PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main...

38
PT. INDO TEHNIK INDUSTRI Company Profile

Transcript of PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main...

Page 1: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

PT. INDO TEHNIK INDUSTRICompany Profile

Page 2: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

keep the best specialty of the past and pursue

the best quality in the future

keep the best specialty keep the best specialty of the past and pursue of the past and pursue

the best quality in the futurethe best quality in the future

keep the best specialty of the past and pursue

the best quality in the future

Page 3: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

CONTENTS3 Company Information

11 Performance Record

13 Project Highlight

23 Project Experience

29 License & Certification

35 Contact US

Page 4: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

Company Information

In order to meet your need, we are stepping forward to you with our abundant engineering technology and construction experience accumulated over21 years.

Our highly advanced technology and prominent management structure lead all projects promptly and effectively. We will secure to satisfy all your needs.

PT. INDO TEHNIK INDUSTRI

3

Page 5: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

To keep the best specialty of the past and pursue the best quality in the future.

MISSION

VISIONTo be a leading construction company providing Internationally accepted qualification.

To continue enjoying good reputation from clients with their full satisfaction.

MOTTO

4

Page 6: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

5

We, PT. INDO TEHNIK INDUSTRI,

was established on January 21, 1997

newly as one of the engineering and construction

company with 100% Foreign Investment (PMA)

Specialized for Mechanical Erection,

Piping Fabrication and Installation,

Steel Structure fabrication and Installation,

Plumbing, H.V.A.C., Fire Fighting, Sanitary Work.

HISTORY

1997

COMPANY INFORMATION

Page 7: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

6

Utilizing the unique experience of all our

management and members in

Indonesia and South East Asia

for more than 21 years,

We, PT. INDO TEHNIK INDUSTRI, has been

growing rapidly since its establishment and

enjoying good reputation on

our diversified service executed.

It is our firm belief that our service will provide

customers with full satisfaction in terms of

quality and schedule.

21 Years

Now, we are ready to serve you.

Page 8: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

7

COMPANY INFORMATION

OUR BUSINESS LINES

Major Field of Engineering and Construction

Steel Structure Fabrication / Installation

Piping Fabrication / Installation

Mechanical Erection

Plumbing. H.V.A.C., Fire Fighting, Sanitary Work

Page 9: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

8

GeneralAffair

Engineering ProjectExecution Marketing

Vice PresidentCHUNG SOK KIM

President DirectorKIM SOO YONG

DirectorHO SOK KIM

Board Director

Administration

Procurement

Financing

Accounting

Steel Structure

Mechanical

Piping

QA / QC

Steel Structure

Mechanical

Piping

QA / QC

CAD

Cost Schedule

Government Relation

ORGANIZATION

Page 10: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

9

COMPANY INFORMATION

KEY PERSONNEL

President Director Kim Soo Yong

Vice President Kim Chung Sok

Director Kim Ho sok

Site Manager Jung Hyun Mo

Project Manager Abdul Rohim

Engineering Manager Gunadi

Cost & Schedule Andi Syamsudin

Administration Manager Johannes Endro Sulistyo

Financing & Accounting Mintari Rimadaniati

Procurement Gatut Sugeng Wiyono

NitaHuman Resource Development

Page 11: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

10

Our EmployeeMax.

Mobilization

Description Korean Indonesia

Managing Staff

Administration

Engineering

CAD/DWG

DWG Drafter

Construction

QA/QC, Safety

Sch. / Cost

Supervisor

Foreman & Others

Total 6 114

3 1

6

1 20

5

8

2

UAE

2

1

1

10

10

3

16

35

Description Manpower

Welder (6G/3G)

Pipe Filter

Millwright /Mechanical

Rigger

Scaffolder

Steel Fabricator

Insulator

Painter

Equipment Operator

Semi Skilled Labor

Carpenter

Concrete Worker

Total 1,850

200

300

350

150

100

100

100

100

100

50

150

150

Page 12: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

PERFORMANCERECORD

Page 13: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

Performance DuringThe Past 20 Years

Project Performanceper Year

Total Contract Amount ExecutedUSD 119,000,000

Biggest Contract Amount for Single ProjectUSD 17,750,000

Highest Manpower Mobilized for Single Project2,000 persons

Highlights for Single Project Executed Steel Structure Fabrication & Erection : 11,800 tons,

