LKR USD 1 2 3 4 5 6 7 Desktop Computers 5 0.500 0.0043 Laptop Computers 3 0.450 0.0039 Flash drives 7 0.035 0.0003 Desk Top Computers 90 9.000 0.0783 Printers - Normal 90 4.500 0.0391 Printers (Duplex) 2 0.300 0.0026 Printers (Color)) 3 0.270 0.0023 UPS 90 0.630 0.0055 Laptop Computers 20 3.500 0.0304 Flatbed Scanners 11 0.165 0.0014 Fax Machines 1 0.050 0.0004 Photocopy Machine (heavy duty) 1 0.600 0.0052 Binding Machine 1 0.020 0.0002 Multi Media Projector with Accessories 1 0.100 0.0009 Two drawers woorden almira 2 0.060 0.0005 Four drawers File Curbed 2 0.036 0.0003 Digital Cameras 12 0.300 0.0026 Voice Recorder 4 0.060 0.0005 Country/Borrower: Government of Sri Lanka Project Name: North East Local Services Improvement Project (Ga East Province ) Implementing Agency: Ministry of Economic Development GPN # and Date Published: Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010 Update as of : (date) 31st July 2012 * ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting ** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22 *** Indicate extensions/modifications etc. Serial No. Package No. Description Method of Procurement* Quantity (Number) Estimated Cost (Million) 1 MED/NELSIP/G/PCU/001 NS 2 MED/NELSIP/G/PCU/ 002 NCB 3 MED/NELSIP/G/PCU/003 NS 4 MED/NELSIP/G/PCU/004 NS 5 MED/NELSIP/G/PCU/007 Internet Dongle - Stage i DC 2 0.010 0.0001 6 MED/NELSIP/G/PCU/008 Internet Dongle - Stage ii DC 2 0.010 0.0001 7 MED/NELSIP/G/PCU/009 Flash Drive Stage 11 NS 5 0.030 0.0003 8 MED/NELSIP/G/PCU/010 Cup & Sources/Spoon/Trays/Jogs etc NS Package 0.010 0.0001 9 MEID/NELSIP/G/PCU/011 Stationeries PCU - Stage i NS Package 0.282 0.0025 10 MED/NELSIP/G/PCU/012 NS 11 MED/NELSIP/G/PCU/013 Printing of Manuals (PIP/LAPIM/FM/PGL) NS 400 0.4 0.0035 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Public Disclosure Authorized - World...

Page 1: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD

1 2 3 4 5 6 7

Desktop Computers 5 0.500 0.0043

Laptop Computers 3 0.450 0.0039

Flash drives 7 0.035 0.0003

Desk Top Computers 90 9.000 0.0783

Printers - Normal 90 4.500 0.0391

Printers (Duplex) 2 0.300 0.0026

Printers (Color)) 3 0.270 0.0023

UPS 90 0.630 0.0055

Laptop Computers 20 3.500 0.0304

Flatbed Scanners 11 0.165 0.0014

Fax Machines 1 0.050 0.0004

Photocopy Machine (heavy duty) 1 0.600 0.0052

Binding Machine 1 0.020 0.0002

Multi Media Projector with Accessories 1 0.100 0.0009

Two drawers woorden almira 2 0.060 0.0005

Four drawers File Curbed 2 0.036 0.0003

Digital Cameras 12 0.300 0.0026

Voice Recorder 4 0.060 0.0005

PROCUREMENT PLAN FOR GOODS

Country/Borrower: Government of Sri Lanka

Project Name:North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the North and

East Province )Implementing Agency: Ministry of Economic Development

GPN # and Date Published:

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

Update as of : (date) 31st July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

*** Indicate extensions/modifications etc.

Ser

ial N

o.

Pac

kag

e N

o.

Des

crip

tio

n

Met

ho

d o

f P

rocu

rem

ent*

Qu

anti

ty (

Nu

mb

er)

Estimated Cost (Million)

1 MED/NELSIP/G/PCU/001 NS

2 MED/NELSIP/G/PCU/ 002 NCB

3 MED/NELSIP/G/PCU/003 NS

4 MED/NELSIP/G/PCU/004 NS

5 MED/NELSIP/G/PCU/007 Internet Dongle - Stage i DC 2 0.010 0.0001

6 MED/NELSIP/G/PCU/008 Internet Dongle - Stage ii DC 2 0.010 0.0001

7 MED/NELSIP/G/PCU/009 Flash Drive Stage 11 NS 5 0.030 0.0003

8 MED/NELSIP/G/PCU/010 Cup & Sources/Spoon/Trays/Jogs etc NS Package 0.010 0.0001

9 MEID/NELSIP/G/PCU/011 Stationeries PCU - Stage i NS Package 0.282 0.0025

10 MED/NELSIP/G/PCU/012 NS

11 MED/NELSIP/G/PCU/013Printing of Manuals

(PIP/LAPIM/FM/PGL) NS 400 0.4 0.0035

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Network Equipments -

Network Swich 1 0.010 0.0000

Construction Machineries & Gabage

Compactor

Gabage Compactors 7 52.500 0.5250

Vibrating Rollers 11 82.500 0.8250

Motor Graders 5 50.000 0.5000

Backoloders 3 30.000 0.3000

Tractor with Trilors (4W) 2 3.000 0.0300

12 MED/NELSIP/G/PCU/014 NS

Power Cord /Adepter Etc 5 0.020 0.0000

13 MEID/NELSIP/G/PCU/015 Television with DVD PLAYER NS 1 0.175 0.0015

14 MEID/NELSIP/G/PCU/016 Telephone (CDMA) Stage 1 DC 2 0.012 0.0001

15 MEID/NELSIP/G/PCU/017 Telephone (CDMA) Stage ii DC 1 0.006 0.0001

16 MED/NELSIP/G/PCU/022 ICB

17 MED/NELSIP/G/PCU/023 Stationeries PCU - Stage ii NS Package 0.150 0.0013

18 MED/NELSIP/G/PCU/024 Printer Toners -Stage I NS 3 0.054 0.0005

19 MED/NELSIP/G/PCU/025 Photocopy Toners - Stage I DC 2 0.010 0.0001

20 MED/NELSIP/G/PCU/026 Fax toner - Stage I DC 2 0.008 0.0001

21 MED/NELSIP/G/PCU/027 Stationeries PCU - Stage iii NS Package 0.150 0.0013

22 MED/NELSIP/G/PCU/028 Laptop Computers NS 3 0.525 0.0046

23 MED/NELSIP/G/PCU/029 Printer Toners -Stage II NS 3 0.054 0.0005

24 MED/NELSIP/G/PCU/030 Photocopy Toners - Stage I I DC 3 0.015 0.0001

25 MED/NELSIP/G/PCU/031 Fax toner - Stage I I DC 2 0.008 0.0001

26 MED/NELSIP/G/PCU/032 Photocopy Toners - Stage III DC 2 0.010 0.0001

27 MED/NELSIP/G/PCU/034 Photocopy Toners - Stage IV DC 2 0.010 0.0001

28 MED/NELSIP/G/PCU/035 Printer Toners -Stage III NS 3 0.054 0.0005

29 MED/NELSIP/G/PCU/037 Stationeries PCU - Stage iv NS Package 0.150 0.0013

30 MED/NELSIP/G/PCU/038 Printer Toners -Stage IV NS 3 0.054 0.0005

31 MED/NELSIP/G/PCU/039 Fax toner/Cardrige/Roll - Stage iii DC 2 0.008 0.0001

32 MED/NELSIP/G/PCU/040 Stationeries PCU - Stage v NS Package 0.150 0.0013

33 MED/NELSIP/G/PCU/041 Training Tool Kit NS Package 0.010 0.0001

34 MED/NELSIP/G/PCU/042 Telephone (CDMA) Stage iii DC 1 0.006 0.0001

35 MED/NELSIP/G/PCU/043 Printing of leafret NS 600 0.024 0.0002

Page 3: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Printers (Color)) 1 0.100 0.0009

Printers (heavy duty) 2 0.400 0.0035

Laptop Computers 10 1.750 0.0152

Flatbed Scanners 2 0.050 0.0004

NS 45 2.5 0.0218

Fax Machines 6 0.300

Photocopy Machine (heavy duty) 6 3.600

Multi Media Projector with Accessories 1 0.1000.0009

Two drawers Iron almira 6 0.120 0.0010

Office Table steel 40 0.320 0.0028

Chair 40 0.120 0.0010

Four drawers File Curbed 40 0.240 0.0021

36 MED/NELSIP/G/PCU/044 Purchasing of Virusgard for Computers NS 6 0.009 0.0001

37 MED/NELSIP/G/PCU/045 Printing of Manuals - Stage ii NS 1310 0.400 0.0040

38 MED/NELSIP/G/PCU/046 NS

39MED?NELSIP/G/PCU/047 Purchasing of Pettycach box

NS 1 0.010 0.0001

40 MED/NELSIP/G/PCU/048 Internet Dongle - Stage iii DC 3 0.010 0.0001

41 MED/NELSIP/G/PCU/049 Purchasing of Printers and UPS NS 7 0.210 0.0018

42 MED/NELSIP/G/PCU/050 Purchasing of Scaner (Leagle) NS 1 0.075 0.0007

43 MED/NELSIP/G/PCU/051 Purchasing of Telephon NS 1 0.030 0.0003

44 MED/NELSIP/G/PCU/052Purchasing of Toner Cardridge (Color -

Stage i)NS 1 Set 0.030 0.0003

45 MED/NELSIP/G/PCU/053Purchasing of Digital Camara -Stage

iii)NS 6 0.150 0.0013

46 NELSIP/G/NP/PMU/001 Flash drives NS 80 0.3200.0028

47 NELSIP/G/NP/PMU/ 002 Scaner

48 NELSIP/G/NP/PMU/003 NS0.0026

49 NELSIP/G/NP/PMU/004 NS

50 NELSIP/G/NP/PMU/005 Internet Dongle - Stage i DC* 40 0.16 0.0014

51 NELSIP/G/NP/PMU/006 Cup & Sources/Spoon/Trays/Jogs etc NS Package 0.06 0.0005

52 NELSIP/G/PMU/007 Stationeries PMU - Stage i NS Package 0.72 0.0063

53 NELSIP/G/NP/PMU/008 Printer Toners -Stage I NS 40 0.72 0.0063

54 NELSIP/G/NP/PMU/009 Photocopy Toners - Stage I DC* 6 0.03 0.0003

55 NELSIP/G/NP/PMU/010 Stationeries PCU - Stage ii NS Package 0.72 0.0063

56 NELSIP/G/NP/PMU/011 Training Tool Kit NS Package 0.06 0.0005

Page 4: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

57 NELSIP/G/NP/PMU/013 Internet Dongle DC* 1 0.005 0.0000

58 NELSIP/G/NP/PMU/014 Destop Computer with UPS NS 18 1.62 0.0141

59 NELSIP/G/NP/PMU/015 Printer NS 18 0.36 0.0030

60 NELSIP/G/NP/PMU/016 Laptop Computer NS 22 2.64 0.0230

61 NELSIP/G/NP/PMU/017 Destop Computer with UPS NS 29 3.42 0.0297

62 NELSIP/G/NP/PMU/018 Printer NS 12 0.24 0.0021

63 NELSIP/G/NP/PMU/019 Laptop Computer NS 34 4.08 0.0355

64 NELSIP/G/NP/PMU/020 Photocoppiya-heavy duty NS 8 4 0.0348

65 NELSIP/G/NP/PMU/021 Photocoppiya NS 36 5 0.0435

66 NELSIP/G/NP/PMU/022 Hard Disk-External NS 44 0.7 0.0061

67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS 10 1.25 0.0109

68 NELSIP/G/NP/PMU/024 Internet Dongle DC* 3 0.015 0.0001

69 NELSIP/G/NP/PMU/025Vedio Camera with DVD Recoding

FacilitiesNS 4 0.8 0.0070

70 NELSIP/G/NP/PMU/026 Digital Camera NS 3 0.12 0.0010

71 NELSIP/G/NP/PMU/027 Voice Recoder NS 10 0.2 0.0017

72 NELSIP/G/NP/PMU/028 Levelling Instuments NS 44 3.08 0.0268

73 NELSIP/G/NP/PMU/029 Statineries NS Items 1.8 0.0157

74 NELSIP/G/NP/PMU/030 Global Positioning System NS 10 1.5 0.0130

75 NELSIP/G/NP/PMU/031 Measuring Wheel NS 45 0.45 0.3947

Page 5: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

60& 20

76 NELSIP/G/NP/PMU/033

Furnituries 10 nos office table with

chairs,01no.Conference

table,03nos.Steel Almara,

NS Items 0.45 0.3947

77 NELSIP/G/NP/PMU/035 Cup & Sources NS 1 0.1 0.0877

78 NELSIP/G/NP/PMU/036Cube Mould&Concrete Compacting

BarNS 0.005 0.0044

79 NELSIP/G/NP/PMU/038Slump cone TestSet Stainless Steel

ConeNS 20&20 0.24 0.2105

80 NELSIP/G/NP/PMU/040 Furnituries for LAA NS 40set 2.00 0.0148

81 NELSIP/G/NP/PMU/041Office Equipments for CLG

office,ACLG office as 1 packsNS 3set 3.00 0.0261

82 NELSIP/G/NP/PMU/042

Desktop Computers-5 Nos,Lap top -1

No,Air condition-1 No for Provincial

Audit Department as 1 No Package

NS 1set 0.55 0.4825

83 NELSIP/G/NP/PMU/043 Laboratory Testing Item NS 2 10 0.1000

84 NELSIP/G/NP/PMU/044 Library Cabinet NS 3 0.045 0.0045

85 NELSIP/G/NP/RACLG/VA/001 Internet Dongle DC* 1 0.005 0.0000

86 NELSIP/G/NP/RACLG/MA/002 Internet Dongle DC* 1 0.005 0.0000

87 NELSIP/G/NP/RACLG/KI/003 Internet Dongle DC* 1 0.005 0.0000

88 NELSIP//NP/J/JAMC/G/1 Bitumin for reconstruction of roads in LA DC* 3150 L 0.315 0.0027

89 NELSIP//NP/J/JAMC/G/2 Bitumin for reconstruction of roads in LA DC* 27630L 2.65 0.0230

90 NELSIP/NP/J/ChUC/G/1Bitumin for reconstruction of roads in

LADC* 32656 L 3.265

0.0286

91 NELSIP/NP/J/ChUC/G/2Bitumin for reconstruction of roads in

LADC* 11586 1.112

0.0097

92 NELSIP/NP/J/ChPS/G/1Bitumin for reconstruction of roads in

LADC* 27000L 2.700

0.0236

93 NELSIP/NP/J/ChPS/G/2Bitumin for reconstruction of roads in

LADC* 19800 1.900

0.0166

94 NELSIP/NP/J/PPPS/G/1Bitumin for reconstruction of roads in

LADC* 19080L 2.067

0.0181

Page 6: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

94 NELSIP/NP/J/PPPS/G/1Bitumin for reconstruction of roads in

LADC* 19080L 2.067

0.0181

95 NELSIP/NP/J/PPPS/G/2Bitumin for reconstruction of roads in

LADC* 40275 4.200

0.0368

96NELSIP/NP/J/VdSWPS/G

/1

Bitumin for reconstruction of roads in

LADC* 22950 2.525

0.0221

97NELSIP/NP/J/VdSWPS/G

/2

Bitumin for reconstruction of roads in

LADC* 19605 2.078

0.0182

98 NELSIP/NP/J/VSPS/G/1Bitumin for reconstruction of roads in

LADC* 26820 L 2.608

0.0228

99 NELSIP/NP/J/VSPS/G/2Bitumin for reconstruction of roads in

LADC* 27270L 2.542

0.0223

100 NELSIP/NP/J/VEPS/G/1Bitumin for reconstruction of roads in

LADC* 47250L 4.128

0.0361

101 NELSIP/NP/J/VEPS/G/2Bitumin for reconstruction of roads in

LADC* 13500L 1.300

0.0114

102 NELSIP/NP/J/VWPS/G/1Bitumin for reconstruction of roads in

LADC* 25200L 2.572

0.0225

103 NELSIP/NP/J/VWPS/G/2Bitumin for reconstruction of roads in

LADC* 20250L 1.986

0.0174

104 NELSIP/NP/J/VNPS/G/1Bitumin for reconstruction of roads in

LADC* 16830L 1.730

0.0151

105 NELSIP/NP/J/VNPS/G/2Bitumin for reconstruction of roads in

LADC* 33030L 3.263

0.0286

106NELSIP/NP/J/VSWPS/G/

1

Bitumin for reconstruction of roads in

LADC* 48860L 4.986

0.0437

107NELSIP/NP/J/VSWPS/G/

2

Bitumin for reconstruction of roads in

LADC* 10373L 0.996

0.0087

108 NELSIP/NP/J/VLPS/G/1Bitumin for reconstruction of roads in

LADC* 29700L 3.267

0.0286

109 NELSIP/NP/J/DELPS/G/1Bitumin for reconstruction of roads in

LADC* 38700L 4.644

0.0407

110 NELSIP/NP/J/DELPS/G/2Bitumin for reconstruction of roads in

LADC* 43200L 5.184

0.0454

111 NELSIP/NP/J/KRPS/G/1Bitumin for reconstruction of roads in

LADC* 13500 L 1.418

0.0124

112 NELSIP/NP/J/KRPS/G/2Bitumin for reconstruction of roads in

LADC* 27000L 2.997

0.0262

113 NELSIP/NP/J/KYPS/G/1Bitumin for reconstruction of roads in

LADC* 14490L 1.521

0.0133

114 NELSIP/NP/J/KYPS/G/2Bitumin for reconstruction of roads in

LADC* 30915L 3.121

0.0273

Page 7: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

0.0007134

NELSIP/G/EP/PMU/08 Purchase of Colour Printer

NS 1 0.085

0.0010133

NELSIP/G/EP/PMU/09 Supply & Fixing of Air Condition

NS 1 0.110

0.0008132NELSIP/G/EP/PMU/07 Purchase of Flash Drive

NS 10 0.094

0.0027131

NELSIP/G/EP/PMU/05 Purchase of Furniture (Items)

NS 16 0.310

0.0031130

NELSIP/G/EP/PMU/04 Purchase of Stationery - Stage 1

NS Package 0.360

0.0005129NELSIP/G/EP/PMU/03 Purchase of External Hard Disk

NS 5 0.057

0.0003128NELSIP/G//EP/PMU/02 Purchase of Internet Dongle

NS 8 0.040

114 NELSIP/NP/J/KYPS/G/2Bitumin for reconstruction of roads in

LADC* 30915L 3.121

0.0273

115NELSIP/NP/VU/VSTPS/

G/1

Bitumin for reconstruction of roads in

LADC* 48900L 4.366

0.0380

116NELSIP/NP/J/VVTUC/G/

1

Bitumin for reconstruction of roads in

LADC* 25127L 3.040

0.0260

117NELSIP/NP/MN/MNPS/

G/1

Bitumin for reconstruction of roads in

LADC* 9000L 0.864

0.0070

118NELSIP/NP/MN/MUPS/

G/1

Bitumin for reconstruction of roads in

LADC* 16514L 1.750

0.0150

119NELSIP/NP/MN/NAPS/G

/1

Bitumin for reconstruction of roads in

LADC* 85446L 8.202

0.0710

120NELSIP/NP/MN/MWPS/

G/1

Bitumin for reconstruction of roads in

LADC* 29400L 2.821

0.0240

121 NELSIP/NP/KI/POPS/G/1Bitumin for reconstruction of roads in

LADC* 31860L 3.053

0.0270

122 NELSIP/NP/KI/PAPS/G/1Bitumin for reconstruction of roads in

LADC* 46710L 4.623

0.0402

123NELSIP/NP/KI/KAPS/G/

1

Bitumin for reconstruction of roads in

LADC* 41625L 4.115

0.0360

124NELSIP/NP/MU/KTPS/G

/1

Bitumin for reconstruction of roads in

LADC* 40477L 3.876

0.0340

125NELSIP/NP/MU/PUPS/G/

1

Bitumin for reconstruction of roads in

LADC* 36000L 3.672

0.0320

126NELSIP/NP/MU/TUPS/G

/1

Bitumin for reconstruction of roads in

LADC* 45000L 4.590

0.0400

127NELSIP/NP/MU/MEPS/G

/1

Bitumin for reconstruction of roads in

LADC* 49200L 5.020

0.0440

Page 8: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

 NELSIP/G/EP/PMU/15Purchase of soil testing

Equepments & tools (3 District)NCB  Items

0.400 0.0035159 NELSIP/G/EP/BT/EPPS/01IT Equepment Eraur pattu PS

NS  Items

158 NELSIPG//EP/BT/KPPS/01IT Equepment Koralai Pattu PS

NS  Items 0.400 0.0035

157 NELSIP/G/EP/TR/RACLG/01IT Equepment Assiatant

Commisstioner of Local NS  Items 0.400 0.0035

0.400 0.0035156 NELSIP/G/EP/TR/PSPS/01IT Equepment Padavi Sri Pura

PSNS  Items

155 NELSIP/G/EP/TR/MUPS/01IT Equepment Muthur PS

NS  Items 0.400 0.0035

154 NELSIP/G/EP/TR/THPS//01IT Equepment Thambalagam

PSNS  Items 0.400 0.0035

0.400 0.0035153 NELSIP/G/EP/TR/KIPS/01IT Equepment Kinniya PS

NS  Items

152 NELSIP/G/EP/TR/KUPS/01IT Equepment Kuchchaweli PS

NS  Items 0.400 0.0035

151 NELSIP/G/EP/TR/MOPS/01IT Equepment Morawewa PS

NS  Items 0.400 0.0035

0.400 0.0035150 NELSIP/G/EP/TR/GOPS//01IT Equepment

Gomarankadawala PSNS  Items

149 NELSIP/G/EP/TR/SEPS//01IT Equepment Seruvila PS

NS  Items 0.400 0.0035

148 NELSIP/G/EP/TR/VEPS/01IT Equepment Verugal PS

NS  Items 0.400 0.0035

0.400 0.0035147 NELSIP/G/EP/TR/KAPS/01IT Equepment Kantale PS

NS  Items

146 NELSIP/G/EP/TR/TGPS/01IT Equepment Toun and Gravel

PSNS  Items 0.400 0.0035

145 NELSIP/G/EP/TR/ KIUC/ 01IT Equepment Kinniya UC

NS  Items 0.400 0.0035

0.400 0.0035144 NELSIP/G/EP/TR/TRUC/01IT Equepment Trinco UC

NS  Items

143  NELSIP/G/EP/PMU/22 Interpretation System Equipment NS  System unit 2.000 0.0174

142  NELSIP/G/EP/PMU/21 Audit Department IT Equipment NS  14 0.085 0.0007

2.500 0.0217141  NELSIP/G/EP/PMU/20 Lavelling Instrument NS  50

140  NELSIP/G/EP/PMU/19 Purchase of Laptop Computer NS  7 8.200 0.0713

139  NELSIP/G/EP/PMU/18 Purchase of UPS NS  3 0.210 0.0018

0.070 0.0006138  NELSIP/G/EP/PMU/17 Purchase of Laser Printers NS  2

137  NELSIP/G/EP/PMU/16 Purchase of Desk top computers NS  3 0.200 0.0017

136 15.000 0.1304

0.0013135  NELSIP/G/EP/PMU/10 Purchase of Photocopier NS  1 0.150

0.0007134

NELSIP/G/EP/PMU/08 Purchase of Colour Printer

NS 1 0.085

Page 9: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

184 NELSIP/G//EP/AM/RACLG/01IT Equepment Assistnat

Commisser of Local NS  Items 0.400 0.0035

0.400 0.0035183 NELSIP/G/EP/AM/KMC/01IT Equepment Kalmuni MC

NS  Items

182 NELSIP/G/EP/AM/AKMC/01IT Equepment Akkaraipattu

MCNS  Items 0.400 0.0035

181 NELSIP/G/EP/AM/AMUC/01IT Equepment Ampara UC

NS  Items 0.400 0.0035

0.400 0.0035180 NELSIP/G/EP/AM/NIPS/01IT Equepment Ninthavur PS

NS  Items

179 NELSIP/G/EP/AM/UHPS/01IT Equepment Uhana PS

NS  Items 0.400 0.0035

178 NELSIPG//EP/AM/LAPS/01IT Equepment Lahugala PS

NS  Items 0.400 0.0035

0.400 0.0035177 ENELSIP/G//P/AM/AKPS/01IT Equepment Akkaraipattu PS

NS  Items

176 NELSIP/G/EP/AM/POPS/01IT Equepment Pottuvil PS

NS  Items 0.400 0.0035

175 NELSIPG//EP/AM/KTPS//1IT Equepment Karaitivu PS

NS  Items 0.400 0.0035

0.400 0.0035174 NELSIP/G/EP/AM/ALPS/01IT Equepment Alayadivembu

PSNS  Items

173 NELSIP/G/EP/AM/ADPS/01IT Equepment Addalachchenai

PSNS  Items 0.400 0.0035

172 NELSIP/G/EP/AM/DEPS/ 01IT Equepment Dehiattakandiya

PSNS  Items 0.400 0.0035

0.400 0.0035171 NELSIP/G/EP/AMP/NVPS/01IT Equepment Navithanveli PS

NS  Items

170 NELSIP/G/EP/AM/THPS/1IT Equepment Thirukkovil PS

NS  Items 0.400 0.0035

169 NELSIP/G/EP/BT/RACLG/01IT Equepment Commisioner of

Local Government BatticaloNS  Items 0.400 0.0035

0.400 0.0035168 NELSIP/G/EP/BT/MC/01IT Equepment Batticalo MC

NS  Items

167 NELSIP/G/EP/BT/EUC/01IT Equepment Eravur UC

NS  Items 0.400 0.0035

166 NELSIPG//EP/BT/PPPS/01IT Equepment Poraitivupattu

PSNS  Items 0.400 0.0035

0.400 0.0035165 NELSIP/G/EP/BT/MWPS/01IT Equepmen tManmunai West

PSNS  Items

164 NELSIP/G/EP/BT/KPWPS/O1IT Equepment Koralaipattu

West PSNS  Items 0.400 0.0035

163 NELSIP/G/EP/BT/MPPS/01IT Equepment Manmunaipattu

PSNS  Items 0.400 0.0035

0.400 0.0035162 NELSIP/G/EP/BT/KUC/O1IT Equepment Kattankudi UC

NS  Items

161 NELSIP/G/EP/BT/MS&EPPS/01IT Equepment Manmunai south

& Eruvil Pattu NS  Items 0.400 0.0035

160NELSIP/G/EP/BT/MSWPS/W/0

1

IT Equepment Manmunai

South West PSNS  Items 0.400 0.0035

Page 10: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Date

Cu

rren

cy Amount (LKR)

8 9 10 11 12 13 14 15 16

489,700.00

-

Actual 20-May-10 28-Jul-10 37,632.00

Actual 25-Jan-11 07-Mar.-11 30-Mar.-11 10-June.-11 N/A

Actual 12-Dec-11 18-Jan-12 89,000.00

Planned 07-Sep-11 07-Oct-11

Actual

Planned 17-May-10 26-May-10

Actual 10-Aug-10 11-Aug.-10

Planned 27-Jul-11 03-Aug-11

Actual 10-Aug-11 16-Aug-11

Planned 26-Jul-11 25-Aug-11

Actual

Planned 21-Nov-11 05-Dec-11

Actual

Planned 17-Jun-10 02-Jul-10

Actual 27.July-10 05-Aug.-10

Planned 07-Feb-11 21-Feb-11

Actual 01-Feb.-11 23-Mar.-11

Planned 14-Feb-11 28-Feb-11

Actual 2-Feb.-11 25-Mar.-11

PROCUREMENT PLAN FOR GOODS

Government of Sri LankaNorth East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the North and

East Province )Credit/#: 4728LK

Ministry of Economic Development

5th April 2010

31st July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

*** Indicate extensions/modifications etc.

Pri

or/

Po

st R

evie

w b

y B

ank*

*

Stage

Su

bm

it D

BD

wit

h IF

B f

or

Ban

k's

N/O

Pu

blis

h IF

B in

Nat

ion

al n

ewsp

aper

s an

d

UN

DB

Dea

dlin

e fo

r su

bm

issi

on

of

bid

s

Su

bm

it B

ER

fo

r B

ank'

s N

/O

Signing of contract

Post ReviewPlanned

N/A N/A17-May-10

N/A1-Jul-10

LKR

Prior Review Planned 15-Nov-10 22-Nov-10 15-Dec-10 14-Jan-11 21-Jan-11

LKR -

Post Review

Planned

N/A N/A

28-Oct-11

N/A

18-Nov-11

LKR

73,808.00

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR 10,980.00

Post Review N/A N/A N/A LKR 5,922.00

Post Review N/A N/A N/A LKR -

Post Review N/A N/A N/A LKR -

Post Review N/A N/A N/A LKR 139,818.00

Post Review N/A N/A N/A LKR 298,180.00

Post Review N/A N/A N/A LKR 158,223.00

Page 11: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

6,300.00

Actual 12-Aug.-10 17-Aug.-10 4,250.00

Planned 11-Jan-12 25-Jan-12

Actual

Planned 07-Jun-10 14-Jun-10

Actual 06-Aug.-10 06-Aug.10

Planned 07-Dec-10 14-Dec-10

Actual 28-Dec.-10 28-Dec.-10

Actual 30-May-12

Planned 15-Nov-10 25-Nov-10

Actual 16-Dec.-10 23-Dec.-11

Planned N/A N/A 18-Aug-10 25-Aug-10

Actual 25-Aug.-10 26-Aug.-10

Planned N/A N/A 18-Aug-10 N/A 25-Aug-10

Actual 07-Sep.-10 08-Sep.-10

Planned 18-Aug-10 N/A 25-Aug-10

Actual 14-Oct.-11 15-Oct.-11

Planned 04-Jun-11 14-Jun-11

Actual 24-Oct-11 01-Nov-11

Planned 12-Oct-10 11-Nov-10

Actual 27-Oct.10 15-Nov.-10

Planned N/A N/A 27-Jan-11 03-Feb-11

Actual 03-Feb.-11 09-Feb.-11

Planned 09-Dec-10 16-Dec-10

Actual 03-Dec.-10 07-Dec.-10

Planned N/A N/A 08-Dec-11 15-Dec-11

Actual 13-Feb-12 10-Feb-12

Planned N/A N/A 10-Feb-11 18-Feb-11

Actual 03-Feb.-11 09-Feb.-11

Planned N/A N/A 08-Dec-11 15-Dec-11

Actual 23-Jan-12 23-Jan-12

Planned N/A N/A 06-May-10 13-May-10

Actual 25-Oct-10 25-Oct-10

Planned 03-Jan-12 13-Jan-12

Actual

Planned 04-Jan-12 11-Jan-12

Actual

Planned 05-Mar-12 12-Mar-12

Actual

Planned 28-Mar-11 06-Apr-11

Actual

Planned 28-Nov-11 08-Dec-11

Actual

Planned 08-Dec-11 19-Dec-11

Actual

Planned 05-Aug-11 12-Aug-11

Actual 08-Aug-11 08-Aug-11

Post ReviewPlanned

N/A N/A04-Aug-10

LKR28-Jul-10

N/A

Post Review N/A N/A N/A LKR -

Post Review N/A N/A N/A LKR 11,500.00

Post Review N/A N/A N/A LKR 4,610.00

Prior Rewew

Planned21-Nov-11 28-Nov-11 10-Jan-12 21-Feb-12 19-Apr-12

LKR -

Post Review N/A N/A N/A LKR 57,802.00

Post Review N/A LKR 26,109.60

Post Review LKR 9,184.00

Post Review N/A N/A LKR 10,752.00

Post Review N/A N/A N/A LKR 57,244.16

Post Review N/A N/A N/A LKR 447,000.00

Post Review N/A LKR 37,948.00

Post Review N/A N/A N/A LKR 13,776.00

Post Review N/A LKR 12,768.00

Post Review N/A LKR 9,499.00

Post Review N/A LKR 9,184.00

Post Review N/A LKR 16,170.00

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR -

Post Review N/A N/A N/A LKR -

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR 14,000.00

Page 12: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Planned 15-Aug-11 22-Aug-11

