PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING...

12
JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION PUBLIC EXHIBITION AERIAL VIEW OF PARSONS NORTH PROPOSAL PARSONS HOUSE EDGWARE ROAD HALL PLACE PARSONS NORTH PROPOSAL COMMERCIAL AREA HEYWOOD HOUSE THE LITTLE VENICE MEDICAL CENTRE EDWARD HOUSE HETHPOOL HOUSE CHURCHFIELD HOUSE Site boundary Parsons House landscape works boundary PARSONS HOUSE LANDSCAPED AREA

Transcript of PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING...

Page 1: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

PUBLIC EXHIBITION

AERIAL VIEW OF PARSONS NORTH PROPOSAL

PARSONS HOUSE

EDGWARE ROAD

HALL PLACE

PARSONS

NORTH

PROPOSALCOMMERCIAL

AREA

HEYWOOD HOUSE

THE LITTLE VENICE

MEDICAL CENTRE

EDWARD HOUSE

HETHPOOL HOUSE

CHURCHFIELD

HOUSE

Site boundaryParsons House landscape works boundary

PARSONS HOUSE LANDSCAPED AREA

Page 2: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

2011

This plan was the long term vision for the area. STEERING GROUP

APRIL 2012

A steering group meeting was held to

discuss the proposed development of the site.

Residents were consulted on options at public workshops

INITIAL CONCEPT ANDRESIDENT CONSULTATION

NEW CONCEPTS AND RESIDENT CONSULTATION

This design was developed with planning officers and the Resident Working Group. Resident opinions were captured at a drop-in session.

CONCEPT DEVELOPMENT AND RESIDENT CONSULTATION

STEERING GROUPNOVEMBER 2012

This steering groupmeeting discussed

the proposed ‘Green Spine’ for the whole Paddington Green

Estate.

STEERING GROUPSEPTEMBER 2013

At the third group meeting community

facilities were discussed.

TIMELINE 1

2012 2013

Residents of Paddington Green have been working with the council since 2012 to help guide the Paddington Green Regeneration programme.

Following consultation in 2013 residents commented on a preferred option for the redevelopment of the site and the community benefits this would bring.

The council worked with the Paddington Green Steering Group to respond to the comments made during the consultation.

Resident opinions were captured and local people voiced their support for the proposals presented.

EXHIBITION OF DEVELOPED REGENERATION PROPOSALS FOR PADDINGTON GREEN.

Page 3: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

TIMELINE 2

PRE- PLANNING MEETING 01EARLY 2016

PUBLIC EXHIBITIONJUNE 2017

PADDINGTON GREENPUBLIC REALM CONSULTATION

2019-21

PRE - PLANNING MEETING 02

PLANNINGSUBMISSION

JULY 2017

STATUTORYCONSULTATION PERIOD(21 DAYS)After the planning application has been submitted residents will have a further 21 days to view and comment on the application.

PLANNINGDECISION

AUTUMN 2017

START ON SITEEARLY 2018

BUILDING COMPLETION

2020

STEERING GROUP

JUNE 2014This meeting was focussed on the

public realm.

STEERING GROUP

NOVEMBER 2014This meeting was

focussed upon the impact on the existing facilities.

STEERING GROUP

FEBRUARY 2016

2014 2015 2016 2017 2018 2019-20

STEERING GROUP

MAY 2017

APRIL 2017

Page 4: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

OUR DESIGN RESPONSE... • Site wide strategy of

reducing opportunities for anti-social behaviour.

• Creating outdoor spaces for people to enjoy together.

YOU SAID...

“Parsons North podium - dangerous and ugly currently.”

(Private tenant, Hall Place, Paddington Green).

YOU SAID...

“It will be great to see better homes built specially for

parents that have three or more children.”

(Council tenant, Campbell House, Paddington Green)

OUR DESIGN RESPONSE... • Family duplex homes with

individual entrances.• A substantial proportion of

well designed family homes

YOU SAID...“The old car park is an

eyesore.”(Council tenant, Hethpool

House, Paddington Green)

OUR DESIGN RESPONSE... • Existing car park redesigned

to meet all modern standards.• Replace existing concrete

walls surrounding the podium deck with raised planted beds.