Mechanical Equipment Erection of 8,600 tons, Piping Fabrication and Installation of 260,000 DI

93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09 10 11 12 13 14

500.0

0

1500.0

2000.0

1000.0

USD 11,000

12

Page 14: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

PROJECTHIGHLIGHTS

Project Location : QatarProject Summary : Customer : Umm Al-Houl Power CompanyMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 30.000.000Time Frame : May 2016 ~ August 2018

Umm Al-Houl Power Plant Project

OVERSEAS PROJECT

Page 15: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

EMAL Phase 2 CCPP Project

PRAI CCGT Project

Project Location : Prai, Penang, MalaysiaProject Summary : MWCustomer : TNB Prai Sdn BhdMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 4,100.000Time Frame : May 2014 ~ September 2015

Project Location : Al Taweelah, Abu DhabiProject Summary : 1,023 MW Customer : Emirates Alumminium Company LimitedMain Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 12.670.000Time Frame : March 2012 ~ June 2014

OVERSEAS PROJECT

PROJECT HIGHLIGHTS

14

Page 16: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

UAE Shuwaihat S2 IWPP Project

Project Location : Ruwais, UAE Project Summary : 1510 MW and 100 MIGDCustomer : Ruwais Power Company Main Contractor : Samsung C & TWork Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 17.750.000Time Frame : September 2009 ~ October 2010

Al- Ezzel Power Plant

Project Location : BahrainProject Summary : 4 Unit HRSG Power PlantCustomer : Al Ezzel Power Co.Main Contractor : Doosan Heavy Industries & Const. Co., Ltd.Work Scope : - Installation of Mechanical Equipment, - Fabrication and Installation of Piping : 98,000 DIContract Amount : USD 2,745,000Time Frame : January 2006 ~ August 2006

15

OVERSEAS PROJECT

PROJECT HIGHLIGHTS

Page 17: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

Khurais Central Gas Facilities Project

Project Location : Khurais, Saudi ArabiaCustomer : Saudi Arabia Oil Company (Saudi Aramco)Main Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 5.000.000Time Frame : August 2007 ~ August 2008

FCFC Aroma II, ISBL Chemical Plant

Project Location : Mai-Liao complex, TaiwanCustomer : Formosa Chemical & Fiber Corp.Main Contractor : Daelim Industrial. Co., Ltd.Work Scope : - Installation of Mechanical Equipment : 8,600 tons, - Fabrication and Installation of Piping : 520,000 DI, - Steel Structure : 11,800 tons, Maintenance and Commissioning Contract Amount : USD 6,000,000 excluding additional work

Time Frame : June 1998 ~ March 2000

16

Page 18: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

17

LOCAL PROJECT

PROJECT HIGHLIGHTS

Project Location : Anyer, Banten, IndonesiaProject Summary : Customer : PT. Asahimas Chemical (ASC)Main Contractor : Lotte Engineering & Construction.Work Scope : - Steel Structure Erection, - Equipment Erection, - Piping Fabrication and Installation - Pipe Support, Painting Insulation Maintenance & Commissioning AssistanceContract Amount : USD 6,000,000Time Frame : December 2014 ~ December 2015

ASC Phase-VI VCM Project

Project Location : Grati, Pasuruan, IndonesiaProject Summary : Customer : PT. Indonesia PowerMain Contractor : Lotte Engineering & Construction.Work Scope : - Equipment Erection, - Piping Fabrication and Installation, - Pipe Support, Painting & Insulation - Hydrotesting & Commissioning AssistanceContract Amount : USD 8,659,000Time Frame : March 2017~ August 2018

Grati CCPP (Peaker) Ext. Pjt. 450MW

Page 19: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

Khurais Central Gas Facilities Project

18

Cilacap RFCC Project

Khurais Central Gas Facilities Project

Project Location : Cikarang, West Java, Indonesia Customer : Hankook Tire Main Contractor : Lotte Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Equipment Erection, Contract Amount : USD 5,000,000Time Frame : December 2011 ~ September 2012

Project Location : Cikarang, West Java, Indonesia Customer : Hankook Tire Main Contractor : Lotte Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Equipment Erection, Contract Amount : USD 5,000,000Time Frame : December 2011 ~ September 2012

