SEMINARON
“Construction Aspects of Post-Tensioned Flat Slab”
Presented By
Mr. Mulla Amanulla Liyakatali Department Of Civil Engineering
Sanjay Ghodawat Institute, Attigre
Guided by- Prof. Patil V S Prof. Khurth V G
![Page 2: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/2.jpg)
Session Outline Quick review of basic prestressing
technique General applications of prestressing
What is PT flat slab & its Types Construction aspects &materials Used
in PT flat slab Benefits over conventional RCC slab Discussion References
![Page 3: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/3.jpg)
Prestressing is process of subjecting member under compressive stresses (compression) by external longitudinal loading.
Prestressing is process of subjecting member under compressive stresses (compression) by external longitudinal loading.
What Is Prestressing????
![Page 4: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/4.jpg)
Prestressed Concrete vs. RCC
The main difference between PC and RC is the fact that steel reinforcement in the Prestressed Concrete is ACTIVE and the same is PASSIVE in Reinforced Concrete
Prestressed concrete can most easily be defined as pre-compressed concrete. This mean that compressive stress is put into concrete member before begin its working life and its position to be in areas where tensile stress develop under working load.
Also….
![Page 5: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/5.jpg)
Types of Prestressing.
Post-tensioning-
Pre-tensioning-
![Page 6: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/6.jpg)
What is Pre-tensioning???Steel reinforcement are stressed prior to concrete
placement, usually at a precast plant remote from the construction site.How Pre-tensioning is done ???
![Page 7: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/7.jpg)
![Page 8: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/8.jpg)
![Page 9: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/9.jpg)
What is Post-tensioning ??? Steel tendons are stressed after the concrete has been placed and gained sufficient strength at the construction sites.Example : Post – Tensioning of Floor Slab,How Post-tensioning is done ???
STRESSING AFTER CASTING
![Page 10: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/10.jpg)
Post-Tensioning System-
![Page 11: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/11.jpg)
Application of Prestressed Concrete
![Page 12: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/12.jpg)
![Page 13: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/13.jpg)
![Page 14: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/14.jpg)
![Page 15: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/15.jpg)
COMMERCIAL / INDUSTRIAL FLOORS
![Page 16: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/16.jpg)
SLAB ON GROUND
![Page 17: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/17.jpg)
![Page 18: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/18.jpg)
Buildings
![Page 19: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/19.jpg)
What is PT Slab ???
The slab constructed with post-tensioning technique and having top and bottom surfaces parallel to each other.
![Page 20: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/20.jpg)
Types of Flat Slab
![Page 21: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/21.jpg)
STEPS IN CONSTRUCTION OF PT SLAB AND
MATERIALS
![Page 22: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/22.jpg)
Shuttering
Marking
Layout Elevation
Profiling
Stages in formwork and reinforcement
![Page 23: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/23.jpg)
ADJUSTABLE SPANNINGSTEEL PROPS
![Page 24: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/24.jpg)
PLACING OF BOTTOM REINFORCEMENT
![Page 25: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/25.jpg)
POSITION OF CHAIRS FOR PROFILING OF TENDONS
![Page 26: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/26.jpg)
Elevation
Profiling
Layout
It is the arrangement of Duct/strands +ve and –ve moment.
Setting out of the cable profile, spacing of strands.
![Page 27: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/27.jpg)
PLACING OF TOP REINFORCEMENT
![Page 28: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/28.jpg)
LIVE END BLOCK REINFORCEMENT
![Page 29: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/29.jpg)
BALLOONING AT DEAD END
![Page 30: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/30.jpg)
DEAD END R/F
![Page 31: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/31.jpg)
STRANDS USED FOR BONDED PT CONSTRUCTION
![Page 32: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/32.jpg)
STRANDS USED FOR UNBONDED PT CONSTRUCTION
![Page 33: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/33.jpg)
IDENTIFICATION OF TENDONS
![Page 34: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/34.jpg)
![Page 35: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/35.jpg)
PLASTIC DUCTS
![Page 36: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/36.jpg)
STEEL DUCTS
![Page 37: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/37.jpg)
FLAT DUCTS RESTED ON CHAIRS
![Page 38: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/38.jpg)
MONOSTRANDANCHORS FOR UNBONDED P T
![Page 39: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/39.jpg)
MULTISTRAND ANCHORS FOR UNBONDED P T
![Page 40: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/40.jpg)
![Page 41: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/41.jpg)
![Page 42: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/42.jpg)
POSITIONS OF COMPONENTS
![Page 43: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/43.jpg)
SHEAR RESESTING STUDS
![Page 44: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/44.jpg)
![Page 45: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/45.jpg)
![Page 46: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/46.jpg)
CONCRETING OF SLAB.
