Public Disclosure Authorized RP55 - World...
Transcript of Public Disclosure Authorized RP55 - World...
RP55Volume 4
GOVERNMENT OF KARNATAKA
LN 4606-IN
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT
Updated Resettlement Action Plan
for
Rehabilitation Roads
December 2004
PROJECT IMPLEMENTATION UNIT, KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECTI Floor, PWD Offices, Annexe Building, K.R. Circle, Bangalore-560 001.
Tel: 080-2230510, 2226262, 2230714, Fax: 080-2229666e-mail: niunh(&bg1.vsn1.net.in
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
TABLE OF CONTENTS
Executive Summary 21 Introduction 41.1 Introduction .............................................................. 41.5 Brief Outline of Rehabilitation Roads ........................................................ 41.6 Objectives .............................................................. 51.7 Impacts .............................................................. 51.8 Socio-Economic Census .............................................................. 61.11 Minimizing the Adverse Impacts ............................................................. 61.12 Remedial measures for Athani (M3) and Nagamangala (M6) towns PAFs ............ 62 Baseline Socio-Economic Characteristics ................................................. 82.2 Socio-Economic Census .............................................................. 82.3 Public Consultation .............................................................. 82.4 Methodology and Data base .............................................................. 82.5 Methods of data collection .............................................................. 82.6 Socio-Economic Census: results and discussion ........................................... 82.7 Socio-Economic characteristics of PAPs/PAFs ............................................. 112.8 Occupation and Poverty Line ......................................................... 122.9 Details of PAFs by Impact Categories .............................. ...... .. 123 Implementation Mechanisms .............................................................. 163.1 Introduction .............................................................. 163.2 Mitigation of impacts .............................................................. 163.3 Grievance Redressal .............................................................. 163.4 Implementation Schedule .............................................................. 163.6 Implementation Procedure .............................................................. 193.7 Timing of Resettlement .............................................................. 193.8 Costs and Budget .............................................................. 193.11 Monitoring and Evaluation .............................................................. 203.12 Public Disclouser 21
1. LIST OF TABLESTable 1-1 Road Links for Rehabilitation .......................................................... 4-5Table 2-1 No. of Families and Persons affected by Contract Packages ....................... 9Table 2-2 Socio-Economic Characteristics of PAPs/PAFs ....................... 1............. I Table 2-3 PAFs by Impact Category in Project Rehabilitation Roads ........ ................ 13-14Table 3-1 Implementation schedule RAP_R 17Table 3-2 Budget Estimates for RAP-R ..................................... I ................. 20
ANNEXURES
Annexure 1 General identification and type of lossAnnexure 2 House holds particularsAnnexure 3 Structure detailsAnnexure 4 Distribution of community assets / public utilitiesAnnexure 5 Entitlement MatrixAnnexure 6 Action Plan for Allotment of Alternative Houses and Commercial SitesAnnexure 7 Action Plan for Relocation of Community Assets
PIU/KSHIPPa2e I of 20
Executive Summary
1. The Government of Karnataka (GOK) is implementing the Kamataka StateHighways Improvement Project (KSHIP) with assistance from the World Bank.Phase-I consists of 394 kms of roads for Upgradation and 848 kms for MajorMaintenance. Phase-II consists of 548 kms of roads for Upgradation and 429 kmsfor Major Maintenance. The GOK has adopted a Resettlement and Rehabilitation(R&R) Policy for KSHIP to address the adverse impacts arising out of this project.
2. The Upgradation of roads involves removal of existing pavement and widening toa carriageway width of 7.00 m with 1.00 m paved shoulder and 1.5 m unpavedshoulder on either side, strengthening of pavement, raising of embankment,providing drainage and geometrical corrections. This results in adverse impactsassociated with land acquisition and loss of other facilities, requiring resettlementand rehabilitation. Resettlement Action Plans (RAPs) were formulated toimplement the R & R policy for Phase-I and II Upgradation roads. The impactsidentified in the Upgradation roads are being mitigated under the above RAPs.
3. The Major Maintenance or Rehabilitation of roads involved improvement of theroads in the existing width of carriageway. Thus there were no adverse impactsinvolved in the Rehabilitation component of the Project. However, during thecourse of the Project, design modifications, modification of alignments,geometrical improvements, safety considerations etc. were incorporated in theRehabilitation roads. This involved social impacts, which required mitigation.Therefore, a social screening along with a socio-economic census of the ProjectAffected Families (PAFs) in the Rehabilitation packages was conducted duringSeptember-October 2003 to identify the impacts. This RAP for Rehabilitationroads (RAP-R) has been formulated to address the impacts in Rehabilitation roads.
4. The impacts include 541 PAFs in 15 contract packages who are losingresidential/residential-cum-commercial/commercial structures and there are 285BPL PAFs. Of these 72 BPL PAFs are losing residential structures, 195 BPLPAFs are losing commercial structures, 7 BPL PAFs are losing residential-cum-commercial structures and 11 BPL PAFs are partly affected. The impacts will bemitigated in accordance with the provisions of the R & R policy for KSHIP as isbeing done in Phase I and II Project Upgradation roads.
5. There are 137 Community assets/public utilities were identified from 13 contractpackages only. No CAs/PUs were reported from other 2 contract packages. Theaffected Community assets and public utilities will be relocated and reconstructedby the project.
7. The impacts are mostly in the drainage portion of the roads. As the drainageworks will be taken up after the completion of the main carriageway works, bythat time the impacts will be addressed as per R and R Policy.
8. The key socio-economic characteristics of the PAFs are: The number of PAFs andPAPs are 541 and 2755 respectively. There are 44 women-headed households.Among religious groups, Hindus dominate with 69.50 per cent, Muslims were
PIU/KSHIPPaze 2 of 20
25.32 per cent and others were 05.81 per cent. Distribution of PAPs by occupationreveals that commerce/trade occupies a significant place with 62.11 percent ofPAFs involved, 9.42 percent having other occupations and 28.46 percent beingagricultural labourers. Reported data on household income/expenditure suggestthat of the total PAFs (541), 52.68 percent reported their income to be below thepoverty line (with cut-off income at Rs. 18,000 per annum). The reported averageannual income of APL families works out to Rs. 62,523. The average incomeworks out to Rs.1 1,259 for a BPL family. 47.79% of the PAFs have own TV.22.08% have own bicycles/two-wheelers.
9. The local authorities in Athani town in contract package M3 and in Nagamangalatown in contract package M6, had on their own accord demolished about 138encroached structures along the project road within the town limits, without givingnotices and extending eligible compensation and assistance which is inconsistentwith the R & R policy for KSHIP. Remedial measures have been implemented tothe PAFs in the above towns, which include the delivery of entitlements asapplicable under the R&R policy, assistances like structure cost of the affectedpucca structures without depreciation, shifting and subsistence allowances to thosewho have shifted, transition allowances from the date of demolition to delivery ofentitlements in case of those who have fully lost their houses or livelihood,compensation for losses suffered during demolition (excluding the cost ofstructures) and an opportunity for redressing any grievances before the DistrictLevel Grievance Redressal Committee.
10. Exgratia structure costs have been disbursed in Athani (M3) and Nagamangala(M6) towns; the numbers being 47 and 86 respectively.
11. As per the World Bank Supervision Mission September 27 October 1, 2004 intheir draft Aide Memoire NGO was asked to take up a Socio Economic Survey ofPAFs, who have fully affected and shifted. Accordingly NGO conducted SocioEconomic Survey and submitted the report and accordingly a plan of action hasbeen prepared and submitted to the World Bank.
12. Internal monitoring and external evaluation mechanisms, methodology, andindicators as in RAP Phase-I will be followed in implementation of RAP-R.Periodical monthly progress by monitoring will be collected by field staff andreviewed in PIU. External evaluation including income and access to basicamenities will be conducted after substantial/full implementation.
13. The Annexures include i) The general identification & type of loss ii) Thehousehold particulars iii) The structure details and iv) The distribution ofcommunity assets and public utilities v) Entitlement matrix vi) Action plan forallotment of Alternative Houses and Commercial Sites vii) Action plan forRelocation of Community Assets.
PIU/KSHIPPaze 3 of 20
1. INTRODUCTION
Introduction1.1 The Karnataka State Highways Improvement Project is being implemented in two
phases. Phase I consists of 394 kms of Upgradation and 848 kms of MajorMaintenance. Phase II consists of 548 kms of Upgradation and 429 kms of MajorMaintenance.
1.2 Resettlement Action Plans (RAPs) were formulated to implement the R&R policyfor Phase-I and II Upgradation roads. The impacts identified in Upgradation roadsare being mitigated under the above RAPs.
1.3 The Major Maintenance or Rehabilitation of roads involved improvement of theroads in the existing width of carriageway. Thus there were no adverse impactsinvolved in the Rehabilitation component of the Project. However, during thecourse of the Project, design modifications, modification of alignments,geometrical improvements, safety considerations etc. were incorporated in theRehabilitation roads. This involved social impacts, which required mitigation.Therefore, a social screening along with a socio-economic census of the ProjectAffected Families (PAFs) in the Rehabilitation packages was conducted duringSeptember-October 2003 to identify the impacts. This RAP for Rehabilitationroads (RAP-R) has been formulated to address the impacts in Rehabilitation roads.
1.4 The RAP-R is basically an addendum report to Phase I RAP. This RAP-R consistsof three chapters. Chapter 1. Introduction outlines the objectives of RAP-R andthe details of the identified impacts. Chapter 2. Baseline Socio-EconomicCharacteristics, provides an analysis of the socio-economic data collectedthrough the census, to measure the magnitude of social impacts on project affectedpersons and families. The analysis identifies severely impacted categories andhelps in estimating the extent of costs involved for mitigating the social impacts inaddition to analysing the census data. Chapter 3. Implementation Mechanismsoutlines the implementation mechanisms for resettlement and rehabilitation. Ittakes into account costs and budget implications and monitoring and evaluation ofthe resettlement components.
Brief outline of Rehabilitation roads
1.5 Phase I consists of 848 kms of Rehabilitation roads. Phase II consists of 525 kmsof Rehabilitation roads. The contract package-wise distribution of Rehabilitationroads is given in Table 1-1.
Table 1-1
ROAD LINKS FOR REHABILITATION
Sl. No. Tranche Contract Link From - To Length
1 1 M8 6C Kibbanahalli to Huliyar 372 1 M17 9E Honnali to Shimoga 393 1 M18 1 lA Belur to Chikkamagalur 244 1 M19 1 lB Chikkamagalur to Tarikere 565 2 M2 2B Tikota to Athani 44
PIU/KSHIPPage 4 of 20
SI. No. Tranche Contract Link From - To (in kms)_______ ~~Package (in__ _ _ __ _ _ __ _ __ _ _ __ _ _
6 2 M3 2B Athani to Shedbal 497 2 M4 2C&D Shedbal to Sankeshwar 558 2 M12 6J Sindhanur to Lingsugur 529 2 M13 6K Lingsugur to Hattigudur 6810 3 M5 6A Srirangapatna to Chinya 3211 3 M6 6A Chinya to Nelligere 3112 3 M7 6B Nelligere to Kibbanahalli 4713 3 M25 8C Yellapur to Sirsi 4814 3 M26 8D&E Sirsi to Mavingundi 4915 4 Ml IE Hungund to Mudgal 4016 4 Mio 6H Bellary to Tekkalakote 4117 4 Mll 6H Tekkalakote to Sindhanur 4318 4 M30 1C Kalmala Cross to Kavithal 5019 4 M31 1C&D Kavithal to Mudgal 4720 5 M24 8B Alnavar to Yellapur 5621 5 M27 13A Sadashivagadh to Kumbarwada 2522 5 M28 1 3A Kumbarwada to Ramnagar 6223 5 M29 4B Yaragatti to Hulikatti 2924 5 M32 10A Srirangapatna to Mananthavadi 6125 6 M9 6D Huliyar to Hiriyur 4926 6 M14 9A Mariyammanahalli to Ittagi 4127 6 M15 9B&C Ittagi to Harihar 6628 6 M16 9D Harihar to Honnali 3529 6 M33 Navalgund to Ron 4430 6 M34 Ron to Kushtagi 5231 6 U-9 Khanapur to Alnavar 3532 6 U-10 Hulikatti to Nargund 21
I______ ________ _________ Total Length 1429
Objectives
1.6 A. To assist the identified PAFs to improve their livelihood.
B. To present an action plan for the delivery of compensation and assistanceto the identified PAFs in accordance with the R & R policy adopted for theproject.
Impacts
1.7 The various impacts identified include 541 structures and 137 communityassets / public utilities.
PIU/KSHIPPa2e 5 of 20
Socio - Economic Census
1.8 The social impacts and resettlement component includes assessment of socialimpacts in Rehabilitation roads of the project and development of appropriatemitigation plans as required. To facilitate the preparation of RAP-R, socialscreening, Public consultations and a socio-economic census were conducted inthe Rehabilitation roads.
1.9 The socio-economic census was conducted for the width of the road till the edgesof the drains. The socio-economic census helped to register and document thestatus of the potentially affected population in terms of their assets and sources oflivelihood.
1.10 This census provided a baseline against which mitigation measures and supporthave been measured. Analysis of collected data examined the needs and resourcesof different groups and individuals. The results of the census are discussed inChapter 2.
Minimizing the adverse impacts
1.11 Efforts are being made to revise the cross-section of the road at places whereimpacts are concentrated, without compromising on the safety parameters, so as tominimize the adverse impacts of the project.
Remedial measures for Athani (M3) and Nagamangala (M6) towns PAFs:
1.12 The local authorities in Athani town in contract package M3 and in Nagamangalatown in contract package M6, have on their own accord demolished theencroached structures along the project road within the town limits, without givingnotices and extending eligible compensation and assistance which is inconsistentwith the R & R policy for KSHIP. The World Bank Mid Term ReviewSupervision Mission of February 2004 recommended initiation of remedialmeasures for the PAFs in the above towns.
1.13 47 PAFs in Athani town have experienced adverse impact from the demolition oftheir structures. 91 structures in Nagamangala town have been demolished. Theremedial measures which have been implemented include the delivery ofentitlements as applicable under the R&R policy, assistances like structure cost ofthe affected pucca structures without depreciation, shifting and subsistenceallowances to those who have shifted, transition allowances from the date ofdemolition to delivery of entitlements in case of those who have fully lost theirhouses or livelihood, compensation for losses suffered during demolition(excluding the cost of structures) and an opportunity for redressing any grievancesbefore the District Level Grievance Redressal Committee.
PIU/KSHIPPa2e 6 of 20
1.14 As per the World Bank Mission September 27th to October 1, 2004 in their draftAide Memoire the NGO was asked to submit eligibility for resettlemententitlements (alternative house or shop) among those who are fully affected andshifted. Accordingly NGO conducted survey and submitted the reports.Accordingly action plan has been prepared and submitted to the World Bank.
PIU/KSHIPPa2e 7 of 20
2. BASELINE SOCIO-ECONOMIC CHARACTERISTICS
2.1 The main findings of the socio-economic census of Project Affected Families /Persons (PAFs/ PAPs) are presented in this chapter.
Socio-economic census
2.2 The socio-economic census was required in order to generate necessary data/inputfor preparing the RAP-R. The census would provide a baseline measurement ofpotential impacts on affected families/persons that form the eligibility criteria forentitlement spelt out in the R & R Policy of the KSHIP.
Public Consultations:
2.3 Consultations with the affected population were restricted to discussions held withthe PAFs during the socio-economic census. The PAFs were informed about theentitlements and assistances provided by the Project to the various categories ofimpacts, involvement of the NGO in RAP implementation and grievance redressalmechanism.
Methodology and Data Base
2.4 A socio-economic census of the project-affected population was conducted. Thishas provided a baseline against which mitigation measures have been worked out.For this purpose, information related to the PAFs' assets, incomes and otherrelevant socio-economic information has been collected.
Methods of Data collection
2.5 Household level contacts and interviews with each affected family for completingthe household socio-economic profile were conducted. Each of the householdssurveyed and the structures likely to be affected by the project has beendocumented.
Socio-economic census: results and discussion
2.6 The socio-economic census reveals that there are 541 PAFs and 2755 PAPs.Contract package-wise distribution of PAFs/PAPs is as shown in table 2-1 below.
PIU/KSHIPPage 8 of 20
Table 2-1
NO. OF FAMILIES AND PERSONS AFFECTED BY CONTRACT PACKAGES
SI. No. Tranche Contract From - To PAFs PAPsPackage1 1 M8 Kibbanahalli to Huliyar - -
2 1 M17 Honnali to Shimoga3 1 M18 Belur to Chikkamagalur - -
4 1 M19 Chikkamagalur to TarikereSub-total
5 2 M2 Tikota to Athani _ -6 2 M3 Athani to Shedbal 52 3297 2 M4 Shedbal to Sankeshwar 3 168 2 M12 Sindhanur to Lingsugur _ _ _
9 2 M13 Lingsugur to HattigudurSub-total 55 345
10 3 M5 Srirangapatna to Chinya - -
11 3 M6 Chinya to Nelligere 87 39212 3 M7 Nelligere to Kibbanahalli - -
13 3 M25 Yellapur to Sirsi 94 42114 3 M26 Sirsi to Mavingundi 30 159
Sub-total 211 97215 4 Ml Hungund to Mudgal - -
16 4 M1o Bellary to Tekkalakote17 4 Mll Tekkalakote to Sindhanur - -
18 4 M30 Kalmala Cross to Kavithal 32 18319 4 M31 Kavithal to Mudgal 19 147
Sub-total 51 33020 5 M24 Alnavar to Yellapur 10 5921 5 M27 Sadashivagadh to Kumbarwada 06 1822 5 M28 Kumbarwada to Ramnagar 01 1123 5 M29 Yaragatti to Hulikatti 44 23824 5 M32 Srirangapatna to Mananthavadi -
Sub-total 61 32625 6 M9 Huliyar to Hiriyur26 6 M14 Mariyamrnanahalli to Ittagi _ _ _
27 6 M15 Ittagi to Harihar - -
28 6 M16 Harihar to Honnali29 6 M33 Navalgund to Ron 97 54430 6 M34 Ron to Kushtagi 23 9031 6 U-9 Khanapur to Alnavar 2 932 6 U-10 Hulikatti to Nargund 41 139
Sub-total 163 782Total 541 2755
Note: 1. Impacts in Chikodi town in contract package M4 have been avoided byredesigning the road cross-section.
2. No impacts have been reported in contract packages M8, Ml 7, M18andM19 in Tranche 1; M2, M12 and M13 in Tranche 2; M5, and M7 in
PIU/KSHIPPage 9 of 20
Tranche 3;M], M1O and Mll in Tranche 4; M32 in Tranche 5; M9, M14,MI5 and MI 6 in Tranche 6.
Socio-economic characteristics of PAPs/PAFs:
2.7 The gist of the socio-economic characteristics of PAPs/PAFs is given in table 2-2below.
Table 2-2: Socio-Economic Characteristics of PAPs/PAFs
Si. Particulars MagnitudeNo.1. Affected families/Persons (no.): ___
a) Total number of families 541b) Women headed families 044c) Below Poverty Line (BPL) families 285d) Total number of PAPs 2755
2 Sex Ratioa) Male 1457 (52.89%)b) Female 1298 (47.11%)
3 Religious Stratification:(a) Religious Groups (°)a) Hindu 376 (69.50 %)b) Muslim 137 (25.32%)c) Others 028 (5.18%)(b) Social Stratification (no. & %):a) SC 41 (7.58%)b) ST* 21 (3.88%)c) Others 479 (88.54%)
4 Occupation (%)a) Agriculture _b) Agricultural Labourers 154 (28.47%)c) Commerce/Trade 336 (62.11%jd) Others 051 (9.42%)e) BPL cut-off income (Annual) Rs. 18,000f) No. and % of BPL families 285 (52.68%)g) Average annual income of BPL families Rs. 11,259h) Average annual income of APL families Rs. 62,523i) Average annual income of families Rs. 34,393j) No. of PAFs having own house-sites
k) Average size of the household 51) No. of PAFs having electricity supply 40 (7.39%)m) No. of PAFs having drinking water supply 12 (2.21%)facilityn) Building/property status Pucca-130 (24.03%)
Semi pacca-277 (51.20%)Kutcha huts-92 (17.0 1%)Others-42 (7.76%)
o) No. of PAFs having cooking gas connection Nilp) No. of PAFs having T.V 238 (47.79%)g) No. of PAFs having bicycles / two-wheelers 110 (22.08%)r) Physically Handicapped 21 (0.81%)
* Migrant people who have moved in search of labour/employment and do notexhibit any characteristics such as close to ancestral properties, identification ofdistinct cultural group, speaking own language or subsistence production.
PIU/KSHIP
Paae 10 of20
The socio-economic census revealed that the number of PAFs and PAPs are 541and 2755 respectively. There are 44 households with females as heads. Amongreligious groups, Hindus dominate with 69.50 per cent, Muslims were 25.32 percent and others were 5.18 per cent.
Occupation and Poverty Line
2.8 Distribution of PAPs by occupation reveals that commerce/trade occupies asignificant place with 62.11 percent of PAFs involved, 9.42 percent having otheroccupations and 28.46 percent being agricultural labourers. Reported data onhousehold income/expenditure suggest that of the total PAFs (541), 52.68 percentreported their income to be below the poverty line (with cut-off income at 15,000+ 20% = 18,000 per annum). The reported average annual income of APL familiesworks out to Rs. 62,523. The average income works out to Rs.1 1,259 for a BPLfamily.
Assets/ownership characteristics:
47.79% of the PAFs have own TV. 22.08% have own bicycles/two-wheelers.
Details of PAFs by Impact Categories
2.9 In all 541 structures are being affected by the rehabilitation roads. Of which 128are residential structures and 344 are commercial structures. Other assets that aregoing to be affected are 52. Only 17 residential-cum-commercial structures areaffected.
2.10 Out of the 128 residential structures that are affected 67 belong to BPL families.In other words more than 50 percent of the residential structures that belongs toBPL families are affected. There are 344 commercial structures and of which 195belongs to BPL families. Loss of residential-cum-commercial constitutesinsignificant proportion.
The details of the PAFs by Impact Categories are shown in table 2.3 below:
PIU/KSHIPPa2e II of 20
Table 2-3
DETAILS OF PAFS AND PROPOSED ENTITLEMENT MATRIX FOR REHABILITATION ROADS
Si. Impact Total BPL APL Entitlement MatrixNo. Category Type of loss PAFs PAFs PAFs BPL FAMILIES APL FAMILIES
I Squatters Loss of residential i. EWS House Structure cost for affecteda. strucofres22 16 06 ii. Shifting Allowance
structure iii. Subsistence Allowance portion, without depreciation
Loss of i. Commercial Siteb. Commercial 201 151 50 ii. Shifting Allowance Structure cost for affected
structure iii. Subsistence Allowancei. EWS House or
Loss of residential- Commercial Sitec. cum-commercial 01 01 (Option left to PAP/PAF) Structure cost for affected
structure ii. Shifting Allowance portion, without depreciationiii. Subsistence Allowance
d. Loss of other 03 02 01 Replacement cost without Replacement cost withoutd. assets 03 02 01 depreciation depreciationSub-total 227 169 58
2 Encroachers Loss of residential i.Structure cost for affecteda*. structure 106 56 50 ii. Shifting Allowance porture cout forectd
iii. Subsistence Allowance ortion, withoutdepreciation
Loss of i. Commercial Siteb*. Commercial 143 44 99 ii. Shifting Allowance Structure cost for affected
structure iii. Subsistence Allowance ortion, without depreciation
PIU/KSHIP Page 12 of 20
Si. Impact Total BPL APL Entitlement MatrixNo. Category Type of loss PAFs PAFs PAFs BPL FAMILIES APL FAMILIES
i. EWS House orLoss of residential- Commercial Site
c*. cum-commercial 16 07 09 (Option left to PAP/PAF) Structure cost for affectedstructure ii. Shifting Allowance ortion, withoutdepreciation
ill. Subsistence Allowance
d. Loss of other 49 09 40 Replacement cost without eplacement cost withoutassets depreciation epreciation
Sub-total 314 116 198
TOTAL 541 285 256Note: Above major impacts have been identified in respect of lands situated in between the proposed drain on either side of the
road.* The extent of impact is only preliminary in nature as given in table 2.3 the exact extent of loss will be known at the time ofjoint verificationwhich will be taken up by the NGO, Revenue and PWD Department. Once joint verification is completed the exact number of PAFs who are tobe provided with houses and commercial sites will be known. Accordingly the impacts will be mitigated.
PIU/KSHIP Page 13 of 20
2.11 There are 44 women headed households and 21 physically handicapped persons.Depending on their interest the project authorities will be training the womenheaded households in income generation activities, so that they can improve theirincome level. Physically handicapped persons will be assisted in enrolment inemployment exchanges, assisting in getting disability certificates and pensionfrom department of physically handicapped.
2.12 There are 137 Community assets/public utilities were identified from 13 contractpackages only. The affected Community assets and public utilities will berelocated and reconstructed as being done in Phase I and Phase II roads. Thedetails of CAs/PUs are appended in Annexure-4.
2.13 According to the R&R Policy, Resettlement sites will have to be developed,where 20 or more families are getting displaced in a continuous stretch of 2 Kmsat one given location. Accordingly the Rehabilitation Center will be established inM-30 and M-33 packages.
PIU/KSHIPPage 14 of 20
3. IMPLEMENTATION MECHANISMS
Introduction3.1 This chapter outlines mitigation of impacts, grievance redressal mechanism,
implementation schedule, costs & budget and monitoring & evaluation of theresettlement components.
Mitigation of impacts:
3.2 The PAFs will be provided assistance as prescribed in the Entitlement Matrix ofthe R & R Policy for KSHIP. The BPL PAFs losing residential structures will beentitled to be provided with EWS houses; the BPL PAFs losing commercialstructures will be entitled to be provided with commercial sites. The affectedcommunity assets / public utilities will be relocated and reconstructed by theProject.
Grievance Redressal
3.3 The project has established a Grievance Redressal process, with District-Levelgrievance redressal cells. These cells hear complaints and facilitate solutions; andthe process, as a whole, has promoted dispute settlement through mediation toreduce unnecessary litigation.
Implementation Schedule
3.4 The resettlement program will be co-ordinated with the timing of civil works. Theproject will provide adequate notification, counselling and assistance to affectedpeople so that they are able to move or give up their assets without undue hardshipbefore commencement of civil works. The impacts identified are in the drainageportion of the roads. Though contracts are awarded for tranches 1 to 5, drainageworks have not commenced in the portions where impacts are identified. Prior tocommencement of works where impacts have been identified, the concernedExecutive Engineer will confirm the delivery of entitlements. The RAP-Rimplementation schedule is shown in table 3.1 below:
3.5 The start date for implementation will be the date of approval of the RAP-R by theSteering Committee for the Project.
PIU/KSHIPPa2e 15 of 20
Table 3-1IMPLEMENTATION SCHEDULE RAP-R
2004 2005 _ 2006Sl.No. Tasks Dec Jan Feb Mar Apr May un Jul Aug Sept Oct Nov Dec Jan
Procurement of NGOServices
2 Joint verification andissue of RD cards.
Building EWS houses/Commercial sites ...
4 Establishment ofRehabilitation Centre
Payment of allowancesI5 ompensation .. ....
Relocation and * .....6 Community Assets .......
Note: 1. Priority in implementation will be given to Tranches already awarded and considering the stage of civil work
2. Impact Evaluation will be taken up after substantial completion of RAP implementation.
PIU/KSHIP Page 16 of 20
Implementation Procedure
3.6 Other implementation procedures detailed in RAP Phase I will also be followed inthe implementation of RAP-R.
Timing of resettlement
3.7 The resettlement process will be completed before the start of civil works in theconcerned portions. The PAFs who are not eligible for any assistance will begiven 60 days notice to vacate/shift out of COI. All those who are entitled forcompensation and assistance will be offered the compensation and assistance priorto asking them to vacate the land or structure occupied by them. Theimplementation schedule for Civil Works will be worked out in detail between theEngineering Wing and the SDRC.
Costs and Budget
3.8 The total budget for RAP-R is estimated to be Rs. 4,99,40,000. A consolidatedoverview of the budget estimate for the resettlement implementation, includingassistance, administrative expense, monitoring and evaluation, and contingenciesare given below in Table 3-2. The unit costs for various items as in RAP Phase Irevised periodically have been adopted for RAP-R.
3.9 The subsistence allowance, shifting allowance, relief assistance, amounts forincome generating schemes, cost for the provision of sites for commercialsquatters and rental allowance will be as provided in the RAP Phase I.
3.10 The budget required is available and will be included in the next annual budget forthe project.
PIU/KSHIP Page 17 of 20
Table 3-2
BUDGET ESTIMATES FOR RAP-R
SI.No. Items Amount (in Rs)
Payment of Cash Allowances ( Shifting and subsistence1 8,00,000
allowances)
2 Procurement of NGO services 35,00,000
3 Restoration of community assets 68,00,000
4 Providing Commercial sites of PAFs 28,00,000
5 Providing EWS Houses for PAFs 28,00,000
6 Payment of structure cost 1,50,00,000
7 Establishment of Rehabilitation Centre 1,00,00,000
Sub-Total 4,12,00,000
8 Contingency @ 20% 82,40,000
Grand Total 4,99,40,000
Note: Structure cost amounting to Rs. 63 lakhs have already been paid toPAF'sof Athani, Nagamanagala.
Monitoring and Evaluation
3.11 RAP-R implementation will be closely monitored to provide PIU and SDRCproject managers with an effective basis for assessing resettlement progress andidentifying potential difficulties and problem areas. Monitoring will be carried outby the SDRC and reported regularly to the Project Director on a monthly basis.The monitoring and evaluation system of the RAP Phase I will be followed forimplementation of RAP-R.
PIU/KSHIP Page 18 of 20
3.12 Public Disclosure
The full text of the RAP-R and the Executive Summary in local language wasdisclosed in the following places from 28-12-2004 to 31-12-2004 where ever theKSHIP Rehabilitation road passes through.
Belgaum Division
SI. No. Places of disclosure1 Office of the Deputy Commissioner, Dharwad District, Dharwad2 Office of the Chief Executive Officer, Zilla Panchayath, Dharwad3 District Central Library, Dharwad District, Dharwad.4 Executive Officer, Taluk Panchayath, Navalgund5 Office of the Tahasildar, Navalgund Taluk, Navalgund6 Chief Officer, Town Panchayath, Navalgund7 Office of the Grampanchayath, Shalavadi8 Office of the Grampanchayath Datnal9 Office of the Deputy Commissioner, Gadag district10 Chief Executive Officer, Zilla Panchayath, Gadag11 Office of the Executive officer, Taluk Panchayath, Ron12 Office of the Tahasildar, Ron Taluk, Ron.13 Chief Officer, Town Panchayath, Ron14 Office of the Gram Panchayath, Belavanki15 Office of the Gram Panchayath, Yellapur16 Office of the Gram Panchayath, Belavanki17 Office of the Gram Panchayath, Chikkamannur18 Office of the Executive Officer, Taluk Panchayat, Nargund19 Office of Tahasildar, Nargund Taluk, Nargund20 Office of the Executive Officer, Taluk Panchayath, Nargund21 Office of Gram Panchayath, Kagdal22 Office of Gram Panchayath, Itagi23 Office of Gram Panchayath, Soodi24 Office of Gram Panchayath, Gogeri25 Office of Gram Panchayath, Rajura26 Office of Gram Panchayath, Gajendraghad27 Office of the Deputy Commissioner, Koppal District, Koppal28 Chief Executive Officer, Zilla Panchayath, Koppal District, Koppal29 District Central Library, Koppal District, Koppal30 Office of the Executive Oficer, Taluk Panchayath, Kushtagi31 Chief Officer, Town Panchayath, Kushtagi32 Office of Gram Panchayath, Koradakera33 Office of Gram Panchayath, Bandi34 Office of Gram Panchayath, Hirebannigol
Raichur Division
35 Office of the Deputy Commissioner, Raichur District, Raichur
PIU/KSHIP Page 19 of 20
36 Office of the Assistant Commissioner, Raichur District, Raichur37 Office of the Chief Executive Officer, ZP, Raichur38 Office of the Tahasildar, Raichur39 District Central Library, Raichur40 Office of the Executive Officer, Manvi41 Public Library, Manvi42 Office of the Executive Officer, Taluk Panchayath, Lingasugur43 Office of Tahasildar, Lingasugur44 Office of Gram Panchayath, Kalendar45 Office of Gram Panchayath, Sirwar46 Office of Gram Panchayath, Malebit47 Office of Gram Panchayath, Kavithal48 Office of Gram Panchayath, P. Kellur49 Office of Gram Panchayath, Sarjapur50 Office of Town Panchayath, Mudhol51 Office of Town Muncipal Council, Mudhol52 Public Library, Libray53 Office of Town Municipality Council, Hungund54 Public Library, Hungund
Yellapur Division55 Office of the Tahasildar, Yellapur56 Office of Town Municipality Council, Yellapur57 Public Library, Yellapur58 Office of the Assistant Commissioner, Sirsi59 Office of the Town Municipal Council, Sirsi60 Office of the Tahasildar, Sirsi61 Office of Gram Panchayath, Manchikeri62 Office of Town Municipality Council, Haliyal63 Office of Executive Officer, Taluk Panchayath64 Office of the Deputy Commissioner, Karwar District, Karwar.65 Office of the Chief Executive Officer, Zilla Panchayath, Karwar.66 Office of the Assistant Commissioner, Karwar.67 District Library, Karwar.68 Office of Gram Panchayath, Bhagavanthi69 Office of Grampanchayath, Bhyrambi70 Office of Town Muncipal Council, Alnawar.
