INFRASTRUCTURE. CHECK LIST From To : M/S STRUCTURAL CONSULTANT PROJECT :- PT Slab Floor : Date: / / 2015 Please check and allow P.T Beam , Slab , Chajja , etc.. Sr.No. Item Yes No CHECK 1 Are the sheating pipes water tight to prevent entrance of cement grout during concreting . 2 Are the prestressing Strands free of grease and corrosion. 3 Is the Installation of tendon in accordance with the shop drawings? 4 Is vertical & horizontal Tendon profile within the tolerance limit? 5 Are the Anchorage are fixed to the end of the formwork by support bar. 6 Are the Tendon Support bars & bar- chairs placed at Sufficient Intervals and secured with binding wire to avoid movement 7 Are the duct joints sealed with tapes? 8 Are the grout hose pipes protected from embedded in concrete ? 9 Are sufficient no of grout hose pipes inserted? Signatu

description

T

Transcript of Pt Check List

Page 1: Pt Check List

INFRASTRUCTURE.

CHECK LIST

From

 

To : M/S STRUCTURAL CONSULTANT

PROJECT :-      

        PT Slab Floor :     Date:      /      /  2015          Please check and allow P.T Beam , Slab , Chajja , etc..

        

Sr.No. Item Yes No CHECK 1 Are the sheating pipes water tight to prevent entrance  of cement grout 

during concreting .     2 Are the prestressing Strands free of grease and corrosion.    3

Is the Installation of tendon in accordance with the shop drawings?   

4 Is vertical & horizontal Tendon profile within the tolerance limit?    5

Are the Anchorage are fixed to the end of the formwork by support bar.   

6 Are the Tendon Support bars & bar- chairs placed at Sufficient Intervals and secured with binding wire to avoid movement    

7 Are the duct joints sealed with tapes?    8 Are the grout hose pipes protected from embedded in concrete ?    9 Are sufficient no of grout hose pipes inserted?

       

      

 Signature                  

Project Engineer:    )