Procurement Plan-Goods
Country/Organisation:Project/Programme:
Loan #:
Description*Source of Funds
PackageNumber
Work Plan Reference
LotNumber
Estimated Amount in US $
Procurement Method
Pre-or Post Qualification
Prior or Post Review
If Prequalification
add 7-13 wks
List of Contracts
780,000.00 ICB/IAPSO Post Prior
891,000.00 ICB Post Prior
250,000.00 ICB/IAPSO Post Prior
105,000.00 ICB Post Prior
Total Cost 2,026,000.00
Motor Vehicles for Accra MMDAs
Equipment for Accra MMDAs UTP Goods 4 AFD
MoT,DVLA, NRSC, MLGRDE, EPA, TCPD,PAO,
DUR, MTTU, OPERATORS,
KMA,EJDA
UTP Goods 1
MoT,DVLA, NRSC, MLGRDE, EPA, TCPD,PAO,
DUR, MTTU, OPERATORS,
KMA,EJDA
BASIC DATA
1
1
1
1
AMA, TMA, GWDA, GEDA,
AUPTCG,
AMA, TMA, GWDA, GEDA,
AUPTCG,
Norm Duration of Proc Steps
IDA
IDA
AFD
Motor Vehicles for PAO, MDAs and Kumasi MMDAs
Equipment for PAO, MDAs and Kumasi MMDAs
UTP Goods 3
UTP Goods 2
439530PROP0P091ort0PP0May0291020080.xls 1 of 21 5/30/2008 1:10 AM
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Procurement Plan-Goods
Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Total Cost
Motor Vehicles for Accra MMDAs
Equipment for Accra MMDAs
Norm Duration of Proc Steps
Motor Vehicles for PAO, MDAs and Kumasi MMDAs
Equipment for PAO, MDAs and Kumasi MMDAs
If Post-Review, No-objection Dates are not neededSpec Proc Notice
Advert
Plan vs.
Actual
Prep & Submission
by Ex Agency
No-objectionDate
On-line UNDBGatewayNat Press
Bid Invitation Date
Bid Closing-Opening
SubmissionBid Eval Rpt
No-objectionDate
Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks
Actual
Plan April 9, 08 April 23,08 April 30,08 May 14,08 June 11, 08 June 25,08 July 2,08
Actual
Plan April 9, 08 April 23,08 April 30,08 May 14,08 June 11, 08 June 25,08 July 2,08
Actual
Plan April 9, 08 April 23,08 April 30,08 May 14,08 June 11, 08 June 25,08 July 2,08
Actual
Plan April 9, 08 April 23,08 April 30,08 May 14,08 June 11, 08 June 25,08 July 2,08
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Bid EvaluationBidding PeriodDraft Bid Documents, including specs and quantities, draft SPN
439530PROP0P091ort0PP0May0291020080.xls 2 of 21 5/30/2008 1:10 AM
Procurement Plan-Goods
Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Total Cost
Motor Vehicles for Accra MMDAs
Equipment for Accra MMDAs
Norm Duration of Proc Steps
Motor Vehicles for PAO, MDAs and Kumasi MMDAs
Equipment for PAO, MDAs and Kumasi MMDAs
Contract Implementation
Plan vs.
Actual
Contract Amount in
US$’000
DateContractAward
DateContractSignature
Openingof
Let of Credit
Arrivalof
Goods
InspectionFinal
Acceptance
Plan 1 wk 1.5-3 wks
Actual
Plan July 9,08 July 23,08
Actual
Plan July 9,08 July 23,08
Actual
Plan July 9,08 July 23,08
Actual
Plan July 9,08 July 23,08
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Plan 0.00
Contract Finalization
439530PROP0P091ort0PP0May0291020080.xls 3 of 21 5/30/2008 1:10 AM
Procurement Plan-Works
Country/Organisation:Project/Programme:
Loan #:
Description*Source
of FundsPackageNumber
Work Plan Reference
LotNumber
Lumpsum or Bill of
Quantities
Procurement Method
Pre-or Post Qualification
Prior or Post Review
If Prequalification
add 7-13 wks
List of Contracts
1 TMS.2A.07.001 1 BoQ ICB 8,100.00 prequali prior
TMS.2C.07.001-2 1 BoQ ICB 2.00 prequali prior
TMS.2B.07.001 1 BoQ ICB 6,800.00 prequali prior
TMS.2D.07.001 1 BoQ ICB 2,500.00 prequali prior
BRT.3A.07.001 1 BoQ ICB 41,500.00 prequali prior
AFD TMS.2A.07.002 1 BoQ ICB 4,000.00 prequali prior
Total Cost 58,902.00
#REF!Fill gray cells only!