Hiriyur Division71 Office of the Deputy Commissioner, Mandya District, Mandya72 Office of the Chief Executive Officer, Zilla Panchayath, Mandya73 District Library, Mandya74 Office of the Tahsildar, Nagamangala taluk, Nagamangala75 Office of the Chief Officer, Town Municipality Council, Nagamangala
PIU/KSHIP Page 20 of 20
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTlFEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE -I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
qm)
1 2 3 4 5 6 7 8 9 10 it 12 13 14
1 M3 51+840 LHS Belgaum Athani Athant Parmeshi muttappa Kevaddannavar com ATN/ATN/L/01 Squatter Kutcha 1.45 1.3
2 M3 51+905 LHS Belgaum Athani Athani Babu Gangappa Honkatti com ATNiATN/U02 Squatter Semi-pucca 4.32 48
3 M3 52+345 LHS Belgaum Athani Athani Sidaraya B Bajantri res ATN/ATN/U03 Encroacher Pucca 23.5 0.63
4 M3 52+570 LHS Belgaum Athani Athani Tukaram Shettappa Nuli com ATN/ATN/LJ04 Encroacher Semi-pucca 15.96 0.85
5 M3 52+590 LHS Belgaum Athani Athani Bapu T Bepan com ATN/ATN/UO5 Squatter Semi-pucca 94.08 9
6 M3 52+590 LHS Belgaum Athani Athani Jayashri M Nuli com ATN/ATN/LJ05A Squatter Semi-pucca 94.08 9
7 M3 51+945 RHS Belgaum Athani Athani Sursh B Shedabal com ATN/ATN/R/02 Squatter Semi-pucca 1.83 1.4
8 M3 52-330 RHS Belgaum Athani Athani Tippanna Dada Bajantri res ATN/ATN/R/03 Encroacher Pucca 30.74 12.47
9 M3 52+335 RHS Belgaum Athani Athani Sabu Bhima Bajantri res ATN/ATN/R/04 Encroacher Semi-pucca 32.86 11.93
10 M3 52+342 RHS Belgaum Athani Athani Tippavva Chandrappa Bajantri res ATN/ATN/R/05 Encroacher Semi-pucca 22.91 10.44
II M3 52+347 RHS Belgaum Athani Athani Hanamant Bhima Bajantri res ATN/ATN/R/06 Encroacher Semi-pucca 12.25 4.2
12 M3 52+355 RHS Belgaum Athani Athani S. K Bhutali res ATN/ATN/R/07 Encroacher Kutcha 25.11 5.81
13 M3 52+370 RHS Belgaum Athani Athani Sanju Yellappa Bajantri com ATN/ATN/R/08 Encroacher Semi-pucca 15.19 3.87
14 M3 52+370 RHS Belgaum Athani Athani Ramachandra Banma Bajantri com ATN/ATN/R/09 Encroacher Senmi-pucca 48.6 0.9
15 M3 52+470 RHS Belgaum Athani Athani Babu Abdulsab Gadyal com ATN/ATN/R/10 Squatter Kutcha 2.72 0.16
16 M3 52+470 RHS Belgaum Athani Athani Hanmrashid B Mitjakar com ATN/ATN/R/1 I Squatter na 3.12 0.32
17 M3 52+530 RHS Belgaum Athani Athani Ladlesaheb Husainsab Drakshi com ATN/ATN/R/12 Squatter Semi-pucca 1.53 1.105
18 M3 52+548 RHS Belgaum Athani Athani Dastagir Imamasab Gaiban res ATN/ATN/R/ 1 3 Encroacher Semi-pucca 84.75 5.08
19 M3 52+560 RHS Belgaum Athani Athani Srekant v Kalal com ATN/ATN/R/14 Encroacher Semi-pucca 19.25 1.92
20 M3 52+565 RHS Belgaum Athani Athani Gangavva Irayya Matapathi res ATN/ATN/R/15 Encroacher Pucca 28.47 22.31
21 M3 52+565 RHS Belgaum Athani Athani Abdul Gafar Imaamsab Choudri res ATN/ATN/K116 Encroacher Pucca 39.5 1.5
22 M3 52+590 RHS Belgaum Athani Athani Jairabi Sikhandar Drakshi res ATN/ATN/R/ 17 Encroacher Pucca 48.3 1.84
23 M3 52+595 RHS Belgaum Athani Athani Ayazbabu m Drakshi res ATN/ATN/R/ 18 Encroacher Pucca 39+06 2.17
24 M3 52+640 RHS Belgaum Athani Athani Gafarsab Imaamsab Choudn com ATN/ATN/R/ 19 Encroacher Pucca 34.83 1.21
25 M3 52+700 RHS Belgaum Athani Athani Ashok Ramachandra kshirasagar com ATN/ATN/R/20 Encroacher Pucca 11.2 5.6
26 M3 52+703 RHS Belgaurn Athani Athani Saroja Ashoka Kshirasagar com ATN/ATN/R/21 Encroacher Semi-pucca 19.47 1.37
27 M3 52+710 RHS Belgaum Athani Athani Nazeer Ahmed Anwarsab Bagbon com ATN/ATN/R/22 Encroacher Pucca 25.6 8.12
28 M3 52+7 15 RHS Belgaum Athani Athani Rasool lbrahimsab Satbache res ATN/ATN/R/23 Encroacher Semi-pucca 26 5.68
29 M3 52+725 RHS Belgaum Athani Athani Masabhi Mahiboob Shekh com ATN/ATN/RJ24 Encroacher Semi-pucca 13.42 6.16
30 M3 52+720 RHS Belgaum Athani Athani Bhasha sab Lalsab Satbache com ATN/ATN/R/25 Encroacher Semi-pucca 11.7 2.85
31 M3 52a730 RHS Belgaum Athani Athani B B Sahera Md.Sab Mudalgi com ATN/ATN/R/26 Encroacher Semi-pucca 18.28 3.17
32 M3 52+735 RHS Belgaum Athani Athani Prakash G Savadkar corn ATN/ATN/R/27 Encroacher Semi-pucca 24.6 2.1
33 M3 52+740 RHS Belgauin Athani Athani AshrafMehaboob Master Others ATN/ATN/R/28 Encroacher Semi-pucca 15.5 0.43
34 M3 52+890 RHS Belgaum Athani Athani Krishna Chandu Mulya com ATN/ATN/R/29 Encroacher Semi-pucca 19.5 1.95
35 M3 52+895 RHS Belgaum Athani Athani Smt tangavva D Kumbar res ATN/ATN/R/30 Encroacher Semi-pucca 22 3.75
36 M3 52+900 RHS Belgaum Athani Athani Dattagirao G Sindhe res ATN/ATN/R/31 Encroacher Semi-pucca 26.75 2.94
37 M3 52+905 RHS Belgaum Athani Athani Shrimanth Depanna Hunashimore com ATN/ATN/RY32 Encroacher Pucca 20.3 3.48
38 M3 52+920 RHS Belgaur Athani Athani Chennappa Janunanna Kumbar res ATN/ATN/R/33 Encroacher Pucca 35.04 3.84
39 M3 52+925 RHS Belgaun Athani Athani Tavakkalbhi N Tamboli res-cum-com ATN/ATN/R/34 Encroacher Pucca 13.5 1.2
40 M 3 52+930 RHS Belgaum Athani Athani Sadashiva Appanna ichan res-cum-com ATN/ATN/R/35 Encroacher Semi-pucca 12.15 1.5
41 M3 52+935 RHS Belgaum Athani Athani Siddappa bannappa Yakkanchi res ATN/ATN/R/36 Encroacher Semi-pucca 18.61 0.18
42 AM3 53+210 RHS Belgaum Athani Athani Natuba Allappa Venkanti com ATN/ATN/R/37 Squatter Semi-pucca 2.59 1 .99
PIU/KSHIP Page 1 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACT'ION PLAN FOR REHABILITATION ROADS
ANNEXUJRE - I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
qm)
- 2 3 4 5 6 7 8 9 10 II 12 13 14
43 M3 53+270 RHS Belgaum Athani Athani Shanta R Pawar com ATN/ATN/R/38 Encroacher Semi-pucca 12.83 7.9
44 M3 53+275 RHS Belgaurm Athani Athani Shivaji Sahu Pawar com ATN/ATN/R/39 Encroacher Semi-pucca 27.93 7.35
45 M3 53±279 RHS Belgaum Achani Athani layavanth ramachandra Pawar res ATN/ATN/R/39A Encroacher na
46 M3 53+545 RHS Belgaun Athani Athani Sanjeev Neelayy Mulli com ATN/ATN/R/40 Squatter Semi-pucca 2.4 1.56
47 M3 53.585 RHS Belgaum Athani Athani Bashadastagir Sudrani com ATN/ATN/R/41 Squatter Semi-pucca 3.51 1.81
48 M3 53+590 RHS Belgaum Athani Athani Noorahamad Allabhaksh Nalabandh com ATN/ATN/R/42 Squatter Semi-pucca 18.28 1.02
49 M3 53+595 RHS Belgaun Athani Athani Mallikatjun Ramanna Chamkeri com ATN/ATN/R/43 Encroacher Semi-pucca 8.29 1.99
50 M3 53+908 RHS Belgaum Athani Athani Sharanayya Shankarayya Gaduginanath com ATN/ATN/R/44 Squatter Semi-pucca 2.62 2.25
51 M3 53+600 RHS Belgaurn Athani Athani Umesh Murgappa hadpad com ATN/ATN/R/45 Squatter Semi-pucca 2.4 2.4
52 M3 53+602 RHS Belgaumn Athani Athani Mubaraq Nabisab Sanadhi com ATN/ATN/R/46 Squatter Semi-pucca 2.1 2.1
53 M4 8+735 LHS Belgaum Athani Shiraguppa AltafGulab Khanwade com ATN/SGP/UOI Squatter Semi-pucca 5.75 2.87
54 M4 8+736 LHS Belgaun Athani Siraguppa Khallil H.Kanawade com ATN/SGP/U02 Squatter Semi-pucca 4.62 0.12
55 M4 8+743 LHS Belgaum Athani Siraguppa Sadat Allabaksha Alase com ATN/SGP/L 03 Squatter Semi-pucca 3.45 0.40
56 M6 47+940 LHS Mandya Nagamangala Nagamangala Mohanunad Barkattulla Md. Khasim Others NGM/NGM/LOI Encroacher Boundary Walls 617.70 23.30
57 M6 47+950 LHS Mandya Nagamangala Nagamangala N.R Mohamnnad Fiaz s/o N Abdul Rehaman res NGMINGM/U02 Encroacher Pucca 96.50 10.50
58 M6 47+964 LHS Mandya Nagamangala Nagamangala Nazinijan w/o Nasrulla Khan res NGMfNGM/U03 Encroacher Pucca 38.04 30.00
59 M6 47+957 LHS Mandya Nagamangala Nagamangala N.R. Kizar Ahamad S/o N Abdul Rehmnan res NGMfNGM/U04 Encroacher Pucca 96.50 10.50
60 M6 47+969 LHS Mandya Nagamangala Nagamangala Rasheeda Jan w/o Rahamuthalla Khan res NGM/NGM/U05 Encroacher Pucca 48.20 12.00
61 M6 47+976 LHS Mandya Nagamangala Nagamangala Mohammad Masood s/o Siddiq Sab com NGM/NGM/UO6 Encroacher Pucca 108.83 6.80
62 M6 47+980 LHS Mandya Nagamangala Nagamangala N.R. Mohammrad Illias sbo Abdul Rehaman com NGM/NGM/U07 Encroacher Semi-pucca 36.78 22.80
63 M6 47+985 LHS Mandya Nagamangala Nagamangala Nishad Khanam w/o Hyder Ali Khan com NGM/NGM/U08 Encroacher Semi-pucca 36.78 19.20
64 M6 47+990 LHS Mandya Nagamangala Nagamangala N.S. Alijan s/o Sattar Sab res-cum-com NGM/NGM/U09 Encroacher Semi-pucca 22.57 15.60
65 M6 47+989 LHS Mandya Nagamangala Nagamangala Zeenathunnisa d/o late Abdul Hameed com NGM/NGM/UIO Encroacher Semi-pucca 22.57 14.40
66 M6 48+003 LHS Mandya Nagamangala Nagamangala Ahamad Khan s/o Gaub Khan res-cuyn-com NGM/NGM/UI I Encroacher Pucca 31.79 31.79
67 M6 47+999 LHS Mandya Nagamangala Nagamangala N.S Fiaz Khan s/o Sheikh Silar Sab res-cum-com NGM/NGM/U12 Encroacher Semi-pucca 55.74 22.80
68 M6 47+994 LHS Mandya Nagamangala Nagamangala Abdul Khader s/o Tailor Gybe Sab res NGM/NGM/U13 Encroacher Semi-pucca 45.14 20.42
69 M6 48+010 LHS Mandya Nagamangala Nagamangala Sanaulla Khan s/o late Gafar Khan res NGM/NGM/U14 Encroacher Pucca 30.07 28.25
70 M6 48+017 LHS Mandya Nagamangala Nagamangala Basheer Khan s/o Gouse Khan res NGM/NGM/UI5 Encroacher Semr-pucca 13.74 13 74
71 M6 48+023 LHS Mandya Nagamangala Nagamangala Doddaiah s/o Javaregowda com NGM/NGM/UL16 Encroacher Pucca 47.77 44 99
72 M6 48+027 LHS Mandya Nagamangala Nagamangala Kalammra w/o D.V. Krishnachar res NGMfNGM/UJ17 Encroacher Pucca 43.89 43.55
73 M6 48+030 LHS Mandya Nagamangala Nagamangala Late Chennanuna W/o Chenmgappa shetty com NGMiNGM/U 18 Encroacher Semi-pucca 29.75 29.75
74 M6 48+033 LHS Mandya Nagamangala Nagamangala N.R. Basavarajappa S/o Rudraiah res NGMINGM/U19 Encroacher Pucca 32.60 32.25
75 M6 48+038 LHS Mandya Nagamangala Nagamangala N.R Jeetaendra s/o N.H Raju com NGMINGM/UL20 Encroacher Pucca 32.60 27.00
76 M6 48+043 LHS Mandya Nagamangala Nagamangala Huchhania w/o late Chikkaiah com NGM/NGM/U21 Encroacher Semi-pucca 25.36 25.36
77 M6 48+049 LHS Mandya Nagamangala Nagamangala Ahamad Husain s/o Late Md. Saheb com NGM/NGM/U22 Encroacher Pucca 24.96 24.96
78 M6 48+055 LHS Mandya Nagatmangala Nagamangala N.G Gopal late M.S Govind Shetty res-cum-com NGM/NGM/UL23 Encroacher Pucca 28.61 24.70
79 M6 48+060 LHS Mandya Nagamangala Nagamangala Siddiq Ahamad Late D.M Ismail com NGMINGM/U24 Encroacher Pucca 30.65 28.83
80 M6 48+065 LHS Mandya Naganmangala Nagamangala N. M Subbaraya Shetty Narappa shetty com NGMINGM/U25 Encroacher Pucca 117.05 34.20
81 M6 48+070 LHS Mandya Nagamangala Nagamangala Nagina Aja Md. Jahangir com NGMINGM/U26 Encroacher Pucca 73.64 19.80
82 M6 48+075 LHS Mandya Nagamangala Nagamangala Nasrin Begum Ahniad Husain com NGM/NGM/L/27 Encroacher Seini-pucca 54.13 19.80
83 M6 48+080 LHS Mandya Nagamangala Nagamangala Gurubasappa Late Ramappa res-cum-com NGM/NGM/U28 Encroacher Pucca 82.77 30.90
84 M6 48+085 LHS Mandya Nagamangala Naganmangala Girijamma Late Ramakrishnappa res NGMINGM/UL29 Encroacher Pucca 40.96 18.90
85 M6 48 4090 LHS Mandya Nagamangala Nagamangala V.Ravishankara N.N. Veerappa com NGM/NGM/U30 Encroacher Pucca 70.04 38.70
PIU/KSHIP Page 2 of 13
KARNATAIKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE -I General Identification and Type of loss
SI.No. Contract Chainage Side Distnct Taluk Village Name Type of loss SI.No. of Sir Status of Type of structure Total AreaOccupier Area(sqmn) Affected(s
2 3 4 5 6 7 8 9 10 II 12 13 1- 4
86 M6 48+097 LHS Mandya Nagamangala Nagamangala N.S Nandakumara S Subbashetty com NGM/NGM/U31 Encroacher Pucca 26.26 16.91
87 M6 48+106 LHS Mandya Nagamangala Nagamangala S.L Vasanta Kmnari w/o Nanjundaswamy Shetty res-cum-com NGMfNGM/LU32 Encroacher Pucca 70.04 15.57
88 M6 48+131 LHS Mandya Nagamangala Nagamangala Siddiq Ahamad Late D.M Ismail com NGM/NGM/U33 Encroacher Pucca 86.16 18.60
89 M6 48+166 LHS Mandya Nagamangala Nagamangala N.R ShivaShankar s/o T.H Rudrappa com NGM/NGM/U34 Encroacher Pucca 22.99 22.99
90 M6 48+171 LHS Mandya Nagamangala Nagamangala N.R Umesh Sl TH Rudrappa comr NGM/NGM/U35 Encroacher Pucca 42.91 20.00
9 1 M6 48+176 LHS Mandya Nagamangala Nagamangala N.R Nagaraj S/o T. H Rudrappa com NGM/NGM/U36 Encroacher Pucca 61.31 21.50
92 M6 48+183 LHS Mandya Nagamangala Nagamangala N.S. Guruprasad s/o Late N.R Shivakumar com NGM/NGM/U37 Encroacher Pucca 61.31 21.50
93 M6 48+190 LHS Mandya Nagamangala Nagamangala Huchamma w/o Late Chikkaiah res NGMfNGM/U38 Encroacher Pucca 9.19 7.09
94 M6 48+195 LHS Mandya Nagamangala Nagamangala Adavishetty s/c Kanchishetty com NGM/NGM/U39 Encroacher Pucca 78.96 12.25
95 M6 48+210 LHS Mandya Nagamangala Nagamangala Diddaiah s/o Javaregowda com NGM/NGM/U40 Encroacher Pucca 5.85 5.85
96 M6 48+235 LHS Mandya Nagamangala Nagamangala M Devakiamma w/o late Narayana Nayar com NGM/NGM/U41 Encroacher Pucca 295.21 16.45
97 M6 48+400 LHS Mandya Nagamangala Nagamangala MDCC Bank Others NGMINGM/U42 Encroacher Boundary Walls 222.96 12.00
98 M6 48+350 LHS Mandya Nagamangala Nagamangala Land Development Bank Others NGM/NGM/U43 Encroacher Boundary Walls 222.96 13.30
99 M6 48+400 RHS Mandya Nagamangala Nagamangala Agril. Co-op Society Others NGM/NGM/U44 Encroacher Boundary Walls 557.40 11.81
100 M6 47+750 RHS Mandya Nagamangala Nagamangala Siddiq Ahamad Late D.M Ismail res NGM/NGM/U45 Encroacher Pucca 2047.51 27.80
101 M6 47+760 RHS Mandya Nagamangala Nagamangala N.R Mohanmnad Noorulla s/o M Abdul Rehnian res NGM/NGM/U46 Encroacher Pucca 61.31 6.27
102 M6 47+770 RHS Mandya Nagamangala Nagamangala NAR Md. Illias s/ M Abdul Rehaman res NGM/NGM/U47 Encroacher Pucca 61.31 6.27
103 M6 47+778 RHS Mandya Nagamangala Nagamangala N.R Md. Abbas s/o M Abdul Rehaman res NGMINGM/U48 Encroacher Pucca 61.31 6.27
104 M6 47+782 RHS Mandya Nagamangala Nagamangala Ameerul Hamza s/o Late N.R md. Gouse res NGMINGM/L/49 Encroacher Pucca 61.31 6.27
105 M6 47+785 RHS Mandya Nagamangala Nagamangala N.H Ulfath Ali Khan s/o Late N.V hyder ali Khan res NGMfNGM/U50 Encroacher Pucca 92.31 9.00
106 M6 47+789 RHS Mandya Nagamangala Nagamangala N.H Sadatali Khan s/o late N.V Hyderali Khan res NGMfNGM/U51 Encroacher Pucca 172.32 31.50
107 M6 47+795 RHS Mandya Nagamangala Nagamangala N.G Shafiulla Khan s/o Gouse Khan res NGM/NGM/U52 Encroacher Semi-pucca 59.14 16.45
108 M6 47+800 RHS Mandya Nagamangala Nagamangala Habeebulla Khan s/o Gouse Khan res NGM/NGM/U53 Encroacher Semi-pucca 38.09 12.00
109 M6 47+817 RHS Mandya Nagamangala Nagamangala Peer Khan s/o Late Abdul Khan res NGM/NGM/U54 Encroacher Semi-pucca 27.87 16.80
110 M6 47+822 RHS Mandya Nagamangala Nagamangala Rabbani s/o Late Khader Ahaniad res NGMfNGM/U55 Encroacher Semi-pucca 25.8 22.36
IIl M6 47+827 RHS Mandya Nagamangala Nagamangala Shanur urf Imambee w/o Maqbul res NGMfNGM/U56 Encroacher Semi-pucca 11.15 8.40
112 M6 47+835 RHS Mandya Nagamangala Nagamangala Altaf Pasha s/o Late zigurulla Khan res NGMiNGM/LU57 Encroacher Semi-pucca 11.15 8.40
113 M6 47+838 RHS Mandya Nagamangala Nagamangala Ayub Khan s/o Late Abbas Khan res NGM/NGM/U58 Encroacher Semi-pucca 33.44 15.48
114 M6 47+843 RHS Mandya Nagamangala Nagamangala Amanulla Khan s/o gouse Khan res NGMfNGM/U59 Encroacher Semi-pucca 45.52 33.12
115 M6 47+847 RHS Mandya Nagamangala Nagamangala Inayathulla Khan s/o Late Gouse Khan res NGM/NGM/LU60 Encroacher Pucca 29.73 11.00
116 M6 47+853 RHS Mandya Nagamangala Nagamangala Jaffar Husain s/o Late Abdul Rasheed res NGM/NGM/U61 Encroacher Semi-pucca 55.80 21.06
117 M6 47+852 RHS Mandya Nagamangala Nagamangala N.G Siddaramanna s/o Late Gubbishettv res NGM/NGM/U62 Encroacher Pucca 86.35 41.25
118 M6 47+860 RHS Mandya Nagamangala Nagamangala Md. Gouse s/o Abdul Gafar res NGM/NGM/U63 Encroacher Semi-pucca 17.23 17.23
119 M6 47+864 RHS Mandya Nagamangala Nagamangala R.B Rajapp s/o Ramappa res NGMfNGM/U64 Encroacher Pucca 87.94 28.80
120 M6 47+869 RHS Mandya Nagamangala Nagamangala H.D Soubagyamma w/o R B Rajappa res NGMINGM/U65 Encroacher Pucca 79.89 36.85
121 M6 47+872 RHS Mandya Nagamangala Nagamangala Siddalingamma w/o Late Siddappa res NGM/NGM/U66 Encroacher Pucca 29.89 28.80
122 M6 47+877 RHS Mandya Nagamangala Nagamangala Kamalammna w/o Late N C Hanumanth Shetty res NGM/NGM/U67 Encroacher Pucca 193.21 43.20
123 M6 47+884 RHS Mandya Nagamangala Naganiangala Late Chennamma W/o Chennigappa shetty res NGM/NGM/U68 Encroacher Pucca 125.42 58.30
124 M6 47 904 RHS Mandya Nagamangala Nagamangala N.S. Shivakumar Gupta s/o Late N.K Subbraya Shetty res NGM/NGM/U69 Encroacher Pucca 86.49 43.12
125 M6 47+914 RHS Mandya Nagamangala Nagamangala N.V Chidananda s/o T.H Veerappa res NGM/NGM/UJ70 Encroacher Pucca 83.23 24.00
126 M6 47+919 RHS Mandya Nagamangala Nagamangala Puttarudramma w/o Late Chemnappa res NGMINGM/U71 Encroacher Semi-pucca 157.93 30.60
127 M6 47+923 RHS Mandya Nagamangala Nagamangala Asmatunnisa w/o Md. Abdul Rasheed com NGM/NGM/UJ72 Encroacher Pucca 130.60 22.80
128 M6 47+926 RHS Mandya Nagansangala Nagamangala N.V Nagaraju s/o S Venkata shetty com NGM/NGM/U73 Encroacher Pucca 92.90 33.60
PIU/KSHIP Page 3 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE -I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total Area
Occupier Area(sqm) Affected(s
1 2 3 4 5 6 7 8 9 10 II 12 13 14
129 M6 47+930 RHS Mandya Nagamangala Nagamangala N.V Suresh s/o S Venkata Shetty com NGM/NGM/U74 Encroacher Pucca 46.45 16.80
130 M6 47+930 RHS Mandya Nagamangala Nagamangala N B Ramachandra S/o Balayay Shetty com NGM/NGM/L/75 Encroacher Pucca 148.64 20.00
131 M6 48+000 RHS !Mandya Nagamangala Nagamangala Alumelamma w/o D Ramakrishnashetty com NGM/NGM/L/76 Encroacher Pucca 195.09 48 00
132 M6 48+025 RHS Mandya Nagamangala Nagamangala Md. Noorulla s/o Khazi Md. Abbas Sab res NGM/NGM/LU77 Encroacher Pucca 161.65 14.48
133 M6 48+105 RHS Mandya Nagamangala Nagamangala A Md. Gouse s/o Mohiddin Sab com NGM/NGM/L/78 Encroacher Pucca 445.46 121.80
134 M6 48+130 RHS Mandya Nagamangala Nagamangala Firoze Pasha s/o Late Abdul Kareem Sab com NGM/NGM/U79 Encroacher Pucca 128.75 10.80
135 M6 48+155 RHS Mandya Nagamangala Nagamangala UmmerDaraz sto late Abdul Jabbar res-cum-com NGM/NGM/LU80 Encroacher Pucca 195.09 11.88
136 M6 48+200 RHS Mandya Nagamangala Nagamangala nabijan s/o late A Abdul Jabbar res-cum-com NGM/NGM/L/81 Encroacher Pucca 10.45 5.94
137 M6 48+210 RHS Mandya Nagamangala Nagamangala A Md Gouse s/o Abdul Azeez res-cum-com NGM/NGM/U82 Encroacher Pucca 10.45 4.86
138 M6 48+240 RHS Mandya Nagamangala Nagarnangala Ahrnad Pasha s/o Late Abdul Azeez res-cum-com NGM/NGM/LJ83 Encroacher Pucca 10.45 5.40
139 M6 48+250 RHS Mandya Nagamangala Nagamangala N.K Venkatesh s/o N.G Krishna Shetty res-cum-com NGM/NGM/LJ84 Encroacher Pucca 120.30 17.83
140 M6 48+260 RHS Mandya Nagarangala Nagamangala N.K Srinivasa Murthy s/ oN.G KrishnaShetty corn NGM/NGM/L/85 Encroacher Pucca 50.58 17.83
141 M6 28+270 RHS Mandya Nagamangala Nagamangala N.V Subbarao s/o Venkatapatahiah Others NGM/NGM/L/86 Encroacher Boundary Walls 441.46 16.30
142 M6 48+300 RHS Mandya Nagamangala Nagamangala B.A Mamtha w/o N.S Umesh Others NGM/NGM/L/87 Encroacher Boundary Walls 512.62 28.10
143 M25 18+190 LHS Karwar Yellapur Manchi Keri B.R.Bhadkar res YPR/MCR/L/A/01 Encroacher Semi-pucca 66.00 4.10
144 M25 18+194 LHS Karwar Sirsi Manchi Keri Sadananda G.Payde res YPR/MCR/UA/02 Encroacher Semi-pucca 50.00 2.88
145 M25 18+197 LHS Karwar Yellapur Manchi Keri Siraj Shaifuddin Sheik com YPR/MCR/UA/03 Encroacher Semi-pucca 36.00 8.40
146 M25 18+325 LHS Karwar Yellapur Manchi Keri Annappa Shivappa Nayak res YPR/MCR/ILA/04 Encroacher Semi-pucca 93.00 8.68
147 M25 48+100 LHS Karwar Sirsi Sirsi Ganapathi.G.Hegde Others SRS/SRSUA/05 Encroacher na na -
148 M25 48+125 LHS Karwar Sirsi Sirsi Subraya.V.Hegde Others SRS/SRSUA/06 Encroacher Pucca 8.90 8.90
149 M25 48+220 LHS Karwar Sirsi Sirsi B.L.Hegde Others SRS/SRSLA/07 Encroacher Semi-pucca 50.00 40.00
150 M25 48+300 LHS Karwar Sirsi Sirsi RamachandraV.Shastri com SRS/SRSLJA/08 Encroacher Semi-pucca 7.50 7.40
151 M25 48+340 LHS Karwar Sirsi Sirsi F.L.D'Souza cons SRS/SRSL/A/8V2 Encroacher na 7.50 3.00
152 M25 48+325 LHS Karwar Sirsi Sirsi Suman Dathanand Habbu com SRS/SRSL'A/8V1 Encroacher Serni-pucca 30.00 3.25
153 M25 48+405 LHS Karwar Sirsi Sirsi Paramesh G.Hegde Others SRS/SRSLUA/09 Encroacher Semi-pucca 40.00 40.00
154 M25 48+445 LHS Karwar Sirsi Sirsi A.Azim Others SRS/SRSUA/10 Encroacher Semi-pucca 15.00 15.00
155 M25 49+420 LHS Karwar Sirsi Sirsi Abdul Sattor Shekh Others SRS/SRSUA/10 Encroacher Wall 11.70 11.70
156 M25 49+442 LHS Karwar Sirsi Sirsi Abdul Mazid Shekh Others SRS/SRSUA/12 Encroacher Semi-pucca 9.50 9.50
157 M25 49+442 LHS Karwar Sirsi Sirsi Narayan V Udupikar Others SRS/SRS/UA/13 Encroacher Semi-pucca 24.00 24.00
158 M25 49+467 LHS Karwar Sirsi Sirsi Jeevu Ram Karnath Others SRS/SRSUA/14 Encroacher Semi-pucca 25.00 25.00
159 M25 49+492 LHS Karwar Sirsi Sirsi Dr. Ramachandra Hegde Others SRS/SRSUA/15 Encroacher Semi-pucca 11.60 11.60
160 M25 49+530 LHS Karwar Sirsi Sirsi Sudhir.H.Holekar Others SRS/SRSUA/16 Encroacher Semi-pucca 17.40 17.40
161 M25 50+180 LHS Karwar Sirsi Sirsi Lalitha Madhukar Shet Others SRS/SRSUA/17 Encroacher Semi-pucca 2.30 2.30
162 M25 50+234 LHS Karwar Sirsi Sirsi Vinayak H.Bhatkal Others SRS/SRSJUA/18 Encroacher Semi-pucca 2.10 2.10
163 M25 50+255 LHS Karwar Sirsi Sirsi Taranath.S,Shirali Others SRS/SRSUA/19 Encroacher Semi-pucca 10.00 10.00
164 M25 50+265 LHS Karwar Sirsi Sirsi Ganapathi Shet Others SRS/SRSUA/20 Encroacher Semi-pucca 4.00 4.00
165 M25 50+283 LHS Karwar Sirsi Sirsi Devidas.B.Bhat Others SSRS/SRSUA/21 Encroacher Semi-pucca 13.00 13.00
166 M25 50+296 LHS Karwar Sirsi Sirsi Shantha Thomas Femandes com SRS/SRSUA/22 Encroacher Semi-pucca 18.50 2.96
167 M25 50+306 LHS Karwar Sirsi Sirsi Narayan com SRS/SRSL/A/23 Encroacher na 8.40 0.74
168 M25 50+304 LHS Karwar Sirsi Sirsi Muruti com SRS/SRSUA/24 Encroacher na 8.40 0.84
169 M25 50+310 LHBS Karwar Sirsi Sirsi Victor Breto ret SRS/SRSUA/25 Encroacher Semi-pucca 9.00 2.30
170 M25 18+110 LHS Karwar Yellapur Manchikeri Abubakar cor YPR/MCRIR/A/01 Encroacher Kutcha 10.50 3.68
171 M25 - LHS Karwar Yellapur Manchikeri Narayana Ramachandra Bhat com YPR/MCR/A/0l/V Encroacher Kutcha 19.50 5.85
PIU/KSHIP Page 4 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE - I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
qrn)
1 2 3 4 5 6 7 8 9 10 II 12 13 14
172 M25 49+467 LHS Karwar Yellapur Manchikeri Ravidas Shetty com YPRIMCR/RJA/I/V Encroacher na 28.50 9.53
173 M25 18+200 RHS Karwar Yellapur Manchikeri Dr. H.Nagaraj com YPRIMCR./RIA02 Encroacher Semi-pucca 61.00 5.80
174 M25 0+015 RHS Karwar Yellapur Yellapur Ullas Male com YPR/YPR/R'01 Encroacher Semi-pucca 15.00 0.30
175 M25 0+108 LHS Karwar Yellapur Yellapur Nagendra Kabadi com YPR/YPRIL/01 Encroacher Semi-pucca 1.00 0.10
176 M25 0+112 LHS Karwar Yellapur Yellapur Ganapati Revanakar comr YPRIYPRLUO2 Squatter Semi-pucca 9.00 0.30
177 M25 0+115 LHS Karwar Yellapur Yellapur Venkatesh P.Nayak com YPR/YPR'U03 Squatter Semi-pucca 8.40 0.42
178 M25 0+117 LHS Karwar Yellapur Yellapur Dyamavva Nagesh Jogi com YPR./YPR/L104 Squatter Semi-pucca 4.00 0.20
179 M25 0+121 LHS Karwar Yellapur Yellapur Rarna Puttu Savarkar com YPR/YPRILIO8 Squatter Semi-pucca 6.00 0.40
180 M25 0+122 LHS Karwar Yellapur Yellapur Mansurkhan Pathan com YPRIYPR/L Encroacher Semi-pucca 4.00 0.40
181 M25 0+126 LHS Karwar Yellapur Yellapur Vinayak Nagendra Halgeri com YPRIYPRIL/06 Squatter Semi-pucca 6.00 0.50
182 M25 0+128 LHS Karwar Yellapur Yellapur S.M.Chandru com YPRIYPR/L/07 Encroacher Serni-pucca 3.00 0.30
183 M25 0+132 LHS Karwar Yellapur Yellapar Badravathi Gavnkar com YPR/YPR/U09 Squatter Semi-pucca 3.00 0.30
184 M25 0+134 LHS Karwar Yellapur Yellapur Mahadev Patankar com YPR/YPRILIO Squatter Semi-pucca 4.00 0.40
185 M25 0+136 LHS Karwar Yellapur Yellapur Stinath S.Naik com YPR'YPRLUOI I Squatter Semi-pucca 6.00 0.40
186 M25 0+138 LHS Karwar Yellapur Yellapur Mohan Badhi com YPR/YPRIU0O12 Squatter Serni-pucca 9.00 0.45
187 M25 0+141 LHS Karwar Yellapur Yellapur Shailesh Darna Nayak com YPRIYPR/L 13 Squatter Semi-pucca 9.00 0.30
188 M25 0+142 LHS Karwar Yellapur Yellapur Hanumanthappa Mallappa Ingale com YPR/YPRJU014 Squatter Semi-pucca 9.00 0.30
189 M25 0+145 LHS Karwar Yellapur Yellapur Parashu Rama Hingle com YPR/YPR/U0 15 Squatter Semi-pucca 9.00 0.30
190 M25 0+148 LHS Karwar Yellapur Yellapur Shamguddin Isamil Shekh com YPR/YPR/L/16 Squatter Semi-pucca 7.50 0.25
191 M25 0+151 LHS Karwar Yellapur Yellapur Raju Mukund Naik com YPR/YPR/U017 Squatter Semi-pucca 7.50 0.30
192 M25 0+153 LHS Karwar Yellapur Yellapur Abdul LatifFairoj Shekh com YPR/YPR/U018 Squatter Semi-pucca 3.75 0.15
193 M25 0+155 LHS Karwar Yellapur Yellapur Sheskkamaza N.Shekh com YPR/YPRLU019 Squatter Semi-pucca 3.75 0.15
194 M25 0+157 LHS Karwar Yellapur Yellapur Shekh Ooli Mohamad comr YPR/YPRIU020 Squatter Semi-pucca 7.50 0.30
195 M25 0+160 LHS Karwar Yellapur Yellapur Hanamanasa Gunasa Ladawa com YPR/YPR/U021 Encroacher Semi-pucca 6.00 0.30
196 M25 0+163 LHS Karwar Yellapur Yellapur Mahamad Raffeq com YPR/YPR.JU022 Squatter Semi-pucca 9.00 0.30
197 M25 0+166 LHS Karwar Yellapur Yellapur Basheer com YPR/YPRiU023 Squatter Semni-pucca 12.50 1.25