Actual 24-Aug-11 24-Aug-11

Planned 09-Sep-11 19-Sep-11

Actual 19-Sep-11 22-Sep-11

Actual 18-Oct-11 22-Nov-11

Planned 15-Dec-11 22-Dec-11

Actual

Planned 15-Dec-11 22-Dec-11

Actual 14-Dec-11 14-Dec-11

Planned 14-Jun-12 21-Jun-12

Actual 24-Jul-12 02-Aug-12

Planned 14-Mar-12 21-Mar-12

Actual

Planned 14-Jun-12 21-Jun-12

Actual

Planned 14-Jun-12 21-Jun-12

Actual 27-Jun-12 02-Jul-12

Planned 14-Jun-12 21-Jun-12

Actual

Planned 25-Aug-11 30-Aug-11

Actual 31-Jan-12 9-Mar-12

Post Review Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual

Actual 16-Mar-12 30-Mar-12

Actual

Planned N/A N/A 15-Aug-10 N/A 24-Aug-10 LKR

Actual

Planned N/A N/A 15-Aug-11 N/A 29-Aug-11 LKR

Actual

Planned N/A N/A 15-Aug-11 N/A 30-Aug-11 LKR

Actual 04-Aug-11 09-Aug-11

Planned N/A N/A 18-Aug-11 N/A 25-Aug-11 LKR

Actual 10-Aug-11 15-Aug-11

Planned N/A N/A 18-Aug-10 N/A 25-Aug-10 LKR

Actual 05-Aug-11 05-Aug-11

Planned N/A N/A 05-Dec-11 N/A 15-Dec-11 LKR

Actual

Planned N/A N/A 26-Aug-11 N/A 05-Sep-11 LKR

Actual

Post Review N/A N/A N/A LKR 6,100.00

Post Review N/A N/A N/A LKR 278,790.00

Post ReviewPlanned

N/A N/A30-Sep-11

N/A14-Oct-11

LKR 2,023,550.00

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR 8,883.00

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR 16,500.00

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR 19,800.00

Post Review

Planned

N/A N/A

26-Aug-11 N/A 16-Sep-11

LKR 262,080.00

Post ReviewPlanned

N/A N/A26-Aug-11

N/A12-Sep-11

LKR

Post Review

Post Review

Post Review 393,188.00

Post Review 109,400.00

Post Review 58,100.00

Post Review

Post Review

Page 13: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Planned N/A N/A 10-Feb-11 N/A 18-Feb-11 LKR

Actual 15-Feb-11 18-Feb-11

Planned N/A N/A 21-Sep-11 N/A 28-Sep-11

Actual 08-Nov-11 07-Dec-11

Planned N/A 21-Sep-11 N/A 28-Sep-11

Actual 08-Nov-11 07-Dec-11

Planned N/A N/A 21-Sep-11 N/A 28-Sep-11

Actual 08-Nov-11 01-Dec-11

Planned N/A N/A 19-Oct-11 N/A 31-Oct-11 LKR

Actual

Planned N/A N/A 10-Feb-11 N/A 18-Feb-11 LKR

Actual 15-Feb-11 18-Feb-11

Planned N/A N/A 21-Sep-11 N/A 28-Sep-11

Actual 08-Nov-11 07-Dec-11

Planned N/A N/A 19-Oct-11 N/A 31-Oct-11

Actual 08-Nov-01 22-Dec-11

Planned N/A N/A 19-Oct-11 N/A 31-Oct-11 LKR

Actual 11-Jan-11 23-Jan-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11

Actual 31-Jan-12 9-Mar-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11

Actual 15-Feb-12 09-Mar-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual 11/15/2011 11/22/2011

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual 17-Apr-12 30-Apr-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual 17-Feb-11 05-Mar-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual 09-Jan-11 23-Jan-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual 09-Jan-11 23-Jan-12

Planned N/A N/A 17-Oct-11 N/A 31-Oct-11 LKR

Actual

Planned 17-Oct-11 31-Oct-11

Actual

Post Review 5,990.00

Post Review LKR 1,654,000.00

Post Review N/A LKR 358,200.00

Post Review LKR 1,749,000.00

Post Review

Post Review 5,990.00

Post Review LKR 1,654,000.00

Post Review LKR 1,835,814.00

Post Review 1,128,000.00

Post Review LKR 462,000.00

Post Review LKR 1,318,400.00

Post Review 10,980.00

Post Review 2,278,080.00

Post Review 148,500.00

Post Review

Post Review 1,320,000.00

Post Review 1,230,000.00

Post Review

Post Review N/A N/A N/A LKR

Page 14: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Planned 17-Oct-11 31-Oct-11

Actual

Planned 17-Oct-11 31-Oct-11

Actual

Planned 24-Apr-12 11-May-12

Actual

Planned 24-Apr-12 11-May-12

Actual

Planned 24-Apr-12 11-May-12

Actual

Planned 24-Apr-12 11-May-12

Actual

Planned 24-Apr-12 11-May-12

Actual

Planned 01-Jun-12 30-Jun-12

Actual

Planned 04-Apr-12 05-Apr-12

Actual 06-Apr-12 13-Apr-12

Planned 01-Feb-11 08-Feb-11

Actual 07-Feb-11 11-Feb-11

Planned 10-Feb-11 18-Feb-11

Actual 21-Feb-11 24-Feb-11

Planned 10-Feb-11 18-Feb-11

Actual 23-Feb-10 28-Feb-11

Planned 12-May-11 19-May-11

Actual 19-Jul-11 25-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 30-Jun-11 7-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 26-Jul-11 3-Aug-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR 0.04

Post Review N/A N/A N/A LKR 5,990.00

Post Review N/A N/A N/A LKR 5,990.00

Post Review N/A N/A N/A LKR 5,990.00

Post Review N/A N/A N/A LKR 252,000.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 2,612,520.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 2,160,000.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 1,526,400.00

Page 15: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Actual 27-Jul-11 4-Aug-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11 LKR

Actual 18-Jul-11 25-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 21-Jul-11 28-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 20-Jun-11 27-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 5-Jul-11 13-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 10-Jun-11 17-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 4-Jul-11 12-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 20-Jul-11 28-Jul-11

Planned 12-May-11 N/A 19-May-11

Actual 25-Jul-11 3-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 5-Jul-11 13-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 N/A 19-May-11

Actual 16-Jun-11 23-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

Post Review N/A N/A LKR 1,526,400.00

Post Review N/A N/A LKR

Post Review N/A N/A 6,616,800.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 2,145,600.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 3,780,000.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 2,016,000.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 1,346,400.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 3,988,800.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 2,497,110.00

Post Review N/A N/A LKR 3,168,000.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 1,080,000.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR 1,123,200.00

Post Review N/A N/A LKR

Page 16: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Actual

Planned 12-May-11 N/A 19-May-11

Actual 6-Sep-11 15-Sep-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 20-Jun-11 30-Jun-11

Actual 25-Jun-11 30-Jun-11

Planned 3-Aug-11 17-Aug-11

Actual 3-Aug-11 17-Aug-11

Planned 24-Mar-11 28-Mar-11

Actual 21-Apr-11 4-May-11

Planned 3-Aug-11 6-Aug-11

Actual 5-Aug-11 6-Aug-11

Planned 3-Aug-11 24-Aug-11

Actual

Planned 3-Aug-11 20-Jul-11

Actual 30-Jun-11 24-Aug-11

Planned 3-Aug-11 24-Aug-11

32,000.00 Post Review N/A N/A N/A LKR

102,900.00 Post Review N/A N/A N/A LKR

27,750.00 Post Review N/A N/A N/A LKR

136,086.02 Post Review N/A N/A N/A LKR

61,865.00 Post Review N/A N/A N/A LKR

57,500.00 Post Review N/A N/A N/A LKR

42,720.00 Post Review N/A N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR 3,916,800.00

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Post Review N/A N/A LKR

Page 17: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Actual 2/12/2011 4-Jan-12

Planned 7-Oct-11 21-Oct-11

Actual 2/12/2011 4-Jan-12

Planned 22-Sep-11 30-Sep-11 24-Oct-11 7-Nov-11 21-Nov-11

Actual

Planned 7-Oct-11 21-Oct-11

Actual 2/12/2011 4-Jan-12

Planned 7-Oct-11 21-Oct-11

Actual 2/12/2011 4-Jan-12

Planned 7-Oct-11 21-Oct-11

Actual 2/12/2011 4-Jan-12

Planned 7-Oct-11 21-Oct-11

Actual 2/12/2011 4-Jan-12

Planned 30-Apr-12 14-May-12

Actual

Planned 30-Apr-12 14-May-12

Actual

Planned 18-May-12 1-Jun-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

ActualLKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKR 2,330,000.00 Post Review N/A N/A N/A

Post Review N/A N/A N/A LKR 703,500.00

N/A N/A LKR 12,000.00 Post Review N/A

LKR 60,000.00 Post Review N/A N/A N/A

Post Review N/A N/A N/A LKR 276,000.00

Prior Rewew LKR

105,000.00 Post Review N/A N/A N/A LKR

32,000.00 Post Review N/A N/A N/A LKR

Page 18: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

Actual

Planned 16-Apr-12 30-May-12

ActualN/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

LKRPost Review N/A N/A N/A

Post Review N/A N/A N/A LKR

N/A N/A LKRPost Review N/A

Page 19: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

17 18 19 20 21.00 22

15-Oct-10

N/A N/A

John Keels 30-Jan-12

06-Nov-11

05-Jun-10

16-Aug.-10

13-Aug-11

15-Sep-11

08-Sep-11

15-Dec-11

12-Jul-10

16-Aug.-10

07-Mar-11

25-Mar.-11

14-Mar-11

PROCUREMENT PLAN FOR GOODS

Government of Sri Lanka

Credit/#: 4728LK

Ministry of Economic Development

5th April 2010

31st July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

*** Indicate extensions/modifications etc.

Nam

e o

f C

on

trac

tor/

nat

ion

alit

y

Su

bm

it s

ign

ed c

on

trac

t co

py

to B

ank

Pu

blis

h c

on

trac

t aw

ard

no

tice

in U

ND

B

& N

atio

nal

new

spap

ers

Co

mp

leti

on

of

con

trac

t

Exp

end

itu

re in

curr

ed t

o d

ate

(LK

R)

Sta

tus/

Rem

arks

***

Archi Tech &

Metropolitan

N/A N/A15-Jul-10

527,332.00

-21-Jan-11

N/A21-Feb-11

-

Re

invi

te a

s ne

w p

acka

ges

CBA Pvt Ltd

N/A N/A

18-Dec-11

162,808.00

Ph

and

Fax

not

purc

hase

d du

e to

reci

pt o

f goo

ds

from

oth

er s

ours

e

N/A N/A

Furniture were

recive d From

Ministry

Dialog Pvt Ltd N/A N/A 10,980.00

Dialog Pvt Ltd N/A N/A 5,922.00 -

N/A N/A - -

N/A N/A - -

Lakvin, Pilot,

Leader, NarahN/A N/A 139,818.00

Seadlers Pvt

LtdN/A N/A 298,180.00 -

Printed only

FMMN/A 158,223.00

Softwave, Pvt

LtdN/A

Page 20: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

13-Sep-10

04-Feb-12

19-Jun-10

06-Aug.-10

19-Dec-10

30-Dec.10

05-Dec-10

7-Jan-11

01-Sep-10

30-Aug.-10

01-Sep-10

17-Sep.11

01-Sep-10

21-Oct.-10

24-Jun-11

08-Nov-11

11-Dec-10

23-Nov.-10

10-Feb-11

31-Mar.11

23-Dec-10

13-Dec.10

22-Dec-11

12-Mar-12

25-Feb-11

22-Dec-11

20-May-10

23-Jan-12

18-Jan-12

19-Mar-12

16-Apr-11

18-Dec-11

29-Dec-11

15-Aug-11

10-Aug-11

Net work

witch -ABC

Computers

Adepter from

Technocity

N/A N/A18-Aug-10

10,550.00 -

- N/A N/A - -

SLT Pvt Ltd N/A N/A 11,500.00 -

SLT Pvt Ltd N/A N/A 4,610.00 -

-21-Apr-12 21-Apr-12 03-Jun-12

-

Pilot, Narah,

Leader

statineries

N/A N/A 57,802.00

Office

Network Pvt

Ltd

N/A N/A 26,109.60 -

Metropolitan

Pvt LtdN/A N/A 9,184.00 -

Metropolitan

Pvt LtdN/A N/A 10,752.00 -

Sealine

Trading Pvt

Ltd and Narah

N/A N/A 57,244.16

Metropolitan N/A N/A 447,000.00

Ewis Pvt Ltd

Office

Network Pvt

N/A N/A 37,948.00 -

Metropolitan N/A N/A 13,776.00 -

Office

Network Pvt

Ltd

N/A N/A 12,768.00 -

John Keels N/A N/A 9,499.00 -

Metropolitan

Offcie Pvt LtdN/A N/A 9,184.00 -

Office

Network Pvt

Ltd

N/A N/A 16,170.00 -

N/A N/A

- N/A N/A - -

- N/A N/A - -

N/A N/A

N/A N/A

N/A N/A

Ygen

Advertising

solution

N/A N/A 14,000.00

Page 21: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

29-Aug-11

02-Sep-11

29-Sep-11

05-Mar-12

29-Dec-11

29-Dec-11

22-Dec-11

28-Jun-12

28-Mar-12

28-Jun-12

28-Jun-12

11-Jul-12

05-Jul-12

7-Sep-11

19-Mar-12

N/A N/A 07-Nov-11

N/A N/A 03-Sep-10

26-Aug.-10

N/A N/A 08-Sep-11

N/A N/A 09-Sep-11

N/A N/A 01-Sep-11

N/A N/A 01-Sep-10 58,100.00

N/A N/A 25-Dec-11 -

N/A N/A 15-Sep-11 -

Techno Form

Pvt LtdN/A N/A 6,100.00

Ygen

Advertising

solution

N/A N/A 247,051.00

Metropolitan

Computers/E

wis

information/A

bans

N/A N/A28-Oct-11

N/A N/A

Dialog Pvt Ltd N/A N/A 8,883.00

N/A N/A

N/A N/A

N/A N/A

Office

Network Pvt

Ltd

N/A N/A 16,500.00

N/A N/A

Jhon Kells

officeN/A N/A 19,800.00

Jhon Keels

Office

Automation

N/A N/A

16-Oct-11

N/A N/A12-Oct-11

STC Genaral

Trading PVT 393,188.00

PC house Pvt

Ltd 109,400.00

Jhon Kells

(Toshoba)

Page 22: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

N/A N/A 25-Feb-11 5,990.00

21-Feb-11

N/A N/A 07-Oct-11

N/A N/A 07-Oct-11

358,200.00

N/A N/A 07-Oct-11 1,749,000.00

N/A N/A 14-Nov-11

N/A N/A

25-Feb-11

N/A N/A 21-Feb-11

07-Oct-11

N/A N/A 14-Nov-11 1,835,814.00

N/A N/A 14-Nov-11 1,128,000.00

N/A N/A

07-Nov-11

N/A N/A 19-Mar-12

07-Nov-11

N/A N/A 07-Nov-11

N/A N/A 14-Nov-11

N/A N/A 14-Nov-11

N/A N/A 14-Nov-11

N/A N/A 14-Nov-11

N/A N/A 14-Nov-11

N/A N/A 14-Nov-11

14-Nov-11

Dialog Pvt Ltd

Abans PVT

LTD1,654,000.00

Jhon Kells

office

Metropoliton

Dialog Pvt Ltd 5,990.00

Abans PVT

LTD1,654,000.00

Metropoliton

Jhonkeels Pvt Ltd

Jhon Kells

office462,000.00

Debug

Computer 1,318,400.00

Dialog Pvt Ltd 10,980.00

Uniwakers Pvt

Ltd

Metropoliton

Bhoomi Tech 1,320,000.00

Survey and

Labotary Pvt

Ltd

1,230,000.00

N/A N/A

Page 23: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

14-Nov-11

14-Nov-11

10-Jue-2012

10-Jue-2012

10-Jue-2012

10-Jue-2012

10-Jue-2012

30-Jul-12

30-Apr-12

18-Apr-12

15-Feb-11 5,990.00

11-Feb-11

25-Feb-11 5,990.00

27-Feb-11

25-Feb-11 5,990.00

2/29/2011

06-Jun-11

1-Aug-11

15-Nov-11

06-Jun-11

6-Jul-11

15-Nov-11

06-Jun-11

28-Jul-11

15-Nov-11

06-Jun-11

N/A N/A

N/A N/A

N/A N/A

N/A N/A

N/A

N/A

N/A N/A

N/A N/A

Mangala show

roomN/A N/A

Dialog Pvt Ltd N/A N/A

Dialog Pvt Ltd N/A N/A

Dialog Pvt Ltd N/A N/A

CPC N/A N/A 252,000.00

CPC N/A N/A

CPC N/A N/A 2,612,520.00

CPC N/A N/A

CPC N/A N/A 2,160,000.00

CPC N/A N/A

CPC N/A N/A 1,526,400.00

Page 24: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

8-Aug-11

15-Nov-11

06-Jun-11

20-Jul-11

15-Nov-11

06-Jun-11

6-Aug-11

15-Nov-11

06-Jun-11

2-Jul-11

15-Nov-11

06-Jun-11

12-Jul-11

15-Nov-11

06-Jun-11

1-Jul-11

15-Nov-11

06-Jun-11

25-Jul-11

15-Nov-11

06-Jun-11

20-Aug-11

06-Jun-11

5-Aug-11

15-Nov-11

06-Jun-11

12-Jul-11

15-Nov-11

06-Jun-11

10-Jun-11

15-Nov-11

CPC N/A N/A 1,526,400.00

CPC N/A N/A

CPC N/A N/A 6,616,800.00

CPC N/A N/A

CPC N/A N/A 2,145,600.00

CPC N/A N/A

CPC N/A N/A 3,780,000.00

CPC N/A N/A

CPC N/A N/A 2,016,000.00

CPC N/A N/A

CPC N/A N/A 1,346,400.00

CPC N/A N/A

CPC N/A N/A 3,988,800.00

CPC N/A N/A

CPC N/A N/A 2,497,110.00

CPC N/A N/A 3,168,000.00

CPC N/A N/A

CPC N/A N/A 1,080,000.00

CPC N/A N/A

CPC N/A N/A 1,123,200.00

CPC N/A N/A

Page 25: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

06-Jun-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

30-Sep-11

30-Sep-11

15-Oct-11

17-Oct-11

7-Apr-11

4-May-11

25-Jul-12

18-Aug-11

3-Sep-11

21-Dec-11

5-Aug-11

15-Aug-12

16-Jan-12

Trintec N/A N/A 32,000.00

Abans Pvt Ltd N/A N/A 102,900.00

N/A N/A 27,750.00

DR Industries

Pvt LtdN/A N/A 136,086.02

Come Home

StatineriesN/A N/A 61,865.00

Trintec N/A N/A 57,500.00

Dialog Pvt Ltd N/A N/A 42,720.00

CPC N/A N/A

CPC N/A N/A 3,916,800.00

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

CPC N/A N/A

Page 26: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

8-Feb-12

16-Jan-12

8-Feb-12

24-Nov-11 24-Nov-11

48

16-Jan-12

8-Feb-12

16-Jan-12

8-Feb-12

16-Jan-12

8-Feb-12

16-Jan-12

8-Feb-12

31-May-12

15-Jun-12

31-May-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/A_ N/A

Bhoom Tech N/A N/A

Trintec N/A N/A 703,500.00

N/A 12,000.00 Trintec N/A

Trintec N/A N/A 60,000.00

Trintec N/A N/A 276,000.00

Trintec N/A N/A 105,000.00

Trintec N/A N/A 32,000.00

Page 27: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12

30-Jun-12N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

N/A N/A

N/A N/A

N/AN/A

Page 28: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 29: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 30: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 31: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 32: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 33: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 34: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 35: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 36: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 37: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 38: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 39: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 40: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80

Page 41: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 42: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 43: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 44: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 45: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 46: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 47: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 48: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 49: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 50: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 51: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 52: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 53: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 54: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 55: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 56: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 57: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 58: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 59: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 60: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 61: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 62: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 63: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 64: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 65: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 66: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 67: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 68: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 69: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 70: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 71: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 72: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 73: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 74: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 75: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 76: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 77: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 78: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 79: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 80: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 81: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 82: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 83: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 84: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 85: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 86: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 87: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 88: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 89: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 90: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 91: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 92: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 93: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 94: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 95: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 96: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 97: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 98: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 99: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 100: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 101: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 102: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 103: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 104: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 105: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 106: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 107: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 108: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 109: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 110: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 111: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 112: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 113: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 114: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 115: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 116: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 117: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 118: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 119: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 120: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 121: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 122: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 123: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 124: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 125: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 126: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 127: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 128: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 129: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 130: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 131: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 132: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 133: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 134: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 135: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 136: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 137: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 138: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 139: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 140: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 141: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 142: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 143: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 144: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 145: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 146: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 147: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 148: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 149: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 150: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 151: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 152: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 153: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 154: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 155: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 156: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 157: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 158: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 159: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 160: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 161: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 162: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 163: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 164: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 165: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 166: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 167: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 168: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 169: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 170: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 171: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 172: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 173: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 174: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 175: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 176: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 177: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 178: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 179: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 180: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 181: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 182: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 183: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 184: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 185: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 186: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 187: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 188: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 189: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 190: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 191: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 192: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 193: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 194: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 195: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 196: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 197: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 198: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 199: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 200: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 201: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 202: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 203: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 204: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 205: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 206: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 207: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 208: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 209: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 210: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 211: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 212: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 213: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 214: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 215: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 216: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 217: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 218: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 219: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 220: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 221: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 222: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 223: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 224: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 225: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 226: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 227: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 228: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 229: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80 80 80 80 80 80 80 80 80 80

Page 230: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 231: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 232: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 233: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 234: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 235: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 236: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 237: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 238: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

80

Page 239: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Ser

ial N

o.

Pac

kag

e N

o.

Des

crip

tio

n

Met

ho

d o

f P

rocu

rem

ent*

Qu

anti

ty (

Nu

mb

ers)

Pri

or/

po

st r

evie

w b

y

Ban

k**

LKR USD

0.0039 Post Review8NELSIP/S/NP/RPMU/M

/001

Hiring Vehicle - RPMU

(Mulathivu)NS 1 0.450

0.0039 Post Review7NELSIP/S/NP/RPMU/K

/001

Hiring Vehicle - RPMU

(KIlinochchi)NS 1 0.450

0.0039 Post Review6NELSIP/S/NP/RPMU/M

//001

Hiring Vehicle - RPMU

(Mannar)NS 1 0.450

0.0039 Post Review5NELSIP/S/NP/RPMU/J/

001

Hiring Vehicle - RPMU

(Jaffna)NS 1 0.450

0.0052 Post Review4NELSIP/S/NP/PMU/00

1Hiring Vehicle - PMU NS 1 0.600

0.041 Post Review3MEID/NELSIP/S/PCU/0

04Hiring Vehicle - PCU Stage ii NS 3 4.720

1.000 0.009 Post Review2MEID/NELSIP/S/PCU/0

03Hiring Vehicle - PCU Stage ii NS 2

0.004 Post Review

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

*** Indicate extensions/modifications etc.

Estimated Cost (Million)

1MED/NELSIP/S/PC

U/002Translation Services DC Items 0.500

GPN # and Date Published:

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

Update as of : (date) 31st July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting

PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES

Country/Borrower: Government of Sri Lanka

Project Name:North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for

the North and East Province )

Implementing Agency: Ministry of Economic Development

Page 240: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

0.0008 Post Review25NELSIP/NP/J/V

WPS/S/2Trasport of Bitumin NS 20250L 0.081

24NELSIP/NP/J/V

WPS/S/1Trasport of Bitumin NS 25200L 0.107 0.0008 Post Review

23NELSIP/NP/J/V

EPS/S/2Trasport of Bitumin NS 13500L 0.054 0.0005 Post Review

0.162 0.0013 Post Review22NELSIP/NP/J/V

EPS/S/1Trasport of Bitumin NS 47250

0.0009 Post Review21NELSIP/NP/J/V

SPS/S/2Trasport of Bitumin NS 27270L 0.109

20NELSIP/NP/J/V

SPS/S/1Trasport of Bitumin NS 26820L 0.097 0.0003 Post Review

19NELSIP/NP/J/P

PPS/S/2Trasport of Bitumin NS 40275L 0.161 0.0014 Post Review

0.069 0.0002 Post Review18NELSIP/NP/J/P

PPS/S/1Trasport of Bitumin NS 19080

0.0007 Post Review17NELSIP/NP/J/C

hPS/S/2Trasport of Bitumin NS 19800L 0.079

16NELSIP/NP/J/C

hPS/S/1Trasport of Bitumin NS 27000L 0.099 0.0009 Post Review

15NELSIP/NP/J/NaPS/

S/2Trasport of Bitumin NS 28323L 0.113 0.0010 Post Review

0.033 0.0003 Post Review14NELSIP/NP/J/NaPS/

S/1Trasport of Bitumin NS 8775L

0.0004 Post Review13NELSIP/NP/J/ChUC/

S/2Trasport of Bitumin NS 11586L 0.046

12NELSIP/NP/J/ChUC/

S/1Trasport of Bitumin NS 32656L 0.220 0.0018 Post Review

11NELSIP//NP/J/JAM

C/S/2Trasport of Bitumin NS 27630L 0.111 0.0010 Post Review

0.012 0.0001 Post Review10NELSIP//NP/J/JAM

C/S/1Trasport of Bitumin NS 3150L

0.0039 Post Review9NELSIP/S/NP/RPMU/V

U/001

Hiring Vehicle - RPMU

(Vavuniya)NS 1 0.450

Page 241: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

0.0017 Post Review44NELSIP/NP/MU/ME

PS/W/01Trasport of Bitumin NS 49200L 0.197

0.144 0.0013 Post Review43NELSIP/NP/MU/PU

PS/W/01Trasport of Bitumin NS 36000L

0.0014 Post Review42NELSIP/NP/MU/KT

PS/S/01Trasport of Bitumin NS 40477L 0.162

0.167 0.0015 Post Review41NELSIP/NP/KI/KAP

S/S/1Trasport of Bitumin NS 41625L

0.0016 Post Review40NELSIP/NP/KI/PPPS

/S/1Trasport of Bitumin NS 46710L 0.187

0.127 0.0011 Post Review39NELSIP/NP/KI/P0PS

/S/1Trasport of Bitumin NS 31860L

0.0010 Post Review38NELSIP/NP/MN/M

WPS/S/1Trasport of Bitumin NS 29400L 0.118

Post Review37NELSIP/NP/MN/NA

PS/S/1Trasport of Bitumin NS 85446L 0.342 0.0030

36NELSIP/NP/MN/MU

PS/S/1Trasport of Bitumin NS 16514L 0.066 0.0006 Post Review

35NELSIP/NP/MN/MN

PS/S/1Trasport of Bitumin NS 9000L 0.036 0.0003 Post Review

0.017 0.0000 Post Review34NELSIP/NP/VU

/VSTPS/S/1Trasport of Bitumin NS 48900L

0.0011 Post Review33NELSIP/NP/J/K

YPS/S/2Trasport of Bitumin NS 30915L 0.124

32NELSIP/NP/J/K

YPS/S/1Trasport of Bitumin NS 14490L 0.053 0.0006 Post Review

31NELSIP/NP/J/K

RPS/S/2Trasport of Bitumin NS 27000L 0.110 0.0010 Post Review

0.051 0.0004 Post Review30NELSIP/NP/J/K

RPS/S/1Trasport of Bitumin NS 13500L

0.0015 Post Review29NELSIP/NP/J/D

ELPS/S/2Trasport of Bitumin NS 43800L 0.173

28NELSIP/NP/J/D

ELPS/S/1Trasport of Bitumin NS 38700L 0.160 0.0013 Post Review

27NELSIP/NP/J/V

SWPS/S/2Trasport of Bitumin NS 10373L 0.041 0.0004 Post Review

0.187 0.0016 Post Review26NELSIP/NP/J/V

SWPS/S/1Trasport of Bitumin NS 49860L

0.0008 Post Review25NELSIP/NP/J/V

WPS/S/2Trasport of Bitumin NS 20250L 0.081

Page 242: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

0.010 Post Review48NELSIP/S/EP/PMU/00

3

Hiring Vehicle - PMU (Stage

ii)NCB 1 1.200

0.0004 Post Review47NELSIP/S/EP/PMU/

02Creation of Web site NS 1 0.050

0.042 Post Review46NELSIP/S/EP/PMU/00

1

Hiring Vehicle - PMU (Stage

1)NCB 5 4.800

0.180 0.0016 Post Review45NELSIP/NP/MU/TU

PS/W/01Trasport of Bitumin NS 45000L

Page 243: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Credit/ #: 4728 LK

Sta

ge

Su

bm

it D

BD

wit

h IF

B f

or

Ban

k's

N/O

Pu

blis

h IF

B in

Nat

ion

al

new

spap

ers

and

UN

DB

Dea

dlin

e fo

r su

bm

issi

on

of

bid

s

Su

bm

it B

ER

fo

r B

ank'

s

N/O

Nam

e &

Nat

ion

alit

y o

f

con

trac

tor

Su

bm

it s

ign

ed c

on

trac

t

cop

y to

Ban

k

Date Currency Value

Planned 10-Feb-10 N/A 03-Mar-10

Actual

Planned 21-Jun-10 N/A 06-Jul-10

Actual 05-Jul.-10 12-Aug.-10

Planned 21-Jan-11 N/A 10-Feb-11

Actual 12-Jan-11 04-Mar.-11

Planned 01-Feb-11 18-Feb-11

Actual 14-Feb-11 01-Mar-11

Planned 01-Apr-11 18-Apr-11

Actual 29-Apr-11 01-May-11

Planned 07-Feb-11 16-Mar-11

Actual 21-Feb-11 01-Apr-11

Planned 14-Feb-11 25-Apr-11

Actual 28-Mar-11 09-May-11

Planned 28-Feb-11 18-Apr-11

Actual 11-Mar-11 02-May-11

on actual

used KM

Mr..K.

PartheepanN/AN/A N/A N/A LKR

on actual

used KM

Mr.P.Thabees

waranN/AN/A N/A N/A LKR

on actual

used KM

Mr.N.Krishna

kumarN/AN/A N/A N/A LKR

on actual

used KM

Mr.Satheesku

marN/AN/A N/A N/A LKR

on actual

used KM

Mr.S.Jeyakum

aN/AN/A N/A N/A LKR

Sakvin Tours

& rent a Car

service

N/AN/A N/A LKR

On

Actual/Monthly

base

on actual

used KM

Sakvin Tours

& rent a Car

service

N/AN/A N/A LKR

N/AN/A N/A LKR

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

*** Indicate extensions/modifications etc.

Signing of contract

5th April 2010

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting

PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for

the North and East Province )

Ministry of Economic Development

Page 244: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Planned 24-Feb-11 15-Mar-11

Actual 29-Apr-11 10-Oct-11

Planned 12-May-11 19-May-11

Actual 24-Jun-11 02-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 30-Jun-11 05-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 07-Jul-11 15-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 20-Jul-11 27-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 27-Jul-11 04-Aug-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 29-Jul-11 05-Aug-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 20-Jun-11 27-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 01-Jun-11 08-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

CPC N/AN/A N/A LKR

N/AN/A N/A N/A LKR 94,500.00 Kajamugan

Transport

N/A LKR CPC N/AN/A

LKR 170,625.00 AM Transport

IRUPALAIN/AN/A N/A N/A

CPC N/AN/A N/A LKR

N/AN/A N/A N/A LKR 96,850.00

Narayana

transportJaffn

a

N/A LKR CPC N/AN/A

LKR 69,069.00 AM Transport

IRUPALAIN/AN/A N/A N/A

CPC N/AN/A N/A LKR

N/AN/A N/A N/A LKR 97,500.00

Narayana

transportJaffn

a

N/A LKR CPC N/AN/A

LKR 33,075.00 Kajamugan

TransportN/AN/A N/A N/A

CPC N/AN/A N/A LKR

N/AN/A N/A N/A LKR 219,451.00 Easwaran

Traders Jaffna

N/A LKR CPC N/AN/A

LKR 11,655.00 AM Transport

IRUPALAIN/AN/A N/A N/A

on actual

used KM

Mr.k.Kirushna

kumarN/AN/A N/A N/A LKR

Page 245: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Actual

Planned 12-May-11 19-May-11

Actual 15-Jul-11 21-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 12-Jul-11 19-Jul-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 16-Jun-11 23-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 01-Jun-11 07-Jun-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 12-May-11 19-May-11

Actual 26-Jul-11 03-Aug-11

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 01-Nov-11 N/A 08-Nov-11

ActualCPC N/AN/A N/A LKR

CPC N/AN/A N/A LKR

CPC N/AN/A N/A LKR

CPC N/AN/A N/A LKR

CPC N/AN/A N/A LKR

CPC N/AN/A N/A LKR

CPC N/AN/A N/A LKR

N/AN/A N/A LKR CPC

N/A N/A LKR CPC N/A

N/A LKR CPC N/AN/A

LKR 116,960.00 JANUFIYA

TransportN/AN/A N/A N/A

CPC N/AN/A N/A LKR

N/AN/A N/A N/A LKR 52,650.00 S.T.Paramesw

aran Transport

N/A LKR CPC N/AN/A

LKR 50,625.00 Kajamugan

TransportN/AN/A N/A N/A

CPC N/AN/A N/A LKR

N/AN/A N/A N/A LKR 160,600.00 AM Transport

IRUPALAI

N/A LKR CPC N/AN/A

LKR 186,975.00 S.T.Paramesw

aran TransportN/AN/A N/A N/A

CPC N/AN/A N/A LKR

Page 246: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Planned 01-Nov-11 N/A 08-Nov-11

Actual

Planned 11-Feb-11 N/A 01-Mar-11

Actual 14-Feb-11 06-May-11

Planned 26-Aug-11 02-Sep-11

Actual

Planned 11-Sep-11 N/A 21-Sep-11

Actual

N/AN/A N/A LKR

N/AN/A N/A N/A LKR

Mr.Sutharas

an,K,Sivakua

mar,K.Umas

hankar,S.W.