OUR DESIGN RESPONSE... • Exterior design has been a

key focus. • The resulting scheme

restores the building line along all surrounding streets.

YOU SAID...

“I like to see my area newly built and to look more developed as this area is in central

London and it should look more interesting.” (Private tenant, Cuthbert House,

Paddington Green).

OUR DESIGN RESPONSE...• Access into both the service

yard and basement car park will be secured with access controlled gates.

• Upgraded ‘back-of-house’ service yard that serves the bin stores for both buildings.

YOU SAID...

“The bin stores by Parsons House are problematic

and should be improved. We need better waste and

recycling facilities.”

EXISTING PODIUM LEVEL 00

EXISTING BASEMENT LEVEL - 01

PARSONS HOUSE EXISTING FIRST FLOOR 01

PARSONS HOUSE EXISTING NINTEENTH FLOOR 19

PARSONS HOUSE EXISTING TWENTIETH FLOOR 20

PARSONS HOUSE EXISTING ROOF LEVEL

33820 mm

36600 mm

CROMPTON STREET

HALL PLAC

E

EDG

WAR

E RO

AD

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A0

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P3

PROPOSED NORTH-EAST ELEVATION

432

03102

1:100 ADS DMA

ZZPRN DMA DR A

S2

KvG

FOR INFORMATIONEDGWARE ROAD,LONDON

1 : 100WIP - NORTH-EAST ELEVATION1

REVISION DETAILS DATE DRAWN BYP1 1 ISSUE OF ELEVATIONS WITH FIXED WINDOW

LOCATIONS03.04.17 KvG

P2 2 ISSUE OF ADJUSTED ELEVATIONS FORCOORDINATION

08.05.17 KvG

P3 3 ISSUE OF ADJUSTED ELEVATIONS FOR PLANNINGOFFICER REVIEW

09.05.17 KvG

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

RESIDENT CONSULTATION ‘YOU SAID, WE DID!’

How you have helped to influence the design of the proposed scheme...

Page 5: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

Access to raised concrete area at rear of Parsons House improved with a new amenity space.

Single storey commercial area to avoid any detrimental daylight impact upon Parsons House.

Joint service yard between with secure access.

New ramped access to basement to improve car access.

1.

2.

3.

4.

5.

6.

7.

8.

Proposed commercial area to continue the active street frontage

Planting in front of Heywood House for privacy

Planting surrounding Parsons House acting as a buffer.

Area of raised land removed and levels dropped to give access.

SCHEDULE OF ACCOMMODATION FOR PARSONS NORTH

KEY

AFFORDABLE ACCOMMODATION

PRIVATE ACCOMMODATION

PARSONS NORTH PROPOSAL

SUMMARY OF PROPOSED WORKS:

• 60 high quality new homes.

• 36% of the development will be affordable, providing 19 affordable homes.

• A new communal garden within the perimeter of the proposed new building.

• Green / bio-diverse type roofs.

• New basement car park to comply with modern standards and regulations.

• New communal amenity space to the front and side of Parsons House.

PRIVATE - 64% AFFORDABLE - 36% Total GIA

1 Bed 15 Homes 2 Homes 20%

2 Bed 19 Homes 8 Homes 45%

3 Bed 7 Homes 9 Homes 35%

TOTAL 41 Homes 19 Homes 100%

TOTAL 60 Homes

HEYWOOD HOUSE

PARSONS HOUSE

KEY

EDGWARE ROAD

CR

OM

PTO

N S

TRE

ET

HALL PLACE

4.

8.

3.

2.

1.

5.

6.

7.

SITE PLAN OF PARSONS NORTH

Page 6: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

PROPOSED CAR PARK LAYOUT

The proposed basement offers a fully compliant car park with 56 car parking spaces as well as providing space for the new development’s various communal facilities such as bike store, refuse stores, bulky waste stores and plant rooms.