198 M25 0+171 LHS Karwar Yellapur Yellapur Abdul Kareem Shekh com YPR/YPRIU024 Encroacher Semi-pucca 8.75 0.70
199 M25 0+175 LHS Karwar Yellapur Yellapur Lalitha Manohar Patil com YPR/YPR/L/025 Squatter Semi-pucca 0.25 0.50
200 M25 0+210 LHS Karwar Yellapur Yellapur Shankar Pawar com YPR/YPR/L/026 Squatter Semi-pucca 4.00 0.20
201 M25 0+212 LHS Karwar Yellapur Yellapur K.S.Bhatt com YPR/YPR/L/027 Squatter Semi-pucca 4.00 0.20
202 M25 0+214 LHS Karwar Yellapur Yellapur Aravinda Vaman Bhandarkar com YPR/YPR/L/028 Squatter Semi-pucca 6.00 0.20
203 M25 0+-16 LHS Karwar Yellapur Yellapur Balakrishna Poomale com YPR/YPR/U029 Squatter Semi-pucca 6.00 0.40
204 M25 0+218 LHS Karwar Yellapur Yellapur Manjunath Sheth Bikka com YPR/YPR/L/030 Squatter Semi-pucca 6.00 0.20
205 M25 0+220 LHS Karwar Yellapur Yellapur Jubad Karinikhan com YPR/YPR/U031 Squatter Semi-pucca 4.50 0.15
206 M25 0+222 LHS Karwar Yellapur Yellapur Abdul Ghani Raja Sab Durga com YPR/YPRIUO32 Squatter na 5.50 1.75
207 M25 43+058 LHS Karwar Sirsi Dasangadde Krishna Appu Shetti Others SRS/SG/L/39 Squatter Kutcha 62.00 62.00
208 M25 38+147 RHS Karwar Sirsi Bainimbi Shreepad Krishna Hegade com SRS/BMB/R/22 Squatter Semi-pucca 6.60 1.10
209 M25 38+140 RHS Karwar Sirsi Bairumbi Subraya N.Naik com SRS/I3MB/R/021 Encroacher Semi-pucca 10.20 3.40
210 M25 38+135 RHS Karwar Sirsi Bairumbi Mahaling Narayan Nayak com SRS/BMB/R/20 Squatter Semi-pucca 8.00 2.80
211 M25 38+020 LHS Karwar Bairumbi Bairumbi Sridhar Ganapati Hegade Others SRS/BMB/U38 Encroacher Kutcha 50.00 50.00
212 M25 36+440 LHS Karwar Sirsi Hulgol Anant Venktaram Hedage Others SRS/HGL/U37 Encroacher Pucca 115.00 115.00
213 M25 36+485 RHS Karwar Sirsi Hulgol Narayan M ahabaleshwar Hegade Others SRS/HGLUR/19 Encroacher na 115.00 109.25
214 M25 36+430 LHS Karwar Sirsi Hulgol Narayan Mahabaleshwar Hegade Others SRS/HGUU36 Encroacher Others 55.00 55.00
PIU/KSHIP Page 5 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE - I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total Area
Occupier Area(sqm) Affected(s
_ .~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~___ qm)
1 2 3 4 5 6 7 8 9 to II 12 13 14
215 M25 36-425 RHS Karwar Sirsi Hulgol Anant Venktarnam Hedage Others SRS/HGUR/I8 Encroacler Kutcha 60.00 57.00
216 M25 48+302 LHS Karwar Sirsi Sirsi Satish Yallappa Kalal com SRS/SSR.L'40 Squatter Semi-pucca 5.20 1.04
217 M25 48+305 LHS Karwar Sirsi Sirsi Suresh Yallappa Kalal com SRS/SSR/L/41 Encroacher Semi-pucca 11.40 3.23
218 M25 48+308 LHS Karwar Sirsi Sirsi R.N.Hegade Bende Godde com SRS/SRS/L/042 Encroacher Semi-pucca 12.00 4.32
219 M25 18+157 RHS Karwar Yellapur Manchiken Sachin Timmappa Shet com YPR/MCR/R/02 Encroacher Semi-pucca 25.20 2.73
220 M25 18+178 RHS Karwar Yellapur Manchikeri Tinmnappa J.Shet com YPR/MCR/RJ03 Encroacher Semi-pucca 116.40 2.42
221 M25 18+198 RHS Karwar Yellapur Manchiken Sudhindra Ganapathy Payde com YPR/MCR/R/04 Encroacher Semi-pucca 38.40 0.48
222 M25 18+206 LHS Karwar Yellapur Manchiketi Radha Gopalakrishna Shet res YPRIMCR.L/33 Encroacher Semi-pucca 21.00 0.42
223 M25 18+208 RHS Karwar Yellapur Manchiken Sudhindra G. Payde com YPRiMCRIRI05 Encroacher Pucca 70.95 0.82
224 M25 18+212 RHS Karwar Yellapur Manchikeri Jayaprnakash Payde com YPR/MCR/R/06 Encroacher Semi-pucca 26.00 4.80
225 M25 18+219 RHS Karwar Yellapur Manchikeri Jayaprakash Payde res YPR/MCR/R/07 Encroacher Semi-pucca 94.50 5.04
226 M25 18+222 LHS Karwar Yellapur Manchikeri Jayaprakash Narnayan Shet com YPR/MCR/U34 Squatter Semi-pucca 96.00 5.76
227 M25 18+225 RHS Karwar Yellapur Manchikeri Dinkar Payde res YPRJMCR/R/08 Encroacher Semi-pucca 15.40 1.87
228 M25 18+227 Karwar Yellapur Manchikeri Robert Tailor com YPRJMCR/R/09 Encroacher Pucca 16.80 0.22
229 M25 18+227 RHS Karwar Yellapur Manchikeri Sridhar Bhat res YPR/MCR/R.I0 Encroacher Semi-pucca 45.00 0.36
230 M25 18+231 LHS Karwar Sirsi Manchiken Ashok.G.Desai res-cum-com YPRJMCR/LU35 Encroacher Semi-pucca 9.00 2.55
231 M25 18+232 RHS Karwar Yellapur Manchikeri Subash Payde res YPR/MCR!R/I I Encroacher Semi-pucca 63.00 0.54
232 M25 18+232 RHS Karwar Yellapur Manchikeri Prahalad Masken res YPR/MCR/R/12 Encroacher Semi-pucca 63.00 5.04
233 M25 18+237 RHS Karwar Yellapur Manchikeri Surendra G.Payde res-cum-com YPRIMCR/R/13 Encroacher Semi-pucca 50.00 4.50
234 M25 18+242 RHS Karwar Yellapur Manchikeri S F.Mirandar com YPR/MCR/R/14 Encroacher Semi-pucca 7.60 1.99
235 M25 18+245 RHS Karwar Yellapur Manchiken Vinod.L.Pyade com YPR/MCR/R/15 Encroacher Semi-pucca 11.90 3.06
236 M25 18+248 RHS Karwar Yellapur Manchikeri Vinod.L.Pyade com YPR/MCR/R/l6 Encroacher Semt-pucca 13.30 3.42
237 M26 0+040 LHS Karwar Sirsi Sirsi Venkatesh Damodhar Nayak Others SRS/SRS/LJA/01 Encroacher Pucca 15.00 2.25
238 M26 0+049 LHS Karwar Sirsi Sirsi T.P. Ganessh Others SRS/SRS/LJA/02 Encroacher Semi-pucca 8.30 2.24
239 M26 0+165 LHS Karwar Strsi Sirsi R.M.Revankar Others SRS/SRS/LUA/03 Encroacher Semi-pucca 11.00 11.00
240 M26 0+270 LHS Karwar Sirsi Sirsi Vasudev Vaman Bhat Others SRS/SRS/LUAI04 Encroacher Semi-pucca 6.50 6.50
241 M26 0+297 LHS Karwar Sirsi Sirsi Vasanth D Keshwain Others SRS/SRS/LUA/05 Encroacher Pucca 9.20 9.20
242 M26 0+754 LHS Karwar Sirsi Sirsi Dnyaneshwar Kanth Others SRS/SRS/LUA/06 Encroacher Kutcha 31.00 11.25
243 M26 0+765 LHS Karwar Sirsi Sirsi Diwakar Parameshwar Mangarasi Others SRS/SRS/L/A/07 Encroacher Semi-pucca 15.00 15.00
244 M26 0+780 LHS Karwar Sirsi Sirsi Sridhar Babhu Kini Others SRS/SRS/UA/08 Encroacher Semi-pucca 35.00 35.00
245 M26 0+840 LHS Karwar Sirsi Sirsi Lakshman Durjappa Dalal res SRS/SRS/UA/09 Encroacher Semi-pucca 150.00 8.75
246 M26 1+500 LHS Karwar Sirsi Sirsi Baskar R.Nayak res SRS/SRS/LUA/10 Encroacher Semi-pucca 66.00 0.83
247 M26 13+080 LHS Karwar Siddapur Kansur Laxmikanth V,Naik comr SDP/KSR!UA/1 I Squatter Kutcha 4.50 1.35
248 M26 18+060 LHS Karwar Sirsi Thyagli Gajanana Ganapathy Hegde Others SDP/TGULLA/12 Encroacher Pucca 17.50 17.50
249 M26 18+080 LHS Karwar Siddapur Thyagli Suresh Ranakrishna Hedge Others SDP/TGUULA/13 Encroacher Semi-pucca 17.00 17.00
250 M26 18+183 LHS Karwar Siddapur Thyagli Shashidhar Hegde Others SDP/TGLULUA/14 Encroacher Semi-pucca 11.00 11.00
251 M26 18+224 LHS Karwar Siddapur Thyagli Laxmeesh Sitaram Hegde Others SDP/TGULIA/15 Encroacher Semi-pucca 6.00 6.00
252 M26 18+230 LHS Karwar Siddapur Thyagli Nagapathi G.Hegde Others SDP/TGULA/16 Encroacher Semi-pucca 6.00 6.00
253 M26 18+455 LHS Karwar Sirsi Thyagh Seetharama Lakshminarayana Hegde res SDP/TGUCLA/17 Encroacher Semi-pucca 180.00 6.00
254 M26 36+900 LHS Karwar Sirsi Siddapur K.P.Prabhu Others SDP/SDP/LJA/18 Encroacher Semi-pucca 18.00 18.00
255 M26 37+090 LHS Karwar Siddapur Siddapur Philip Santhya Badrigus Others SDP/TGL)L AI19 Encroacher Pucca 15.00 11.00
256 M26 0+050 RHS Karwar Sirsi Sirsi Vinayak Ananth Vemekar Others SRS/SRS/RIA/01 Encroacher Semi-pucca 14.40 3.42
257 M26 0+054 RHS Karwar Sirsi Sirsi Shyam.K.Chinchankar coni SRS/SRS/R/A/02 Encroacher Pucca 7.50 2.00
PIU/KSHIP Page 6 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE - I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total Area
Occupier Area(sqm) Affected(s
1 2 3 4 5 6 7 8 9 10 II 12 13 14
258 M26 0+057 RHS Karwar Sirsi Sirsi Dattatreya Hegdee com SRS/SRS/RJA/03 Encroacher Pucca 10.50 2.80
259 M26 0+061 RHS Karwar Sirsi Sirsi Gajanana S.Bhat comr SRS/SRS/R/AI04 Encroacher Pucca 10.50 2.80
260 M26 0+054 RH S Karwar Sirsi Sirsi A.B.D'Costa res SRS/SRS/RIAI0 Encroacher Pucca 28.50 7.13
261 M26 0+305 RHS Karwar Sirsi Sirsi Manjunath com SRS/SRS/RIAI05 Encroacher Semi-pucca 7.50 7.50
262 M26 0+330 RHS Karwar Sirsi Sirsi Sumnthra.J.Kalbag res SRS/SRS/RJAI06 Encroacher Kutcha 80.00 4.00
263 M26 0+365 RHS Karwar Sirsi Sirsi K.Budensab Others SRS/SRS/RJAO07 Encroacher Pucca 14.50 14.50
264 M26 0+830 RHS Karwar Sirsi Sirsi Mohan.M.Nayak res SRS/SRS/RIA/08 Encroacher Semi-pucca 198.00 2.62
265 M26 1+711 RHS Karwar Sirsi Sirsi Venkatesh.R Nayak Others SRS/SRS/RIAI09 Encroacher Pucca 8.00 8.00
266 M26 1+777 RHS Karwar Sirsi Sirsi Yeshwanth.Bhat com SRS/SRS/R/AI10 Encroacher Semi-pucca 6.25 1.13
267 M30 2+550 RHS Raichur Raichur Marema Camp Anandappa res I Squatter Kutcha 10.00 1.50
268 M30 2+570 RHS Raichur Raichur Marema Camp Kariyappa res 2 Squatter Kutcha 12.00 12.00
269 M30 2+580 RHS Raichur Raichur Marema Camp Gangappa res 3 Squatter Kutcha 6.00 6.00
270 M30 2+600 RHS Raichur Raichur Marema Camp Kariyappa/Saranga Beema res 4 Squatter Kutcha 8.00 8.00
271 M30 2+660 RHS Raichur Raichur Marema Camp Shivalingappa res 5 Squatter Kutcha 8.00 8.00
272 M30 2+670 RHS Raichur Raichur Marema Camp Ramanna res 6 Squatter Kutcha 6.00 5.00
273 M30 3+120 RHS Raichur Raichur Marema Camp Narayanappa res 7 Squatter Kutcha 7.00 5.00
274 M30 3+100 LHS Raichur Raichur Marema Camp Basavaraju res 8 Squatter Kutcha 9.00 9.00
275 M30 2+550 LHS Raichur Raichur Marema Camp Nagaraj res 9 Squatter Kutcha 8.00 8.00
276 M30 1+600 LHS Raichur Raichur Vijayanagar camp Narasappa Kattamalli res 2 Encroacher Kutcha 6.00 6.00
277 M30 1+610 LHS Raichur Raichur Vijayanagar camp Bapura Hanumantha Gadwar res 3 Squatter Kutcha 7.00 7.00
278 M30 1+620 LHS Raichur Raichur Vijayanagar camp Rayacher Musara Kallu res 4 Squatter Kutcha 4.00 4.00
279 M30 1+625 LHS Raichur Raichur Vijayanagar camp Thimappa Phodabhai res 5 Encroacher Kutcha 7.00 4.00
280 M30 1+640 LHS Raichur Raichur Vijayanagar camp Krishnappa Bhandar res 6 Encroacher Kutcha 6.00 6.00
281 M30 1+650 RHS Raichur Raichur Vijayanagar camp Hussianappa res 7 Squatter Kutcha 7.00 7.00
282 M30 1+670 LHS Raichur Raichur Vijayanagar camp Narasappa res 8 Encroacher Kutcha 6.00 4.00
283 M30 1+680 RHS Raichur Raichur Vijayanagar camp Jambanna Kumbara res 9 Encroacher Kutcha 8.00 8.00
284 M30 2+000 RHS Raichur Raichur Vijayanagar camp Lakshmappa Venkatapura res 10 Squatter Kutcha 7.00 7.00
285 M30 2+030 RHS Raichur Raichur Vijayanagar camp Hurukundamma res 11 Squatter Kutcha 6.00 6.00
286 M30 2+045 LHS Raichur Raichur Marema Camp Hanumantha res 12 Encroacher Kutcha 8.00 4.00
287 M30 2+055 LHS Raichur Raichur Marema Camp Hanumantha Gudi res 13 Squatter Kutcha 6.00 6.00
288 M30 2+800 LHS Raichur Raichur Marema Camp Gangamma res 14 Encroacher Kutcha 9.00 5.00
289 M30 2+700 LHS Raichur Raichur Marenia Camp Gurubasava Mariyappa res 15 Squatter Kutcha 4.00 4.00
290 M30 2+740 LHS Raichur Raichur Gundamma Camp Nagamma res 16 Encroacher Kutcha 7.00 3.00
291 M30 3+100 LHS Raichur Raichur Gundamma Camp Kadappa *Tres 1 _ __7 __Squatter Kutcha 4.00 4.00
292 M30 3+180 RHS Raichur Raichur Gundamma Camp Ranganna res 18 Squatter Kutcha 5.00 5.00
293 M30 3+195 LHS Raichur Raichur Gundamma Camp Gurupadaiah Swamy res 19 Encroacher Kutcha 8.00 3.00
294 M30 3+200 RHS Raichur Raichur Gundanmna Camp Hanumantharaya res 20 Squatter Kutcha 3.00 3.00
295 M30 4+410 LHS Raichur Raichur Kalmala Lolamma Dharmappa s 21 Squatter Kutcha 4.00 4.00
296 M30 4+100 LHS Raichur Raichur Kalmala Rangamma N Venkatesh res 22 Encroacher Kutcha 17.00 4.00
297 M30 12+000 LHS Raichur Raichur Nilagalla Camp Rachaiah Swamy res 23 Encroacher Kutcha 7.00 4.00
298 M30 21+000 RHS Raichur Manvi Jaraladinni Camp G.tBaddarao res 24 Encroacher Kutcha 6.00 2.00
299 M31 0+140 RHS Raichur Lingasugur K.Lingasugur Channamallappa Hippargi es I Squatter Pucca 17.00 6.00
300 M31 0+160 RHS Raichur Lingasugur K.Lingasugur Veeresh.S com 2 Squatter Pucca 13.00 2.00
301 M31 0+190 RHS Raichur Lingasugur K. Lingasugur Basammna Teggin res 3 Encroacher Pucca 11.00 3 00
PIU/KSHIP Page 7 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXHRE - I General Identification and Type of loss
SINo. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
_ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~qm)2 3 4 5 6 7 8 9 10 II 12 13 1 4
302 M31 0+190 LHS Raichur Lingasugur K.Lingasugur Duddaiah Swamy res 4 Encroacher Pucca 7.00 3.00
303 M31 0+230 RHS Raichur Lingasugur K.Lingasugur Koppanna res 5 Encroacher Pucca 15.00 6.00
304 M31 0+235 RHS Raichur Lingasugur K.Lingasugur Veeresh.Budamalla res 6 Encroacher Pucca 13.00 2.50
305 M31 0+235 RHS Raichur Lingasugur K.Lingasugur Basanra res 7 Encroacher Pucca 12.00 2.00
306 M31 0+240 LHS Raichur Lingasugur K.Lingasugur Narasappa Joginavaru res 8 Encroacher Pucca 14.00 3.00
307 M31 0+260 LHS Raichur Lingasugur K.Lingasugur Shankaremma res 9 Encroacher Pucca 10.50 3.00
308 M31 0+270 RHS Raichur Lingasugur K.Lingasugur Shivappa Mahadevappa Budamalla res 10 Encroacher Pucca 12.00 3.00
309 M31 0+270 LHS Raichur Lingasugur K.Lingasugur Dastamma res II Encroacher Pucca 14.00 3.00
310 M31 0+275 RHS Raichur Ltngasugur K.Lingasugur Lalsab res 12 Encroacher Pucca 12.00 2.00
311 M31 0+275 LHS Raichur Lingasugur K.Lingasugur Dastagir Sab res 13 Encroacher Pucca 15.00 6.00
312 M31 0+280 RHS Raichur Lingasugur K.Lingasugur Rajasab Bankada Mane res 14 Encroacher Pucca 13.00 4.00
313 M31 0+285 RHS Raichur Lingasugur K.Lingasugur Shanthamma res 15 Encroacher Pucca 14.00 5.00
314 M31 0+290 RHS Raichur Lingasugur K.Lingasugur Lalasab Pinjar res 1_6 Encroacher Pucca 10.00 2.00
315 M31 0+295 LHS Raichur Lingasugur K.Lingasugur Shanthamma res-cum-com 17 Encroacher Pucca 11.00 2.00
316 M31 0+280 RHS Raichur Lingasugur K.Lingasugur Kuppamma res 18 Encroacher Pucca 10.00 1.50
317 M31 0+275 RHS Raichur Lingasugur K.Lingasugur Auramnma res 19_ Encroacher Pucca 11.00 3.00
318 M24 50+520 LHS Karwar Haliyal Haliyal ShashiKanth Kini res HYUHYUULAI Encroacher na 36.00 1.80
319 M24 50+200 RHS Karwar Haliyal Haliyal M.G.Pai res HYUHYUUA/ Encroacher Wall 8.40 7.14
320 M24 50+230 LHS Karwar Haliyal Haliyal Balappa Bajanthri com HYUHYLUUA/01 Encroacher Semi-pucca 2.89 2.38
321 M24 LHS Karwar Haliyal Haliyal Chandrakanth Agasar com HYYUHYUUA3 Encroacher Semi-pucca 10.50 9.80
322 M24 50+070 LHS Karwar Haliyal Haliyal Shantharam Gowda com HYUHYUUA/04 Encroacher Semi-pucca 12.80 0.32
323 M24 44+400 RHS Karwar Haliyal Antrolli Sanju Hadapad com HYUJANT/R/A/01 Squatter Kutcha 7.50 0.60
324 M24 44+403 RHS Karwar Haliyal Antrolli Riyaz Ismail Peerzade com HYUANT/R/A/02 Encroacher Kutcha 6.25 1.50
325 M24 LHS Karwar Haliyal Haliyal Basha Rusul Khan com HYUHYUUA/02 Squatter Semi-pucca 5.50 5.50
326 M24 50+074 RHS Karwar Haliyal Haliyal B.H.Darwadkar com HYUHYUR/A/04 Encroacher Semi-pucca 12.80 0.64
327 M24 54+100 LHS Karwar Haliyal Kesoroli Fathima com HYUKSUUA/05 Encroacher Kutcha 6.50 1.62
328 M27 119+150 RHS Karwar Karwar Asnoti Govind Ragunath Kolankar com AST/KWRIR/AI01 Encroacher na 30.00 1.80
329 M27 116+405 LHS Karwar Haliyal Asnoti Yeshwanth.Godkar com AST/KWR/LLAI01 Encroacher na 7.50 0.50
330 M27 116+390 LHS Karwar Haliyal Asnoti Gunavathi Kushali Godkar res KWR/AST/LUA/02 Encroacher fencing 30.00 23.25
331 M27 116+490 LHS Karwar Asnoti Ganumahal Out of station (Locked) com KWR/AST/U02 Squatter Semi-pucca 4.00 1.00
332 M27 116+500 LHS Karwar Karwar Asnoti Panduwang Appu Nayak com KWR.AST/U03 Squatter Semi-pucca 9.00 0.30
333 M27 116+390 LHS Karwar Karwar Asnoti Krishna Menu Gadakar Others KWRIAST/UF.W/01 Encroacher fencing 15.00 15.00
334 M28 55+700 RHS Karwar Joida Kumbarwada Hanamanth P.Kamat com JDAIKBD/RI0I Encroacher Senmi-pucca 25.50 2.13
335 M29 0+030 LHS Belgaum Soundathi Yaragatti Dilawar Husainnaik Husainnaikar com SDT/YGT/U02 Squatter Senmi-pucca na N
336 M29 0+035 LHS Belgaum Soundathi Yaragatti Sunadavva Hanumanth Hunchi Katti com SDT/YGT/U03 Squatter Semi-pucca 3.00 1.42
337 M29 0+040 LHS Belgaum Soundathi Yaragatti Somappa Hanumanthappa Malagi com SDT/YGT/U04 Squatter Semi-pucca 3.40 2.85
338 M29 16+580 LHS Belgaum Soundathi Munavalli Irappa Kareppa Meti com SDT/MNUL/UOS Squatter Semi-pucca 17.40 3.84
339 M29 16+584 LHS Belgaum Soundathi Munavalli Iramna Yallappa Hadapad com SDT/MNUJU06 Squatter Semi-pucca 2.21 0.55
340 M29 16+647 LHS 3elgaum Soundathi Munavalli Raju Megundappa Alanannavar com SDT/MNLUU07 Encroacher Semi-pucca 3.80 2.32
341 M29 16+650 LHS Belgaum Soundathi Munavalli Maruthi Vishnupant Rasankar com SDT/MNLUU09 Encroacher Semi-pucca 5.72 3.35
342 M29 16+655 LHS Belgaum Soundathi Munavalli Anwarhusen Abdulsab Yaragatti com SDT/MNUULIO Encroacher Semi-pucca 21.00 7.62
343 M29 16+660 LHS Belgaum Soundathi Munavalli Ajjappa Ashok Kamnalapur com SDT/MNL/L/I I Squatter Semi-pucca 3.00 0.45
344 M29 16+666 LHS Belgaum Soundathi Munavalli Arjun Namanna Bavikatti com SDT/MNUU12 Squatter Semi-pucca 3.45 1.66
345 M29 16+666 LHS Belgaum Soundathi Munavalli Hanumath Nagappa Jeevaji com SDT/MNUU 13 Squatter Semi-pucca 6.60 1.60
346 M29 16+669 LHS Belgaum Soundathi Munavalli Panchappa Shibasappa Mudalagi con SDT/MNUUL14 Squatter Semi-pucca 5.85 1.63
347 M29 116+674 LHS Belgaum Soundathi Munavalli Magtumhusain M. Yaragatti cons SDT/MNLJU15 Squatter Semi-pucca 10.00 1.81
PIU/KSHIP Page 8 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE -I General Identification and Type of loss
SINo. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
qm)
1 2 3 4 5 6 7 8 9 10 II 12 13 14
348 M29 16+675 LHS Belgaum Soundathi Munavalli Raju Yallappa Komalapur com SDT/MNVUU16 Squatter Semi-pucca 6.00 1.45
349 M29 16+676 LHS Belgaum Soundathi Munavalli Bandusab Gafarsab Hubli com SDT/MNLIU1 7 Squatter Semi-pucca 11.70 4.48
350 M29 16+676 LHS Belgaum Soundathi Munavalli Mahamad Rafiq Hasimasab Taseds com SDT/MNL LU8 Squatter Semi-pucca 6.00 2.05
351 M29 116+680 LHS Belgaum Soundathi Munavalli Hanumanthappa Gangappa Nageshawar com SDTIMNL'L'19 Squatter Semi-pucca 8,40 2.03
352 M29 16+700 LHS Belgaum Soundathi Munavalli AltafPakrusab Kadkal com SDT/MNUL/20 Encroacher Semi-pucca 1.50 0.73
353 M29 16+655 RHS Belgaum Soundathi Munavalli Mohalasab Allisab Kdovi com SDT/MNUR/27 Encroacher Semi-pucca 4.20 2.54
354 M29 16+670 RHS Belgaum Soundathi Munavalli Imamsab Ibrahitmsab Attar com SDT/MNLUR/28 Squatter Semi-pucca 5.40 0.65
355 M29 16+684 RHS Belgaum Soundathi Munavalli Mohan Panchappa Therdal com SDT/MNL/R/29 Squatter Semi-pucca 2.89 1.23
356 M29 16+690 RHS Belgaumn Soundathi Munavalli Modinsab Faridsab Attar com SDTIMNLUR/31 Squatter Semi-pucca 1.50 0.93
357 M29 16+780 RHS BelgaumI Soundathi Munavalli Vasanth Tatappa Honali com SDT/MNUR/32 Squatter Semi-pucca 4.36 3.24
358 M29 16+786 RHS Belgaum Soundathi Munavalli Ramachandra Maleppa Murunal com SDTIMNLUR/33 Squatter Semi-pucca 9.16 5.55
359 M29 0+050 RHS Belgaum Soundathi Yaragatti Baramaji Basavantappa Aralimatti com SDTIYGT/R/02 Squatter Semi-pucca na Na
360 M29 0+045 RHS Belgaum Soundathi Yaragatti Hussen Sab Sayeedsallo Nadaf com SDT/YGT/R/03 Squatter Kutcha na Na
361 M29 0+038 RHS Belgaurn Soundathi Yaragatti Suresh Bheemappa Vantagodi com SDT/YGT/R/04 Squatter Semi-pucca 4.55 4.00
362 M29 0+50 RHS Belgaurm Soundathi Yaragatti LathifGousab Hussennaikar com SDT/YGT/RP05 Squatter Kutcha 9.00 5.17
363 M29 0+065 RHS Belgaum Soundathi Yaragatti Ibramsab I Dilawamayakar com SDT/YGT/RJ07 Squatter Semi-pucca 16.05 7.40
364 M29 0+70 RHS Belgaum Soundathi Yaragatti Allabax Hasimsab Attar com SDT/YGT/R/08 Squatter Kutcha 7.50 5.17
365 M29 0+76 RHS Belgaum Soundathi Yaragatti Dilwarsab Hussensab Dilawar Nayak com SDT/YGT/R/09 Squatter Semi-pucca 6.25 4.31
366 M29 0+083 RHS Belgaum Soundathi Yaragatti Sidraya Karjagimath com SDT/YGT/R/10 Squatter Kutcha 4.00 3.45
367 M29 0+085 RHS Beigaum Soundathi Yaragatti Bhimashi Khamashi com SDT/YGTIR/1 I Squatter Kutcha 2.80 2.76
368 M29 0+089 RHS Belgaum Soundathi Yaragatfi Babulal Dawalsab Karanachi com SDT/YGT/R/13 Squatter Semi-pucca 2.93 2.38
369 M29 0+092 RHS Belgaum Soundathi Yaragatti Khadarbi Davalasab Karunachi com SDT/YGT/R/14 Squatter Kutcha 9.00 5.17
370 M29 0+094 RHS Belgaum Soundathi Yaragatti Dawalbhi Subambaig Jamadhar com SDT/YGT/R 15 Squatter Semi-pucca 4.41 3.62
371 M29 0+096 RHS Belgaurn Soundathi Yaragatt Indraimma Chanbasappa Kallappanavar com SDT/YGT/R/16 Squatter Semi-pucca 6.60 4.50
372 M29 0+112 RHS Belgaum Soundathi Yaragatti Pathima Mehaboobsab Janganavar com SDT/YGT/R/18 Squatter Semi-pucca 4.08 3.75
373 M29 16+595 RHS Belgaum Soundathi Munavalli Azad Baseerahamad Madlur com SDT/MNUR/20 Squatter Semi-pucca 3.00 2.70
374 M29 16+610 RHS Belgaum Soundathi Munavalli Basavaraj B Badiger com SDT/YGT/R/21 Encroacher Semi-pucca 42.00 1.83
375 M29 16+620 RHS Belgasun Soundathi Munavalli Dr. Nazeerahemad com SDTNYGT/R/22 Squatter Kutcha 32.00 2.08
376 M29 16+652 RHS Belgaum Soundathi Munavalli Vijay Dyamappa Komalapur com SDT/YGT/R/24 Squatter Semi-pucca 4.60 3.96
377 M29 16+653 RHS Belgaum Soundathi Munavalli Adiveppa Yallappa Targol com SDT/YGT/R/25 Squatter Semi-pucca 1.73 1.00
378 M29 16+652 RHS Belgaum Soundathi Munavalli Maningayya Basayya Olimath com SDT/YGT/R/26 Squatter Semi-pucca 2.16 1.48
379 M33 31+595 RHS Gadag Ron Mallapur Shivappa T Kanthigonannavar com RON/MPR/R/01 Squatter Sems-pucca 3.23 0.38
380 M33 31+600 RHS Gadag Ron Mallapur Shekappa Veerappa Pawar Shetty com RON/MPR/R/02 Encroacher Pucca 9.75 3.60
381 M33 31+180 RHS Gadag Ron C'mannavar Gadigappa Gowda Kalengowda Shivalli com CKRiMPR/RJ03 Squatter Semi-pucca 40.96 14.08
382 M33 35+415 RHS Gadag Ron Saragwade Panchappa Bhimappa Hadpad com RON/SGD/R/03A Squatter Semi-pucca 15.04 0.96
383 M33 36+194 RHS Gadag Ron C'mannur cross Shankrappa Suchirapap Katagi com RON/CKR/RP04 Squatter Semi-pucca 28.09 7.02
384 M33 36+203 RHS Gadag Ron C'mannur cross Out of station (Locked) com RON/CKR/R/05 Squatter Semi-pucca 16.45 1.88
385 M33 36+216 RHS Gadag Ron C'mannur cross Tajuddin Gaibusab Namnazi com RON/CKR/RI06 Squatter Semi-pucca 36.12 6.30
386 M33 36+215 RHS Gadag Ron C'mannur cross Out of station (Locked) com RON/CKR/R/07 Squatter Semi-pucca 2.62 1.50
387 M33 36+220 RHS Gadag Ron C'mannur cross Shivanand Kolkappa Katagi com RON/CKR/R/08 Squatter Semi-pucca 24.30 4.32
388 M33 36+235 RHS Gadag Ron C'mannur cross Channabasappa H Nadagoudar com RON/CKR/R/09 Squatter Semi-pucca 29.20 8.76
389 M33 43+050 RHS Gadag Ron Ron Panchayya V Vtraktimath com RON/RON/Ro 0 Squatter Semi-pucca 14.21 0.29
390 M33 43+053 RHS Gadag Ron Ron Ramesh Shivappa Hadpad com RON/RON/R/I I Squatter Semi-pucca 3.80 1.89
391 M33 43+055 RHS Gadag Ron Ron Hanmanthappa Nilappa Duglad com RON/RON/R/12 Squatter Semi-pucca 3.04 0.34
392 M33 43 057 RHS Gadag Ron Ron Irappa Muradh com RON/RON/R/13 Squatter Shop closed
393 M33 43+059 RHS Gadag Ron Ron Shivanand Ningappa Navalgund com RON/RON/R/14 Squatter Shop closed _
PIU/KSHIP Page 9 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXIJRE - I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of SIr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
_ 2 3 4 5 6 7 8 9 10 II 12 13 1q 4
394 M33 43+064 RHS Gadag Ron Ron Veerappa Muddappa Navalgund com RON/RON/R/15 Squatter Semi-pucca 9.40 1.60
395 M33 43+066 RHS Gadag Ron Ron Mahantesh Kanteppa Navalgund com RON/RONR/16 Squatter Semi-pucca 5.00 1.50
396 M33 43+068 RHS Gadag Ron Ron Gedappa Nandeppa Gadepennavar com RON/RON/RI17 Squatter Semi-pucca 9.30 2.28
397 M33 43+070 RHS Gadag Ron Ron Rajasab Hussainsab Rajekhan com RON/RON/R/18 Squatter Semi-pucca 6.60 5.50
398 M33 43+075 RHS Gadag Ron Ron Out of station (Locked) com RON/RON/R/19 Squatter Shop closed
399 M33 43+077 RHS Gadag Ron Ron Rafiq Malliksab Moognur com RON/RON/R/20 Squatter Semi-pucca 12.60 9.24
400 M33 43+081 RHS Gadag Ron Ron Out of station (Locked) com RONIRON/RP21 Squatter Pucca
401 M33 44+140 RHS Gadag Ron Ron Mahadevappa M Navalgund com RON/RON/R/22 Squatter Semi-pucca 15.95 2.20
402 M33 44+144 RHS Gadag Ron Ron Veerapakshappa Haggadinni com RON/RON/R/23 Encroacher Semi-pucca 32.20 6.04
403 M33 44+150 RHS Gadag Ron Ron Veerabhadrappa Chennappa Kadgad com RON/RON/RP24 Encroacher Semi-pucca 52.50 10.93
404 M33 44+156 RHS Gadag Ron Ron Out of station (Locked) com RON/RON/RP25 Squatter Shop closed
405 M33 44+160 RHS Gadag Ron Ron Andyanappa Shambamna Hadpad com RON/RON/R/26 Squatter Pucca 19.44 2.70
406 M33 44+166 RHS Gadag Ron Ron Chandrashekharayya G. Bhandrimath com RON/RON/R/27 Squatter Semi-pucca 34.80 0.42
407 M33 44+168 RHS Gadag Ron Ron V.B. Lingangouda com RONIRON/R/28 Squatter Shop closed
408 M33 44+171 RHS Gadag Ron Ron Out of staton (Locked) com RON/RON/R/29 Squatter Shop closed 9.00 3.00
409 M33 44+173 RHS Gadag Ron Ron Basavannappa Nagappa Chakrasali com RON/RON/R/30 Squatter Semi-pucca 3.70 1.60
410 M33 44+175 RHS Gadag Ron Ron Sharamappa Mareappa Koppad com RON/RON/R/31 Squatter Semi-pucca 4.00 0.50
411 M33 44+179 RHS Gadag Ron Ron BasangoudaJ Jakkannnavar com RON/RON/R/32 Squatter Semi-pucca 16.00 2.20
412 M33 44+181 RHS Gadag Ron Ron Shekrappa Saurab com RON/RON/R/33 Squatter Semi-pucca 6.00 1.40
413 M33 44+183 RHS Gadag Ron Ron Basavraj Yellappa Tenginakai com RON/RON/RP34 Squatter Semi-pucca 5.00 0.16
414 M33 44+250 RHS Gadag Ron Ron Ningappa Sharanappa Machivalar com RON/RON/R/35 Squatter Semi-pucca 4.00 1.50