N/AN/A N/A LKR On Actual

usage KM

CPC N/AN/A N/A LKR

Page 247: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Pu

blis

h c

on

trac

t aw

ard

no

tice

in U

ND

B &

Nat

ion

al

new

spap

ers

Co

mp

leti

on

of

con

trac

t

Exp

end

itu

re in

curr

ed t

o

dat

e

Sta

tus/

Rem

arks

***

21-Feb-12

02-Jan-11

7-Mar-11

10-Feb-12

06 Mar.-12

18-Aug-11

31-Aug-11

18-Oct-11

01-Nov-11

16-Sep-11

01-Mar-12

25-Oct-11

19-Nov-11

18-Oct-11

N/A 311,960.00

N/A 313,914.00

N/A 318,311.00

N/A 603,750.00

N/A 1,195,440.00

N/A 1,403,792.00

N/A 638,625.00

N/A 205,527.00

5th April 2010

PROCUREMENT PLAN FOR NON-CONSULTANT SERVICES

Page 248: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

31-Mar-11

06-Jun-11

01-Aug-11

15-Nov-11

06-Jun-11

06-Jul-11

15-Nov-11

06-Jun-11

15-Jul-11

15-Nov-11

06-Jun-11

28-Jul-11

15-Nov-11

06-Jun-11

08-Aug-11

15-Nov-11

06-Jun-11

06-Aug-11

15-Nov-11

06-Jun-11

02-Jul-11

15-Nov-11

06-Jun-11

12-Jul-11

15-Nov-11

N/A

N/A 94,500.00

N/A

N/A 170,625.00

N/A

N/A 96,850.00

N/A

N/A 69,069.00

N/A

N/A 97,500.00

N/A

N/A 33,075.00

N/A

N/A 219,451.00

N/A

N/A 11,655.00

N/A 253,804.00

Page 249: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

06-Jun-11

25-Jul-11

15-Nov-11

06-Jun-11

05-Aug-11

15-Nov-11

06-Jun-11

12-Jul-11

15-Nov-11

06-Jun-11

10-Jun-11

15-Nov-11

06-Jun-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11

15-Nov-11N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A 116,960.00

N/A

N/A 52,650.00

N/A

N/A 50,625.00

N/A

N/A 160,600.00

N/A

N/A 186,975.00

N/A

Page 250: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

15-Nov-11

05-May-12

05-May-12

07-Dec-11

15-Oct-12N/A

N/A

N/A

N/A

Page 251: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD

1 2 3 4 5 6.00 7 8

Prior Review5 MED/NELSIP/C/PCU/008 Internal Audit LCS Lumpsum 15.00 0.1304

3.00 0.0261 Prior Review4 MED/NELSIP/C/PCU/005Consultancy service for

Training Need Assessment CQS Lumpsum

1.50 0.0130 Post Review3 MED/NELSIP/C/PCU/004 Financial Manual for LAs IC Lumpsum

0.1739 Prior Review2 MED/NELSIP/C/PCU/002

LA Survey for Northern and

Eastan Province and HH

survey for Eastern province

SS Lumpsum 20.00

0.0174 Prior Review1 MED/NELSIP/C/PCU/001Social Impact Assessment

(SIA)QCBS Lumpsum 2.00

Prio

r/p

ost

rev

iew

by

Ba

nk

**

Seria

l n

o.

RF

P N

o.

Desc

rip

tio

n

Meth

od

of

Sele

cti

on

*

Lu

mp

sum

/Tim

e B

ase

d

Estimated Cost (Million)

Update as of : (date) 31st July 2012

* QCBS-Quality & Cost Based; QBS-Quality Based; FBS-Fixed Budget; LCS-Least Cost; CQ-Consultant's Qualifications; SSS-Single Source Selection; IC-Individual Consultant; IC(S)-Sole Source IC

** For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25

*** Indicate extensions/modifications etc.

Implementing Agency: Ministry of Economic Development

GPN # and Date Published:

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

PROCUREMENT PLAN FOR CONSULTANT SERVICES

Country/Borrower: Government of Sri Lanka

Project Name:North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and

Small Twonship Development Initiative for the North and East Province )

Page 252: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

4.10 0.0357Prior

Review12

NELSIP/C/EP/TR/GOP

S//01

Preperation of designed

and estimate of

Watersupply scheme at

Gomarankadawala Town

Area

SS Lumpsum

0.0357Prior

Review11

NELSIP/C/EP/BT/EUC/

01

Preparation of Master

Plan for Eravur UC

Area

SS Lumpsum 4.10

3.00 0.026 Prior

Review10

NELSIP/C/EP/BT/MC/0

2

Preparation of Master

Plan for Kallady Area

Drainage System

SS Lumpsum

0.0217Prior

Review9

NELSIP/EP/C/BT/MC/0

1

Preparation of Master

Plan for Iruthayapuram

Drainage System In

Batticallo area

SS Lumpsum 2.50

Prior

Review8

NELSIP/EP/C./BT/KUC

//01

Preparing Drainage

Master Plan to Entire

Kattankudy Division

SS Lumpsum 3.69 0.0321

0.0235Prior

Review7

NELSIP/C/EP/TR/KIUC

//001/

Preparation of Master

plan for storm water

drainage system for

Kinniya

SS Lumpsum 2.70

0.0174 Prior Review

Prior Review

6 MED/NELSIP/C/PCU/009Developing of Accounting

Software PakageQCBS Lumpsum 2.00

5 MED/NELSIP/C/PCU/008 Internal Audit LCS Lumpsum 15.00 0.1304

Page 253: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Date Currency

9 10 11 12 13 14 15 16 17 18

Planned 15-Jan-10 05-Feb-10 12-Feb-10 15-Mar-10 29-Mar-10 05-Apr-10 12-Apr-10 19-Apr-10

Actual 20-Nov.-09 28-Dec.-09 19-Jan.-10 08-Feb.-10 10-Mar.-10 10-Mar.-10 31-Mar.-10 12-May-10

Planned 27-Feb-11 09-Mar-11 08-Apr-11 08-May-11 19-May-11

Actual 02-Feb-11 05-Jul-11 04-Aug-11 15-Nov-11 10-Jan-12

Planned 10-Mar-10 24-Mar-10 N/A 23-Apr-10

Actual 11-Mar.-10 19-Mar.-10 22-Apr.-10

Planned 29-Nov-11 27-Dec-11 06-Jan-12 06-Feb-12 07-Mar-12 16-Mar-12

Actual -

Planned 29-Jul-11 28-Aug-11 07-Sep-11 07-Oct-11 06-Nov-11 15-Nov-11 25-Nov-11 06-Dec-11

LKR

N/A N/A LKR

N/A LKRN/A N/A N/A

N/A N/A N/A LKR

LKR

Su

bm

it T

ER

fo

r B

an

k's

N/O

Op

en

ing

of

fin

an

cia

l p

ro

po

sals

Su

bm

itC

ER

&in

itia

led

dra

ft

neg

oti

ate

d c

on

tra

ct

for B

an

k's

N/O Signing of Contract

Sta

ge

Pu

bli

sh N

oti

ce f

or E

OI

Su

bm

itsh

ortl

ist

an

dd

ra

ftR

FP

for

Ba

nk

's N

/O

Issu

e R

FP

to

sh

ortl

iste

d f

irm

s

Dea

dli

ne

for

sub

mis

sio

no

f

pro

po

sals

31st July 2012

* QCBS-Quality & Cost Based; QBS-Quality Based; FBS-Fixed Budget; LCS-Least Cost; CQ-Consultant's Qualifications; SSS-Single Source Selection; IC-Individual Consultant; IC(S)-Sole Source IC

** For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25

*** Indicate extensions/modifications etc.

Ministry of Economic Development

5th April 2010

PROCUREMENT PLAN FOR CONSULTANT SERVICES

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and

Small Twonship Development Initiative for the North and East Province )Credit #: 4728LK

Page 254: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Actual 08-Aug-11 02-Oct-11 22-Nov-11 22-Dec-11 24-Feb-12 01-Mar-12 19-Mar-12 16-Apr-12

Planned 30-May-12 13-Jun-12 23-Jun-12 23-Jul-12 12-Aug-12 20-Aug-12 27-Aug-12 03-Sep-12

Actual

Planned 30-Sep-11 10-Oct-11 09-Nov-11 09-Dec-11 19-Dec-11

Actual 19-Oct-11 13-Oct-12 11-Nov-12 30-Apr-12 02-May-12

Planned 26-Apr-12 10-May-12 9-Jun-12 21-Jun-12

Actual 08-Jun-12

Planned 26-Apr-12 10-May-12 9-Jun-12 21-Jun-12

Actual 08-Jun-12

Planned 26-Apr-12 10-May-12 9-Jun-1209-Jul-12

Actual 08-Jun-12

Planned 26-Apr-12 10-May-12 9-Jun-1209-Jul-12

Actual 08-Jun-12

Planned 23-Jul-12 06-Aug-12 05-Sep-1225-Sep-12

Actual

N/A LKRN/A N/A N/A

LKRN/A N/A N/A N/A

LKR LKRN/A N/A N/A

LKRN/A N/A N/A N/A

N/A N/A N/A N/A LKR

N/A N/A N/A LKR

LKR

LKR

Page 255: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

Value

19 20 21 22 23 24 25

19-Apr-10 18-Jul-10

12-May-10

21-May-11 06-Oct-11

N/A 20-Sep-10 900,000

15-Sep.-10

18-Mar-12 17-May-12

Suspended

due to Works

Done by PCU

- -

06-Dec-11 N/A 05-Dec-13

4,600,000 PricewaterCoo

pers Pvt Ltd

N/A

900,000

Mr.

Balasubraman

iyam

N/A

4,737,090 IPS N/A 947,000

Contact

implimented

Only for LA

survey

(Task 2)

1,792,433 1,792,433 EML, Pvt Ltd N/A

Pu

bli

shC

on

tra

ct

Aw

ard

inU

ND

B

& N

ati

on

al

new

spa

pers

Co

ntr

act

Co

mp

leti

on

Ex

pen

dit

ure i

ncu

rred

to

da

te

Sta

tus/

Rem

ark

s *

**

Signing of Contract

Na

me/n

ati

on

ali

ty o

f th

e c

on

sult

an

t

Su

bm

itsi

gn

ed

co

ntr

act

co

py

to

Ba

nk

31st July 2012

* QCBS-Quality & Cost Based; QBS-Quality Based; FBS-Fixed Budget; LCS-Least Cost; CQ-Consultant's Qualifications; SSS-Single Source Selection; IC-Individual Consultant; IC(S)-Sole Source IC

** For post review, fill in columns 1 to 8, 10, 12 & 13, 15, 17 to 20, and 22 to 25

*** Indicate extensions/modifications etc.

Ministry of Economic Development

PROCUREMENT PLAN FOR CONSULTANT SERVICES

Government of Sri Lanka

Credit #: 4728LK

Page 256: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

22-May-12

03-Sep-12 N/A 02-Dec-12

21-Dec-11 18-Mar-12

01-Sep-12

19-Oct-12

19-Sep-12

07-Oct-12

07-Oct-12

13-May-13

NW@DB N/A N/A

SLLRDC N/A N/A

SLLRDC N/A N/A

SLLRDC N/A N/A

SLLRDC N/A N/A

2.43 SLLRDC N/A

4,600,000 PricewaterCoo

pers Pvt Ltd

Page 257: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Planned 11-Jul-11 13-Oct-11

Actual 2-Aug-11 31-Oct-11

Planned 11-Jul-11 13-Oct-11

Actual 2-Aug-11 10-Nov-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 24-Jan-12 17-Feb-12 27-Mar-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 24-Jan-12 17-Feb-12 26-Mar-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 24-Jan-12 17-Feb-12 27-Mar-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 24-Jan-12 17-Feb-12 26-Mar-12

7.20 0.062608696 Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

N/A - 0.0435 Post Review N/A LKR

N/A -

12 NELSIP/NP/J/JAMC/W/12

Reconstruction of Water tank 1St. &

3ed. Cross road ,Sinnakkadai 4th Cross

Street & Kondady Veethy with drainge

Jaffna MC Jaffna MC

7.20

NCB 6.30

LKR

N/A LKR0.04348 Post Review

0.05 Post Review N/A11 NELSIP/NP/J/JAMC/W/11

Reconstruction of Odai Veethy

,Sivappirakasam Veethy & Bylanes

,Thalaiyali Veethy, College Lane

Jaffna MC Jaffna MC NCB

-

10 NELSIP/NP/J/JAMC/W/10

Reconstruction of Bharathy Veethy

&bylanes ,stanley lane and

perinpanayakam Road

Jaffna MC Jaffna MC NCB

0.054782609

N/A -

LKR

N/ALKR

N/A6.30

Post Review N/A

Post Review N/A9 NELSIP/NP/J/JAMC/W/09

Reconstruction of Mavadi Vairavar

kovil veethy, Kamel veethy with channel

and Drainage

Jaffna MC Jaffna MC NCB

8 NELSIP/NP/J/JAMC/W/08

Reconstruction of jinna road,Asath veethy

, kaathiapupakkar veethy , Ithuris Makka

Veethy with Drainage and culvert

Jaffna MC Jaffna MC NCB 7.20 0.06 -

LKR N/A - 7 NELSIP/NP/J/JAMC/W/07

Reconstruction of Chedyar thoddam

Veethy and Construction of Culvert and

Reconstruction of Murugesar Veethy

Jaffna MC Jaffna MC NCB Post Review N/A

N/AN/APost Review0.03626087NCB

Jaffna MC 0.04373913 Post Review N/A LKR5.03

0.035304348 N/ALKR 5.20

0.039478261 Post Review

N/APost Review

3.99

3.39

N/A

Star Construction N/A

Star Construction 2.51

5.20Shiram

Construction

4.54

Jaffna MC

NCB

NELSIP/NP/J/JAMC/W/04 Jaffna MC

NCB

NCB 4.06

6.30

NELSIP/NP/J/JAMC/W/03Reconst. Of main channel retaining wall

from Thiyoku Nursary schoolJaffna MC Jaffna MC

NELSIP/NP/J/JAMC/W/05Const. of Anjuthankulam outlet channel,

retaining wall and culvertJaffna MC

NELSIP/NP/J/JAMC/W/06

N/A

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

1.06

4.50 N/A N/A

CC

CC

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Green King

Gurunar

Community Center

N/A N/A 1.06 N/A

N/A

Post Review0.011478261 N/A

0.009217391Colombothurai

Community CenterN/A

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Jaffna MC Jaffna MC

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

2

3

4

NELSIP/NP/J/JAMC/W/01(JA

MC -2) 1.32

4.17

Jaffna MC

Jaffna MCJaffna MC

Jaffna MC

Ministry of Economic Development Implementing Agency:

Signing of contract

NELSIP/NP/J/JAMC/W/01(JA

MC -1)1 LKR 1.06 Post Review

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

5

Construction of Tar road at

Vasanthapuram 1st $ 2nd Lane at Jaffna

MC area

Reconstruction of Drainage at Sippithatai

lane at Jaffna MC area

Mettaling & Tarring Vidan's lane and By

lanes and construction & reconst. of

channel and retaining wall

Mettaling & Tarring Nallur Thurka lane

& Surrounding

6

LKR 1.32

LKR

Shiram

Construction

3.50

LKR 4.24 4.20

Page 258: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 2-May-2011 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual ########## 3-Jun-11 23-Jun-11 2-Aug-11 31-Oct-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 23-Jun-11 2-Aug-11 10-Nov-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 17-Jan-12 13-Feb-12 28-Mar-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 4-Jun-11 28-Jun-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 29-Mar-2012 24-Apr-2012 16-May-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012 23-Jul-2012

LKR 5.877 Ranjan Contractor N/ANCB 7.40 0.064347826 Post Review N/A

N/A -

24 NELSIP/NP/J/ChPS/W/05Mettaling & Tarring Ammakadai Road

2nd StageChavakachcheri PS

Chavakachcheri

PS

6.30 0.0435 Post Review N/A LKR15 NELSIP/NP/J/JAMC/W/15

Recosntruction of Hindu ladies lane,

Aththysoodi Veethy, Convent lane and

Gana Vairavar Front lane

Jaffna MC Jaffna MC

-

NCB

LKR N/A - NCB

5.40NCB

N/A6.30 0.0435 Post Review

13 NELSIP/NP/J/JAMC/W/13Reconstruction of Drainage at Convent

road & Mathiyas Veethy Jaffna MC Jaffna MC

14 NELSIP/NP/J/JAMC/W/14

Reconstruction of Suvamiar Veethy

Uppukulam Veethy with cross street &

Reclamation Road

Jaffna MC Jaffna MC

0.0374 Post Review N/A LKR N/A

Reconst. Of Ammakadai Veethyat

Chavakachcheri PS area

Reconst. Of Navalkuli West Koolarupitty

Road at Chavakachcheri PS area

Krishna

Contractors

N/A

Post Review

LKR 3.49 Turbo Group

Construction

Krishna

Contractors21

N/A

N/A

0.036434783NCB

Chavakachcheri

PS

Post Review

Post Review

Const. of Paththiniyar Thuravu Road Chavakachcheri UC

Reconst Ariyalai South East Manipuri

Veethy at Nallur PS areaNallur PS

NELSIP/NP/J/NaPS/W/02 Const. of Kerniyady Road Nallur PS

Nallur PS

Nallur PS

N/A

-

N/A

Chavakachcheri PSChavakachcheri

PS

0.065217391

NCBChavakachcheri PS

Prior Review

4.25

4.40

0.061826087

NCB

NCB

NCB

NCB

0.046434783

0.036

Chavakachcheri

UCNCB 7.50 NELSIP/NP/J/ChUC/W/03

Chavakachcheri

PSChavakachcheri PS

N/A

N/A

N/A

N/A

NELSIP/NP/J/NaPS/W/05(Na

PS-1)

16

17

19

NELSIP/NP/J/ChUC/W/03(Ch

UC-1)

NELSIP/NP/J/ChUC/W/04(Ch

UC-2)Chavakachcheri UC

Chavakachcheri

UC

Chavakachcheri

UC

NCB

NELSIP/NP/J/ChPS/W/06(Ch

PS-1)

NELSIP/NP/J/ChPS/W/07(Ch

PS-2)

NELSIP/NP/J/ChPS/W/08(Ch

PS-3)

Chavakachcheri UC

18

23

22

20

Reconst. Of Kalvayal Ramalingam Old

School Joint Road at Chavakachcheri UC

area

Reconst. Of Meesalai West Kerniyadi

Veethy at Chavakachcheri UC area

Reconst. Of Mirusuvil Hospital Front

Veethy at Chavakachcheri PS area

Post Review

LKR 2.98

LKR 3.32

LKR

Kamiska Civil

Engeeniring

Turbo Group

Construction

Selvam Engineers

Acme Construction

3.76

5.94

LKR 4.47

5.42

LKR 5.53

0.065478261

N/A

Turbo Group

Construction

Post Review

Post Review

N/A

Post Review

N/A

LKR

LKRN/A

N/A0.036956522

0.03826087

5.94

5.42

2.98

3.32

3.49

4.47

4.60

5.34

7.11

4.19

4.14

7.53 N/A

Page 259: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10.06.2011 1-Jul-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10.06.2011 1-Jul-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 21-Feb-2012 16-Mar-2012 23-Apr-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 21-Feb-2012 16-Mar-2012 20-Apr-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 21-Feb-2012 16-Mar-2012 23-Apr-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 21-Feb-2012 16-Mar-2012 23-Apr-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 29-Jun-11 1-Aug-11 31-Dec-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 29-Jun-11 1-Aug-11 31-Dec-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 6-Feb-2012 1-Mar-2012 21-Mar-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 29-Jun-11 2-Aug-11 1-Nov-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 29-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 29-Jun-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

LKR N/A - Mettaling & Tarring Kerudavil Amman

Kovil RoadPoint Pedro PS Point Pedro PS 0.07826087 Post Review N/A

1.85

Krishna

Contractors

1.85 34 NELSIP/NP/J/VdSWPS/W/03Reconst. Of Maththoni public market

Road

LKRPost Review N/A0.038608696

Vali South PS

Vali South PS

Vada South

West PS

Vali South PS

Post ReviewVada South

West PS

Point Pedro PS

NCB

NELSIP/NP/J/PPPS/W/05 Reconstruction of Poomagal road

NELSIP/NP/J/PPPS/W/04

NELSIP/NP/J/VSPS/W/13(VS

PS-1)

NELSIP/NP/J/PPPS/W/06)Reconstruction of Periyathevanaththai

Road

Reconst. Of Kampavaththai internal

Roads

Shiriraam

Construction

NELSIP/NP/J/VSPS/W/14(VS

PS-2)

Reconst of Uruththiravattai School

Veethy at Pointpedro PS area

Point Pedro PS

Point Pedro PS

Enthys

ConstructionN/A

N/A

NCB

Post Review

Vali South PS

Pointpedro PS

Vali South PS

NCB

Point Pedro PS

NCB

NCB 9.00

-

NCB

Vada South West PS

NCB

NCB

NCBVali South PS

NCB

Vali South PS

Vali South PS

Point Pedro PS

Vada South West PS

Pointpedro PS

Pointpedro PS

Point Pedro PS

Vada South West PS

Point Pedro PS

Point Pedro PS

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NELSIP/NP/J/PPPS/W/09(PP

PS-1)

NELSIP/NP/J/VdSWPS/W/12(

VdSWPS-2)

NELSIP/NP/J/VdSWPS/W/11(

VdSWPS-1)

NELSIP/NP/J/PPPS/W/10(PP

PS-2)

NELSIP/NP/J/PPPS/W/03

NELSIP/NP/J/PPPS/W/07

NELSIP/NP/J/VSPS/W/15(VS

PS-3)

NELSIP/NP/J/VSPS/W/0438

30

36

27

31

33

35

32

28

Reconstruction of Kulanai Road at Vada

South West PS area

29

Reconstruction of Kudakkamparai

internal Road

Reconst. Of Kadakarampai Cemetry Road

at Vali South PS area

Reconst. Kali Kovil Veethy at Vali South

PS area

Reconst. Of Thikkam School Veethy at

Pointpedro PS area

37

25

26

Reconst.of Sabapathipillai Road

Reconstruction of Miththil Sembadu Road

at Vada South West PS area

Reconst. Of Malvam 3rd Cross Road at

Valisouth PS area

NCB

NCB

NCB

0.02

N/A 7.97

Post Review

Post Review

Post Review

Post Review N/A

Post Review

LKR

Post Review LKR

LKR

Post Review

N/A

Post Review

Post Review

N/A

N/A

N/A

N/A

N/A

N/A

N/A

Global

Construction

Kavinsan

Construction

Global

Construction

Global

Construction

Jana Agency

Jana Civil Works

Sri Ram Civil

Engineering

Construction

1.91 Kavinsan

Construction

LKR 5.81

LKR

7.28

6.15

LKR

N/A

6.93

LKR

2.87 LKR

LKR

2.95

LKR 6.92

4.12

LKR

0.056434783

0.037391304

0.022173913

0.045130435

0.068521739

0.050869565

0.034956522

0.034956522

0.02973913

0.038173913

0.026086957

3.65

Jana Civil

Engineering

Construction

LKR 2.19

2.95

6.23

5.81

2.67

4.54

4.24

2.19

5.81

2.87

3.65

1.91

4.44

2.30

2.55

3.00

4.30

4.02

5.85

3.42

Pointpedro PS

5.19

4.39

7.88

4.02

6.49

NCBVada South

West PSPost Review N/A

KNS Construction

Page 260: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 27-Apr-12 22-May-12 11-Jun-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 27-Apr-12 22-May-12 18-Jun-12

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 17-Jan-12 13-Feb-12 3-Apr-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 18-Feb-2012 14-Mar-2012 23-Apr-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10-Jun-11 1-Jul-11 2-Aug-11 28-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10-Jun-11 1-Jul-11 2-Aug-11 1-Nov-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 2-Feb-2012 28-Feb-2012 27-Mar-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 2-Feb-2012 28-Feb-2012 26-Mar-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 2-Feb-2012 28-Feb-2012 27-Mar-2012

0.0704 Post Review N/ANELSIP/NP/J/VSPS/W/06Mettaling & Tarring Nagathampiran

VeethyVali South PS Vali South PS NCB 9.90

Reconst. Of Kooththancheema Road Vali North PS Vali North PS NCB

Vali North PS Vali North PS

0.054173913 Post Review

Post Review 0.90

N/A 5.80 N/A

N/A N/A

2.48

Jupiters

Construction3.06

N/A

3.17

Vali West PS Vali West PS

Vali East PS

Reconst. Of Vanniyasingam Veethy at

Valieast PS area

N/A3.17

N/A

NCB

6.15

5.64

Sugantha civil

contractors8.53

Krishna

Contractors

4.92

Visvakaran(PVT)Li

mited

Seelan Brothers

Civil Engineering

Enthys

Construction

Post Review

6.95

Vali West PS

Reconst .of Thanipanaiyaddi Veethy at

Vali East PS area

Reconst. Of Ponnipulam Road

Reconst. Of vellijampathy Road

Reconst of Nochchiampathy Patchanthai

Veethyat Vali West PS area

Vali South PS

5.74

-

N/A

N/A

NCB

Vali North PS

Vali West PS

NCBVali East PS

Vali East PSVali East PS

NCB

Vali East PS

Vali South PS

Vali South PS

Vali South PS

Vali East PS

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

NELSIP/NP/J/VSPS/W/04

NELSIP/NP/J/VSPS/W/05

NELSIP/NP/J/VNPS/W/04

NELSIP/NP/J/VEPS/W/16(VE

PS-1)

NELSIP/NP/J/VEPS/W/17(VE

PS-2)

NELSIP/NP/J/VWPS/W03

NELSIP/NP/J/VWPS/W/19(V

WPS-2)

NELSIP/NP/J/VNPS/W/05

NELSIP/NP/J/VEPS/W/04

47

50

48

51

45

49

NELSIP/NP/J/VNPS/W/21(V

NPS-1)

NELSIP/NP/J/VNPS/W/22(V

NPS-2)

46

NELSIP/NP/J/VNPS/W/03

38

44

52

40

Reconst. Of Sellappa Maniyakaaran

Veethy

NELSIP/NP/J/VEPS/W/18(VE

PS-3)

NELSIP/NP/J/VWPS/W/19(V

WPS-1)

39

41

42

43

Reconst.of Sabapathipillai Road

Re-Construction of Pallasuddi Road

Reconst. Of old post office veethy

Reconst. Of Kopay Kiluvanai Veethy at

Vali East PS area

Reconst. Of Ponnaiya Veethy at Vali

North PS area

Reconst. Kuddiyapulam cemetry veethy at

Vali North PS area

Reconst. Chulipuram Periya Thampiran

Veethy at Vali West PS area

NCB

NCB

Vali North PS

Vali North PS

NCB

Vali North PS

Vali North PS

Vali East PS

Vali West PS

Vali East PS

Vali North PS

NCB

NCB

NCBVali West PS

NCB

NCB

NCB 0.037130435

5.48

N/A

N/A

N/A 7.97

N/A

LKR

LKR

7.40

N/A

Post Review

N/A

N/A

Post Review

Post Review

N/APost Review

Post Review

LKR

LKR

LKR

LKR

LKR

Post Review

Post Review

Post Review

N/A

N/A

Post Review

Post Review

Post Review

A Group

Construction

&Consults

LKR 3.06

Jupiters

Construction

Karthiga

Contractors

4.10

Seelan Brothers

Civil Engineering

LKR

6.10

6.00

LKR 5.86 Jupiters

Construction

A Group

Construction

&Consults

LKR

LKR0.031478261

0.056434783

0.051686957

0.052173913

0.042782609

0.058956522

0.063130435

0.085391304

0.031652174

0.049913043

0.076086957

0.060434783

LKR

LKR

N/A

LKR

Kamshikaas Civil

Engineering Works

N/A

6.78 Enthys

Construction

4.92

6.78

5.00

6.01

5.88

4.80

6.00

9.82

4.92

6.00

3.62

3.64

8.75

7.26

6.23

6.78

6.49

5.94

4.27

Page 261: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 6-Jun-11 28-Jun-11 2-Aug-11 21-Mar-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 6-Jun-11 28-Jun-11 2-Aug-11 21-Mar-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 6-Jun-11 28-Jun-11 2-Aug-11 2-Nov-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 6-Jun-11 28-Jun-11 2-Aug-11 2-Nov-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 18-Jan-12 13-Feb-12 4-Apr-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 3-Jun-11 24-Jun-11 2-Aug-11

N/APost Review N/A LKR

N/A

Mettaling & Tarring Soda Company Rd Vali North PS Vali North PS NCB 5.10 0.044347826

7.80 0.067826087 Post Review N/A LKR

N/A

56 NELSIP/NP/J/VNPS/W/09 Mettaling & Tarring Thammalai Veethy Vali North PS Vali North PS NCB

0.086086957 Post Review N/A LKR

N/A

55 NELSIP/NP/J/VNPS/W/08 Mettaling & Tarring Kuruvalai veethy Vali North PS Vali North PS NCB

0.085217391 Post Review N/A LKRNELSIP/NP/J/VNPS/W/07Mettaling & Tarring Periya Kanakar

valavu RoadVali North PS Vali North PS NCB 9.80

Post Review N/A N/A53 NELSIP/NP/J/VNPS/W/06Mettaling & TarringKernipiddy veethy

(Periya Kinnaththady Veethy)Vali North PS Vali North PS NCB 6.40 0.055652174

N/A

N/ARatna Engineers &

Contractors

Ratna Engineers &

Contractors

N/A

3.98

5.50

2.84 Vali South West PS

0.030695652Vali South West

PS

Maya Engineering

KSB Construction N/A

N/A

Maya Engineering

N/A

N/A

N/A

N/A

LKR

Vali South West

PS

Vali South West PS

3.57

4.70

Vali South West PS

Reconst. Of Unthupalaikaddai Veethy Vali South West PS NCB

0.040869565

NCB

Velanai PS

Vali South West PS

Vali South West

PS

Velanai PS

Velanai PS NCB

Vali South West

PS

Vali South West

PS

NELSIP/NP/J/VSWPS/W/25(

VSWPS-3)

NELSIP/NP/J/VSWPS/W/26(

VSWPS-4)

60

61

57 NELSIP/NP/J/VNPS/W/10

NELSIP/NP/J/VLPS/W/28(VL

PS-2)

NELSIP/NP/J/VLPS/W/27(VL

PS-1)

62 NELSIP/NP/J/VSWPS/W/05

NELSIP/NP/J/VSWPS/W/24(

VSWPS-2)