AFD
IDA
Procurement of Contractors for for the implementation of Area Wide Traffic Signal Control Accra (AFD)
Procurement of Contractors for for the implementation of Area Wide Traffic Signal Control Ksi (IDA)
Procurement of Contractors for the Construction of BRT Infrastructure (IDA, GOG)
Procurement of Contractors for the implementation of Traffic Management measures in TMA,Ga East and Ga West (Second Batch)
3
IDA, GoG
GoG
AFD
5
4
Procurement of Contractors for the implementation of Traffic Management measures in AMA
Procurement of Contractors for for the implementation of Traffic Management in Ksi (GoG) 2
Norm Duration of Proc Steps
Basic Data
439530PROP0P091ort0PP0May0291020080.xls 6 of 21 5/30/2008 1:10 AM
Procurement Plan-Works
Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Total Cost
Fill gray cells only!
Procurement of Contractors for for the implementation of Area Wide Traffic Signal Control Accra (AFD)
Procurement of Contractors for for the implementation of Area Wide Traffic Signal Control Ksi (IDA)
Procurement of Contractors for the Construction of BRT Infrastructure (IDA, GOG)
Procurement of Contractors for the implementation of Traffic Management measures in TMA,Ga East and Ga West (Second Batch)
Procurement of Contractors for the implementation of Traffic Management measures in AMA
Procurement of Contractors for for the implementation of Traffic Management in Ksi (GoG)
Norm Duration of Proc Steps
If Post-Review, No-objection Dates are not needed
Spec Proc NoticeAdvert
Plan vs.
Actual
Prep & Submission
by Ex Agency
No-objectionDate
On-line UNDBGatewayNat Press
Bid Invitation Date
Bid Closing-Opening
SubmissionBid Eval Rpt
No-objectionDate
Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks
Actual
Plan August 4,08 August 18,08 September 1,08 September 15,08 October 27,08 December 1,08 December 15,08
Actual
Plan October 5, 07 October 15, 07 October 29, 07 November 12, 07 December 24, 07 February 4, 08 February 25, 08
Actual
Plan September 22, 08 October 6, 08 October 20, 08 November 3, 08 December 15,08 January 26,09 February 9, 09
Actual
Plan November 2,07 November 14, 07 November 28,07 December 12, 07 January 23, 08 March 5, 08 March 26, 08
Actual
Plan April 2, 08 April 16, 08 April 30, 08 May 14, 08 June 25, 08 August 6, 08 August 27, 08
Actual
Plan August 4,08 August 18,08 September 1,08 September 15,08 October 27,08 December 1,08 December 15,08
Actual
Plan
Actual
Plan
Actual
Plan
Actual
Bidding PeriodDraft Bid Documents, including specs
and quantities, draft SPN Bid Evaluation
439530PROP0P091ort0PP0May0291020080.xls 7 of 21 5/30/2008 1:10 AM
Procurement Plan-Works
Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Total Cost
Fill gray cells only!
Procurement of Contractors for for the implementation of Area Wide Traffic Signal Control Accra (AFD)
Procurement of Contractors for for the implementation of Area Wide Traffic Signal Control Ksi (IDA)
Procurement of Contractors for the Construction of BRT Infrastructure (IDA, GOG)
Procurement of Contractors for the implementation of Traffic Management measures in TMA,Ga East and Ga West (Second Batch)
Procurement of Contractors for the implementation of Traffic Management measures in AMA
Procurement of Contractors for for the implementation of Traffic Management in Ksi (GoG)
Norm Duration of Proc Steps
Plan vs.
Actual
Contract Amount in US$ ’000
DateContractAward
DateContractSignature
MobilizationAdvancePayment
SubstantialCompletion
FinalAcceptance
FinalCost
Plan 1 wk 1.5-3 wks
Actual
Plan December 22,08 January 5,09
Actual
Plan March 3, 08 March 24, 08
Actual
Plan February 16, 09 March 2,09
Actual
Plan April 2, 08 April 23, 08
Actual
Plan September 10, 08 October 1, 08
Actual
Plan December 22,08 January 5,09
Actual
Plan
Actual
Plan
Actual
Plan #REF! #REF!