415 M33 44+252 RHS Gadag Ron Ron Nazeer Ahmed lbrahimsab Nadimulla com RON/RON/R/36 Squatter Semi-pucca 3.45 1.42
416 M33 44+254 RHS Gadag Ron Ron Gaurappa Basappa Kodekar com RON/RON/R/37 Squatter Serni-pucca 3.24 1.08
417 M33 44+256 RHS Gadag Ron Ron Jakkappa Durgappa Madar com RON/RON/R/38 Squatter Semi-pucca 3.60 0.54
418 M33 44+030 RHS Gadag Ron Ron I S Sankangouda com RON/RON/R/39A Squatter Semi-pucca 8.58 1.56
419 M33 44+033 RHS Gadag Ron Ron Muttanna Andappa com RON/RON/RI40A Encroacher Semi-pucca 29.50 1.25
420 M33 44+038 RHS Gadag Ron Ron K H Mageri com RON/RON/R/41A Encroacher Semi-pucca 51.70 0.94
421 M33 44+040 RHS Gadag Ron Ron Shivegouda Patil com RON/RON/R/42A Encroacher Semi-pucca 25.62 1.12
422 M33 44+044 RHS Gadag Ron Ron Pundalik H Packhangi com RON/RON/R/43A Encroacher Semi-pucca 35.34 0.19
423 M33 44+049 RHS Gadag Ron Ron Chandrashekhrappa K Sunkad com RON/RON/R/44A Encroacher Semi-pucca 53.90 3.06
424 M33 44+051 RHS Gadag Ron Ron Shivanand Ningappa Karadi com RON/RON/R/45A Squatter Semi-pucca 4.00 3.65
425 M33 44+059 RHS Gadag Ron Ron Mallikarjun Basalingappa Sabaraddi com RON/RON/R/46A Encroacher Pucca 60.00 5.20
426 M33 44+061 RHS Gadag Ron Ron Nagappa Sangappa Gadag com RON/RON/R/47A Encroacher Pucca 8.32 0.10
427 M33 44+066 RHS Gadag Ron Ron Ramachandra Ningappa Gajari com RON/RON/R/48A Encroacher Pucca 32.45 0.33
428 M33 44+070 RHS Gadag Ron Ron Basappa Nagappa Gadagi com RON/RON/R/48A Encroacher Pucca 39.16 0.88
429 M33 44+074 RHS Gadag Ron Ron Basappa Nagappa Gadagi com RON/RON/R/48A Encroacher Pucca 34.32 0.66
430 M33 44+077 RHS Gadag Ron Ron Ashok Navalgund com RON/RON/R/48A Encroacher Semi-pucca 21.00 1.04
431 M33 44+078 RHS Gadag Ron Ron Macharlal Bafna com RON/RON/R/48A Encroacher na
432 M33 0+390 LHS Dharwar Navalgund Shelvadi Basaiah Channayya kondakanimath com NGD/SHD/UOI squatter Semi-pucca 1.43 1.30
| 1 433 M33 1+700 LHS Dharwar Navalgund Damnal Basappa Nagappa Angadi com NGD/DT/L/02 Squatter Semi-pucca 15.40 1.57
434 M33 3+705 LHS Dharwar Navalgund Damnal Eswarappa Nagappa com NGD/BT/L/03 Squatter Semi-pucca 9.36 1.68
435 M33 3+180 LHS Gadag Ron C'mannur Cross Verappa Shivalingappa jamannavar cons RON/CKR'U04 Squatter na
436 M33 3+186 LHS Gadag Ron C'rmannur Cross Veerappa Shivappa Hadpad com RON/CKRILJO5 Squatter Semi-pucca 4.84 1.10
437 M33 6+217 LHS Gadag Ron Csmannur Cross Gurangouda kangangouda Shivalli res-cum-com RON/CKRIL'06 Squatter Semi-pucca 97.98 22.01
438 M33 3+050 LHS Gadag Ron Ron Out of station (Locked) com RON/RON/UO6A Squatter na
439 M33 3+058 LHS Gadag Ron Ron Mahantesh Kalappa Kuinbar com RON/RON/L/07 Squatter Sensi-pucca 1.80 0 15
PIU/KSHIP Page 10 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE - I General Identification and Type of loss
SINo. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
_ _ ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~qm)1 2 3 4 5 6 7 8 9 10 I I 12 13 14
440 M33 3+7 10 LHS Gadag Ron Ron Basavaraj Bheemappa Chogachgudda com RON/RON/L08 Squatter Semi-pucca 11.07 4.86
441 M33 3+712 LHS Gadag Ron Ron Appanna Gabappa Kuri com RON/RON/U09 Encroacher Semi-pucca 5.88 2.99
442 M33 43+720 LHS Gadag Ron Ron Pakeerappa Yamappa Madival com RON/RON/UIO Squatter Semi-pucca 5.40 1.89
443 M33 43+722 LHS Gadag Ron Ron Javedladsab Ulla com RON/RON/U1 I Squatter Semi-pucca 9.00 3.00
444 M33 43+724 LHS Gadag Ron Ron Veerappa Pavdappa Hadpad com RON/RON/L/12 Squatter Semi-pucca 9.20 2.98
445 M33 43+726 LHS Gadag Ron Ron Abdulazeez Budansab Betigeri com RON/RON/UI2A Encroacher Semi-pucca 5.51 3.04
446 M33 43+728 LHS Gadag Ron Ron Budansab Bhashasab Betigeri com RON/RON/U13 Encroacher Semi-pucca 5.76 4.68
447 M33 43+732 LHS Gadag Ron Ron Bhashasab Mohmed Alsab Dalwai res RON/RON/U14 Encroacher Pucca 55.97 1.01
448 M33 43+735 LHS Gadag Ron Ron Kimamasab Babsab Dalwai res RON/RON/I/15 Encroacher Pucca 49.21 1.40
449 M33 43+738 LHS Gadag Ron Ron Abduirehman Babsab Dalwai res RON/RON/L/16 Encroacher Pucca 47.28 1.83
450 M33 43+740 LHS Gadag Ron Ron Anab Davalsab Kaleghar com RON/RON/U117 Squatter Semi-pucca 5.75 0.50
451 M33 43+742 LHS Gadag Ron Ron Andatti Lindaliksa Muskin com RON/RON/L/18 Encroacher Semi-pucca 28.80 1.86
452 M33 43+745 LHS Gadag Ron Ron Hanumantha Ramachandra Rangrez com RON/RONL/J19 Encroacher Pucca 30.24 2.63
453 M33 43+130 LHS Gadag Ron Ron Shashikanth Shripadrao Kulkami com RON/RON/L/20 Encroacher Semi-pucca 29.60 3 .20
454 M33 43+135 LHS Gadag Ron Ron Gururaj Kalashrao Kulkarni com RON/RON/U21 Encroacher Semi-pucca 24.08 2.79
455 M33 43+140 LHS Gadag Ron Ron Gurupadrao Kulkarni com RON/RON/U22 Encroacher Pucca 77.28 5 .04
456 M33 43+144 LHS Gadag Ron Ron Beveri Narayan Rao Kulkami com RON/RON/L/23 Encroacher Pucca 34.50 0.24
457 M33 44+147 LHS Gadag Ron Ron Deemash Venkatarao Kulkarni com RON/RON/L/24 Encroacher Pucca 34.00 0.23
458 M33 44+148 LHS Gadag Ron Ron Venkatesh Manna Gudisagar com RON/RON/U25 Squatter Semi-pucca 1.44 0 .81
459 M33 44+160 LHS Gadag Ron Ron Saleem Dadannavar com RON/RON/L/26 Encroacher na
460 M33 44+165 LHS Gadag Ron Ron Vijay Mahadevappa Kadagol com RON/RON/U27 Encroacher Semi-pucca 23.52 3.43
461 M33 44+170 LHS Gadag Ron Ron Vishnu Veerabhadrappa Pathar com RON/RON/L/28 Encroacher Pucca 26.00 7 15
462 M33 44+035 LHS Gadag Ron Ron Mahadevapap M Navalgund com RON/RON/L/29A Encroacher Semi-pucca 36.96 7.20
463 M33 44+040 LHS Gadag Ron Ron Dr Lakshman Sa Bakkale com RON/RON/U30A Encroacher Pucca 45.24 4.06
464 M33 44+045 LHS Gadag Ron Ron Sakrappa Kallappa Sunkad com RON/RON/U31A Encroacher Serni-pucca 30.39 5. 15
465 M33 44+050 LHS Gadag Ron Ron Ramanna Rudrappa basanthgoudar com RON/RON/U32A Encroacher Pucca 49.00 5.25
466 M33 44+054 LHS Gadag Ron Ron Hanumanth Gouda com RON/RON/IU33A Encroacher Semi-pucca 31.15 0.33
467 M33 44+057 LHS Gadag Ron Ron Rudragouda com RON/RON/L/34A Encroacher Semi-pucca 20.03 2 .53
468 M33 44+060 LHS Gadag Ron Ron Ganpal SonagiBhati com RON/RON/U35A Encroacher Pucca 25.04 0 .26
469 M33 44+063 LHS Gadag Ron Ron Chandrashekarapap K Sunkad com RON/RON/U36A Encroacher Semi-pucca 23.10 2. 70
470 M33 44+066 LHS Gadag Ron Ron B V Redaar com RON/RON/U37A Encroacher Semi-pucca 19,20 0.25
471 M33 44+068 LHS Gadag Ron Ron Sangappa Marithiimmappa Gigtur com RON/RON/U38A Encroacher Semi-pucca 24.90 0 25
472 M33 44+071 LHS Gadag Ron Ron M B Angadi com RON/RON/L/39A Encroacher Semi-pucca 28.70 1.92
473 M33 44+075 LlIS Gadag Ron Ron Basalingappagouda L Patil com RON/RON/U40A Encroacher Pucca 20,52 3.04
474 M33 44+078 LHS Gadag Ron Ron Prabhu Bheemappa Gadagi com RON/RON/L/41A Encroacher Semi-pucca 32.00 0.27
475 M33 44+082 LHS Gadag Ron Ron B. B Navalgund com RON/RON/U42A Encroacher Semi-pucca 31.50 2.92
476 M34 116 RHS Gadag Ron Ron Manjunath Bandarimath com RON/RON/R/O I Encroacher Kutcha 6.00 1.80
477 M34 116 RHS Gadag Ron Ron Eranna Hadapad com RON/RON/R/02 Squatter Kutcha 3.60 0.45
478 M34 116 RHS Gadag Ron Ron IbrahimRajesab Nali Mulla com RON/RON/RP03 Squatter Kutcha 2.52 0.63
479 M34 115 RHS Gadag Ron Ron Vacant Shop com RON/RON/R/04 Squatter na
480 M34 94 RHS Gadag Ron Rajur Yallavva Shankari com RON/RON/R/05 Squatter Kutcha 2.25 0.75
481 M34 94 RHS Gadag Ron Rajur Prermath Ramanna Suleman com RON/RON/R/06 Squatter Kutcha 17 50 1.05
482 M34 94 RHS Gadag Ron Rajur veeraiah Shekaraiah Salimath com RON/RON/R107 Squatter Pucca 6.00 0.40
483 M34 94 RHS Gadag Ron Rajur Hanumanth Madivader cor RON/RJR/R/08 Squatter Kutcha 2.72 0.34
484 M34 90 RHS Gadag Ron Gajendragad Basavraj Sangappa Hadpad com RON/GJD/R/09 Squatter Kutcha 3.80 0 38
485 M34 90 RHS Gadag Ron Gajendragad Huchappa Angadi com RON/GJD/R/10 Squatter Kutcha 1.44 0.48
PIU/KSHIP Page 11 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJEC1 RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE -I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total Area
Occupier Area(sqm) Affected(s
qm)
_ 2 3 4 5 6 7 8 9 10 II 12 13 14
486 M34 90 RHS Gadag Ron Gajendragad Mallikarjun Jagdish Adur com RON/GJD/R/I I Squatter Kutcha 5 06 0.66
487 M34 84 RHS Gadag Ron Gojeri Shankraiah Andanaiah Methimath com RON/GLD/R/12 Squatter Kutcha 3.20 2.47
488 M34 67 RHS Raichur Kushtagi Kushtagt Hanumanth Shekappa Hanjan com RCR/KSG/R/13 Squatter Kutcha 10.75 1.29
489 M34 67 RHS Raichur Kushtagi Kushtagi Hanunanthapap Kondakgeri com RCR/KSG/R 14 Squatter Kutcha 1.20 0.48
490 M34 RHS Raichur Kushtagi Kushtagi Sangappa Basavarajappa Madivala com RCR/KSG/R/15 Squatter Kutcha 7.50 1.20
491 M34 100 RHS Gadag Ron Sudi Ismailsab havkadi com RON/SDI/UOI Squatter Kutcha 7.50 1.50
492 M34 94 LHS Gadag Ron Rajur Premavva Shirappa Gonal com RON/RJR/U02 Squatter Kutcha 3.04 0.48
493 M34 94 LHS Gadag Ron Rajur Sangana Gowda Patil com RON/RJR/L/03 Squatter Kutcha 3.40 0.16
494 M34 90 LHS Gadag Ron Gajendragad Vacant Shop com RN/GJD/L/04 Squatter Kutcha 2.08 1.60
495 M34 67 LHS Raichur Kushtagi Kushtagi Vacant Shop com RCR!KSG/R/05 Squatter Kutcha 4.37 0.69
496 M34 67 LHS Raichur Kushtagi Kushtagi Vacant Shop com RCR/KSG/R/06 Squatter Kutcha 1.92 0.64
497 M34 67 LHS Raichur Kushtagi Kushtagi Sharanaiah Veeerabhadraiah com RCR/KSG/R/07 Squatter Kutcha 1.92 1.60
498 M34 67 LHS Raichur Kushtagi Kushtagi Channappa Shamappa Kachi com RCR/KSG/R/08 Squaner Kutcha 2.56 1.44
499 U-9 17+120 LHS Belgaum Khanapur Beed Kareemsab A Badikar com KNP/BDI/LU6 Encroacher Kutcha 3.50 3.50
500 U-9 17+120 LHS Belgaum Khanapur Beed Mugtubsab Ibailhongal com KNP/BDI/U6A Encroacher Kutcha 2.80 2.80
501 U-10 0+015 LHS Belgaum Soundathi Hulikatti Kenchappa Basappa Angadi Res SDT/ HIST/LO I Squatter Kutcha 1.8 1.8
502 U-10 0+025 LHS Belgaum Soundathi Hulikatti Channa Muliab Basaiah Hugan Others SDT/HIST/U02 Squatter Pucca 4 4
503 U-10 5+510 LHS Belgaum Soundathi Hulikatfi Megundi corn HRK/SDT/L/O3 Squatter Semi-pucca 1.5 1.5
504 U-10 19+550 LHS Gadag Naradunda Dandapura Murugaiah Mata Pathy Vacant NGO/ DDP/ U 04 Squatter Kutcha 2.2 2.2
505 U- 10 20+213 LHS Gadag Naradunda Dandapura Gurulingiah Basaiah Chilkimath com NGO/ NGO/ U 05 Encroacher Pucca 22 22
506 U-10 20+235 LHS Gadag Naradunda Dandapura Subash Gowda Patial Boundary wall NGO/NGO/U06 Encroacher Pucca 20 20
507 U-10 20+280 LHS Gadag Naradunda Dandapura A.M.Kabse com NGO/NGO/UL07 Squatter Kutcha 1.5 1.5
508 U-10 20+460 LHS Gadag Naradunda Naragunda Mehabubali Fukruddin Aktar com NGO!NGO/UL08 Squatter Semi-pucca 10 10
509 U-10 20+565 LHS Gadag Naradunda Naragunda Ramesh Barkar com NGO/NGO/UL09 Squatter Semi-pucca 1.2 1.2
510 U-10 5+350 LHS Belgaum Soundathi Harakatti Siddappa Kareppa Poolar com SDT/ HRT/ RP01 Squatter Kutcha 1.3
511 U-10 5+330 LHS Belgaun Soundathi Harakatti Yallappa Gowda Kuratti com SDT/ HRK/R/02 Squatter 5.8 5.8
512 U-10 19+710 RHS Gadag Naradunda Naragunda Mylarappa Yallappa Chimnore com NGD/ NGD/ R/ 04 Squatter Semi-pucca 1.9 1.9
513 U-]0 19+770 RHS Gadag Naradunda Naragunda Prema Laxman Dodmani Others NGD/ NGD/ R/ 05 Encroacher Pucca 9.5 9.5
514 U-10 20+190 RHS Gadag Naradunda Naragunda Muktum Sab Naganur com NGD/ NGD/ RI 06 Squatter Kutcha 2 2
515 U- 10 20+485 RHS Gadag Naradunda Naragunda Out of station (Locked) com NGD/ NGD/ R 07 Squatter 2 2
516 U-10 20+550 RHS Gadag Naradunda Naragunda Allbakshi Rajesab Agsar com NGD/ NGD/ R 08 Squatter Kutcha 2 2
517 U-10 20+552 RHS Gadag Naradunda Naradunda Out of station (Locked) com NGD/ NGD/ R 09 Squatter Semi-pucca 2 2
518 U-10 20+555 RHS Gadag Naradunda Naradunda N.R.Navalgund com NGD/ NGD/ RI 10 Squatter 1 4 1.4
519 U-10 20+557 RHS Gadag Naradunda Naradunda Bunde Sab com NGD/ NGD/ RI 11 Squatter Kutcha 2 2
520 U-10 20+580 RHS Gadag Naradunda Naradunda Tippanna Baramappa Choudi com NGD/ NGD/ R 12 Squatter Kutcha 2.2 2.2
521 U-10 20+582 RHS Gadag Naradunda Naradunda Yallawa Bagur com NGD/ NGD/ RI 13 Squatter Kutcha 2 2
522 U-10 20+586 RHS Gadag Naradunda Naradunda Manjula Londry com NGD/ NGD/ RI 14 Squatter 1.5 1.5
523 U-10 20+590 RHS Gadag Naradunda Naradunda Yallappa V.Sunagar com NGD/ NGD/ R 15 Squatter Kutcha 1.5 1.5
524 U-10 20+595 RHS Gadag Naradunda Naradunda Mahalingappa Munugappa Madepad com NGD/ NGD/ RI 16 Squatter Kutcha 2 2
525 U-10 20+600 RHS Gadag Naradunda Naradunda Muna Mane com NGD! NGD/ R 17 Squatter Semi-pucca 4 4
526 U-10 20+604 RHS Gadag Naradunda Naradunda Hampanna Hugar com NGD/ NGD/ R 18 squatter Semi-pucca 1.5 1.5
527 U-10 20+609 RHS Gadag Naradunda Naradunda Out of station (Locked) com NGD/ NGD/ R 19 squatter _1__5 1.5
528 U-10 20+611 RHS Gadag Naradunda Naradunda Out of station (Locked) com NGD/ NGD/ R 20 squatter Sensi-pucca 2 2
529 U-10 20+613 RHS Gadag Naradunda Naradunda Duragappa P.Honakeri com NGD/ NGD/ R 21 squatter Semi-pucca 2 2
530 U-10 20+616 RHS Gadag Naradunda Naradunda Moula Sab Sildhgi com NGD/ NGD/ RI 22 squatter Semi-pucca 2 2
531 U-b10 20+620 RHS Gadag Naradunda Naradunda Rangappa Kadiwal com NGD/ NGD/ R 23 squatter Kutcha 2.3 2.3
PIU/KSHIP Page 12 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE -I General Identification and Type of loss
SI.No. Contract Chainage Side District Taluk Village Name Type of loss SI.No. of Slr Status of Type of structure Total AreaOccupier Area(sqm) Affected(s
qmn)
1 2 3 4 5 6 7 8 9 10 II 12 13 14
532 U-10 20+625 RHS Gadag Naradunda Naradunda Manjunath Pattanagi com NGD/ NGD/ RI 24 squatter Semi-pucca 2.2 2.2
533 U-10 20+628 RHS Gadag Naradunda Naradunda Ramzan Sab Yaligar com NGD/ NGD/ RI 25 squatter Semi-pucca 1 8 1.8
534 U-10 20+631 RHS Gadag Naradunda Naradunda M.S.Alur com NGD/ NGD/ RI 26 squatter 2 2
535 U-10 20+635 RHS Belgaum Naradunda Naradunda Parasuram Sangali com NGD/ NGD/ RI 27 squatter
536 U-10 20+639 RHS Gadag Naradunda Naradunda Suresh Veerappa Pateed com NGD/ NGD/ RI 28 squatter Kutcha 1.8 1.8
537 U-10 20+641 RHS Gadag Naradunda Naradunda Shivayya, Irayya, ganachari com NGD/ NGD/ RI 29 squatter Semi-pucca 2 2
538 U-10 20+645 RHS Gadag Naradunda Naradunda Ramzan Sab Yaligar com NGD/ NGD/ RI 30 squatter _
539 U-10 20+648 RHS Gadag Naradunda Naradunda Mahanthawa, Gurupadshetty, Angadi com NGD/ NGD/ RI 31 squaner Kutcha 2 2
540 U- 10 20+652 RHS Gadag Naradunda Naradunda Govindappa Veerappa Doddamani com NGD/ NGD/ RI 32 squatter Kutcha 1.3 1.3
541 U-10 20+656 RHS Gadag Naradunda Naradunda Renunaka Kaladagi com NGD/ NGD/ RI 33 squatter Kutcha 1.8 .1.8
PIU/KSHIP Page 13 of 13
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
ANNEXURE -2: HOUSEHOLD PARTICULARS
SI ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~Religious SocialNof Total Land owned Total AintnualSi Qnr. No. Contract Chainage Side Village Nanme Gnop Sicio Family members Disabled
No. Gnu tatiainpros (in acres) Income
Male Female TotalI 0 3 4 5 6 7 8 9 1 0 1I 1 2 1 3 14 IS5
1 M3 51 +84(0 LHS Athani Parmeshi muttappa Kevaddannavar Hindu 1 2 3 0 0 13000
2 M3 51+905 LHS Athani Babu Gangappa Honkatti Hiiidu 2 2 4 0 0 12000
3 M3 52+345 LHS Athani Sidaraya B Bajantr Hindu 5 4 9 0 0 201100
4 M3 52+570 LHS Athani Tukaram Shettappa Nuli Muslim 3 2 5 0 0 25000
5 M3 52+590 LHS Athant Bapu T Bepan Muslins 3 2 5 0 0 12000
6 M3 52+590 LHS Athani Jayashni M Nuli Hindu 3 3 6 0 0 360()0
7 M3 51+945 RHS Athiani Sursh B Shedabal Hindu I 0 I 0 0 12()00
8 M3 52+330 RHS Athani Tippanna Dada Bajantn Hindu SC I I 9 20 0 0 250()0
9 M3 52+335 RHS Athaiti Sabu Bbima Bajantni Hindu SC 4 2 6 0 0 13000
10 M3 52+342 RHS Athani Tgppavva Chandrappa Bajantri Hindu SC 3 2 5 0 () 10000
II M3 52+347 RIS Athani Hanamant Bhima Bajantn Hindu SC 5 5 10 0 () 32000
12 _ M3 52+355 RHS Athani S.K Bhutali Hindu 5 6 1 I 0 0 36000
13 M3 52+37(i RHS Athani Sanju Yellappa Bajantni Hindu SC 2 5 7 () 0 35000
14 M3 52+370 RHS Athani Ramachandra Barnma Bajantn Hindu SC 4 5 9 0 0 27000
15 M3 52+47(0 RHS Athani Babu Abdulsab Gadyal Musliili I I 2 I 0 1000In
16 M3 52+470 RHS Athani Hannrashid B Mirjakar Muslim I 4 5 0 0 14000
17 M3 52+530 RHS Athani Ladlesaheb Husainsab Drakshi Muslim 6 2 8 I 0 25(0))()
18 M3 52+548 RHS Athani Dastagir Imamasab Gaiban Muslim 3 I 4 0 0 18000
19 M3 52+560 RHS Athani Srekant v Kalal Hindu SC 2 2 4 ( 0 20000
20 M3 52+565 RHS Athaini Ganiga-av Irayya Matapathi Hindu Lingayat 3 3 6 0 0 25000
21 M3 52+565 RHS Athalbu Abdul Gafar Imanmsab Choudn Muslim Pinjar 4 I 5 0 0 25000
22 M3 52+590 RHS Athabii Jairabl Sikhandar Drakshi Muslim Sunny 5 6 11 I () 7(10()0
23 M3 52+595 RHS Athani Ayazbabu M Drakshi Muslim Sunny 3 3 6 () 0 6900()
24 M3 52+640 RHS Athani Gafarsab Imaamsab Choudri Muslim Pinjar 4 I 5 0 0 25000
25 M3 52+70(1 RHS Athani Ashok Ramuachaidra kshirasagar Hindu Maratha 4 4 8 0 0 17000
20 M3 52+70)3 RHS Athani Saroja Ashoka Kshirasagar Hindu Maratha 3 3 6 0 0 2500i)
27 M3 52+710 RHS Athani Nazeer Ahibmed Anwarsab Bagbon Muslin, Sunny 4 4 8 0 0 o(101(0
28 M3 52-715 RHS Athani Rasool lbrahimsab Satbache Muslim Sunny 7 5 12 I 0 _ 80100
29 M3 52-725 RES Athani Masabhi Mahiboob Shekh Muslim Sunnv 14 7 21 0 0 50000
30 M3 52-720 RHS Athani Bhasha sab Lalsab Satbache Muslim Sunny 2 2 4 0i 0 35000
31 M3 52-730 RHS Athoni B B Sahero Md.Sab Mudalgi Muslim Snunny I I 2 0 0 200001
32 M3 52+735 RHS Athani Prakash G Savadkar Hindu Liitgayat 3 I 4 i 0 50011)(
33 M3 52+740 RHS Athani Ashraf Mehaboob Master Muslim Sunny 3 2 5 0 0 180(1(i
34 M3 52+890 RHS Athani Knshna Chandu Mulya Hindu Kunubar 2 3 5 0 () 1800()
35 M3 52+895 RFIS Athani Smt Tanga-sa D Kumbar Hindu 3 4 7 0 0 151(0(1
36 M3 52-90(0 RHS Athani Dattagirao (G Sindhe (Out ofstation) 0 0 0 0 0 0
37 M3 52 905 RiiS Athanii Sliritioanth Depaoina Hunashimore Jain 4 4 8 0 0 6001)1)
38 M3 52+020 RHS Athani Cheittiappa Jammanna Kumbar Hiiidu Lingayat 2 I 3 0 n 25(0(10
39 M3 52+i25 RHS Athani Tasakkalbhi N Tamboli Muslim Sunny 4 4 8 (I 0 27000
41) M3 52+930 RHS Athani Sadashlia Appanna ichari Hindu Kurubar 2 3 5 I t 8000
41 M3 520935 RHS Athani Siddappa b-miappa Yakkanchi Hindu Knrubar 3 3 6 0 0 140010
Page 1 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE-2 Household Particulars
No. Onr No Contract Chainage Side Village Natine Rigous Stratfication Family members Disabled Total Laned o Ined Tomta Annulpersons
_____________ Male Female Total
I_ 3 4 5 6 7 8 9 10 II 12 13 14 15
42 M3 53-210 RHS Athani Natuba Allappa Venkatt, Hindu SC 3 5 8 0 0 10000
43 M3 53i270 RHS Athani Shanta R Pawar Hindu Maratha 3 2 5 0 0 15000
44 M3 53+275 RHIIS Athani Shivajt Sahu Pawar Hindu Maratha 4 2 6 0 0 36000
45 M3 53+279 RHS Athatii Jayavanith ramachandra Pa,ar Hindu Maratha I 2 3 0 0 15000
46 M3 53+545 RHS Athani Sanjeev Neelayy Mulli Hindu Kurubar 1 4 5 0 0 1000(
47 M3 53.585 RHS Athant Bashadastagir Sudrant Muslim Sunny 3 I 4 1 0 24000
48 M3 53+590 RHS Athan, Noorahamad Allabhaksh Nalabandh Muslim 8 4 12 0 0 25000
49 M3 53+595 RHS Athani Mallikarjun Ramanna Chamken Hindu Lingayat I 2 3 0 0 20000
50 M3 53+908 RHS Athani Sharanayya Shankarayya Gaduginamath Hindu Lingayat 3 I 4 0 0 33000
51 M3 53+600 RHS Athani Umesh Murgappa hadpad Hindu Lingayat 2 4 6 0 0 14000
52 M3 53+602 RH-S Athani Mubaraq Nabisab Sanadhi Muslim Sunny 2 2 4 0 0 12000
53 189 M4 8+735 LHS Shiraguppa AltafGulab Khanwade Muslim Sunny 5 2 7 0 0 20000
54 190 M4 8+736 LHS Siraguppa Khalltl H.Kanawade Muslim Sunny 5 0 5 0 0 280000
55 191 M4 8+743 LHS Siraguppa Sadat Allabaksha Alase Muslim Suy 3 4 0 0 23000
56 1M6 47-940 LHS Nagamangala Mohammad Barkattulha Md. Khasim Muslim 4 _ 5 0 0 21)1)00
57 2 M6 47+951 LHS Nagamangala N.R Mohammad Fiaz s/o N Abdul Rehaman Muslim 4 2 6 0 0 25000
58 3 M6 47+964 LHS Nagamangala Nazinijan w/o Nasrulla Khan Muslinm 5 1 6 () 0 39000
59 4 M6 47+957 LHS Nagamangala N.R. Kizar Ahaniad S/o N Abdul Rehman Muslim 2 5 7 0 0 10000
60 5 M6 47+969 LHS Nagamangala Rasheeda Jan w/o Rahanmuthalla Khan Muslim 3 1 4 0 0 75000
61 6 M6 47+976 LHS Nagamangala Mohammad Masood s/o Stddtq Sab Muslim 4 I 5 0 0 71101)0
62 7 M6 47+980 LHS Nagamangala N R. Mohammad Illias s,o Abdul Rehaman Muslin I (I ( 0 20000
63 8 M6 47+985 LHS Nagamangala Ntshad Khanam w/o Hyder Alt Khan Muslim 4 2 6 0 0 10000
64 9 M6 47+990 LHS Nagamangala N.S. Alijan s/o Sattar Sab Mushm 2 I 3 0 0 25000
65 10 M6 47+989 LHS Nagamangala Zeenathunnisa d/o late Abdul Hameed Muslim I 2 3 0 0 20000
66 11 M6 48+003 LHS Nagamangala Ahamad Klian s/o Gaub Khait Muslim 3 3 6 0 0 5()00(
67 12 M6 47+999 LHS Nagamatigala N.S Fiaz Pasha s/o Shetkh Silar Sab Muslim 3 1 4 0 0 12000
68 13 M6 47+994 LHS Nagamangala Abdul Khader s,o Tailor Gybe Sab Muslinm 2 1 3 0 0 60000
69 14 M6 48+010 LHS Nagamangala Sanaulla Khan s/o late Gafar Klhan Muslim 4 3 7 () 0 50000
70 15 M6 48+017 LHS Nagamangala Basheer KEhan s/o Gouse Khatt Muslim 2 1 3 0 0 40000
71 10 M6 48+023 LHS Nagamangala Doddaiah s/o Jasaregowda Hindu 3 I 4 0 0 28000
72 1-7 Mb 48 i 027 LIIS Nagamatigala Kalamina w,'o D V. Knslinacltar Hindu 2 4 6 0 0 20000
73 1 M 6 48+030 LHS Nagamangala Late Chennanmma W/o Chennigappa shetty Hindu 8 8 16 0 0 288000
74 19 M6 48+033 LHS Nagaittangala N.R. Basavarajappa S/o Rudraiah Hindu 2 2 4 0 0 25000
75 20 M6 48+038 LHS Naganiangala N.R Jeetaendra s/o N.H Raju Hindu I 3 4 0 0 40000
70 21 M6 48+043 LHS Nagamangala Huchhama w/o late Chtkkaiah Hindu 3 3 6 0 0 8000
77 22 M6 48+049 LHS Nagamangala Ahanad Flusain s,o Late N1d. Saheb Muslim 3 2 5 0 0 50(100
78 23 M6 48+(155 LHS Nagamangala N.G Gopal late M S Goa tnd Shetty Hindu 2 2 4 0 () 10000
79 24 M6 48+060 LHS Naganiangala Stddiq Ahanmad Late D.M Ismail Muslinm 3 0 3 0 0 120000
80 25 M6 48+065 LHS Nagamangala N.M Subbaraya Shetty Narappa shetty Hindu 2 2 4 0 0 31()00(
8 1 20 M6 48+070 LHS Nagamangala Nagina Aja Md. Jahangir Muslinh 2 3 5 0 0 180000
S2 27 M6 48+075 LHS Nagamangala Nasnn Begunt Ahmad Husaitt Muslint I 2 3 1) 0 156000
83 20 MO 48+080 LHS Naganiangala Gumbasappa Late Raniappa Hindu 2 2 4 0 0 10000
Page 2 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
SI. ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~~~~~~~~~~~~~~eiiu oilN.f Total Land ossned Total AnniualSL Q No Contract Chainage Side Village Namie Regious Social Family niembers Disabled
No. Group Stratification persons (in acres) Inconie
Male Female Total
I 0 3 4 5 6 7 8 9 I 0 II 1 2 13 14 15
84 29 M6 48+085 LHS Nagamangala Ginjamnta Late Ramakrishnappa Hindu 2 3 5 0 0 80000
85 30 M6 48+090 LHS Nagamangala V.Ravishankara N.N. Veerappa Hindu I 0 I 0 0 6(00(:1
86 31 M6 48+097 LHS Nagamangala N.S Nandakumara S Subbashetty Hindu I I 2 0 0 48000
87 32 M6 48+106 LHS Nagamangala S.L Vasanita Kuntari w/o Nanjundaswantv Slietty Hindu 3 I 4 lJ () 36000
88 33 M6 48+131 LHS Nagamangala Siddiq Ahantad lIate D.M Ismail Muslim 3 0 3 0 120000
89 34 M6 48+166 LHS Nagamangala N.R ShivaShankar s/o T.H Rudrappa Hindu 2 0 2 0 0 96000
90 35 M6 48+171 LHS Nagamangala N.RUmesh S/o TH Rudrappa Hindu 2 2 4 0 0 36000
91 36 M6 48+176 LHS Nagamangala N.RNagaraj S/o T. H Rudrappa Hindu 2 2 4 0 0 50000
92 37 M6 48+183 LHS Nagamangala N.S. Guruprasad s/o Late N.R Shivakumar Hindu I 2 3 0 () 40000
93 38 M6 48+190 LHS Nagamangala Huchamma w,o Late Chikkaiah Hindu 3 3 6 0 () 8000
94 39 M6 48+195 LHS Naganmangala Adavishetty s/o Kanchishetty Hindu 3 3 6 (J () 65000
95 411 M6 48-210 LHS Naganmangala Diddaah s/olJavarego.da Hindu 3 I 4 () 0 24000
96 41 M6 48+235 LHS Nagamangala M Devakiamma w/o late Narayana Nayar Hindu 4 5 9 1 0 72000
97 42 M6 48+400 LHS Nagamangala MDCC Bank 0 () 0 0 0 0
98 43 M6 48+350 LHS Nagamangala Land Development Bank 0 0 0 0 0 0
99 44 M6 48+400 RHS Nagamangala Agril. Co-op Society 0 0 0 0 0 0
100 45 M6 47+750 RHS Nagamangala Stddiq Ahamad Late D.M Ismail Muslim 3 0 3 0 0 90000
101 46 M6 47+760 RHS Nagantangala N.R Moltamiiad Noomlla s/o M Abdul Rehman Muslim S I 6 0 0 18000
102 47 M6 47 >770 RHS Nagamangala N.R Md. Illias s/o M Abdul Rehaman Muslim I () I 0 () 20000
103 48 M6 47+778 RHS Nagamangala N.R Md. Abbas s/o M Abdul Rehaman Muslim 3 1 4 0 0 16000
104 49 M6 47+782 RFIS Nagamangala Ameerul Hanaza s/o Late N.R md. Gouse Muslim 4 5 9 () 0 48111)1
105 50 M6 47+785 RHS Nagamangala N.H Ulfatlh Ali Khan s/o Late N.V hyder ali Khan Muslim 5 I 6 0 0 24000
106 5) M6 47+789 RIIS Nagamangala N.H Sadatali Khan s/o late N.V Hyderali Khata Muslim 4 3 7 n 0 180000
107 52 M6 47+795 RHS Nagantangala N.G Shafiulla Khan s/o Gouse Khan Muslim 4 3 7 0 0 31000
108 53 M6 47+800 RHS Nagamangala Habeebulla Khan s/o Gouse Khan Muslim 4 2 6 0 0 8000
109 54 M6 47+81 7 RHS Nagamangala Peer Kltan s,o Late Abdul Khan Muslim 3 3 6 0 0 12000
110 55 M6 47+822 RHS Nagamangala Rabbani s, o Late Khader Ahamad Muslim I 2 3 0 0 110(10
III 56 M6 47+827 RHS Nagamangala Shanur urf Intanibec w/o Maqbul Muslim 6 3 9 0 0 3811110
112 57 M6 47+835 RHS Nagamangala Altaf Pasha s/o Late zigunrlla Khan Muslim 3 I 4 0 0 20000
113 58 M6 47+838 RHS Nagamatigala Ayub Khait s/o Late Abbas Khan Muslim I 2 3 0 () 9000
i 14 59 M6 47+843 RHS Nagamangala Atianll.1a Klih,i 5/ goose KOani Muslim 0 0 0 () 15000
115 60 M6 47+847 RHS Nagamangala Inayathulla Khan s/o Late Gouse Khan Muslim 5 1 6 0 0 1001((
116 61 M6 47+853 RHS Nagamangala Jaffar Husain s/o Late Abdul Rasheed Muslint 3 2 5 () 0 7000(.