EXISTING CAR PARK LAYOUT

• A total of 101 bays were marked• 58 bays were usable parking spaces• 43 bays were not usable

BASEMENT CAR PARK

StandardDesignVehicle(SDV)

StandardDesignVehicle(SDV)UP

UP

UPUP PLANT ROOM

130M²

REFUSE STORE25m² / 7 EURO BINS

REFUSE STORE24m² /

7 EURO BINS

BIK

E S

TAN

DS

NEW RAMP OPTION UTILISES THE WIDER AREA INFRONT OF PARSONS HOUSE- ACCURATE RAMP DRAWINGS FROM CIVIL ENGINEER OVERLAID

REQUIREMENT FOR A SERVICE LIFT TO BRING BINS TO GROUND FLOOR LEVEL FOR COLLECTION

ACCESS REQUIRED TO PARSONS HOUSE BIN STORE FOR REFUSE COLLECTION

SUBSTATION ABOVE AT PAVEMENT

LEVEL

OVERHANG OF PARSONS HOUSE OVER BASEMENT

AREA TO BE REINFORCED AND

BLOCKED OFF FROM BASEMENT

EXISTING UPSTAND ADJACENT TO PARSON HOUSE -TO BE RETAINED DUE TO RISK OF COSTS TO RELOCATE SERVICES

BIK

E S

TAN

DS

NEW RETAINING WALLS INSET FROM EXISTING

NEW RETAINING WALLS INSET FROM EXISTING

6000

6037

6200

SMOKE EXTRACT UP TO PODIUM ABOVEBOILER EXTRACT AIR PENETRATION UP TO PODIUM ABOVE

BOILER INTAKE AIR PENETRATION UP TO PODIUM ABOVE

AREA WITH REDUCED HEAD HEIGHT OF 2458mm

AREA WITH REDUCED HEAD HEIGHT OF 2458mm

4461

6004

CARPARKSHOWS

56 SPACES

BIKE STANDS

SHARED BULKY

REFUSE STORE

18m²

1200

BIK

E S

TAN

DS ELECTRICAL

EQUIPTMENT9.6m²

BIK

E S

TAN

DS

BIK

E S

TAN

DS

CROMPTON STREET

HALL P

LACE

EDG

WAR

E RO

AD

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A0

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P12

WIP Proposed Basement Plan

432

02000

1:100 KvG DMA

B1PRN DMA DR A

S0

RM

WORK IN PROGRESS

XX

EDGWARE ROAD,LONDON

CAR PARKING REQUIREMENTS

CURRENT PLAN SHOWS 56 SPACES

DISABLED SPACES = 1 PER DISABLED UNIT(PROVISIONAL NUMBER OF 6 PROVIDED AT THIS STAGE)

20% OF ALL SPACES TO BE FOR ELECTRIC VEHICLESADDITIONAL 20% OF SPACES TO HAVE PASSIVE PROVISION FOR ELECTRIC VEHICLES IN THE FUTURE

BICYCLE PARKING REQUIREMENTS

1 BEDROOM UNITS = 1 SPACE2 & 3 BEDROOM UNITS = 2 SPACES

PRIVATE ACCOMMODATION = 67 SPACES1 BEDROOM UNITS = 15 UNITS x 1 = 15 SPACES2 & 3 BEDROOM UNITS = 26 UNITS x 2 = 52 SPACES

AFFORDABLE ACCOMMODATION = 36 SPACES1 BEDROOM UNITS = 2 UNITS x 1 = 2 SPACES2 & 3 BEDROOM UNITS = 17 UNITS x 2 = 34 SPACES

1 VISITOR UNIT PER 40 UNITS = 2 SPACES (ONE PER STORE)

TOTAL REQUIRED NO. OF SPACES = 105

REFUSE STORAGE REQUIREMENTS

55L STORAGE FOR WASTE REFUSE PER BEDROOM+60% ADDITIONAL CAPACITY FOR RECYCLABLE REFUSEEURO BIN CAPACITY = 1100L

PRIVATE ACCOMMODATIONREFUSE = 55L x 74 BEDROOMS = 4070L RECYCLING (+60%) = 2442LMINIMUM 6 EURO BINS REQUIRED

AFFORDABLE ACCOMMODATIONREFUSE = 55L x 45 BEDROOMS = 2475L RECYCLING (+60%) = 1485LMINIMUM 4 EURO BINS REQUIRED

BULKY REFUSE STORE REQUIRED APPROX. 10-20m²

BINS TO BE MOVED FROM STORES LOCATED BY CORES (FOR RESIDENTS ACCESS) TO A COLLECTION POINT AT GROUND FLOOR LEVEL ON COLLECTION DAYS BY SITE MANAGEMENT TEAM USING GOODS LIFT LOCATED NEAR SERVICE YARD.