54

59

NELSIP/NP/J/VSWPS/W/23(

VSWPS-1)58

Reconst. of Alankulan Lane at Vali

South West PS area

Reconst. Of Sinnappa Veethy at Vali

South West PS area

63

64

Reconst. Cemetry Veethy, Ilavalai at

Vali South West PS area

Reconst of Sangaththa Keri Veethy at

Velanai PS area

NCB

NCBReconst. Of Utchchiodai Veethi at Vali

South West PS area

Reconst. Of Rasaiya Veethy at Velanai

PS areaVelanai PS

NCB

NCB

3.34

4.41

LKR

Post Review

Post Review

Post Review

Post Review

Post Review

Post Review

Post Review

LKR

LKR

LKR

Ratna Engineers &

Contractors

4.54

Ratna Engineers &

Contractors

2.84

6.33

3.41

LKR0.042086957

0.056521739

0.052

0.056347826

0.027478261

N/A

N/A

LKR

LKR

N/A

N/A

N/A

3.57

3.41

3.34

4.41

9.90

4.84

6.50

5.98

3.16

6.48

3.53

Page 262: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 27-Feb-2012 23-Mar-2012 18-Apr-12

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10-Jun-11 1-Jul-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10-Jun-11 1-Jul-11 2-Aug-11

0.0509 Post Review N/A LKR66 NELSIP/NP/J/VLPS/W/04 Construction of Market Thuraiyoor Velanai PS Velanai PS NCB 5.85

0.086347826Velanai PS N/A

N/A

N/A

N/A

V.S.K BuildersLKR

LKR

V.S.K Builders

65 NELSIP/NP/J/VLPS/W/3) 9.70

Delft PS

N/ADelft PS

Velanai PSLingam Building

ConstructionNCB

Delft PS

Delft PS NCB

NCBNELSIP/NP/J/DELPS/W/30(D

ELPS-2)

NELSIP/NP/J/DELPS/W/29(D

ELPS-1)67

68

Reconst. Of South Sudalai Vigaravadi

Veethy at Delft PS area

Reconst. of Perunkulam veethy & Const.

of retaining wall

Reconst. Of St. Jagappar Kovil

Kalamunai Veethy at Delft PS area

2.43 Post Review

Post Review LKR

Post Review

0.023478261 N/A

3.21 N/A

0.27

2.00

1.65 0.031304348

2.70

3.60

9.93

Page 263: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 10-Jun-11 1-Jul-11 2-Aug-11

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 2-Feb-12 28-Feb-12 19-Mar-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 2-Feb-2012 28-Feb-2012 19-Mar-12

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual 18-Jun-2012 10-Jul-2012 2-Aug-2012

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 30-Jun-11 2-Aug-11

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 30-Jun-11 2-Aug-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 17-Jan-12 13-Feb-12 29-Mar-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 17-Jan-12 13-Feb-12 11-Apr-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 17-Jan-12 13-Feb-12 29-Mar-12

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 7-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

LKR N/ANCB 6.00 0.052173913 Post Review N/A80 NELSIP/NP/J/(KYPS//06Metalling &Tarring Naranthai

Utharappiddy RoadKayts PS Kayts PS

7.56 AMT Transport N/A8.32 0.1443 Post Review N/A LKR74 NELSIP/NP/J/KRPS/W/4Metalling &Tarring Kovalam

Maruthapuram 1st joing veethyKarainagar PS R/ACLG, Jaffna NCB

Post Review N/A LKR N/A81 NELSIP/NP/J/KYPS/W/07 Metalling &Tarring Koththikula veethy Kayts PS Kayts PS NCB 6.13 0.053304348

Post Review N/A LKR N/A82 NELSIP/NP/J/KYPS/W/08Metalling &Tarring Naranthanai Ganesha

school RdKayts PS Kayts PS NCB 7.85 0.06826087

LKR5.10 N/A0.044347826 Post Review70 NELSIP/NP/J/DELPS/W/04Construction of Children Park Delft

centreDelft PS Delft PS NCB

0.12 N/A7.75

LKR

LKR

78 NELSIP/NP/J/KYPS/W04 Reconst. Of Seddiyanthodda Road

8.40 0.073043478 Post Review N/A

Walker

Construction4.30 0.037391304 Post Review N/A

79 NELSIP/NP/J/KYPS/W/05) Reconst. Of Sooriyawathai Road Kayts PS

Kayts PS NCB

4.19 Maya Engineering4.50 0.039130435

4.70 3.50

Kayts PS NCB

8.48 Karthiga

Contractors4.60 0.04

N/A

2.40

72 NELSIP/NP/J/KRPS/W/02 Reconstruction of Sampalodai Road Karainagar PS LKRNCBKarainagar PS

Post Review N/A

2.75 N/ALKR

6.22 N/A

Karainagar PS NCB

NCB

Post Review

0.084347826 Post Review

Ratna Engineers &

Contractors

N/A

N/AN/A

LKR

2.82

73

NELSIP/NP/J/DELPS/W/31(D

ELPS-3)

Kavinsan

Construction

K.M.P. Association

Post Review N/A

N/A

Kayts PS

NELSIP/NP/J/KYPS/W/03 Reconst. Of Camp Road

N/A

Kayts PS

N/A

Ratna Engineers &

Contractors

NCB

N/A

77

Delft PS

Karainagar PS

Kayts PSKayts PS

Kayts PS

Delft PS

Karainagar PS

N/A

N/A

NELSIP/NP/J/KRPS/W/32(KR

PS-1)

NELSIP/NP/J/KYPS/W/33(K

YPS-1)

NELSIP/NP/J/KRPS//W/03

69

71

NELSIP/NP/J/KYPS/W/34(K

YPS-2)

75

76

Reconst. Of Melingimunai Main Road at

Kayts PS area

Reconst. Of Oori Murukan Kovil Veethy

at Karainagar PS area

Reconst. Of Murukan Kovil Kopalapiddi

Veethyat Delft PS area

Kayts PS

Karainagar PS

NCB

Reconstruction of Palaiyakandy Sivan

Kovil Road

Kayts PS

NCBReconst. Of Analaidivu Kadaiyadi Cross

Road at Kayts PS area

NCB Maya Engineering

3.72

N/A

Karthiga

Contractors

LKR

1.38

6.19

3.31

LKR

Post Review

LKR

Post Review

0.012521739 LKRN/A

2.82

1.05

6.10

3.05

4.14

9.70

3.55

1.44

0.036

0.030869565

0.073269565

Post Review

8.43

Page 264: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 17-Jan-12 13-Feb-12 16-Mar-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 13-Feb-2012 8-Mar-2012 18-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 13-Feb-2012 8-Mar-2012 21-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 13-Feb-12 8-Mar-2012 18-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 5-Apr-12 2-May-12 15-Jul-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 5-Apr-12 2-May-12 22-Jun-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 5-Apr-12 2-May-12 22-Jun-12

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Dec-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 6-Dec-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 6-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 16-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012

N/A

N/A20.40 0.177391304 Post Review N/A LKR93NELSIP/NP/J/ACLG/W/07(PP

UC)

Reconstruction of Aththiyady DC

Channel -Continuous WorkPoint Perdro UC R/ACLG, Jaffna NCB

LKR N/ANCB 14.20 0.1826 Post Review N/A91NELSIP/NP/J/ACLG/W/05

(KRPS)

Metalling &Tarring Paththar keniyady

Road & DrainageKarainagar PS R/ACLG, Jaffna

LKR N/ANCB 13.50 0.1391 Post Review N/A92NELSIP/NP/J/ACLG/W/06(K

RPS)

Metalling &Tarring Thoppukkadu

vairavar Kovil VeethyKarainagar PS R/ACLG, Jaffna

Post Review N/A LKR90NELSIP/NP/J/ACLG/W/04

(CHPS)

Mettaling & Tarring Mirusuvil Hospital

Front Road 2nd StageChavakachcheri PS R/ACLG, Jaffna NCB 17.55 0.152608696

Post Review N/A LKR

N/A12.80 Post Review

N/A95NELSIP/NP/J/ACLG/W/9

(KYPS)

Metalling &Tarring Puliyankoodal North

RoadKayts PS Kayts PS NCB 13.70 0.119130435

Post Review N/A15.40 0.133913043 LKR N/A

LKR

96NELSIP/NP/J/ACLG/W/10

(KYPS)

Metalling &Tarring Naranthai Sinnamadu

1st &2 nd Road & DrainageKayts PS Kayts PS NCB

94NELSIP/NP/J/ACLG/W/08(V

LPS)Metalling &Tarring Sudalai Veethy Velanai PS R/ACLG, Jaffna NCB 0.783 N/A

N/A

Sri Ram Civil

Engineering

Construction

1.55

6.31 0.054869565

LKR

Reconstruction of Karampakam

Vidaththatpalai RoadN/A

Post Review

Point Perdro UC

NELSIP/NP/J/ACLG/W/02

NELSIP/NP/J/PPUC/W/01

State Engeneering

Cooperation0.48 N/A

N/AKamsikas Civil

Engeniring Works

7.44

89

Reconstruction Manippuri joint Veethy

and Reconstruction Manippuri 8th

CrossVeethy

Nallur PS ACLG

Post Review N/A

6.89

86 NELSIP/NP/J/VVUC/W/03

Reconstruction of Retaining wall along

coastal Area from vady lane access to

mathavady area

Valvettithurai UCValvettithurai

UC

85 NELSIP/NP/J/VVUC/W/02

Reconstruction of Periakadakkarai Road,

Vellankarai cemetry Road, Veeramakali

Aman Kovil Road

Valvettithurai UCValvettithurai

UC

0.027652174

8.13

N/A

11.85

N/A

LKR

Post Review

Valvettithurai

UCNCB 3.18

NCB

NCB

10.05

ACLG

Point Perdro UC

Post Review

Post Review N/A LKR 5.36 Kamshikaas Civil

Engineering WorksN/A

87 NELSIP/NP/J/ACLG/W/01) Construction Athiyady DC Channel Point Perdro UC

84

Reconstruction of KKS Road 2nd

lane,Netkolu lane, Netkolu Varivar Kovil

front road ,

Valvettithurai UC

83

NCB 17.17

NCB

NCB

N/A

N/A

NELSIP/NP/J/VVUC/W/01

88 Chavakachcheri PS

ACLG

Const. of Retaining wall

NCB

0.17826087

0.149304348

13.12

Post Review

20.50

LKR

LKRN/A

Kumar Building

Consruction

18.81

3.75

15.15 LKRTurbo Group

Construction

10.77 N/ATurbo Group

Construction

0.087391304

0.059913043

LKR

2.59

-

Post Review N/A

0.114086957NELSIP/NP/J/ACLG/W/03

Page 265: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Jan-2013

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Dec-2012

Actual

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11 21-Jan-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11 21-Jan-12

N/A26.20 0.2278 Post Review N/A LKR101NELSIP/NP/J/CLG/W/01(PPP

S)Construction of Market at manthikai Point Pedro PS CLG, Jaffna NCB

LKR N/ANCB 49.50 0.4304 Post Review N/A

N/A

105NELSIP/NP/J/CLG/W/05(VLP

S)

Construction of Modern Shoping

ComplexVelanai PS CLG, Jaffna

36.00 0.313043478 Post Review N/A LKR104NELSIP/NP/J/CLG/W/04(PPU

C)Reconstruction of Peruveddy Channel Point Perdro UC CLG, Jaffna NCB

LKR N/ANCB 42.75 0.3717 Post Review N/A

N/A

103NELSIP/NP/J/CLG/W/03(NA

PS)

Construction of Children indoor

games,Training centre & Cultural Hall Nallur PS CLG, Jaffna

50.76 0.4414 Post Review N/A LKR102NELSIP/NP/J/CLG/W/02(VV

UC)

Construction of vegetable Market with

Shopping ComplexValvettithurai UC CLG, Jaffna NCB

N/A18.00 0.1565 Post Review N/A LKR100NELSIP/NP/J/ACLG/W14(DE

LPS)Construction of Computer Trainig Center Delft PS R/ACLG, Jaffna NCB

N/A13.50 0.0913 Post Review N/A LKR99NELSIP/NP/J/ACLG/W/13(V

LPS)Construction of Market -Madathuveli Velanai PS R/ACLG, Jaffna NCB

N/A14.40 0.1565 Post Review N/A LKR

N/A

97NELSIP/NP/J/ACLG/W/11(V

SPS)

Mettaling & Tarring Kantharoodai

Cemetry Veethy Vali South PS R/ACLG, Jaffna NCB

0.1565 Post Review N/A LKR98NELSIP/NP/J/ACLG/W/12(PP

PS)Construction of Shopping complex Point Pedro PS R/ACLG, Jaffna 18.00NCB

Post Review N/A15.40 0.133913043 LKR N/A96NELSIP/NP/J/ACLG/W/10

(KYPS)

Metalling &Tarring Naranthai Sinnamadu

1st &2 nd Road & DrainageKayts PS Kayts PS NCB

Mannar PS

Mannar PS

N/A

Mannar PS N/A

N/A

NELSIP/NP/MN/MNPS/W/36

(MNPS-2)

NELSIP/NP/MN/MNPS/W/35

(MNPS-1)106

107

Cons of Bus Pip Line at 5th mile post

Erukalampitty at Mannar PS area

Repair of public well and cons of Water

tank at Uyilamkulamat Mannar PS area

Mannar PS NCB Post Review

1.32 0.011478261

0.85 0.007391304

NCB Post Review N/A 1.29 Ben Construction

LKRErukkalampitty

Community Center0.85

LKR

0.66

1.29

Page 266: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 7-Jun-11 28-Jun-11 2-Aug-11

Planned ########## 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 5th July 2011 29-Jul-11 23-Aug-11 28-Oct-11

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 26-Jan-12 21-Feb-12 9-Apr-12

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 26-Jan-12 21-Feb-12 9-Apr-12

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

N/AN/A LKR113 NELSIP/NP/MN/MNPS/W/08Metalling & Tarring Pesalai Internal

RoadMannar PS Mannar PS NCB

N/A111 NELSIP/NP/MN/MNPS/W/06Metalling & Tarring Erukkalampitty

Internal RoadMannar PS Mannar PS NCB

N/A LKR N/A120 NELSIP/NP/MN/MNPS/W/15Construction of Erukkalampitty Cultural

hallMannar PS Mannar PS NCB

N/A4.200 0.036521739 Post Review N/A LKR119 NELSIP/NP/MN/MNPS/W/14Construction of Children park with play

ground UyilankulamMannar PS Mannar PS NCB

LKR118 NELSIP/NP/MN/MNPS/W/13Construction of Meat stall & Slaughter

house UyilankulamMannar PS Mannar PS NCB 3.700 0.032173913 Post Review

LKR N/A117 NELSIP/NP/MN/MNPS/W/12 Construction of Meat stall Talvuppadu Mannar PS Mannar PS 0.030434783

N/A116 NELSIP/NP/MN/MNPS/W/11 Construction of Beef stall Karaisal Mannar PS Mannar PS NCB

N/A115 NELSIP/NP/MN/MNPS/W/10Metalling & Tarring Thalaimannar

internal RoadMannar PS Mannar PS Post Review

N/A6.200 0.053913043 Post Review N/A114 NELSIP/NP/MN/MNPS/W/09Metalling & Tarring Periyakarisal

Sinnakarisal Road KaraisalMannar PS Mannar PS

0.008 Post Review N/A

Post Review

N/A

4.600 0.04

0.057391304

NCB

LKR

Post Review N/A LKR

0.046956522

LKR

LKR

NCB 3.500

LKR

N/A

NCB N/A

3.500 0.030434783

Construction of Market Building Mannar PS Mannar PS NCB

6.600

0.920

5.400

Post Review

Post Review

Mannar PS Mannar PS NCB 0.05226087 Post Review

Kasun Construction 1.08 N/A3.23

Ben Construction

ACLG

Mannar PSMannar PS

Mannar PS

N/A

N/A

N/A

NELSIP/NP/MN/MNPS/W/05

NELSIP/NP/MN/MNPS/W/37

(MNPS-3)

NELSIP/NP/MN/MNPS/W/07

109NELSIP/NP/MN/MNPS/W/38

(MNPS-4)

108

110

112

Reconst. Of Manthai Elupitty intenal

Road

Cons of measstall withslaughter house at

Mannar PS area

Cons of Market Building at Thalimannar

Station at Mannar PS area

0.015565217NCB Post Review

3.82

NCB 0.09730434811.19

1.79

6.01

0.033217391

N/A

Prior Review

N/A

Post Review N/A

10.40

LKR

1.51

LKR

LKR

5.31

Vigitha

Construction Works

MS Construction

0.99

6.50

4.15

N/A

Page 267: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 29-Jun-2012 24-Jul-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 3-Feb-12 28-Feb-12 9-Apr-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 3-Feb-12 28-Feb-12 9-Apr-12

Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

0.987 0.008582609 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

1.657 0.014408696 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

3.409 0.029643478 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

2.398 0.020852174 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

3.596 0.031269565 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

8.100 0.070434783 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

7.133 0.062026087 Planned 15-Jul-2012 8-Aug-2012 6-Sep-2012 6-Dec-2012

Actual 16-Jul-2012 9-Aug-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

N/A LKR N/A120 NELSIP/NP/MN/MNPS/W/15Construction of Erukkalampitty Cultural

hallMannar PS Mannar PS NCB

0.032173913 N/APost ReviewReconst. Of Madukarai Road Nanattan PS Nanattan PS 3.20

N/APost Review LKRNCB 3.80

N/ANCB

N/A

0.033043478Nanattan PS

LKR3.70

Lanka Hardware

and Civil

Construction

8.100

Musali PS Post Review0.041565217Musali PS

9.16 Musali PS

Reconst.of Pericharkadu Road & Culvert

Construction of Market Building

Nanattan PS

NCB

3.500 0.030434783

Post Review

Post Review

NELSIP/NP/MN/MUPS/W/01Reconst. Of Arippu Pandaraveli Road &

CulvertMusali PS LKR 3.23 Kasun ConstructionN/A

Ben Construction3.49

LKR 4.33

N/A

N/A

N/A 1.50

-

1.70

Aheel Construction

NELSIP/NP/MN/NAPS/W/02

NELSIP/NP/MN/MUPS/W/03

NELSIP/NP/MN/NAPS/W/01

122

123

124

121

4.78

NCB 0.079652174 0.82

123 NELSIP/NP/MN/MUPS/W/04Construction of Small Town Ship at

Marichchikaddi (Shopping Complex)Musali PS Musali PS NCB N/A - 0.070434783 Post Review N/A LKR

124 NELSIP/NP/MN/MUPS/W/05Construction of Meat Stall at

ChilawathuraiMusali PS Musali PS NCB N/A - Post Review N/A LKR

125 NELSIP/NP/MN/MUPS/W/06Construction of Slaughter House at

VarivelyMusali PS Musali PS NCB N/A - Post Review N/A LKR

126 NELSIP/NP/MN/MUPS/W/07Construction of Children Park with

Playground at ChilawathuraiMusali PS Musali PS NCB N/A - Post Review N/A LKR

127 NELSIP/NP/MN/MUPS/W/08Construction of Children Park with

Playground at MarichchikaddiMusali PS Musali PS NCB N/A - Post Review N/A LKR

128 NELSIP/NP/MN/MUPS/W/09Construction of Children Park with

Playground at VeepankulamMusali PS Musali PS NCB N/A - Post Review N/A LKR

129 NELSIP/NP/MN/MUPS/W/10Metalling and Taring Koolankulam

Interanal Road Musali PS Musali PS NCB Post Review N/A LKR

130 NELSIP/NP/MN/MUPS/W/11Metalling and Taring Chilawathurai

Interanal Road Musali PS Musali PS NCB Post Review N/A LKR N/A -

N/A -

Page 268: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 19-Jul-2012 14-Aug-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 19-Jul-2012 14-Aug-2012

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-11

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-11

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 4-May-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 7-Mar-12

Actual 3-Feb-12 28-Feb-12 23-Apr-12

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 13-Jul-2012 7-Aug-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 13-Jul-2012 7-Aug-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 13-Jul-2012 7-Aug-2012

N/A - 0.057913043 Post Review N/A LKR

N/A -

139 NELSIP/NP/MN/MWPS/W09Metteling & Tarring Sinnapandivirichan

RoadManthai West PS

Manthai West

PSNCB 6.660

7.490 0.065130435 LKR138 NELSIP/NP/MN/MWPS/W08Construction of Public market Iranai

IllupaikulamManthai West PS

Manthai West

PSNCB

N/A -

N/A

137 NELSIP/NP/MN/MWPS/W07Metteling & Tarring Sinnavalayankaddu

internal RoadManthai West PS

Manthai West

PSNCB LKR

0.054956522 Post Review N/A LKR

N/A

130 NELSIP/NP/MN/NAPS/W/08Metteling & Tarring Valkaipettankandal

RoadNanattan PS Nanattan PS NCB 6.320

0.067652174 Post Review N/A LKR

N/A

129 NELSIP/NP/MN/NAPS/W/07Construction of Fish Market Vankalai

WestNanattan PS Nanattan PS NCB 7.780

0.067652174 Post Review N/A LKR128 NELSIP/NP/MN/NAPS/W/06Mettaling Tarring Vanchiyankulam

Village RoadNanattan PS Nanattan PS NCB 7.780

- N/A

N/A -

6.750 0.058695652 Post Review N/A

Post Review N/A

N/A -

N/A - Construction of Meet Stall with Slaughter

House Manthai West PS

Manthai West

PS

0.016869565 Y.A.Construction

NCB 1.94 0.016869565 Post Review

1.51 Post Review N/A

LKR 1.61 N/A

Construction of Meet Stall with Slaughter

House Manthai West PS

Manthai West

PS1.94

0.068086957 N/APost Review7.83

- N/A

134 NELSIP/NP/MN/MWPS/W/04 Construction of Market Building Manthai West PSManthai West

PSLKRNCB

Post Review

- LKR 7.37 Aheel Construction

7.04 S.M.S.Construction

Manthai West PS 0.0569565226.55 NCBManthai West

PS5.58 133

9.18 0.079826087 Post Review N/AReconst. Of Nedauankandal Sornapuri

Road

N/A

0.063478261 N/A

Construction of Market Building

Reconst. Of Kathalampiddy Road Manthai West PSManthai West

PS

Manthai West PSManthai West

PS

7.30 Post Review

LKR

N/A

5.94

Aheel Construction

N/A 2.16 7.10 0.06173913 Post Review N/A 7.28

Nochikulam Road Nanattan PS

127 NELSIP/NP/MN/NAPS/W/05 Reconstruction of Vankalai Central Road Nanattan PS

4.48 NCB

Nanattan PS

Post Review4.25

Post Review N/A

N/A 1.50

N/A

N/A

0.032173913

0.036956522

N/A

LKR

Post Review

Reconst. Of Achchamkulam Road &

CulvertNanattan PS Nanattan PS NCB

Reconst. Of Madukarai Road Nanattan PS Nanattan PS 3.20 N/ANCB LKR3.70

Lanka Hardware

and Civil

Construction

3.67 Matha Construction

Work

3.84

High Tech Creation

(Pvt)LTD

LKR Ben Construction

Aheel Construction

S.Y.Construction

LKR

LKR

LKR

1.70

Nanattan PS

NELSIP/NP/MN/NAPS/W/02

NELSIP/NP/MN/NAPS/W/04

NELSIP/NP/MN/MWPS/W/01

NELSIP/NP/MN/MWPS/W/05

NELSIP/NP/MN/MWPS/W/02

NELSIP/NP/MN/MWPS/W06

NELSIP/NP/MN/NAPS/W/03

NELSIP/NP/MN/MWPS/W/03

124

135

136

126

125

132

131

NCB

NCB

NCB

NCB

0.038956522 1.60

Page 269: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 26-Jan-12 21-Feb-12 24-Apr-12

Planned 19-Oct-11 9-Nov-11 7-Dec-11 30-Apr-12

Actual 26-Jan-12 21-Feb-12 24-Apr-12

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 13-Jul-2012 7-Aug-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Dec-2012

Actual 19-Jul-2012 14-Aug-2012

Planned 20-Jun-2012 12-Jul-2012 10-Aug-2012 9-Dec-2012

Actual

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 29-Jun-11 2-Aug-11 10-Jan-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 29-Jun-11 2-Aug-11 10-Jan-12

Planned 16-May-11 7-Jun-11 11-Jul-11 13-Oct-11

Actual 8-Jun-11 29-Jun-11 2-Aug-11 29-Dec-11

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 2-Apr-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 2-Apr-12

N/AN/A LKR146 NELSIP/NP/MN/ACLG/W/03Construction of Cultural hall

ModdaikadaiNanattan PS

A,CLG,MANN

ARNCB 12.150 0.105652174 Post Review

LKR N/ANCB 11.660 0.101391304 Post Review N/A

N/A -

145 NELSIP/NP/MN/ACLG/W/02Construction of Murunkan Market 2nd.

StageNanattan PS

A,CLG,MANN

AR

0.039130435 Post Review N/A LKR

N/A

142 NELSIP/NP/MN/MWPS/W12 Children park with play ground

KakayankulamManthai West PS

Manthai West

PSNCB 4.500

N/A LKR141 NELSIP/NP/MN/ACLG/W/01Metalling & Tarring Sahayaveethi

Palakuli RoadManthai West PS

Manthai West

PSNCB 6.750 0.058695652 Post Review

LKR N/A - NCB 3.150 0.027391304 Post Review N/A140 NELSIP/NP/MN/MWPS/W10Construction of children park with play

ground AdampanManthai West PS

Manthai West

PS

N/ASanjeeve

Construction Works11.92

LKR

LKRMannar UC Mannar UC 14.03 Post Review0.122

2.70 N/A12.73 Sanjeeve

Construction WorksMannar UC Mannar UC

Vavuniya South Tamil

PS

Vavuniya South Tamil

PS

N/A

N/A

N/A

NELSIP/NP/VU/VSTPS/W/40

(VSTPS-2)

NELSIP/NP/VU/VSTPS/W/39

(VSTPS-1)

NELSIP/NP/MN/MNUC/W/01

NELSIP/NP/VU/VSTPS/W/41

(VSTPS-3)

NELSIP/NP/MN/MNUC/W/02

149

148

144

143

147

Moor Street Concrete Road

Katkulam 111 Roadat Vavuniya South

Tamil PS area

Vavuniya South Tamil

PS

Thalikulam School Roadat Vavuniya

South Tamil PS area

Labour office Concrete Road

Ukulan kulam Road at Vavuniya South

Tamil PS area

NCB

NCB

NCB

NCB

NCB

14.62 0.127130435 Post Review N/A

N/A

Keerthika

Construction

6.15 Ganam Builders

Vanaja

Construction

LKR 2.43 2.43

6.15

1.89

Post Review5.34 LKR

LKR

Vavuniya South

Tamil PSN/A

0.046434783

0.0264347833.04 Post Review

2.80 Vavuniya South

Tamil PSN/A

Post Review6.98 0.060695652

5.12

Vavuniya South

Tamil PSN/A

150 NELSIP/NP/VU/VSTPS/W/04Reconstruction of Matheenanagar School

Road

Vavuniya South Tamil

PS

Vavuniya South

Tamil PSNCB 4.42 0.038434783 Post Review N/A LKR 4.53

Yansika

ConstructionN/A 1.13

151 NELSIP/NP/VU/VSTPS/W/05Reconstruction of Pulitharitha

Puliyankulam Arfanagar Road

Vavuniya South Tamil

PS

Vavuniya South

Tamil PSNCB 6.10 0.053043478 Post Review N/A LKR 3.59 Jeya Construction N/A 1.13

Page 270: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual 29-Jun-2012 24-Jul-2012

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Feb-12 28-Feb-12 30-Apr-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 30-Apr-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 30-Apr-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 30-Apr-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 30-Apr-12

Planned 26-Jun-2012 19-Jul-2012 18-Aug-2012 18-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 26-Jun-2012 19-Jul-2012 18-Aug-2012 18-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

155 NELSIP/NP/VU/VUC/W/01Reconstruction of Thachchankulam Main

RoadVavuniya UC

162 NELSIP/NP/VU/VSSPS/W/01

Mettaling & Tarring of

Mahakachchakoddiya - Etambaskoddalla

Road , Agbopura - Kokkeliya Road ,

Nedunkulam - Malayarparuthikulam

Road -

N/ANCB 4.800 0.04173913 Post Review N/A LKR

N/A

154 NELSIP/NP/VU/VSTPS/W/08Metalling & Tarring Salambaikkulam

Internal Road

Vavuniya South Tamil

PS

Vavuniya South

Tamil PS

153 NELSIP/NP/VU/VSTPS/W/07Metalling and Taring Poompugar

Kalmadu Road

Vavuniya South Tamil

PS

Vavuniya South

Tamil PSNCB N/A LKR9.700 0.084347826 Post Review

LKR152 NELSIP/NP/VU/VSTPS/W/06Metalling & Tarring Thonikal

Lakshabana Road

Vavuniya South Tamil

PS

Vavuniya South

Tamil PS8.90 0.077391304 Post Review N/A N/ANCB

Vavuniya UC NCB 6.76 0.058782609 Post Review N/A LKR 3.60 Keerthika

ConstructionN/A 1.14

156 NELSIP/NP/VU/VUC/W/02Reconstruction of Paddaikadu Road and

Construction of drainageVavuniya UC Vavuniya UC NCB 5.69 0.049478261 Post Review N/A LKR 4.96

Pasindu

Hettiarachchi

Construction

N/A 0.94

157 NELSIP/NP/VU/VUC/W/03Reconstruction of Thekawatte Internal

RoadVavuniya UC Vavuniya UC 1.14 NCB 4.60 0.04 Post Review N/A

Post Review

LKR 3.93 Keerthika

ConstructionN/A

158 NELSIP/NP/VU/VUC/W/04 Kurumankadu internal Road Vavuniya UC Vavuniya UC NCB 3.54 0.030782609 0.98

159 NELSIP/NP/VU/VUC/W/05 Thirunavatkulam Sivan Kovil Road Vavuniya UC Vavuniya UC NCB 4.95

N/A

Post Review LKR 4.45

N/ALKR 3.85 S.J.Civil

Constructions

Keerthika

Construction1.00 0.043043478 N/A

Vavuniya South

Singala PS

Vavuniya South

Singala PSNCB 6.92 0.060173913 Post Review N/A LKR 7.97

Asiri Construction

& Designed N/A 1.50

160 NELSIP/NP/VU/VUC/W/06Metalling&Tarring Paththiniyar

Mahilankulam 1st lane(Cemetry Road)Vavuniya UC Vavuniya UC NCB 2.850 0.024782609 Post Review N/A LKR

161 NELSIP/NP/VU/VUC/W/07Metalling&Tarring Paddaikadu Road

Through Veppankulam 7th lane Vavuniya UC Vavuniya UC NCB 13.427 0.116756522 Post Review N/A LKR N/A

N/A

N/A

Page 271: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 3-Jan-12 28-Jan-12 10-May-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 10-May-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 2-May-12

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual 29-Jun-2012 24-Jul-2012

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 9-Apr-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-12 28-Jan-12 9-Apr-12