117 62 M6 47+852 RHS Nagamangala N.G Siddaramanna s/o Late Gubbishetty Hindu I I 2 () 0 150000
118 63 M6 47- 860 RHS Nagatitangala Md. Gouse s/o Abdul Gafar Muslim 3 0 3 0 0 70000
119 64 M6 47+864 RHS Nagamangala R.B Rajapp s/o Rantappa Hitidu 2 I 3 0 0 St0(
120 65 M6 47+869 RHS Nagamangala H.D Soubagyanania ./o R B Rajappa Hindu 2 I 3 (J 0 800(
121 66 M6 47+872 RIIS Nagaittangala Siddalitigatinia ,'o Late Siddappa Hindu ( 2 3 0 0 15(10(
122 67 M6 47+877 RHS Nagantaiigala Kanialamma is'o Late N.C Hanumanth Shettv Hindu 5 5 10 0 0 55000
123 68 M6 47+884 RHS Nagamangala Late Chetritamnuta W/o Chetinigappa shetty Hindu 8 8 16 0 0 288000
124 69 M16 47+904 RHS Nagatnaiigala N.S. Shivakunitar Gupta s/o Late N.K Snbbraya Shetty Hindu I I2 Ii 0 92000
125 70 M6 47+914 RHS Nagamanigala N V Chidananda s,o T.H Veerappa Hindu 3 I 4 (I () 70000
Page 3 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE-2 Household Particulars
Si. Rlgos Sca oo Total Land ossned Total AnnualQnr. No. Contract Chainage Side Village Name Rehgious Social Fantily members Disabled
No. Group Stratification persois Hn acrcs) Income
Male Female Total
I 0 3 4 5 6 7 8 9 10 II 12 13 14 IS
126 71 M6 47+919 RHS Nagamangala Puttarudramma wto Late Chennappa Hindu 0 1 I 0 () i()00
127 72 M6 474923 RHS Nagamangala Asmatunnisa w/o Md. Abdul Rasheed Muslim 2 I 3 1) 0 2000(0
128 73 M6 47+926 RHS Nagamangala N.V Nagaraju s/o S Venkata shetty Hindu 2 3 5 0 0 20000
129 74 M6 47+930 RHS Nagamauigala N.V Suresh s/o S Venkata Shetty Hindu 2 2 4 () 0 30000
130 75 M6 47+930 RHS Nagamangala N B Ramachandra S/o Balayay Shetty Hindu 3 3 6 0 0 44000
131 76 M6 48+000 RHS Nagantangala Alumelamma i/o D Ramakrishnashetty Hindu 2 3 5 0 0 10000
132 77 M6 48+025 RHS Nagamaiigala Md Noorulla s/o Khazi Md. Abbas Sab Muslim I 0 1 0 0 30000
133 78 M6 48+105 RHS Nagamangala A Md. Gouse s/o Mohiddin Sab Muslim 4 I 5 0 0 26000
134 79 M6 48+130 RHS Nagamangala Firoze Pasha s/o Late Abdul Kareem Sab Muslim 3 2 5 0 0 20000
135 80 M6 48+155 RHS Nagamangala Unimer Daraz s/o late Abdul Jabbar Muslim 3 I 4 0 0 10000
136 81 M6 48+200 RHS Nagamangala itabijan s/o late A Abdul Jabbar Muslim 2 2 4 0 0 18000
137 82 M6 48+210 RHS Nagamangala A Md Gouse s/o Abdul Azeez Muslim 3 3 6 0 0 30000
138 83 M6 48+240 RHS Nagamangala Ahmad Pasha s/o Late Abdul Azeez NMuslim 5 I 6 0 0 42000
139 84 M6 48+250 RHS Nagamangala N.K Venkatesh s/o N.G Knshna Shetty Hindu 2 2 4 0 0 36000
140 85 M6 48+2611 RHS Nagamangala N.K Srinivasa Murthy s/ oN G KrishnaShetty Hindu 3 I 4 f) () 28000
141 86 M6 28 270 RHS Nagamangala N.V Subbarao s/o Venkatapatahiah Hindu 2 I 3 0 0 30000
142 87 M6 48+300 RHS Nagamangala B.A Mamtha v/o N.S Umesh Ilindu Other 2 2 4 0 0 50000
143 81 M25 18+190 LHS Manchi Keri B.R Bhadkar Hindu Vvsya 2 4 6 0 0 75000
144 82 M25 18+195 LHS Manchi Ken Sadananda G.Payde Hiudu Vaishnara 2 3 5 0 0 10800
145 83 M25 118+197 LHS Manchi Ken Siraj Shatfuddin Sheikh Muslint Sheikh 3 I 4 0 0 114000
146 84 M25 18+35) LHS Manchi Keri Annappa Shisappa Nayak Hindu Nantdhani Nayah 8 4 12 0 0 107200
147 85 M25 48-100 LHS Sirsi Ganapahi G Hegde Hindu Brahmin 5 4 9 0 0 300000
148 86 M25 48+125 LHS Sirsi Subraj.V Hegde Hindu Brahmin 3 4 7 (J () 144000
149 87 M25 48. 220 LHS Sirsi B L.Hegde Hindu HB 3 2 5 0 0 250000
i 5i 88 M25 48+300 LHS Sirsi RamachandraV.Shastn Hiisdu Havyak Brahmi 2 2 4 () 72100
15i 89 M25 48+340 LHS Sirsi F.L.D'Souza Christian Roman Catliolic 3 I 4 0 0 5341111
152 90 M25 48+325 LHS Sirsi Suman Dathanand Habbu Hinidu 0 0 0 0 0 0
153 91 M25 48+405 LHS Sirsi Paraitteslt G.Hegde Hlindu 1iBR 3 2 5 0 0 75000
154 92 M25 48+445 LHS Sirsi A.Azim Muslim Sheikh 3 I 4 0 0 48000
155 93 M25 49+420 LHS Sirsi Abdil Sattor Shekh Muslim 3 2 5 0 0 0
156 94 M25 49+442 LHS Sirsi Abdul Mazid Shekh Muslim Shetkh 3 I 4 u 0 60090
157 95 M25 49+442 LHS Sirsi Narayan V Udupikar Hindu GSB 9 6 15 0 0 170000
158 96 M25 49+467 LHS Sirsi Jeevn Ram Kamath Hindu () 0 0 0 0
159 97 M25 49+492 LHS Sirsi Dr.Ramachandra Hegde Hiiidu Havyak Brahmir 3 4 0 0 9)000
1613 98 M25 49+530 LHS Sirsi Sudhir.H.Holekar Hii,du GSB 3 2 5 0 80000
161 99 M25 50-18() LHS Sirsi Raju Madhukar Shet Hindu Daiwajna Brahb 3 5 8 1 75000
162 1011 M25 50+234 LIIS Sirsi Vinayak H.Bhatkal Hindu Bhovi 5 4 9 0 0 180000
163 101 M25 50+255 LHS Sirsi Taranath.S,Sbirali Hindu Bhovi I 2 3 0 0 60100
164 102 M25 50*265 LHS irsi Ganapathi Shet Hindu Daisajna Brahm 8 6 14 0 0 100000
lb. 103 M25 50+283 HS Sirsi Des idas.B.Bhat Hindu Daisajna Brahn 4 5 ( () 96111111
16( 104 M25 50+2(16 LHS Sirs Sliaitha Thomas Femandes Chnstian Roman Catholic 5 2 7 0 0 24000
16 l0 M25 50+306 rHS Siri Narayai Hlindu 0 (I 0 O 0 1
Page 4 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE-2 Household Particulars
SI. Religious Social Noof Total Land owned Total Annual~~~~~~~~~~~~~~~~~~No.f otl Lndo,ne ToalAnuaNo. Qnr. Nn. Contract Chainage Side Village Name Rehgious Social Family members Disabled Tota ace Income
N. Group Stratificatioii persons (inl acres) Income
Male Female Total
I 0 3 4 5 6 7 8 9 10 II 12 13 14 15
1 68 106 M25 50+304 LHS Sirsi Muruti Hindu 0 0 0 0 0 0
165 107 M25 50+310 LHS Sirsi Victor Breto Christian Roman Catholic 2 3 5 0 0 36000
1711 108 M25 18+110 LHS Manchikeri Abubakar Muslim Sheilkh 6 3 9 0 0 15600
171 109 M25 LHS Manchikeri Narayana Ramachandra Bhat Hindu Brahmin I 3 4 0 0 36000
172 110 M25 49+467 LHS Manchiken Ravidas Shetty Hindu Vysya 3 2 5 0 0 17000
173 III M25 18+200 RHS Manchiken Dr. H.Nagaraj Hindu Brahmin 2 I 3 0 0 60000
174 M25 0+015 RHS Yellapur Ullas Male Hindu 0 0 0 - 0 0
175 M25 0+108 LHS Yellapur Nagendra Kabadi Hindu Kabbaliga I I 2 0 0 8(0(
176 M25 0+112 LHS Yellapur Ganapati Reuanakar Hindu 0 0 0 - 0 0
1 77 M25 0+1 15 LHS Yellapur Venkatesh P.Nayak Hindu Deva Nayak 2 3 5 0 0 10800
178 M25 0+117 LHS Yellapur Dyamavva NageshJogi Hindu Baligar I 3 4 0 0 9000
179 M25 0+121 LHS Yellapur Rama Puttu Savarkar Hindu Lingayat 2 I 3 0 0 10800
180 M25 0+122 LHS Yellapur Mansurkhan Pathan Muslim Sunny 2 I 3 0 0 18000
181 M25 0+126 LHS Yellapur Vinayak Nagendra Halgen Hindu SC 3 3 6 0 ( 12000
182 M25 0+128 LHS Yellapur S.M.Chandru Hindu SC I I 2 0 0 12000Havyak
183 M25 0+132 LHS Yellapur Badravathi Gavnkar Hindu Brahmin 2 5 7 0 0 14200
184 M25 0+134 LHS Yellapur Mahades Patankar Hindu SC 4 3 7 0 0 12000
185 M25 0+136 LHS Yellapur Stinatb S.Naik Hindu Nantadari Naik 5 I 6 0 0 30000
186 M25 0+138 LHS Yellapur Mohan Badhi Hindu 0 0 0 0 0 0
187 M25 0+141 LHS Yellapur Shauiesh Darnma Nayak Hindu Konkan Marath 6 3 9) 0 () 34000
18S M25 0+142 LHS Yellapur Hanumanthappa Mallappa Ingale Hindu Other 6 6 12 0 0 54000
1 89 M25 0+145 LHS Yellapur Parashu Rama Hingle Hindu Other 5 5 I () 0 0 30000
190 M25 0+148 LHS Yellapur Shaniguddin Isamil Sheklh Muslim Pinjar 2 2 4 0 0 18000
191 M25 ()+151 LHS Yellapur Raju Mukunid Naik Hindu Other I I 2 0 0 20000
192 M25 0+153 LHS Yeliapur Abdul LatifFairoj Shekh Muslim 0 0 0 0 0 ()
193 M25 0+155 LHS Yellapur Sheskkamaza N.Shekh Muslim Sunny 3 2 5 0 0 12()()(
194 M25 0+157 LHS *'ellapur Shekh Ooli Mohamad Muslim I 3 4 0 0 24000
195 M25 0+160 LHS Yellapur Hanamanasa Gunasa Ladawa Hindu Other 3 2 5 0 0 13600
196 M25 )+163 LHS Yellapur Mahamad Raffeq Muslim 3 2 5 0 0 36000
197 N125 0+166 LHS Yellapur Basheer Muslim 2 I 3 0 0 24000
198 M25 0+171 LHS Yellapur Abdul Kareem Shekh Muslim Sunny 5 I 6 () 0 12008
199 M25 0+175 LHS Yellapur Lalitha Matiohar Patil Hindu SC 5 2 7 0 0 864000
200 M25 0+210 LHS Yellapur Shankar Pawar Hindu () () () 0 0 0
201 M25 0+212 LHS Yellapur K.S Bhatt Hindu Other 2 2 4 0 0 1800
Konkan
202 M25 0+214 LHS Yellapur Aravinda Vaman Bhandarkar Hindu Brahmin 3 2 5 0 0 39000
203 _ M25 0+216 LHS Yellapur Balakrislina Poomale Hindu SC 4 3 7 0 0 24000
204 N125 0+218 LHS 'ellapur Manjunath Sheth Bikka Hindu 0 0 0 0 0
205 M25 0+220 LHS *'ellapur Jubad Karimkhan Muslim 0 0 0 0 0
20t M125 0+222 LHS Yellapur Abdul Ghaiti Raja Sab Durga Muslim 0 0 0 0 0
Page 5 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
Si. Flliiou Socal o.o Total Land airmed Total Annual
No. Oar. No. Contract Chainage Side Village Naile Relgrous Social Fanly members Disable (in and Income
Male Female Total
I 0 3 4 5 6 7 8 9 10 I 1 12 13 14 15
207 M25 43+058 LHS Dasangadde Krishna Appu Shetti Hindu GanigShett i 3 12 25 0 0 37500
208 = M25 38 147 RHS Bairumbi Shreepad Knshiia Hegade Hindu HBR Brahmin 2 2 4 (t 0 2800
Namadhari
209 M25 38+140 RHS Bairumbi Subraya N.Naik Hindu Nayak I 3 4 0 0 4000
Namdhari
210 M25 38+135 RHS Bariumbi Mahaling Narayan Nayak Hindu Nayak 2 2 4 0 0 1080
211 M25 38+020 LHS Batrumbi SridharGanapati Hegade Hindu HBR I 4 5 () 0 50000
Havyak
212 M25 LHS Hulgol Anant Venktaranm Hedage Hindu Brahmin 3 2 5 0 (t 50000
213 M25 36+485 RHS Hulgol Narayan Mahabaleshsrar Hegade Hindu Havyak Brahmi 3 I 4 0 1) 200000
Havyak
214 M25 36+430 LHS Hulgol Narayan MahabaleshIvar Hegade Hindu Brahmin 2 2 4 0 0 200000
Havyak
215 M25 36+425 RHS Hulgol Anant Venktaranm Hedage Haiidu Brahmin 3 2 5 0 0 50000
216 M25 48+302 LHS Sirsi Satish Yallappa Kalal Hindu Surya Kshatriya 2 2 4 0 0 18000
217 M25 48+305 LHS Sirsi Suresh Yallappa Kalal Hindu Surya Kshatriya 2 2 4 0 0 12000
Havyak
218 M25 48+308 LHS Sirsi R.N.Hegade Bende Godde Hlindu Brahmin 2 I 3 0 0 23000
219 M25 18+157 RHS Manichikeri Sachin Timmappa Shet Hindu Shet 4 I 5 0 0 2800
220 M25 18+178 RHS Manchikeri Timmappa J.Shet Hindu Shet 4 I 5 0 0 2900
221 M25 18+198 RHS Manchikeri SudhindraGanapathy Payde Hindu Vysya 2 3 5 0 0 2400
222 M25 18-206 LHS Manchikeri Radha Gopalaknshna Shet Hindu Ganiga I 0 I 0 () 2400
223 M25 18+208 RIH-S Manchikeri Sudhindra G. Payde Hiiidu Kshatnya 2 3 5 0 0 2400
224 M25 18+212 RHS Manchiken Jayaprakash Payde Hindu 0 0 0 0 0
225 M25 18+219 RHS Manchikeri Jayaprakash Payde Hindu 0 0 0 - 0
226 M25 18+222 LHS Manchikeri Jayaprakash Narayan Shet Hindu It 0 0 0 (
227 M25 18+225 RHS Maiicltiken Dinkar Payde Hindu 0 0 0 0 0
228 M25 18+227 Manchikeri Robert Tailor Christian 0 0 0 0
229 M25 18+227 RHS Manchiken Sridhar Bhat Hindu Brahmin I 0 1 0 3800
230 MN25 18-231 LHS Manchikeri Ashok.G.Desai Hindu GSB 3 i 4 0 0 4600(
231 M25 18+232 RHS Manchikeri Subash Payde Hindu Other 2 1 3 0 0 42000
232 M25 18+232 RHS Manchiken Prahalad Masken Hindu 0 0 0 - 0 0
233 M25 18+237 RHS Manchiken Surendra G.Payde Hindu Other 2 1 3 () 43500
Bharatiya
234 M125 1 8,242 RHS Manchikeri S.F Mirandar Hindu Knshna 2 5 7 0 3400
235 M25 18+245 RHS Mancelikeri Vinod.L.Pyade Hindt Navi 4 4 8 ( 36000
236 \125 18+248 RHS Manchiken Vinod.L Pyade Hindu 0 0 0 - 0
237 051 F1126 0+040 LHS Sirsi Venkatesh Damodhar Nayak Hitidu Other 4 3 7 0 0 24000
238 052 M26 0+049 IIHS Sirsi T.P. Ganessh Hindu Bhovi 2 2 4 0 0 2400(0
239 053 M26 0+ 165 LHS Sirsi R.M.Resankar Hindu Brahmiti 4 2 6 0 O 36000
240 054 M26 04270 LHS Sirsi Vasudes Vaman Bhat Hindu GSB 6 3 9 () 0 92000
Page 6 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE-2 Household Particulars
Si. Religious Socal No.of Total Laid owned Total AnnualNo nOr. No. Contract Chainage Side Village Nanie Religiou Socialinracre)sIncom
No. ~~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~(iroup Stratificationiteraois memberesDisabled
Male iFemiale I otalI_ It 3 4 5 6 7 8 9 10 II 12 13 14 15
241 055 M26 0+297 LHS Sirsi Vasanth D Keshwain Hindu GSB I I 2 0 O 100000
242 U56 M2t, 0+754 LHS Sirsi Dnyaneshuar Kanth Hindu 0 J () () 0
243 057 M26 0+765 I.HS Sirsi Diwakar Parameshwar Mangarasi Hindu GSB 3 I 4 ( 0 6()1)0(1
244 058 M26 0+780 LHS Sirsi Sridhar Babhu Kini Hindu GSB 4 2 6 0 0 36t100
245 059 M26 0+840 LHS Strsi Lakshman Durgappa Dalal Hindu Desh Bandan 5 2 7 0 0 18000
246 060 M26 1+500 LHS Sirsi Baskar R.Nayak Hindu Namadhari 3 2 5 0 0 30000
247 061 M26 13+080 LHS Kansur Laxmikanth V,Naik Hindu Naik 4 3 7 0 0 16800
248 062 M26 18+060 LHS Thyagli Gajanana Ganapathy Hcgde Hindu Brahmin 3 3 6 0 0 100000
249 063 M26 18+080 LHIS Thyagli Suresh Ramaknshna Hedge Hindu HBR 2 3 5 () 0 50000
250 (64 M26 18+183 LHS Thyaghi Shashidhar Hegde Hindu HBR I 2 3 0 0 75000
25 1 (65 M26 18+224 LHS 1Thyaghi Laxmeesh Sitaram Hegde Hindu HBR 2 I 3 0 0 50000
252 066 M26 18+230 LHS Thyagli Nagapathi G.Hegde Hindu HBR 2 I 3 0 0 50000
253 067 M26 18+455 LHS Thyagli Seetharama Lakshminarayania Hegde Hindu Brahnin 2 2 4 0 0 30000
254 068 M26 36+900 LHS Siddapur K.P.Prabhu Htndu GSB 2 2 4 0 0 50000
255 069 M26 37+090 LHS Siddapur Philip Santhya Badrigus Christian 0 0 0 0 0
256 070 M26 0+050 RHS Sirsi Vinayak Ananth Vemekar Hindui Other 2 1 3 0 ( 36000
257 1171 M26 11+054 RHS Sirsi Shyam.K.Chinchankar Hindu Padathi 4 5 9 () 0 66000
258 072 M26 0+057 RHS Sirsi Dattatreya Hegdee Hmdu 0 0 0 0 0 0Has yak
259 073 M26 0+061 RHS Sirsi Gajanana S.Bhat Hindu Brabiiin 3 2 5 0 0 31000
260 074 M26 0+054 RIHS Sirsi A.B.DCosta Christiati Roman Catholic I 4 5 0 0 18000
261 075 M26 0+305 RHS Sirsi Manjunath Hindu Naik 3 3 6 0 0 18000
262 076 M26 0+330 RHS Sirsi Sumithra.J.Kalbag Hindu Desh Bandari 2 2 4 0 0 48000
263 0177 M26 0+365 RHS Sirsi K.Budensab NMuslim Nadaf 7 9 1 () 0 120000
264 078 M26 11+83f) RHS Sirsi Mohan.M.Nayak Hindu Namadhan 6 5 1 1 0 () 2711100
265 079 N126 1+711 RHS Sirsi Venkatesh.R Nayak Hindu Namadhari 5 2 7 () 0 72000Koteshwar
266 080 M26 1+777 RHS Sirsi Yeshwanth.Bhat Hindu Brahmin 4 4 8 () 0 28800
267 2()8 M30 2+550 RHS Marema Camp Anandappa Hindu SC 5 5 10 (i 0 25000
268 200 M30 2+570 RHS Marema Camp Kariyappa Hindu SC 3 2 5 0 0 18000
269 210 M30 2+580 RHS Marema Camp Gangappa Hindu Other I 3 4 (( 1(1000
270 211 M30 2+600 RHS Marema Canmp KariyappalSaranga Beeissa Hindu OBC 2 2 4 0 0 16000
271 212 M30 2+660 RIHS Marenia Camp Shivalingappa Hindu ST 3 I 4 0 0 19000
272 213 N130 2+670 RHS Mareitia Cauitp Ramanna Hindu ST 2 3 5 0 0 11000
273 214 M3(0 3+12() RHS Marenma Camp Narayanappa Hindu SC 5 3 8 0 0 18(1)((
274 215 M30 3+100 LHS Marema C anip Basavaraju Hindu Otlier 2 3 5 0 0 20000
275 216 M30 2+550 LHS Marenta Canmp Nagaraj Hindu, SC 3 I 4 0 0 16000
276 M3() 1+600 LHS Vijavanagar camp Narasappa Kattamalli Hindu ST 2 2 4 O 9(00
277 M30 1+610 LHS \'ijayaianar canp Bapura Hanumantha Gadscar Hindu ST 2 6 8 0 O 18000
278 M30 11+620 LHS Vijayaiiagar camp Rayacher Musara Kallu Hindu OBC 4 I 5 0 0 36000
279 M30 1+625 LHS IVijayanagar camp Thimappa Phodabli Hindu ST 4 3 7 0 0 9000
Page 7 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
No. Qtsi No Contract Chainage Side V illage Nanse Rlous Social Fanaiy members Noeof Total Land ossned Total AnnualNo. Qnr. N ContraciChainage ide Villae Nanic Group Stratification Fail ebr iald (mi acres) Income
persons __________
Male Female Total
I 0 3 4 5 6 7 8 9 10 II 1 12 13 14 15
28(0 M30 1+640 LHS Vtjayanagar canip Knshnappa Bhandari Hindu OBC 4 5 () 0 14000
281 M30 1-650 RHS Vijayanagar camp Hussianappa Muslin Others 3 4 7 0 0 90C0
282 M30 1+670 LHS Vijayanagar camp Narasappa Hindu OBC 3 5 8 0 0 12000
283 M30 1+680 RHS Vtjayanagar camp Jambanna Kumbara Hindu OBC 2 3 5 0 0 12000
284 M30 2+000 RHS Vijayanagar camp Lakshmappa Venkatapura Hindu OBC 3 2 5 0 0 15100
285 M30 2+030 RHS Vtjayanagar camp Hurukundamma Htndu OBC I 1 2 0 0 6000
286 M30 2i-045 LHS Marenma Camp Hanumatitha Hiidu SC 7 8 15 0 0 160011
287 M30 2+055 LHS Marenia Canip Hanuantitha Gudi Hiidu ST 3 2 5 0 0 16000
288 M30 2+800 LHS Marenia Cnamp Gangamma Hindu OBC 2 2 4 0 0 1200
289 M30 2+700 LHS Marenma Canmp Gurubasava Mariyappa Hindu SC 4 5 0 0 131)00
290 M30 2+740 LHS Gundamma Camp Nagamma Hi_idu SC 0 1 0 0 41000
291 M30 3+100 LHS Gundanmma Canip Kadappa Hindu ST 3 6 9 O O 16000
292 M30 3+180 RHS Gundarmila Canmp Ranganna Hindu ST _ 2 3 0 0 13000
293 M3() 3+195 LHS Gundamma Camp Gurupadaiah Swamy Hindu OBC 3 3 6 0 0 12000
294 M30 3+200 RHS Gundamma Camp Hanumantharaya Hndu ST 2 2 . 4 0 0 25000
295 M30 4+410 LHS Kalmala Lolamma Damiappa Ilindu SC I 3 4 0 0 13000
296 M30 4+100 LHS Kalmala Rangamma N Vetikatesh Hindu OBC I 6 7 0 0 9000
297 M30 12+000 LHS Nilagalla Camp Rachaiah Swamy Hindu OBC 3 2 5 3 0 140()()
298 M30 21+000 RHS Jaraladinni Canmp G.Baddarao Hindu ST 1 5 6 00 1500
299 217 M31 0+140 RHS K.Lingasugur Channamallappa Hippargi Hindu Ltngayat 3 2 5 () 0 24000
300 218 M31 0+160 RIIS K.Lngasugur Veeresh S Hindi, Lingayat 5 2 7 0 0 18000
301 219 M31 0+190 RHS K.Lingasugur BasanmiaTeggin Hindu Lingayat 4 7 II 0 0 18000
302 220 M31 0+190 LHS K.Lingasugur Duddaiah Swamy Hindu Other 2 5 7 0 () 30000
303 221 M31 0+230 RHS K.Lingasugur Koppanna Hindu OBC I 5 6 0 0 18000
304 222 M31 0+235 R-HS K.Lingasugur Veeresh.Budamalla Hindu Lingayat I 2 3 () 0 14000
3()5 223 M31 0+235 RHS K.Lingasugur Basanmia Hindu Lingayat I I () 0 14000
306 224 M31 0+240 LHS K.Lingasugur Narasappa Joginavnam Hindu SC II 10 21 0 0 18000
307 225 M3 1 0+260 LHS K.Lingasugur Shankaremma Hiitdu SC I 2 3 0 0 7200
308 226 M31 0+270 RHIS K.Litigasugur Shivappa Mahaderappa Budamalla Hindu Other 2 2 4 0 0 18000
309 227 M31 0+270 LHS K.LingasUtgur Dastamma Muslim OBC 5 2 7 0 _ 14000
310 228 M31 0+275 RIHIS K.Lingasugur Lalsab Muslini OBC 3 4 7 0 0 17000
311 229 M3 1 0 s275 LHS K.LiigasugUr Dastagir Sab Muslim OBC 8 7 15 0 0 20000
312 230 M31 0+280 RHS K.Lingasugur Rajasab Bankada Mane Muslim OBC 5 6 II 0 0 150()0
313 231 M31 (0+285 RHS K Lingasugur Shanthamma Hindu Naik 4 4 8 0 0 18((0
314 232 M31 0+290 RHS K.L-igasuigur Lalasab Pinjar Muslim OBC 2 7 9 0 0 14000
315 233 M31 0+295 LHS K Lingasugur Shanthamma Hindu ST 4 4 8 0 0 18000
316 234 M31 0+280 RHS K.Lingasugur Kupparruta Hindu ST 3 4 7 0 0 18000
317 235 M31 0+275 RHS K.Lingasugiir Anaanitiiia Hindu ST 3 4 7 0 0 18000
318 112 M24 5(0+520 LHS Haliyal ShashiKanth Kini Hindu GSB 3 5 8 0 () 168000
319 113 M24 50+200 RHiS Haliyal M.G Pai Hindu 0GSB 3 4 0 0 4600
321 114 M24 50+230 LHS Hlahyal Balappa Bajanthri Hindu Korara 2 2 4 0 0 7n0o
321 115 M24 LIIS Hahiyal Clihaidrakanth Agasar Hindu Agasar 2 6 8 O 0 39(10(1
Page 8 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
Si Religious Social ~~~~~~ ~~~~~~~~~~~~~~~~~~~~~~~~~~~No of Total Land owned Total AnnualNo Qnr. No. Contract Chainage Side Village Nanie Grioup Sraatifcialn Family members Disabled d (in acrc Inconic
persons
Male Female Total
I 0 3 4 5 6 7 8 9 10 I I 12 13 14 15
322 116 M24 511+070 LHS Haliyal Shantharam Gowda Hindu Maratha I 3 4 () () 180(1)(
323 117 M24 44+41)0 RHS Antrolli Sanju Hadapad Hindu 3 2 5 0 0 67000
324 118 M24 44+403 RHS Antrolli Riyaz Ismail Peerzade Muslim 4 3 7 0 0 18000
325 119 M24 LHS Hahtyal Basha Rusul Khan Muslim 2 5 7 0 0 24000
326 120 M24 50+074 RHS Haliyal B.H.Darwadkar Hindu Maratha 3 2 5 0 0 25000
327 121 M24 54+100 LHS Kesoroli Fathima Muslim 4 3 7 0 0 12000
328 122 M27 119+150 RHS Asitoti Govind Ragunath Kolankar Hindu 0 0 0 0 0 0
329 123 M27 116+405 LHS Asnoti Yeshwanth.Godkar Hindu 0 0 0 0 0 0
330 124 M27 116+390 LHS Asuoti Gunavathi Kushali Godkar Hindu Chamagovw 5 3 8 0 0 0
331 124a M27 116+490 LHS Ganumahal He is out of station (Locked) 0 0 0 - 0 0
332 124b M27 116+500 LHS Asnoti Pandurang Appu Nayak Hindu ST 3 2 5 0 8000
333 124c M27 116+390 LHS Asnoti Krishna Menu Gadakar Hindu SC 3 2 5 0 18000
334 236 M28 55+700 RHS Kumbarsvada Hanamanth P.Kamat Hindu Others 7 4 11 0 0 10000
335 M29 0+1130 LHS Yaragatti Dilawar Husainnaik Husainnaikar Muslim Sunny 3 I 4 0 0 8000
336 M29 11+035 LHS Yaragatti Sunadavva Hanumanth Hunchi Katti Hindu Holaya I I 2 () () 411
337 M29 0+040 LHS Yaragatti Somappa Hanumanthappa Malagi Hindu Madar 3 2 5 0 0 80013
338 M29 16+580 LHS Munasalli Irappa Kareppa Meti Hindu Lingayat 3 4 7 0 0 20000
339 M29 16+584 LHS Munavali traina Yallappa Hadapad Hindu Lingayat 2 3 5 I 0 14000
340 M29 16+647 LHS Muna,alli Raju Megundappa Alanannavar Hindu Lingayat I 2 3 0 0 15000
341 M29 16+650 LHS Munavalli Marthi Vishnupant Rasankar Hindu Kshatriya 2 I 3 I 0 1200()
342 M29 16+655 LHS Munavalli Anisarhusen Abdulsab Yaragatrn Muslim Shekh 3 4 7 0 0 36000
343 M29 16+660 LHS Munavalli Ajjappa Ashok Kamalapur Hindu SC 5 4 9 () 0 17500
344 M29 16+666 LHS Munavalli Aijun Namanna Bavikatti Hindu Maratlia 4 3 7 I 0 15000
345 M29 16+666 LHS Munasalh Hanumath Nagappa Jeevaji Hindu Maratha 4 7 11 0 0 9000
346 M29 16+669 LHS Muna,alli Paitchappa Shibasappa Mudalagi Hindu Lingayat 2 1 3 0 IW 11)()0
347 M29 10+674 LHS Munavalh Magtumhusain M Yaragatti Muslim Others 3 3 6 0 0 11300
348 M29 16+675 LHS Munasalli Raju Yallappa Komalapur Hindu SC 2 5 7 0 0 18000
349 M29 16+676 LHS Munavalh Bandusab Gafarsab Hubli Muslim Others 3 2 5 0 0 16400
350 M29 16+676 LHS Muna,alli Niahamad Rafiq Hasimasab Taseds Muslim Others 4 7 11 0 0 13000
351 M129 16+680 LHS Munavalli Haniumanthappa Gangappa Nageshasar Hindu Devang 2 I 3 0 0 17000
352 M29 lo+700 LHS Munasalli AltafPakmsab Kadkal Muslim Others 8 2 iO 0 0 28800
353 M29 16+655 RHS Munavalli Mohalasab Allisab Kdovi Muslim Others 2 3 5 0 0 12(100
354 M29 16t670 RHS Munavali Imnamsab Ibrahimsab Attar Muslim Others 3 6 9 I 0 160()0
355 M29 16 684 RHS Munavalli Mohan Panchappa Therdal Hindu SC 3 1 4 I 0 10500
356 M29 16+69() RHS Munaralh Modinsab Faridsab Attar Muslim others 3 3 6 0 14()00
357 M29 16+780 RIHS Munasalli Vasanth Tatappa Honali Hindu Devanig 2 2 4 () ( 105(111
358 N129 16+786 RHS Munasalli Ranisachandra Maleppa Murunal Hindu Lingayat 2 _ 3 0 0 6000
359 M29 0+05( RHS Yaragatti Baramaji Basavantappa Aralimatti Hindu SC 2 3 5 0 0 10000
360 M29 01 045 RHS Yaragatti Hussen Sab Sayeedsallo Nadaf Muslim Others 2 2 4 0 0 16000
361 M29 (1+038 RHS Yaragatti Suresh Bheemappa Vantagodi Hindu Reddy 2 I 3 I () 72000
362 M29 0+50 RHS Y'aragatti athifGonsab Hussennaikar Muslim Others I 0 0 0 1801)0
363 M29 0+1)65 RFIS Yaragatti Ibramsab I Dilawarnmayakar Muslim Others 3 4 0 0 9(0)0
Page 9 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
Si. Religious SocialNof Total Land ossned Total AnnualNo. Qur. No. Contract Chainage Side Village Name Group Stratification Family members Disabled (in and Income
persons
Male iFemale Total
I 0 3 4 5 6 7 8 9 1 0 icI 12 13 14 1 5
364 M29 0+70 RHS Yaragatti Allabax Hasimsab Attar Muslttn Others 3 I 4 0 0 15000
365 M29 0+76 RHS Yaragatti Diloarsab Hussensab Dilawar Nayak Muslito Others 3 2 5 0 0 33120
366 M29 0+083 RHS Yaragatti Sidraya Kagagimath Hindu Others 2 2 4 0 0 15()()(
367 M29 0+-)85 RHS Yaragatti Blinmashi Khantashi Hindu SC I 0 I 0 () 15000
368 M29 0+()89 RHS Yaragatti Babulal Dawalsab Karanachi Muslim Others 4 3 7 0 0 14000
369 M29 0+092 RHS Yaragatti Khadarbi Davalasab Karunachi Muslim Others 5 2 7 0 0 16000
370 M29 0+094 RHS Yaragatti Dasalbhi Subambaig Jamadhar Muslim Others 5 3 8 0 0 14400
371 M29 0+096 RHS Yaragatti Indrantnia Chanbasappa Kallappanavar Hindu Lingayat 3 2 5 0 0 5000
372 M29 0+112 RHS Yaragatti Pathima Mehaboobsab Janganavar Muslim Others 3 6 9 0 0 14000
373 M29 16+595 RHS Munasalh Azad Baseerahamad Madlur Muslim Tablic 3 1 4 0 0 12000
374 M29 16+610 RHS Munasalli Basavaraj B Badiger Hiitdu Panchal I 6 7 0 0 12000
375 M29 16+620 RHS Munasalh Dr. Nazeerahemad Muslim Others 2 2 4 0 0 50000
376 M29 16+652 RHS MuniasalIt Vijay Dyamappa Komalapur Hindu SC 2 3 5 t) 0 18000
377 M29 16+653 RHS MunaNallI Adiveppa Yallappa Targol Hindu SC 3 3 6 () 0 6000
378 M29 16+652 RHS Munavalli Maningayya Basayya Olinmath Hindu Lingayat 4 2 6 0 0 18000
379 I M33 31+595 RHS NMallapur Shisappa T Kanlthigonatnnavar Hindu Lingayat 2 I 3 0 ) 19000
380 2 M33 31+6()0 RHS Mallapur Shekappa Veerappa Pawar Shetty Hindu Lingayat 3 5 8 0 0 14000
381 3 M33 36+180 RHS C'matnnavar Gadigappa Gowda Kalengowda Shivalli Hindu Lingayat 3 2 5 0 0 24000
382 4 M33 35+415 RHS Saragsade Panchappa Bhimappa Hadpad Hindu Lingayat 3 5 8 () 0 14400
383 5 M33 36+194 RHS C'mannur cross Shankrappa Suchirapap Katagi Hindu Lingayat 0 0 0 0 0 0
384 6 M33 36+203 RHS C'mannur cross He is out of station (Locked) 0 0 0 0 0 0
385 7 M33 36+220 RHS C'ittaisliun cross Tajuddin Gaibusab Namazi Muslim Others I 1 2 0 0 27001
386 8 M33 36 + 215 RHS C'nantiur cross He is out of station (Locked) () 0 0 0 0 0
387 9 N133 36+230 RHS C'mantitur cross Shisanand Kolkappa Katagi Hindu Lingayat 5 3 8 0 0 18000
388 10 M33 36+235 RHS C'manntir cross Channabasappa H Nadagoudar Hindu Lingayat 3 2 5 0 0 13000
389 1 1M33 43+080 RHS Ron Panchayya V Vtraktimath Hindu Lingayat 3 I 4 0 0 100)(0
390 12 M33 43+480 RHS Ron Ramesh ShNiappa Hadpad Hindu Lingayat 5 3 8 1 0 26400
391 13 M33 43+055 RHS Ron Hanmanthappa Nilappa Duglad Hiidu Kurubas 0 0 0 0 0
392 14 M33 43+1157 RHS Ron Irappa Muradh Hindi () () 0 0 0 0
393 1 M33 43+1195 RHS Ron Pan shop is vacant sitice 6 years 0 () 0 0 0 0