M+E / PLANT REQUIREMENTS

CO-ORDINATED IN ACCORDANCE WITH PLANT ROOM LAYOUT ISSUED 19.05.17

CBG PLANT ROOM LAYOUT:PRN-CBG-B1-XX-DR-M-00016-PLANT_ROOM_LAYOUT

REVISION DETAILS DATE DRAWN BYP1 1 WIP PLANS FOR REVIEW 24.02.17 RMP2 2 WIP PLANS FOR COORDINATION - INTERNAL

LAYOUTS ADDED09.03.17 RM

P4 3 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 4 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP7 5 ISSUE OF PLANS FOR COORDINATION 24.04.17 KvGP8 6 ISSUE OF ADJUSTED FLOOR PLANS FOR PLANNING

OFFICER REVIEW02.05.17 KvG

P9 7 ISSUE OF ADJUSTED PLANS FOR COORDINATION 08.05.17 KvGP10 8 ISSUE OF REVISED PLANS FOR COORDINATION 15.05.17 KvGP11 9 ISSUE OF BASEMENT PLAN WITH COLUMN LAYOUT

ADDED24.05.17 KvG

P12 10 ISSUE OF REVISED BASEMENT PLAN FOLLOWINGTRACKING

05.06.17 KvG

RESIDENTIAL UNIT NUMBERS IN SCHEME

· Total of 1 Bed Units = 17· Total of 2 Bed Units = 27· Total of 3 bed Units = 16

USABLE SPACES

NOT USABLE SPACES

The existing basement car park is in a poor condition and is structurally unfit for re-use in its current condition.

The proposed development will therefore demolish and rebuild a new basement car park in the location of the existing.

PHOTOS OF THE EXISTING CAR PARK

•A total of 56 parking spaces are proposed

•Six accessible bays on a 1:1 basis for the six adaptable homes

•A total of 32 parking spaces will be for use by the new residents of Parsons North

•The remaining 24 parking spaces will be for other use in the estate.

•20% of the parking spaces provided will have active electric vehicle charging facilities

IMAGE SHOWING PROPOSED DESIGN OF NEW CAR PARK ENTRANCE

ENTRANCE

EXIT

56 CAR PARKING SPACES

Page 7: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

PROPOSED VIEW ALONG EDGWARE ROAD

Existing View

AERIAL VIEW OF THE PARSONS NORTH SITE

BEFORE & AFTER

PROPOSED VIEW ALONG EDGWARE ROAD

Existing View

Plan showing the viewpoint location ( )

Plan showing the viewpoint location ( )

PRIVATE

AFFORDABLE

KEY

CR

OM

PTO

N S

TREE

T

HALL PLACE

EDGWARE ROAD

JOIN

T S

ER

VIC

E

YAR

D B

ETW

EE

NP

AR

SO

NS

NO

RTH

&P

AR

SO

NS

HO

US

E

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A1

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P6PARSONS NORTHEDGWARE ROAD,LONDON

PROPOSED SITE PLAN

432

01101

1:100 ADS DMA

00PRN DMA DR A

S0

KvG

WORK IN PROGRESS

XX

REVISION DETAILS DATE DRAWN BYP4 1 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 2 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP6 3 ISSUE OF SITE PLAN FOR LANDSCAPING 13.04.17 KvG

PRIVATE

AFFORDABLE

KEY

CR

OM

PTO

N S

TREE

T

HALL PLACE

EDGWARE ROAD

JOIN

T S

ER

VIC

E

YAR

D B

ETW

EE

NP

AR

SO

NS

NO

RTH

&P

AR

SO

NS

HO

US

E

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A1

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P6PARSONS NORTHEDGWARE ROAD,LONDON