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual

N/A

N/A4.500 0.039130435 Post Review N/A LKR

N/A

171 NELSIP/NP/VU/VCKPS/W/03Reconstruction of Children Park & Play

ground at Sooduventhapulavu

Vengala Cheddikulam

PS

Vengala

Cheddikulam PSNCB

N/A

168 NELSIP/NP/VU/VSSPS/W/07Metalling & Tarring Puthuvillan kulam

main Road

Vavuniya South

Singala PS

Vavuniya South

Singala PSNCB

NELSIP/NP/VU/VSSPS/W/04Renovation of Market

Periyapuliyalankulam

Vavuniya South

Singala PS

162 NELSIP/NP/VU/VSSPS/W/01

Mettaling & Tarring of

Mahakachchakoddiya - Etambaskoddalla

Road , Agbopura - Kokkeliya Road ,

Nedunkulam - Malayarparuthikulam

Road -

Post Review

3.000 0.026086957 Post Review

LKR

N/A LKR

NCB 1.000 0.008695652

NCB 0.500 0.004347826 Post Review N/A

166 NELSIP/NP/VU/VSSPS/W/05Construction of Market

Mahakachchakodiya

Vavuniya South

Singala PS

Vavuniya South

Singala PSNCB

165Vavuniya South

Singala PS

LKR

N/ALKR

167 NELSIP/NP/VU/VSSPS/W/06Concrete Paving Galachiyambalawa

Pansala Road

Vavuniya South

Singala PS

Vavuniya South

Singala PS

1.000 0.008695652 Post Review N/A

Vavuniya South

Singala PS

Vavuniya South

Singala PSNCB 6.92 0.060173913 Post Review N/A LKR 7.97

Asiri Construction

& Designed N/A 1.50

163 NELSIP/NP/VU/VSSPS/W/02

Mettaling & Tarring of Maruthamadu

Vihara Road,Acre 60 Pansala

Road,Ullukulam Deewaragammanaya

Road -

Vavuniya South

Singala PS

Vavuniya South

Singala PSN/A - NCB 7.04 0.061217391 Post Review N/A

4.82 0.041913043 Post Review

LKR 6.89 Sanjeeve

Construction Works

164 NELSIP/NP/VU/VSSPS/W/03

Mettaling & Tarring of Err

apperiyakulam 2nd Cross

Road,Errapperiyakulam Railway Road,Sri

Ratnasara Mawatha -Ambalankoddalla

Vavuniya South

Singala PS

Vavuniya South

Singala PSNCB

NCB 0.19

N/A LKR 5.70 Thevan

Construction

N/A

LKR

N/A -

169 NELSIP/NP/VU/VCKPS/W/01 DBST of Muthaliyarkulam internal RoadVengala Cheddikulam

PS

Vengala

Cheddikulam PS

Vengala

Cheddikulam PSNCB

7.87 AR,Constructions(P

VT)LTDN/A9.21 0.080086957 Post Review N/A

Reconstruction of Veerapuram 1 st Lane

internal Road0.18 8.56 0.074434783 Post Review N/A LKR

Vengala Cheddikulam

PS7.14

AR,Constructions(P

VT)LTDN/A170 NELSIP/NP/VU/VCKPS/W/02

Page 272: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Nov-2011

Actual

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-2012 28-Jan-2012 8-Jun-12

Planned 15-Dec-11 7-Jan-12 21-Feb-12 21-May-12

Actual 3-Jan-2012 28-Jan-2012 9-Apr-12

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012

Actual

Planned 24-Jun-2012 17-Jul-2012 16-Aug-2012 15-Dec-2012

Actual

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 2-Feb-12 28-Feb-12 9-May-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-11

Actual 2-Feb-12 28-Feb-12 9-May-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12

N/A

N/A

N/A

0.03913 Post Review172 NELSIP/NP/VU/VCKPS/W/04 Pavatkulam Unit II Children ParkVengala Cheddikulam

PS

Vengala

Cheddikulam PSNCB N/A LKR N/A4.500

LKR N/A0.143478261NCB Post Review N/A

14.400 0.125217391 Post Review

16.500

N/A

178NELSIP/NP/VU/ACLG/W/06

(VCKPS)Sinnasippikulam Anaivilunthan Road

Vengala Cheddikulam

PSVU/ACLG

NELSIP/NP/VU/ACLG/W/05(VC

KPS)Construction of Kanthinagar Road

Vengala Cheddikulam

PSVU/ACLG NCB

15.600 LKR

LKR

N/A

VU/ACLG NCB 0.135652174 Post Review N/A

0.195652174 Post Review N/A LKR180NELSIP/NP/VU/ACLG/W/08

(VSSPS)

Construction of Guest House

Eratperiyakulam

Vavuniya South

Singala PSVU/ACLG NCB 22.500

175NELSIP/NP/VU/ACLG/W/03(V

NPS)

Metalling & Tarring Kanakarayankulam

Puthukulam RoadVavuniya North PS VU/ACLG NCB 12.600 0.109565217 Post Review

179NELSIP/NP/VU/ACLG/W/07(V

UC)

Construction of Market & Shopping

Complex at SinnaputhukulamVavuniya UC VU/ACLG

176NELSIP/NP/VU/ACLG/W/04(VC

KPS)

Metalling & Tarring Neriyakulam to

Sinnasippikulam Road

Vengala Cheddikulam

PS

177

LKR

NCB 21.600 0.187826087 Post Review N/A

N/A

LKR N/A

4.70 LKR 4.40 5.40 0.040869565

LKR 7.09 Shiriraam

ConstructionN/A

KNS Construction N/A

Post Review

Post Review

N/A

N/A

3.90

183 NELSIP/NP/KI/POPS/W/03

Construction of Market Complex -

Vegetable market, Fish market, Meat stall

& Toilet Pallikuda

Poonakary PS Poonakary PS NCB

Shiriraam

Construction

182 NELSIP/NP/KI/POPS/W/02Reconstruction of Pandiveddy

Pallawarayankaddu 2 nd Cross RoadPoonakary PS Poonakary PS NCB 5.60

N/A 1.10 NCB 8.31 0.07226087 Post Review N/A LKR 7.30 NELSIP/NP/KI/POPS/W/01 Reconstruction of Periyathampirai Road Poonakary PS Poonakary PS

0.048695652

173 NELSIP/NP/VU/ACLG/W/01

Construction of Nainamadhu

Karappakuththy Road ( Vavuniya

North)

Vavuniya North PS ACLG NCB 21.07 0.183226087 Post Review N/A LKR 22.10

A Group

Construction

&Consults

N/A 4.50

174 NELSIP/NP/VU/ACLG/W/02Reconstruction of DBST of Pavatkulam

Unit 6 to 4 Road

Vengala Cheddikulam

PSACLG NCB 11.65 0.101304348 Post Review N/A LKR 11.20

A Group

Construction

&Consults

N/A 2.20

181

Page 273: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 2-Apr-2012 27-Apr-2012 7-Jun-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 2-Feb-12 28-Feb-12 9-May-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12

Actual 2-Apr-2012 27-Apr-2012 7-Jun-12

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual

Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12

Actual 16-Jan-12 9-Feb-12 23-Mar-2012

Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12

Actual 16-Jan-12 9-Feb-12 28-Mar-2012

N/A0.0469 Post Review N/A LKR

N/A

190 NELSIP/NP/KI/POPS/W/11Reconstruction of alankerny Cemetary

road Poonakary PS Poonakary PS NCB 5..4

0.0235 Post Review N/A LKR

N/A

189 NELSIP/NP/KI/POPS/W/10 Construction of Park Poonakary PS Poonakary PS NCB 2.70

7.20 0.0626 Post Review N/A LKR188 NELSIP/NP/KI/POPS/W/09 Construction of Shoping Complex Poonakary PS Poonakary PS NCB

N/A0.0391 Post Review N/A LKR

N/A

187 NELSIP/NP/KI/POPS/W/07 Construction of Ayurvedic Hospital Poonakary PS NCB 4.10Poonakary PS

186 NELSIP/NP/KI/POPS/W/06 Construction of Valaippadu Market Poonakary PS Poonakary PS

N/A 1.20 NCB 5.66 0.049217391 Post Review N/A LKR 4.33 192 NELSIP/NP/KI/PAPS/W/02Reconstruction of Plopallai Allipallai

RoadPachchilappalli PS

Pachchilappalli

PS

0.04573913 Post Review N/A 1.10 Rushan

Construction

LKR

Leading Crusher

Works

LKR 3.91 N/A

LKR 4.45 N/A

N/A

191 NELSIP/NP/KI/PAPS/W/01Reconstruction of Plopallai East -

Mullayady RoadPachchilappalli PS

Pachchilappalli

PSNCB

NCB 4.90 0.0391

4.78 Krishna Civil

Engineering

Construction

Post Review

0.040956522 Post Review N/A - KNS Construction

4.70

N/A 1.17 NCB 7.71 0.067043478 Post Review N/A LKR

LKR 4.40 5.40

184 NELSIP/NP/KI/POPS/W/04Reconstruction of Nachchikuda

Kumulamunai roadPoonakary PS Poonakary PS

0.040869565 KNS Construction N/APost Review N/A183 NELSIP/NP/KI/POPS/W/03

Construction of Market Complex -

Vegetable market, Fish market, Meat stall

& Toilet Pallikuda

Poonakary PS Poonakary PS NCB

185 NELSIP/NP/KI/POPS/W/05

Construction of Market Complex -

Vegetable market, Fish market, Meat stall

& Toilet Kiranchchi

Poonakary PS Poonakary PS 4.71

5.26

NCB

Page 274: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12

Actual 16-Jan-12 9-Feb-12 28-Mar-2012

Planned 13-Oct-11 3-Nov-11 1-Dec-2011 1-Mar-12

Actual 17-Jan-12 9-Feb-12 23-Mar-2012

Planned 15-Jun-2012 9-Jul-2012 8-Aug-2012 8-Nov-2012

Actual

Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012

Actual 31-Jul-2012 24-Aug-2012

Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012

Actual 2-Aug-2012 24-Aug-2012

Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

Planned 18-Jun-2012 11-Jul-2012 10-Aug-2011 9-Nov-2012

Actual 2-Aug-2012 24-Aug-2012

Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12

Actual 16-Jan-12 9-Feb-12 5-Apr-12 5-Jul-12

Planned 15-Jun-2012 9-Jul-2012 8-Aus-2012 8-Nov-2012

Actual 18-Jun-2012 10-Jul-2012

0.007 Post Review N/A LKR N/A

N/A

201 NELSIP/NP/KI/KAPS/W/07Reconstruction of Pannankandy

Cemetary and Well Karachchi PS Karachchi PS NCB 0.9

0.07826087 Post Review N/A LKR200 NELSIP/NP/KI/KAPS/W/06 Murasumoddai Cemetery road Karachchi PS Karachchi PS NCB

LKR

9.00

N/ANCB 1.80 0.015652174 Post Review N/A

N/A

199 NELSIP/NP/KI/KAPS/W/05Construction of Cemetary and Well at

KoorankadduKarachchi PS Karachchi PS

9.00 0.07826087 Post Review N/A LKR

N/A

198 NELSIP/NP/KI/KAPS/W/04Mettaling & Tarring of Kanagampikai

Kulam RoadKarachchi PS Karachchi PS NCB

4.50 0.039130435 Post Review N/A LKR

N/A

197 NELSIP/NP/KI/KAPS/W/03 Construction of Irrinaimadu Market Karachchi PS Karachchi PS NCB

9.90 0.086086957 Post Review N/A LKR

N/A

196 NELSIP/NP/KI/KAPS/W/02Mettaling & Tarring of Uruthirapuram

west 4th Cross roadKarachchi PS Karachchi PS NCB

8.55 0.074347826 Post Review N/A LKR195 NELSIP/NP/KI/PAPS/W/05 Construction of Play Ground at Palai Pachchilappalli PSPachchilappalli

PSNCB

N/A15.66 0.0822 Post Review N/A LKR203NELSIP/NP/KI/RACLG/W/02

((POPS)

Mettaling & Tarring of Murugan temple

Road Poonakary PS Poonakary PS NCB

Rushan

ConstructionN/A 1.30 0.052608696 Post Review N/ANCB LKR 4.64

NCB 6.14 0.053391304 Post Review

6.05

N/A193 NELSIP/NP/KI/PAPS/W/03 Reconstruction of Masar school Road Pachchilappalli PSPachchilappalli

PSN/A 4.00 LKR 4.66

Leading Crusher

Works

194 NELSIP/NP/KI/PAPS/W/04 Reconstruction of Mugavil Main Road Pachchilappalli PSPachchilappalli

PS

0.145217391NCB Post Review N/A Jana Agency N/A 2.30 LKR 14.45 202 NELSIP/NP/KI/ACLG/W/01Mettaling & Tarring of Kumarapuram

School roadKarachchi PS ACLG 16.70

Page 275: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 13-Oct-2011 3-Nov-2011 1-Dec-11 1-Mar-12

Actual 23-Feb-2012 20-Mar-2012 8-May-12

Planned 13-Oct-2011 3-Nov-2011 1-Dec-11 1-Mar-12

Actual 23-Feb-2012 20-Mar-2012 8-May-12

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 23-Feb-2012 20-Mar-2012 24-May-12 5-Aug-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 23-Feb-2012 20-Mar-2012 24-May-12 5-Aug-12

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 9-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual 18-Jul-2012 13-Aug-2012

LKR

LKR

LKR

N/A214 NELSIP/NP/MU/TUPS/W/05 Metalling & Tarring Ampalaperumal

village road Thunukkai PS Thunukkai PS NCB 8.10 0.070434783 Post Review

10.00 0.086956522 Post Review N/A212 NELSIP/NP/MU/TUPS/W/03

Metalling & Tarring Mallavi Iyankulam

road(mangainar rd -Continuation)

Therankandal

Thunukkai PS Thunukkai PS NCB

N/A - NCB 6.75 0.058695652 Post Review N/A

N/A -

209 NELSIP/NP/MU/PUPS/W/06 Muththaiyankaddu Mosque Internal Road Puthukkudiyiruppu PSPuthukkudiyirup

pu PS

6.75 0.058695652 Post Review N/A LKR208 NELSIP/NP/MU/PUPS/W/05Repair of Muththuiyankaddu Market

Circular RoadPuthukkudiyiruppu PS

Puthukkudiyirup

pu PSNCB

LKR N/A - NCB 2.70 0.023478261 Post Review N/A

N/A -

207 NELSIP/NP/MU/PUPS/W/04Reconstruction of slaughter House

Oddisuddan Puthukkudiyiruppu PS

Puthukkudiyirup

pu PS

9.00 0.07826087 Post Review N/A LKR206 NELSIP/NP/MU/PUPS/W/03Metalling & Tarring Thaddayamalai

Church RoadPuthukkudiyiruppu PS

Puthukkudiyirup

pu PSNCB

N/APost Review N/A LKR215 NELSIP/NP/MU/KTPS/W/01Metalling & Tarring Rizard

Road KanukernyKarathuraipattu PS

Karathuraipattu

PSNCB

N/A Metalling & TarringThirunagar school

front road Thunukkai PS 7.50 0.1065

6.75 0.0587

LKRPost Review N/A2.28 K.P.K Construction

K.P.K Construction N/A0.007304348 Post Review N/A

Post Review N/A

0.79

LKR

N/A

210 NELSIP/NP/MU/TUPS/W/01Construction of Market and Meatstall

Building IyankulamThunukkai PS Thunukkai PS NCB 2.64 0.022956522

Thunukkai PS

N/A

Reconstruction of Market Meat stall

Building MallaviThunukkai PS 0.84

Post Review0.064608696

Thunukkai PS NCB

213 NELSIP/NP/MU/TUPS/04

211 NELSIP/NP/MU/TUPS/W/02

NCB

LKR 6.46

LKR 7.45

N/A

Post Review

205 NELSIP/NP/MU/PUPS/W/02Reconstruction of Thachchadmpan

Periyapuliyankulam School RoadPuthukkudiyiruppu PS

Puthukkudiyirup

pu PSNCB 7.43

N/A204 NELSIP/NP/MU/PUPS/W/01Reconstruction of Mankulam Katkuvari

RoadPuthukkudiyiruppu PS

Puthukkudiyirup

pu PS0.069130435NCB 7.95 1.44

N/A 1.31

Sulaikha and Sons

Contractor

Sulaikha and Sons

Contractor

LKR

N/A

-

1.27

N/A

Page 276: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 23-Feb-12 20/3/2012 3-May-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 23-Feb-2012 20-Mar-2012 3-May-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12

Actual 23-Feb-2012 20-Mar-2012 3-May-12 8-Sep-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 1-Mar-12

Actual 23-Feb-2012 20-Mar-2012 3-May-12 8-Sep-12

Planned 13-Oct-11 3-Nov-11 1-Dec-11 30-Apr-12

LKR N/ANCB 5.00 0.043478261 Post Review N/A223 NELSIP/NP/MU/MEPS/W/2Contruction of Naddankandal Market and

Shoping Complex Manthai East PS Manthai East PS

LKR N/ANCB 4.50 0.039130435 Post Review N/A

N/A

222 NELSIP/NP/MU/KTPS/W/8HijraPuram Children Park with Play

GroundKarathuraipattu PS

Karathuraipattu

PS

4.50 0.039130435 Post Review N/A LKR221 NELSIP/NP/MU/KTPS/W/7Thaneerottru Children Park with Play

GroundKarathuraipattu PS

Karathuraipattu

PSNCB

LKR N/ANCB 3.15 0.027391304 Post Review N/A

N/A

220 NELSIP/NP/MU/KTPS/W/06 Neerawippitti East Road Mulliyawalai Karathuraipattu PSKarathuraipattu

PS

6.75 0.058695652 Post Review N/A LKR219 NELSIP/NP/MU/KTPS/W/05 Neerawippitti East Road Neerawippitti Karathuraipattu PSKarathuraipattu

PSNCB

LKR N/ANCB 6.75 0.058695652 Post Review N/A

N/A

218 NELSIP/NP/MU/KTPS/W/04 Hijra Puram internal Road Hijirapuram Karathuraipattu PSKarathuraipattu

PS

4.50 0.0391 Post Review N/A LKR

N/A

217 NELSIP/NP/MU/KTPS/W/03Construction of Children Park

Mullaithivu South Karathuraipattu PS

Karathuraipattu

PSNCB

0.0587 Post Review N/A LKR216 NELSIP/NP/MU/KTPS/W/02Metalling & Tarring Rani road

Mullaithivu West Karathuraipattu PS

Karathuraipattu

PSNCB 6.75

ACLG

11.07

0.117130435

N/A

N/A

N/A

Thunukkai PS

Bavithan

Contraction

K.P.K Construction

Subramaniyam

Coustruction

N/A LKR

11.03

11.93

N/A0.112434783 Post Review

0.10373913 10.70

Post Review N/A

KSB Construction

LKR 11.90

K.P.K Construction

226

227 NELSIP/NP/MU/ACLG/W/04

225 NELSIP/NP/MU/ACLG/W /02Renovation of Pradeshiya Sabha behind

Road

LKR

NELSIP/NP/MU/ACLG/W/03 Renovation of Yogapuram Centre Road Thunukkai PS ACLG

Construction of Mankainagar Mallavi

Main RoadNCB Post Review

NCB 13.47

N/A LKR 10.90 13.34 0.116 Post ReviewNCB

228 NELSIP/NP/MU/ACLG/W/05Renovation of Land No 317 to 350 Link

RoadManthai East PS ACLG NCB 12.93

ACLGManthai East PS

LKR

N/A -

N/A -

-

NCB 13.45 0.116956522 Post Review N/A224 NELSIP/NP/MU/ACLG/W/01 Renovation of Vettiyar veethy Karathuraipattu PS ACLG 1.60

Page 277: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 2-Apr-2012 24-Apr-2012 2-Jun-12

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 8-Nov-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual

Planned 19-Jun-2012 12-Jul-2012 10-Aug-2012 10-Dec-2012

Actual 29-Jun-2012 24-Jul-2012

Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Oct-2012

Actual 24-May-2012

Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Oct-2012

Actual

N/A12.30 0.106956522 Post Review N/A LKR230NELSIP/NP/MU/MEPS/W/7-

MEPS

Metalling & Tarring Poovarankulam

coloni Link roadManthai East PS

R/ACLG,

MullaithivuNCB

N/A18.76 0.1271 Post Review N/A LKR236NELSIP/NP/MU/ACLG/W/13-

MEPS

Metalling & Tarring30 housing scheme

toParappukal roadManthai East PS

R/ACLG,

MullaithivuNCB

LKR N/ANCB 12.60 0.1096 Post Review N/A235NELSIP/NP/MU/ACLG/W/12-

TUPS

Reconstruction of Shops at Mallavi

marketThunukkai PS

R/ACLG,

Mullaithivu

LKR

11.07

N/ANCB 10.65 0.1 Post Review N/A

N/A

229NELSIP/NP/MU/ACLG/W/6-

TUPS

Metalling & Tarring Puthuveduvan health

center road Thunukkai PS

R/ACLG,

Mullaithivu

22.50 0.1957 Post Review N/A LKR234NELSIP/NP/MU/ACLG/W/09-

PUPS

Reconstruction of Public Market & Shops

MankulamPuthukkudiyiruppu PS

R/ACLG,

MullaithivuNCB

LKR N/ANCB 22.50 0.1957 Post Review N/A

N/A

233NELSIP/NP/MU/ACLG/W/08-

PUPS

Reconstruction of Public Market & Shops

OddisuddanPuthukkudiyiruppu PS

R/ACLG,

Mullaithivu

13.50 0.117391304 Post Review N/A LKR

N/A

232NELSIP/NP/MU/ACLG/W/07-

KTPSMurippu internal Road Murippu Karathuraipattu PS

R/ACLG,

MullaithivuNCB

0.117391304 Post Review N/A LKR231NELSIP/NP/MU/ACLG/W/06-

KTPS

Construction of Market & Shopping

Complex Stage I Mullaithivu TownKarathuraipattu PS

R/ACLG,

MullaithivuNCB 13.50

N/AN/A0.112434783 Post Review KSB ConstructionLKR228 NELSIP/NP/MU/ACLG/W/05Renovation of Land No 317 to 350 Link

RoadManthai East PS ACLG NCB 12.93

Post Review N/A LKR237 NELSIP/NP/PMU/W/01Extention of the CLG office Building For

Pura Neguma Office PMU,NP PMU,NP CC N/A 0.58

238 NELSIP/NP/PMU/W/02 Parttion of the CLG Office building PMU,NP PMU,NP

2.00 0.017391304

NS 1.50 0.013043478 Post Review N/A LKR N/A

2.2Themarachchiwest

MPCS

Page 278: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Nov-2012

Actual

Planned 15-Jun-2012 15-Jul-2012 15-Aug-2012 15-Nov-2012

Actual

Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11

Actual 4-Jul-11 26-Jul-11 30-Sep-11 24-Jan-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 24-Oct-11 14-Nov-11 25-Jan-12 1-May-12

Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11

Actual 4-Jul-11 26-Jul-11 30-Sep-11 3-Jan-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 23-Sep-11 14-Oct-11 10-Jan-12 16-Mar-12

Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11

Actual 8-Jul-11 1-Aug-11 21-Dec-11 28-Mar-12

Planned 20-Jun-11 18-Jul-11 15-Aug-11 14-Nov-11

Actual 8-Jul-11 1-Aug-11 11-Nov-11 25-Feb-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 26-Sep-11 18-Oct-11 19-Jan-12 28-Mar-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 26-Sep-11 18-Oct-11 19-Jan-12 28-Mar-12

Planned 13-Mar-11 4-Apr-11 2-May-11 1-Jul-11

Actual 20-Apr-12 14-May-12

Planned 31-Aug-11 17-Nov-11

Actual 19-Aug-11 5-Dec-11

Planned 4-Nov-11 3-Jan-12

Actual 28-Nov-11 28-Feb-12

Planned 4-Nov-11 3-Jan-12

Actual 28-Nov-11 28-Feb-12

Planned 4-Nov-11 3-Jan-12LKR 1.27

Community Center,

JayanthipuraN/A - 253 EP/TR/KAPS/W/04

Improvements to Bridge structure at

Jeyanthipura 3rd cross Channel in

Kantale

Kantale PS Kantale PS CC 9.70 0.084347826 Post Review

252 EP/TR/KAPS/W/03Construction of bridge at seruvila across

the Peraru Channel KantaleKantale PS Kantale PS CC 1.12 0.00973913 Post Review

N/A LKR 7.44 CEB

N/A 1.26

251 EP/TR/KAPS/W/02 Supply of electricity to Wanela west Kantale PS Kantale PS DC

250 EP/TR/KAPS/W/01Constructoin of Bridge at 2460m of RB

Main channel, Batukachchiya in Kantale.Kantale PS Kantale PS CC 1.20 0.010434783 Post Review

4.10

249 EP/TR/TGPS/W/05 Blcok paving of Tsnami Gama Road Town & Gravets PSTown & Gravets

PSNCB 9.45 0.082173913

2.20

248 EP/TR/TGPS/W/04

Improvement of Thevanagar road at

Thevanagar, Puliyankulam in

Trincomalee

Town & Gravets PSTown & Gravets

PSNCB 9.45 0.082173913

Ragal Construction N/AN/A LKR 7.22

1.25

247 EP/TR/TGPS/W/03

Improvement of Jayasundara Mawatha

at Gemunupura, 5th mile

post,Sumethankarapura in Trincomalee.

Town & Gravets PSTown & Gravets

PSNCB 8.10 0.070434783

NCB 3.10 0.026956522 Post Review N/A

M.A.M. Fareed

ConstructionN/A 2.20

246

EP/TR/TGPS/W/02

Construction Of Market At Vellaimanal

TrincomaleeTown & Gravets PS

Town & Gravets

PS

2.30

245 EP/TR/TGPS/W/01

Construction Of Drainage From

Nithyapuri to Farm Road at third Mile,

Post Uppuveli In Trincomalee.

Town & Gravets PSTown & Gravets

PSNCB 5.50 0.047826087

2.14

244 EP/TR/KIUC/W/02

Construction of Concrete road with

Retaining wall at Ahudhanagar,

Addappana vayal Lagoon side in

Kinniya UC Kinniya UC NCB 9.11 0.079217391

2.30

243 EP/TR/ KIUC/W/ 01Construction of Fish Market at

Kandaladyoothu, Faizal Nagar, KinniyaKinniya UC Kinniya UC NCB 2.90 0.025217391

242 EP/TR/TRUC/W/02Improvement of Court road with side

drainage and culvert in TrincomaleeTrincomalee UC Trincomalee UC NCB 5.60 0.048695652 Post Review

241 EP/TR/TRUC/W/01Improvement of Customs Road in

TrincomaleeTrincomalee UC Trincomalee UC NCB

N/A N/A N/A

N/AN/A N/A N/A

N/A 7.30

LKR -

0.06426087 Post Review N/A N/A

1.04

Jana Jaya

Community

Center,Kanthale

LKR 1.26 Ekkamuthu

Community centerN/A N/A N/A

7.39

N/AN/A LKR

8.12 Ragal Construction N/ALKR

Post Review

Post Review N/A

2.51 SVMK

Construction

LKR

Post Review

N/ALKR

Post Review N/A

Post Review

N/A LKR 4.09

4.84 N/A LKR

Post Review

Sunrise

Constructon

8.02 EHJAS

ConstructionN/A

Farwees

ConstructionN/A

N/A

N/A LKR 2.16

N/A LKR 5.67 Sivashakthi

ConstructionN/A 3.70 6.20 0.053913043 Post Review

0.5239 NELSIP/NP/PMU/W/03Renovation of the Mannar R/ACLG

Office buildingDPMU,NP DPMU,NP NS

1.00 0.008695652

N/A LKR0.004347826 Post Review

Post Review N/A240 NELSIP/NP/PMU/W/04Renovation of the Trainning Hall at

R/ACLG Office JaffnaDPMU,NP DPMU,NP NCB LKR

N/A

N/A

Page 279: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 20-Nov-11 20-Feb-12

Planned 4-Nov-11 3-Jan-12

Actual

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 26-Apr-12 14-May-12

Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11

Actual 13-Jul-11 4-Aug-11 15-Oct-11 14-Jan-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 21-Nov-11 12-Dec-11 21-Feb-12 31-Jul-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 21-Nov-11 12-Dec-11 21-Feb-12 5-Jul-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 3-Feb-12 24-Feb-12 16-May-12 15-Aug-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 1-May-12 21-May-12 25-Jul-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 1-May-12 21-May-12 25-Jul-12

Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11

Actual 11-Jul-11 2-Aug-11 4-Nov-11 14-Feb-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 28-Sep-11 20-Oct-11 11-Jan-12 25-Apr-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 3-Jan-12 3-Feb-12 17-Mar-12 23-Jun-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 4-Jul-11 26-Jul-11 29-Feb-12 31-Jul-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 30-Sep-11 24-Oct-11 14-Dec-11 21-Mar-12

Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11

Actual 13-Jul-11 4-Aug-11 30-Sep-11 6-Jan-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 29-Sep-11 21-Oct-11 28-Apr-12 31-Aug-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 29-Sep-11 21-Oct-11 28-Apr-12 31-Aug-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 29-Sep-11 21-Oct-11 28-Apr-12 31-Aug-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12 7.04 0.061217391 2.10 271 EP/TR/KUPS/W/05

Mettaling & Tharring of Kumburupity

North Mariamman Kovil roadKuchaveli PS Kuchaveli PS NCB

Shalika And

ContructionN/APost Review 1.51 N/A LKR

5.03

1.80

270 EP/TR/KUPS/W/04Metaling & Tarring to Periyakulam

internal roadKuchchaveli PS Kuchchaveli PS NCB 5.88 0.051130435

3.99

269 EP/TR/KUPS/W/03Metaling & Tarring of Pulmoddai

Arafanagar roadKuchchaveli PS Kuchchaveli PS NCB 6.51 0.056608696

268 EP/TR/KUPS/W/02Metaling & Tarring of Thiriyai internal

roadKuchchaveli PS Kuchchaveli PS NCB 9.10 0.079130435

Shhira Agency

0.04173913 Post Review N/A 4.70 N/ALKR 4.73 Sulaika 7 Sons

Contractor

N/A 2.70

267 EP/TR/KUPS/W/01

Construction of Metaling & Tarring

Kanakula Road at Thiriyai GN Division

in Kuchchaveli Division

Kuchchaveli PS Kuchchaveli PS NCB 4.80

266 EP/TR/MOPS/W/02Construction of public Market Building,

at Mahadiulwewa Morawewa PS Morawewa PS NCB 3.69 0.032086957

RS Construction,

Kinniya

Post Review N/A 0.88 N/AM.S.Rasika

ConstructionLKR

1.60

265 EP/TR/MOPS/W/01Construction of block paving along school

road at MahadivulwewaMorawewa PS Morawewa PS NCB 3.69 0.032086957

5.40

264 EP/TR/GOPS/W/03

CONSTRUCTION OF CONCRETE

ROAD FOR THIRAPANE -

GALGADAWELLA ROAD

Gomarankadawela PS GOPS NCB 12.72 0.110608696

4.30

263 EP/TR/GOPS/W/02

Construction of Concrete Block paving

for Indikatuwewa Road in

Gomarankadawela.

