Papworth Hospital Floor Plans Purpose of the Drawing For the hospital in Papworth, the actual designing took place in England and they sent the floor plans for the hospital. These floor plans were in the form of sketches of the rooms required on each floor which were then drawn up. The drawings needed to ensure that the required areas of each room and corridors. After the drawing were finished, they were sent back to England for approval.

description

updated portfolio

Transcript of pss update

Page 1: pss update

Papworth Hospital Floor Plans

Purpose of the Drawing

For the hospital in Papworth, the actual designing took place in England and they

sent the floor plans for the hospital. These floor plans were in the form of sketches

of the rooms required on each floor which were then drawn up. The drawings

needed to ensure that the required areas of each room and corridors. After the

drawing were finished, they were sent back to England for approval.

Page 2: pss update

TREAT.

4 BED

4 BED

E.S.

GYM

ST.EQ.

A WC

WC

ROOMMACHINE

OFFICEOFFICEMANAG.

IT.OFFICE

OFFICE

SEMINAR

CH.CH.

INT.

INT.

INT.

CLNR.

DISP.

WAIT.

RECEP.

LIFTEM.

OFFICE

CONTROL

GAMMA

PET CT.

PREPMRI

ROOMDAY

BEDBEDBEDBEDBEDBED

BRONCOSCOPY

VOID OVER ATRIUM

E.S. E.S. E.S.E.S. E.S. E.S.

MDT

BED

E.S.

BED

BED

BED

BED

BED

E.S.

PNU

RESUS

E.S.

TREAT.

PANTRY

E.S.

E.S.

E.S.

E.S.

WAITING

STAIRS

CLEAN UTILITY

DISP.

ASS. WC

STRESS

HOT WAIT.

WC.

HOT

WC.

HOT

WASTE

WASTE

CT. ROOM

CONTROLCT. ROOM

CH.SUB. WAIT

CHANGED

OFFICE

DUTY

SCANNER

DENSITY

BONE

UTILITY

CLEAN

UTILITYDIRTY

CH.

CH.

FLUOROSCOPY

CLEAN

SCOPE

CLNR

DISP.

PREP

PATIENT

BRONCH.

CONTROL

MRI

ROOM

MRI

OFFICE INTER.

RECEPTION

MRI STORE

ROOM

MRI

WC.

WC

PREP

CT.

HOLD

INPATIENT

CH

FEMALE

SUPPORT

PACS

CH.

ST.

WC

SW.

WC

A WC

CLNR.

VIEWINGPOST

PRE-INJECT

BASE

STAFF

STORE

EQUIP.

LINEN

ASS. WC WC

ASS.

UTILITY

DIRTY INT.

WC

ST.

TOUCH DOWN

WCWC

CLNR

RECEPTION

DISP.

Req:16.0m†

Req:16.0m†

Req:6.0m†

Req:2.0m†

Req:48.0m†

Req:1.0m†

Req:1.0m†

Req:48.0m†

Req:6.0m†Req:6.0m†

Req:16.0m†

Req:16.0m†

Req:6.0m†

Req:6.0m†

Req:16.0m†

Req:16.0m†

Req:6.0m†

Req:5.0m†Req:5.0m†

Req:2.5m†Req:2.5m†

Req:5.0m†

Req:8.0m†

Req:18.0m†

Req:12.0m†

Req:5.0m†

Req:18.0m†

Req:10.0m†

Req:5.0m† Req:5.0m†

Req:6.0m†

Req:6.0m†

3.43 m†

4.98 m†

0.48 m†

0.48 m†

4.60 m†3.80 m†

3.60 m†

3.60 m†

3.80 m†

5.85 m†

2.19 m† 2.38 m†

8.24 m†

4.87 m†

18.59 m†

9.57 m†

Req:12.0m†

Req:16.0m†

Req:6.0m†

Req:16.0m†

Req:6.0m† Req:6.0m†

Req:16.0m† Req:16.0m†

Req:6.0m† Req:6.0m†

Req:16.0m†

Req:6.0m†

Req:25.0m†

Req:10.0m†

Req:14.0m†Req:15.0m†

Req:20.0m† Req:20.0m†

Req:20.0m†Req:33.0m†

Req:45.0m†

Req:5.0m† Req:15.0m† Req:5.0m†

Req:20.0m†

Req:45.0m†Req:40.0m†

Req:45.0m†

Req:18.0m†

Req:18.0m†

Req:12.0m†

Req:5.0m†

Req:5.0m†

Req:15.0m†

Req:33.0m†

Req:5.0m†

Req:33.0m†

Req:12.0m†

Req:8.0m†

Req:8.0m†

Req:33.0m†

Req:26.0m† Req:12.0m†

Req:5.0m†Req:5.0m† Req:5.0m†

Req:3.0m†Req:3.0m†

Req:9.0m†

Req:2.5m†

Req:2.5m†

Req:5.0m†

Req:15.0m†Req:14.0m†

Req:2.5m†

Req:2.5m†Req:12.0m†Req:12.0m†

Req:14.0m†

Req:8.0m†

Req:20.0m†

Req:24.0m†Req:45.0m†Req:22.0m†

Req:45.0m†

Req:4.0m†

Req:10.0m† Req:10.0m†

Req:10.0m†

Req:33.0m†Req:33.0m†Req:12.0m†

Req:5.0m†

Req:60.0m†

Req:5.0m†

Req:5.0m†

Req:2.0m†

Req:10.0m†

Req:16.0m†

Req:22.0m†

Req:5.0m†

Req:5.0m†

Req:2.0m†

Req:15.0m†

Req:18.0m†

Req:10.0m†

Req:10.0m†

Req:10.0m†

Req:35.0m†

Req:16.0m†

Req:12.0m†

Req:45.0m†

Req:26.0m†

Req:20.0m†Req:30.0m†Req:12.0m†Req:30.0m†

Req:10.0m†Req:8.0m†

Req:5.0m†

Req:2.5m†

Req:48.0m†

Req:22.0m†Req:22.0m†

Req:5.0m†

Req:6.0m†

Req:5.0m†

Req:8.0m†

Req:5.0m†

Req:6.0m†

Req:7.5m†

Req:12.0m†

Req:8.0m†

17.04 m† 17.04 m†

25.76 m†12.86 m†

7.92 m†

15.93 m†

30.36 m†

2.74 m†

105.93 m†

6.67 m†

Req:14.0m†

3.32 m†

15.39 m†31.62 m† 31.53 m†

20.63 m†5.57 m†

5.57 m†

17.05 m†

Req:16.0m†

10.77 m† 10.77 m†

18.39 m†

8.25 m†

6.98 m†

5.11 m†

8.83 m†

1.97 m†

11.17 m†

29.40 m† 19.63 m†29.50 m†

12.00 m†

11.53 m†

11.57 m†

4.64 m†

4.64 m†

25.37 m†

21.22 m†

13.25 m†

8.65 m†

5.29 m†

10.72 m†

4.42 m†

4.03 m†

7.01 m†

37.27 m†

47.99 m†

20.10 m†47.40 m†

29.44 m†

4.59 m†

17.65 m†

19.09 m†

4.61 m†

11.50 m†

44.78 m†

3.60 m†

17.05 m†

3.60 m†

17.04 m†

3.60 m†

14.95 m†

3.80 m†

17.04 m† 12.96 m†

21.27 m†

19.02 m†

2.97 m†

3.80 m†3.60 m†

2.97 m†

10.01 m†

4.45 m†

2.71 m†

10.21 m†

3.73 m†

48.22 m†

16.05 m†

12.33 m†

4.23 m†

5.03 m†

23.41 m† 23.41 m†

6.21 m†

29.34 m†

6.21 m†

18.02 m†

6.71 m†

18.11 m†

2.37 m†

5.71 m†3.89 m†

6.10 m†2.87 m†

14.54 m†24.47 m†

2.40 m†

Req:3.0m†

OFFICE

2.82 m†

OFFICE

PREPMRI

REPORT REPORT

CT CH CT STORECT CH

PREP

CT.

WC.

WC.

COMP

MALE CH

REST

STAFF

OFFICE

SWITCH CUP.

Req:0.00m†

Req:10.0m†

Req:11.5m†

Req:2.5m†

Req:2.5m†

11.50 m†

9.93 m†

2.34 m†

2.32 m†

Req:22.0m†

21.52 m†

16.66 m†

16.66 m†

16.66 m†

16.66 m†

RHT-017

Req:40.0m†RHT-001

Req:3.0m†

RHT-006

RHT-007

RHT-008

RHT-009

RHT-014

RHT-016

RHT-012

RHT-015

3.15 m†

20.42 m†

RHT-013

RHT-005

RHT-004

Req:0.00m†

Req:3.0m†

8.46 m†

STUDY

Req:3.5m†

3.50 m†

STUDY

Req:3.5m†

3.50 m†

PRINT

Req:10.0m†

10.73 m†

STUDY

Req:3.5m†

3.67 m†

Req:11.5m†

11.50 m†

STUDY

Req:3.5m†

3.50 m† STUDY

Req:3.5m†

3.50 m†

Req:3.0m†

6.81 m†

Req:2.5m†

2.50 m†

Req:2.5m†

2.36 m†

STUDY

Req:3.5m†

3.67 m†

Req:11.5m†

11.50 m†

Req:11.5m†

15.55 m†

PRINT

Req:10.0m†

10.00 m†

Req:11.5m†

11.75 m†

Req:2.5m†

Req:5.0m†

Req:14.0m†

19.63 m†

Req:5.0m†

Req:5.0m† Req:10.0m†

Req:10.5m†

9.30 m†

Req:10.0m†

10.73 m†

PRINT

Req:22.0m†

23.71 m†

PRINT

PRINT

Req:10.0m†

10.00 m†

PRINT Req:11.5m†

11.75 m†

PRINT

PRINT

Req:10.0m†

11.50 m†

21.31 m†

Req:5.0m†

2.88 m†

A WC

43.89 m†

979.81 m†

BEV BAYMEETING

MEETING

BEV BAY

WC

WC

MEETING

LINEN

MEETING

STAFF REST

MEETING

WC

11.35 m†

ASS. WC

5.40 m†

11.51 m†

MALEFEMALE

ROOM

MACHINE

Req:2.5m†

2.33 m†WC.

A. WC

Req:5.0m†

5.05 m†

4.64 m†

4.64 m†

10.83 m†

33.36 m†

3.47 m†

24.92 m†

42.63 m†

12.89 m†

9.33 m†

Req:6.0m†

8.18 m†4.43 m†11.91 m†10.13 m†

19.54 m†

5.36 m†

14.32 m†

12.04 m†11.29 m†

45.93 m†

38.78 m†

17.93 m†

59.67 m†

5.92 m†

18.38 m†

2.13 m†

2.06 m†

2.56 m†

14.66 m†

WC

WC

MEETING

PRINT

47.86 m†

47.73 m†

19.64 m†

2.69 m†

5.06 m† 16.07 m†

3.50 m†14.95 m†

15.07 m†

4.08 m†

8.80 m†

131.26 m†

STAFF REST

Req:0.00m†

32.57 m†

Req:0.00m†

16.48 m†

13.87 m†

SWITCH CUP.

SWITCH CUP.

Req:0.00m†Req:0.00m†

Req:0.00m†

Req:0.00m†

1.74 m†

TOUCH DOWNReq:0.00m†

1.74 m†

CUB.

CHANG

LINEN STORE

CONSUMABLES

STORE

Req:1.0m†

1.04 m†RESUS

Req:1.0m†

1.04 m†

INTENSIFIER

IMAGE

CHANGE

PLAIN FILM

PLAIN FILM

MONITOR

STAFF

RESUS1.01 m†

Req:1.0m†

Req:4.0m†

2.16 m†

HOIST

Req:1.0m†

0.82 m†

ADM-CF-009

ADM-SF-014

ADM-SF-042

ADM-SF-037

DCW-010

DCW-011

DCW-018

DCW-039

DCW-038 DCW-037

DCW-015

DCW-035

DCW-054

DCW-019

DCW-040

DCW-041

DCW-020

DCW-042

DCW-021

DCW-043

DCW-001

DCW-016

DCW-030

DCW-005

DCW-007

DCW-034

DCW-002

DCW-036DCW-006

DCW-044

DCW-033

DCW-022

DCW-045

DCW-046 DCW-023

DCW-032

DCW-003

DCW-004 DCW-009

DCW-043

DCW-017

DCW-014

DCW-047

DCW-024 DCW-025

DCW-048 DCW-049

DCW-026

DCW-055

DCW-012DCW-031

DCW-027

DCW-050 DCW-051

DCW-028 DCW-029

DCW-052

DCW-008

ADM-SF-021

IMG-O-045

IMG-O-048

IMG-O-023

IMG-O-022IMG-O-020

IMG-O-042

IMG-O-013

IMG-O-002

IMG-O-041IMG-O-026

IMG-O-001

IMG-O-021IMG-O-004

IMG-O-029

IMG-O-028 IMG-O-030

IMG-O-031

IMG-O-027

IMG-O-036 IMG-O-037 IMG-SHS-004IMG-SHS-001

IMG-SHS-003

IMG-SHS-006

IMG-O-005

IMG-SHS-011

IMG-SHS-010

IMG-SHS-008

IMG-SHS-007

IMG-SHS-005 IMG-SHS-002

IMG-O-006

IMG-O-007

IMG-O-019

IMG-O-012 IMG-O-025

IMG-O-044IMG-O-043

IMG-O-032 IMG-O-003

IMG-O-009IMG-O-008

IMG-O-016

IMG-O-014

IMG-O-015

IMG-O-017

IMG-O-010 IMG-O-018

IMG-O-011

IMG-O-046

IMG-O-034 IMG-O-035 IMG-O-033

IMG-O-047

OFFICE 1

OFFICE 2

IMG-O-038

IMG-O-039

NUC-010

NUC-012

NUC-008

NUC-009

NUC-001

NUC-022

NUC-013

NUC-019

NUC-025

NUC-027

NUC-023

NUC-015

NUC-014

NUC-021

PNU.