PROPOSED SITE PLAN

432

01101

1:100 ADS DMA

00PRN DMA DR A

S0

KvG

WORK IN PROGRESS

XX

REVISION DETAILS DATE DRAWN BYP4 1 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 2 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP6 3 ISSUE OF SITE PLAN FOR LANDSCAPING 13.04.17 KvG

How the proposed view would look without the Commercial Space

PARSONS NORTH PROPOSAL VISUALS

Page 8: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

PROPOSED VIEW ALONG CROMPTON STREET

Existing View

PRIVATE

AFFORDABLE

KEY

CR

OM

PTO

N S

TREE

T

HALL PLACE

EDGWARE ROAD

JOIN

T S

ER

VIC

E

YAR

D B

ETW

EE

NP

AR

SO

NS

NO

RTH

&P

AR

SO

NS

HO

US

E

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A1

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P6PARSONS NORTHEDGWARE ROAD,LONDON

PROPOSED SITE PLAN

432

01101

1:100 ADS DMA

00PRN DMA DR A

S0

KvG

WORK IN PROGRESS

XX

REVISION DETAILS DATE DRAWN BYP4 1 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 2 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP6 3 ISSUE OF SITE PLAN FOR LANDSCAPING 13.04.17 KvG

PROPOSED VIEW ALONG HALL PLACE

PRIVATE

AFFORDABLE

KEY

CR

OM

PTO

N S

TREE

T

HALL PLACE

EDGWARE ROAD

JOIN

T S

ER

VIC

E

YAR

D B

ETW

EE

NP

AR

SO

NS

NO

RTH

&P

AR

SO

NS

HO

US

E

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A1

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P6PARSONS NORTHEDGWARE ROAD,LONDON

PROPOSED SITE PLAN

432

01101

1:100 ADS DMA

00PRN DMA DR A

S0

KvG

WORK IN PROGRESS

XX

REVISION DETAILS DATE DRAWN BYP4 1 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 2 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP6 3 ISSUE OF SITE PLAN FOR LANDSCAPING 13.04.17 KvG

PARSONS NORTH PROPOSAL VISUALS

Viewpoint location ( )Viewpoint location ( ) Existing View

Page 9: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

PROPOSED STREET VIEW FROM ENTRANCE TO PARSONS HOUSE

PRIVATE

AFFORDABLE

KEY

CR

OM

PTO

N S

TREE

T

HALL PLACE

EDGWARE ROAD

JOIN

T S

ER

VIC

E

YAR

D B

ETW

EE

NP

AR

SO

NS

NO

RTH

&P

AR

SO

NS

HO

US

E

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A1

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P6PARSONS NORTHEDGWARE ROAD,LONDON

PROPOSED SITE PLAN

432

01101

1:100 ADS DMA

00PRN DMA DR A

S0

KvG

WORK IN PROGRESS

XX

REVISION DETAILS DATE DRAWN BYP4 1 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 2 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP6 3 ISSUE OF SITE PLAN FOR LANDSCAPING 13.04.17 KvGExisting View

AERIAL VIEW OF PARSONS HOUSE LANDSCAPING WORKS

Boundary of Parsons House landscaping areaOverall Site Boundary

AERIAL VIEW OF THE PARSONS NORTH PROPOSAL

Existing View

PRIVATE

AFFORDABLE

KEY

CR

OM

PTO

N S

TREE

T

HALL PLACE

EDGWARE ROAD

JOIN

T S

ER

VIC

E

YAR

D B

ETW

EE

NP

AR

SO

NS

NO

RTH

&P

AR

SO

NS

HO

US

E

Copyright - David Miller Limited

PROJECT

ORIGINATOR TITLE

PROJECT ORIGINATOR ZONE LEVEL TYPE ROLE DOC NO

DRAWNJOB NO. SCALE

@A1

CHECKED APPROVED

KEY PLAN

STATUS: REVISION:PURPOSE OF ISSUE

DMA

KEY RESIDUAL RISK

P6PARSONS NORTHEDGWARE ROAD,LONDON

PROPOSED SITE PLAN

432

01101

1:100 ADS DMA

00PRN DMA DR A

S0

KvG

WORK IN PROGRESS

XX

REVISION DETAILS DATE DRAWN BYP4 1 ISSUE OF FIXED DESIGN LAYOUTS 03.04.17 KvGP5 2 ISSUE OF PLANS FOR PRE-APP 10.04.17 KvGP6 3 ISSUE OF SITE PLAN FOR LANDSCAPING 13.04.17 KvG