Gomarankadawela PS GOPS NCB 8.82 0.076695652

0.040869565Munees

ConstructionN/APost Review N/A LKR 4.20

N/A

262 EP/TR/GOPS/W/01Ipprovement of Market Building in

GomarankadawelaGomarankadawela PS

Gomarankadawe

la PSNCB 4.70

8.78

261 EP/TR/SEPS/W/06Construction of bridge across Serunuwara

RajaelaSeruwilla Ps NCB 5.82 0.050608696 Post Review

Mack Civil

EngineeringN/A -

260 EP/TR/SEPS/W/05Block paving of Somapura

SamagimawathaSeruwilla Ps

Seruwilla Ps NCB

259 EP/TR/SEPS/W/04CONSTRUCTION OF SELVANAGAR

RDS ROADSeruvila PS Seruvila PS NCB 7.92 0.068869565 Post Review

-

258 EP/TR/SEPS/W/03Construction of Concreet block paving at

Serunuwara Siriduwa road Seruvila PS Seruvila PS NCB 5.68 -

N/A LKR 6.01 MAM Fareed

constructionN/A257 EP/TR/SEPS/W/02

Construction of Concrete block paving at

Dehiwatta Samagipura roadSeruvila PS Seruvila PS NCB 6.70 0.05826087 Post Review

256 EP/TR/SEPS/W/01Constrution of Market Stalls Building at

Seruwila Rajamaha Viharaya in Seruwila.Seruvila PS Seruvila PS NCB 6.50 4.13

0.047652174 Post Review N/A LKR N/A

0.016608696 Post Review N/A

255 EP/TR/VEPS/W/01Construction of drainage at

ValaiththoddamVerugal Ps Verugal Ps NCB 5.48

LKR 1.27 Community Center,

JayanthipuraN/A - 253 EP/TR/KAPS/W/04

Improvements to Bridge structure at

Jeyanthipura 3rd cross Channel in

Kantale

Kantale PS Kantale PS CC 9.70 0.084347826 Post Review

Post Review N/A Sahira Agency

5.66

6.40

N/A N/ALKRShak Agency

N/ALKR

N/AN/A LKR 8.00

Post Review

Post Review

Post Review

N/A LKR 8.02

N/A LKR 3.06

6.60

7.84 Uthpalana

ConstructionN/ALKR

Post Review

Post Review N/A

NAARS

ConstructionN/A

6.19 Ganditha Civil

Engenerring N/ALKR

0.049391304 Post Review N/A LKR

Ganditha Civil

Engenerring

N/A LKR 7.81

0.076347826 Post Review N/A 8.65 N/ALKR

5.44 Orient Construction N/A

4.70

Okra Construction

EngineeringN/A

LKR

N/A

0.056521739 Post Review N/A

LKR254 EP/TR/KAPS/W/05EXTENSION OF WATER SUPPLY

LINES AT KANTHALAY PERARUKantale PS Kantale PS DC 1.91

N/A N/A N/A

N/A N/A

Page 280: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 2-Mar-12 23-Mar-12 25-Apr-12 24-Sep-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 2-Mar-12 23-Mar-12 25-Apr-12 24-Sep-12

Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11

Actual 11-Jul-11 2-Aug-11 14-Nov-11 15-Jan-12

Planned 24-Jun-11 21-Jul-11 18-Aug-11 17-Nov-11

Actual 8-Jul-11 1-Aug-11 25-Oct-11 27-Jan-02

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 22-Sep-11 14-Oct-11 10-Jan-12 13-Apr-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 22-Sep-11 14-Oct-11 10-Jan-12 13-Apr-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 28-Sep-11 19-Oct-11

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 28-Sep-11 19-Oct-11 11-Jan-12 25-Apr-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12 28-May-12 22-Sep-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12 28-May-12 22-Sep-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12 28-May-12 22-Sep-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 9-Mar-12 30-Mar-12 28-May-12 22-Oct-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 31-Oct-11 21.Nov-11 9-Jan-12 24-Apr-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 14-Mar-12 4-Apr-12 12-Jun-12 11-Nov-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 14-Mar-12 4-Apr-12 12-Jun-12 11-Nov-12

Planned 16-Jun-11 12-Jul-11 11-Aug-11 10-Nov-11N/A 4.20 289 EP/TR/RACLG/W/01

Improvement of Thulasipuram Road in

TrincomaleeTrincomalee UC

RACLG

TrincomaleeNCB 11.40 0.099130435

Uthpalana

Construction

288 EP/TR/PAPS/W/03Consreting of Saiman Kade to Meeoya

Aniket roadPadavisripura ps NCB 9.82 0.085391304 Post Review N/A

NCB 9.90 0.086086957 Post Review N/A

N/APost Review 3.38

287 EP/TR/PAPS/W/02Concrete surfacing to Mahasen Mawatha

at ThissapuraPadavisripura ps

Padavisripura ps

0.92

286 EP/TR/PSPS/W/01Construction of side drainage at

Jayanthiwewa main roadPathavisiripura PS

Pathavisiripura

PSNCB 4.15 0.036086957

0.96

285 EP/TR/MUPS/W/06Mettaling & Tharring of Ilakkandai to

Patalipuram link roadMuthur Ps Muthur Ps NCB 5.29 0.046

284 EP/TR/MUPS/W/05Mettaling & Tarring of Pattithidal to

Manalchenai link roadMuthur Ps Muthur Ps NCB 6.20 0.053913043 Ilham construction

0.042434783 Post Review N/A 1.02 N/ALKR 5.12 Ilham construction

N/A 0.88

283 EP/TR/MUPS/W/04Mettalin & Tharring of Neithal Nagar to

Pala Nagar link roadMuthur Ps Muthur Ps NCB 4.88

282 EP/TR/MUPS/W/03Mettaling & Tharring of Allai Nagar west

to Ikbal Nagar link roadMuthur Ps Muthur Ps NCB 5.23 0.045478261 Ilham construction

5.88 0.051130435 Post Review N/A 1.80 N/ARS ConstructionLKR281 EP/TR/MUPS/W/02Construction of Market building at

Allainagar, ThopurMuttur PS Muttur PS NCB

9.61 0.083565217 N/APost Review

7.95 0.069130435

280 EP/TR/MUPS/W/01Metaling & Taring to Kattaiparichchan

north south link roadMuttur PS Muttur PS NCB

279 EP/TR/THPS/W/06Block paving of Galmetiyawa School

central roadThampalagamam Ps

Thampalagama

m PsNCB

N/APost Review N/A LKR278 EP/TR/THPS/W/05 Block paving of Muhamadiya Nagar road Thampalagamam PsThampalagama

m PsNCB 7.97 0.069304348

4.80

277 EP/TR/THPS/W/04Block paving of Thelungu nagar 01st

cross streetThampalagamam Ps

Thampalagama

m PsNCB 7.95 0.069130435

276 EP/TR/THPS/W/03

Construction of concrete Block paving of

Kobbekaduwa road in Thampalagamam

D.S Division

Thambalakamam PSThambalakama

m PSNCB 6.95 0.060434783

M2 Lanka

Engineering (Pvt)

Ltd

0.067391304 Post Review N/A 6.50 N/ALKR 6.51

M2 Lanka

Engineering (Pvt)

Ltd

N/A 7.13

275 EP/TR/THPS/W/02

Construction of Concrete Block paving of

Kuda road in Thampalagamam D.S

Division

Thambalakamam PSThambalakama

m PSNCB 7.75

274 EP/TR/THPS/W/01

Construction of Concrete Block Paving

for Mullipothanai Main Road At

Mullipothanai in Thampalakamam DS

Thambalakamam PS Thambalakama

m PS NCB 8.40 0.073043478

M.A.M. Fareed

Construction

4.70 0.040869565 Post Review N/A 4.70 N/AMunees

ConstructionLKR273 EP/TR/KIPS/W/01

Construction of Tarring at

Elumathuraiyady at Kurunchakerny in

Kinniya

Kinniya PS Kinniya PS NCB

6.11 0.053130435 N/A 2.65 Post Review

7.04 0.061217391 2.10

272 EP/TR/KUPS/W/06 Mettaling & Tharring of Jinna Palli road Kuchaveli PS Kuchaveli PS NCB

271 EP/TR/KUPS/W/05Mettaling & Tharring of Kumburupity

North Mariamman Kovil roadKuchaveli PS Kuchaveli PS NCB

LKR

N/A LKR 10.22 Post Review

N/A - LKR 9.30

9.10 Gowri Construction N/A -

N/A LKR 3.73

4.60

Sulaika ASC

N/A

Gamini

Construction

N/ALKR Ilham construction

N/AN/A LKR 4.80 Post Review

Post Review

Post Review

N/A LKR

N/A

Post Review N/A

LKR 4.40

4.98

N/A N/ALKR

N/ALKR

N/AN/A LKR 5.72 Post Review

Post Review

Post Review

N/A LKR 6.30

N/A

Post Review N/A

Sahira Agency

LKR 7.75

4.15

Sahira Agency 6.40 N/ALKR

Page 281: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 17-Aug-11 8-Sep-11 29-Mar-12 28-Jul-12

Planned 16-Jun-11 12-Jul-11 11-Aug-11 10-Nov-11

Actual 18-Aug-11 8-Sep-11 30-Nov-11 1-Mar-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 12-Oct-11 3-Nov-11 28-Dec-11 2-Apr-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 12-Oct-11 3-Nov-11 2-Jan-12 8-Apr-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 1-Nov-11 22-Nov-11 11-Jan-12 25-Apr-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 1-Nov-11 22-Nov-11 29-Dec-11 5-Apr-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 1-Nov-11 22-Nov-11 12-Jan-12 31-Jul-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 12-Oct-11 3-Nov-11 7-Jan-12 10-Apr-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 1-Nov-11 22-Nov-11 23-Jan-12 30-Apr-12

Planned 15-Sep-11 7-Oct-11 4-Nov-11 3-Jan-12

Actual 1-Nov-11 22-Nov-11 10-Jan-12 23-May-12

Planned 13-Sep-11 5-Oct-11 2-Nov-11 1-Jan-12

Actual 27-Dec-11 17-Jan-12 2-Jul-12

Planned 24-Feb-12 16-Mar-12 18-Apr-12 18-Sep-12

Actual 24-Feb-12 16-Mar-12 7-May-12 6-Oct-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 22-Jun-12 13-Jul-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 24-Feb-12 16-Mar-12 25-May-12 22-Oct-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 24-Feb-12 16-Mar-12 21-May-12 13-Oct-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 9-Apr-12 30-Apr-12 14-May-12 6-Nov-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 9-Apr-12 30-Apr-12 6-Jul-12 6-Nov-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 24-Feb-12 16-Mar-12 22-May-12

Planned 24-Feb-12 19-Mar-12 27-May-12 27-Oct-12 - 307 EP/TR/RACLG/W/19

Block paving of Jinna Nagar to Alin

Nagar link roadMuttur PS RACLG NCB 10.47 0.091043478

NCB 13.77 0.11973913Adman

ContrcuctionN/APost Review N/A LKR

11.50 0.1 Post Review -

306 EP/TR/RACLG/W/18

Construction of Concrete Block paving of

97th to 98th link road Stage 1 in

Thampalagamam DS Division

Thampalagam PS RACLG

11.00 0.095652174 Post Review

305 EP/TR/RACLG/W/17Block paving of Ayliyadi Muslim Colani

RoadKinniya Ps RACLG NCB

Post Review N/A

304 EP/TR/RACLG/W/16Mettaling & Tarring of

Kachchakodhitheew Mahamaru road Kinniya Ps RACLG NCB

303 EP/TR/RACLG/W/15Mettaling & Tarring of Kuruinchakerny

Main roadKinniya Ps RACLG NCB 13.74 0.119478261

16.00 0.139130435 MM Building N/A 13.63 Post Review LKR

0.104869565 Post Review

302 EP/TR/RACLG/W/14 Concreting of Al-Irfa school road Kinniya UC RACLG NCB

N/A

301 EP/TR/RACLG/W/13 Improvement of Main street - stage 1 Trincomalee UC RACLG NCB 12.06

5.19

300 EP/TR/RACLG/W/12Improvement of court road- stage 2 with

drainage and 2 culverts Trincomalee UC RACLG NCB 24.08 0.209391304

13.23 0.115043478 Lankamachine

Leasers PVT LtdN/ALKR 17.68 299 EP/TR/RACLG/W/11

Improvements to Illangathurai main road

to Punnayadi ferry roadVerugal PS RACLG NCB

11.68 0.101565217 Post Review 3.00 N/A

21.64 0.188173913 -

298 EP/TR/RACLG/W/10Construction of pipe water supply scheme

at GemunupuraPathavisiripura PS RACLG NCB

297 EP/TR/RACLG/W/09METALING AND TARING AT AT

ATHABENTHIWEWAMorawewa PS RACLG NCB

0.094521739 Post Review N/A 3.54 9.61 SA Construction

and TradersN/A

N/A -

296 EP/TR/RACLG/W/08 Construction of public market at Sripura Pathavisiripura PS RACLG NCB 10.87

-

295 EP/TR/RACLG/W/07Construction of Block paving to

Kakkamunai west roadKinniya PS RACLG NCB 17.25 0.15

294 EP/TR/RACLG/W/06Concreating of Jayanthipura 20th barrier

roadKantale PS RACLG NCB 12.07 0.104956522 Post Review

20.00 0.173913043 Lucky Construction N/A 6.40 Post Review

13.23 0.115043478 3.60

293 EP/TR/RACLG/W/05Construction of Market building at new

bus stand in MuthurMuttur PS RACLG NCB

292 EP/TR/RACLG/W/04Improvements to Illangathurai main road

to Punnayadi ferry roadVerugal PS RACLG NCB

N/ALKR 11.58 6.10 291 /EP/TR/RACLG/W/03

Construction of Concrete Block Paving to

Kattaiyaru Seaside Road at

Malinthurai,Periyathumunai

Kinniya UC RACLG NCB 13.36 0.116173913Lanka Machine

Leasers(pvt)LTD

10.80 0.093913043 Post Review N/A 9.57

N/A 4.20

290 EP/TR/RACLG/W/02

Improvement of Illankaithurai Main Road

at Echchilampattru in Verugal

D.S.Division

Verugal PSRACLG

TrincomaleeNCB

289 EP/TR/RACLG/W/01Improvement of Thulasipuram Road in

TrincomaleeTrincomalee UC

RACLG

TrincomaleeNCB 11.40 0.099130435

Uthpalana

Construction

8.32 Adman

ContrcuctionN/ALKRPost Review N/A

10.94

9.42

N/A LKR 8.69

N/AN/A LKRMAM Fareed

construction

- LKR 10.90

Adman

ContrcuctionN/A -

A.R.Contruction N/A

N/A LKR

N/A

LKR 27.00

N/A

Udana Engineers

Ragal Construction

8.44

N/A

LKR

Post Review

N/A LKR 12.95

N/A

Post Review

LKR

N/A

Post Review

M2 Lanka

Engineering (Pvt)

Ltd

N/A

Post Review

N/A LKR 17.50

N/A LKR 12.91

10.31

M2 Lanka

Engineering (Pvt)

Ltd

N/ALKR

N/ALKRM2 lanka

Engineering Pvt Ltd

Post Review

N/A

N/A

10.00 Sisira Builders

11.54 Lanka Machine

leasersN/A

N/ALKR

Post Review

N/A LKR 10.22 Post Review

Page 282: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 24-Feb-12 16-Mar-12 14-May-12 30-Sep-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 24-Feb-12 16-Mar-12 27-May-12 27-Sep-12

Planned 24-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual 9-Apr-12 30-Apr-12 18-Jun-12 27-Oct-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 24-Feb-12 16-Mar-12 9-May-12 9-Oct-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 9-Apr-12 30-Apr-12 26-Jun-12 25-Nov-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 9-Apr-12 30-Apr-12 3-Jul-12 2-Dec-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 22-Jun-12 13-Jul-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 24-Feb-12 16-Mar-12 30-Nov-12

Pathavisiripura PS Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 24-Feb-12 16-Mar-12 17-May-12 16-Oct-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 24-Feb-12 16-Mar-12 2-May-12 2-Oct-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 9-Apr-12 30-Apr-12 28-Apr-12 23-Oct-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 9-Apr-12 30-Apr-12 28-Apr-12 23-Oct-12

Planned 2-Mar-12 26-Mar-12 25-Apr-12 25-Sep-12

Actual 24-Feb-12 16-Mar-12 2-May-12 1-Oct-12

Planned 12-Mar-12 2-Apr-12 27-Apr-12 25-Sep-12

Actual 22-Jun-12 13-Jul-12

Planned 28-Dec-12 18-Jan-13 17-Feb-13 15-Oct-13

Actual

Planned 27-Feb-12 19-Mar-12 18-Apr-12 18-Sep-12

Actual

Planned 22-May-11 3-Jun-11 24-Jun-11 5-Aug-11 1-Nov-11

Actual 7-Jun-11 29-Jun-11 21-Jul-11 19-Sep-11 19-Dec-11

Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11 7.25 8.76 0.076173913 Post Review Shana Const. N/AN/A LKR 7.15

7.76 0.067478261 Prior Review

324 EP/BT/KPPS/W/02Const. of Concrete surfacing to

Sunkankerny Kinnaiyady Link Road Koralaipattu PS Koralaipattu PS NCB

323 EP/BT/KPPS/W/01Construction of Concrete Surfacing to

Barathy road at Kiran West (900 m)Koralaipattu PS Koralaipattu PS NCB

N/A - 34.55 0.300434783 Post Review N/A LKR322 EP/PMU/W/09 Construction of Multippurpose Building Kanthale Ps (T) PMU NCB

N/A -

-

321 EP/PMU/W/08Construction of water supply scheem at

Gomarankadawala

Gomarankadawalla PS

(T)PMU NCB 28.90 0.251304348

320 EP/TR/RACLG/W/32 Improvement of Serunuwara market Seruwilla Ps RACLG NCB 8.20 0.071304348 Post Review

13.35 0.116086957 Vaman Enterprices N/A 3.20 Post Review

0.128086957 Post Review -

319 EP/TR/RACLG/W/31

Mettaling and Tarring to Illankaithurai

main road 2.0km at Vinayagapuram in

Verugal

Verugal PS RACLG NCB

NCB 22.31

318 EP/TR/RACLG/W/30Block paving of Nochchikulam central

roadMorawewa PS RACLG NCB 14.73

14.35 Nars Construction N/A -

317 EP/TR/RACLG/W/29Mettaling & Tharring of Ethabediwewa

road - Stage -2Morawewa PS RACLG

N/A -

316 EP/TR/RACLG/W/28 Construction of Public Market Morawewa PS RACLG NCB 17.54

-

315 EP/TR/RACLG/W/27Concreting to Lassana gama , Diulapitiya

Tempale roadRACLG NCB 10.17 0.088434783

-

314 EP/TR/RACLG/W/26Construction of Childran Park & Day

care center in Kanthalay.Kanthale Ps (T) RACLG NCB

NCB N/A LKR

11.50 0.100 Post Review -

313 EP/TR/RACLG/W/25 Construction of Cremotorium at Kanthale Kanthale Ps (T) RACLG

10.54 0.091652174 Post Review

312 EP/TR/RACLG/W/24 Block Paving of Mihindupura School road Town & Gravets PS RACLG NCB

21.57 0.187565217 Post Review

311 EP/TR/RACLG/W/23 Block paving of Linganagar Internal road Town & Gravets PS RACLG NCB

310 EP/TR/RACLG/W/22Construction of Drainage at Puliyankulam

UppuweliTown & Gravets PS RACLG NCB

0.156 Post Review N/A LKRSulaika 7 Sons

ContractorN/A -

N/A -

309 EP/TR/RACLG/W/21Mettaling & Tharring of Valautthu

Cematary roadKuchchaveli PS RACLG NCB 17.94

-

308 EP/TR/RACLG/W/20 Mettaling & Tharring of Salamiya street Kuchchaveli PS RACLG NCB 16.20 0.140869565

307 EP/TR/RACLG/W/19Block paving of Jinna Nagar to Alin

Nagar link roadMuttur PS RACLG NCB 10.47 0.091043478

6.60 Bemake Const.

LKR

Post Review

N/A 6.60 LKR

N/A LKR

N/A

11.92 Sulaika ASC

N/A

N/AN/A LKR

N/A LKR 11.49

N/A - 0.194 Post Review N/A LKR 18.05

LKR 8.59 Sulaiaka ASC

Sulaika ASC

LKR

Post Review N/A

0.152521739

Post Review N/A

Post Review N/A

LKR 14.08 M2Lanka

Engeeneing

10.10 Samasiri & Sons

ConstructionN/AN/A LKR

Post Review

Varnan Enterprises N/A - N/A LKR 12.60

MMM Contraction N/A - N/A LKR 19.40

9.96

LKR 13.64 Vaman Enterprices

8.32 Adman

ContrcuctionN/ALKR

Post Review N/A

Post Review N/A

Page 283: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 23-Set-11 14-Oct-11 30-Dec-11 29-Mar-12

Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12

Actual 2-Mar-12 23-Mar-12

Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12

Actual 2-Mar-12 23-Mar-12 23-May-12

Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12

Actual 23-May-12 13-Jun-12

Planned 9-Apr-12 09-Jul-12

Actual 30-Apr-12 29-Jul-12

Planned N/A 9-Apr-12 09-Jul-12

Actual 30-Apr-12 29-Jul-12

Planned N/A 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12

Actual 2-Mar-12 23-Mar-12 20-Jun-12 18-Sep-12

Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11

Actual 29-Jun-11 21-Jul-11 10-Oct-11 2-Jan-12

Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11

Actual 29-Jun-11 21-Jul-11 5-Oct-11 16-Jan-12

Planned N/A 27-Feb-12 19-Mar-12 2-Apr-12 2-Jul-12

Actual 5-Apr-12 21-May-12 24-May-12 10-Sep-12

Planned 27-Feb-12 19-Mar-12 2-Apr-12 2-Jul-12

Actual 3-May-12 24-May-12 26-Jul-12 24-Oct-12

Planned 2-Apr-12 2-Jul-12

Actual 29-May-12 28-Aug-12

Planned 16-Jun-11 14-Sep-11

Actual 25-Jul-11 24-Oct-11

Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11

Actual 21-Oct-11 11-Nov-11 05-Jan-12 20-Mar-12

Planned 2-Apr-12 2-Jul-12

Actual 27-Apr-12 25-Jul-12

Planned 2-Apr-12 2-Jul-12

Actual 10-May-12 25-Jul-12

Planned N/A 27-Feb-12 19-Mar-12 2-Apr-12 2-Jul-12

Actual 3-May-12 24-May-12 19-Jul-12 17-Oct-12

Post Review Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11

NCB LKR 7.68

Arunankal CC N/A

-

Kattankudi UC NCB 3.15 0.027391304 N/A

0.82

340 EP/BT/MS&EPPS/W/03Construction of concrete Surfacing to

New Post office Road at Kurumanvely.

Manmunai south &

Eruvil Pattu

Manmunai south

& Eruvil Pattu 9.79 0.085130435 Post Review

339 EP/BT/MS&EPPS/W/02Construction of Market Building at

Periyakallar

Manmunai south &

Eruvil Pattu

Manmunai south

& Eruvil Pattu CC 1.14 0.009913043 1.43

338 EP/BT/MS&EPPS/W/01Construction of Market Building at

Kottaikallar.

Manmunai south &

Eruvil Pattu

Manmunai south

& Eruvil Pattu CC N/A N/A

337 EP/BT/MSWPS/W/02Const. of Concrete surfacing

toKuluvinamadu to Thanthamalai Road

Manmunai South

West PS

Manmunai

South West PSNCB N/A 7.65

336 EP/BT/MSWPS/W/01Improvement to Public Market at

Kokkaddicholai

Manmunaipattu South

West PS

Manmunaipattu

South West PSCC 3.08 0.026782609 Post Review

CC LKR 0.99 Thuritham C.C

0.069130435 N/A -

335 EP/BT/EPPS/W/05Construction of Children park at

Kommathurai NorthEravurpattu PS Eravurpattu PS

0.072086957 1.40

334 EP/BT/EPPS/W/04Renovation of Market Building at

Vantharumoolai. Eravurpattu PS Eravurpattu PS NCB 7.95

5.87

333 EP/BT/EPPS/W/03Construction of concrete Surfacing to

School Road at Savukkady.Eravurpattu PS Eravurpattu PS NCB 8.29

7.38 0.064173913 N/A LKR 5.87 332 EP/BT/EPPS/W/02

Construction of concrete Slab Surfacing

to Vinayakar road at Kommathurai East

(750M)

Eravur Pattu PS Eravur Pattu PS NCB

8.38 0.072869565 Post Review 6.55 6.55 Brilliant

EngineeringN/AN/A

8.19 0.071217391 Post Review

331 EP/BT/EPPS/W/01

Construction of concrete slab surfacing to

Mariyamman kovil road at Kumaraveliyar

Village (850m)

Eravur Pattu PS Eravur Pattu PS NCB

330 EP/BT/KPPS/W/08Construction of concrete Surfacing to

Mohamathiya Road at Sammannodai.Koralaipattu PS Koralaipattu PS NCB

0.93 0.008086957 Post Review N/A N/A329 EP/BT/KPPS/W/07Construction of Children park at

PassikudahKoralaipattu PS Koralaipattu PS CC

N/A -

328 EP/BT/KPPS/W/06Construction of Drainage to Commaini

Road at ValachchenaiKoralaipattu PS Koralaipattu PS CC 1.17

6.40

327 EP/BT/KPPS/W/05 Renovation of public Market at Kiran Koralaipattu PS Koralaipattu PS NCB 8.28 0.072

326 EP/BT/KPPS/W/04Construction of concrete Surfscing Main

link Road at KiranKoralaipattu PS Koralaipattu PS NCB 8.20 0.071304348

7.25

325 EP/BT/KPPS/W/03

Construction of concrete Surfacting of

Hairath Umar Vaddavithanai Road at

Valachchenai

Koralaipattu PS Koralaipattu PS NCB 8.19 0.071217391

8.76 0.076173913 Post Review Shana Const. N/AN/A LKR 7.15 324 EP/BT/KPPS/W/02Const. of Concrete surfacing to

Sunkankerny Kinnaiyady Link Road Koralaipattu PS Koralaipattu PS NCB

341 EP/BT/KUC/W/O1Construction of Concrete drain at Sir

Razeek Fareed mawatha -(350 m )Kattankudi UC N/A - LKR

K.S.P Construction N/A

N/A

LKR

LKR 2.37 Kalmunthal CC 1.70

LKR

Post Review N/A N/A N/A

9.90 0.086086957 Post Review N/A

2.37 0.020608696 Post Review N/A

0.20

LKR 3.08 Aathavan C.C

7.65 K.S.P. Const

N/A

N/A 3.09

LKR

N/A N/A N/A

6.59 SMR ContructionPost Review N/A

0.77 N/A0.006695652 Post Review N/A N/A

Post Review LKR 6.57

N/A

Brilliant

EngineeringN/A

Post Review Sinthu Const.

LKR

Ms.Luxry Lanka

Civil ConstructionN/A - LKR 8.10

0.20

N/A 0.20

LKR 1.17 N/A0.010173913 Post Review N/A N/A

LKR 0.93 Thinvar CC

LKRPrior Review N/A

N/A

N/A LKR 8.18 Ranya Contruction

Ashraff CC

N/ALKR

Post Review

Post Review N/A

N/A

Page 284: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 26-Apr-12 23-May-12

0.015652174 Planned 20-Jun-11 11-Jul-11 22-Aug-11 21-Nov-11

Actual 26-Mar-12 16-Apr-12 5-Jun-12 4-Sep-12

Planned 5-Mar-12 26-Mar-12 16-Apr-12 16-Jul-12

Actual

Planned 5-Mar-12 26-Mar-12 16-Apr-12 16-Jul-12

Actual

Planned 5-Mar-12 26-Mar-12 16-Apr-12 LKR 16-Jul-12

Actual

Planned 20-Jun-11 19-Sep-11

Actual 25-Jul-11 25-Oct-11

Planned 20-Jun-11 19-Sep-11

Actual 25-Jun-11 25-Oct-11

Planned 23-Fer-12 15-Mar-12 5-Apr-12 4-Jul-12

Actual 4-Apr-12 25-Apr-12 24-May-12 30-Aug-12

Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12

Actual 4-Apr-12 25-Apr-12 24-May-12 30-Aug-12

Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12

Actual 4-Apr-12 25-Apr-12 24-May-12 28-Aug-12

Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12

Actual 4-Apr-12 25-Apr-12 30-May-12 28-Aug-12

Planned 23-Fer-12 15-Mar-12 5-Apr-12 2-Jul-12

Actual 4-Apr-12 25-Apr-12 24-May-12 30-Aug-12

Planned 20-Jun-11 19-Sep-11

Actual 18-Jul-11 30-Oct-11

Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12

Actual 26-Mar-12 16-Apr-12 24-May-12 31-Aug-12

Planned 24-Fer-12 16-Mar-12 9-Apr-12 09-Jul-12

Actual 26-Mar-12 16-Apr-12 24-May-12 31-Aug-12

0.072434783 Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11

Actual 20-Oct-11 11-Nov-11 27-Dec-11 26-Mar-12

Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11

Actual 20-Oct-11 11-Nov-11 23-Dec-11 22-Mar-12

Planned 22-Feb-12 14-Mar-12 4-Apr-12 4-Jul-12

Actual 3-May-12 24-May-12 3-Jul-12 11-Oct-12

Planned 22-Feb-12 14-Mar-12 4-Apr-12 4-Jul-12359 EP/BT/MWPS/W/04

Construction of concrete Surfacing

Vaikal.Road at SalampakerniManmunai West PS

Manmunai West

PSNCB 6.91 0.060086957

LKR 4.50 V.J.Construction - N/A

5.50

358 EP/BT/MWPS/W/03Construction of Market building at

AythiyamalaiManmunai West PS

Manmunai West

PSNCB 5.14 0.044695652

357 EP/BT/MWPS/W/02Const. of Concrete surfacing to

Unnichchai Vaikkal RoadManmunai West PS

Manmunai West

PSNCB 6.65 0.057826087 Post Review

356 EP/BT/MWPS/W/01Const. of Concrete surfacing to

Nelluchchenai Mullamunai RoadManmunai West PS

Manmunai West

PSNCB 8.33 Post Review N/A

NCB 9.25 0.080434783 N/A 5.56 Post Review N/A

9.90 0.086086957 Post Review -

355 EP/BT/KPWPS/W/03

Construction of concrete Surfacting of Al

Ameen Road with rainage at

Kawathamunai.

Koralaipattu West PSKoralaipattu

West PS

354 EP/BT/KPWPS/W/O2

Construction of concrete Surfacing of

Araffa Nagar Amirali Road with

Drainage at Thiyavettavan.