PNU.

Req:3.0m†

Req:3.0m†

Req:10.0m†

Req:18.0m†

Req:100.0m†

IMT-C-001ADM-SW-154

ADM-SW-046ADM-SF-010ADM-SF-031

ADM-SF-032ADM-SF-033

ADM-SF-019

ADM-SF-005ADM-SF-030

ADM-SF-015

ADM-SF-028ADM-SF-029

ADM-SF-036

ADM-SF-045

ADM-SF-041

ADM-SF-016

ADM-SF-008

IMT-C-005IMT-C-006IMT-C-004IMT-C-007

IMT-C-002 IMT-C-008

IMT-C-009

IMT-C-010

IMT-C-003

RHT-019

RHT-011

RHT-010

RHT-002RHT-003

RHT-018

RHT-020

ADM-SF-034

ADM-SF-038

ADM-SF-017 ADM-SF-006

ADM-SF-022

ADM-SF-018 ADM-SF-007

NUC-004

NUC-003

NUC-007

NUC-017

NUC-016

NUC-002

NUC-018NUC-020

NUC-026NUC-028

NUC-024

NUC-011

NUC-029

NUC-030

NUC-031

NUC-005

NUC-006

ADM-SW-155

COLD WCCOLD WC

COLD WAIT

22.94 m†

28.93 m†

6.65 m†

6.65 m†

22.94 m†

30.31 m†

Req:11.5m†

31.29 m†

ADM-SF-023

STAFF REST

Req:3.0m†

BEV BAY

ADM-SW-047

BEV BAY

MIR COMP MIR COMP

EQ. STORE

HOT OFFICE

EQ. STORE

INTERVIEW

BEV BAY

INJECTION

INJECTION

CT COMP

PREP

CLEAN UTILITY

3.52 m†

CORRIDOR

211.71 m2

CORRIDOR

256.19 m†

CORRIDOR

44.98 m†

CORRIDOR

41.80 m†

CORRIDOR

63.94 m†

CORRIDOR

67.66 m†

CORRIDOR

146.43 m†

CORRIDOR

57.85 m†

CORRIDOR

52.40 m†

CORRIDOR

72.71 m†

CORRIDOR

88.78 m†CORRIDOR

71.46 m†

CO1 008

CO1 010

CO1 009

CO1 011

CO1 002

CO1 017

CO1 019

CO1 018

CO1 012

CO1 001

CO1 003

CO1 006

CO1 005

CO1 007

CO1 002

CO1 004CORRIDOR

CORRIDOR

CO1 020

CO1 021

RESTAURANT

VOID OVER

DCW-056DCW-057

DCW-058

CO1-014

CO1-016

Req:0.00m†

Req:0.00m†

LIFT 7

BED

LIFT 8

BED

LOBBY

LOBBY

STAIR 2

STAIR 3

LOBBY

14

LIFT

LIFT 1

BED

LIFT 2

BED

LOBBY

STAIR 1

LOBBY

LIFT 5

FM

LIFT 6

FM

LIFT 3

PUBLIC

LIFT 4

PUBLIC

STAIR 4

LOBBY

15

LIFT

LIFT 12

FM

LIFT 13

FM

LIFT 11

PUBLIC

LIFT 9

BED

LIFT 10

PUBLIC

DCW-001

DCW-002

DCW-003DCW-004

DCW-006

DCW-009

DCW-007

DCW-008

DCW-010

DCW-011

DCW-012

DCW-013

DCW-014

DCW-015

DCW-016

DCW-018

DCW-019

DCW-020

DCW-021

DCW-022

DCW-023

DCW-024DCW-025 DCW-026 DCW-027

DCW-028

DCW-029

DCW-030

DCW-032

DCW-033

DCW-034

DCW-035

DCW-036

DCW-037

DCW-038

DCW-039

DCW-040

DCW-041

DCW-042

DCW-043

DCW-044

DCW-045

DCW-046

DCW-047 DCW-048 DCW-049 DCW-050DCW-051

DCW-052

NUC-003

NUC-004

NUC-005

NUC-006

NUC-007

NUC-008

NUC-009

NUC-010

NUC-011

NUC-012

NUC-014

NUC-015

NUC-016

NUC-017

NUC-018

NUC-020

NUC-021

NUC-022

NUC-023

NUC-024

NUC-025

NUC-026

NUC-027

NUC-028

NUC-029

NUC-030

NUC-031

IMG-O-001

IMG-O-003

IMG-O-004

IMG-O-005 IMG-O-008

IMG-O-009

IMG-O-010

IMG-O-012

IMG-O-006IMG-O-007

IMG-O-013

IMG-O-014

IMG-O-015

IMG-O-016

IMG-O-017

IMG-O-018

IMG-O-019

IMG-O-021

IMG-O-020

IMG-O-022

IMG-O-023

IMG-O-026

IMG-O-027

IMG-O-028

IMG-O-029

IMG-O-030

IMG-O-031

IMG-O-034IMG-O-035

IMG-O-036

IMG-O-037

IMG-O-042

IMG-O-043 IMG-O-044

IMG-O-045

IMG-O-046

IMG-O-047

IMG-O-032

IMG-O-025

IMG-O-033

RHT-006

RHT-014

RHT-007

RHT-008

RHT-009

RHT-011

RHT-012

RHT-013

RHT-001

RHT-017

RHT-016

RHT-010

RHT-002

RHT-003

RHT-004

RHT-005

RHT-015

RHT-020

RHT-018

RHT-019

IMT-C-001

IMT-C-002

IMT-C-003

IMT-C-008

IMT-C-009

IMT-C-010

IMT-C-004

IMT-C-005

IMT-C-006

ADM-SF-028ADM-SF-029

ADM-SF-030

ADM-SF-005

ADM-SF-006

ADM-SF-007

ADM-SF-008

ADM-SF-009

ADM-SF-014

ADM-SF-015

ADM-SF-016

ADM-SF-017

ADM-SF-018

ADM-SF-021

ADM-SF-022

ADM-SF-019

ADM-SF-031

ADM-SF-032

ADM-SF-033

ADM-SF-010

ADM-SF-036

ADM-SF-041

ADM-SF-037

ADM-SF-042

IMT-C-007

IMG-O-038

IMG-O-039

IMG-O-011

NUC-002

IMG-SHS-002

IMG-SHS-005

IMG-SHS-001

IMG-SHS-004

IMG-SHS-003

IMG-SHS-007

IMG-SHS-008

IMG-SHS-011

IMG-SHS-010

IMG-SHS-006

DCW-017

IMG-O-048

IMG-O-041

IMG-O-002

DCW-005

DCW-031

NUC-013

NUC-001

NUC-019

DCW-054

DCW-055

ADM-SF-045

ADM-SF-046

ADM-SW-154

ADM-SW-155

ADM-SF-034

ADM-SF-038

2. 5

IMG-SHS-010

WC - Staff (Female)

12. 0

NUC-010

Inpatient holding area (1 space)

18. 0

NUC-009

Injection room

18. 0

NUC-008

Injection room

33. 0

NUC-007

Gamma camera room

5. 0

NUC-006

FM - Domestic/Cleaners room

5. 0

NUC-005

FM - Disposal Hold

15. 0

NUC-004

Control room

12. 0

NUC-003

Computer room

10. 0

IMG-O-047

Staff changing - male

1. 0

NUC-001

Bay - resus trolley

2. 5

NUC-029

WC - Staff (Female)

5. 0

IMG-SHS-007

WC - accessible (female)

24. 0

IMG-SHS-006

Waiting (16)

26. 0

IMG-SHS-005

Staff rest room (15) (incl beverage bay)

12. 0

IMG-SHS-004

Reception Office / notes store (2)

20. 0

IMG-SHS-003

Reception (3)

12. 0

IMG-SHS-002

PACS support

12. 0

IMG-SHS-001

Interview/Counseling Room

2. 0

IMG-O-048

Store - Linen (including linen trolley)

5. 0

NUC-002

Changing cubicle (assisted)

2. 0

NUC-021

Store - Linen (including linen trolley)

4. 0

IMG-O-001

Bay - image intensifier

45. 0

NUC-012

PET CT scanner

1. 0

NUC-013

Pneumatic tube point

15. 0

NUC-014

Post scan processing room

18. 0

NUC-015

Preparation/Injection room

8. 0

NUC-016

Radiopharmacy waste store

8. 0

NUC-017

Radiopharmacy waste store

3. 0

NUC-018

Staff Changing cubicle

9. 0

NUC-011

Office (1 person)

3. 0

NUC-020

Staff Shower

5. 0

NUC-028

WC - accessible (male)

12. 0

NUC-022

Stress room

7. 5

NUC-023

Waiting area (post-injection) - 5 person

10. 5

NUC-024

Waiting area (pre-injection) - 7 person

5. 0

NUC-025

WC - accessible (female)

5. 0

NUC-026

WC - accessible (female)

5. 0

NUC-027

WC - accessible (male)

5. 0

NUC-031

WC Staff accessible

2. 5

NUC-030

WC - Staff (Male)

5. 0

IMG-SHS-008

WC - accessible (male)

6. 0

NUC-019

Staff monitoring area

14. 0

IMG-O-012

Clean utility

33. 0

IMG-O-021

Fluoroscopy/Screening room

10. 0

IMG-O-019

Dirty utility

1. 0

IMG-O-002

Bay - resus trolley

22. 0

IMG-O-046

Staff changing - female

2. 5

IMG-SHS-011

WC - Staff (Male)

6. 0

IMG-O-018

CT Store

45. 0

IMG-O-017

CT room

45. 0

IMG-O-016

CT room20. 0

IMG-O-015

CT Control (shared)

5. 0

IMG-O-022

FM - Disposal Hold

10. 0

IMG-O-013

Clean Utility/Preparation room

16. 0

IMG-O-020

Equipment store

5. 0

IMG-O-011

Changing cubicle (assisted) - Plain Film

5. 0

IMG-O-010

Changing cubicle (assisted) - MRI/CT)5. 0

IMG-O-009

Changing cubicle (assisted) - MRI/CT)

5. 0

IMG-O-008

Changing cubicle (assisted) - Bone densitometry/ultrasound

3. 0

IMG-O-007

Changing cubicle

3. 0

IMG-O-006

Changing cubicle

12. 0

IMG-O-005

Changed sub-wait (CT/MRI)

33. 0

IMG-O-004

Bronchoscopy room

33. 0

IMG-O-003

Bone densitometry / ultrasound

15. 0

IMG-O-014

CT Computer

20. 0

IMG-O-032

Office - 1 Person (Duty Consultant)

60. 0

IMG-O-045

Scope cleaning

20. 0

IMG-O-044

Reporting (3 person)

20. 0

IMG-O-043

Reporting (3 person)

10. 0

IMG-O-042

Preparation room - screening and bronchoscopy

1. 0

IMG-O-041

Pneumatic tube point

33. 0

IMG-O-039

Plain film room

33. 0

IMG-O-038

Plain film room

14. 0

IMG-O-037

Patient preparation - MRI

14. 0

IMG-O-036

Patient preparation - MRI

14. 0

IMG-O-035

Patient preparation - CT

15. 0

IMG-O-033

Office (3 person)

5. 0

IMG-O-023

FM - Domestic/Cleaners room

20. 0

IMG-O-028

MRI Control (shared)

45. 0

IMG-O-030

MRI room

15. 0

IMG-O-025

MDT office

10. 0

IMG-O-026

MRI Computer

10. 0

IMG-O-027

MRI Computer

45. 0

IMG-O-029

MRI room

8. 0

IMG-O-031

MRI Store

14. 0

IMG-O-034

Patient preparation - CT

16. 0

DCW-029

Single bedroom

4. 0

DCW-005

Bay - hoists

10. 0

DCW-012

Interview room

18. 0

DCW-032

Store - equipment

5. 0

DCW-036

WC - Staff (Accessible - Unisex)

12. 0

DCW-031

Store - consumables

5. 0

DCW-035

WC - accessible (unisex)

18. 0

DCW-034

Treatment room

8. 0

DCW-030

Staff base

2. 0

DCW-052

Linen

5. 0

DCW-011

FM - Domestic/Cleaners room

5. 0

DCW-010

FM - Disposal Hold

10. 0

DCW-009

Dirty utility

25. 0

DCW-008

Day room

1. 0

DCW-006

Bay - resus trolley

5. 0

DCW-004

Assisted WC5. 0

DCW-003

Assisted WC

48. 0

DCW-002

4 bed bay - day ward

48. 0

DCW-001

4 bed bay - day ward

2. 5

DCW-037

WC - Staff (Female)

6. 0

DCW-047

WC/Shower - En-suite (assisted)