394 16 M33 43+500 RHS Ron Veerappa Mkiddappa Navalgund Hiitdu Lingayat 3 2 5 i () 8()()(
395 17 M33 43+5 10 RIIS Roit Mahantesh Kainteppa Navalgund Hindu Kshaunk 4 4 8 0 () 18(1)((
396 18 M33 43+825 RHS Ron Gedappa Nandeppa Gadepennavar Hindu Ganiga 3 2 5 0 0 63000
397 19 M33 43+855 RHS Ron Rajasab Hussainsab Rajekhan Muslim Others 3 I 4 0 0 37200
398 20 M33 43+860 RHS Ron Devendrappa Y ellappa Madiwal Hindu Madivala 2 3 5 () 0 14400
399 21 M33 43+885 RHS Ron Rafiq Malliksab Moognur Muslim Nadaf 5 5 10 0 0 46000
400 22 M33 43+081 RHS Ron He is out of statioti (Locked) 0 0 0 0 0 0
401 23 M33 44+14() RHS Ron Mahadesappa M Nasalgund Hitidu Ganiga 7 12 19 () 0 69200
402 24 M33 44-i 144 RHS Ron Veerapakshappa Haggadtni Hindu Reddy 3 2 5 0 0 70000
4(3 25 M33 44+150 RHS Ron Veerabhadrappa Chenitappa Kadgad Htndu Lingayai 3 4 7 0 t 24000
404 26 M33 44-156 RHS Ron He is out of station (Locked) 0 0 0 0 0 0
405 27 M33 44i160 RHS Ron Andsanappa Shambanna Hadpad Hindu Kunmbas 10 12 22 0 0 36000
Page 10 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
SI Religo umembe SrscDisabd Total Land osoied Total Annual
No Or. No. C'ontract Chainage Side Village Nansie ReligiousbersSocialeNo G~~~~~~~~~~~~~~~~~~~~~~~~~~~~(roop Stratifitcation pesn lini acres) Income
Male IFeniale Total
I 0 3 4 5 6 7 8 9 10 II 12 13 14 15
406 28 M33 44+168 RHS Ron Chandrashekharayya G. Bandariniati Hindu Lingayat 4 3 7 0 0 3450C
407 29 M33 44+174 R-HS Ron V.B. Litigaiigouda Hindu 5 4 9 0 0 400(111
408 30 M33 44+176 RHS Ron He is out of station (Locked) 0 (I 0 0 0 0
401 31 M33 44+179 RHS Ron Basavannappa Nagappa Chakrasali Hindu Lingayat 2 I 3 0 0 30000
410 32 M33 44+101 RHO Ron Sbaramappa Mareappa Koppad Htnud Kurubas 3 3 6 0 0 12000
411 33 M33 44+320 RHS Ron Basangouda Jakanagouda Jakkanagoudar Hindu Lingayat 6 2 8 0 0 14000
412 34 M33 44+324 RHS Ron Shekrappa Saurab Hindu Lingayat 4 2 6 0 0 13000
413 35 M33 44+327 RHS Ron Basavraj Yellappa Tegginamani Hindu () 0 0 0 0 0
414 38 M33 44+330 RHS Ron Ninigappa Sharanappa Madivalar HIDdu Lingayat 2 3 5 0 0 10000
415 37 M33 44+332 RHS Ron NazeerAhnued lbrahimsabNadimulla Muslim Others 3 8 II I 0 12000
416 30 M33 44+334 RHS Ron Gurappa Basappa Kodekar Hindu Lingayat 3 1 4 0 0 10800
417 30 M33 44+340 RHS Ron Jakkappa Durgappa Madar Hindu SC 3 2 5 0 0 10000
418 40 M33 44+030 RHS Ron I S Sankangouda Hindu Lingayat 2 3 5 0 0 3600(
419 41 M33 44+033 RHS Ron Muttanna Andappa Iln Hindu Lingayat I 2 3 0 0 26000
420 42 M33 44+038 RHS Ron K H Magen Hindu Lingayat 6 2 8 0 0 44000
421 43 M33 44+040 RHS Ron SbIsegouda Patil Hindu Lingayat 2 4 6 0 0 24000
422 44 M33 44+044 RHS Ron Pundalik H Pachangi Hindu Others 8 3 1 1 0 0 38000
423 45 M33 44+049 RHS Ron Chandrashekhrappa K Sunkad Hindu Ganiga 4 4 8 0 0 64000
424 46 M33 44+051 RHS Ron ShO\ anand Ningappa Karadi Hindu Lingayat 3 I 4 0 0 16200
425 47 M33 44+059 RHS Ron Mallikaijun Basalingappa Sabaraddi Hindu Lingayat 3 I 4 0 0 3800(0
426 48 M33 44+061 RHS Ron Nagappa Sangappa Gadag Hindu Lingayat 5 2 7 2 0 29000
427 40 M33 44+066 RHS Ron Ramachandra Ningappa Gajan Hindu Devang I (I I 0 0 3111001
428 50 M33 44+070 RIIS Ron Basappa Nagappa Gadagi Hindu Reddy 5 3 8 0 0 36000
429 51 M33 44+074 RHS Ron Basappa Nagappa Gadagi Hindu Reddy 5 3 8 0 1 36000
430 52 M33 44+1177 RHS Ron Ashok Navalgund Hindu Ganiga 9 10 19 0 0 67200
431 53 M33 44+078 RHS Ron Mohanlal B Bafna Hindu 2 I 3 () 0 18001J
432 54 M33 0+390 LHS Shelvadi Basaiah Channayya kondakattimath Hindu Lingayat 0 0 0 () 0 18000
433 55 M33 33+700 LHS Datnal Ramappa Ningappa Angadi Hindu Liigayat 4 2 6 0 0 14000
434 56 M33 33+705 LHS Datnal Essarappa Nagappa Auradh Hindu Lingayat 5 6 11 0 0 13000
435 57 M33 36+180 LHS C'mannur Cross Verappa Shivalingappa jamannasar Hindu Kurubas 2 4 6 0 0 12000
436 58 M33 36+186 LHS C'nannur Cross V'eerappa Shivappa Hadpad Hindu Lingayat 8 5 )3 0 0 13(100
437 59 M33 36+217 LHS C'mannur Cross Gurangouda kallaiigouda Sltivalli Hindu -ingayat 3 2 5 0 0 21))000
438 60 M33 3+050 ILHS Ron He is out of station (Locked) 0 0 0 0 0 ()
430 61 M33 43+090 LHS Ron Chaitdraiah Jedimath Hindu Kumbar 3 2 5 0 0 10800
440 62 M33 43+730 LHS Ron Basasaraj Veerappa Cholachagudda Hindu Lingayat 2 3 5 1) () 10800
441 63 M33 43+735 LHS Ron Appanna Gabarappa Kun Hindu Kumubas 2 2 4 0 0 9000
442 64 M33 43+740 LHS Ron Pakeerappa Yallappa Madival Hindu Madivala 7 9 16 0 0 21000
443 65 M33 43+722 LHS Ron Javed Ladasab Mulla Musins Psnjar 4 I 5 0 0 13000
444 66 M33 43+750 LHS Ron Vecrappa Pavdappa Hadpad Hindu Hadapad 4 2 6 0 0 11000
445 1i7 M33 43+810 LHS Ron Budensab betagen Muslim 2 2 4 0 0 15000
446 68 M33 43+807 LHS Rots Bavansab Budnesab Betagen Muslim I 0 I 0 0 18()00
447 60 M33 43+812 I HS Ron Bawasab Mobedahsab Dalwai Muslim 5 9 14 0 C) (90(o()
Page 11 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
Si. Rlgos Sca oo Total Land osaned Total AnnualNo Qnr No. Contract Cbainage Side Village Namic Religiousa Soiay meminrs Dr ablId n
No. Group Stratification persoiis (in acres) Incotiie~~~~~~~~~~~~~~~~~~~~~~~~~rup SiaifcaiinFaiy emes isbedpesns_______________________
Male Female Total
I_ 0 3 4 5 7 8 9 i0 II 12 13 14 1 5
448 70 M33 43+815 LHS Ron Kareeniasab Bausasab Dal.ai Muslim 3 3 6 0 0 17000
449 71 M33 43+820 LHS Roll Abduirelinian Bawasab Dalsai Muslinm 5 5 t0 0 0 18000
450 72 M33 43+740 LHS Ron Anab Davalsab Kaleghar Muslim ( 0 0 0 ( 26000
451 73 M33 43+830 LHS Ron Arundattibai Pundaliksa Miskin Christian 6 4 10 (I 0 23800
452 74 M33 43+828 LHS Roln Hanumantha Ramachandra Rangrez Hindu Kshatriya 2 3 5 () 0 36000
453 75 M33 43+130 LHS Roti Shashikanth Shnpadrao Kulkarni Hindu Brahmin 0 0 0 0 76000
454 76 M33 43+135 LHS Roni Gumraj Kalashrao Kulkanii Hindu Brahmin 0 0 0 0 0 36000
455 77 M33 43+140 LHS Roni Gurupadrao Kulkami Hindu Others 0 0 0 0 0 12000
456 78 M33 43+144 LHS Ron Beven Narayan Rao Kulkanmi Hindu Brahmin 0 0 0 0 0 36000
457 79 M33 44+147 LHS Ron Deemash Venkatarao Kulkarni Hindu Brahmin 0 0 0 0 0 38000
458 80 M33 44+148 LHS Ron Venkatesh Manna Gudisagar Hindu Vysya 0 0 0 0 0 12000
459 81 M33 44+160 LHS Ron Saleem Dadannavar Muslim Others 0 0 0 0 0 0
460 82 M33 4 4
+165 LHS Ron Vijay Mahadevappa Kadagol Hindu Lingayat 0 0 () 0 0 24600
461 83 M33 44+170 LHS Ron Vishnu Veerabhadrappa Pathar Hindu Panchal 0 0 0 0 0 40000
462 84 M33 44+035 LHS Ron Mahadevappa M Navalgund Hindu Ganiiga 7 12 19 0 0 69200
463 85 M33 44+040 LHS Roii Dr Lakshman Sa Bakkale Hindu Pattegar 8 13 21 0 0 216000
464 86 M33 44+045 LHS Ron Sakrappa Kallappa Sunkad Hindu Ganiga 5 6 11 0 () 49000
465 87 M33 44+050 LHS Ron Ramanna Rudrappa basanthgoudar Hindu Ganiga 4 4 8 0 0 64000
466 88 M33 44+054 LHS Ron Hanumanth Gouda V. Basanagouda Hindu Lingayat 1 2 3 0 0 12000
467 89 M33 44+057 LHS Ron Rudragouda Hindu Lingayat 2 2 4 0(0 12000
468 90 M33 44+t)60 LHS Ron Gatipal SonagiBhati Hindu Marsvadi 2 0 2 0 0 24000
469 91 M33 44+063 LHS Ron Chandrashekarapap K Sunkad Hindu Ganiga 4 4 8 ( 0 64000
470 92 M33 44+066 LHS Roni B V Redaar Hindu Reddar 3 I 4 0 0 48000
471 93 M33 44+068 LHS Ron Sangappa Marithimn appa Gigtur Hindu Lingayat 2 2 4 0 0 14000
472 94 M33 44-071 LHS Ron M B Angadi Hindu Liigayat 8 7 15 0 0 96000
473 95 M33 44-105 LHS Ron Basalingappagouda L Patil Hindu Reddy 2 2 4 0 0 5000(
474 96 M33 44+1111 LHS Ron Prabhu Bheemappa Gadagi Hindu Reddy 3 2 5 0 0 240()0
475 97 M33 44+115 LHS Ron B. B Navalgund Hindu Reddy 3 I 4 0 0 37000
476 1 M34 116 RHS Ron Manjunath Bandarimath Hindu Lingayat 2 I 3 0 0 14000
477 2 M34 116 RHIS Ron Eranna Hadapad Hindu SC 4 7 II 0 () 12000
478 3 M34 116 RHS Ron IbrahiniRajesab Nadimulla Muslim Sayed 2 7 9 1 0 14400
479 4 M34 115 RHS Ron Hussainsab Hiremani Muslim I 2 3 () 0 10000
480 5 M34 94 RHS Rajur Y'allavva Shankani Hindu Halmath 1 2 3 0 0 6000
481 6 M34 94 RHS Rajur Premnath Ramanna Sulensan Hindu Savagi I I 2 0 0 9000
482 7 M34 94 RHS Rajur seeraiah Shekaraiah Salinathi Hindu Jangans 1 3 4 0 0 7200
483 8 M34 94 RHS Rajur Hanumatith Madivader Hindu Agsar I 0 1 0 0 6000
484 9 M34 90 RHS Gajendragad BasaNraj Sangappa Hadpad Hindu Lingoyat 2 4 6 0 0 960(
485 10 M34 90 RHS Gajendragad Huchappa Angadi Hindu Shettar I 2 3 0 0 9000
486 Ii M34 90 RHS Gajendragad Mallikarjun Jagdish Adur Hindu Hadapad 2 2 4 0 0 12000
487 12 M34 84 RHS Gojeni Shankraiah Andanaiah Methimath indu Linga,at 4 2 6 0 0 18000
488 13 N134 67 RMS IKushtagi Haonumanth Shekappa Hanjan Hiiidu Kurubas I 2 3 0 n 7800
489 14 M34 167 RHS KusIitagi Hanumanth Hanumanithappa Kondakgeri Hiiidu SC 4 3 7 n1 0 12000
Page 12 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADS
ANNEXURE-2 Household Particulars
SI. Religious Social emhcr 0 bId Total [and owned Total Animal~~~~~~~~~~Noof otl Lnd ,ne TtalAniua
No. Qir. No. Contract Chaitage Side Village Name Religious Social Family members DisabledNo. Group Stratificatioo pesn in acres) Income
Male Female Total
I I 3 4 5 6 7 8 9 10 I I 12 13 14 15
490 15 M34 RHS Kushtagi ,.- n .'iadivala Hindu Madivala 3 1 4 0 0 9000
491 16 M34 100 RPHS Sudi Salim Ismailsab hurakadli Muslim 2 3 5 0 ti 9600()
492 17 M34 94 LHS Rajur Premasvva Shirappa Gonal Hindu Lingaoyat I I 2 () 0 6000
493 18 M34 94 LHS Rajur Sharanappa Sanganagowda Patti Hindu Lingayat 3 2 5 0 0 12200
494 19 M34 90 LHS Gajendragad Vacant Shop ()0 0 0 0 0 1)
495 20 M34 67 LHS Kushtagi Vacant Shop 0 0 0 0 0° 0
496 21 M34 67 LHS Kushtagi Vacant Shop () 0 0 0 O 0
497 22 M34 67 LHS Kushtagi Sharanaiah Veeerabhadraiah Balwadaniath Hindu Lingayat 2 2 4 0 (i 9600
498 23 M34 67 LHS Kushtagi Channappa Shamappa Kanchi Hindu Lingayat 3 2 5 1 0 13000
499 I U-9 17+120 LHS Beed Kareenasab A Badikar Mushilm 1 5 6 0 0 20000
500 2 U-9 17+120 LHS Beed Mugtubsab Batihongal Muslinm I 2 3 0 (I 12000
501 I 1U-10 0+015 LHS Belgaum Kenchappa Basappa Angadi Hindu Lingayat 2 I 3 0 0 18000
502 2 U-10 0+025 LHS Belgaum Channa Mallial Basaiah Hugari Hindu Lingayat 3 5 8 0 0 14400
503 3U- 1I0 5+510 LHS Belgaum Megundi Hindu 0 0 0 0 () 18000
504 4 U-10 19+550 LHS Gadag Murugaiah Mata Pathy Hindu 0 0 0 0 o 18000
505 5 U-10 20+213 LHS Gadag Gunlingiah Basaiah Chilkintath Hindu Lingayat I 1 2 0 0 7625
506 6 IU-10 20+235 LHS Gadag Subash Gowda Patial Hindu Lingayat 4 2 6 0 0 60000
507 7 U-1l) 20+280 LHS Gadag A.M.Kabse Hindu Madivala 4 0 4 0 0 18000
508 8 U-10 20+460 LHS Gadag Mehabubali Fukmddin Aktar Muslim Shaikh 1 3 4 0 0 24000
509 9 U-10 20+565 IHS Gadag Ramesh Barkar Hindu ST 1 1 2 0 0 24000
510 10 1U-10 5+35(1 LHS Belgauni Siddappa Kareppa Poolar Hindu Others 4 2 6 0 0 15200
511 I I1 -10 5+330 LHS Belgaum Yallappa Gowda Kuratti Hindu 18000
512 12 2U-10 19+710 RHS Gadag MylarappaYallappaChinmore Hindu Kurubas 2 1 3 0 0 10000
513 13 U-10 19+770 RHS Gadag Preitta Laxman Dodmani Hindu SC 3 2 5 0 0 84000
514 14 U-10 20+190 RHS Gadag Muktim Sab Naganur Muslim 1 1 2 0 0 5400
515 15 U-10 20+485 RHIS Gadag Vacant 18000
516 16 U-10 20+55(0 RHS Gadag Allbakshi Rajesab Agsar Muslim 2 2 4 0 0 18000
517 17 U-10 20+552 RHS Gadag Vacant 0
518 18 U-10 20+555 RHS Gadag Vacant _ 0
519 19 U-10 20+557 RHS Gadag Yellappa Sunagar Hindu Others 1 4 5 0 0 18000
520 20 U-10 20+580 RHS Gadag TI ppaittia Baramappa Choudi Hindu Others 3 2 5 0 0 18000
521 21 U-10 20+582 RHIS Gadag YallasN-a Bagur Iiindu Others 3 2 5 0 0 15200
522 22 U-10 20+580 RHS Gadag Masijula Londry Hindu 18000
523 23 U-110 20*590 RHS Gadag Yallappa V.Sunagar Hindu Ambigar 1 4 5 0 0 18000
524 24 U-10 20+595 ItiS Gadag Mahalingappa Munugappa Madepad Hindu Hadpad 2 2 4 0 0 54000
525 25 U-10 20+600 RHS Gadag Vittal H Mane Hindu Maratha 4 2 6 0 0 36000
526 26 U-It) 20i-604 RHS Gadag Hampanna Hugar Hindu Lingayat 3 1 4 0 0 18000
527 27 11-10 2()+609 RHS Gadag Vacant 0
528 28 11-I0 20+611 RHS Gadag Vacanit _ _ 0
529 29 U-10 2()+613 RHS (iadag Duragappa P.Honakeri Hindu SC 1 1 2 0 0 18000
530 30 U-10 2ti+616 P3HS Gadag Moula Sab Sindhgi Muslim Shake 2 3 5 0 0 14400
531 31 U-10 2tt+620 RHS Gadag Raiigappa Kadioal Hindu Kurubas 4 2 6 0 0 14400
Page 13 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE-2 Household Particulars
SI. Religions ~~~~~~~~~~~ ~ ~~~~~~~~~~~~~~~~~~~~~~~Social No.of Total Land owned Total AnnualSi. Qnr No Conltract Chainage Side Village Nac Roup Strfcati Family mentbers Disabled
Na. Gop Srtfcto pros (in acres) Inconie
_______Male iFemale Total
I 0 3 4 5 6 7 8 9 to I I 2 13 14 1 5
532 32 U-10 20-625 RHS Gadag Manjunath Pattanagi Hiadu SC 4 3 7 0 0 18000
533 33 U-10 20+628 RHS Gadag Ramzan Sab Y aligar Muslim 2 3 5 0 0 18000
534 34 L,-10 20+631 RHS Gadag M S.Alur Hindu 18000
535 35 U-10 20+635 RHS Belgaum Parasuram Sangahi Hindu 18000
536 36 U-10 20+639 RH S Gadag Suresh Veerappa Pateed Hindu Lingayat 5 3 8 0 0 25000
537 3 7U-10 20+641 RHS Gadag Shivayya, Irayya. ganachari Hindu Jangam 4 3 7 0 0 18000
538 38 U-10 20+645 RHS Gadag Ranizan Sab Yaligar Muslim 2 3 5 0 0 18000
539 39 U-10 20+648 RHS Gadag Mahanthavva, Gurupadshetty. Angadi Hindu Lingayat 2 2 4 0 0 18000
540 40 U-10 20+652 RRHS Gadag Govindappa Veerappa Doddamani Hindu SC 2 3 5 0 0 10800
5411 41 IU-10 20+656 RHS Gadag Renunaka Kaladagi Hindu ST 1 1 2 0 0 18000
Page 14 of 14
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE- 3 STRUCTURE DETAILS
ANNEXURE - 3: STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
1 M3 51+840 na na na na 5 5 Pan/cigeratte 12002 M3 51+905 na na na na 40 40 Footwear Shop 10003 _ M3 52+345 40 30 Yes No na na na na5 M3 52+590 na na na na na 8 Mutton Shop 15006 M3 52+590 na na na na na na na na7 _ M3 51+945 na na na na na I month Pan/cigeratte 10008 M3 52+330 80 45 Yes No na na na na9 M3 52+335 55 55 Yes Yes na na na na10 M3 52+342 50 50 Yes No na na na na11 M3 52+347 80 80 Yes Yes na na na na12 M3 52+355 na na na na na na na na13 _ M3 52+370 na na na na 8 2 General Merchant 250014 M3 52+370 na na na na 10 10 Tyre Repair 240015 M3 52+470 na na na na 35 35 Pan/cigeratte 175016 M3 52+470 na na na na na na na na17 M3 52+530 na na na na 30 30 Hotel 200018 = M3 52+548 10 10 Yes Yes 6 6 Chicken Stall 210019 _ M3 52+560 na na na na na 6 Mutton Shop 200020 M3 52+565 40 20 Yes Yes 20 20 General Merchant 205021 M3 52+565 na na na na na na na na22 M3 52+590 60 60 Yes Yes na na na na23 M3 52+595 55 50 Yes Yes na na na na24 M3 52+640 na na na na na na na na25 M3 52+700 na na na na 30 20 Electrical goods 100026 M3 52+703 na na na na na na na na27 M3 52+710 na na na na na na na na28 = M3 52+715 60 60 Yes Yes na na na na29 M3 52+725 na na na na 30 20 Tailoring 150030 M3 52+720 na na na na na na na na31 M3 52+730 na na na na na na na na32 M3 52+735 na na na na na na na na
PIU/KSHIP Page 1 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Tumover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
Sl.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)I1 2 3 4 5 6 7 8 9 10 11 12
33 M3 52+740 na na na na na na na na34 M3 52+890 na na na na na 9 Tea stall 300035 M3 52+895 na na na na na na na na36 M3 52+900 na na na na na na na na37 M3 52+905 na na na na 6 6 Electronic Goods 450038 M3 52+920 60 60 Yes Yes na na na na39 M3 52+925 na na na na 3 3 Zerox 90040 M3 52+930 na na na na na na na na41 M3 52+935 na na na na na na na na42 = M3 53+210 na na na na 20 20 Chappal repair 120043 M3 53+270 na na na na na na na na44 M3 53+275 na na na na 10 10 Zerox 200045 M3 53+279 na na na na na na na na46 = M3 53+545 na na na na 5 3 Pan/cigeratte 120047 M3 53.585 na na na na 30 30 Pan/cigeratte 120048 M3 53+590 na na na na na na na na49 = M3 53+595 na na na na na 2 Pan/cigeratte 500050 M3 53+908 na na na na 10 4 STD Booth 150051 _ M3 53+600 na na na na 10 10 Barber Shop 120052 M3 53+602 na na na na 13 13 Pan/cigeratte 100053 189 M4 8+735 na na na na 2 1/2 2 1/2 Tyre repairing 210054 190 M4 8+736 na na na na 10 8 Audio Cassette 150055 191 M4 8+743 na na na na 5 5 Audio Cassette 120056 1 M-6 47+940 na na na na na na na na57 2 M-6 47+950 na na na na na na na na58 3 M-6 47+964 na na na na na na na na59 4 M-6 47+957 na na na na na na na na60 5 M-6 47+969 na na na na na na na na61 6 M-6 47+976 na na na na na na na na62 7 M-6 47+980 na na na na na na na na63 8 M-6 47+985 na na na na na na na na64 9 M-6 147+990 na na na na na na na na
PIU/KSHIP Page 2 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE - 3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)I1 2 3 4 5 6 7 8 9 10 11 12
65 10 M-6 47+989 na na na na na na na na66 11 M-6 48+003 na na na na na na na na67 12 M-6 47+999 na na na na na na na na68 13 M-6 47+994 na na na na na na na na69 14 M-6 48+010 na na na na na na na na70 15 M-6 48+017 na na na na na na na na71 16 M-6 48+023 na na na na na na na na72 17 M-6 48+027 na na na na na na na na73 18 M-6 48+030 na na na na na na na na74 19 M-6 48+033 na na na na na na na na75 20 M-6 48+038 na na na na na na na na76 21 M-6 48+043 na na na na na na na na77 22 M-6 48+049 na na na na na na na na78 23 M-6 48+055 na na na na na na na na79 24 M-6 48+060 na na na na na na na na80 25 M-6 48+065 na na na na na na na na81 26 M-6 48+070 na na na na na na na na82 27 M-6 48+075 na na na na na na na na83 28 M-6 48+080 na na na na na na na na84 29 M-6 48+085 na na na na na na na na85 30 M-6 48+090 na na na na na na na na86 31 M-6 48+097 na na na na na na na na87 32 M-6 48+106 na na na na na na na na88 33 M-6 48+131 na na na na na na na na89 34 M-6 48+166 na na na na na na na na90 35 M-6 48+171 na na na na na na na na91 36 M-6 48+176 na na na na na na na na92 37 M-6 48+183 na na na na na na na na93 38 M-6 48+190 na na na na na na na na94 39 M-6 48+195 na na na na na na na na95 40 M-6 48+210 na na na na na na na na96 41 M-6 48+235 na na na na na na na na
PIU/KSHIP Page 3 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
97 42 M-6 48+400 na na na na na na na na98 43 M-6 48+350 na na na na na na na na99 44 M-6 48+400 na na na na na na na na100 45 M-6 47+750 na na na na na na na na101 46 M-6 47+760 na na na na na na na na102 47 M-6 47+770 na na na na na na na na103 48 M-6 47+778 na na na na na na na na104 49 M-6 47+782 na na na na na na na na105 50 M-6 47+785 na na na na na na na na106 51 M-6 47+789 na na na na na na na na107 52 M-6 47+795 na na na na na na na na108 53 M-6 47+800 na na na na na na na na109 54 M-6 47+817 na na na na na na na na110 55 M-6 47+822 na na na na na na na na111 56IM-6 47+827 na na na na na na na na112 57 M-6 47+835 na na na na na na na na113 58IM-6 47+838 na na na na na na na na114 59 M-6 47+843 na na na na na na na na115 60IM-6 47+847 na na na na na na na na116 61 M-6 47+853 na na na na na na na na117 62 M-6 47+852 na na na na na na na na118 63 M-6 47+860 na na na na na na na na119 64 M-6 47±864 na na na na na na na na120 65 M-6 47+869 na na na na na na na na121 66 M-6 47+872 na na na na na na na na122 67 M-6 47+877 na na na na na na na na123 68 M-6 47+884 na na na na na na na na124 69 M-6 47+904 na na na na na na na na125 70 M-6 47+914 na na na na na na na na126 71 M-6 47+919 na na na na na na na na127 72 M-6 47+923 na na na na na na na na128 73 M-6 47+926 na na na na na na na na
PIU/KSHIP Page 4 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
129 74 M-6 47+930 na na na na na na na na130 75 M-6 47+930 na na na na na na na na131 76 M-6 48+000 na na na na na na na na132 77 M-6 48+025 na na na na na na na na133 78 M-6 48+105 na na na na na na na na134 79 M-6 48+130 na na na na na na na na135 80 M-6 48+155 na na na na na na na na136 81 M-6 48+200 na na na na na na na na137 82 M-6 48+210 na na na na na na na na138 83 M-6 48+240 na na na na na na na na139 84 M-6 48+250 na na na na na na na na140 85 M-6 48+260 na na na na na na na na141 86 M-6 28+270 na na na na na na na na142 87 M-6 48+300 na na na na na na na na143 81 M25 18+190 na na na na na na na na144 82 M25 18+195 na na na na na na na na145 83 M25 18+197 na na na na na na na na146 84 M25 18+350 na na na na na na na na147 85 M25 48+100 na na na na na na na na148 86 M25 48+125 na na na na na na na na149 87 M25 48+220 na na na na na na na na150 88 M25 48+300 na na na na na na na na151 89 M25 48+340 na na na na na na na na152 90 M25 48+325 na na na na na na na na153 91 M25 48+405 na na na na na na na na154 92 M25 48+445 na na na na na na na na155 93 M25 49+420 na na na na na na na na156 94 M25 49+442 na na na na na na na na157 95 M25 49+442 na na na na na na na na158 96 M25 49+467 na na na na na na na na159 97 M25 49+492 na na na na na na na na160 98 M25 49+530 na na na na na na na na
PIU/KSHIP Page 5 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Str-ucture - Residential S Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
161 99 M25 50+180 na na na na na na na na162 100 M25 50+234 na na na na na na na na163 101 M25 50+255 na na na na na na na na164 102 M25 50+265 na na na na na na na na165 103 M25 50+283 na na na na na na na na166 104 M25 50+296 na na na na na na na na167 105 M25 50+306 na na na na na na na na168 106 M25 50+304 na na na na na na na na169 107 M25 50+310 na na na na na na na na170 108 M25 18+110 na na na na na na na na171 109 M25 na na na na na na na na172 110 M25 49+467 na na na na na na na na173 111 M25 18+200 na na na na na na na na174 M25 0+015 na na na na na na na na175 . M25 0+108 na na na na 15 10 Watch repair 40176 M25 0+112 na na na na na na na na177 IM25 0+115 na na na na 20 15 Tailoring 650178 IM25 0+117 na na na na 23 20 Bangle Store 700179 M25 0+121 na na na na 10 10 Pan/cigeratte 900180 M25 0+122 na na na na na na na na181 . M25 0+126 na na na na 30 30 Cobbler Shop 1000182 M25 0+128 na na na na na na na na183 M25 0+132 na na na na na na na na184 = M25 0+134 na na na na 45 30 Cobbler Shop -185 M25 0+136 na na na na 5 5 Tailoring 2000186 M25 0+138 na na na na na na na na187 \M25 0+141 na na na na 15 10 Tailoring 950188 \M25 0+142 na na na na 30 25 Plastic Shop .189 \M25 0+145 na na na na 25 25 Metal Shop .190 4M25 0+148 na na na na 10 10 Cloth shop 1500191 = M25 0+151 na na na na 30 6 STD Booth _
192 \M25 0+153 na na na na na na na na
PIU/KSHIP Page 6 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 I1 12
193 IM25 0+155 na na na na 8 8 Pan/cigeratte 1000194 IM25 0+157 na na na na 20 6 Pan/cigeratte 2000195 _ M25 0+160 na na na na 19 18 Chappal repair 1200196 _ M25 0+163 na na na na 18 1 Stationery 3000197 M25 0+166 na na na na na na na na198 IM25 0+171 na na na na 18 16 Hotel 700199 IM25 0+175 na na na na 12 10 Cobbler Shop -200 M25 0+210 na na na na na na na na201 _ M25 0+212 na na na na 25 18 Pan/cigeratte 1500202 M25 0+214 na na na na 10 10 Jewellary Shop 2000203 M25 0+216 na na na na 15 15 Bangle Store 2000204 M25 0+218 na na na na na na na na205 M25 0+220 na na na na na na na na206 M25 0+222 na na na na na na na na207 _ M25 43+058 na na na na na na na na208 M25 38+147 na na na na 8 8 Pan/cigeratte 1500209 = M25 38+140 na na na na 24 20 Pan/cigeratte 2000210 M25 38+135 na na na na 30 25 Bicycle repair 900211 M25 38+020 na na na na na na na na212 M25 - na na na na na na na na213 M25 36+485 na na na na na na na na214 M25 36+430 na na na na na na na na215 M25 36+425 na na na na na na na na216 = M25 48+302 na na na na 17 17 Pan/cigeratte 1200217 M25 48+305 na na na na na na na na218 M25 48+308 na na na na 20 4 Canteen na219 _ M25 18+157 na na na na 6 6 Tea Stall 500220 M25 184178 na na na na na na na na221 M25 18+198 na na na na na na na na222 M25 18+206 na na na na na na na na223 M25 18+208 na na na na na na na na224 M25 18+212 na na na na na na na na
PIU/KSHIP Page 7 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
Sl.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
225 _ M25 18+219 na na na na na na na na226 M25 18+222 na na na na na na na na227 M25 18+225 na na na na na na na na228 = M25 18+227 na na na na na na na na229 M25 18+227 na na na na na na na na230 I M25 18+231 80 16 Yes No 80 16 Grocery 1000231 IM25 18+232 30 2 months Yes No na na na na232 IM25 18+232 na na na na na na na na233 IM25 18+237 21 15 Yes No na na na na234 IM25 18+242 na na na na na na na na235 IM25 18+245 na na na na 70 70 Barber Shop 350236 _ M25 18+248 na na na na na na na na237 051 M26 0+040 na na na na na na na na238 052 M26 0+049 na na na na na na na na239 053 M26 0+165 na na na na na na na na240 054 M26 0+270 na na na na na na na na241 055 M26 0+297 na na na na na na na na242 056 M26 0+754 na na na na na na na na243 057 M26 0+765 na na na na na na na na244 058 M26 0+780 na na na na na na na na245 059 M26 0+840 na na na na na na na na246 060 M26 1+500 na na na na na na na na247 061 M26 13+080 na na na na 40 40 Pan/cigeratte 600248 062 M26 18+060 na na na na na na na na249 063 M26 18+080 na na na na na na na na250 064 M26 18+183 na na na na na na na na251 065 M26 18+224 na na na na na na na na252 066 M26 18+230 na na na na na na na na253 067 M26 18+455 na na na na na na na na254 068 M26 36+900 na na a na na na na na255 069 M26 37+090 na na na na na na na na256 070 M26 0+050 na na na na na na na na