Hankook Tire Indonesia Plant Ph2

Project Location : Cilacap, Central Java, IndonesiaProject Summary : Customer : PT. Pertamina Main Contractor : GS Engineering & Construction.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning Assistance - Steel Structure Erection, Equipment Erection,Contract Amount : USD 16,200,000Time Frame : March 2013 ~ May 2015

Hankook Tire Indonesia Plant

Page 20: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

19

LOCAL PROJECT

PROJECT HIGHLIGHTS

Cibinong Phase III Extension Project

Project Location : Cibinong, West Java, IndonesiaProject Summary : 6,000 MTPD Cement PlantCustomer : PT. Semen CibinongMain Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Steel Structure : 2,637 tons - Erection : 8,071 tons - Piping Fabrication and Installation : 426 tons, Maintenance and Commissioning Contract Amount : USD 6,700,000 excluding additional work

Time Frame : March 1990 ~ July 1992

Cirebon CFPP : 660 MW x 1 Unit

Project Location : Cirebon, West Java, IndonesiaProject Summary : 660 MW x 1 UnitCustomer : Cirebon Electric Power Main Contractor : Doosan Heavy Industries & Construction, Co.. Ltd.Work Scope : - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 3,300,000Time Frame : September 2009 ~ December 2010

Page 21: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

20

OBL & Revamping for L Project

Project Location : Dumai, Sumatra, IndonesiaProject Summary : Lube Base Oil Plant, VDU unit 25,000 BPSD, CDW unit 9.000 BPSD Customer : PT. Pertamina & SK EnergyMain Contractor : SK Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection : 792 tons, - Piping Fabrication and Installation : 209,000 DI, - CommissioningContract Amount : USD 4,392,000Time Frame : May 2007 ~ April 2008

Project Location : Batu Licin, Kalimantan, IndonesiaProject Summary : 1,000 MTPH Cement ConveyorCustomer : PT. Indocement Tunggal Prakarsa, TbkMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Design & Engineering, Civil Work, Steel Structure Fabrication - Erection, Equipment Fabrication & Erection, - Electrical and Instrument, Start Up and CommissioningContract Amount : USD 1,975,000Time Frame : March 2006 ~ October 2006

Bulk Loading Conveyor Project

Page 22: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

21

LOCAL PROJECT

PROJECT HIGHLIGHTS

Project Location : Muara Tawar, West Java, IndonesiaProject Summary : 6 x 143 MW Gas Turbine Power PlantCustomer : PT. PLNMain Contractor : Samsung Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection, - Piping Fabrication and Installation - Pipe Support Maintenance & Commissioning AssistanceContract Amount : USD 2,475,000Time Frame : October 2003 ~ May 2004

Project Location : Jombang, East Java, IndonesiaCustomer : PT. Cheil Jedang IndonesiaMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Detail Design & Engineering for Piping - Piping Fabrication and Installation 120,000 DI Contract Amount : USD 1,400,000Time Frame : February 2003 ~ January 2004

Muara Tawar GTPP Project

Refinery / Fermentation Plant

Page 23: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

22

Project Location : Jombang, East Java, IndonesiaCustomer : PT. Cheil Jedang IndonesiaMain Contractor : PT. Indo Tehnik IndustriWork Scope : - Detail Design & Engineering for Piping - Piping Fabrication and Installation 120,000 DI Contract Amount : USD 1,400,000Time Frame : February 2003 ~ January 2004

Project Location : Gresik, East Java, IndonesiaProject Summary : Exhaust gas firing for PA PlantCustomer : PT. PetrowidadaMain Contractor : Envirotect, GermanyWork Scope : - Piping and Duct Fabrication & Refractory - Steel Structure Fabrication & Erection, Work - Equipment Erection, Contract Amount : USD 1,600,000Time Frame : 2001

Project Location : Paiton, East Java, IndonesiaProject Summary : 400 MW Coal Fired Stem Power PlantCustomer : PT. PLNMain Contractor : Hyundai Eng. & Const. Co., Ltd.Work Scope : - Equipment Erection : 2.548 tons, - Piping Fabrication and Installation : 1.124 tons - Fabrication and Installation of Fuel Oil Storage Tank, Contract Amount : USD 4,890,000 excl. Additional WorkTime Frame : August 1992 ~ August 1994

Thermal Incineration Unit

Paiton Power Plant Unit No. 1 & 2

Page 24: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

PROJECTEXPERIENCE

Page 25: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

24

ProjectName

Owner/Client

ContactValue Period Workspace

Hankook Tire Ph 2 IndonesiaCikarang, Indonesia

Hankook Tire Indonesia /

Lotte E & C Co., Ltd.