Actual #REF! #REF!
Contract ImplementationContract Finalization
439530PROP0P091ort0PP0May0291020080.xls 8 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation: For Contracts under projects approved before the May 2002 GuidelinesProject/Programme: If Post-Review, No-objection Dates are not needed
Loan #:Contract
Type
Description*Source
of FundsSelection Method
Work Plan ReferenceLumpsum
orTime-Based
Estimated Amount
in US$ ’000
Prior/Post Review
Plan vs.
Actual
Prep & Submission
by Ex Ag
No-objectionDate
On-line UNDBGatewayNat Press
Lead-time before
shortlist
SubmissionDate
No-objectionDate
Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks
Actual
List of Contracts
QCBS BRT.3B.07.001 LS 1,000.00 prior review Plan
Actual June 22,06 Sep. 6,05
IC PAO.OCS.07.001 LS 100.00 prior review Plan N/A N/A Aug. 29, 07 Sept. 5,07 Sept. 12,07 N/A
Actual
QCBS various (see AWPB) LS 90.00 prior review Plan May 14,08 May 28, 08 June 4,08 June 11, 08 June 18,08 June 25, 08
Actual
QCBS various (see AWPB) LS 80.00 prior review Plan May 14,08 May 28, 08 June 4,08 June 11, 08 June 18,08 June 25, 08
Actual
IC PAO.TA.07.009 LS 200.00 prior review Plan N/A N/A Oct. 1, 07 Oct. 15, 07 Oct. 29, 07 N/A
Actual
IC PAO.TA.07.010 LS 200.00 prior review Plan N/A N/A Dec 3, 07 Dec 17, 07 Jan.7,08 N/A
Actual
QCBS PAO.TA.07.004 LS 100 prior review Plan Nov. 26, 07 Dec. 10, 07 Oct. 29, 07 Nov. 12, 07 Nov. 26, 07 Dec. 10, 07
Actual
CQS AUPTCG.TA.O7.001 LS 50.00 prior review Plan N/A N/A June 18,08 June 25,08 July 2,08 N/A
Actual
CQS KMA.TA.O7.002 LS 25.00 prior review Plan N/A N/A Nov. 19, 07 Dec. 3, 07 Dec. 17, 07 N/A
Actual
IC TSI.5A.07.001-2, LS 150.00prior review
Plan N/A N/A Dec. 3, 07 Dec. 17,07 Dec. 31, 07 N/A
EI.5B.07.001-2,CDI.5C.07.001-2 Actual
QCBS PAO.TA.07.001 LS 100.00 prior review Plan Jan. 2, 08 Jan 16, 08 Dec. 5, 07 Dec. 19, 07 Jan. 2, 08 Jan 16, 08
Actual
Technical Assistance for the datacollection of transport routes andregistration of operators for AccraMMDAs
Preparation Request for Proposals
Norm Duration of Proc Steps
Procurement of Consultantants for the design of BRT Infrastructure IDA
IDA
Request for EOI(where required) Short
List
AFD
Procurement of individual consultants for PAO/CUT (minimum 4 contracts)
Technical Assistance for the datacollection of transport routes andregistration of operators forKumasi MMDAs IDA
Technical Assistance for theDesign and operational study forthe implementation of a pilot routeservice contract for Kumasi IDA
Procurement of consultants for specialist support to PAO
Procurement of consultants for support to UPTUs
IDA
IDA
IDA
AFD
Technical Assistance for theDesign and operational study forthe implementation of a pilot routeservice contract and developmentof a mandate for the AUPTCG
Technical Assistance for thedevelopment of ICT systems forthe UTP and the development ofAccra BRT website
Procurement of consultants to monitor indicators (3 contracts)
Procurement of consultants for institutional and financing study for PAO (IDA)
GEF
IDA
439530PROP0P091ort0PP0May0291020080.xls 11 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation: For Contracts under projects approved before the May 2002 GuidelinesProject/Programme: If Post-Review, No-objection Dates are not needed
Loan #:Contract
Type
Description*Source
of FundsSelection Method
Work Plan ReferenceLumpsum
orTime-Based
Estimated Amount
in US$ ’000
Prior/Post Review
Plan vs.