PIU/KSHIP Page 8 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
Sl.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
257 071 M26 0+054 na na na na na na na na258 072 M26 0+057 na na na na na na na na259 073 M26 0+061 na na na na na na na na260 074 M26 0+054 na na na na na na na na261 075 M26 0+305 na na na na 2 1 Pan/cigeratte na262 076 M26 0+330 na na na na na na na na263 077 M26 0+365 na na na na na na na na264 078 M26 0+830 25 25 Yes Yes na na na na265 079 M26 1+711 na na na na na na na na266 080 M26 1+777 na na na na 52 8 Pan/cigeratte 1200267 208 M30 2+550 10 10 Yes No na na na na268 209 M30 2+570 25 25 No No na na na na269 210 M30 2+580 20 20 na na na na na na270 211 M30 2+600 20 20 na na na na na na271 212 M30 2+660 18 18 No No na na na na272 213 M30 2+670 16 16 No No na na na na273 214 M30 3+120 16 16 na na na na na na274 215 M30 3+100 16 16 na na na na na na275 216 M30 2+550 6 6 na na na na na na276 M30 1+600 10 10 na na na na na na277 _ M30 1+610 18 3 na na na na na na278 _ M30 1+620 16 6 Yes No na na na na279 M30 1+625 15 15 na na na na na na280 _ M30 1+640 12 12 na na na na na na281 _ M30 1+650 8 8 Yes No na na na na282 M30 1+670 20 20 na na na na na na283 M30 1+680 15 15 na na na na na na284 IM30 2+000 11 11 na na na na na na285 I M30 2+030 8 8 na na na na na na286 M30 2+045 5 5 na na na na na na287 M30 2+055 10 10 No No na na na na288 M30 2+800 10 10 na na na na na na
PIU/KSHIP Page 9 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE - 3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
289 _ M30 2+700 15 15 No No na na na na290 M30 2+740 20 20 na na na na na na291 M30 3+100 10 10 na na na na na na292 _ M30 3+180 20 20 na na na na na na293 M30 3+195 20 20 na na na na na na294 M30 3+200 10 10 na na na na na na295 _ M30 4+410 10 10 na na na na na na296 _ M30 4+100 10 10 na na na na na na297 IM30 12+000 12 12 na na na na na na298 _ M30 21+000 10 10 na na na na na na299 217 M31 0+140 40 40 Yes No na na na na300 218 M31 0+160 50 50 Yes No na na na na301 219 M31 0+190 45 45 Yes No na na na na302 220 M31 0+190&0+220 35 35 Yes No na na na na303 221 M31 0+230 35 35 Yes No na na na na304 222 M31 0+235 40 40 Yes No na na na na305 223 M31 0+235 40 40 Yes No na na na na306 224 M31 0+240 45 45 Yes No na na na na307 225 M31 0+260 40 40 Yes No na na na na308 226 M31 0+270 40 40 Yes No na na na na309 227 M31 0+270 45 45 Yes No na na na na310 228 M31 0+275 35 35 Yes No na na na na311 229 M31 0+275 30 30 Yes No na na na na312 230 M31 0+280 na na na na na na na na313 231 M31 0+285 45 45 Yes No na na na na314 232 M31 0+290 48 48 Yes No na na na na315 233 M31 0+295 40 40 Yes No na na na na316 234 M31 0+280 40 40 Yes No na na na na317 235 M31 0+275 40 40 Yes No na na na na318 112 M24 50+520 na na na na na na na na319 113 M24 50+200 na na na na na na na na320 114 M24 50+230 na na na na 5 5 Musician shop na
PIU/KSHIP Page 10 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)I1 2 3 4 5 6 7 8 9 10 11 12
321 115 M24 na na na na na na na na322 116 M24 50+070 na na na na na na na na323 117 M24 44+400 na na na na na na na na324 118 M24 44+403 na na na na na na na na325 119 M24 na na na na 1 1 Pan/cigeratte 450326 120 M24 50+074 na na na na na na na na327 121 M24 54+100 na na na na na na na na328 122 M27 119+150 na na na na na na na na329 123 M27 116+405 na na na na na na na na330 124 M27 116+390 na na na na na na na na331 124alM27 116+490 na na na na na na na na332 124b M27 116+500 na na na na na na na na333 124c M27 116+390 na na na na na na na na334 236 M-28 55+700 na na na na na na na na335 M29 0+030 na na na na 2 2 Bicycle repair 666336 _ M29 0+035 Not necessary337 _ M29 0+040 na na na na 3 3 Footwear Shop 900338 IM29 16+580 na na na na 5 5 Hotel 2100339 = M29 16+584 na na na na 7 7 Barber Shop 1500340 _ M29 16+647 na na na na 8 8 Pan/cigeratte 1500341 M29 16+650 na na na na na 1 Electrical Goods 10000342 M29 16+655 Not necessary343 M29 16+660 Not necessary344 = M29 16+666 na na na na 15 15 General Merchant 1800345 M29 16+666 Not necessary346 M29 16+669 na na na na 18 18 Barber Shop 1200347 M29 16+674 na na na na 4 4 Tea Stall 1800348 M29 16+675 na na na na 12 12 Footwear Shop 2000349 M29 16+676 Not necessary350 M29 16+676 Not necessary351 = M29 16+680 na na na na 10 10 Tea Stall 1500352 M29 16+700 na na na na 1 1 Pan/cigeratte 1800
PIU/KSHIP Page 11 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE - 3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
353 _ M29 16+655 na na na na 20 4 Flower Shop 1200354 _ M29 16+670 na na na na 18 18 Flower Shop 18000355 _ M29 16+684 na na na na 12 12 Cobbler Shop 27360356 -IM29 16+690 na na na na 26 26 Flower Shop 1500357 _ M29 16+780 na na na na 4 4 Pan/cigeratte 1500358 _ M29 16+786 na na na na 4 4 Barber Shop 500359 M29 0+050 na na na na 3 3 Footwear Shop 900360 _ M29 0+045 na na na na 5 5 Bicycle Repair 1500361 _ M29 0+038 na na na na 3 3 Electronic materials repairs 6000362 = M29 0+50 na na na na 10 10 Bicycle Repair 1500363 IM29 0+065 na na na na 14 14 Sugarcane milk 900364 IM29 0+70 na na na na 14 14 Watch Repair 1500365 IM29 0+76 na na na na 1 1 Chicken Stall 1800366 _ M29 0+083 na na na na 5 5 Fruit Stall 1500367 _ M29 0+085 na na na na 8 8 Chappal Repair 1250368 IM29 0+089 na na na na 25 25 Fruit Stall 1200369 = M29 0+092 na na na na 30 30 Fruit Stall 1200370 _ M29 0+094 na na na na 50 50 Hotel 1200371 _ M29 0+096 na na na na 20 20 Fruit Stall 900372 M29 0+112 na na na na 5 5 Sugarcane milk 1200373 M29 16+595 na na na na 10 10 Pan/cigeratte 1200374 M29 16+610 na na na na na 4 Carpentre 400375 M29 16+620 na na na na 2 2 Cold Drinks 10000376 M29 16+652 na na na na 5 5 Footwear Shop 1500377 _ M29 16+653 na na na na 20 20 Chappal Repair 300378 M29 16+652 na na na na 35 35 Pan/cigeratte 1200379 M33 31+595 na na na na 1 1 Pan/cigeratte 750380 M33 31+600 na na na na na 15 Tea Stall 4000381 . M33 31+180 na na na na 4 4 Hotel 900382 M33 35+415 na na na na 15 15 STD Booth 700383 1 M33 36+194 na na na na 2 Arrack Shop 1000384 2 M33 36+203 na na na na na na na na
PIU/KSHIP Page 12 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE - 3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
385 3 M33 36+216 na na na na 10 3 months Hotel 1500386 4 M33 36+215 na na na na na na387 5 M33 36+220 na na na na 2 2 Tea Stall 800388 6 M33 36+235 na na na na 8 8 Tea Stall 850389 7 M33 43+050 na na na na I I Tea Stall 900390 8 M33 43+053 na na na na 3 3 Barber Shop 350391 9 M33 43+055 na na na na 5 5 Job Typing 800392 10 M33 43+057 na na na na Closed since 4 years na na393 11 M33 43+059 na na na na Closed since 6 years na na394 12 M33 43+064 na na na na 7 7 Tea Stall 700395 13 M33 43+066 na na na na 5 5 Job Typing na396 14 M33 43+068 na na na na na na na na397 15 M33 43+070 na na na na na na na na398 16 M33 43+075 na na na na na na na na399 17 M33 43+077 na na na na 20 20 Fruit Stall 500400 18 M33 43+081 na na na na na na na na401 19 M33 44+140 na na na na na na na na402 20 M33 44*144 na na na na na na na na403 21 M33 44+150 na na na na na na na na404 22 M33 44+156 na na na na na na na na405 23 M33 44+160 na na na na 56 56 Barber Shop 650406 24 M33 44+166 na na na na na na na na407 25 M33 44+168 na na na na na na na na408 26 M33 44+171 na na na na na na na na409 27 M33 44+173 na na na na 15 15 Tailoring na410 28 M33 444175 na na na na 3 months 3 months Tea Stall 900411 29 M33 44+179 na na na na 8 8 Fruit Stall 1050412 30 M33 44+181 na na na na 25 25 Fruit Stall 1200413 31 M33 44+183 na na na na na na na na414 32 M33 44+250 na na na na 7 7 Laundry 800415 33 M33 44+252 na na na na 4 4 Flower Shop 800416 34 M33 44+254 na na na na na na na na
PIU/KSHIP Page 13 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
Sl.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
417 35 M33 44+256 na na na na 20 20 Cobbler Shop 600418 36 M33 44+030 na na na na 5 Stationery Shop 20000419 37 M33 44+033 na na na na 20 20 Hotel 1200420 38 M33 44+038 na na na na na na na na421 39 M33 44+040 na na na na na na na na422 40 M33 44+044 na na na na na na na na423 41 M33 44+049 na na na na na na na na424 42 M33 44+051 na na na na 1 1 Pan/cigeratte 12000425 43 M33 44+059 na na na na 50 4 Hotel 3000426 44 M33 44+061 na na na na na na na na427 45 M33 44+066 na na na na 11 Cloth shop 50000428 46 M33 44+070 na na na na 80 50 Kirani Shop 3000429 47 M33 44+074 na na na na 80 50 Kirani Shop 3000430 48 M33 44+077 na na na na na na na na431 49 M33 44+078 na na na na na na na na432 50 M33 0+390 na na na na na na na na433 51 M33 1+700 na na na na 4 4 Tea Stall 1050434 52 M33 3+705 na na na na 4 4 Arrack Shop 800435 53 M33 3+180 na na na na na na na na436 54IM33 3+186 na na na na 4 4 Barber Shop 1000437 55 M33 6+217 5 5 Yes Yes 5 5 Hotel 1700438 56 M33 3+050 na na na na na na na na439 57 M33 3+058 na na na na 1 1 Pan/cigeratte 450440 58 M33 3+710 na na na na na na na na441 59 M33 3+712 na na na na 2 days Pan/cigeratte 1000442 60 M33 43+720 na na na na na na na na443 61 M33 43+722 na na na na 10 10 Bicycle Repair 650444 62 M33 43+724 na na na na 6 6 Barber Shop 550445 63 M33 43+726 na na na na na na na na446 64 M33 43+728 na na na na 50 8 Fruit Stall 1500447 65 M33 43+732 80 80 Yes No na na na na448 66 M33 43+735 100 80 No No na na na na
PIU/KSHIP Page 14 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
449 67 M33 43+738 80 80 Yes Yes na na na na450 68 M33 43+740 na na na na na na na na451 69 M33 43+742 na na na na na na na na452 70 M33 43+745 10 10 Yes Yes 10 10 Hotel 3000453 71 M33 43+130 na na na na na na na na454 72 M33 43+135 na na na na na na na na455 73 M33 43+140 na na na na 6 6 Hotel 1000456 74 M33 43+144 na na na na 6 6 General Merchant 1000457 75 M33 44+147 na na na na 6 6 Electrical Goods 3000458 76 M33 44+148 na na na na 3 3 Pan/cigeratte 900459 77 M33 44+160 na na na na na na na na460 78 M33 44+165 na na na na na na na na461 79 M33 44+170 na na na na _ 12 Zerox 1200462 80 M33 44+035 na na na na na na na na463 81 M33 44+040 na na na na 4 4 Hospital 2500464 82 M33 44+045 na na na na na na na na465 83 M33 44+050 na na na na na na na na466 84 M33 44+054 na na na na na na na na467 85 M33 44+057 na na na na na na na na468 86 M33 44+060 na na na na na na na na469 87 M33 44+063 na na na na na na na na470 88 M33 44+066 na na na na 20 13 Contract office 2000471 89 M33 44+068 na na na na 2 2 months Carpentre 15000472 90 M33 44+071 na na na na na na na na473 91 M33 44+075 na na na na 5 3 Medical Stores 10000474 92 M33 44+078 na na na na 50 20 Oil Shop 2000475 93 M33 44+082 na na na na 5 4 Kirani Shop 1000476 1 M34 116 na na na na 5 5 Tailoring 550477 2M34 116 na na na na 15 15 Barber Shop 650478 3 M34 116 na na na na 3 3 Pan/cigeratte 600479 4 M34 115 na na na na na na na na480 5 M34 94 na na na na 5 5 Pan/cigeratte 500
PIU/KSHIP Page 15 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - ResidentiaI Structure Commerical
Length of Period of Tumover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
481 6 M34 94 na na na na 1 month 1 month Soda Shop 9000482 7IM34 94 na na na na 5 3 Pan/cigeratte 1500483 8 M34 94 na na na na 3 3 Laundry 500484 9IM34 90 na na na na na na na na485 10 M34 90 na na na na 3 3 Pan/cigeratte 300486 11 M34 90 na na na na 5 5 Barber shop 1000487 12 M34 84 na na na na 2 months 2 months STD Booth 500488 13 M34 67 na na na na 1 1 Tea Stall 600489 14IM34 67 na na na na 10 10 Cobbler Shop 80490 15 M34 na na na na 5 5 Tea Stall 750491 16 M34 100 na na na na na na na na492 17 M34 94 na na na na 3 3 Pan/cigeratte 500493 18 M34 94 na na na na 2 2 STD Booth 600494 19 M34 90 na na na na na na na na495 20 M34 67 na na na na na na na na496 21 M34 67 na na na na na na na na497 22 M34 67 na na na na 1 1 Pan/cigeratte 800498 23 M34 67 na na na na 1 1 Pan/cigeratte 650499 1 U-9 17+120 na na na na 10 10 Pan shop 300500 2U-9 17+120 na na na na 10 10 Fruit shop 400501 1 U-10 0+015 na na na na 2 2 Pan/cigeratte 40502 2 U-io 0+025 na na na na na na na na503 3 u-io 5+510 na na na na na na na na504 4 U-to 19+550 na na na na na na na na505 5 U-io 20+213 na na na na na na na na506 6 U-l0 20+235 na na na na na na na na507 7 U-lo 20+280 na na na na 3 3 Londry 1500508 8 U-10 20+460 na na na na 15 15 Tea stall 2000509 9 U-io 20+565 na na na na 2 2 Pan/Cigeratte 2000510 10 U-lo 5+350 na na na na 2 2 Pan/Cigeratte 7200511 11 U-io 5+330 na na na na na na na na512 12 U-10 19+710 na na na na na na na na
PIU/KSHIP Page 16 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -3 STRUCTURE DETAILS
Structure - Residential Structure Commerical
Length of Period of Turnover perQnr. Age of Str. (in stay Tap Age of Str. operating month (in
SI.No. No. Contract Chainage years) (in years) Electrified connection (in years) (in years) Type of business Rs.)1 2 3 4 5 6 7 8 9 10 11 12
513 13 u-Io 19+770 na na na na na na na na514 14 u-Io 20+190 na na na na 6 4 Pan/Cigeratte515 15 U-io 20+485 na na na na na na na na516 16 U-io 20+550 na na na na 9 9 Londry 1500517 17 u-Io 20+552 na na na na na na na na518 18 u-io 20+555 na na na na na na na na519 19 U-10 20+557 na na na na 8 8 General Merchant 1500520 20 U-IC 20+580 na na na na 5 5 Only Vegetable 1500521 21 u-Io 20+582 na na na na 2 2 Tea Stall 7200522 22 u-Io 20+586 na na na na na na na na523 23 U-IC 20+590 na na na na 8 8 General Merchant 18000524 24 U-IC 20+595 na na na na 14 14 Saloon shop 3000525 25 U-IC 20+600 na na na na 10 10 Fruits & vegetables. 3000526 26 U-iC 20+604 na na na na 15 15 Fruits & vegetables. 1500527 27 U-10 20+609 na na na na na na na na528 28 U-io 20+611 na na na na na na na na529 29 U-io 20+613 na na na na 15 15 Foot wear 18000530 30 U-iC 20+616 na na na na 8 8 Pan 1200531 31 U-IC 20+620 na na na na 10 10 Others 1200532 32 u-IC 20+625 na na na na 6 6 Cobler shop 1500533 33 U-io 20+628 na na na na 2 2 Bettalnut shop 1500534 34 u-io 20+631 na na na na na na na na535 35 U-IC 20-635 na na na na na na na na536 36 U-IC 20+639 na na na na 7 7 Others 1200537 37 u-io 20+641 na na na na 7 7 Only fruits 900538 38 U-IC 20+645 na na na na 2 2 Bettle nut shop 1500539 39 U-iC 20+648 na na na na 8 8 Fruits & Vegetables. 1500540 40 U-IC 20+652 na na na na 5 5 Only fruits 900541 41 u-Io 20-656 na na na Ina 1j0 10 Fruits & Vegetables. 1500
PIU/KSHIP Page 17 of 17
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -4 Distnbution of Conunusity Assets / Public Utilit-es
ANNEXURE - 4: DISTRIBUTION OF COMMUNITY ASSETS / PUBLIC UTILITIES
SI.N Type of Total Area AeSl Contract Chainage Side Village Type Typ of sqmr affectedo. ownership (in sqm) (in sgm)
_ 3 4 5 6 7 8 9 10
I M2 11+370 LHS Honawar Flag Post Community 2.25 2.25
2 M3 52+495 RHS Athani Public Urinary Government 0.15 0.15
3 M3 51+770 RHS Athani Trilokeshwar Temple Community 17.11 7.54
4 M3 52+650 LHS Athani Wall Community 3.18 3.18
5M3 52+830 RHS Athani Air Valve Government 0.09 0.81
6 M3 52+830 RHS Athani Others Government 236.90 40.53
7 M3 53+202 RHS Athani Telephone Junction Box Government 0.12 0.12
8 M3 53+530 RHS Athani Basaveshwara Circle Community 2.89 3.06
9 M3 53+540 LHS Athani Compound Wall Government 2.70 2.70
10 M3 53+345 RHS Athani Aralikatte Community 7.42 1.68
11 M3 53+365 RHS Athani Aralikatte 3.24 3.78
12 M3 53+380 LHS Athani Compound Wall Government 9.30 9.30
13 M3 91+680 LHS Athani Water Tap Panchayat 1.00 1.00
14 M3 91+850 LHS Athani Mosque(shed) Community 32.90 22.32
15 M3 91+955 LHS Athani Compound Wall Community 18.40 18.40
16 M6 47+750 LHS Nagamangal Toll Gate Panchayat 21.10 21.10
17 M6 47+900 LHS Nagamangal Compound Wall Government 432.35 37.80
18 M6 48+156 LHS Nagamangal Station) Panchayat 929.00 31.00
19 M6 48+161 LHS Nagamangal Compound Wall (Hospital) Panchayat 423.06 20.10
20 M6 48+149 LHS Nagamangal Commercial Complex Public Trust 340.01 73.71
21 M6 48+076 RHS Nagamangal Muslim Co-op Society Public Trust 371.51 13.00
22 M25 0+245 e Yellapur Others Community na na
23 M25 19+576 LHS Gorsegadde Aralikatte Panchayat 17.64 0.84
24 M25 105+700 LHS Uppleshwar Forest Checkpost Government 9.00 0.75
25 M25 38+000 LHS Bairumbi Valve Panchayat 0.09 0.09
26 M25 42+930 LHS Targod Temple Fence Community 28.00 28.00
27 M25 47+070 LHS Sirsi Circle Government 15.90 1.32
28 M25 48+250 LHS Sirsi Appu Circle Government 10.81 3.29
29 M25 17+825 RHS Manchikeri Barbed Fence Government 50.00 50.00
30 M25 49+997 LHS Sirsi Water Tap Government 0.60 0.60
31 M25 50+115 LHS Sirsi Water Valve Government 0.40 0.40
32 M25 50+ 156 LHS Sirsi Water Valve Government 0.80 0.80
33 M25 50+504 LHS Sirsi Compound wall Community 19.50 19.50
34 M26 0+20 LHS Sirsi Valve Government 0.04 0.04
35_M26 0+720 LHS Sirsi Water Tap Government 0.10 0.10
36 M26 1+710 RHS Sirsi Police Check Post Government 0.50 0.50
37 M26 13+337 LHS Kansur Water Tap Panchayat 1.00 0.40
38 M26 18+862 LHS Tagali Temple Steps ICommunity 67.20 5.04
KSHIP/SDRC 1 of 2
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -4 D,strib.tion of Comtssnity Assets / Pubi,c Utilities
SI.N Type of Total Area AraffceS. Contract Chainage Side Village Type ownership (in sqm) affeced
o.________________sqm) (in sqm)
1 3 4 5 6 7 8 9 10
39 M26 28+370 LHS Nidagod Water Tap Panchayat 1.00 0.20
40 M26 37+160 LHS Siddapur Bus Stop Government 1242.00 0.46
41 M26 36+525 LHS Siddapur Garden Circle Government 1.69 1.69
42 M26 37+630 LHS Siddapur Aralikatte Community 7.84 2.80
43 M26 40+875 LHS Padambailu Aralikatte Panchayat 26.88 5.12
44 M26 48+800 LHS Kilar Water Tap Panchayat 0.25 0.15
45 M24 41+500 LHS Madanhalli Pump House Panchayat 2.25 0.45
46 M24 47+700 LHS Havugi Pump House Panchayat 2.25 0.30
47 M24 1+200 LHS Alnawar Well Government 13.80 1.84
48 M24 56+200 RHIS Kesoroli Hand Pump Community 1.50 2.10
49 M24 50+850 LHS Haliyal Compound wall Community 180.00 18.00
50 M24 41+850 LHS Duski Bus Stand Government 13.50 0.80
51 M24 47+715 RHS Howgi Water Point Government 0.08 0.48
52 M24 2+100 LHS Alnawar Power Pump Government na na
53 M24 41+500 LHS Madanhalli Power Pump Government na 0.65
54 M27 104+700 RHS Ambray Temple Community 19.25 14.24
55 M27 107+400 LHS Gobsetta Water Tap Panchayat 0.25 0.25
56 M27 107+800 LHS Gobsetta Water Tap Panchayat 0.25 0.25
57 M27 116+600 RHS Asnoti Check Post Projection Government 6.00 0.45
58 M27 100+900 RHS Baire Water Tap Government 0.25 0.35
59 M27 100+950 RHS Baire Water Tap Government 0.25 0.20
60 M27 106+600 LHS Ambrai Water Tap Government 0.25 0.70
61 M27 109+900 LHS Baramwada Water Tap Government na na
62 M27 109+990 LHS Baramwada Bus Stand Government 12.00 2.10
63 M27 107+500 LHS Gobsetta Water Tap Government 0.25 0.50
64 M27 106+600 LHS Gobsetta Water Tap Government 0.25 0.20
65 M27 117+600 RHS Kilage Bus Stand Government 13.50 5.10
66 M28 25+500 LHS Ganeshgudi Temple RC and Fence Private Trust 20.00 20.00
67 M28 26+700 RHS Ilva Water tap Panchayat 0.40 0.40
68 M28 25+700 RHS Ganeshgudi Fence Government 20.00 20.00
69 M28 56+950 LHS Kumbarwad Water Tank Panchayat 2.25 0.60
70 M28 56+990 LHS Kumbarwada Water Tap Panchayat 0.40 0.40
71 M28 22+200 RHS IGanehgudi WaterTap Goverment 0.40 0.48
72 M28 22+250 LHS Ganeshgudi Water Tap Government 0.40 1.04
73 M28 26+750 RHS Ilva Water Tap Government 0.25 0.70
74 M28 26+950 RHS llva Water Tap Government 0.10 0.50
75 M28 27+006 RHS Ilva Water Tap Government 0.25 0.45
76 M28 29+540 RHS Bapeli Telephone Tower Govemment 0.09 0.42
77 M28 51+950 RHS Dorga Shrine Community 4.50 1.80
78 M28 53+200 RHS Dorga Water Tap Government 2.50 2.10
KSHIP/SDRC 2 of 2
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -4 Distrnbutmot of Co -nrnuty Assets / Public Utilities
AreaSIN. Contact Chainage Side Village Type Type of Total Area affectedC. . ownership (in sqm) (in sqm)
I 3 4 5 6 7 8 9 1079 M28 55+010 RHS Kumbarwad Water Tap Government 0.40 0.4080 M28 56+ 116 RHS Kumbarwad Shrine Community 0.36 0.48
81 M29 23+018 LHS Yakkeri Shrine Community 3.60 1.44
82 M33 31+615 RHS Mallapur Bus Stand Government 17.38 6.42
83 M33 31+700 LHS Mallapur Hand Pump detoned Govemment 2.56 0.64
84 M33 35+850 LHS Sandhigawa Pump House detoned Government 0.35 0.25
85 M33 36+ 100 LHS Chickmannu Pump House Panchayat 0.75 0.25
86 M33 36+228 RHS Chickmannu Bus Stand Government 22.90 9.0287 M33 43+060 LHS Ron Air Valve Government 0.90 0.60
88 M33 43+065 RHS Ron Air Valve Government 0.90 0.60
89 M33 43+500 RHS Ron Air Valve Government 0.40 0.25
90 M33 43+530 RHS Ron Air Valve Government 0.35 0.25
91 M33 43+760 LHS Ron Temple Community 12.00 2.70
92 M33 43+900 RHS Ron Air Valve Govemment 1.20 0.25
93 M33 44+000 RHS Ron Air Valve Government 0.85 0.2594 M33 44+410 LHS Ron Temple Community - -
95 M33 44+425 LHS Ron Temple Community -
96 M34 00+010 RHS Ron Air valve Panchayat 0.25 0.25
97 M34 00+550 RHS Ron Air Valve Panchayat 2.00 1.2
98 M34 00+560 RHS Ron Air Valve Panchayat 0.25 0.25
99 M34 08+500 LHS Hosalli Handpump Panchayat 0.25 0.25
100 M34 18+290 RHS Katral Handpump Panchayat 2.5 1.35
101 M34 18+330 LHS katral Bus shelter Government 0.25 0.25
102 M34 18+335 RHS Katral Handpump Government 0.25 0.25
103 M34 20+570 RHS Lokalhatti Handpump Panchayat 2.25 2.25
104 M34 22+190 RHS Rajur Bus shelter Panchayat 2.25 2.25
105 M34 22+180 RHS Raj ur Handpump Panchayat 2.25 1.35
106 M34 24+840 RHS Puratgeri Bus shelter Panchayat 19.47 3.54
107 M34 29+900 LHS Gogeri Borewell point & Pump hous Panchayat 2.25 2.25108 M34 29+900 RHS Gogeri Water supply line Panchayat 33.75 4.87
109 M34 31+400 LHS Gogeri Borewell point Panchayat - -
110 M34 32+400 RHS Gogeri Bus shelter Govemment 30.60 8.10
111 M34 32+410 LHS Gogeri Handpump Government - -
112 M34 51+600 LHS Kustagi Borewell point Govemment
113 U-9 8+100 LHS Khariwada Temple Community
114 U-9 8+150 RHS Khariwada Bus Stop Govt. Property
115 U-9 9+00 RHS Khariwada Water Supply Chember Valv Community
116 U-9 9+200 RHS Khariwada Water Supply Chember Valv Community
117 U-9 10+00 RHS Khariwada Water Supply Chember Valv Community
118 U-9 11+10 RHS Khariwada Water Supply Chember Valv Community
KSHIPISDRC 3 of 2
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REHABILITATION ROADSANNEXURE -4 Distribution of Cotrmmunity Assets I Public UtfI,les
SIN Type of Total Area AreaS. Contract Chainage Side Village Type onTyp of sqma affectedo. ownership (in sqm) (in sgm)
- 3 4 5 6 7 8 9 10
119 U-9 11+150 RHS Khariwada Water Supply Chember Valv Community -
120 U-9 11+225 RHS Khariwada Water Supply Chember Valv Community -
121 U-9 12+00 RHS Khariwada Water Supply Chember Valv Community -
122 U-9 12+200 RIIS Khariwada Water Supply Chember Valv Community -
123 U-9 13+100 RHS Khariwada Water Supply Chember Valv Community -
124 U-9 13+250 RHS Khariwada Water Supply Chember Valv Community -
125 U-9 22+150 LHS Khariwada Hand Pump Public Property -
126 U-9 32+100 RHS Holikeri Bus Stop Govt. Property -
127 U-9 32+150 RHS Holikeri Hand Pump Public Property
128 U-9 34+00 RHS Holikeri Arali Katte Community
129 U-9 34+150 RHS Linganmath Bus Stop Govt. Property
130 U-10 1+300 LHS Hulikatti Air Valve & W/S Line Panchayat
131 U-10 2+500 LHS Hulikatti Pump House Panchayat _
132 U-10 8+980 LHS Kagadal Water Point Panchayat
133 U-10 19+010 RHS Dandapu.r Water Point & Pump House Panchayat
134 U-10 19+630 LHS Naragaund Statue & Circle Government
135 U-10 19+600 LHS Naragaund Water Tap & W/S Line Panchayat
136 U-10 20+489 RHS Naragaund Bus Stand Compund Wall Government
137 U-10 20+489 RHS Naragaund Water point Panchayat
KSHIP/SDRC 4 of 2
Annexure-5 Entitlement Matrix ENTITLEMENT MATRIX
No. Impact Type of Unit of DetailsCategory loss Entitle Entitlement
mentTitle holder (a) Loss of Project 1. Consent Award OR * Consent Award, as per definition.of Private Land Affected Compensation in accordance LAA * Compensation will be made as per LAAProperty Family 2. Assistance for economic rehabilitation * For gramthana land compensation is as
3. Subsistence allowance above.* If notice under Section 4 (1) of LAA, for
standing seasonal crops cannot be given thencash compensation for lost localised standingcrop will be paid based on the valuation doneby the Department ofAgriculture/Horticulture.