12. 0

DCW-007

Clean utility

16. 0

DCW-026

Single bedroom

16. 0

DCW-018

Single bedroom

16. 0

DCW-019

Single bedroom

16. 0

DCW-020

Single bedroom

16. 0

DCW-021

Single bedroom

16. 0

DCW-022

Single bedroom

16. 0

DCW-023

Single bedroom

5. 0

DCW-017

Reception (2)

16. 0

DCW-025

Single bedroom

16. 0

DCW-027

Single bedroom

16. 0

DCW-028

Single bedroom

0. 0

DCW-055

Touch down

0. 0

DCW-054

Touch down

2. 5

DCW-038

WC - Staff (Male)

6. 0

DCW-045

WC/Shower - En-suite (assisted)

16. 0

DCW-024

Single bedroom

6. 0

DCW-048

WC/Shower - En-suite (assisted)

6. 0

DCW-042

WC/Shower - En-suite (assisted)

6. 0

DCW-039

WC/Shower - En-suite (assisted)

6. 0

DCW-040

WC/Shower - En-suite (assisted)

6. 0

DCW-044

WC/Shower - En-suite (assisted)

6. 0

DCW-041

WC/Shower - En-suite (assisted)

1. 0

DCW-016

Pneumatic tube point

6. 0

DCW-043

WC/Shower - En-suite (assisted)

6. 0

DCW-049

WC/Shower - En-suite (assisted)

6. 0

DCW-050

WC/Shower - En-suite (assisted)

6. 0

DCW-051

WC/Shower - En-suite (assisted)

6. 0

DCW-052

WC/Shower - En-suite (assisted)

18. 0

DCW-013

MDT Office/ Staff Area

12. 0

DCW-014

Office - 2 Person (Ward Office)

8. 0

DCW-015

Pantry

6. 0

DCW-046

WC/Shower - En-suite (assisted)

2. 5

RHT-020

WC - Staff (Female)

5. 0

RHT-019

WC - Staff (Accessible)

5. 0

RHT-018

WC - accessible (female)

40. 0

RHT-017

Waiting (30)

16. 0

RHT-016

Treatment room

45. 0

RHT-015

Store - equipment

5. 0

RHT-004

FM - Disposal Hold

3. 0

RHT-001

Beverage Bay - Staff

6. 0

RHT-013

Reception (1)

22. 0

RHT-002

Changing room - female patient

35. 0

RHT-014

Seminar room - Patient Education (30)

5. 0

RHT-005

FM - Domestic/Cleaners room

22. 0

RHT-003

Changing room - male patient

10. 0

RHT-007

Interview room

10. 0

RHT-008

Interview room

10. 0

RHT-009

Interview room

8. 0

RHT-010

Machines room

48. 0

RHT-011

Office (12 person)

12. 0

RHT-012

Office (2)

100. 0

RHT-006

Gym

3. 0

IMT-C-001

Beverage Bay - Staff

10. 0

IMT-C-002

Interview room

26. 0

IMT-C-003

Machine room

30. 0

IMT-C-006

Office - 6 Person (IT Support) 20. 0

IMT-C-005

Office - 4 person (Application Development)

30. 0

IMT-C-007

Office - 6 Person (Network Support)

8. 0

IMT-C-008

Store - equipment

5. 0

IMT-C-009

WC - Staff (Accessible)

2. 5

IMT-C-010

WC - Staff (Unisex)

12. 0

IMT-C-004

Office - 2 Person (IT Managers)

0. 0

ADM-SW-154

Office 1

0. 0

ADM-SW-155

Office 2

11. 5

ADM-SF-006

Meeting room

11. 5

ADM-SF-005

Meeting room

3. 5

ADM-SF-031

Study booth

0. 0

ADM-SF-045

Beverage Bay

0. 0

ADM-SF-046

Beverage Bay

22. 0

ADM-SF-022

Staff rest areas

11. 5

ADM-SF-007

Meeting room

11. 5

ADM-SF-008

Meeting room

11. 5

ADM-SF-009

Meeting room

11. 5

ADM-SF-010

Meeting room

10. 0

ADM-SF-014

Print / storage room

10. 0

ADM-SF-015

Print / storage room

10. 0

ADM-SF-016

Print / storage room

10. 0

ADM-SF-017

Print / storage room

10. 0

ADM-SF-018

Print / storage room

3. 5

ADM-SF-033

Study booth

22. 0

ADM-SF-021

Staff rest areas

2. 5

ADM-SF-042

WC - male

3. 5

ADM-SF-028

Study booth

3. 5

ADM-SF-029

Study booth

3. 5

ADM-SF-030

Study booth

3. 5

ADM-SF-032

Study booth

5. 0

ADM-SF-034

WC - accessible

2. 5

ADM-SF-036

WC - female

2. 5

ADM-SF-037

WC - female

2. 5

ADM-SF-038

WC

2. 5

ADM-SF-041

WC - male

10. 0

ADM-SF-019

Print / storage room

ADM-SF-023

ADM-SF-047

CO1 001

CO1 003

CO1 004

CO1 005

CO1 006

CO1 007

CO1 008

CO1 009

CO1 010 CO1 011

CO1 012

CO1 014

CO1 002

CO1 016

CO1 017

CO1 018

CO1 019

CO1 020

DCW-056

DCW-057

DCW-058

CO1 002

CO1 021

MEETING

PRINT

MEETINGPRINT

Staff Rest

21.52 m†

4.5

4 m

4.5

4 m

MEETING

MEETING

MEETING

ASS WC

WC

PRINT

PRINT

PRINT

WC

WC

STUDY STUDY

STUDY

STUDY

STUDYSTUDY

BEV BAY

BEV BAY

STAFF REST

MEETING

PRINT

WC

WC

5. 0

IMG-SHS-007

WC - accessible (female)

33. 0

NUC-007

Gamma camera room

5. 0

NUC-006

FM - Domestic/Cleaners room

5. 0

NUC-005

FM - Disposal Hold

15. 0

NUC-004

Control room

12. 0

NUC-003

Computer room

5. 0

NUC-002

Changing cubicle (assisted)

1. 0

NUC-001

Bay - resus trolley

2. 5

IMG-SHS-011

WC - Staff (Male)

22. 0

IMG-O-046

Staff changing - female

5. 0

IMG-SHS-008

WC - accessible (male)

40. 0

NUC-010

Inpatient holding area (1 space)

24. 0

IMG-SHS-006

Waiting (16)

26. 0

IMG-SHS-005

Staff rest room (15) (incl beverage bay)

12. 0

IMG-SHS-004

Reception Office / notes store (2)

20. 0

IMG-SHS-003

Reception (3)

12. 0

IMG-SHS-002

PACS support

12. 0

IMG-SHS-001

Interview/Counseling Room

2. 0

IMG-O-048

Store - Linen (including linen trolley)

5. 0

NUC-027

WC - accessible (male)

2. 5

IMG-SHS-010

WC - Staff (Female)

18. 0

NUC-015

Preparation/Injection room

5. 0

NUC-026

WC - accessible (female)

5. 0

NUC-025

WC - accessible (female)

10. 5

NUC-024

Waiting area (pre-injection) - 7 person

7. 5

NUC-023

Waiting area (post-injection) - 5 person

12. 0

NUC-022

Stress room

2. 0

NUC-021

Store - Linen (including linen trolley)

3. 0

NUC-020

Staff Shower

6. 0

NUC-019

Staff monitoring area

18. 0

NUC-008

Injection room

4. 0

IMG-O-001

Bay - image intensifier

18. 0

NUC-009

Injection room

15. 0

NUC-014

Post scan processing room

1. 0

NUC-013

Pneumatic tube point

45. 0

NUC-012

PET CT scanner

5. 0

NUC-031

WC Staff accessible

2. 5

NUC-030

WC - Staff (Male)

2. 5

NUC-029

WC - Staff (Female)

5. 0

NUC-028

WC - accessible (male)

9. 0

NUC-011

Office (1 person)

60. 0

IMG-O-045

Scope cleaning

8. 0

NUC-017

Radiopharmacy waste store

5. 0

IMG-O-010

Changing cubicle (assisted) - MRI/CT)

16. 0

IMG-O-020

Equipment store

10. 0

IMG-O-019

Dirty utility

6. 0

IMG-O-018

CT Store

45. 0

IMG-O-017

CT room

45. 0

IMG-O-016

CT room20. 0

IMG-O-015

CT Control (shared)

15. 0

IMG-O-014

CT Computer

10. 0

IMG-O-013

Clean Utility/Preparation room

10. 0

IMG-O-047

Staff changing - male

5. 0

IMG-O-011

Changing cubicle (assisted) - Plain Film

5. 0

IMG-O-023

FM - Domestic/Cleaners room

5. 0

IMG-O-009

Changing cubicle (assisted) - MRI/CT)

5. 0

IMG-O-008

Changing cubicle (assisted) - Bone densitometry/ultrasound

3. 0

IMG-O-007

Changing cubicle

3. 0

IMG-O-006

Changing cubicle

12. 0

IMG-O-005

Changed sub-wait (CT/MRI)

33. 0

IMG-O-004

Bronchoscopy room

33. 0

IMG-O-003

Bone densitometry / ultrasound

1. 0

IMG-O-002

Bay - resus trolley

14. 0

IMG-O-012

Clean utility

15. 0

IMG-O-033

Office (3 person)

20. 0

IMG-O-044

Reporting (3 person)

20. 0

IMG-O-043

Reporting (3 person)

10. 0

IMG-O-042

Preparation room - screening and bronchoscopy

1. 0

IMG-O-041

Pneumatic tube point

33. 0

IMG-O-039

Plain film room

33. 0

IMG-O-038

Plain film room

14. 0

IMG-O-037

Patient preparation - MRI

14. 0

IMG-O-036

Patient preparation - MRI

33. 0

IMG-O-021

Fluoroscopy/Screening room

14. 0

IMG-O-034

Patient preparation - CT

5. 0

IMG-O-022

FM - Disposal Hold

20. 0

IMG-O-032

Office - 1 Person (Duty Consultant)

8. 0

IMG-O-031

MRI Store

45. 0

IMG-O-030

MRI room

45. 0

IMG-O-029

MRI room

20. 0

IMG-O-028

MRI Control (shared)

10. 0

IMG-O-027

MRI Computer10. 0

IMG-O-026

MRI Computer

15. 0

IMG-O-025

MDT office

3. 0

NUC-018

Staff Changing cubicle

14. 0

IMG-O-035

Patient preparation - CT

8. 0

NUC-016

Radiopharmacy waste store

6. 0

DCW-044

WC/Shower - En-suite (assisted)

18. 0

DCW-034

Treatment room

5. 0

DCW-035

WC - accessible (unisex)

2. 5

DCW-037

WC - Staff (Female)

6. 0

DCW-039

WC/Shower - En-suite (assisted)

6. 0

DCW-040

WC/Shower - En-suite (assisted)

6. 0

DCW-041

WC/Shower - En-suite (assisted)

6. 0

DCW-050

WC/Shower - En-suite (assisted)

6. 0

DCW-043

WC/Shower - En-suite (assisted)

12. 0

DCW-031

Store - consumables

6. 0

DCW-045

WC/Shower - En-suite (assisted)

6. 0

DCW-046

WC/Shower - En-suite (assisted)

6. 0

DCW-047

WC/Shower - En-suite (assisted)

6. 0

DCW-048

WC/Shower - En-suite (assisted)

6. 0

DCW-049

WC/Shower - En-suite (assisted)

6. 0

DCW-042

WC/Shower - En-suite (assisted)

10. 0

DCW-009

Dirty utility

48. 0

DCW-001

4 bed bay - day ward

48. 0

DCW-002

4 bed bay - day ward

5. 0

DCW-003

Assisted WC

5. 0

DCW-004

Assisted WC

4. 0

DCW-005

Bay - hoists

1. 0

DCW-006

Bay - resus trolley

2. 0

DCW-052

Linen

25. 0

DCW-008

Day room

18. 0

DCW-032

Store - equipment

5. 0

DCW-010

FM - Disposal Hold

5. 0

DCW-011

FM - Domestic/Cleaners room

10. 0

DCW-012

Interview room

16. 0

DCW-029

Single bedroom

8. 0

DCW-030

Staff base

2. 5

DCW-038

WC - Staff (Male)

12. 0

DCW-007

Clean utility

16. 0

DCW-021

Single bedroom

18. 0

DCW-013

MDT Office/ Staff Area

12. 0

DCW-014

Office - 2 Person (Ward Office)

8. 0

DCW-015

Pantry

1. 0

DCW-016

Pneumatic tube point

5. 0

DCW-017

Reception (2)

16. 0

DCW-018

Single bedroom

0. 0

DCW-058

Switch Cupboard

16. 0

DCW-020

Single bedroom

16. 0

DCW-023

Single bedroom

16. 0

DCW-022

Single bedroom

6. 0

DCW-051

WC/Shower - En-suite (assisted)

16. 0

DCW-024

Single bedroom

5. 0

DCW-036

WC - Staff (Accessible - Unisex)

16. 0

DCW-026

Single bedroom

16. 0

DCW-027

Single bedroom

16. 0

DCW-028

Single bedroom

16. 0

DCW-019

Single bedroom

0. 0

DCW-054

Touch down

0. 0

DCW-057

Switch Cupboard

0. 0

DCW-056

Switch Cupboard

6. 0

DCW-052

WC/Shower - En-suite (assisted)