Actual
Prep & Submission
by Ex Ag
No-objectionDate
On-line UNDBGatewayNat Press
Lead-time before
shortlist
SubmissionDate
No-objectionDate
Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks
Actual
List of Contracts
Preparation Request for Proposals
Norm Duration of Proc Steps
Request for EOI(where required) Short
List
Actual
QCBS BRT.3C.07.004 LS 100.00 prior review Plan Feb. 18, 08 March 3, 08 Jan. 21, 08 Feb. 4, 08 Feb. 18, 08 March 3, 08
Actual
QCBS DVLA.TA.O7.001 LS 40.00 prior review Plan March 4, 08 March 18, 08 Feb 5, 08 Feb. 19, 08 March 4, 08 March 18, 08
Actual
QCBS KMA.TA.O7.003 LS 160.00 prior review Plan March 17, 08 March 31, 08 Feb. 18, 08 March 3, 08 March 17, 08 March 31, 08
Actual
QCBS BRT.3B.07.002 TB 3,000.00 prior review Plan March 31, 08 April 14, 08 March 3, 08 March 17,08 March 31, 08 April 14, 08
Actual
QCBS IUD.4.O7.001 LS 100.00 prior review Plan April 28, 08 May 12, 08 March 31, 08 April 14, 08 April 28, 08 May 12, 08
Actual
CQS BRT.3D.07.001 LS 50.00 prior review Plan N/A N/A April 14, 08 April 28, 08 May 12, 08 N/A
Actual
CQS AMA.TA.O7.003 LS 35.00 prior review Plan N/A N/A January 9,08 January 23,08 Febraury 6,08 N/A
Actual
CQS MLGRDE.TA.07.002 LS 85.00 prior review Plan N/A N/A March 17, 08 March 31, 08 April 14, 08 N/A
Actual
QCBS TMS.2F.07.001 TB 540.00 prior review Plan October 8,07 October 22,07 November 5, 07 Nov. 19,07 Dec. 24,07
Actual
QCBS TMS.2F.07.002 TB 300.00 prior review Actual October 8,07 October 22,07 November 5, 07 Nov. 19,07 January 11,08
Plan
QCBS TMS.2F.07.003-4 TB 560.00 prior review Plan October 8,07 October 22,07 November 5, 07 Nov. 19,07 Dec. 24,07
Actual
Technical Assistance for publictransport regulation and operation
Technical Assistance for thedevelopment and protection ofmajor Right of Ways in AccraMMDAs
Procurement of consultants for theSupervision of BRT
Technical Assistance for thedevelopment of operationalstandards for urban passengertransportation
Procurement of Consultants for the Development of a BRT Business Model (IDA)
Procurement of Consultants for the BRT Options study & Infrastructure design for K’si
Organizational study for the enforcement of transport regulations by MMDAs AFD
IDA
IDA
IDA
Procurement of consultants for Traffic Enforcement and Education (IDA and GOG)
IDA
IDA
IDA, GoG
IDA
Procurement of Consultants for the design and supervison of Traffic Management measures in AMA (AFD)
Procurement of Consultants for the Design and Supervision of Area Wide Traffic Study - Accra and Kumasi
Procurement of Consultants for the detailed design and supervison of Traffic Management measures in TMA,GEDA,GWDA
AFD
AFD
AFD
439530PROP0P091ort0PP0May0291020080.xls 12 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation: For Contracts under projects approved before the May 2002 GuidelinesProject/Programme: If Post-Review, No-objection Dates are not needed
Loan #:Contract
Type
Description*Source
of FundsSelection Method
Work Plan ReferenceLumpsum
orTime-Based
Estimated Amount
in US$ ’000
Prior/Post Review
Plan vs.