Koralaipattu West PSKoralaipattu

West PSNCB

LKR 6.58 Iyapan Building

Construction

Koralaipattu

West PSCC 1.76 0.015304348 Post Review N/A

Manmunaipattu

PSNCB 8.88 0.077217391 Post Review N/A

351 EP/BT/MPPS/W/06Construction of concrete Surfacing of

Nvalady Road at Selvanagar.Manmunaipattu PS

Manmunaipattu

PSNCB -

N/A LKR N/A 3.60

N/A LKR 6.73 Iyapan Building

ConstructionNCB 9.27 0.080608696

350 EP/BT/MPPS/W/O5Construction of Concrete Surfacing of

kanthy Road at kirankulam.Manmunaipattu PS

Manmunaipattu

PSNCB

NCB LKR

7.28

N/A

349 EP/BT/MPPS/W/04

Construction of Concrete Surfacing of

Navaratnarajah Vithyalaya Road at

Arayampathy-East

Manmunaipattu PSManmunaipattu

PS

0.34 0.002956522

0.61

Post Review

348 EP/BT/MPPS/W/03Construction of Drainage to jothy lane at

Arayampathy-SouthManmunaipattu PS

Manmunaipattu

PS

Post Review N/A

Post Review347 EP/BT/MPPS/W/02Construction of Children Park at

Vannankulam in ArayampathyManmunaipattu PS

Manmunaipattu

PSCC

0.65 346 EP/BT/MPPS/W/01

Construction of Children Park at

Arayampathy Central GS Division (900

m)

Manmunaipattu PSManmunaipattu

PSCC N/A0.005652174

0.100347826 Post Review N/A - N/A

N/A

345 EP/BT/KUC/W/05Construction of 750m Side Drainage to

Sinna thona at Kattankudy. Kattankudi UC Kattankudi UC NCB 11.54

344 EP/BT/KUC/W/04Construction of 900m Side Drainage to

Karbala Road at KattankudyKattankudi UC Kattankudi UC NCB 12.72 0.110608696 Post Review

-

343 EP/BT/KUC/W/03Construction of 900m Side Drainage to

Nooraniya Cemetery Road at KattankudyKattankudi UC Kattankudi UC NCB 12.51 0.108782609

Kattankudi UC NCB 1.80 Post Review N/A 3.25

Kattankudi UC NCB 3.15 0.027391304 N/A

- Post Review N/A LKR 5.72

5.50 Rifthy Group N/A

Sadha Contruction N/A

N/A LKR

Post Review

Sadhu ConstLKR 6.70

N/A

N/A 6.70

LKR 9.16 C.H.Civil

Contruction

9.86 Alshan

ConstructionN/AN/A LKR

N/A 1.80 N/A N/A LKR353 EP/BT/KPWPS/W/O1Construction of Drainage at Manchcholai

VillageKoralaipattu West PS

N/A352 EP/BT/MPPS/W/07Construction concrete Surfacing of RDS

Road at Palamunai.Manmunaipattu PS 3.88

1.80

5.89 Sadha Contruction N/A

Bathuriya C.C

7.09 0.061652174 Post Review N/A

5.98 Arun Contruction

LKR

0.063304348 Post Review

N/A N/A

N/A

0.94

3.00

N/A

SMR Contruction5.13 0.044608696 Post Review N/A 4.10

LKR 0.61

LKR 0.34 Sri Murugan C.C

N/A

N/A 0.34

LKR

N/A Parithy C.C

N/A

Hilimiya

ContructionN/ALKR

Post Review N/AN/A LKR

341 EP/BT/KUC/W/O1Construction of Concrete drain at Sir

Razeek Fareed mawatha -(350 m )Kattankudi UC

342 EP/BT/KUC/W/02Construction of Concrete drain at Al -

Ameen cross road (200 m)Kattankudi UC

N/A - LKR

Page 285: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 21-Mar-12 11-Apr-12 22-May-12 30-Aug-12

Planned 05-Aug-11 26-Aug-11 23-Sep-11 22-Dec-11

Actual 20-Oct-11 11-Nov-11 30-Mar-12 28-May-12

Planned 27-Sep-11 26-Dec-11

Actual 18-Nov-11 16-Feb-12

Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11

Actual 21-Oct-11 11-Nov-11 6/21/2012 19-Sep-12

Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11

Actual 21-Oct-11 11-Nov-11 6/26/2012 19-Sep-12

Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11

Actual 21-Oct-11 11-Nov-11 7/2/2012 1-Oct-12

Planned 28-Feb-12 20-Mar-12 10-Apr-12 9-Jul-12

Actual 29-Mar-12 19-Apr-12 2-Jul-12 01-Oct-12

Planned N/A 28-Feb-12 20-Mar-12 10-Apr-12 9-Jul-12

Actual 29-Mar-12 19-Apr-12 21-Jun-12 19-Sep-12

Planned 10-Apr-12 9-Jul-12

Actual 21-May-12 19-Sep-12

Planned 10-Apr-12 9-Jul-12

Actual 20-Jun-12 18-Sep-12

Planned 5-Mar-12 26-Mar-12 25-Apr-12 9-Jul-12

Actual 29-Mar-12 19-Apr-12 2-Jul-12 1-Oct-12

Planned 28-Feb-12 20-Mar-12 10-Apr-12 9-Jul-12

Actual

Planned 25-Jul-11 15-Aug-11 12-Sep-11 11-Dec-11

Actual 12-Oct-11 02-Nov-11 29-Nov-11 06-May-12

Planned 25-Jul-11 15-Aug-11 12-Sep-11 11-Dec-11

Actual 12-Oct-11 02-Nov-11 29-Nov-11 31-Jul-12

Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12

Actual 19-Mar-12 9-Apr-12 22-Jun-12 22-Sep-12

Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12

Actual 19-Mar-12 9-Apr-12 22-Jun-12 29-Sep-12

Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12

Actual 19-Mar-12 9-Apr-12 22-Jun-12 29-Sep-12

Planned 30-Jan-12 20-Feb-12 26-Mar-12 2-Jul-12

Actual

Planned 27-Jun-11 26-Sep-11LKR NWS & D N/A - 377 EP/BT/RACLG/W/01

Providing Community water supply

scheme to KanthinagarManmunai West PS

RACLG

BatticaloDC 15.00 0.130434783

376 EP/BT/MC/W/06Construction of IRUTHAYAPURAM

AREA DRAINAGEBatticaloa MC Batticaloa MC NCB 20.00 0.174

3.56 0.031 Post Review N/A LKR375 EP/BT/MC/W/05Construction of Metaling and Tarring at

Duch Bar Road Batticaloa MC Batticaloa MC NCB

374 EP/BT/MC/W/04Construction of Metaling and Tarring at

Munich Victoria Road & Cross Road Batticaloa MC Batticaloa MC NCB 12.15

LKR 4.86

Santhalingams

Building

Construction

N/A373 EP/BT/MC/W/03

Construction of Concrete, Metaling and

Tarring at Sethukkudah Vinayagar Road

& Cross Road

Batticaloa MC Batticaloa MC NCB 5.50 0.048

7.64

372 EP/BT/MC/W/02

Construction of Metaling and Tarring to

Iruthayapuram West Roads in

Iruthayapuram West GN Division,

Batticaloa MC Batticaloa MC NCB 14.00 10.00

N/A LKR 7.65 Murugesh works

and ConstructionN/A371 EP/BT/MC/W/01

Construction of Metaling and Tarring to

Murugan Kovil Road from

Palameenmadu to Thiraimadu, Batticaloa

Batticaloa MC Batticaloa MC NCB 8.95 0.077826087 Post Review

370 EP/BT/EUC/W/09Construction of Drainage Main street to

Lagoon Road at EravurEravur UC Eravur UC NCB 7.00 0.060869565

369 EP/BT/EUC/W/08Construction of concrete Surfacing of

Thaika Road at Eravur.Eravur UC Eravur UC NCB 10.04 0.087304348

Nazeeha

Hardware&Const.

1.59 0.013826087 Post Review N/A N/A N/A

Hara Ahara CC N/A 0.20

368 EP/BT/EUC/W/07 Construction of Children park at Eravur Eravur UC Eravur UC CC

367 EP/BT/EUC/W/06Construction of Bridge at Al Azhar

School Raod at EravurEravur UC Eravur UC CC 1.59 0.013826087 1.59

366 EP/BT/EUC/W/05Construction of concrete Surfacing of

Rifai palli odaviyar Road at EravurEravur UC Eravur UC NCB 8.97 0.078 1.50

N/A LKR 6.29 K.S.P.Construction 5.30 N/A365 EP/BT/EUC/W/04Construction of concrete Surfacing of

Veerapathirar Kovil Road at Eravur.Eravur UC Eravur UC NCB 7.21 0.062695652 Post Review

0.75

364 EP/BT/EUC/W/03Const. of Metaling and Tar

Athisayavinagar Road - Lucky RoadEravur UC Eravur UC NCB 5.96 -

Eravur UC NCB Post Review N/A LKR

Vinayakar C.C

ThampatawattaN/A

Eravur UC NCB 5.96 0.051826087 Post Review N/A 4.90

361 EP/BT/PPPS/W/02

Const. of Concrete surfacing to

Manikkappillayar Kovil Road at

Thampalawattai

Poraitivupattu PSPoraitivupattu

PSCC LKR 4.32

9.77 0.084956522 Post Review N/A 6.70 360 EP/BT/PPPS/W/01Const. of Concrete surfacing to Kampar

Road at Kovilporathivu WestPoraitivupattu PS

Poraitivupattu

PSNCB

359 EP/BT/MWPS/W/04Construction of concrete Surfacing

Vaikal.Road at SalampakerniManmunai West PS

Manmunai West

PSNCB 6.91 0.060086957

Prior Review N/A N/A N/A

LKR N/APost Review N/A

LKR

N/A

13.30 Sanjaya

ConstructionN/A

3.70 Sanjaya

Construction

0.12173913 Post Review N/A

0.106 Post Review N/A

Post Review N/A

LKR

N/A

11.89 Murugesh works

and ConstructionN/A

Post Review N/A LKR

N/A LKRPost Review 8.45

LKR 4.99 Hajimuli CC N/A -

LKR

Post Review

Post Review N/A N/A N/A

LKR 7.58 N/A

4.64 Ramanas

ContructionN/A

Nazeeha

Hardware&Const.

0.051826087 Post Review N/A LKR

6.90 K.S.P. Const

Nazeeha

Hardware&Const.N/ALKR

5.96 0.051826087 N/A

362 EP/BT/EUC/W/01Const. of Metaling and Tar to Palliyady

Road at EravurEravur UC

363 EP/BT/EUC/W/02Const. of Metaling and Tar Rural Court

Road at EravurEravur UC

4.32 N/A 4.00

1.04

0.037565217 Post Review N/A N/A

- Post Review N/A LKR

LKR 8.46 Krishnapila

ConstructionN/A

5.72 Sadha Contruction N/A

Page 286: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual

Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11

Actual 30-Set-11 21-Oct-11 22-Dec-11 21-Mar-12

Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11

Actual 30-Set-11 21-Oct-11 04-Jan-12 3-Apr-12

Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11

Actual 30-Set-11 21-Oct-11 5-Jan-12 4-Apr-12

Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11

Actual 30-Set-11 21-Oct-11 27-Dec-11 26-Mar-12

Planned 03-Aug-11 24-Aug-11 21-Sep-11 20-Dec-11

Actual 30-Set-11 21-Oct-11 26-Dec-11 26-Mar-12

Planned 04-Sep-11 26-Sep-11 24-Oct-11 22-Jan-12

Actual 30-Set-11 21-Oct-11 4-Dec-11 3-Apr-12

Planned 04-Sep-11 26-Sep-11 24-Oct-11 22-Jan-12

Actual 18-Oct-11 08-Nov-11 05-Jan-12 4-Apr-12

Planned 04-Sep-11 26-Sep-11 24-Oct-11 22-Jan-12

Actual 18-Oct-11 08-Nov-11 26-Dec-11 26-Mar-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 9-Feb-12 1-Mar-12 8-May-12 7-Aug-12

Planned 29-Feb-12 21-Mar-12 11-Apr-12 10-Jul-12

Actual 27-Apr-12 18-May-12 31-May-12 29-Aug-12

Planned 29-Feb-12 21-Mar-12 11-Apr-12 N/A 10-Jul-12

Actual 21-Mar-12 11-Apr-12 20-May-12 20-Aug-12

Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12

Actual 30-Jul-12 20-Aug-12

Planned 29-Feb-12 21-Mar-12 11-Apr-12 N/A 10-Jul-12

Actual 15-Mar-12 5-Apr-12 18-May-12 27-Aug-12

Planned 29-Feb-12 21-Mar-12 11-Apr-12 10-Jul-12

Actual 15-Mar-12 5-Apr-12 18-May-12 27-Aug-12

Planned 29-Feb-12 21-Mar-12 11-Apr-12 N/A 10-Jul-12

Actual 15-Mar-12 5-Apr-12 18-May-12 27-Aug-12

Planned 5-Mar-12 26-Mar-12 16-Apr-12 16-Jul-12

Actual

Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12

Actual 27-Apr-12 18-May-12 24-May-12 23-Sep-12RACLG NCB 16.25 0.141304348 Post Review N/ALKR 15.39

-

393 EP/BT/RACLG/W/17

Construction of 1.8 km side Drainage to

Fisharish Coorporation Road at

kattankudy.

Porathivupattu PS RACLG LKR

0.102782609 11.28 Sanjaya

ContructionPost Review N/A LKR

0.160869565 -

392 EP/BT/RACLG/W/16Construction of concrete Surfacing of

Ampilanthurai Road at Navaladi

Manmunai South

West PSRACLG NCB 11.82

-

391 EP/BT/RACLG/W/15

Construction of concrete Surfacing of

Kadukkamunai Pandarively Road at

Pandariyavely.

Manmunai South

West PSRACLG NCB 18.50

390 EP/BT/RACLG/W/14

Construction of concrete Surfacing of

Arasadytheevu Santhirakanthan Road at

Arasadytheevu.

Manmunai South

West PSRACLG NCB 11.02 N/A

389 EP/BT/RACLG/W/13Construction of Children park at

Oddamavadi.Koralaipattu West PS RACLG NCB 21.19 0.18426087 Post Review

388 EP/BT/RACLG/W/12

Construction of concrete Surfacing of

Katpakerni Road at

Puthumandapaththady

RACLG NCB 14.17

N/A LKR 9.72 0.096086957

0.18

387 EP/BT/RACLG/W/11Construction of Market building at

VavunathivuManmunai West PS

RACLG NCB 11.05 Post Review

386 EP/BT/RACLG/W/10Concreting Mankadu Boundary Road at

Thethathiu

Manmunai south &

Eruvil Pattu RACLG NCB 16.05 0.139565217 N/A

385 EP/BT/RACLG/W/09Const. of Concrete surfacing to EHED

Housing Scheme Road at Thalankuda.Manmunaipattu PS RACLG NCB 27.54 0.239478261 Post Review

NCB LKR 22.78 Aramjee Group

M.R.T Group N/A 10.50

384 EP/BT/RACLG/W/08

Const. of Concrete surfacing to

Boundary Road with Const. of Drainage

at Oddamvady

Koralaipattu West PS RACLG

9.20

383 EP/BT/RACLG/W/07Const. of Concrete surfacing to Cemetery

Road at Eruvil

Manmunai south &

Eruvil Pattu RACLG NCB 12.23 10.58

382 EP/BT/RACLG/W/06Const. of Concrete surfacing to Girls

School Road to Mackamady Road Eravu UC RACLG NCB 10.92 0.094956522 N/A

381 EP/BT/RACLG/W/05Const. of Concrete surfacing to School

Road at AnaikaddiyavelyPoraitivupattu PS RACLG NCB 13.10 0.113913043 Post Review

LKR 11.64 Sinthu Const. N/A380 EP/BT/RACLG/W/04Const. of Concrete surfacing to Puthur

Road at RugamEravur Pattu PS RACLG NCB

11.15 Sinthu Const. N/A 11.00

N/A 9.70

379 EP/BT/RACLG/W/03Const. of Concrete surfacing to

Palayadithona to Santhively link RoadKoralaipattu PS RACLG NCB 11.79

378 EP/BT/RACLG/W/02

Const. of Concrete surfacing to

Nagathambiran kovil road at

Kokkadicholai

Manmunai South

West PSRACLG NCB 12.35 0.107391304 Post Review

LKR NWS & D N/A - 377 EP/BT/RACLG/W/01Providing Community water supply

scheme to KanthinagarManmunai West PS

RACLG

BatticaloDC 15.00 0.130434783

MRT Group

N/A21.35 0.185652174 Post Review N/ANCB

394 EP/BT/RACLG/W/18

Construction of cncrete Surfacing to

Manikkapillayar Kovil Road at

Thampalavatta.

N/APorathivupattu PS

Post Review N/A LKR 16.17 Sanjaya

ContructionN/A

LKR N/A

LKR 8,78 Ramanas

Contruction

N/A

0.095826087 Post Review

LKR0.123217391 Post Review N/A 15.54 Focus Marketting

and Engennering

N/A

2.30

Taj Building

Contruction

10.08 Jeeyago

ContructionPost Review N/A LKR

N/A LKR 17.68

22.10

M.R.T.Group N/A

N/A

17.68

LKR

LKR 9.73 Nazeeha

Hardware&Const.

29.29 0.254695652 Post Review N/A

Post Review

Post Review N/A

0.106347826

N/A

N/A

LKR 11.75

6.90

Sanjeev Const. N/A 11.70

LKR

LKR 9.77 Snajaya Const

13.81 0.120086957 Post Review N/A

Post Review

N/A

0.102521739

Prior Review N/A N/A N/A

N/A

Page 287: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12

Actual 15-Mar-12 20-Apr-12 11-Jun-12 10-Sep-12

Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12

Actual 24-May-12 12-Jun-12 18-Jun-12

Planned 1-Mar-12 22-Mar-12 16-Apr-12 16-Jul-12

Actual 15-Mar-12 5-Apr-12 18-May-12 14-Aug-12

Planned 08-Aug-11 29-Aug-11 26-Sep-11 25-Dec-11

Actual 02-Dec-11 23-Dec-11 06-Feb-12 6-Aug-12

Planned 6-Mar-12 27-Mar-12 17-Apr-12 15-Oct-12

Actual

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 1-Mar-12

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 1-Nov-12

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 1-Nov-11

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 1-Mar-12

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 1-Mar-12

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 1-Mar-12

Planned 17-Jun-11 9-Sep-11

Actual 29-Jun-11 31-Mar-12

Planned 17-Jun-11 9-Sep-11

Actual 15-Aug-11 25-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 17-Jun-11 1-Sep-11

Actual 18-Jul-11 1-Mar-12

Anver Ismail

Community CenterN/A

N/A

411 EP/AMP/NVPS/W/01Const.of Concrete Drainage at

Salambaikerny - 01Navithanveli PS Navithanveli PS CC

410 EP/AM/THPS/W/11Construction of concrete surfacing to

Pillayar kovil road Thampattai Thirukkovil PS Thirukkovil PS NCB 8.68 0.08 Post Review

409 EP/AM/THPS/W/10Construction of concrete surfacing to old

post office road at vinayagapuramThirukkovil PS Thirukkovil PS NCB 8.72 0.08 Post Review

408 EP/AM/THPS/W/09Construction of concrete surfacing to

Sarvodaya road at Thambiluvil -01Thirukkovil PS Thirukkovil PS NCB 8.72 0.08 Post Review

LKR 3.70 Navalar CC N/A 3.70 407 EP/AMP/THPS/W/08Costruction of Public Market at

Thambiluvil Thirukkovil PS Thirukkovil PS CC 3.70 0.032173913 Post Review

406 EP/AMP/THPS/W/07Supply of Electricity at Vinayagapuram

03,Rice mill RdThirukkovil PS Thirukkovil PS DC 0.50 0.004347826 Post Review

LKR 0.30 CEB N/A405 EP/AM/THPS/W/06Supply of Electricity at Thirukkovil 02,

04Thirukkovil PS Thirukkovil PS DC

N/A 1.00 LKR 1.00 CEB

1.00 0.008695652 Post Review N/A N/A N/A403 EP/AM/THPS/W/04

Supply of Electricity at East West –

Thambilivil - 01,Konamalai

veethy,Villiyampillai 1st cross rd

Thirukkovil PS Thirukkovil PS DC

LKR 0.50 CEB N/A

N/A 2.00

402 EP/AM/THPS/W/03Supply of Electricity at Vinayagapuram

03 PalakkudihThirukkovil PS Thirukkovil PS DC 0.50

Thirukkovil PS DC 2.00 0.017391304 Post Review N/A

N/A -

400 EP/AM/THPS/W/01

Supply of Electricity at East South –

Thambiluvil - 01,Iron ferry Rd,Valluvar

cross Rd

Thirukkovil PS Thirukkovil PS DC

41.73 0.362869565 Post Review N/A LKR

NCB 28.00 11.40

399 EP/PMU/W/07Construction of concrete Surfacing

Mankerney to Kirimichchai.RoadVakarai PS (B) PMU NCB

18.14 Ramanas

ContructionN/A -

398 EP/PMU/W/03Const. of Concrete surfacing at

Farmcolony to Kirimichchai Rd

Korrali pattu North

(B)PMU

RACLG NCB Post Review N/A LKR 23.08 0.200695652

2.40

RACLG NCB 11.43 0.099391304 Post Review

15.06 LKR 11.88 P.T.S.Brilliat N/A395 EP/BT/RACLG/W/19

Construction of concrete Surfacing to

Naripulthoddam Road at

Eluppadichchenai.

Eravurpattu P.S RACLG NCB

1.60 0.013913043 Post Review N/A N/A

LKR 7.98 N/A

1.60 N/A LKR 1.60

N/AN/A LKR 8.00

N/A LKR

0.50 CEB

N/A

N/A N/A

N/A N/A N/A

0.30

LKR 0.50

0.002608696 Post Review N/A N/A

N/AN/A

0.30 N/A

404 EP/AM/THPS/W/05Supply of Electricity at Vinayagapuram

04,visnu puram,sarvothaya veethyThirukkovil PS Thirukkovil PS DC Post Review N/A 1.00 0.008695652

N/A 1.00 LKR 1.00

N/A N/A

N/A

0.50 Post Review N/A N/A N/A

CEB

0.004347826

LKR 0.50 CEB 0.50 0.004347826 Post Review N/A

LKR401 EP/AM/THPS/W/02Supply of Electricity at Thandiyadi

Sengamam Gramam - 01Thirukkovil PS

N/A

2.00 CEBN/A

0.50 N/A N/A

29.56 N/A

N/ALKR

0.243478261 Post Review N/A LKR

N/A396 EP/BT/RACLG/W/20

Renovation of Market at Kirantion of

Market Building at

Armugaththankudiyiruppu.

Eravurpattu P.S

397 EP/BT/RACLG/W/21Construction of concrete Surfacing of

Division Boundary Road at Koddaikallar.

ManmunaiSouth

Eruvil Pattu P.S

-

0.130956522 Post Review N/A

10.67 Bobby Construction

Page 288: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 17-Jun-11 1-Sep-11

Actual 18-Jul-11 1-Mar-12

Planned 17-Jun-11 1-Sep-11

Actual 18-Jul-11 1-Mar-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 12-Nov-11 5-Dec-11 20-Mar-12 1-Jul-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 12-Nov-11 5-Dec-11 20-Mar-12 1-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 11-Jun-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 11-Jun-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 11-Jul-12

Planned 14-Jun-11 1-Sep-11

Actual 3-Aug-11 1-Mar-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 13.Oct.11 03.Nov.11 23-Dec-11 5-May-12

Planned 18-Apr-12 17-Jul-12

Actual 9-May-12 9-Jul-12

Planned 18-Apr-12 17-Jul-12

Actual 9-May-12 9-Jul-12

Planned 18-Apr-12 17-Jul-12

Actual 10-Apr-12 9-Jul-12

Planned 18-Apr-12 17-Jul-12

Actual 9-May-12 9-Jul-12

Planned 18-Apr-12 17-Jul-12N/A 0.80 429 EP/AM/ADPS/W/08

Construction of Navaladi road concerete

Drainage at PalamunaiAddalaichchenai PS

Addalachchenai

PSDC 4.03 0.04 Post Review

Alimah CC N/A 0.50

Addalachchenai

PSDC 1.57 0.01 Post Review N/A

DC 2.54 0.02 Post Review LKR 2.54

DC 1.49 0.01 Post Review

427 EP/AM/ADPS/W/06Construction of concerete Drainage

Mohaideen road at AddalaichchenaiAddalaichchenai PS

Addalachchenai

PS

2.70 Kanthee CC N/A

426 EP/AM/ADPS/W/05Construction of Drainage at MPCS,

internal road AddalaichchenaiAddalaichchenai PS

Addalachchenai

PS

425 EP/AM/ADPS/W/04Construction of conceret Drainage at

APO internal road AddalaichchenaiAddalaichchenai PS

Addalachchenai

PSDC 2.70 LKR

424 EP/AM/ADPS/W/03Const.of concrete Surfacing to South

Eastern University Road at OluvilAddalaichchenai PS

Addalaichchenai

PSNCB 9.05 N/A 6.66

LKR N/A423 EP/AM/ADPS/W/02Const.of Market Building stage 2 at

AddalachchenaiAddalaichchenai PS

Addalaichchenai

PSNCB 7.49 0.065130435

N/A

422 EP/AM/ADPS/W/01Const.of Market building at

AddalchchenaiAddalachchenai PS

Addalachchenai

PSNCB 7.10

9.26 0.08 Post Review N/A LKR

9.22 0.08

421 EP/AM/DEPS/W/03Construction of Concrete Road at

ThuwaragalaDehiattakandiya PS

Dehiattakandiya

PSNCB

N/A 1.70

420 EP/AM/DEPS/W/02Construction of Concrete Road at

KadirapuraDehiattakandiya PS

Dehiattakandiya

PSNCB

-

419 EP/AM/DEPS/W/ 01Const.Of Weekly Faire Market at

Dehiyahakandy Dehiattakandiya PS

Dehiattakandiya

PSCC LKR

418 EP/AM/NVPS/W/08Construction of concrete road at 18 main

road Annamalai -03Navidanveli PS Navidanveli PS NCB 8.18 0.07 Post Review

417 EP/AM/NVPS/W/07Construction of concrete road at Co-

oporate road Navithanveli -02Navidanveli PS Navidanveli PS NCB 8.73 0.08 Post Review

NCB 8.34 0.07 Post Review N/A

Super Daina power N/A 2.30

416 EP/AM/NVPS/W/06Construction of concrete road at Al-

rahman road, Salambakkany Navidanveli PS Navidanveli PS

5.10

415 EP/AM/NVPS/W/05Construction of Concrete Surfacing to

Jummah Palli Road at Central Camp 1Navithanveli PS Navithanveli PS NCB 7.55 0.065652174

1.60

414 EP/AM/NVPS/W/04Const.of Concrete Surfacing to Alayadi

at Central Camp-5,6Navithanveli PS Navithanveli PS NCB 9.53 0.082869565

1.60 0.013913043 Post Review LKR 1.60 Sri murugan

Community Center

2.10 0.01826087 Post Review

413 EP/AM/NVPS/W/03Const.of Concrete Drainage of

Navidanveli - 02Navithanveli PS Navithanveli PS CC

412 EP/AM/NVPS/W/02Const.of Concrete Drainage at

Navidanveli - 01Navithanveli PS Navithanveli PS CC

LKR 4.03 AL Iqrahu CCN/A N/A N/A

LKRN/A N/A428 EP/AM/ADPS/W/07Construction of RDS road conceret

Drainage at AddalaichchenaiAddalaichchenai PS N/A 0.90

N/A N/A N/A

1.57 Alimah CC

N/AN/A N/A N/A

1.68

LKR 1.00

0.02 Post Review N/A N/A N/A

1.49 Kanthee CC

N/A

LKR 6.66 Hijra Construction,

Sammanthurai0.078695652 Post Review N/A

Post Review N/A

LKR

Post Review N/A LKR

0.06173913 Post Review N/A

LKR

N/A

N/A

1.70 Muwagammana

Community Center

6.58 Sivasangaraj

ConstructionN/A

1.70 0.014782609

Sanath Contractor

Post Review N/A N/A N/A

N/A - N/A LKR 6.55

Sanath Contractor N/A - LKR 6.38

Post Review N/A LKR 5.75

6.90 Post Review

1.70 Saththiyam

Community Center

N/AN/A LKR Hijra Construction,

N/A

N/A N/A

N/A N/A N/A

LKR 1.70 N/AN/A

Page 289: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 10-Apr-12 9-Jul-12

Planned 18-Apr-12 17-Jul-12

Actual 9-May-12 9-Jul-12

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual 27-Jun-11 19-Jul-11 24-Aug-11 1-Mar-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 13.Oct.11 03.Nov.11 28-Dec-11 1-Mar-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 8-Mar-12 29-Mar-12 17-May-12 16-Aug-12

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual 27-Jun-11 19-Jul-11 8-Aug-11 1-Apr-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 13.Oct.11 03.Nov.11 17-Jan-12 1-May-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 13.Oct.11 03.Nov.11 17-Jan-12 1-May-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 13.Oct.11 03.Nov.11 17-Jan-12 1-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 14-May-12 26-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 14-May-12 26-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 14-May-12 20-Aug-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 12-Nov-11 5-Dec-11 26-Mar-12 30-Jun-12N/A 0.89

N/A 3.30

445 EP/AM/KTPS/W/01Const.of Tarring to Thesikar Therodum

Rd at KaraithivuKaraitivu PS Karaitivu PS NCB

444 EP/AM/NAPS/W/07Construction of Concrete surfacing to

Buruthagas Handiya Road Namaloya PS Namaloya PS NCB 6.80 0.06 Post Review

1.00

443 EP/AM/NAPS/W/06Construction of Concrete surfacingto

Paragakala 6th channal Road Namaloya PS Namaloya PS NCB N/A 1.12

N/A LKR 5.29 N/AJabha & Son

Construction

N/A 2.40

442 EP/AM/NAPS/W/05Construction of Concrete surfacing to

School Road at KarangawaNamaloya PS Namaloya PS NCB 6.80

N/A 5.34

441 EP/AM/NAPS/W/04Const.of Tarring to 288 Abayapura Rd at

ParagakellaNamal Oya PS Namal Oya PS NCB

0.065652174 Post Review N/A LKR 6.09

N/A 4.20

440 EP/AM/NAPS/W/03Const. of tarring to of A/41road at

Muwangala.Namal Oya PS Namal Oya PS NCB 7.55

439 EP/AM/NAPS/W/02Const.of Tarring to 1/31to1/41 to

Cemetary Rd at WawinnaNamal Oya PS Namal Oya PS NCB

LKR 1.12 N/A 1.00

N/A 2.02

438 EP/AM/NAPS/W/01 Construction of Drainage at Polwattha Namal Oya PS Namal Oya PS NCB 1.50

N/A 1.74

437 EP/AM/ALPS/W/07Construction of concrete surfacing to

Samurthi raod Alayadivembu Alayadivembu PS

Alayadivembu

PSNCB

436 EP/AM/ALPS/W/06Construction of concrete surfacing to

Potkollar road AkkaraiputtuAlayadivembu PS

Alayadivembu

PSNCB 8.75 0.08 Post Review

3.07

435 EP/AM/ALPS/W/05Construction of concrete surfacing to pre

school SinnapanagaduAlayadivembu PS

Alayadivembu

PSNCB N/A -

N/A LKR 9.71 N/AYogesh

Construction

N/A 2.45

434 EP/AM/ALPS/W/04Construction of concrete surfacing to

Kovil front road at Kolavil -01Alayadivembu PS

Alayadivembu

PSNCB 9.75

N/A 5.17

433 EP/AM/ALPS/W/03Construction of concrete surfacing to

Masilamani road AlayadivembuAlayadivembu PS

Alayadivembu

PSNCB

0.067304348 Post Review N/A LKR 5.84

N/A 4.70

432 EP/AM/ALPS/W/02Const.of Concrete Surfacing to -7/8

Common Rd at Akkaraipattu-8Alayadivembu PS

Alayadivembu

PSNCB 7.74

431 EP/AM/ALPS/W/01Const.of Concrete Road at

Vallapathukappu RoadAlayadivembu PS

Alayadivembu

PSNCB

N/A 2.61 Alinukus CC

N/A 0.80

430 EP/AM/ADPS/W/09Construction of conceret Drainage Mahir

Dr. Road at PalamunaiAddalaichchenai PS

Addalachchenai

PSDC 3.28

429 EP/AM/ADPS/W/08Construction of Navaladi road concerete

Drainage at PalamunaiAddalaichchenai PS

Addalachchenai

PSDC 4.03 0.04 Post Review

LKR 4.47 Super Dayana5.96 0.051826087 Post Review N/A

N/A World Ten Building

LKR 5.64 D.Team Holding

LKR 5.19

5.56 0.048347826 Post Review N/A

7.99 0.07 Post Review N/A

0.06 Post Review

N Sivarajaha

LKR 6.27 DMPR

Dissanayake

LKR 4.73 DMPR

Dissanayake

7.55 0.065652174 Post Review N/A

WM.Jayasingha0.013043478 Post Review N/A

LKR 6.00 Keerthi

Construction6.11 0.05 Post Review N/A

N/AM.M.Jalardeen

Refthi Group

LKR 8.84 N.LSarjhon Arenco

Pvt Ltd

LKR 8.70

9.79 0.09 Post Review N/A

8.89 0.08 Post Review N/A

0.08 Post Review

Brilliant

Construction

LKR 4.80 Santh Contractor

LKR 9.78 Santhraja and Son

Construction

6.50 0.056521739 Post Review N/A

LKR 3.28 0.03 Post Review N/A N/A

LKR 4.03 AL Iqrahu CCN/A N/A N/A

N/A

Page 290: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 19-Mar-12 9-Apr-12 17-May-12 16-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 19-Mar-12 9-Apr-12 17-May-12 16-Aug-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 5-Nov-11 5-Dec-11 25-Feb-12 1-Apr-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 5-Nov-11 5-Dec-11 25-Feb-12 1-Jun-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 2-May-12 15-Aug-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 8-Mar-12 29-Mar-12 28-Apr-12 30-Jun-12

Planned 2-Mar-12 31-Jul-12

Actual 25-Jan-12 1-Jun-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 12-Mar-12 2-Apr-12 27-Apr-12 10-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 14-May-12 11-Sep-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 6-Mar-12 27-Mar-12 2-May-12 1-Jul-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 6-Mar-12 27-Mar-12 2-May-12 1-Jul-12 10.05 1.20 462 EP/AM/LAPS/W/02

Const.of Concrete Surface Road along

with Kantha Hintha Police Post RoadLahugala PS Lahugala PS NCB

LKR 7.44 BM Construction N/A 1.40

1.65

461 EP/AM/LAPS/W/01Const.of concrete surfacing road along

with South Panama RoadLahugala PS Lahugala PS NCB 11.68 0.101565217

N/A 3.00

460 EP/AM/AKPS/W/07Construction of Drainage along side of

Mosque road Akkaraipattu PS Akkaraipattu PS DC 4.42

7.56 0.07 Post Review N/A LKR

NCB 8.86 7.40

459 EP/AM/AKPS/W/06Construction of conceret Drainage at

pallikkudiuruppuAkkaraipattu PS Akkaraipattu PS NCB

9.43 Parshan Building

ConstructionN/A -

458 EP/AM/AKPS/W/05Construction of concrete surfacing to

paddiyadippitty school raodAkkaraipattu PS Akkaraipattu PS

Akkaraipattu PS NCB Post Review N/A LKR

N/A

Akkaraipattu PS NCB 8.44 0.07 Post Review N/A N/A8.34

455 EP/AM/AKPS/W/02Electricity Supply for Alimnagar,

IssanganicheemaiAkkaraipattu PS Akkaraipattu PS DC 2.77 LKR

12.18 0.105913043 Post Review N/A 1.90 N/A454 EP/AM/AKPS/W/01Const.of Concrete Surfacing to

Paddiyadipitty Sinnalebbe RoadAkkaraipattu PS Akkaraipattu PS NCB

8.78 0.08 Post Review N/A LKR453 EP/AM/POPS/W/06 Concre surfacing to Selvamani road Pottuvil PS Potthuvil PS NCB

1.90

452 EP/AM/POPS/W/05Construction of concrete Drainage at Al-

fathah roadPottuvil PS Potthuvil PS NCB LKR

1.70

451 EP/AM/POPS/W/04Construction of concrete surfacing to

MathuranchenaiPottuvil PS Potthuvil PS NCB 9.54 0.08

Post Review N/A LKR 8.94 KMST Lanka

3.10

450 EP/AM/POPS/W/03Construction of concrete surfacing to

Nazar road Pottuvil PS Potthuvil PS NCB 8.99 0.08

N/A 6.60

449 EP/AM/POPS/W/02Const.of Concrete Surfacing to Pansala

Rd at PottuvilPottuvil PS Pottuvil PS NCB

9.71 0.084434783 Post Review N/A LKR448 EP/AM/POPS/W/01Const.of Concrete Surfacing to Victor

watha Rd at PottuvilPottuvil PS Pottuvil PS NCB

447 EP/AM/KTPS/W/03Construction of concrete surfacing to

Vivehananda road at KaraitivuKaraitivu PS Karaitivu PS NCB N/A 1.03

LKR 9.07 N/A 1.47 446 EP/AM/KTPS/W/02 Construction of beach park at karaitivu Karaitivu PS Karaitivu PS NCB 9.00

BM Construction N/A0.087391304 Post Review N/A LKR

Post Review N/A

6.42

N/A

4.41

Leena Community

Center

Akkaraipattu

N/A0.04 Post Review N/A

7.52

0.08 Post Review N/A

LKR

8.71 Rifthy Group

Master

Construction

LKR

9.49 0.08

456 EP/AM/AKPS/W/03Construction of concrete surfacing to

Alim nagar mosque front road Akkaraipattu PS

457 EP/AM/AKPS/W/04Construction of concrete surfacing to

Pallikkudiuruppu Hakeem PC road Akkaraipattu PS

2.77

6.30

0.024086957 Post Review N/A N/A

AS Hardware

LKR 9.68 Super Dyna

LKR

N/A 2.77 CEB

8.78 R.Anandaraja

Construction

2.66

N/A 3.80

7.93 JR.Construction N/A 7.94 0.07 Post Review N/A

Post Review N/A LKR

N/A

9.54 Rifthy Group N/A

N/A7.36 0.064 Post Review N/A

Nibars

Construction

LKR

LKR 7.04 SV Construction

5.73 Nibars

Construction

7.55

9.38 0.08 Post Review N/A

PPS Construction0.08 Post Review N/A

Page 291: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 6-Mar-12 27-Mar-12 2-May-12 1-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12 13-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12 13-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12 13-Jul-12

Planned 15-Aug-11 5-Sep-11 3-Oct-11 1-Jan-12

Actual 12-Nov-11 5-Dec-11 30-Mar-11 15-Aug-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 5-Mar-12 26-Mar-12 24-May-12

Planned 30-Jan-12 20-Feb-12 26-Mar-12 24-Jun-12

Actual

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 5-Mar-12 26-Mar-12

Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12

Actual 16-Jan-12 06-Feb-12 17-May-12 24-Aug-12

Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12

Actual 16-Jan-12 06-Feb-12 17-May-12 16-Aug-12

Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12

Actual 30-Mar-12 23-Apr-12 15-Jun-12 15-Sep-12

Planned 25-Jul-11 15-Aug-11 19-Sep-11 19-Dec-12

Actual 30-Mar-12 23-Apr-12 15-Jun-12 15-Sep-12

Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12

Actual 21-May-12 11-Jun-12

Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12

Actual 21-May-12 11-Jun-12

Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12

Actual 31-Mar-12 23-Apr-12

Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12480 EP/AM/KMC/W/09

Construction of concrete Road along

Market Road,Kalmunai Town.KalmunaiMC Kalmunai MC NCB N/A

N/A LKR N/A

N/A

479 EP/AM/KMC/W/08Construction of concrete Road French city

Housing Scheme Maruthamunai.KalmunaiMC Kalmunai MC NCB 6.00

N/A

478 EP/AM/KMC/W/07Construction of Children Park Stage -1

Sainthamaruthu.KalmunaiMC Kalmunai MC DC

0.07 Post Review N/A LKR

N/A -

477 EP/AM/KMC/W/06

Construction of concreteDrainage at north

& South of Nadarasa Vaikal Kalmunai

kudy.