0. 0

DCW-055

Touch down

16. 0

DCW-025

Single bedroom

40. 0

RHT-017

Waiting (30)

16. 0

RHT-016

Treatment room

3. 0

RHT-001

Beverage Bay - Staff

22. 0

RHT-002

Changing room - female patient

22. 0

RHT-003

Changing room - male patient

5. 0

RHT-004

FM - Disposal Hold

5. 0

RHT-005

FM - Domestic/Cleaners room

10. 0

RHT-007

Interview room

2. 5

RHT-020

WC - Staff (Female)

10. 0

RHT-008

Interview room

10. 0

RHT-009

Interview room

8. 0

RHT-010

Machines room

48. 0

RHT-011

Office (12 person)

12. 0

RHT-012

Office (2)

6. 0

RHT-013

Reception (1)

35. 0

RHT-014

Seminar room - Patient Education (30)

100. 0

RHT-006

Gym

45. 0

RHT-015

Store - equipment

5. 0

RHT-018

WC - accessible (female)

5. 0

RHT-019

WC - Staff (Accessible)

10. 0

IMT-C-002

Interview room

26. 0

IMT-C-003

Machine room

3. 0

IMT-C-001

Beverage Bay - Staff

2. 5

IMT-C-010

WC - Staff (Unisex)

5. 0

IMT-C-009

WC - Staff (Accessible)

8. 0

IMT-C-008

Store - equipment

30. 0

IMT-C-007

Office - 6 Person (Network Support)30. 0

IMT-C-006

Office - 6 Person (IT Support) 20. 0

IMT-C-005

Office - 4 person (Application Development)

12. 0

IMT-C-004

Office - 2 Person (IT Managers)

0. 0

ADM-SW-154

Office 1

0. 0

ADM-SW-155

Office 2

11. 5

ADM-SF-006

Meeting room

3. 0

ADM-SF-045

Beverage Bay

3. 0

ADM-SF-046

Beverage Bay

3. 5

ADM-SF-031

Study booth

3. 0

ADM-SF-047

Beverage Bay

11. 5

ADM-SF-005

Meeting room

11. 5

ADM-SF-010

Meeting room

11. 5

ADM-SF-008

Meeting room

3. 5

ADM-SF-033

Study booth

11. 5

ADM-SF-009

Meeting room

2. 5

ADM-SF-042

WC - male

10. 0

ADM-SF-014

Print / storage room

10. 0

ADM-SF-015

Print / storage room

10. 0

ADM-SF-016

Print / storage room

10. 0

ADM-SF-017

Print / storage room

10. 0

ADM-SF-018

Print / storage room

10. 0

ADM-SF-019

Print / storage room

22. 0

ADM-SF-021

Staff rest areas

2. 5

ADM-SF-037

WC - female

22. 0

ADM-SF-022

Staff rest areas

2. 5

ADM-SF-041

WC - male

2. 5

ADM-SF-038

WC

2. 5

ADM-SF-036

WC - female

5. 0

ADM-SF-034

WC - accessible

3. 5

ADM-SF-032

Study booth

11. 5

ADM-SF-007

Meeting room

3. 5

ADM-SF-030

Study booth

3. 5

ADM-SF-029

Study booth

3. 5

ADM-SF-028

Study booth

22. 0

ADM-SF-023

Staff rest areas

0. 0

CO1 003

Corridor

0. 0

CO1 010

Corridor

0. 0

CO1 019

Corridor

0. 0

CO1 017

Corridor

0. 0

CO1 016

Lift Lobby

0. 0

CO1 015

Corridor

0. 0

CO1 014

Corridor

0. 0

CO1 012

Corridor

0. 0

CO1 011

Corridor

0. 0

CO1 018

Corridor

0. 0

CO1 009

Corridor

0. 0

CO1 008

Corridor

0. 0

CO1 007

Corridor

0. 0

CO1 006

Lift Lobby

0. 0

CO1 002

Corridor

0. 0

CO1 004

Corridor

0. 0

CO1 001

Lift Lobby

0. 0

CO1 021

Lift Lobby

0. 0

CO1 020

Lift Lobby

0. 0

CO1 005

Corridor

Page 3: pss update

BED

BEDBED

BED

BED BED BED BED BED BED BED BEDBED BED BED BED

BED BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BEDBEDBEDBED

BEDBED

BEDBEDBED

BED BED BED BED

UTILITYCLEAN

FLEX

PANTRY

BEDINT.

DISP

REGEN

WC

RESTST.

(W)OFF

OFFICEMDT

BATHASSIST

BASESTAFF

BATHASSIST

BASESTAFF

UTILITYCLEAN

UTILITYDIRTY

STOREBEDBEDBEDBEDBEDBEDBEDBEDBEDBED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

BED

FLEX

BED BEDBED

BED

BED

BED

BED

BED

BED

BED

BEDUTILITY

CLEAN

BASE

STAFF

WC

SEMINAR

REGEN

DISP

REST

STAFF

STORE

F. STORE

MOB ST.

PAT. PROP.

WC

BASE

STAFF

BATH

ASSIST

BED

PANTRY

PAT. PROP.

BED

ES.

STAFF BASE TOUCH DOWN

STAFF BASE

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES. ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES. ES. ES. ES.

ES. ES.

ES.ES.

ES. ES.

ES. ES. ES. ES. ES. ES. ES. ES.

ES. ES. ES. ES. ES. ES.

ES. ES.

ES. ES.

ES. ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.

ES.ES.ES.ES.

ES.ES.

ES.ES.ES.ES.

ES. ES. ES.

RESUS

RESUS

LOBBYLOBBY

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†Req:6.00m† Req:6.00m†

Req:8.00m†Req:5.00m†Req:4.00m†

Req:5.00m†

Req:5.00m†

Req:8.00m†

Req:4.00m†

Req:4.00m†

Req:6.00m†

Req:2.00m†Req:5.00m†

Req:4.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†Req:0.00m†

Req:6.00m†

Req:6.00m†Req:6.00m†

Req:6.00m†

Req:1.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†Req:6.00m† Req:6.00m† Req:6.00m†

Req:8.00m†

Req:1.00m†

Req:0.00m†

Req:6.00m† Req:6.00m† Req:6.00m† Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:8.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†Req:5.00m†Req:5.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m†

Req:6.00m† Req:6.00m†

Req:6.00m†Req:6.00m†

Req:6.00m†Req:6.00m†

Req:0.00m†

Req:6.00m†

Req:6.00m†Req:6.00m†Req:6.00m†Req:6.00m†Req:6.00m†Req:6.00m†Req:6.00m†Req:6.00m†

Req:6.00m†

Req:6.00m†Req:6.00m†

Req:6.00m†Req:6.00m†Req:6.00m†Req:6.00m†

Req:6.00m†Req:6.00m†

Req:6.00m† Req:6.00m† Req:6.00m†Req:6.00m† Req:6.00m† Req:6.00m† Req:6.00m†Req:6.00m†

Req:4.00m†

Req:4.00m†

Req:1.00m†

Req:4.00m†

Req:6.00m†Req:6.00m† Req:6.00m†

Req:6.00m† Req:6.00m†

3.80 m†

15.99 m†

3.80 m† 3.80 m†

16.16 m†

3.80 m†

3.80 m†

16.28 m†

0.32 m†

3.80 m†

3.80 m†

16.28 m†

8.32 m†

13.52 m†

4.04 m†

0.38 m†

3.80 m†

16.52 m†16.52 m†

3.80 m†

16.52 m†

3.60 m†3.60 m†

16.52 m†16.34 m†16.34 m†

3.60 m† 3.60 m†3.60 m†

16.35 m†

3.60 m†

16.35 m†16.52 m†

3.60 m†

16.52 m†

5.41 m†

3.80 m†3.80 m†

15.74 m†15.70 m†

3.79 m†

3.51 m†

16.61 m†

3.60 m†

16.61 m†

3.60 m†3.80 m†

16.61 m†

3.80 m†

16.61 m†16.61 m†

3.60 m†3.60 m†

16.61 m†16.61 m†

3.80 m†

16.61 m†

3.80 m†

16.61 m†16.61 m†

11.91 m†

16.61 m†

3.80 m†3.80 m†

16.61 m†

3.60 m†

3.80 m†3.80 m†17.10 m†

3.80 m†3.60 m†3.60 m†

16.73 m† 16.73 m†

3.80 m†

16.73 m†

3.59 m†

16.73 m†

3.60 m†3.60 m†

20.51 m†

3.80 m†

2.73 m†

3.59 m†

3.54 m†

3.80 m†

3.60 m†

9.83 m†

3.60 m†

5.55 m†

10.81 m†

3.60 m†

3.60 m†

11.76 m†

11.76 m†

3.60 m†

3.60 m†

24.90 m†

14.59 m†

3.80 m†

3.80 m†

7.17 m†

3.60 m†

16.86 m†

3.80 m†

16.86 m†

3.80 m†

16.86 m†

3.80 m†

16.86 m†

3.60 m† 3.60 m†

13.86 m†14.81 m†

16.61 m†

3.80 m†

16.61 m†

3.80 m†

16.61 m†

3.80 m†

16.61 m†

3.80 m†

16.61 m†

3.59 m†

Req:4.00m†

16.73 m†

Req:4.00m†

3.20 m†

Req:4.00m†

3.52 m†

Req:4.00m†

3.52 m†

15.74 m†

16.61 m†

0.38 m†

3.60 m†3.60 m†

1.54 m†

Req:1.00m†

DIRTY UTILITY

BATH

ASSIST

PANT

ST.

CL.

ST.

ES.

BED

L

Req:2.00m†

ES.

