st week of May

Complete Replacement - Spring thru Fall

Remove Small Cofferdam 4th week of Nov. to 3rd week of December

TECHNICAL DISCUSSION

Page 58: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

58

Single Contract Construction Sequence – Yr 1(Continued)

BIN 5522000

Install Large Cofferdam Begin installation (½) – Late Spring Finish Installation (½) – Early August

Remove existing bridge, Construct new foundations, abutments, piers, and set arches

Remove Large CofferdamBeginning to End of December

Winter shutdown

TECHNICAL DISCUSSION

Page 59: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

59

Single Contract Construction Sequence – Yr 2

BIN 5522000 Remobilize to site in early spring

Backfill arches, paving, and sidewalks

Complete approach work and site restoration

Wrap up construction by the fall of year 2

TECHNICAL DISCUSSION

Page 60: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

60

TECHNICAL DISCUSSION

BIN 5522000

41 Week Duration

Install Large Cofferdam 3-week of April to End of May

Completely remove and replace the bridge

Remove Large Cofferdam Beginning to End of December

Note: Some elements require 24/7 operations

Two Contracts Construction Sequence – Yr 1

Page 61: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

61

TECHNICAL DISCUSSION

BIN 5522010

36 Week Duration

Install Small Cofferdam 3-week of April to 1-week of May

Completely remove and replace the bridge

Remove Small Cofferdam 4-week of Nov. to 3-week Dec

2 Contracts Construction Sequence – Yr 2

Page 62: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

62

Dewatering Technique – Large CofferdamTECHNICAL DISCUSSION

CofferdamNo Flow / Low Flow Area

Page 63: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

63

Dewatering Technique – Small CofferdamTECHNICAL DISCUSSION

Channel FlowCofferdamNo Flow / Low Flow Area

Page 64: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

64

PROCEDURAL PRESENTATION

Cameron Schulz, P.E.NYSDOT

Page 65: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

65

PUBLIC INPUT (METHODS)

Stenographer

Public Comment

Website

Comment Sheet(Included in the brochure)

Letters – Addressed to:Mr. Mark Thomas

Director, Western DistrictProspect Park, PO Box 1132

Niagara Falls, NY 14303-1725

All comments are due by February 10, 2016

www.dot.ny.gov/americanfallsbridges

Page 66: Public Hearing for American Falls Bridges, Niagara … Technique ... BIN 5522000 Install Large ... Public Hearing for American Falls Bridges, Niagara Falls State Park Author: NY State

66

Precast Arch

PROCEDURAL PRESENTATION