KalmunaiMC Kalmunai MC NCB 8.00

476 EP/AM/KMC/W/04

Construction of concrete drainage at

Mosque Road and Thaika Road at

Kalmunai kudy

KalmunaiMC KalmunaiMC NCB

LKR 3.25 N/A 1.22

N/A 1.00

475 EP/AM/KMC/W/03Construction of concrete drainage at

Ameer Road , Islamabad KalmunaiMC KalmunaiMC DC 3.70

474 EP/AM/KMC/W/02Construction of concrete road along

Orabipasha Road , Sainthamaruthu KalmunaiMC KalmunaiMC NCB

0.072173913 Post Review N/A -

N/A

473 EP/AM/KMC/W/01

Construction of concrete road along

Thuravandiyamedu Road

,Chenaikkudiyiruppu

Kalmunai MC KalmunaiMC NCB 8.30

N/A

472 EP/AM/RACLG/W/25Improvement of Public Park at

Akkaripattu Akkarapattu MC RACLG NCB

14.56 N/A LKR

NCB N/A 3.10

471 EP/AM/AKMC/W/02 Improvement of Public Park Stage -II Akkaraipattu MCAkkaraipattu

MCNCB

7.31 N/A 1.46

470 EP/AM/AKMC/W/01 Construction of Public Park Akkarapattu MCAkkarapattu

MC

9.36 0.081391304 Post Review N/A LKR

4.00 N/A

469 EP/AM/AMUC/W/01

Construction of concrete Surfacing to

Despensary 20/9 Road at

Jayawardnapura ,Ampara

Amparai UC Amparai UC NCB

0.80 N/A

468 EP/AM/NIPS/W/03 Construction of Children Park Ninthavur PS Ninthavur PS NCB

467 EP/AM/NIPS/W/02 Construction of Vehicle Park Ninthavur PS Ninthavur PS NCB

NCB 4.30 0.04

8.10 0.07 Post Review

466 EP/AM/NIPS/W/01 Construction of Fish Market Ninthavur PS Ninthavur PS

465 EP/AM/UHPS/W/02 Construction Piyangala Nugalanda Bridge Uhana PS Uhana PS NCB

1.40

464 EP/AM/UHPS/W/01Construction of Concrete Road at

Mayathunna School RoadUhana PS Uhana PS NCB 7.93

0.101652174 Post Review N/A LKR N/A463 EP/AM/LAPS/W/03

Const.of Concrete Surface Road along

with North Panama Central Boundary

Road

Lahugala PS Lahugala PS NCB 11.69

LKR

3.70 0.03 Post Review N/A

8.00 0.07 Post Review N/A

0.05 Post Review

LKR 5.25 Renco Pvt Ltd

LKR

6.00 0.052173913 Post Review N/A

Akshan Engeenring 0.032173913 Post Review N/A

LKR 5.71 R.J Construction8.00 0.069565217 Post Review N/A

N/A

Sudushka Shopping

Complex

Construction s

LKR

LKR 5.37

17.50 0.152173913 Post Review N/A

23.08 0.200695652 Post Review N/A

0.13 Post Review

Yasoda

Construction

LKR 3.00 Sajith Construction

LKR 13.61 W.EARTH Movers

0.03 Post Review N/A

Post Review N/A0.01 LKR

N/A

0.65 Sakura

Construction

N/A

LKR

N/A LKR

Post Review N/A 3.36 Marsook

Construction

0.07 Post Review N/A LKR

7.44 BM Construction

N/A

Page 292: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 31-Mar-12 23-Apr-12

Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12

Actual 31-Mar-12 23-Apr-12 15-Jun-12 15-Sep-12

Planned 27-Feb-12 2-Apr-12 23-Apr-12 22-Jul-12

Actual

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual 10-Aug-11 2-Sep-11 12-Oct-11 5-Apr-12

Planned 20-May-11 30-Jun-11 21-Jul-11 1-Sep-11 1-Dec-11

Actual 18-Jul-11 10-Aug-11 2-Sep-11 12-Oct-11 1-Apr-12

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual 10-Aug-11 1-Sep-11 12-Oct-11 1-Apr-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 9-Dec-11 5-Apr-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 9-Dec-11 5-Apr-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 16-Mar-12 1-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 23-Dec-11 1-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 23-Dec-11 1-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 9-Dec-11 1-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 9-Dec-11 1-May-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 9-Dec-11 5-Apr-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 17.Oct.11 07.Nov.11 16-May-12 25-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 28.Sep.11 19.Oct.11 9-Dec-11 1-Jun-12

RACLG Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 17.Oct.11 07.Nov.11 17-Jan-12 1-Jun-12

RACLG Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 29.Sep.11 20.Oct.11 9-Dec-11 5-Apr-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-119.34 N/A 3.90 11.57 0.100608696 Post Review N/A LKR498 EP/AM/RACLG/W/16

Construction of Concrete Road at

Kehululla Kiriwana Pathiya Thalawa RACLG NCB

497 EP/AM/RACLG/W/15Const.of concrete Surfacing to

PuthuNagar cetral Road at MalwaththaSamanthurai PS NCB 10.62 N/A 4.29

LKR 14.52 N/A 10.00

7.13

496 EP/AM/RACLG/W/14

Const.of concrete Surfacing to

Kallarichchal 1st, 2nd eallai Road at

Sammanthrai

Samanthurai PS NCB 19.47 0.169304348 Post Review

495 EP/AM/RACLG/W/13Construction .of Concrete at 9 th

Avenue,AmparaAmpara UC RACLG NCB 14.12 0.122782609

15.08 0.131130435 Post Review N/A - 12.70 Nibras

ConstructionN/A

N/A 8.36

494 EP/AM/RACLG/W/12 Const of Cocrete Rd at Sugathagama Uhana PS RACLG NCB

493 EP/AM/RACLG/W/11

Construction of Concrete Surfacing to

Murugankovil Rd.

( Nanthwaner Pillayar Rd to

Karaithivu PS RACLG NCB 14.65 0.127391304sajath

Sainthamaruthu

0.091043478 Post Review N/A 5.25 PTS. Brilliant

Akkaraipattu

5.95 Post Review

492 EP/AM/RACLG/W/10Const.of Concrete Surfacing to-7/4

Kanakar Rd at Akkaraipattu-Alayadivembu PS RACLG NCB 10.47

NCB 14.98 0.13026087 Subodha Matara N/A

10.43 0.090695652 5.40

491 EP/AM/RACLG/W/09Const.of concrete Road at Poolawala

Dumanapura,MahaoyaMaha Oya PS RACLG

490 EP/AM/RACLG/W/08Const.of concrete Surfacing to

Ariyanayaham Road at ThirukkovilThirukovil PS RACLG NCB

0.090695652PTS. Brilliant

AkkaraipattuN/A 2.00

5.70

489 EP/AM/RACLG/W/07Const.of concrete Surfacing to

Vaddavidana Road at ThambiluvilThirukovil PS RACLG NCB 10.43

8.20

488 EP/AM/RACLG/W/06Const.of concrete Surfcing to Kappuganar

Road at Vinayahapuram,ThirukkovilThirukovil PS RACLG NCB 11.10 0.096521739

487 EP/AM/RACLG/W/05Const.of Tarring of road from

Hungamalagama to Namalgama Dehiattakandiya PS RACLG NCB 10.55 0.09173913

RJ Construction,

Karaithivu

8.20 8.02 RJ Construction,

KaraithivuN/ALKR486 EP/AM/RACLG/W/04

Const. of Tarring of road from

Henanigala North to Henanigala SouthDehiattakandiya PS RACLG NCB 10.55 0.09173913 Post Review

485 EP/AM/RACLG/W/03Con. Concrete Road Hagnewla

(Waththegamthalawa )in PaddiyathalawaPadiyathalawa PS

RACLG

AmparaNCB 10.60 0.092173913 Post Review

N/A 9.03

484 EP/AM/RACLG/W/02Const.of Concrete surface Road in Zain

pordiyar,Internal roadPottuvil PS

RACLG

AmparaNCB

6.00 0.05

RACLG

AmparaNCB 10.90 0.094782609

482 EP/AM/KMC/W/11Reconstruction of the Library building at

Chanaikudiruppu.KalmunaiMC Kalmunai MC NCB

N/A LKR 7.50 481 /EP/AM/KMC/W/10Construction of concrete Road along

Pillayar kovil Road,Pandiruppu.KalmunaiMC Kalmunai MC DC 3.70 0.03 Post Review

480 EP/AM/KMC/W/09Construction of concrete Road along

Market Road,Kalmunai Town.KalmunaiMC Kalmunai MC NCB N/A

Subodha Matara

LKR 4.29 D-Team

Sammanthurai0.092347826 Post Review N/A

Nibras

Construction

LKR 11.05 D-Team

Sammanthurai

N/A

LKR

Post Review N/A N/A

Post Review

N/A LKR 12.12

N/A LKR 11.79

7.80

N/ALKR

N/ALKR

Post Review N/A

LKR 8.00

9.10 Srifaya Enterprices

7.98 PTS. Brilliant

Akkaraipattu

Post Review N/A N/ALKR

Post Review

N/A LKR 8.02

N/A

Post Review N/A

N/A LKR 8.92 N/A

N/A

8.46 JR.Construction

Shifaya Enterprises

N/A 8.40 10.70 0.093043478 Prior Review LKR

8.92

LKR 9.03 A.R.Enterprises

Construction483 EP/AM/RACLG/W/01

Const.of Road at Nagaswewa

LihiniyagamaDehiattakandiya PS Post Review N/A

N/APost Review N/A LKR

Archana Geocery &

HardwareN/A

LKR8.00 0.07 Post Review N/A

Page 293: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 29.Sep.11 20.Oct.11 9-Dec-11 1-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 29.Sep.11 20.Oct.11 9-Dec-11 1-Aug-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 29.Sep.11 20.Oct.11 16-Mar-12 1-Jul-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 29.Sep.11 20.Oct.11 9-Dec-11 4-May-12

Planned 11-Aug-11 1-Sep-11 28-Sep-11 27-Dec-11

Actual 29.Sep.11 20.Oct.11 9-Dec-11 5-Apr-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 27-Jan-12 17-Feb-12 16-Mar-12 1-Jun-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 31-Jan-12 21-Feb-12 8-May-12 20-Aug-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 31-Jan-12 21-Feb-12 16-Mar-12 15-Jul-12

Planned 25-Jan-12 15-Feb-12 2-Mar-12 31-Jul-12

Actual 16-Feb-12 9-Mar-12 18-Apr-12 1-Jun-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 5-Apr-12 26-Apr-12 19-Jul-12 18-Oct-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 5-Apr-12 26-Apr-12 13-Jun-12 18-Oct-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 18-Apr-12 1-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 18-Apr-12 11-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 3-Apr-12 24-Apr-12 8-May-12 19-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 3-Apr-12 24-Apr-12 8-May-12 19-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 3-Apr-12 24-Apr-12 8-May-12 19-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 4-Apr-12 25-Apr-12 28-May-12 27-Sep-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 4-Apr-12 25-Apr-12 8-May-12 27-Sep-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12- N/A LKR 11.51 N/AAR Enterprices

N/A -

516 EP/AM/RACLG/W/34Construction of Concrete Road at

WewmedagamaDehiattakandiya PS RACLG NCB 11.52

N/A 1.67

515 EP/AM/RACLG/W/33Construction of Concrete Road at

ChanadanagamaDehiattakandiya PS RACLG NCB

0.10 Post Review N/A LKR 8.40

N/A -

514 EP/AM/RACLG/W/32Construction of Concrete Road at

MadagamaDehiattakandiya PS RACLG NCB 10.99

513 EP/AM/RACLG/W/31Construction of concrete surfacing to

Vilathalawa RoadMahaoya PS RACLG NCB

LKR 11.82 N/A -

N/A -

512 EP/AM/RACLG/W/30Construction of concrete surfacing to

Bogamayaya roadMahaoya PS RACLG NCB 15.83

N/A 9.33

511 EP/AM/RACLG/W/29Construction of Concrete Ruhunugama

Road at UhanaUhana PS RACLG NCB

510 EP/AM/RACLG/W/28Construction of Market Bulding at

IrakkamamIrakkamam PS RACLG NCB 13.09 0.11 Post Review

-

509 EP/AM/RACLG/W/27Construction of concrete surfacing road

and Drainage along Cemeteary roadIrakkamam PS RACLG NCB N/A 5.96

N/A LKR 14.97 N/AEllips Engineering

N/A -

508 EP/AM/RACLG/W/26Construction of concrete surfacing to

Vipulananda central college roadKaraithivu PS RACLG NCB 14.98

N/A 2.21

507 EP/AM/RACLG/W/25Construction of concrete surfacing to

Palayadippillayar kovil roadKaraithivu PS RACLG NCB

0.200695652 Post Review N/A LKR 12.88

N/A 5.60

506 EP/AM/RACLG/W/24Construction of Concrete Road &

Drainage to Ampara road at Udanga

1,Sammanthura

Sammanthura PS RACLG NCB 23.08

N/A 1.70

505 EP/AM/RACLG/W/23Const.of concrete road & Drainage &

Culvert to AD at road.Irakkamam PS RACLG NCB

504 EP/AM/RACLG/W/22Const.of Concrete road & Drainage &

Culvert to Varipathanchenai market roadIrakkamam PS RACLG NCB 21.02 0.182782609 Post Review

7.90

503 EP/AM/RACLG/W/21Const.of Drainag to Vaikkal Road at

PallikudiruppuAkkaraipattu PS RACLG NCB N/A 4.87

N/A LKR 8.06 N/A

8.70

502 EP/AM/RACLG/W/20Const.of Concrete Surfacing to Thirumal

Muha Rd to Barathi Rd at KaraithivuKaraithivu PS RACLG NCB 10.27 0.089304348

N/A 5.90

501 EP/AM/RACLG/W/19Construction of Concrete Surfacing to

Musthakeen Mosque Road at NinthaurNinthuar PS RACLG NCB N/A

Post Review N/A LKR 9.66 sajath

Sainthamaruthu

NCB N/A 1.68

500 EP/AM/RACLG/W/18Construction of Concrete Surface Beach

Internal Road at Ninthaur Ninthuar PS RACLG NCB

9.34 N/A 3.90

499 EP/AM/RACLG/W/17Construction of Concrete Road at

HagamwelaPathiya Thalawa RACLG

11.57 0.100608696 Post Review N/A LKR498 EP/AM/RACLG/W/16Construction of Concrete Road at

Kehululla Kiriwana Pathiya Thalawa RACLG NCB

13.80 0.12 Post Review N/A

0.10 Post Review

D-Team

Sammanthurai

LKR 12.39 LG Construction

LKR 10.42 AR Enterprices

15.17 0.13 Post Review N/A

LG Construction0.14 Post Review N/A

LKR 17.45 Sabash

Assosciation 20.46 0.18 Post Review N/A

N/A AS Hardware

LKR 18.70 AS Hardware

LKR 13.70

11.03 0.10 Post Review N/A

18.80 0.16 Post Review N/A

0.13 Post Review

Najeema

Constuction

LKR 13.31 Farzan

Construction

LKR 8.77 Amritha

Construction

23.59 0.205130435 Post Review N/A

AS HardwareN/A LKR 11.91

LKR 8.23 Ellipse Engineering 14.42 0.125391304 Post Review N/A

Post ReviewRJ Construction,

Karaithivu

LKR 8.91 sajath

Sainthamaruthu

13.45 0.116956522 Post Review N/A

10.74 0.093391304 Post Review N/A

11.66 0.101391304

Subodha Matara

LKR 10.91 Subodha Matara

Page 294: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

LKR USD Date Currency Amount

( Million)

1 2 3 3.1 3.2 4 5 6 7 8 9 10 11 13 14 15 16 18 19/ 20.00

Pub

lish

cont

ract

aw

ard

notic

e

in U

ND

B &

Nat

iona

l

new

spap

ers

Exp

endi

ture

incu

rred

to

date

(Mill

ion)

Com

plet

ion

of c

ontr

act

Dea

dlin

e fo

r su

bmis

sion

of

bids

Prio

r/P

ost

Rev

iew

by

Ban

k**

Nam

e of

the

LA

Nam

e of

the

PE Estimated Cost (Million)

Ser

ial

No

.

Des

crip

tion

Met

hod

of P

rocu

rem

ent*

Pac

kag

e N

o.

*** Indicate extensions/modifications etc.

Nam

e of

Con

trac

tor/

Nat

iona

lity

Stage

Pub

lish

IFB

in N

atio

nal

new

spap

ers

and

UN

DB

Sub

mit

DB

D w

ith I

FB

for

Ban

k's

N/O

Original Plan Approved Date (at Appraisal/Negotiations) : 5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

Update as of : (date)

GPN # and Date Published:

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

North East Local Services Improvement Project (Gama Nauguma - Inter Divisional Rural and Small Twonship Development Initiative for the

North and East Province )Credit #: 4728LK

Country/ Borrower:

Project Name:

Ministry of Economic Development Implementing Agency:

Signing of contract

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

Actual 4-Apr-12 25-Apr-12 28-May-12 27-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 20-Mar-12 10-Apr-12 23-May-12 27-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 18-Apr-12 9-May-12 16-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 18-Apr-12 9-May-12 16-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 18-Apr-12 9-May-12 16-Jul-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 4-Apr-12 25-Apr-12 8-May-12 7-Sep-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 10-May-12 31-May-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 5-Apr-12 26-Apr-12 28-May-12 27-Sep-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 16-Mar-12 9-Apr-12 8-May-12 22-Aug-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 20-Mar-12 10-Apr-12 28-May-12 27-Aug-12

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual 10-Aug-11 2-Sep-11 19-Oct-11 1-Jul-12

Planned 6-Jun-11 28-Jun-11 1-Aug-11 1-Nov-11

Actual 10-Aug-11 2-Sep-11 19-Oct-11 1-Jun-12

Planned 22-Mar-12 16-Apr-12 16-May-12 14-Aug-12

Actual 4-Apr-12 25-Apr-12 28-Jun-12 27-Dec-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 4-Apr-12 25-Apr-12 28-Jun-12 27-Dec-12

Planned 27-Feb-12 19-Mar-12 18-Apr-12 17-Jul-12

Actual 4-Apr-12 25-Apr-12 27-May-12 26-Nov-12

Planned 28-Jun-11 24-Jul-11 7-Aug-11

Actual 11-May-11 3-Jun-11 29-Aug-11

N/A N/A

N/A

NS N/A

3.97 NCB

0.04 0.000347826 Post Review

19.86 AMM Welday

ConstructionPost Review

N/A

531 EP/PMU/W/04 Partition of NELSIP Cell in PMU PMU PMU

530 EP/PMU/W/06Construction of concrete road & Drainage

at Varipathanchenai , Valaikkalai Road Irakkamam PS (A) PMU (A)

NCB 27.60 0.24

SS Builders

25.35 N/A LKR

N/A -

0.22

529 EP/PMU/W/05Construction of weekly Market bulding at

HinguranaDamana PS (A) PMU (A)

N/A 11.90

528 EP/PMU/W/04improvement of Municipal Park at

AkkaraipattuAkkaripattu MC (A) PMU NCB 33.00

N/A 4.00

527 EP/PMU/W/02 Const.Of Tappalpola Wawa Udaha Road Maha Oya PS (A) PMU NCB

526 EP/PMU/W/01Const.Of Concrete Road From Piyangala

to Nugelanda Uhana PS (A) PMU NCB 15.60 0.135652174 Post Review

3.28

525 EP/AM/RACLG/W/43Construction of concrete surfacing road at

IndrasarapuraAmpara UC RACLG NCB N/A 2.30

LKR 16.40 N/ANibras

Construction

N/A

524 EP/AM/RACLG/W/42Construction of concrete surfacing to

Kudakalli roadPottuvil PS RACLG NCB 16.57

N/A

523 EP/AM/RACLG/W/41

Construction of Main Drainage along

Suvaniyar Arappattai to Verreamunai

boundary road

Sammanthurai PS RACLG NCB

0.15 Post Review N/A LKR

N/A 7.28

522 EP/AM/RACLG/W/40 Construction of Public Market Padiyathalawa PS RACLG NCB 17.26

521 EP/AM/RACLG/W/39Construction of Palamunai Tsunami

Housing scheme concerete road Addalachennai PS RACLG NCB

LKR 11.71 N/A

N/A

520 EP/AM/RACLG/W/38Construction of concrete Surfacing to

Vellaskaddu RoadNinthavur PS RACLG NCB 11.79

N/A

519 EP/AM/RACLG/W/37Construction of concrete Surfacing Al-

Mina roadNinthavur PS RACLG NCB

518 EP/AM/RACLG/W/36Construction of concrete surfacing to

Girls school roadNinthavur PS RACLG NCB 14.92 0.13 Post Review

-

517 EP/AM/RACLG/W/35Construction of concrete surfacing road at

NavagamburaAmpara UC RACLG NCB N/A 2.90

N/A LKR 11.51 N/AAR Enterprices516 EP/AM/RACLG/W/34Construction of Concrete Road at

WewmedagamaDehiattakandiya PS RACLG NCB 11.52

0.03 LKR 0.03

LKR 22.50

AMM Welding

Works Shop and

Industries

N/A - Post Review N/A

AMM Welding

Works Shop and

Industries

0.287 Post Review N/A LKR 33.89

LKR 13.47 LG Construction 17.60 0.153043478 Post Review N/A

N/A LG Construction

LKR 11.50 LG Construction

LKR 12.93

19.34 0.17 Post Review N/A

13.97 0.12 Post Review N/A

0.14 Post Review

LKR 11.91 JR.Construction

LKR 14.19 ELH Group

11.91 0.10 Post Review N/A

Azeez Constrution0.10 Post Review N/A

LKR 10.09 Adambawa and

Sons 10.20 0.09 Post Review N/A

N/ARJ Construction,

Karaithivu

LKR 14.70 LG Construction

LKR 14.91

20.16 0.18 Post Review N/A

0.10 Post Review

Page 295: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

IFB

IFB

IFB

IFB

IFB

IFB

100%

80%

100%

100%

July

Sta

tus/

Rem

arks

***

100%

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

100%

Page 296: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

IFB

IFB

IFB

0%

100%

100%

100%

45%

100%

100%

100%

95%

Page 297: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

20%

Page 298: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

100%

100%

100%

60%

100%

20%

100%

100%

100%

50%

100%

100%

100%

100%

Page 299: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

TEC

TEC

TEC

100%

100%

80%

100%

TEC

100%

100%

100%

Page 300: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

60%

70%

20%

Page 301: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

0%

TEC

TEC

P

65%

100%

95%

100%

75%

100%

50%

100%

100%

Page 302: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

IFB

TEC

TEC

TEC

IFB

IFB

35%

5%

50%

95%

5%

25%

60%

Page 303: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

P

P

P

P

P

P

IFB

P

IFB

100%

100%

Page 304: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

TEC

TEC

TEC

TEC

TEC

TEC

TEC

100%

90%

90%

TEC

60%

Page 305: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

60%

60%

50%

40%

IFB

IFB

IFB

IFB

IFB

IFB

IFB

IFB

Page 306: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

IFB

IFB

IFB

IFB

IFB

p

80%

80%

70%

60%

60%

60%

60%

50%

50%

50%

Page 307: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

IFB

P

IFB

P

100%

100%

50%

60%

100%

75%

75%

Page 308: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

TEC

TEC

90%

15%

95%

70%

50%

70%

TEC

TEC

Page 309: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

P

TEC

P

P

70%

75%

50%

50%

60%

Page 310: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

IFB

IFB

IFB

P

IFB

P

25%

95%

60%

25%

40%

Page 311: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

P

P

TEC

TEC

85%

65%

60%

30%

25%

Page 312: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

IFB

TEC

TEC

TEC

IFB

P

IFB

TEC

75%

90%

90%

Page 313: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

TEC

P

P

P

P

IFB

TEC

70%

30%

25%

90%

Page 314: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

P

P

P

P

P

P

P

10%

70%

50%

50%

20%

Page 315: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

TEC

P

TEC

P

P

P

P

10%

75%

Page 316: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

25%

25%

100%

TEC

75%

75%

75%

75%

50%

100%

75%

100%

100%

Page 317: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

25%

50%

50%

50%

100%

100%

25%

50%

75%

100%

0%

0%

15%

15%

25%

100%

TEC

100%

P

Page 318: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

25%

15%

15%

100%

25%

25%

25%

25%

75%

TEC

TEC

TEC

TEC

100%

100%

100%

100%

25%

25%

Page 319: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

25%

25%

15%

15%

15%

25%

TEC

0%

25%

50%

25%

50%

50%

15%

75%

35%

25%

100%

25%

Page 320: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

100%

100%

P

P

TEC

25%

25%

15%

15%

25%

0%

TEC

15%

15%

15%

15%

25%

25%

Page 321: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

100%

100%

100%

100%

10%

10%

10%

100%

100%

20%

TEC

100%

TEC

100%

0%

TEC

100%

25%

Page 322: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

0%

75%

100%

100%

75%

75%

50%

25%

100%

100%

P

P

P

50%

25%

100%

25%

50%

TEC

Page 323: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

P

P

10%

0%

10%

100%

100%

P

25%

0%

25%

25%

25%

25%

75%

75%

25%

100%

25%

Page 324: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

25%

25%

25%

IFB

25%

0%

25%

100%

100%

100%

100%

100%

100%

100%

100%

P

P

25%

Page 325: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

100%

TEC

TEC

TEC

100%

100%

100%

100%

100%

P

25%

25%

100%

100%

100%

10%

10%

Page 326: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

20%

75%

100%

75%

100%

P

P

TEC

TEC

100%

0%

15%

15%

75%

100%

100%

100%

30%

Page 327: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

75%

10%

10%

10%

100%

90%

90%

100%

50%

50%

50%

75%

50%

100%

100%

100%

20%

Page 328: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

0%

0%

0%

0%

50%

75%

15%

20%

50%

90%

100%

50%

50%

100%

100%

50%

90%

Page 329: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

TEC

TEC

TEC

TEC

25%

75%

25%

25%

TEC

P

0%

25%

0%

0%

0%

TEC

0%

TEC

Page 330: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

50%

90%

100%

100%

25%

100%

100%

75%

75%

75%

75%

100%

100%

100%

100%

100%

10%

TEC

P

Page 331: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

0%

10%

10%

0%

0%

25%

75%

50%

0%

0%

75%

75%

50%

75%

100%

100%

90%

15%

50%

Page 332: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS

21

July

Sta

tus/

Rem

arks

***

*** Indicate extensions/modifications etc.

5th April 2010

31th July 2012

* ICB-International Competitive Bidding; NCB-National Competitive Bidding; IS-International Shopping; NS-National Shopping; DC-Direct Contracting, CC - Community base Contract

PROCUREMENT PLAN FOR WORKS

Government of Sri Lanka

Credit #: 4728LK

Ministry of Economic Development

** For post review, fill in columns 1 to 8, 11 & 12, 14 to 17, and 19 to 22

100%

25%

0%

25%

100%

75%

90%

20%

0%

TEC

75%

0%

0%

0%

50%

0%

Page 333: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 334: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 335: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 336: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 337: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 338: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 339: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 340: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 341: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 342: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 343: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 344: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 345: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 346: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 347: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 348: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 349: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 350: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 351: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 352: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 353: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 354: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 355: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 356: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 357: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 358: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 359: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 360: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 361: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 362: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 363: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 364: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 365: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 366: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 367: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 368: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 369: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 370: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 371: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 372: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 373: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 374: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 375: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 376: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 377: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 378: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 379: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 380: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 381: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 382: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 383: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 384: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 385: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 386: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 387: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 388: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 389: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 390: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 391: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 392: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 393: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 394: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 395: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 396: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 397: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 398: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 399: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 400: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 401: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 402: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 403: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 404: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 405: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 406: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 407: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS
Page 408: Public Disclosure Authorized - World Bankdocuments.worldbank.org/curated/en/113451468113649974/pdf/755020PROP… · 67 NELSIP/G/NP/PMU/023 Multi Media Projector with Accessories NS