Actual
Prep & Submission
by Ex Ag
No-objectionDate
On-line UNDBGatewayNat Press
Lead-time before
shortlist
SubmissionDate
No-objectionDate
Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks
Actual
List of Contracts
Preparation Request for Proposals
Norm Duration of Proc Steps
Request for EOI(where required) Short
List
QCBS TB prior review Plan October 8,07 October 22,07 November 5, 07 Nov. 19,07 Dec. 24,07
Actual
Procurement of consultants for thedesign and specification of pilotroute for license “type B” AFD QCBS AMA.TA.O7.002 TB 40 Plan May 14,08 May 28, 08 June 4,08 June 11, 08 June 18,08 June 25, 08
Actual
Procurement of Consultants for the design and supervison of Traffic Management measures in KMA (AFD) AFD
439530PROP0P091ort0PP0May0291020080.xls 13 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Technical Assistance for the datacollection of transport routes andregistration of operators for AccraMMDAs
Norm Duration of Proc Steps
Procurement of Consultantants for the design of BRT Infrastructure
Procurement of individual consultants for PAO/CUT (minimum 4 contracts)
Technical Assistance for the datacollection of transport routes andregistration of operators forKumasi MMDAs
Technical Assistance for theDesign and operational study forthe implementation of a pilot routeservice contract for Kumasi
Procurement of consultants for specialist support to PAO
Procurement of consultants for support to UPTUs
Technical Assistance for theDesign and operational study forthe implementation of a pilot routeservice contract and developmentof a mandate for the AUPTCG
Technical Assistance for thedevelopment of ICT systems forthe UTP and the development ofAccra BRT website
Procurement of consultants to monitor indicators (3 contracts)
Procurement of consultants for institutional and financing study for PAO (IDA)
Plan vs.
Actual
InvitationDate
Submission/Opening
Date
SubmissionEvaluationReport (T)
No-objectionEvaluationReport (T)
Opening Financial
Proposals
PreparationEval Report
(T) (F)Negotiations (N)
Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks
Actual
Plan Mar 02, 07 Mar 18, 07
Actual July 13,06 Sept. 15,06 Jan 17,07 Jan 31,07 Feb 14,07 May 11,07
Plan N/A N/A N/A N/A N/A N/A Sept. 26, 07
Actual
Plan July 2,08 July 30,08 Aug. 13,08 Aug. 20, 08 Aug. 27,08 Sept. 3,08 Sept. 10, 08
Actual
Plan July 2,08 July 30,08 Aug. 13,08 Aug. 20, 08 Aug. 27,08 Sept. 3,08 Sept. 10, 08
Actual
Plan N/A N/A N/A N/A N/A N/A Nov. 12,07
Actual
Plan N/A N/A N/A N/A N/A N/A Jan.21,08
Actual
Plan January 7,08 March 3, 08 March 24, 08 April 7, 08 April 21, 08 May 5, 08 May 19, 08
Actual
Plan N/A N/A N/A N/A N/A N/A July 16, 08
Actual
Plan N/A N/A N/A N/A N/A N/A Jan. 7,08
Actual
Plan N/A N/A N/A N/A N/A N/A Jan. 14,08
Actual
Plan Feb. 13,08 April 9, 08 April 30, 08 May 14, 08 May 28, 08 June 11, 08 June 25, 08
Actual
ConsultantProposals
Proposal Evaluation and Negotiation for Projects after May 2002Technical (T) & Financial (F) and Negotions (N)
439530PROP0P091ort0PP0May0291020080.xls 14 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Norm Duration of Proc Steps
Technical Assistance for publictransport regulation and operation
Technical Assistance for thedevelopment and protection ofmajor Right of Ways in AccraMMDAs
Procurement of consultants for theSupervision of BRT
Technical Assistance for thedevelopment of operationalstandards for urban passengertransportation
Procurement of Consultants for the Development of a BRT Business Model (IDA)
Procurement of Consultants for the BRT Options study & Infrastructure design for K’si
Organizational study for the enforcement of transport regulations by MMDAs
Procurement of consultants for Traffic Enforcement and Education (IDA and GOG)
Procurement of Consultants for the design and supervison of Traffic Management measures in AMA (AFD)
Procurement of Consultants for the Design and Supervision of Area Wide Traffic Study - Accra and Kumasi
Procurement of Consultants for the detailed design and supervison of Traffic Management measures in TMA,GEDA,GWDA
Plan vs.