Req:6.00m†

3.80 m†

BED18.68 m†

DAY ROOM

SEMINAR

Req:8.00m†Req:6.00m†

Req:4.00m†

PANTRY

UTILITY

DIRTY

3.27 m†

8.07 m† 8.12 m†

22.82 m†

7.55 m†

7.99 m†

19.76 m† 15.92 m†

11.45 m†

15.17 m†

10.24 m†

16.03 m†

14.40 m†

16.03 m†

16.36 m†16.36 m†

5.72 m†

16.54 m†

17.77 m†

16.68 m†

16.68 m†

4.91 m†16.68 m†

16.48 m†

29.52 m†

5.44 m†

16.68 m†

16.68 m†

16.68 m†

16.68 m†

16.68 m†

16.68 m†

16.68 m†

18.88 m†

3.32 m†

16.53 m†

28.60 m†

20.61 m†

3.80 m†

16.52 m† 16.52 m†

3.80 m†

16.35 m†

3.62 m†

3.62 m†16.35 m†

16.35 m†

3.62 m†

16.35 m†3.62 m†

16.35 m†

3.62 m†

16.35 m† 3.62 m†

16.35 m†

3.62 m†

16.35 m†

16.34 m†

3.62 m†

16.34 m†

3.62 m†

16.28 m†

3.62 m†

10.32 m†

DAY ROOM

UTILITYCLEAN

LINEN

6.94 m†

22.10 m†

4.74 m†

16.16 m†

14.44 m†

12.59 m†

23.77 m†

4.98 m† 5.13 m†

3.82 m†

16.27 m†

3.80 m†3.80 m†

3.60 m†

3.80 m†

15.11 m†15.11 m†

3.80 m†

2.18 m†

Req:2.00m†

28.71 m†

12.43 m†Req:8.00m†

13.10 m†

3.80 m†

15.53 m†

11.73 m†

14.89 m†

16.86 m†

3.58 m†3.33 m†

15.51 m†

14.74 m†

3.32 m† 3.60 m†

16.50 m†

14.67 m†

2.60 m†

12.72 m†

Req:6.00m†

Req:6.00m†Req:6.00m†

HOIST

X-RAYMOBILE

HOIST

LINEN

HOIST

6.65 m†12.97 m†

RESUS1.19 m†

1.19 m†

ID1-CS-012

ID1-CS-005

ID1-CS-003

ID1-CS-025

ID1-CS-009

ID1-CS-016

ID1-CS-020

ID1-CS-006

ID1-CS-017

ID1-CS-001

ID1-CS-004

ID1-CS-027 ID1-CS-015

ID1-FM-001

ID1-FM-003

ID1-SS-004

ID1-SS-003

ID1-SS-001 ID1-CS-002

ID1-CS-011 ID1-CS-013

ID1-CS-007

ID1-CS-014

ID1-CS-026ID1-CS-008

ID1-CS-010

ID1-CS-022

ID1-CS-028

ID1-CB-038ID5-CS-029

ID5-CS-009ID5-CS-015

ID5-CS-001

ID5-CS-028 ID5-CS-003

ID5-CS-012

ID5-CS-027

ID5-CS-005

ID5-CS-016

ID5-SS-004

ID5-SS-002

ID5-CS-013

ID5-SS-001

ID5-SS-003

ID5-FM-002

ID5-CS-002ID5-CS-026

ID5-CS-020

ID5-CS-014

ID5-CS-004

ID5-CS-011

ID5-FM-001

ID5-FM-003

ID5-CS-025ID5-CS-008

ID5-CS-022

ID5-CS-010

ID5-RB-044

ID5-CS-001 ID1-CS-021

ID5-CS-017

ID5-CS-006

ID5-RB-047ID5-RB-048

ID5-RB-001ID5-RB-002

ID5-RB-049

ID5-RB-003

ID5-RB-050

ID5-RB-004

ID5-RB-051

ID5-RB-005

ID5-RB-052

ID5-RB-006

ID5-RB-053

ID5-RB-007ID5-RB-008

ID5-RB-054

ID5-RB-009

ID5-RB-055 ID5-RB-056

ID5-RB-010

ID5-RB-057

ID5-RB-011ID5-RB-012

ID5-RB-058

ID5-RB-013

ID5-RB-059

ID5-RB-014

ID5-RB-060

ID5-RB-015

ID5-RB-061

ID5-RB-016

ID5-RB-062ID5-RB-063

ID5-RB-017

ID5-RB-064

ID5-RB-018ID5-RB-019

ID5-RB-065

ID5-RB-066

ID5-RB-020ID5-RB-021

ID5-RB-067

ID5-RB-068

ID5-RB-022

ID5-RB-023

ID5-RB-069ID5-RB-024

ID5-RB-070ID5-RB-025

ID5-RB-071ID5-RB-026

ID5-RB-072

ID5-RB-027

ID5-RB-073

ID5-RB-028

ID5-RB-074ID5-RB-029

ID5-RB-075ID5-RB-030

ID5-RB-076ID5-RB-031

ID5-RB-077

ID5-RB-032ID5-RB-078

ID5-RB-033

ID5-RB-079

ID5-RB-034

ID5-RB-080

ID5-RB-035ID5-RB-081

ID5-RB-082

ID5-RB-036

ID5-RB-037

ID5-RB-083

ID5-RB-038

ID5-RB-084

ID5-RB-039

ID5-RB-085

ID5-RB-040

ID5-RB-086

ID5-RB-041

ID5-RB-087

ID5-RB-042

ID5-RB-088

ID5-SS-005

ID5-CS-030

ID1-CB-030 ID1-CB-031

ID1-CB-068 ID1-CB-069

ID1-CB-032

ID1-CB-070ID1-CB-033

ID1-CB-071

ID1-CB-034

ID1-CB-072

ID1-CB-29

ID1-CB-067 ID1-CB-073

ID1-CB-035 ID1-CB-036

ID1-CB-074

ID1-CB-024

ID1-CB-062

ID1-CB-061

ID1-CB-023

ID1-CB-060

ID1-CB-022

ID1-CB-021

ID1-CB-059

ID1-CB-058ID1-CB-020

ID1-CB-057

ID1-CB-019

ID1-CB-056 ID1-CB-018

ID1-CB-017

ID1-CB-055

ID1-CB-054ID1-CB-016

ID1-CB-015

ID1-CB-053

ID1-CB-052ID1-CB-014

ID1-CB-013

ID1-CB-051

ID1-CB-012

ID1-CB-050

ID1-CB-049

ID1-CB-011

ID1-CB-048

ID1-CB-010

ID1-CB-047

ID1-CB-009

ID1-CB-046

ID1-CB-008

ID1-CB-045

ID1-CB-007

ID1-CB-044

ID1-CB-006

ID1-CB-043

ID1-CB-005

ID1-CB-042

ID1-CB-004ID1-CB-003

ID1-CB-041ID1-CB-040

ID1-CB-002

ID1-CS-030

F.STORE

14.57 m†

ID1-CS-019

ID1-SS-002

18.52 m†

ID5-CS-032

ID5-CS-031

ID1-RB-002

ID1-RB-008

ID1-RB-003

ID1-RB-009

ID1-RB-004

ID1-RB-010

ID1-RB-005

ID1-RB-011

ID1-RB-006

ID1-RB-012

ID1-RB-007

ID1-RB-001

ID5-CS-007RESUS

ID1-CB-077

ID1-CB-076

ID1-CB-001

ID1-CB-039 ID1-CB-063

ID1-CB-025ID1-CB-026

ID1-CB-064

ID1-CB-027

ID1-CB-065

ID1-CB-028

ID1-CB-066

ID1-CB-037

ID1-CB-075

Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†Req:16.00m†Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†Req:16.00m†

Req:16.00m†Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m†

Req:16.00m† Req:16.00m† Req:16.00m†

Req:16.00m† Req:16.00m† Req:16.00m† Req:16.00m†

Req:10.00m†

Req:10.00m†Req:16.00m†

Req:16.00m†Req:15.00m†

Req:16.00m†

Req:12.00m†

Req:25.00m†

Req:16.00m†Req:16.00m†

Req:12.00m†

Req:10.00m†

Req:14.00m†

Req:32.00m†

Req:14.00m†

Req:16.00m†

Req:10.00m†

Req:16.00m†

Req:12.00m†

5.55 m†

Req:12.00m†

Req:10.00m†

Req:15.00m†

Req:16.00m†

Req:12.00m†

Req:16.00m†

Req:25.00m†

Req:16.00m†Req:10.00m†

Req:12.00m†Req:14.00m†

Req:16.00m† Req:16.00m†

Req:32.00m†

Req:12.00m†Req:14.00m†

HOIST

PNU

PNU

PNU

UTILITYDIRTY

STORE

STAFF BASE

PNU

INTERVIEW

MDT OFFICE

OFFICE

ID1-CS-018

0.38 m†

Req:1.00m†

ID5-CS-0180.38 m†Req:1.00m†

Req:16.00m†

Req:1.00m†

CORRIDOR

CO4 005

158.48 m2

CO4 003

LIFT LOBBY

22.94 m2

CO4 004

84.69 m2

CORRIDOR

CO4 002

CORRIDOR

105.88 m2CO4 001

CORRIDOR

113.27 m2

CO4 013

CORRIDOR

91.04 m2

CO4 011

CORRIDOR

117.70 m2

CO4 009

CORRIDOR

107.96 m2

CO4 008

CORRIDOR

27.10 m2

CO4 012

CORRIDOR

100.95 m2

CO4 010

LIFT LOBBY

22.94 m2

CO4 007

CORRIDOR

93.82 m2

CO4 006

CORRIDOR

97.40 m2

ID1-CB-078

ID5-RB-089

CO4 01326.04 m†

C04 0146.65 m†

6.65 m2

CO4 012

26.04 m2

CO4 011

LOBBY

LOBBY

ID1-CB-038

ID1-CS-001

ID1-CS-002

ID1-CS-003

ID1-CS-006

ID1-CS-007

ID1-CS-008

ID1-CS-009

ID1-CS-010

ID1-CS-011

ID1-CS-012

ID1-CS-013

ID1-CS-014

ID1-CS-015

ID1-CS-016

ID1-CS-017

ID1-FM-001

ID1-FM-003

ID1-SS-001

ID1-SS-003

ID1-SS-004

ID5-CS-001

ID5-CS-002

ID5-CS-003

ID5-CS-004

ID5-CS-008

ID5-CS-009

ID5-CS-010

ID5-CS-011

ID5-CS-012

ID5-CS-013

ID5-CS-014

ID5-CS-015

ID5-CS-016

ID5-CS-020

ID5-CS-001

ID5-CS-022

ID5-CS-025

ID5-CS-026

ID5-CS-027

ID5-CS-028

ID5-CS-029

ID5-CS-006

ID5-CS-017

ID5-FM-001

ID5-FM-002

ID5-FM-003

ID5-SS-001

ID5-SS-002

ID5-SS-003

ID5-SS-004

ID5-CS-005

ID5-RB-044

ID1-CS-020

ID1-CS-021

ID1-CS-025

ID1-CS-026

ID1-CS-004

ID1-CS-005

ID1-CS-028

ID1-CS-022

ID1-CB-001

ID1-CB-002 ID1-CB-003 ID1-CB-004

ID1-CB-005 ID1-CB-006

ID1-CB-007 ID1-CB-008ID1-CB-009 ID1-CB-010

ID1-CB-011

ID1-CB-012

ID1-CB-013

ID1-CB-014

ID1-CB-015

ID1-CB-016

ID1-CB-017

ID1-CB-018

ID1-CB-019

ID1-CB-020

ID1-CB-021

ID1-CB-022

ID1-CB-023

ID1-CB-024

ID1-CB-025

ID1-CB-026 ID1-CB-027

ID1-CB-028

ID1-CB-029

ID1-CB-030 ID1-CB-031ID1-CB-032

ID1-CB-033 ID1-CB-034

ID1-CB-035

ID1-CB-036 ID1-CB-037

ID1-CB-039

ID1-CB-040 ID1-CB-041 ID1-CB-042

ID1-CB-043 ID1-CB-044

ID1-CB-045ID1-CB-046 ID1-CB-047

ID1-CB-048

ID1-CB-049

ID1-CB-050

ID1-CB-051

ID1-CB-052

ID1-CB-053

ID1-CB-054

ID1-CB-055

ID1-CB-056

ID1-CB-057

ID1-CB-058

ID1-CB-059

ID1-CB-060

ID1-CB-061

ID1-CB-062

ID1-CB-063

ID1-CB-064

ID1-CB-065

ID1-CB-066

ID1-CB-067

ID1-CB-068ID1-CB-069

ID1-CB-070

ID1-CB-071ID1-CB-072

ID1-CB-073 ID1-CB-074 ID1-CB-075

ID1-CS-030

ID5-RB-001ID5-RB-002 ID5-RB-003 ID5-RB-004

ID5-RB-005 ID5-RB-006

ID5-RB-007 ID5-RB-008 ID5-RB-009 ID5-RB-010

ID5-RB-011

ID5-RB-012ID5-RB-013

ID5-RB-014

ID5-RB-015

ID5-RB-047

ID5-RB-048ID5-RB-049

ID5-RB-050

ID5-RB-051ID5-RB-052

ID5-RB-053 ID5-RB-054 ID5-RB-055 ID5-RB-056

ID5-RB-057ID5-RB-058ID5-RB-059

ID5-RB-060ID5-RB-061

ID5-RB-016

ID5-RB-017

ID5-RB-018

ID5-RB-019

ID5-RB-020

ID5-RB-021

ID5-RB-022

ID5-RB-023

ID5-RB-024

ID5-RB-025

ID5-RB-026

ID5-RB-027

ID5-RB-028

ID5-RB-029

ID5-RB-030

ID5-RB-031

ID5-RB-032

ID5-RB-033

ID5-RB-034

ID5-RB-035

ID5-RB-036

ID5-RB-037

ID5-RB-038

ID5-RB-039

ID5-RB-040

ID5-RB-041

ID5-RB-042

ID5-RB-062ID5-RB-063

ID5-RB-064

ID5-RB-065

ID5-RB-066

ID5-RB-067

ID5-RB-068

ID5-RB-069

ID5-RB-070

ID5-RB-071

ID5-RB-072

ID5-RB-073

ID5-RB-074

ID5-RB-075

ID5-RB-076

ID5-RB-077

ID5-RB-078

ID5-RB-079

ID5-RB-080

ID5-RB-081

ID5-RB-082

ID5-RB-083

ID5-RB-084

ID5-RB-085

ID5-RB-086

ID5-RB-087

ID5-RB-088

ID5-SS-005

ID5-CS-030

ID1-CS-019

ID1-CS-018

ID1-CS-027

ID1-RB-001

ID1-RB-002

ID1-RB-003

ID1-RB-004

ID1-RB-005

ID1-RB-006

ID1-RB-007

ID1-RB-008ID1-RB-009

ID1-RB-010

ID1-RB-011

ID1-RB-012

ID1-SS-002

ID5-CS-007

ID5-

CS-018

ID5-RB-043

ID5-RB-089

ID5-CS-031

ID5-CS-032

CO5 001

CO4 002

CO4 003

CO4 004

CO4 005

CO4 006

CO4 007

CO4 008

CO4 009

CO4 010

CO4 011

CO4 012

CO4 013

ID1-CB-078

ID5-RB-089

CO4 011

CO4 012

CO4 013

CO4 014

CO4 011

26.04 m2

16. 0

ID1-CB-075

Single bedroom

8. 0

ID1-CS-014

Pantry

10. 0

ID1-CS-013

Interview / Counselling Room

16. 0

ID1-CS-012

Dirty utility

16. 0

ID1-CS-011

Dirty utility

32. 0

ID1-CS-010

Day room (20)

14. 0

ID1-CS-009

Clean utility

14. 0

ID1-CS-008

Clean utility

1. 0

ID1-CS-007

Bay - resus trolley

1. 0

ID1-CS-006

Bay - resus trolley

4. 0

ID1-CS-005

Bay - Mobile imaging

4. 0

ID1-CS-004

Bay - hoists

4. 0

ID1-CS-003

Bay - hoists

16. 0

ID1-CB-059

Single bedroom

16. 0

ID1-CS-001

Assisted bathroom

1. 0

ID1-CS-017

Pneumatic tube point

16. 0

ID1-CB-074

Single bedroom

16. 0

ID1-CB-073

Single bedroom

16. 0

ID1-CB-072

Single bedroom

16. 0

ID1-CB-071

Single bedroom

16. 0

ID1-CB-070

Single bedroom

16. 0

ID1-CB-069

Single bedroom

16. 0

ID1-CB-068

Single bedroom

16. 0

ID1-CB-067

Single bedroom

16. 0

ID1-CB-066

Single bedroom

16. 0

ID1-CB-065

Single bedroom

16. 0

ID1-CB-063

Single bedroom

16. 0

ID1-CB-061

Single bedroom

16. 0

ID1-CB-060

Single bedroom

16. 0

ID1-CS-002

Assisted bathroom

8. 0

ID1-SS-004

Staff rest room (5) (incl beverage bay)