Before casting, some precautions are taken such as checking the sheath joints and connection of grouting vents.
To minimize manual errors in casting and compaction, equipments like concrete pumps, surface compactor, Needle Vibrator are used.
![Page 47: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/47.jpg)
CONCRETE MIXING PLANT
Mixing Unit
Batching Unit
Pumping Unit
![Page 48: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/48.jpg)
CONCRETING
![Page 49: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/49.jpg)
REMOVE POCKET FORMER
![Page 50: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/50.jpg)
CLEAN THE STRANDS
![Page 51: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/51.jpg)
MARK THE TENDONS
![Page 52: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/52.jpg)
STRESS TENDONS
![Page 53: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/53.jpg)
MEASURE ELONGATION
![Page 54: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/54.jpg)
E.O.H PUMP- This is used to give hydraulic pressure to the jack.
Gauge-1:- used to control pressure of the jack.
Gauge-2:- used to block the strand into the jack.
![Page 55: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/55.jpg)
![Page 56: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/56.jpg)
CLEAN END PACKETS
![Page 57: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/57.jpg)
PATCH END POCKETS
![Page 58: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/58.jpg)
Grouting Machine
Grout Mixer &Collection Unit
Supply Pipe
Control Valves Pump
Feeding Unit
Controlling Unit
![Page 59: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/59.jpg)
![Page 60: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/60.jpg)
![Page 61: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/61.jpg)
REDUCED SHORING COST
![Page 62: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/62.jpg)
GEOMETRIC FLEXIBILITY
![Page 63: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/63.jpg)
Reduced construction cost Faster construction Elegant structure Improved Water resistant Early formwork stripping Floor to floor height reduction Reduced foundation loadImproved deflection control Greater column free areasReduced seismic riskFlexible planningReduced cladding cost
BENEFITS OF FLAT SLAB
![Page 64: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/64.jpg)
HOW CONSTRUCTIONIS FASTER?
![Page 65: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/65.jpg)
HOW SECTION SIZES GET REDUSED?
![Page 66: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/66.jpg)
•Post-tensioning reduces overall building mass, which is important in zones of high seismicity.
![Page 67: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/67.jpg)
•Profiled tendons result in balanced gravity loads, significantly reducing total deflections.
•Permanent compressive forces result in greater control of cracks, deflection, and camber.
![Page 68: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/68.jpg)
• The flat-plate building clearly behaves like the strong column-weak beam mechanism
![Page 69: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/69.jpg)
Comparative cost of PT & RCCdurability of structure. innovative technique and theunavailability of materials and if PT slab get implemented on large scale which ultimately increase demand
of materials resulting in production of PT materials. And the material will be easily available
If we observe today’s situation which is exactly in favors of PT construction that is the number of companies entering in the production of PT materials is going on increasing. Resulting in the lesser cost of material which affects the economics of PT.
Also due to advanced portable stressing equipment and sophisticated design software helping in complex tendon profile and rigorous reinforcement details promoting the construction of PT and maximizing the use of today’s engineering skill.
DISCUSSIONS
![Page 70: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/70.jpg)
11.0 REFERENCES
ONLINE REFERENCES:http://www.pci.orghttp://pubs.asce.org/books/http://www.bassbeams.co.zahttp://www.sciencedirect.com/http://www.bbrnetwork.comhttp://www.vsl.nethttp://www.gostructural.comhttp://enr.construction.comhttp://www.noorps.comhttp://www.structureae.de.comhttp://www.wisegeek.comhttp://www.tech9.inhttp://www.concretenetwork.comhttp://www.infolink.com.auhttp://www.ntpholdings.com/projects.asphttp://www.cclstressing.com/http://www.yde.co.il/http://www.conforce.co.uk/http://www.istructe.org.uk/
![Page 71: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/71.jpg)
OFFLINE REFERENCES:
BOOKSPrestressed concrete by krishnarajuPrestressed concrete by DayaratnamModern prestressed concrete by James
R.Libby.STANDARD CODES IS: 1343 for prestressed concreteACI 318-77 ACI Standard building code
requirements for reinforced concrete. CP 110: Part I: 1972 Code of practice for the
structural use of concrete: Part I Design, materials and workmanship.
AS 1481-1974 SAA Prestressed concrete code. Standards Association of Australia.
![Page 72: Pt Flat Slab](https://reader033.fdocuments.net/reader033/viewer/2022061109/54512684af7959d40d8b4762/html5/thumbnails/72.jpg)