Actual
InvitationDate
Submission/Opening
Date
SubmissionEvaluationReport (T)
No-objectionEvaluationReport (T)
Opening Financial
Proposals
PreparationEval Report
(T) (F)Negotiations (N)
Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks
Actual
ConsultantProposals
Proposal Evaluation and Negotiation for Projects after May 2002Technical (T) & Financial (F) and Negotions (N)
Plan March 31, 08 May 26, 08 June 16,08 June 30, 08 July 14, 08 July 28, 08 Aug. 11, 08
Actual
Plan April 15, 08 June 10, 08 June 30, 08 July 8, 08 July 22, 08 Aug 5, 08 Aug 19, 08
Actual
Plan April 28, 08 June 23, 08 July 14,08 July 28, 08 August 11,08 August 25, 08 Sept. 8, 08
Actual
Plan May 12, 08 July 7, 08 July 28, 08 Aug. 11, 08 Aug. 25, 08 Sept. 08, 08 Sept. 22, 08
Actual
Plan June 9, 08 August 4, 08 August 25, 08 September 8,08 September 22,08 October 6, 08 October 13, 08
Actual
Plan N/A N/A N/A N/A N/A N/A May 26, 08
Actual
Plan N/A N/A N/A N/A N/A N/A Febraury 20,08
Actual
Plan N/A N/A N/A N/A N/A N/A April 28, 08
Actual
Plan January 21,08 March 17,08 March 31,08 April 14,08 April 28,08 May 5,08 May 19,08
Actual
Actual February 8,08 April 4,08 April 25,08 May 9,08 May 23,08 June 6,08 June 20,08
Plan
Plan January 21,08 March 17,08 March 31,08 April 14,08 April 28,08 May 5,08 May 19,08
Actual
439530PROP0P091ort0PP0May0291020080.xls 15 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Norm Duration of Proc Steps
Procurement of consultants for thedesign and specification of pilotroute for license “type B”
Procurement of Consultants for the design and supervison of Traffic Management measures in KMA (AFD)
Plan vs.
Actual
InvitationDate
Submission/Opening
Date
SubmissionEvaluationReport (T)
No-objectionEvaluationReport (T)
Opening Financial
Proposals
PreparationEval Report
(T) (F)Negotiations (N)
Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks
Actual
ConsultantProposals
Proposal Evaluation and Negotiation for Projects after May 2002Technical (T) & Financial (F) and Negotions (N)
Plan January 21,08 March 17,08 March 31,08 April 14,08 April 28,08 May 5,08 May 19,08
Actual
Plan July 2,08 July 30,08 Aug. 13,08 Aug. 20, 08 Aug. 27,08 Sept. 3,08 Sept. 10, 08Actual
439530PROP0P091ort0PP0May0291020080.xls 16 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Technical Assistance for the datacollection of transport routes andregistration of operators for AccraMMDAs
Norm Duration of Proc Steps
Procurement of Consultantants for the design of BRT Infrastructure
Procurement of individual consultants for PAO/CUT (minimum 4 contracts)
Technical Assistance for the datacollection of transport routes andregistration of operators forKumasi MMDAs
Technical Assistance for theDesign and operational study forthe implementation of a pilot routeservice contract for Kumasi
Procurement of consultants for specialist support to PAO
Procurement of consultants for support to UPTUs
Technical Assistance for theDesign and operational study forthe implementation of a pilot routeservice contract and developmentof a mandate for the AUPTCG
Technical Assistance for thedevelopment of ICT systems forthe UTP and the development ofAccra BRT website
Procurement of consultants to monitor indicators (3 contracts)
Procurement of consultants for institutional and financing study for PAO (IDA)
Plan vs.
ActualSubmission Date
No-objection Date
Contract Amount in
US$ ’000Contract Award
Contract Signature
Plan vs.