6. 0

ID1-CB-001

Assisted WC/Sh en-suite

16. 0

ID1-RB-011

Single bedroom16. 0

ID1-RB-010

Single bedroom

16. 0

ID1-RB-009

Single bedroom

16. 0

ID1-RB-008

Single bedroom

16. 0

ID1-RB-007

Single bedroom

6. 0

ID1-RB-006

Assisted WC/Sh en-suite

6. 0

ID1-RB-005

Assisted WC/Sh en-suite6. 0

ID1-RB-004

Assisted WC/Sh en-suite6. 0

ID1-RB-003

Assisted WC/Sh en-suite6. 0

ID1-RB-002

Assisted WC/Sh en-suite

6. 0

ID1-RB-001

Assisted WC/Sh en-suite

25. 0

ID1-FM-003

FM - Regeneration kitchen

8. 0

ID1-CS-015

Pantry6. 0

ID1-CS-027

Store - Fluids

16. 0

ID1-CB-062

Single bedroom

1. 0

ID1-CS-018

Pneumatic tube point

10. 0

ID1-CS-020

Staff Base - Main

4. 0

ID1-CS-021

Staff Base - Touchdown

4. 0

ID1-CS-022

Staff Base - Touchdown

5. 0

ID1-FM-001

FM - Disposal Hold

12. 0

ID1-CS-026

Store - equipment

5. 0

ID1-CS-030

WC - accessible (unisex)

2. 0

ID1-CS-028

Store - Linen (including linen trolley)

16. 0

ID1-RB-012

Single bedroom

15. 0

ID1-SS-001

MDT office

12. 0

ID1-SS-002

Office - 2 Person (Ward Manager)

16. 0

ID1-SS-003

Seminar/teaching room (10)

4. 0

ID1-CS-016

Patient Property Store

12. 0

ID1-CS-025

Store - equipment

6. 0

ID1-CB-022

Assisted WC/Sh en-suite

6. 0

ID1-CB-028

Assisted WC/Sh en-suite

6. 0

ID1-CB-016

Assisted WC/Sh en-suite

6. 0

ID1-CB-017

Assisted WC/Sh en-suite

6. 0

ID1-CB-018

Assisted WC/Sh en-suite

6. 0

ID1-CB-019

Assisted WC/Sh en-suite

6. 0

ID1-CB-014

Assisted WC/Sh en-suite

6. 0

ID1-CB-021

Assisted WC/Sh en-suite

6. 0

ID1-CB-013

Assisted WC/Sh en-suite

6. 0

ID1-CB-023

Assisted WC/Sh en-suite

6. 0

ID1-CB-077

Assisted WC/Sh en-suite

16. 0

ID1-CB-064

Single bedroom

6. 0

ID1-CB-025

Assisted WC/Sh en-suite

16. 0

ID1-CB-058

Single bedroom

6. 0

ID1-CB-027

Assisted WC/Sh en-suite

6. 0

ID1-CB-020

Assisted WC/Sh en-suite

6. 0

ID1-CB-007

Assisted WC/Sh en-suite

0. 0

ID1-CB-078

Flex Space

6. 0

ID1-CB-002

Assisted WC/Sh en-suite

6. 0

ID1-CB-003

Assisted WC/Sh en-suite

6. 0

ID1-CB-004

Assisted WC/Sh en-suite

6. 0

ID1-CB-005

Assisted WC/Sh en-suite

6. 0

ID1-CB-015

Assisted WC/Sh en-suite

10. 0

ID1-CS-031

Staff Base - Main

6. 0

ID1-CB-026

Assisted WC/Sh en-suite

6. 0

ID1-CB-008

Assisted WC/Sh en-suite

6. 0

ID1-CB-009

Assisted WC/Sh en-suite

6. 0

ID1-CB-010

Assisted WC/Sh en-suite

6. 0

ID1-CB-011

Assisted WC/Sh en-suite

6. 0

ID1-CB-012

Assisted WC/Sh en-suite

16. 0

ID1-CB-076

Single bedroom

6. 0

ID1-CB-006

Assisted WC/Sh en-suite

16. 0

ID1-CB-047

Single bedroom

16. 0

ID1-CB-057

Single bedroom

16. 0

ID1-CB-056

Single bedroom

16. 0

ID1-CB-055

Single bedroom

16. 0

ID1-CB-054

Single bedroom

16. 0

ID1-CB-053

Single bedroom

16. 0

ID1-CB-052

Single bedroom

16. 0

ID1-CB-051

Single bedroom

16. 0

ID1-CB-050

Single bedroom

6. 0

ID1-CB-024

Assisted WC/Sh en-suite

16. 0

ID1-CB-048

Single bedroom

6. 0

ID1-CB-029

Assisted WC/Sh en-suite

16. 0

ID1-CB-046

Single bedroom

16. 0

ID1-CB-045

Single bedroom

16. 0

ID1-CB-044

Single bedroom

6. 0

ID1-CB-033

Assisted WC/Sh en-suite

6. 0

ID1-CB-030

Assisted WC/Sh en-suite

6. 0

ID1-CB-031

Assisted WC/Sh en-suite

16. 0

ID1-CB-049

Single bedroom

6. 0

ID1-CB-032

Assisted WC/Sh en-suite

16. 0

ID1-CB-043

Single bedroom

6. 0

ID1-CB-034

Assisted WC/Sh en-suite

6. 0

ID1-CB-035

Assisted WC/Sh en-suite 6. 0

ID1-CB-037

Assisted WC/Sh en-suite

16. 0

ID1-CB-042

Single bedroom

6. 0

ID1-CB-038

Isolation lobby

16. 0

ID1-CB-039

Single bedroom

16. 0

ID1-CB-040

Single bedroom

16. 0

ID1-CB-041

Single bedroom

6. 0

ID1-CB-036

Assisted WC/Sh en-suite

16. 0

ID5-CS-001

Assisted bathroom

1. 0

ID5-CS-007

Bay - resus trolley

1. 0

ID5-CS-006

Bay - resus trolley

4. 0

ID5-CS-005

Bay - Mobile imaging

4. 0

ID5-CS-004

Bay - hoists

16. 0

ID5-CS-012

Dirty utility

16. 0

ID5-CS-002

Assisted bathroom

14. 0

ID5-CS-008

Clean utility

4. 0

ID5-CS-003

Bay - hoists

16. 0

ID5-RB-082

Single bedroom

6. 0

ID5-RB-012

Assisted WC/Sh en-suite

6. 0

ID5-RB-011

Assisted WC/Sh en-suite

6. 0

ID5-RB-010

Assisted WC/Sh en-suite

6. 0

ID5-RB-009

Assisted WC/Sh en-suite

6. 0

ID5-RB-008

Assisted WC/Sh en-suite

6. 0

ID5-RB-007

Assisted WC/Sh en-suite

6. 0

ID5-RB-006

Assisted WC/Sh en-suite

6. 0

ID5-RB-005

Assisted WC/Sh en-suite

5. 0

ID5-SS-005

WC - Staff (Accessible - Unisex)

8. 0

ID5-SS-004

Staff rest room (5) (incl beverage bay)

16. 0

ID5-SS-003

Seminar/teaching room (10)

16. 0

ID5-RB-069

Single bedroom

16. 0

ID5-RB-083

Single bedroom

6. 0

ID5-RB-015

Assisted WC/Sh en-suite

16. 0

ID5-RB-081

Single bedroom

16. 0

ID5-RB-080

Single bedroom

16. 0

ID5-RB-079

Single bedroom

16. 0

ID5-RB-078

Single bedroom

16. 0

ID5-RB-077

Single bedroom

32. 0

ID5-CS-010

Day room (20)

16. 0

ID5-RB-075

Single bedroom

14. 0

ID5-CS-009

Clean utility

16. 0

ID5-RB-073

Single bedroom

16. 0

ID5-RB-072

Single bedroom

16. 0

ID5-RB-071

Single bedroom

16. 0

ID5-RB-070

Single bedroom

16. 0

ID5-RB-084

Single bedroom

6. 0

ID5-RB-044

Isolation lobby

10. 0

ID5-CS-032

Staff Base - Main

12. 0

ID5-CS-031

Store - equipment

12. 0

ID5-SS-002

Office - 2 Person (Ward Manager)

15. 0

ID5-SS-001

MDT office

16. 0

ID5-RB-088

Single bedroom

16. 0

ID5-RB-087

Single bedroom

16. 0

ID5-RB-086

Single bedroom

16. 0

ID5-RB-085

Single bedroom

16. 0

ID5-RB-052

Single bedroom

16. 0

ID5-RB-051

Single bedroom

16. 0

ID5-RB-050

Single bedroom

16. 0

ID5-RB-049

Single bedroom

6. 0

ID5-RB-013

Assisted WC/Sh en-suite

16. 0

ID5-RB-047

Single bedroom

6. 0

ID5-RB-014

Assisted WC/Sh en-suite

6. 0

ID5-RB-042

Assisted WC/Sh en-suite

6. 0

ID5-RB-041

Assisted WC/Sh en-suite

6. 0

ID5-RB-040

Assisted WC/Sh en-suite

6. 0

ID5-RB-039

Assisted WC/Sh en-suite

6. 0

ID5-RB-038

Assisted WC/Sh en-suite

6. 0

ID5-RB-037

Assisted WC/Sh en-suite

6. 0

ID5-RB-020

Assisted WC/Sh en-suite

6. 0

ID5-RB-019

Assisted WC/Sh en-suite

6. 0

ID5-RB-018

Assisted WC/Sh en-suite

6. 0

ID5-RB-017

Assisted WC/Sh en-suite

6. 0

ID5-RB-016

Assisted WC/Sh en-suite

16. 0

ID5-RB-074

Single bedroom

16. 0

ID5-RB-048

Single bedroom

6. 0

ID5-CS-027

Store - Fluids

6. 0

ID5-RB-025

Assisted WC/Sh en-suite

16. 0

ID5-RB-068

Single bedroom

6. 0

ID5-RB-023

Assisted WC/Sh en-suite

16. 0

ID5-RB-076

Single bedroom

6. 0

ID5-RB-021

Assisted WC/Sh en-suite

6. 0

ID5-RB-004

Assisted WC/Sh en-suite

6. 0

ID5-RB-003

Assisted WC/Sh en-suite

6. 0

ID5-RB-002

Assisted WC/Sh en-suite

6. 0

ID5-RB-001

Assisted WC/Sh en-suite

25. 0

ID5-FM-003

FM - Regeneration kitchen

5. 0

ID5-FM-002

FM - Domestic/Cleaners room

5. 0

ID5-FM-001

FM - Disposal Hold

5. 0

ID5-CS-030

WC - accessible (unisex)

6. 0

ID5-RB-026

Assisted WC/Sh en-suite

1. 0

ID5-C

S-0

18

Pneu

matic tu

be p

oint

16. 0

ID5-CS-011

Dirty utility

0. 0

ID5-RB-089

Flex Space

10. 0

ID5-CS-013

Interview / Counselling Room

8. 0

ID5-CS-014

Pantry

8. 0

ID5-CS-015

Pantry

2. 0

ID5-CS-029

Store - Linen (including linen trolley)

1. 0

ID5-CS-017

Pneumatic tube point

2. 0

ID5-CS-028

Store - Linen (including linen trolley)

10. 0

ID5-CS-020

Staff Base - Main

4. 0

ID5-CS-021

Staff Base - Touchdown

4. 0

ID5-CS-022

Staff Base - Touchdown

12. 0

ID5-CS-025

Store - equipment

12. 0

ID5-CS-026

Store - equipment

6. 0

ID5-RB-024

Assisted WC/Sh en-suite

4. 0

ID5-CS-016

Patient Property Store

16. 0

ID5-RB-061

Single bedroom

16. 0

ID5-RB-054

Single bedroom

6. 0

ID5-RB-027

Assisted WC/Sh en-suite

16. 0

ID5-RB-056

Single bedroom

6. 0

ID5-RB-022

Assisted WC/Sh en-suite

16. 0

ID5-RB-058

Single bedroom

16. 0

ID5-RB-053

Single bedroom

16. 0

ID5-RB-060

Single bedroom

16. 0

ID5-RB-055

Single bedroom

16. 0

ID5-RB-062

Single bedroom

16. 0

ID5-RB-063

Single bedroom

16. 0

ID5-RB-064

Single bedroom

16. 0

ID5-RB-065

Single bedroom

16. 0

ID5-RB-066

Single bedroom

16. 0

ID5-RB-067

Single bedroom

16. 0

ID5-RB-059

Single bedroom

6. 0

ID5-RB-032

Assisted WC/Sh en-suite

6. 0

ID5-RB-028

Assisted WC/Sh en-suite

6. 0

ID5-RB-029

Assisted WC/Sh en-suite

16. 0

ID5-RB-057

Single bedroom

6. 0

ID5-RB-031

Assisted WC/Sh en-suite

6. 0

ID5-RB-036

Assisted WC/Sh en-suite

6. 0

ID5-RB-033

Assisted WC/Sh en-suite

6. 0

ID5-RB-035

Assisted WC/Sh en-suite

6. 0

ID5-RB-034

Assisted WC/Sh en-suite

6. 0

ID5-RB-030

Assisted WC/Sh en-suite

0. 0

CO4 008

Corridor

0. 0

CO4 013

Corridor

0. 0

CO4 012

Corridor

0. 0

CO4 011

Corridor

0. 0

CO4 009

Corridor

0. 0

CO4 005

Corridor

0. 0

CO4 007

Corridor

0. 0

CO4 001

Corridor

0. 0

CO4 002

Corridor

0. 0

CO4 003

Lift Lobby

0. 0

CO4 004

Corridor

0. 0

CO4 006

Corridor

0. 0

CO4 010

Lift Lobby

LIFT 7

BED

LIFT 8

BED

LOBBY

LOBBY

STAIR 2

STAIR 3

LOBBY

14

LIFT

LIFT 1

BED

LIFT 2

BED

LOBBY

STAIR 1

LOBBY

LIFT 5

FM

LIFT 6

FM

STAIR 4

LOBBY

15

LIFT

LIFT 12

FM

LIFT 13

FM

LIFT 11

PUBLIC

LIFT 3

PUBLIC

LIFT 4

PUBLIC

LIFT 10

PUBLIC

Page 4: pss update

Hermanus Hospital Upgrade

Purpose of the Drawing (Slab-edge detail changes)

The details are slab edge details for the extension of the hospital in Hermanus. The

extension would require excavation of the ground as part of the new structure

would be below ground level. The structural system consists of column and concrete

beams. The difference in height required the use of retaining walls. These would

have a facebrick exterior which would match the existing elevational treatment for

the existing hospital. The original plinth wall detail required the use of a plinth

header brick to conceal the structural columns below ground level.