EXISTING PROPOSED

PARSONS HOUSE LANDSCAPING

PROPOSED STREET VIEW OF LANDSCAPING IN FRONT OF PARSONS HOUSE

HEYWOOD HOUSE

PARSONSHOUSE

EDGW

ARE

ROAD

EDGWARE ROAD

HEYWOOD HOUSE

PARSONSHOUSE

Page 10: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

MH

MH

MH

42 m²COMMUNITY ROOM 2

22.5 m²COMMUNITY ROOM 1

NOT SURVEYED

34.5 m²LOBBY

79.5 m²STORE ROOM

EDGWARE

ROAD

RAISED PLATFORM

ENTRANCE

FIREESCAPE

STOREROOMS

ELECTRICALCUPBOARD

FIRE ESCAPE

NOT SURVEYED

NOT SURVEYED

ELECTRICAL CUPBOARD

JANITORS ROOM

COMMUNITYHALL

COMMUNITYSTORE

ACCESSIBLEWC

KITCHENETTE

STOREROOM

CONCIERGEPARCELSTORAGE

SH

UTT

ER

CONCIERGE

LOBBY

FIRE EXIT

FIRE EXIT

FIRE EXIT

MAIN ENTRANCE

COMMUNITYHALL ENTRANCE

SERVICE AREA

3D VISUALISATION SKETCHES - EXTERNAL WORKS TO ENTRANCE LOBBY AND COMMUNITY ROOM

The proposed changes will include:• An extension to the entrance lobby. • A new canopy to the main entrance.• New and improved signage. • New and upgraded storage, kitchen and toilet facilities.

We will work with local residents to limit noise and disruption during construction.

SITE PHOTOS OF THE EXISTING ENTRANCE, EXISTING LOBBY AREA AND EXISTING COMMUNITY FACILITIES

EXISTING PLAN PROPOSED PLAN

FUTURE PARSONS HOUSE IMPROVEMENT WORKS

3D VISUALISATION SKETCHES - EXTERNAL WORKS TO ENTRANCE LOBBY

COMMUNITY ROOM

PLANTROOM

COMMUNITY ROOM NEW ENTRANCE

CONCIERGESTORE

LOBBY MAIN ENTRANCE

NOT SURVEYED

NOT SURVEYED

ELECTRICAL CUPBOARD

STOREROOM

COMMUNITY STORE

FIRE ESCAPE

DIS.WC

KITCHENETTE

STORE

FIRE ESCAPE

Page 11: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

ESTATE LANDSCAPINGVISION SKETCHES

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Softening hard edges Opening key spaces Creating a playful environment

AFTER

ESTATE LANDSCAPING - GREEN SPINE ESTATE LANDSCAPINGDESIGN PRINCIPLES

Hall Place ◦ 31 Jan 2017

vision & design principles

concept sketch

Hall Place ◦ 31 Jan 2017

sketch view after garage removal

studies

Hall Place ◦ 31 Jan 2017

garage building & street clutter

garagebuilding

streetrailing bollards

wall& railing

playgroundhigh fencing

studies

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Softening hard edges Opening key spaces Creating a playful environment

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Opening up the street Creation of green spaces, reduction of barriers A greener series of spaces

Hall Place ◦ 31 Jan 2017

vision & design principles

design principles

Warm surface materials and paved crossings

Clear pedestrian routes with good visibilityClear sight lines to destination points

Access Routes SurfacingViews

Hall Place ◦ 31 Jan 2017

vision & design principles

design principles

Warm surface materials and paved crossings

Clear pedestrian routes with good visibilityClear sight lines to destination points

Access Routes SurfacingViews

Hall Place ◦ 31 Jan 2017

vision & design principles

design principles

Warm surface materials and paved crossings

Clear pedestrian routes with good visibilityClear sight lines to destination points