* Compensation for perennial crops to becalculated as annual net product valuemultiplied by number of productive yearsremaining. For trees it will be based on themarket value of timber in case of timberbearing trees and replacement cost in case offruit bearing trees, to be done through theDepartment of Agriculture/Forest andHorticulture, as per LAA.
* Subsistence allowance for PAFs, if they areresettled and relocated, will be calculated onthe BPL criteria
* Assistance for purchase of income generatingassets under economic rehabilitation for BPLfamilies, if they are resettled and relocated.The assistance value will be decided by theGOK.
(b) Loss of Project 1. Consent Award OR * Consent Award, as per definitionresidential Affected Compensation at replacement value OR * Replacement cost to be calculated at PWDsstructure Family housing plot in resettlement layout current Schedule of Rates without
2. Shifting assistance depreciation.3. Registration and taxes
PIU/KSHIP I
Annexure-5 Entitlement Matrix ENTITLEMENT MATRIX
4. Right to salvage material from existing * Registration and taxes, associated with thestructure new house, if any will be borne by the project
5. Subsistence allowance * Where loss of structure is partial and theremaining structure is viable, PAF's will beentitled to only replacement cost of theaffected portion.
* Resettlement sites will be developed if morethan 20 families are getting displaced from acontinuous stretch of 2 kms. at one location, ifso desired by the PAFs.
* Housing plot will be provided in theresettlement site.
* Subsistence allowance for PAFs, if they areresettled and relocated, will be calculated onthe BPL criteria.
(c) Loss of Project 1. Consent Award OR Compensation at * Consent Award, as per definitioncommercial Affected replacement value OR allotment in a * Replacement cost to be calculated at PWDsstructure Family shopping complex, if constructed as current Schedule of Rates without
provided 'in detail' column depreciation.2. Economic rehabilitation program. * Subsistence allowance for PAFs, if they are3. Shifting assistance resettled and relocated, will be calculated on4. Subsistence allowance the BPL criteria.5. Right to salvage material from existing * Assistance for purchase of income generating
structure. assets under economic rehabilitation for BPL
families, the value of which will be decidedby the GOK.
* Shopping complex will be constructed if 25or more commercial structures are affected ina stretch of 2 kms and 25 PAFS are willingfor such construction.
(d) Loss of Project 6. Consent Award OR Compensation at * Consent Award, as per definitionresidential Affected replacement value OR allotment in a * Replacement cost to be calculated at PWDscum Family shopping complex, if constructed as current Schedule of Rates withoutcommercial provided 'in detail' column depreciation.
PIU/KSHIP 2
Annexure-5 Entitlement Matrix ENTITLEMENT MATRIX
structure 2. Economic rehabilitation program. * Subsistence allowance for PAFs, if they are3. Shifting assistance resettled and relocated, based on the BPL4. Subsistence allowance criteria.5. Right to salvage material from existing * Assistance for purchase of income generating
structure. assets under economic rehabilitation for BPLfamilies, the value of which will be decidedby the GOK.
* Shopping complex will be constructed if 25or more commercial structures are affected ina stretch of 2 kms and 25 PAFS are willingfor such construction.
(e) Loss of Project 1. Compensation at replacement value for all * Replacement cost to be calculated at PWDsother assets Affected assets acquired. current Schedule of Rates without
Family depreciation* Compensation for other assets include loss of
boundary wall, wells, cattle shed etc.,2. Tenants on (a) Project 1. Rental Value * Mutually agreed rental value or amount as
legal land Residential Affected fixed by the PWD, if rented accommodationstructure Family is vacated within stipulated period.
* BPL families will be given house underweaker section housing scheme.
(b) Project 1. Rental Value * Mutually agreed rental value or amount asCommercia Affected 2. Economic rehabilitation fixed by the PWD, if rented accommodation1 structure Family 3. Shop in a commercial complex is vacated within stipulated period.
* BPL families will be given preference for ashop in the shopping complex or economicrehabilitation as decided by GOK
(c) Project I.Rental Value * Mutually agreed rental value or amount asResidential Affected 2. Economic rehabilitation fixed by the PWD, if rented accommodationcum Family 3. Shop in a commercial complex is vacated within stipulated period.commercial * BPL families will be given preference for a
shop in the shopping complex or economicrehabilitation as decided by GOK.
PrU/KSHIP 3
Annexure-5 Entitlement Matrix ENTITLEMENT MATRIX
* BPL families will be given house underweaker section housing scheme
3. Squatters (a) Project 1. Benefit from Economically Weaker * For those BPL families who do not own anyResidential Affected Section Housing Programme for BPL assets, will be entitled for the EWS housingStructure Family families program and shifting allowance.
2. Advance intimation * Subsistence allowance for BPL families3. Shifting allowance getting resettled and relocated.4. Subsistence allowance * Above poverty line families will be given an
advance intimation of 60 days to shift fromthe public land.
(b) Project 1. Site will be provided, at a price * Above poverty line families will be given anCommercia Affected determined by the GOK, for BPL advance intimation of 60 days to shift from1 Structure Family families the public land.
2. Advance intimation * Subsistence allowance for BPL families3. Shifting allowance getting resettled and relocated.4. Subsistence allowance * Shifting allowance for BPL families only
4. Encroacher (a) Project 1. Benefit from Economically Weaker * For those BPL families who do not own anyResidential Affected Section Housing Programme for BPL assets will be entitled for the EWS housingStructure Farmly families program and shifting allowance.
(total loss 2. Advance intimation * Subsistence allowance for BPL familiesof 3. Shifting allowance getting resettled and relocatedstructure) 4. Subsistence allowance * Above poverty line families will be given an
advance intimation of 60 days to shift fromthe public land.
b) Project 1. Site will be provided, at a price * Above poverty line families will be given anCommercia Affected determined by the GOK, for BPL advance intimation of 60 days to shift from1 Structure Family families the public land.(total loss 2. Advance intimation * Subsistence allowance for BPL familiesof 3. Shifting allowance getting resettled and relocatedlivelihood) 4. Subsistence allowance * Shifting assistance for BPL families only.
PIU/KSHIP 4
Annexure-5 Entitlement Matnrx ENTITLEMENT MATRIX
5. Those Total Loss Project 1. Relief assistance * This amount will be calculated on the basis oflosing their of Affected the BPL criteria.total Livelihood Personlivelihoodasemployees
6. Other Whether loss PAF or 1. Unforeseen impacts shall be documentedimpacts not of assets or PAPidentified livelihood and mitigated based on the principles
provided in this policy6(a) Structure cost to Encroacher PAFs belongs to APL families will be paid as ex-gratia payment7. Loss of Group Project 1. Restoration/ replacement and * Alternative site will be provided by the
Community Impacts Affected improvement of community assets such as Government for the restoration of affectedproperties Groups public water pumps, sanitation and community assets.and Assets drainage facilities, schools, hospitals, * The maintenance of common property
temples and shrines, and cultural heritage resources and infrastructure will be handed toresources. the Local authority.
2. Restoration and improvement of commonproperty resources, such as access towater, fodder, and fuelwood.
PIU/KSHIP 5
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAlnexure-6 Action Plani for Allomient of Alternative Houses and Conmnercial Sites
____________ _ ^Structures
SI. No. Contract Stretch Residential Commercial Others Time Required1 M4 8+735 com
2 M4 8+736 comr 4 Months3 M4 8+743 com _
4 M24 50+200 res _
5 M24 50+520 res _
6 M24 44+400 com
7 M24 com
8 M24 44+403 com __4 Months9 M24 50+070 com
10 M24 50+074 com
11 M24 com
12 M24 50+230 com
13 M24 54+100 com _
14 M25 18+190 res__
15 M25 18+194 res _
16 M25 18+197 com
17 M25 18+325 res _
18 M25 48+100 Others
19 M25 48+125 Others
20 M25 48+220 Others
21 M25 48+300 com
22 M25 48+340 com
23 M25 48+325 com
24 M25 48+405 Others
25 M25 48+445 _ Others
26 M25 49+420 _ Others
27 M25 49+442 Others
28 M25 49+442 Others
29 M25 49+467 Others
30 M25 49+492 Others
31 M25 49+530 _ Others
32 M25 50+180 Others 6Months33 M25 50+234 _ _ Others
34 M25 50+255 Others
35 M25 50+265 _ _ Others
36 M25 50+283 _ _ Others
37 M25 50+296 com
38 M25 50+304 com
39 M25 50+306 com
40 M25 50+310 res _
41 M25 18+110 com
42 M25 - com
43 M25 18+200 com
44 M25 49+467 com
45 M25 0+015 com
46 M25 0+108 com
47 M25 0+112 com
48 M25 0+115 com
PIU/KSHIP Page 1 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAniexure-6 Action Plan for Allotrent of Alternative Houses and Comrercial Sites
StructuresSI. No. Contract Stretch Residential Commercial Others Time Required
49 M25 0+117 com
50 M25 0+121 com
51 M25 0+122 com
52 M25 0+126 com
53 M25 0+128 com
54 M25 0+132 _ com
55 M25 0+134 com
56 M25 0+136 _ com
57 M25 0+138 com
58 M25 0+141 com
59 M25 0+142 com
60 M25 0+145 com
61 M25 0+148 com
62 M25 0+151 com
63 M25 0+153 com
64 M25 0+155 com
65 M25 0+157 com
66 M25 0+160 com
67 M25 0+163 com
68 M25 0+166 com
69 M25 0+171 com
70 M25 0+175 com
71 M25 0+210 com
72 M25 0+212 com
73 M25 0+214 com
74 M25 0+216 com
75 M25 0+218 com
76 M25 0+220 com
77 M25 0+222 comr 6 Months
78 M25 43+058 _ _ Others
79 M25 38+020 com
80 M25 38+135 com
81 M25 38+140 com
82 M25 38+147 Others
83 M25 36+440 Others
84 M25 36+485 Others
85 M25 36+430 Others
86 M25 36+425 Others
87 M25 48+302 com
88 M25 48+305 com
89 M25 48+308 com
90 M25 18+157 com
91 M25 18+178 com
92 M25 18+198 com
93 M25 18+206 res _
94 M25 18+208 com
95 M25 18+212 com
96 M25 18+219 res _
PIU/KSHIP Page 2 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-6 Action Plan for Allotment of Alternative Houses anid Coninsercial Sites
._____________ StructuresSI. No. Contract Stretch Residential Commercial Others Time Required
97 M25 18+222 com
98 M25 18+225 res
99 M25 18+227 com
100 M25 18+227 res
101 M25 18+231 res-cum-com _
102 M25 18+232 res _ _
103 M25 18+232 res _
104 M25 18+237 res-cum-com _
105 M25 18+242 comr 6 Months106 M25 18+245 com
107 M25 18+248 com _
108 M26 0+040 _ _ Others
109 M26 0+049 _ _ Others
110 M26 0+165 ___ Others
111 M26 0+270 Others
112 M26 0+297 _ _ Others
113 M26 0+754 Others
114 M26 0+765 Others
115 M26 0+780 Others
116 M26 0+840 res
117 M26 1+500 res
118 M26 13+080 com
119 M26 18+060 _ Others
120 M26 18+080 _ Others
121 M26 18+183 _ Others
122 M26 18+224 Others
123 M26 18+230 Others
124 M26 18+455 res
125 M26 36+900 Others
126 M26 37+090 Others
127 M26 0+050 Others
128 M26 0+054 com
129 M26 0+057 com
130 M26 0+061 com
131 M26 0+054 res
132 M26 0+305 com
133 M26 0+330 res
134 M26 0+365 Others
135 M26 0+830 res
136 M26 1+711 _ Others
137 M26 1+777 com
138 M27 119+150 com
139 M27 116+405 com
140 M27 116+390 res ____4 Months141 M27 116+490 com
142 M27 116+500 com
143 M27 116+390 _ _ Others
144 M28 55+700 I_ comr 1 Month
PIU/KSHIP Page 3 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-6 Action Plan for Allotnent of Altemative Houses and Conmercial Sites
StructuresSI. No. Contract Stretch Residential Conmmercial Others Time Required
145 M29 0+030 com
146 M29 0+035 com
147 M29 0+040 com
148 M29 16+580 com
149 M29 16+584 comr 5 Months150 M29 16+647 com
151 M29 16+650 com
152 M29 16+655 com
153 M29 16+660 comr
154 M29 16+666 com
155 M29 16+666 com
156 M29 16+669 com
157 M29 16+674 com
158 M29 16+675 com
159 M29 16+676 com
160 M29 16+676 com
161 M29 16+680 com
162 M29 16+700 com
163 M29 16+655 com
164 M29 16+670 com
165 M29 16+684 com
166 M29 16+690 com
167 M29 16+780 com
168 M29 16+786 com
169 M29 0+050 com
170 M29 0+045 com
171 M29 0+038 comr 5 Months172 M29 0+50 com
173 M29 0+065 com
174 M29 0+70 com
175 M29 0+76 com
176 M29 0+083 com
177 M29 0+085 com
178 M29 0+089 com
179 M29 0+092 com
180 M29 0+094 com
181 M29 0+096 com
182 M29 0+112 com
183 M29 16+595 com
184 M29 16+610 com
185 M29 16+620 com
186 M29 16+652 com
187 M29 16+653 com
188 M29 16+652 comr189 M30 2+550 res
190 M30 2+570 res
191 M30 2+580 res _
192 M30 2+600 res
PIU/KSHIP Page 4 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-6 Action Plan for Allotment of Altemative Houses and Commercial Sites
.___________ _ :Structures
SI. No. Contract Stretch Residential Commercial Others Time Required193 M30 2+660 res _
194 M30 2+670 res
195 M30 3+120 res__
196 M30 3+100 res __Months_ _ ~~~~~5 Months197 M30 2+550 res__
198 M30 1+600 res__
199 M30 1+610 res _
200 M30 1+620 res__
201 M30 1+625 res _
202 M30 1+640 res
203 M30 1+650 res
204 M30 1+670 res___
205 M30 1+680 res_ ___
206 M30 2+000 res__
207 M30 2+030 res
208 M30 2+045 res _
209 M30 2+055 res
210 M30 2+800 res _
211 M30 2+700 res _
212 M30 2+740 res ____5_Months5 Months213 M30 3+100 res _
214 M30 3+180 res _
215 M30 3+195 res _
216 M30 3+200 res
217 M30 4+410 res _
218 M30 4+100 res_ ___
219 M30 12+000 res
220 M30 21+000 res
221 M31 0+140 res
222 M31 0+160 com
223 M31 0+190 res _
224 M31 0+190 res _
225 M31 0+230 res _
226 M31 0+235 res _
227 M31 0+235 res
228 M31 0+240 res
229 M31 0+260 res
230 M31 0+270 res 4 Months231 M31 0+270 res
232 M31 0+275 res_ ___
233 M31 0+275 res
234 M31 0+280 res _
235 M31 0+285 res _
236 M31 0+290 res
237 M31 0+295 res-cum-com
238 M31 0+280 res
239 M31 0+275 res
240 M33 31+595 _ com
PIU/KSHIP Page 5 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADS
Annexure-6 Action Plan for Allotment of Altemative Houses and Conmmercial Sites
StructuresSI. No. Contract Stretch Residential Commercial Others Time Required
241 M33 31+600 com
242 M33 31+180 com
243 M33 35+415 _ com
244 M33 36+194 _ com
245 M33 36+203 _ com
246 M33 36+216 _ com
247 M33 36+215 _ com _ 6 Months248 M33 36+220 _ com
249 M33 36+235 _ com
250 M33 43+050 com
251 M33 43+053 com
252 M33 43+055 com
253 M33 43+057 com
254 M33 43+059 com
255 M33 43+064 comr
256 M33 43+066 com
257 M33 43+068 com
258 M33 43+070 com
259 M33 43+075 com
260 M33 43+077 com
261 M33 43+081 com
262 M33 44+140 com
263 M33 44+144 _ com
264 M33 44+150 _ com
265 M33 44+156 _ com
266 M33 44+160 _ com
267 M33 44+166 com
268 M33 44+168 _ _ com
269 M33 44+171 com
270 M33 44+173 _ com
271 M33 44+175 _ com
272 M33 44+179 com
273 M33 44+181 com
274 M33 44+183 com
275 M33 44+250 com
276 M33 44+252 com
277 M33 44+254 _ com
278 M33 44+256 _ com
279 M33 44+030 _ com
280 M33 44+033 com
281 M33 44+038 _ comr 6 Months
282 M33 44+040 corn
283 M33 44+044 _ com
284 M33 44+049 _ com
285 M33 44+051 _ com
286 M33 44+059 _ com
287 M33 44+061 _ com
288 M33 44+066 com
PIU/KSHIP Page 6 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-6 Action Plan for Allotment of Alternative Houses and Commercial Sites
StructuresSI. No. Contract Stretch Residential Commercial Others Time Required
289 M33 44+070 com
290 M33 44+074 com
291 M33 44+077 com
292 M33 44+078 _ com
293 M33 0+390 com
294 M33 1+700 _ com
295 M33 3+705 _ com
296 M33 3+180 com
297 M33 3+186 _ com
298 M33 6+217 res-cum-com
299 M33 3+050 com
300 M33 3+058 com
301 M33 3+710 com
302 M33 3+712 com
303 M33 43+720 com
304 M33 43+722 com
305 M33 43+724 com
306 M33 43+726 corn
307 M33 43+728 com
308 M33 43+732 res
309 M33 43+735 res
310 M33 43+738 res
311 M33 43+740 com
312 M33 43+742 _ com
313 M33 43+745 com
314 M33 43+130 com
315 M33 43+135 com
316 M33 43+140 com
317 M33 43+144 com
318 M33 44+147 com
319 M33 44+148 com
320 M33 44+160 com
321 M33 44+165 _ com 6 Months322 M33 44+170 com
323 M33 44+035 com
324 M33 44+040 _ com
325 M33 44+045 com
326 M33 44+050 _ com
327 M33 44+054 com
328 M33 44+057 _ com
329 M33 44+060 com
330 M33 44+063 com
331 M33 44+066 com
332 M33 44+068 com
333 M33 44+071 com
334 M33 44+075 com
335 M33 44+078 com
336 M33 44+082 _ comr
PIU/KSHIP Page 7 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-6 Action Plan for Allotnient of Alternative Houses and Commercial Sites
.______________ StructuresSI. No. Contract Stretch Residential Commercial Others Time Required
337 M34 116 com _
338 M34 116 com
339 M34 116 com
340 M34 115 com
341 M34 94 com
342 M34 94 _ com
343 M34 94 _ com
344 M34 94 com
345 M34 90 com
346 M34 90 com
347 M34 90 comr 5 Months348 M34 84 com
349 M34 67 com
350 M34 67 comr
351 M34 _ com
352 M34 100 com
353 M34 94 com
354 M34 94 com
355 M34 90 com
356 M34 67 com
357 M34 67 com _
358 M34 67 com 5 Months359 M34 67 com _
360 U-10 0+015 Res
361 u-1o 0+025 Others
362 u-Io 5+510 Com
363 u-io 19+550 Com
364 U-Io 20+213 com
365 u-1o 20+235 _ Others
366 u-lo 20+280 _ com
367 u-io 20+460 _ com
368 u-1o 20+565 com
369 U-10 5+350 _ com
370 U-10 5+330 _ com
371 U-10 19+710 com
372 U-1o 19+770 _ com
373 U-10 20+190 _ com
374 U-1o 20+485 _ com
375 u-1o 20+550 _ com
376 U-1o 20+552 com
377 u-10 20+555 _ com
378 u-10 20+557 com
379 u-Io 20+580 com
380 U-10 20+582 comr 5 Months381 u-10 20+586 com
382 u-10 120+590 _ com
383 u-10 120+595 _ com
384 U-10 20+600 com
PIU/KSHIP Page 8 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexuwe-6 Action Plan for Allotment of Altemative Houses and Conmmercial Sites
Structures _SI. No. Contract Stretch Residential Conmmercial Others Time Required
385 u-Io 20+604 com386 u-Io 20+609 com387 u-io 20+611 com388 u-bo 20+613 com389 u-io 20+616 com390 u-Io 20+620 com391 U-10 20+625 com392 u-bo 20+628 com393 u-io 20+631 com394 U-io 20+635 _ Others
395 u-io 20+639 com396 U-1o 20+641 com397 u-Io 20+645 com398 U-10 20+648 com399 u-io 20+652 com
400 u-Io 20+656 com _
PIU/KSHIP Page 9 of 9
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-7 Action Plan for Relocation of Community Assets
SI.No. Contract Chainage Type Time Required
1 M2 11+370 Flag Post 1 Month
2 M3 52+495 Public Urinary
3 M3 51+770 Trilokeshwar Temple
4 M3 52+650 Wall
5 M3 52+830 Air Valve
6 M3 52+830 Others
7 M3 53+202 Telephone Junction Box
8 M3 53+530 Basaveshwara Circle 3 Months
9 M3 53+540 Compound Wall
1 0 M3 53+345 Aralikatte
1 1 M3 53+365 Aralikatte
12 M3 53+380 Compound Wall
13 M3 91+680 Water Tap
14 M3 91+850 Mosque(shed)
15 M3 91+955 Compound Wall
16 M6 47+750 Toll Gate
17 M6 47+900 Compound Wall
18 M6 48+156 Compound Wall (Police Station) 3 Months
19 M6 48+161 Compound Wall (Hospital)
20 M6 48+149 Commercial Complex
21 M6 48+076 Muslim Co-op Society
22 M25 0+245 Others
23 M25 19+576 Aralikatte 5 Months
24 M25 105+700 Forest Checkpost
25 M25 38+000 Valve
PIU/KSHIP Page 1 of 6
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-7 Action Plan for Relocation of Community Assets
SINo. Contract Chainage Type Time Required
26 M25 42+930 Temple Fence
27 M25 47+070 Circle
28 M25 48+250 Appu Circle
29 M25 17+825 Barbed Fence 5 Months
30 M25 49+997 Water Tap
31 M25 50+115 Water Valve
32 M25 50+156 Water Valve
33 M25 50+504 Compound wall
34 M26 0+20 Valve
35 M26 0+720 Water Tap
36 M26 1+710 Police Check Post
37 M26 13+337 Water Tap
38 M26 18+862 Temple Steps
39 M26 28+370 Water Tap 4 Months
40 M26 37+160 Bus Stop
41 M26 36+525 Garden Circle
42 M26 37+630 Aralikatte
43 M26 40+875 Aralikatte
44 M26 48+800 Water Tap
45 M24 41+500 Pump House
46 M24 47+700 Pump House
47 M24 1+200 Well 4 Months
48 M24 56+200 Hand Pump
49 M24 50+850 Compound wall
150 IM24 141+850 Bus Stand
PIU/KSHIP Page 2 of 6
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-7 Action Plan for Relocation of Community Assets
SI.No. Contract Chainage Type Time Required
51 M24 47+715 Water Point
52 M24 2+100 Power Pump 4 Months
53 M24 41+500 Power Pump
54 M27 104+700 Temple
55 M27 107+400 Water Tap
56 M27 107+800 Water Tap
57 M27 116+600 Check Post Projection
58 M27 100+900 Water Tap
59 M27 100+950 Water Tap 5 Months
60 M27 106+600 Water Tap
61 M27 109+900 Water Tap
62 M27 109+990 Bus Stand
63 M27 107+500 Water Tap
64 M27 106+600 Water Tap
65 M27 117+600 Bus Stand
66 M28 25+500 Temple RC and Fence
67 M28 26+700 Water tap
68 M28 25+700 Fence
69 M28 56+950 Water Tank
70 M28 56+990 Water Tap 5 Months
71 M28 22+200 Water Tap
72 M28 22+250 Water Tap
73 M28 26+750 Water Tap
74 M28 26+950 Water Tap
75 M28 27+006 Water Tap
PIU/KSHIP Page 3 of 6
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-7 Action Plan for Relocation of Community Assets
SI.No. Contract Chainage Type Time Required
76 M28 29+540 Telephone Tower
77 M28 51+950 Shrine
78 M28 53+200 Water Tap 5 Months
79 M28 55+010 Water Tap
80 M28 56+116 Shrine
81 M29 23+018 Shrine 1 Month
82 M33 31+615 Bus Stand
83 M33 31+700 Hand Pump detoned
84 M33 35+850 Pump House detoned
85 M33 36+100 Pump House
86 M33 36+228 Bus Stand
87 M33 43+060 Air Valve
88 M33 43+065 Air Valve 5 Months
89 M33 43+500 Air Valve
90 M33 43+530 Air Valve
91 M33 43+760 Temple
92 M33 43+900 Air Valve
93 M33 44+000 Air Valve
94 M33 44+410 Temple
95 M33 44+425 Temple
96 M34 00+010 Air valve
97 M34 00+550 Air Valve
98 M34 00+560 Air Valve 5 Months
99 M34 08+500 Handpump
100 M34 18+290 Handpump
PIU/KSHIP Page4of6
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-7 Action Plan for Relocation of Community Assets
SI.No. Contract Chainage Type Time Required
101 M34 18+330 Bus shelter
102 M34 18+335 Handpump
103 M34 20+570 Handpump
104 M34 22+190 Bus shelter
105 M34 22+180 Handpump
106 M34 24+840 Bus shelter 5 MonthsM34 29+900 Borewell point & Pump house
107
108 M34 29+900 Water supply line
109 M34 31+400 Borewell point
110 M34 32+400 Bus shelter
111 M34 32+410 Handpump
112 M34 51+600 Borewell point
113 U-9 8+100 Temple
114 U-9 8+150 Bus Stop
115 U-9 9+00 Water Supply Chember Valve
116 U-9 9+200 Water Supply Chember Valve
11 7 U-9 10+00 Water Supply Chember Valve
118 U-9 11 + 10 Water Supply Chember Valve
119 U-9 11+150 Water Supply Chember Valve 5 Months
120 U-9 11+225 Water Supply Chember Valve
121 U-9 12+00 Water Supply Chember Valve
122 U-9 12+200 Water Supply Chember Valve
123 U-9 13+100 Water Supply Chember Valve
124 U-9 13+250 Water Supply Chember Valve
125 U-9 22+150 Hand Pump
PIU/KSHIP Page 5 of 6
KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT RESETTLEMENT ACTION PLAN FOR REAHBILITATION ROADSAnnexure-7 Action Plan for Relocation of Community Assets
SI.No. Contract Chainage Type Time Required
126 U-9 32+100 Bus Stop
127 U-9 32+150 Hand Pump 5 Months
128 U-9 34+00 Arali Katte
129 U-9 34+150 Bus Stop
130 UU-l0 1+300 Air Valve & W/S Line
131 U-10 2+500 Pump House
132 U-10 8+980 Water Point
133 U-10 19+010 Water Point & Pump House 5 Months
134 U-10 19+630 Statue & Circle
135 U-10 19+600 Water Tap & W/S Line
136 U-10 20+489 Bus Stand Compund Wall
137 U-10 20+489 Water point
PIU/KSHIP Page 6 of 6