However, due to cost considerations, the structure was revised from 280 x 280

columns to 230 x 230 columns that are in-set by 1 skin of brickwork. This change was

also brought about as a means of simplifying the plinth wall detail and migrating the

need for a plinth header brick.

Page 5: pss update

24750

Ground Floor

22395

Top of foundation

GL Varies

1 : 10

Typical Slab Edge DetailD1

NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANY OTHERBRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVAL OF THEPROJECT LEADER.

THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY. CHECKALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING ANY WORK.ALL DRAWINGS TO BE READ IN CONJUNCTION WITH DETAILS, SCHEDULES,DRAINAGE DRAWINGS, INTERNAL ELEVATIONS, ENGINEERS AND OTHERSPECIALIST'S DRAWINGS.

REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THE PROVINCIALGOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

WH/3/53/1-A

Typical Slab Edge Detail

A-401/01 C2

Page 6: pss update

24750

Ground Floor

22395

Top of foundation

1 : 10

Level Threshold DetailD2

NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANY OTHERBRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVAL OF THEPROJECT LEADER.

THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY. CHECKALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING ANY WORK.ALL DRAWINGS TO BE READ IN CONJUNCTION WITH DETAILS, SCHEDULES,DRAINAGE DRAWINGS, INTERNAL ELEVATIONS, ENGINEERS AND OTHERSPECIALIST'S DRAWINGS.

REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THE PROVINCIALGOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

WH/3/53/1-A

Typical Level Threshold Detail

A-401/02 C2

Page 7: pss update

1 : 10

Shopfront Threshold DetailD4

NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANY OTHERBRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVAL OF THEPROJECT LEADER.

THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY. CHECKALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING ANY WORK.ALL DRAWINGS TO BE READ IN CONJUNCTION WITH DETAILS, SCHEDULES,DRAINAGE DRAWINGS, INTERNAL ELEVATIONS, ENGINEERS AND OTHERSPECIALIST'S DRAWINGS.

REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THE PROVINCIALGOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

WH/3/53/1-A

ShopfrontSill & Threshold Detail

A-401/04 C2

1 : 5

Shopfront Sill DetailD4a

Page 8: pss update

Hermanus Hospital Upgrade

Purpose of the Drawing (Joinery detail changes)

The first joinery details drawn up were modeled on existing fitted furniture done on

a previous project for a hospital in Nelspruit. This was the sent to the client

(Department of Works) who then sent it back with changes regarding material

specifications, heights and widths. These were then re-drawn according to their

preferences and budget.

Page 9: pss update

SE

CTI

ON

A-A

SE

CTI

ON

B-B

SE

CTI

ON

A

SE

CTI

ON

B

PLAN SECTION 1

ELEVATION 1

ELEVATION 3

ELE

VA

TIO

N 2

ELE

VA

TIO

N 4

PLAN SECTION 2

32mm composite MDFlaminated worktop. Colour TBC

50mm Ï chrome plated tubularleg with fixing plate top & bottomfixed to underside of worktop andscrew fixed to floor.

700 x 450mm built inlockable pedestal unit.Solid colour laminate.Colour TBC

600 x 450mm built in lockablepedestal unit. Solid colourlaminate. Colour TBC

12mm SupaLam Super WhiteMDF board fixed both sides to75x38mm timber frame. ColourTBC

80mm Ï hole to receive pvcgromet to form cable port. PositionTBC.

PLAN SECTION 1

PLAN SECTION 2

PLANELEVATION 1

ELEVATION 3

ELEVATION 2

ELEVATION 4

SECTION A

SECTION B

12mm SupaLam Super WhiteMDF board fixed both sides to75x50mm timber frame. ColourTBC

Built in pigeon hole storage unitsunder writing shelf. Laminatedparticle board. Colour TBC

DS

JOINERY DETAILS

2010/07/14 1:20

NURSE BASE STATION

C3DateRev Revision Notes

50mm Ï chrome plated tubularleg with fixing plate top & bottomfixed to underside of worktop andscrew fixed to floor.

Worktop over

Writing shelf over

Writ

ing

shel

f ove

r

Worktop over

32mm composite MDFlaminated worktop upstand.Colour TBC

32mm composite MDFlaminated worktop. Colour TBC

32mm composite MDF laminatedwriting shelf. Colour TBC

A 402 - 01

FOR CONSTRUCTION

110111C1 ISSUED FOR CONSTRUCTION

GM

110304C2 UPDATED TO REFLECT CLIENT CHANGES

FOR NURSE BASE STATION SPECIFICATION REFER TODOCUMENT: A-510-01-L60CLAUSE: 321A

110309C3 ISSUED FOR CONSTRUCTION

Natural Aluminium laminatefinish to form kickplate

Laminated particle board openshelving with vertical supportboards. Colour TBC

Page 10: pss update

12mm SupaLam Super White MDFboard fixed both sides to 75x38mm

timber frame. Colour TBC

12mm SupaLam Super White MDFboard fixed both sides to 75x38mm

timber frame. Colour TBC

12mm Surrino on 32mmhardboard prefabricated worktop

as per manufacturer'sspecification. Colour TBC

BULKHEAD TO DETAIL BULKHEAD TO DETAIL

BULKHEAD TO LATER DETAIL

SUSPENDEDCEILING

SUSPENDEDCEILING

DS

JOINERY DETAILS

2010/07/14 1:20

MAIN RECEPTION DESK

C3

DateRev Revision Notes

SECTION R1 SECTION R2 SECTION R3

SE

CTI

ON

R1

SECTION R3

SE

CTI

ON

R1

SE

CTI

ON

R2

SE

CTI

ON

R2

50mm Ï chrome plated tubularleg with fixing plate top & bottomfixed to underside of worktop andscrew fixed to floor.

SECTION R3

12mm SupaLam Super White MDFboard fixed both sides to 75x38mmtimber frame. Colour TBC

80mm Ï hole to receive pvcgromet to form cable port.Position TBC.

Built in pigeon hole storage unitsunder writing shelf. Laminatedparticle board. Colour TBC

FEATURE WALL. FINISH TBC

LINE OF BULKHEAD ABOVE

PLAN SECTION 1

PLAN SECTION 2

FRONT ELEVATION

PLAN SECTION 2

Concrete column with plasterfinish. Colour TBC

Concrete column withplaster finish. ColourTBC

Concrete column withplaster finish. ColourTBC

Concrete column with plasterfinish. Colour TBC

Roller Shutter doorRoller shutter door

Writing shelf over

Writ

ing

shel

f ove

r

Worktop over

Natural Aluminium laminatefinish to form kickplate

Natural Aluminium laminatefinish to form kickplate

Natural Aluminium laminatefinish to form kickplate

A 402 - 02

RECORDS AND RECEPTION

50mm Ï chrome plated tubularleg with fixing plate top & bottomfixed to underside of worktop andscrew fixed to floor.

Roller Shutter door Roller Shutter door

110111C1 ISSUED FOR CONSTRUCTION

FOR CONSTRUCTION

GM

DB-REC-16B

UPDATED TO REFLECT CLIENT CHANGES110304C2

DB-REC-16A

DB-REC-16A

FOR MAIN RECEPTION DESK SPECIFICATION REFER TODOCUMENT: A-510-01-L60CLAUSE: 320A

12mm Surrino on 32mmhardboard prefabricated worktop

as per manufacturer'sspecification. Colour TBC

12mm Surrino on 32mm hardboardprefabricated worktop as permanufacturer's specification.

Colour TBC

12mm Surrino on 32mmhardboard prefabricated worktopas per manufacturer'sspecification. Colour TBC

DB-REC-16A

110309C3 ISSUED FOR CONSTRUCTION

Page 11: pss update

DS

JOINERY DETAILS

2010/11/05 1:20

SECURITY/PORTER DESK

C3DateRev Revision Notes

A 402 - 07C1

ELEVATION 1

PLAN SECTION 1

PLAN SECTION 2

PLAN SECTION 1

PLAN SECTION 2

PLAN SECTION 1

PLAN SECTION 2

PLAN SECTION 1

PLAN SECTION 2

32mm composite MDF laminatedworktop. Colour TBC

12mm SupaLam Super White MDFboard fixed both sides to 75x50mm

timber frame. Colour TBC

Natural Aluminium laminatefinish to form kickplate

SE

CTI

ON

S2

SECTION S1

SECTION S1

SECTION S2

12mm SupaLam Super WhiteMDF board fixed both sides to75x50mm timber frame. ColourTBC

32mm composite MDFlaminated worktop. Colour TBC

Natural Aluminium laminatefinish to form kickplate

SE

CTI

ON

S2

SECTION S1

600 x 450mm built inlockable pedestal unit.Solid colour laminate.Colour TBC

Wor

ktop

ove

r

Wor

ktop

ove

r

Writing shelf overW

ritin

g sh

elf o

ver Built in pigeon hole storage units

under writing shelf. Laminatedparticle board. Colour TBC

PLAN SECTION 2PLAN SECTION 1

ELE

VA

TIO

N 1

ELEVATION 2

ELE

VA

TIO

N 1

ELEVATION 2

ELEVATION 2

FOR CONSTRUCTION

Gromlet

110304C2110111 ISSUED FOR CONSTRUCTION

UPDATED TO REFLECT CLIENT CHANGES

FOR SECURITY PORTERS DESK SPECIFICATION REFER TODOCUMENT: A-510-01-L60CLAUSE: 321B

110309C3 ISSUED FOR CONSTRUCTION

Page 12: pss update

Hermanus Hospital Upgrade

Purpose of the Drawing (Access Hatch Details)

The access hatch was required for the ceiling. The Project Architect assigned me to

do the detail of the access panel. The information I had was that the ceiling panels

were 600 x 600mm and I was to make provision for the access panel to be 1200 x

600mm in order not to change the current ceiling grid in place. Above the access

panel, a shutterboard walkway was to be included. I then produced 2 plans, one with

the walkway support and the other with the overall walkway as well as 2 sections.

Page 13: pss update

1 : 20

Plan Section 13

NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANY OTHERBRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVAL OF THEPROJECT LEADER.

THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY. CHECKALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING ANY WORK.ALL DRAWINGS TO BE READ IN CONJUNCTION WITH DETAILS, SCHEDULES,DRAINAGE DRAWINGS, INTERNAL ELEVATIONS, ENGINEERS AND OTHERSPECIALIST'S DRAWINGS.

REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THE PROVINCIALGOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

WH/3/53/1-A

Detail NO3 Ceiling AccessHatch Plans

A-411-04 C1

FOR CONSTRUCTION

1 : 20

Plan Section 24

Page 14: pss update

1 : 10

Section A - A1

NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANY OTHERBRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVAL OF THEPROJECT LEADER.

THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY. CHECKALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING ANY WORK.ALL DRAWINGS TO BE READ IN CONJUNCTION WITH DETAILS, SCHEDULES,DRAINAGE DRAWINGS, INTERNAL ELEVATIONS, ENGINEERS AND OTHERSPECIALIST'S DRAWINGS.

REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THE PROVINCIALGOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

WH/3/53/1-A

Detail NO3 Ceiling AccessHatch Sections

A-411-03 C1

FOR CONSTRUCTION

1 : 10

Section B - B2

Page 15: pss update

Hermanus Hospital Upgrade

Purpose of the Drawing (Operating Theatre void plan)

This drawing was done for a roof void over the Operating Theatre where equipment

will be stored. The project architect asked me to make provision for a walkway to

allow access to the piece of equipment. The walkway would consist of shutterboard

fixed onto the trusses. I was asked to produce 2 plan drawings, 1 with the walkway

support and 1 with the positioning of the equipment and the walkway.