Actual
MobilizationAdvancePayment
DraftReport
FinalReport
FinalCost
Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Plan
Actual Actual
Plan April 10, 07 April 30, 07 May 15, 07 May 30, 07 Plan
Actual May 28,07 June 14,07 June 21,07 June 28,07 Actual
Plan Oct. 10,07 Oct. 17,07 Oct. 24,07 Oct. 31,07 Plan
Actual Actual
Plan Sept. 24,08 October 1, 08 October 8, 08 October 22,08 Plan
Actual Actual
Plan Sept. 24,08 October 1, 08 October 8, 08 October 22,08 Plan
Actual Actual
Plan Nov. 26, 07 Dec. 3,07 Dec. 10,07 Jan. 7,08 Plan
Actual Actual
Plan Feb.4,08 Feb. 11,08 Feb. 18,08 Feb. 25,08 Plan
Actual Actual
Plan June 2, 08 June 16, 08 June 23, 08 July 7, 08 Plan
Actual Actual
Plan July 30,08 August 6,08 August 13,08 August 27,08 Plan
Actual Actual
Plan Jan. 21,08 Jan. 28,08 Feb. 4, 08 Feb. 11, 08 Plan
Actual Actual
Plan Jan. 28, 08 Feb. 4, 08 Feb. 11, 08 Feb. 18, 08 Plan
Actual Actual
Plan July 9, 08 July 23, 08 July 30, 08 Aug. 6, 08 Plan
Actual Actual
Contract ImplementationContract FinalizationDraft Contract
439530PROP0P091ort0PP0May0291020080.xls 17 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Norm Duration of Proc Steps
Technical Assistance for publictransport regulation and operation
Technical Assistance for thedevelopment and protection ofmajor Right of Ways in AccraMMDAs
Procurement of consultants for theSupervision of BRT
Technical Assistance for thedevelopment of operationalstandards for urban passengertransportation
Procurement of Consultants for the Development of a BRT Business Model (IDA)
Procurement of Consultants for the BRT Options study & Infrastructure design for K’si
Organizational study for the enforcement of transport regulations by MMDAs
Procurement of consultants for Traffic Enforcement and Education (IDA and GOG)
Procurement of Consultants for the design and supervison of Traffic Management measures in AMA (AFD)
Procurement of Consultants for the Design and Supervision of Area Wide Traffic Study - Accra and Kumasi
Procurement of Consultants for the detailed design and supervison of Traffic Management measures in TMA,GEDA,GWDA
Plan vs.
ActualSubmission Date
No-objection Date
Contract Amount in
US$ ’000Contract Award
Contract Signature
Plan vs.
Actual
MobilizationAdvancePayment
DraftReport
FinalReport
FinalCost
Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Plan
Actual Actual
Contract ImplementationContract FinalizationDraft Contract
Plan Aug. 25, 08 September 8, 08 September 15, 08 October 6, 08 Plan
Actual Actual
Plan Sept. 2,08 Sept. 16, 08 Sept. 23, 08 Oct. 14, 08 Plan
Actual Actual
Plan Sept. 22, 08 Oct. 6, 08 Oct. 13, 08 Nov. 3,08 Plan
Actual Actual
Plan Oct. 6, 08 Oct. 20, 08 Oct. 27, 08 Nov. 17, 08 Plan
Actual Actual
Plan October 27, 08 November 10, 08 November 17, 08 December 8, 08 Plan
Actual Actual
Plan June 2, 08 June 9, 08 June 16, 08 June 23, 08 Plan
Actual Actual
Plan March 5,08 March 19,08 March 26,08 April 9,08 Plan
Actual Actual
Plan May 5, 08 May 12, 08 May 19, 08 May 26, 08 Plan
Actual Actual
Plan May 26,08 June 9,08 June 16,08 June 30,08 Plan
Actual Actual
Actual July 4,08 July 18,08 July 25,08 August 8,08 Actual
Plan Plan
Plan May 26,08 June 9,08 June 16,08 June 30,08 Plan
Actual Actual
439530PROP0P091ort0PP0May0291020080.xls 18 of 21 5/30/2008 1:10 AM
Procurement Plan-Consultants 2 Country/Organisation:Project/Programme:
Loan #:
Description*
List of Contracts
Norm Duration of Proc Steps
Procurement of consultants for thedesign and specification of pilotroute for license “type B”
Procurement of Consultants for the design and supervison of Traffic Management measures in KMA (AFD)
Plan vs.
ActualSubmission Date
No-objection Date
Contract Amount in
US$ ’000Contract Award
Contract Signature
Plan vs.
Actual
MobilizationAdvancePayment
DraftReport
FinalReport
FinalCost
Plan 1 - 2 wks 1 - 2 wks 1 wk 1 - 3 wks Plan
Actual Actual
Contract ImplementationContract FinalizationDraft Contract
Plan May 26,08 June 9,08 June 16,08 June 30,08 Plan
Actual Actual
Plan Sept. 24,08 October 1, 08 October 8, 08 October 22,08 PlanActual Actual
439530PROP0P091ort0PP0May0291020080.xls 19 of 21 5/30/2008 1:10 AM