Equipment ErectionPiping Fab. & Installation

Commissioning Assistance

September 2014 ~

May 2015

USD 3,800,000-

Prai CCGT ProjectPrai, Penang, Malaysia

TNB Northern Bhd. /Samsung C&T

Piping Fabrication & InstallationCommissioning Assistance

May 2014 ~September

2015

USD 5,500,000-

Cilacap RFCC ProjectCilacap, Indonesia

PT. Pertamina /GS E & C Co., Ltd.

Steel Structure Fab. & ErectionEquipment Fab Erection

Piping Fab. & Installation

March 2013 ~May 2014

USD 16,200,000-

Additional Clay StorageKalimantan, Indonesia

PT. Indocement Tbk.

Steel Structure Fab. & ErectionMarch ~ July 2013

USD 375,000-

EMAL Ph 2 CCPP Project -1,023 MWAl Taweelah, UAE

Emirate Aluminum /

Samsung C & T

Piping Fab. & Installation : 150,000 DI - Pipe Support,

Maintenance & Commissioning Assistance

March 2012 ~June 2014

USD12,670,000-

Hankook Tire IndonesiaCikarang, Indonesia

Hankook Tire Indonesia /

Lotte E & C Co.,Ltd.

Equipment ErectionPiping Fab. & Installation

Commissioning Assistance

December 2011 ~

September 2012

USD 5,000,000-

Piping Engineering J ProjectJombang, Indonesia

PT. Cheil Jedang Indonesia

Basic Design & Piping Design,Drawing & As-Built2011

USD 500,000-

UAE S2 IWPP Project1,310MW & 100 MIGD Ruwais, UAE

Ruwais Power Company /

Samsung C & T

Piping Fab. & Installation : 260,000 DI

Pipe Support,Maintenance & Commissioning

Assistance

September 2009 ~

December 2010

USD 17,750,000-

Cirebon Coal Firing Power Plant (660MW 1 Unit) Cirebon West Java, Indonesia

Cirebon Elektric Power /

Doosan Heavy Industry

Piping Fab. & Installation : 100,000 DI - Pipe Support,Commissioning Assistance

September 2009 ~

August 2010

USD 3,300,000-

ASC Phase VIVCM, Anyer,Indonesia

Asahimas Chemical/

Lotte E & C Co., Ltd.

December2014 ~

December 2015

USD 7,700,000-

Steel Structure ErectionEquipment Fab Erection

Piping Fab. & InstallationPainting, Insulation

Umm Al Houl Power Plant Project

Umm Al Houl Power Company / Samsung C&T

May 2016 ~ June 2017

USD 30,000,000-

Piping Fab. & InstallationCommissioning Assistance

Grati CCPP (Peaker) Ext. Project 450MW

PT. Indonesia Power / Lotte

E&C (Consortium)

March 2017 ~ May 2018

USD 8,569,000-

Equiment ErectionPiping Fab. & Installation

Painting & insulationCommissioning Assistance

Page 26: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

New Jetty - B4 ProjectKalimantan, Indonesia

PT. Indocement Tbk.

Piling & Jetty Installation,Dredging2008

USD 2,000,000-

OBL & Revamping for L-Project - Lube Base Oil Plant

PT. Pertamina & SK Energy

Equipment Erection : 792 Ton Piping Fab. & Installation :

209,000 DI Commissioning

May 2007 ~April 2008

USD 4,392,000-

ProjectName

Owner/Client

ContactValue Period Workspace

Khurais Dentral Gas FacilitiesKhurais, Saudi Arabia

Saudi Arabia Oil Company

(Aramco Energy) /Hyundai E & C

Piping Fab. & Installation : 25,000 DI Pipe Support,

maintenance & Commissioning

August 2007 ~

August 2008

USD 5,000,000-

AL-EZZEL Power Plant4 Unit HRSGBahrain

Al-Ezzel Power Co. /

Doosan Heavy Industri

Equipment ErectionPiping Fab. & Installation :

98,000 DI

January 2006 ~

August 2006

USD 2,745,000-

Bulk Loading Conveyor 1,000

MTPH ConveyorKalimantan, Indonesia

PT. Indocement Tbk.