Access Routes SurfacingViews

Hall Place ◦ 31 Jan 2017

design principles

vision & design principles

Edge treatment Tree Planting

Promote informal arrangementsSoften edges with planting and remove barriers

Promote car parking with planting

Car Parking

Hall Place ◦ 31 Jan 2017

vision & design principles

design principles

Warm surface materials and paved crossings

Clear pedestrian routes with good visibilityClear sight lines to destination points

Access Routes SurfacingViews

Hall Place ◦ 31 Jan 2017

vision & design principles

design principles

Warm surface materials and paved crossings

Clear pedestrian routes with good visibilityClear sight lines to destination points

Access Routes SurfacingViews

Hall Place ◦ 31 Jan 2017

vision & design principles

design principles

Warm surface materials and paved crossings

Clear pedestrian routes with good visibilityClear sight lines to destination points

Access Routes SurfacingViews

Hall Place ◦ 31 Jan 2017

design principles

vision & design principles

Edge treatment Tree Planting

Promote informal arrangementsSoften edges with planting and remove barriers

Promote car parking with planting

Car Parking

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Softening hard edges Opening key spaces Creating a playful environment

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Softening hard edges Opening key spaces Creating a playful environment

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Opening up the street Creation of green spaces, reduction of barriers A greener series of spaces

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Softening hard edges Opening key spaces Creating a playful environment

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Softening hard edges Opening key spaces Creating a playful environment

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Opening up the street Creation of green spaces, reduction of barriers A greener series of spaces

Hall Place ◦ 31 Jan 2017

vision & design principles

conceptual approach - vision sketches

Opening up the street Creation of green spaces, reduction of barriers A greener series of spaces

Hall Place and the adjacent areas have been identified by Westminster City Council as a suitable environment to implement a new public realm strategy, in order to create a ‘green spine’ for the benefit of local residents and visitors.

The landscape masterplan looks to achieve the following key objectives:

FUTURE SITE IMPROVEMENTS

BEFORE AFTER BEFORE

VISION SKETCHES - REMOVAL OF GARAGE & STREET CLUTTER

GREEN SPINE SKETCH

• Create a cohesive public realm strategy.

• Create a positive environment.

• Ensure the residential buildings retain their quality of environment and character.

• Provide a public realm that is flexible in nature.

• Improve pedestrian access.

VIEW SHOWING EXISTING GARAGE & STREET ARRANGEMENT

Page 12: PUBLIC EXHIBITION...JUNE 2017 PADDINGTON GREEN ESTATE REGENERATION TIMELINE 2 PRE- PLANNING MEETING 01 EARLY 2016 PUBLIC EXHIBITION JUNE 2017 PADDINGTON GREEN PUBLIC REALM CONSULTATION

JUNE 2017

PADDINGTON GREEN ESTATE REGENERATION

PUBLIC EXHIBITIONLITTLE VENICE SPORTS CENTRE 5PM - 8 PMTHURSDAY22TH JUNE 2017

Residents are invited to submit their comments.The project team will be available to answer any questions

NEXT STEPS

BOARDSAVAILABLE ONLINEFROM THURSDAY22ND JUNE 2017

www.westminster.gov.uk/paddington-green-renewal

COMMENTS FROM EXHIBITIONCOLLATED

These will be submitted as part of the application

PLANNING SUBMISSION

July 2017

STATUTORY CONSULTATION(21 DAYS)

Local residents will be notified by post that they can submit comments directly to the Planning Officers.

PADDINGTON GREEN ESTATEREDEVELOPMENT

PLANNING DECISION

Estimated late 2017

START ON SITE

Estimated early 2018

BUILDING COMPLETION

Estimated 2020

• 60 new homes• New external amenity spaces• New commercial space on Edgware

Road

PARSONS NORTH BUILDINGSubmission: JULY 2017

• Entrance lobby and canopy extension• Upgraded internal lobby area• Upgraded community room

FUTURE PARSONS HOUSE IMPROVEMENTS

• New “Green Spine” along Hall Place• Bigger and upgraded open spaces

• Improved safety and accessibility

FUTURE ESTATE LANDSCAPING

Hall Place ◦ 31 Jan 2017

sketch view after garage removal

studies