Page 16: pss update

E1 E2

EC

EB

EA

5862

6258

1020

1020

1020

1020

790

230

975

230

1200

1200

1200

2058

3020 X 1200 X 19mm Shutter Board

3000 X 1200 X 19mm Shutter Board

3000 X 1020 X 19mm Shutter Board

18

0018

00

Clash of Structure and Services

Lights

E1 E2

EC

EB

EA

5862

6258

1212

0

B3

1800

1800

740 1000 1000 1000 1000 1000

5658

6089

630 2302

1 : 100

RV Plan Section 11

NOTES:THE USE OF TRADE NAMES ON THIS DRAWING SIMPLY SERVES TOINDICATE A STANDARD ACCEPTABLE TO THE DEPARTMENT, ANY OTHERBRAND MAY BE USED WITH THE PRIOR WRITTEN APPROVAL OF THEPROJECT LEADER.

THE CONTRACTOR MUST WORK FROM FIGURED DIMENSIONS ONLY. CHECKALL DIMENSIONS AND LEVELS ON SITE BEFORE COMMENCING ANY WORK.ALL DRAWINGS TO BE READ IN CONJUNCTION WITH DETAILS, SCHEDULES,DRAINAGE DRAWINGS, INTERNAL ELEVATIONS, ENGINEERS AND OTHERSPECIALIST'S DRAWINGS.

REFER CONFLICTING INFORMATION TO THE ARCHITECT AND OTHERRESPONSIBLE CONSULTANTSTHE DESIGN ON THIS DRAWING IS THE PROPERTY OF THE PROVINCIALGOVERNMENT: WESTERN CAPE- BRANCH WORKS ANDCOPY RIGHT IS RESERVED

WH/3/53/1-A

Operating TheatreCeiling and Roof Void Plans

A-231-05 C1

FOR COORDINATION

1 : 100

RV Plan Section 22

Page 17: pss update

NOAH Property and Conditions Survey

Purpose of the Drawing

The drawings were done for an organization called NOAH which provides homes for

independent elderly people. The organization needs to raise funds from the

government and other private sponsors, therefore to acquire the funding they

required a survey of their homes. These would then be what they would use as a

basis for proposals for their funds.

As part of the report/survey, the following was required:

o Floor Plan

o Roof Plan

o Sections

o Elevations

o Site Plan

o Fire Evacuation Plan for each room

o Conditions Survey

o Schedule of Works (document reference and drawing)

o A photographic record

I was tasked to produce the above information for the first property in Fairview,

Woodstock.

Page 18: pss update

NA(SA)_PR_0009NOAH Property and Conditions Surveys

Project: Property & Conditions SurveysClient: Neighbourhood Old Age homesDate: 6th April 2011

List of Deliverables Per Property

1 Floor Plans General arrangement plan giving overall room dimensions and areas, room names, location of power outlets, services and sanitary appliences (Check if furniture layouts are required).

2 Elevations Stating materials and significant dimensions

3 Sections Generally 2, but depends on complexity of property. Stating ceiling heights and window head & cill heights

4 Site Plan Showing boundary, distance to boundary, length of boundaries, major features of site, roof plan, orientation, road name, location diagram

5 Fire Evacuation Plan Showing location of fire exits, location of fire fighting equipment, telephone numbers

6 Conditions Survey Written report document with accompanying plans/elevations to indicate location of defect.

7 Schedule of Works List of work requried on property as identified by conditions survey

8 Photographic Record Photographs of inside and outside of property, numbered and referenced onto plans/elevations for ease of reference.

9 Report Final document incorporating all of above preferable in A4 format.

4/6/2011

Page 19: pss update

Status

Drawing Title

Scale@A3

Drawing No Rev

Origin

Client

Contractor

Project

www.nightingaleassociates.com

Job No Date (Year/Month)

Zone TypeLevel Content Sequential

Rev Date Revision Notes

Notes:Dimensions are not to be scaled from this drawing, all discrepancieson this drawing are to be reported to the architectThis drawing is copyright.Do not modify any element of this CAD drawing.Drawing only to be used for the purposes it was issued for.

No Design Risk Register

Page 20: pss update

Status

Drawing Title

Scale@A3

Drawing No Rev

Origin

Client

Contractor

Project

www.nightingaleassociates.com

Job No Date (Year/Month)

Zone TypeLevel Content Sequential

Rev Date Revision Notes

Notes:Dimensions are not to be scaled from this drawing, all discrepancieson this drawing are to be reported to the architectThis drawing is copyright.Do not modify any element of this CAD drawing.Drawing only to be used for the purposes it was issued for.

No Design Risk Register

Page 21: pss update

Status

Drawing Title

Scale@A3

Drawing No Rev

Origin

Client

Contractor

Project

www.nightingaleassociates.com

Job No Date (Year/Month)

Zone TypeLevel Content Sequential

Rev Date Revision Notes

Notes:Dimensions are not to be scaled from this drawing, all discrepancieson this drawing are to be reported to the architectThis drawing is copyright.Do not modify any element of this CAD drawing.Drawing only to be used for the purposes it was issued for.

No Design Risk Register

Page 22: pss update

Project Title: PR_0009

Client:

House Name:

Address:

18/04/2011

1.0 Generally

1.1

2.0 Entrance Hall

2.1

2.2

2.3

3.0 Bedroom 1

3.1

3.2

3.3

3.4

5.0 Bedroom 2

5.1

Add 1 double socket and cleaners socket.

Add 1 double socket and cleaners socket.

Rewire entire house to bring electrical services in line with current

regulations and obtain certification. Work to include:

i. Wiring to be replaced and recessed.

ii. Additional sockets required in all rooms to avoid the use of

extension cables.

iii. Redundant switches and sockets to be removed.

Proj No:NOAH Property and Conditions Surveys

Neighbourhood Old Age Homes

Fairview House

46 Fairview Avenue, Woodstock, Cape Town.

Date:Schedule of Works

Install skirting to match existing profile where missing and

decorate.

Hack off plaster affected by damp (after dpc installed) replaster and

paint to match existing.

Brick up unused doorway with single brick thick wall, remove

timber architrave, plaster, install new skirting to match existing

profile and paint to match existing.

Make good to damaged areas to decoration around public

telephone.

Remove redundant telephone point and associated wiring and

make good.

Refurbish existing windows to ensure all opening lights are in

working order.

2011/06/10_110421_Schedule of Works-Fairview House 1

Page 23: pss update

6.0 Lounge

6.1

6.2

6.3

6.4

6.5

7.0 Bedroom 3

7.1

7.2

7.3

8.0 Kitchen

8.1

8.2

8.3

8.4

8.5

8.6

8.7

8.8

8.9

Patch hole in plasterboard ceiling, skim and paint.

Add double socket and single cleaners socket and relocate existing

in accessible position away from fitted cupboards.

Reglaze glazing to existing sash window with opaque glass for

privacy purposes.

Add 2no. Double sockets and 1no. Cleaners socket.

Clean shade for fluorescent lamp fitting.

Remove redundant telephone point and associated wiring and

make good to disturbed decoration.

Remove redundant doorbell chime and associated wiring and make

good to disturbed decoration.

Sand down floorboards and revarnish.

Take down and remove existing cupboards and sink unit.

Remove existing vinyl floor tiles

Remove existing ceramic wall tiles.

Rewire to provide new connection for electric cooker and minimum

3no. Double sockets above worktop height and 1no. Single cleaners

socket.

Install mechanical extract with switched spur.

Repair crack in concrete floor by threshold and apply self levelling

screed to floor to receive new vinyl sheet flooring.

Make good to plastered walls and paint.

Install new stainless steel kitchen sink with double bowl and double

drainer including hot and cold water supply to swivel neck mixer

tap with lever handles.

Install new floor & wall mounted kitchen units and along one wall

and floor mounted units under sink, including worktops.

2011/06/10_110421_Schedule of Works-Fairview House 2

Page 24: pss update

8.10

8.11

9.0 Bathroom

9.1

9.2

9.3

9.4

9.5

9.6

9.7

9.8

9.9

9.10

9.11

9.12

9.13

9.14

Apply new ceramic wall tiles, 2 rows high, over worktops and down

to floor level behind cooker & fridge space.

Replace warped door with similar and varnish.

Take down and remove all ceramic tiles. Retain ceramic soap

dishes for re-use.

Take up vinyl floor tiles and remove.

Remove existing toilet cistern and replace with new water saving

cistern.

Rewire light switch to location outside bathroom or replace with

ceiling mounted pull chord, install mechanical extract fan linked to

light switch, and supply shaving socket.

Reglaze window facing yard with opaque glazing. Partially brick up

window facing side ally and install new window with opaque glazing

to suit new opening size.

Remove steel bracket.

Re-route pipework and blank off various pipes and wires protruding

from walls.

Plumb in washing machine and provide flexible drainage connection

to outlet.

Replace timber architrave were rotten (and frame if necessary) to

match existing. Ease door to prevent sticking. Install bathroom

indicator lock.

Take up and remove existing floor tiles to shower, replace shower

drain and re-tile.

Replace all taps with lever style for ease of use.

Make good to plastered walls and paint.

Apply self levelling screed to floor to receive new vinyl sheet

flooring.

Install ceramic wall tiles to 3 sides of shower to height of 2m, and 2

rows to form splash back above washand basin and 3 sides of bath.

2011/06/10_110421_Schedule of Works-Fairview House 3

Page 25: pss update

9.15

10.0 Kitchen Stoep

10.1

10.2

10.3

11.0 Bedroom 4

11.1

11.2

11.3

12.0 Bedr'm 4 Annex

12.1

12.2

12.3

12.4

12.5

13.0 WC

13.1

13.2

13.3

13.4

Install stainless steel grab rails to shower and long wall adjacent to

bath, and a shower seat to shower.

Repaint concrete floor.

Recommend installation of insulation and plasterboard below roof

sheeting to prevent build up of heat.

Add double socket, and mechanical extract if space to continue as

cooking area.

Hack off plaster from outer walls to an agreed height and once

damp proof course installed re-plaster and paint.

Remove timber architraves and frame, make good to plasterwork,

install new timber shelving and paint.

Remove redundant light switch and rewire to recess wiring and add

1no. Double socket and 1no. single cleaners socket.

Brick up opening into WC, plaster and paint.

Lay concrete floor to match level of remaining bedroom.

Take out sink, cupboards, associated pipework and drainage and

ceramic wall tiles. Make good to plasterwork and paint.

Add double socket.

Hack off plaster from outer walls to an agreed height and once

damp proof course installed re-plaster and paint.

Replace leaking cistern with smaller cistern with dual flush

mechanism to preserve water.

Install washand basin with lever style tap.

Hack off plaster from outer walls to an agreed height and once

damp proof course installed re-plaster and paint.

Rewire to switch light separately from Kitchen Stoep light.

2011/06/10_110421_Schedule of Works-Fairview House 4

Page 26: pss update

13.5

14.0 Yard

14.1

14.2

15.0 Front Stoep

15.1

15.2

15.3

16.0 External Areas

16.1

16.2

16.3

16.4

16.5

16.6

16.7

16.8

Repaint concrete floor.

Install sensor to operate light fitting or remove light fitting.

Paint concrete floor.

Repair cracks in concrete step and repaint concrete floor.

Adjust hinges to security gate on main entrance to prevent sticking.

Cut back rotting timber beam and splice in new section. Paint to

match existing.

Install damp proof course to all external walls.

Replace timber gate to rear of ally on South side of property.

Remove any redundant wiring and make good to plasterwork.

Repair hairline cracks in render.

Remove old metal angle attached to wall on North elevation and

make good to plasterwork.

Make good joint in soffit board on North Elevation.

Replace sections of down pipes where missing end sections on

North elevation.

Replace concrete posts to boundary fence at rear of ally to North

side of property. (Client to confirm if this wall is their

responsibility).

Remove debris from ally on south side of property.

2011/06/10_110421_Schedule of Works-Fairview House 5

Page 27: pss update

Status

Drawing Title

Scale@A3

Drawing No Rev

Origin

Client

Contractor

Project

www.nightingaleassociates.com

Job No Date (Year/Month)

Zone TypeLevel Content Sequential

Rev Date Revision Notes

Notes:Dimensions are not to be scaled from this drawing, all discrepancieson this drawing are to be reported to the architectThis drawing is copyright.Do not modify any element of this CAD drawing.Drawing only to be used for the purposes it was issued for.

No Design Risk Register

Page 28: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 29: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 30: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 31: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 32: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Page 33: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Page 34: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Page 35: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 36: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 37: pss update

E X I T

E X I T

E X

I T

MUSTER POINT

E X I T

Fire Extinguisher

Smoke Detector

Break Glass Key Holder Unit

Fire Escape

Page 38: pss update

NOAH Property and Conditions Survey

Purpose of the Drawing (Possible development options)

The rooms were measured up and fell short of the required areas for each room

required for the elderly people. Due to this, myself and the project architect assisting

me came up with new designs that we could prepare for the organization.

Page 39: pss update

Status

Drawing Title

Scale@A3

Drawing No Rev

Origin

Client

Contractor

Project

www.nightingaleassociates.com

Job No Date (Year/Month)

Zone TypeLevel Content Sequential

Rev Date Revision Notes

Notes:Dimensions are not to be scaled from this drawing, all discrepancieson this drawing are to be reported to the architectThis drawing is copyright.Do not modify any element of this CAD drawing.Drawing only to be used for the purposes it was issued for.

No Design Risk Register