2006USD 1,975,000-

Steam LineGresik East Java, Indonesia

Piping Fab. & Installation

Methanol RecoveryGresik East Java, Indonesia

PT. Petrowidada

PT. Petrowidada

Steel Structure Fab. & ErectionEquipment Fab Erection

Piping Fab. & Installation

USD176,000-

Dismantling PA No. 2 PlantGresik East java, Indonesia

Dismantling & Recondition

USD 130,000-

Drying & Washing ColumnBio Diesel PlantGresik East Java,

Equipment Erection2005

USD 245,000-

USD 75,000-

Steam & Hydrant for PA PlantGresik East Java, Indonesia

Tank RepairPiping Fab. & Installation

Electrical, Commissioning

USD 295,000-

PROJECT EXPERIENCE

2006

2006

2005

2004

PT. Petrowidada

PT. Petrowidada

PT. Anugerah Intitama

Design & Procurement for Conveyor System, Civil & Found

tionSteel Structure Fab. & ErectionEquipment Fab. & Erection Electric

& Instrument, up &Co missioning

25

Page 27: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

26

ProjectName

Owner/Client

ContactValue Period Workspace

Piping Engineering P ProjectJombang, Indonesia

T. Cheil Jedang Indonesia

Basic Design & Piping Design,Drawing & As-Built2003

USD 150,000-

Muara Tawar GTPP Project6 x 143 MW Gas Tbn Power Plant

PT. PLN /Samsung C & T

Co., Ltd.

Equipment Erection,Piping Fab. & Installation : 45,000 DI Commissioning

USD 2,475,000-

Refinery / Fermentation Plant Jombang, Indonesia

PT. Cheil Jedang Indonesia

Piping Fab. & Installation : 120,000 DI

USD 1,400,000-

Furnace Steel WorkTuban East Java, Indonesia

Stone & Webster, UK

Dismantle & Recondition of Furnace System

USD 780,000-

Suban Gas PlantSuban Sumatra, Indonesia

Gulf Indonesia /Hyundai E & C

Co., Ltd.Field Tank Erection

USD455,000-

Paper Bag Storage & Hydrant SystemKalimantan,

PT. Indocement Tbk

Civil & FoundationSteel Structure Fab. & Erection

Equipment Fab. & ErectionPiping Fab. & Installation

USD 150,000-

ThermalIncineration Unit Exhaust Gas FiringGresik East java, Indonesia

PT. Petrowidada /Envirotech,

Germany

USD USD 1,600,000-

Jetty Bulk Loader ModificationKalimantan, Indonesia

Steel Structure Fab. & ErectionEquipment Fab. & Erection

Piping Fab. & InstallationCommissioning

USD 200,000-

Sumpal Gas Plant Sumpal, Sumatra, Indonesia

Gulf Indonesia /Hyundai E & C

Co., Ltd.Field Tank Erection

USD 75,000-

Dismantle for PA 1 & MA PlantGresik, East Java, Indonesia

Dismantle & Recondition PlantUSD

250,000-

Coal & Laterite Storage BLDG.Kalimantan, Indonesia

PT. Indocement Tbk.

Civil & FoundationSteel Structure Fab. & Erection

USD 570,000-

2004

2003

PT. Petrowidada

2003

2003

2002

2002

2002

2001

2001

2001

Main Reactor Fab. & Erection, Civil & Foundation Steel Structure Fab. &

Erection Equipment Fab. & ErectionPiping Fab. & Installation, Electric &

Instrument Refractory, Insulation, Start up &Commissioning

PT. Indocement Tbk

Page 28: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

PROJECT EXPERIENCE

27

ProjectName

Owner/Client

ContactValue Period Workspace

ASPEX Substation70KVCibinong,Indonesia

PT. Aspex /Hyundai E & C

Co., Ltd.

Electrical2000USD

60,000-

Darajat Geotherm Power Plant 55MW GeothermDarajat West Java,

HVAC

Bosowa Cement PlantUjung Pandang, Indonesia

PT. Bosowa Cement /

Daewoo E & C Co., Ltd.

1999USD 120,000-

Irian Jaya Co-Gen Power Plant 13 MW Wood Chip Firing Irian jaya,

Equipment ErectionPiping Fab. & Installation

Refractory, Electric & Instrument,Insulation, Commissioning

Paiton Steam Power Plant 1,200 MW Coal FiringPaiton East Java,

PT. PLN /Shinwha

Costruction

PT. Korindo /Hyundai E & C

Co., Ltd.

T. Amoseas Indonesia /

Hyundai E & C Co., Ltd.

USD500,000-

TPPI Olefine PlantTuban East Java, Indonesia

Steel Structure ErectionPiping Fab. & Installation

USD 5,500,000-

O-Xylene & Raw

Water Storage Tank

10,000 & 2,000 M3

Gresik East Java,

Indonesia

Tank Fab. & Erection,Piping Fab. & Installation,1997

USD 4,600,000-

USD 950,000-

1998

1998

1997PT. TPPI /

Daelim Industri Co., Ltd.

PT. Petrowidada

USD 420,000- 1999

HVAC

Piping Fab. & Installation : 1,124 Ton

Fire Fighting, Electrical,Insulation, Commissioning

Scrubber UnitGresik, East Java, Indonesia

Equipment Feb. & Erection,Piping Fab. & Installation

USD 200,000-

FCFC Aroma II Chemical PlantMai-Liau Comlex Taiwan

Formosa Corporation /

Daelim Industrial Co., Ltd.

Steel Structure Erection : 11,800 TonEquipment

Erection : 8,600 Ton

Piping Fab. & Installation :

520,000DI,Maintenance & Commissioning

USD 6,000,000-

2001

2000

PT. Petrowidada

Page 29: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

28

ProjectName

Owner/Client

ContactValue Period Workspace

Miwon Co-Gen

Power Plant 6 MW

Gas Tbn 3 & 4 Unit

Surabaya, Indonesia

PT. Miwon Indonesia 1996

USD 560,000-

Irian Jaya Co-Gen

Power Plant 13 MW

Wood Chip Firing

Irian jaya, Indonesia

PT. Korindo /Hyundai E & C

Co., Ltd.

USD 600,000-

Seram Co-Gen Power Plant13 MW Wood Chip Firing Seram Island, Indonesia

PT. PLN /Hyundai E & C

Co., Ltd.

Equipment Erection : 1,024 TonPiping Fab. & Installation : 210 Ton

Refractory 428 Ton, Electric & Instrument,Insulation, Commissioning

USD 595,000-

Miwon Co-Gen Power Plant 6 MW Gas Tbn 1 & 2 Unit Surabaya, Indonesia

Equipment Erection : 382 TonPiping Fab. & Installation : 120 Ton

Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning

USD 5,000,000-

Paiton Steam Power Plant 400 MW Coal FiringPaiton East java, Indonesia

PT. PLN /Hyundai E & C

Co., Ltd.

USD4,890,000-

Equipment ErectionPiping Fab. & Installation

HVAC Commissioning

USD 540,000-

Semen Cibinong Phase III 6,000 MTPD Cement Plant Cibinong, West Java, Indonesia

PT. Semen Cibinong/

Hyundai E & C Co., Ltd.

USD 6,700,000-

Darajat Geotherm Power Plant55MW GeothermDarajat West Java, Indonesia

PA Storage Tank1,000 M3Gresik East Java, Indonesia

Tank Fab. & Erection,Piping Fab. & Installation,

Steal Tracing w/jacket

USD 400,000-

Butyl Acetate Plant20,000 MTPYMerak, West Java, Indoneisa

Equipment Erection.Piping Fab. & Installation,

Commissioning

USD 540,000-

MA Chemical Plant

3,000 MTPY

Gresik, East Java,

Indonesia

Equipment Erection.Piping Fab. & Installation,

Electric & Instrument,Commissioning

USD 470,000-

1997

1996

1997

PT. Petrowidada /

LG E & C Co., Ltd.

PT. Petrowidada

PT. Petrowidada

1995

1995

1995

1994

1994

1992 ~1993

Steel Structure Erection : 2,637 TonEquipment Erection : 8,071 Ton

Piping Fab. & Installation : 426 TonCommissioning

Equipment Erection : 328 TonPiping Fab. & Installation : 120 Ton

Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning

PT. Miwon Indonesia

Equipment Erection : 2,548 TonPiping Fab. & Installation : 1,124 Ton

Fuel Oil Storage Tank Commissioning

PT. PLN /Hyundai E & C

Co., Ltd.

Equipment Erection : 328 TonPiping Fab. & Installation : 120 Ton

Refractory 98 Ton, Electric & Instru-ment, Insulation, Commissioning

Page 30: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

LICENSE & CERTIFICATION

Page 31: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

Dinas Perdagangan, Perindustriandan Penanaman Modal

Pemerintah Kota Surabaya

Tanda daftar perusahaan13.0.1.1.41.13185

Tanda Daftar PerusahaanPT. Pembangkitan Jawa-Bali

0244/611/SPA/2015

Certificate of Compliancehas been assesed

and complied against the ISO 9001:2008 Standard

Sertifikat Kesepakatan Jaminan Sosial Tenaga Kerja

NN130091

Assesment Contractor Safety Management

System ResultGrade High

Kementrian Energi dan Sumber Daya Mineral Republik Indonesia

Direktorat Jenderal Minyak dan Gas Bumi

044/SKT-01/DMT/2013

30

Page 32: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

COMPLETION CERTIFICATION

31

PT. Cheil Jedang IndonesiaCJ P Project

LOTTE Eng. & Const. Co., Ltd. Hankook Tire Indonesia Project

GS Engineering & ConstructionPertamina RFCC, Cilacap Project

Page 33: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

32

Hyundai Eng. & Const. Co., Ltd.KCPF Project Saudi Arabia

SK Eng. & Const. Co., Ltd.SK L Project Dumai

Samsung Eng. & Const. Co., Ltd

UAE S2 IWPP Project

Page 34: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

COMPLETION CERTIFICATION

33

Shinwha Const. Co., Ltd.Paiton Power Plant

PT. Artika Optima Inti

Hyundai Eng. & Const. Co., Ltd.

KCPF Project Saudi Arabia

Page 35: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

34

Daelim Industrial Co., Ltd.FCFC Aroma II, Project, Taiwan

Samsung Eng. & Const. Co., Ltd.Muara Tawar DTPP Project

PT. Petrowidada

Page 36: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

35

Plaza Segi 8, Blok D, No. 875, Jl. Pattimura, Surabaya, East Java, 60189, Indonesia

Tel.: +62 31 732 7280, 81 Fax.: +62 317327278E-mail : [email protected] : www.itisby.com

CONTACT US

HEAD OFFICE Surabaya

Complex Wijaya Grand Centre (Gedung Citra) 3rd Floor, Room 10, Blok F No. 48. Jakarta Selatan, 12160, Indonesia

Contact Person : Kim, Young Eon/DirectorTel.: +62 21 726 9045, 720 1674 Fax.: +62 21 720 1862E-mail : [email protected]

LIAISON OFFICE Jakarta

11th floor, Cho Hoon Building. 59-7 Mung-Dong 1Ga, Jung-Gu, Seoul, Korea

Contact Person : Dong Youl, Kim/ ChairmanTel.: +82 2 7562235/6, Fax.: +82 2 7562234E-mail : [email protected]

LIAISON OFFICE Korea

Page 37: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

36

PO.BOX 107729, L L J Business Centre No. 123, Abu Dhabi – U.A.E

Contact Person : Nawaf S. Mohammed Al Amoudi/ RepresentativeTel.: +971 -2-4950700Mob: +97155 - 8897777E-mail : [email protected]

BRANCH OFFICE UAE, Abu Dhabi

B4-3 Jalan Ampang Utama 2/2, Taman Ampang Utama , 6800 Selangor , Malaysia

Contact Person : Ho Sok, Kim/ RepresentativeTel.: +60 1124250747E-mail : [email protected]

Indo Tehnik Industri Sdn. Bhd.

Page 38: PT. INDO TEHNIK NDUSTRI Company Profile - itisby.com · Customer : PT. Semen Cibinong Main Contractor : ... Gresik, East Java, Indonesia ... Cirebon Elektric Power / Doosan Heavy

Indo Tehnik Industri

Plaza Segi 8, Blok D, No. 875, Jl. Pattimura, Surabaya, East Java, 60189, Indonesia

Tel.: +62 31 732 7280, 81 Fax.: +62 31 732 7278E-mail : [email protected] : www.itisby.com